Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i....

37
1 Explanatory Notes for Preparation of District Disaster Management Plan (DDMP) As a supplement to the DDMP framework issued by NDMA, these explanatory notes on the preparation of DDMP provide a guide to risk-informed planning and decision making to help planners examine hazards or threats and produce integrated, coordinated and synchronized plans. When accomplished properly, planning provides a methodical way to engage all stakeholders in thinking through the life cycle of a potential crisis, determining required capabilities and establishing a framework for roles and responsibilities, taking end objectives into consideration. This guide is designed to help planners navigate the planning process through a mix of ―instructions describing the content that each section might contain and some sample contents‖ for sections defined in DDMP framework. This Guide recognizes that many districts across the country have already developed DDMPs that address various emergency management operations. Therefore, this document suggests that the next act of all DDMP is to follow these notes and framework. This guide also recognises that different districts face different hazards and the resources available are not uniform. Hence, this may be used as a framework and not as a template. Suitable changes, as required, may be made in the contents.

Transcript of Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i....

Page 1: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

1

Explanatory Notes for Preparation of

District Disaster Management Plan (DDMP)

As a supplement to the DDMP framework issued by NDMA, these explanatory notes on the

preparation of DDMP provide a guide to risk-informed planning and decision making to help

planners examine hazards or threats and produce integrated, coordinated and synchronized plans.

When accomplished properly, planning provides a methodical way to engage all stakeholders in

thinking through the life cycle of a potential crisis, determining required capabilities and

establishing a framework for roles and responsibilities, taking end objectives into consideration.

This guide is designed to help planners navigate the planning process through a mix of

―instructions describing the content that each section might contain and some sample contents‖

for sections defined in DDMP framework.

This Guide recognizes that many districts across the country have already developed DDMPs

that address various emergency management operations. Therefore, this document suggests that

the next act of all DDMP is to follow these notes and framework. This guide also recognises that

different districts face different hazards and the resources available are not uniform. Hence, this

may be used as a framework and not as a template. Suitable changes, as required, may be made

in the contents.

Page 2: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

2

CHAPTER I:

INTRODUCTION

Describe unique features of district under consideration with statements on hazards and their

impacts on life and property.

Give / elaborate appropriate information in the following subsections:

i. District Profile (Socio, economic, demographic, geographic, critical

infrastructures, key resources)

ii. District Administrative Set up

iii. District Population profile

It is already recognised that it is possible to take preventive, mitigation, preparedness measures

along with the capacity building of the stakeholders so that the negative impact of a disaster can

be minimized. Hence, there is a need for good planning.

Under the DM Act 2005, it is mandatory on the part of District Disaster Management Authority

(DDMA) to adopt a continuous and integrated process of planning, organizing, coordinating and

implementing measures which are necessary and expedient for prevention as well as mitigation

of disasters. These processes are to be incorporated in the developmental plans of the different

departments and preparedness to meet the disaster and relief, rescue and rehabilitation thereafter,

so as to minimize the loss to be suffered by the communities and are to be documented so that it

is handy and accessible to the general public.

1.1 Objectives and Goal of the Plan:

Section 31 of Disaster Management Act 2005 (DM Act), makes it mandatory to have a

disaster management plan for every district. DDMP shall include Hazard Vulnerability Capacity

and Risk Assessment (HVCRA), prevention, mitigation, preparedness measures, response plan

and procedures. An indicative list with possible plan objectives is given below:

i. To identify the areas vulnerable to major types of the hazards in the district.

ii. To adopt proactive measures at district level by all the govt. departments to

preventdisaster and mitigate its effects. iii. To define and assign the different tasks and responsibilities to stakeholders during the

pre-disaster and post-disaster phases of the disaster.

iv. To enhance disaster resilience of the people in the district by way of capacity

building.

v. Reduce the loss of public and private property, especially critical facilities and

infrastructure, through proper planning.

vi. Manage future development to mitigate the effect of natural hazards in the district.

vii. To set up an Emergency Operations Centre at the District level to function effectively

in search, rescue, response.

viii. To develop the standardized mechanism to respond to disaster situation to manage the

disaster efficiently.

Page 3: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

3

ix. To set up an early warning system so as to prepare the community to deal with the

disaster and responsive communication system based upon fail-proof proven

technology.

x. To prepare a response plan based upon the guidelines issued in the State Disaster

Management Plan so as to provide prompt relief, rescue and search support in the

disaster affected areas.

xi. To adopt disaster resilient construction mechanism in the district by way of using

Information, Education and Communication for making the community aware of the

need of disaster resilient future development.

xii. To make the use of media in disaster management.

xiii. Rehabilitation plan of the affected people and reconstruction measures to be taken by

different govt. departments at district level and local authority.

The District Disaster Management Plan (DDMP) is the guide for achieving the objective i.e.

mitigation, preparedness, response and recovery. This Plan needs to be prepared to respond

to disasters with sense of urgency in a planned way to minimize human, property and

environmental loss.

1.2 Scope of the Plan:

The scope of this plan, the entities (e.g., departments, agencies, PRIs, ULBs, private sector,

NGOs, citizens) and geographic areas to which the plan applies need to be stated explicitly

with identified role and responsibilities. The purpose statement need not be complex but

should include enough information to establish the direction for the plan. The scope should

include all disaster phases (Prevention, Preparedness, Mitigation, Response and Recovery),

hazards addressed, area / district etc.

1.3 Authority and Reference:

Mention - references that form the legal basis for actions outlined in this Plan is in

accordance with Sections 31 and 32 of the DM Act 2005. Include and cite the legal and

administrative basis for evolution of the Plan and implementing DDMP including:

i. Laws & Statutes

ii. Executive Orders / Rules

iii. Regulations

iv. Formal agreement (MoU) – with utility service agencies, telecom service providers,

manufacturers of different emergency resources etc.

1.4 Plan Development:

Steps in a collaborative planning process include – formation of team, understanding hazards,

vulnerabilities and risk in the district, plan development (develop and analyse course of

action, identify resources, identify information needs), plan preparation (write, review,

approve and disseminate), plan implementation and maintenance (exercise, review, revise

and maintain).

Planning Team:

There is no fixed format / composition for planning team, but integrating Emergency Service

Function agencies into planning team would be useful.

Page 4: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

4

An ideal team could be as given below -

i. District Magistrate / District Collector (Chairperson)

ii. Elected member of the district

iii. DEOC coordinator / Manager (nominate him/her as plan coordinator)

iv. District Fire Chief

v. Head of the Primary agency supervising each ESF (Telecom, Public health,

Agriculture, Power, Transport, Education, PWD, Food and civil supplies, Water

supply and sanitation, Law and order, Information / Media)

vi. Representatives from central agencies located in / around the district (Army/Navy/Air

Force, Coast Guard, Port and fisheries, DDK, AIR, IMD and CWC etc.)

vii. Representatives from major places of worships

viii. Local NGOs / Corporate / CIKR

The best way to move forward is to constitute a core team composed of a department or

office that was likely to be involved in most, if not all, responses. The five to seven most

central departments are: the Fire and Police Chiefs, the Emergency Manager and the Planner

(DDMO/DPO), Civil Surgeon and the Superintending Engineer / Executive Engineer (Public

Works). Other agencies / members of community can be consulted on an SOS basis. The

Core team should invite representatives from civil societies for consultation on specific

components of the plan. The plan should not be just an administrative plan, but a plan for all

stakeholders including citizens.

1.5 Stakeholders and their responsibilities

At State HQ level - the State Disaster Management Authority and the Office of the

Commissioner of Relief (CoR), Revenue Department, are the major institutions in the State

that deal with all the phases of disaster management. All the major line departments of the

State Government and the emergency support function agencies converge into SEOC during

disasters.

At the District level, District Disaster Management Authority, with the District Collector

designated as Response Officer (RO), and other line departments at district HQ are

responsible to deal with all phases of disaster management within district.

Other technical institutions, community at large, local self-governments, NGOs etc. are also

stakeholders of the District Disaster Management Pan. The role of the stakeholders has been

prepared with the sole objective of making the concerned organizations understand their

duties and responsibilities regarding disaster management at all levels and accomplishing

them.

The District Collector has the following duties:

i. To facilitate and coordinate with local Government bodies to ensure that pre and post

disaster management activities in the district are carried out.

ii. To assist community training, awareness programmes and the installation of emergency

facilities with the support of local administration, non-governmental organizations and

the private sector.

Page 5: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

5

iii. To function as a leader of the team and take appropriate actions to smoothen the response

and relief activities to minimize the adverse impact of disaster.

iv. To recommend the Commissioner of Relief (CoR) and State Government for declaration

of disaster.

Local Authorities have the following duties:

i. To provide assistance to the District Collector in disaster management activities.

ii. To ensure training of its officers and employees and maintenance of resources so as to

be readily available for use, in the event of a disaster.

iii. To undertake capacity building measures and awareness and sensitization of the

community

iv. To ensure that all construction projects under it conform to the standards and

specifications laid down.

v. Each department of the Government in a district shall prepare a disaster management

plan for the district. The local authorities need to ensure that relief, rehabilitation and

reconstruction activities in the affected area, within the district, are carried out.

vi. Trust / Organisations managing Places of Worships & Congregation

a. Each establishment / organisation identified as ―critical infrastructure and key resource‖,

b. Including places of congregation in a district shall prepare ―on-site‖ and ―off-site‖

c. Disaster management plan. Carry out mitigation, response, relief, rehabilitation and

d. Reconstruction activities.

Private Sector:

i. The private sector should be encouraged to ensure their active participation in the pre-

disaster activities in alignment with the overall plan developed by the DDMA or the

Collector.

ii. They should adhere to the relevant rules regarding prevention of disasters, as may be

stipulated by relevant local authorities.

iii. As a part of CSR, undertake DRR projects in consultation with district collector for

enhancing district‘s resilience.

Community Groups and Volunteer Agencies:

i. Local community groups and voluntary agencies including NGOs normally help in

prevention and mitigation activities under the overall direction and supervision of the

DDMA or the Collector.

ii. They should be encouraged to participate in all training activities as may be organized

and should familiarise themselves with their role in disaster management.

Citizens:

It is the duty of every citizen to assist the District Collector or such other person entrusted

with or engaged in disaster management whenever demanded generally for the purpose of

disaster management.

Page 6: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

6

1.6 How to use the Plan:

i. Section 31 of DM Act 2005 makes it mandatory for every district to prepare a disaster

management plan, for the protection of life and property from the effects of hazardous

events within the district.

ii. In significant emergencies or disasters, District Magistrate or the chairperson of DDMA

will have the powers of overall supervision direction and control as may be specified

under State Government Rules / State Disaster Management Plan guidelines.

iii. The district EOC will be staffed and operated as the situation dictates. When activated,

operations will be supported by senior officers from line departments and central

government agencies; private sector and volunteer organizations may be used to provide

information, data and resources to cope with the situation.

iv. The DDMA may recommend for action under Sec 30 of DM Act.

v. Facilities that have been identified as vital to operation of the district government

functions have been identified.

vi. The DM or his designee will coordinate and control resources of the District.

vii. Emergency public information will be disseminated by all available media outlets

through the designated media and information officer.

viii. Prior planning and training of personnel are prerequisites to effective emergency

operations and must be considered as integral parts of disaster preparations.

ix. Coordination with surrounding districts is essential, when an event occurs, that impacts

beyond district boundaries. Procedure should be established and exercised for inter

district collaboration.

x. Departments, agencies and organizations assigned either primary or supporting

responsibilities in this document must develop implementation documents in order to

support this plan.

xi. When local resources prove to be inadequate during emergency operations, request for

assistance will be made to the State or higher levels of government and other agencies in

accordance with set rules and procedures.

xii. District authority will use normal channel for requesting assistance and/or resources, i.e.,

through the District Emergency Operations Center (DEOC) to the State EOC. If state

resources have been exhausted, the state will arrange to provide the needed resources

through central assistance.

xiii. The District EOC will coordinate with the State EOC, Agencies of the Govt. of India like

IMD / CWC to maintain upto-date information concerning potential flooding, cyclones

etc. As appropriate, such information will be provided to the citizens of the affected

areas in the district.

xiv. Upon receipt of potential problems in these areas, DEOC / designated officials will

appropriately issue alert and notify action to be taken by the residents.

xv. Disaster occurrence could result in disruption of government functions and, therefore, all

levels of local government and their departments should develop and maintain procedures

to ensure continuity of Government action.

It is necessary that for suo-moto activation of the agencies involved in the disaster

management, the institutional trigger mechanism should be there so that every agency takes

its assigned role at the time of such disaster. There will be three types of Trigger mechanism

that will be set up depending upon the warning signals availability as mentioned below:

Page 7: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

7

Warning Signal Available:

In such case the Govt. of India / State Govt. has authorized agencies generating such early

warning signals; in case the matter is very urgent needing action at Block/Tehsil/Village

levels, the alerts and action points will go directly to all concerned. Arrangements need to be

in place to ensure prompt receipt of these signals and action thereon. After such

warning/advisory received by the State Govt., the SEOC will communicate it to the DEOC

urgently. The DEOC will communicate such warning to the departments at the district level.

The information flow in such cases will be as follows:-

State Emergency Operation Center (SEOC)(Information communicated by the Nodal Department)

Through DEOC

SDMS and All Nodal Departments at District HQ are informed

Tehsil and Block

Tehsildar/BDO/ Panchayat Pradhans / Others at Village level

District Collector District Emergency Operation Center (DEOC)

Figure 1: With warning Information flows from Top - Down

Without Early Warning Signal:

When disaster occurs without any early warning in that case the information starts from the

place of incident through government agency or otherwise and the institutional mechanism in

such cases will be as follows:-

i. The concerned village will report to the Panchayat, block, police

station/SDM/DM and the information will be sent to the Deputy Commissioner.

ii. DDMA will assess the information and assess the disaster to be of the level L0,

L1, L2 or L3.

iii. DEOC will be activated and if required the SEOC will be kept at alert if

assistance needed; otherwise information of the incident will be passed on to

SEOC.

Page 8: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

8

iv. DDMA will convene the meeting of DEOC and plan the management of the

disaster as Incident Response Plan.

v. The respective Incident response teams will be rushed to the site for effective

management.

DEOC / District Collector

SEOC / COR

Sub-Div. / SDMLine

Departments at Sub Div.

Line Departments

at Sub Div.

Line Departments

at Division level

Line Departments

at Division level

Villages

Village Block Tehshil

Figure 2: Without Warning – Information, generally, should flow from Bottom side

– up but it is a crisscross scenario

The disaster response structure will be activated on the receipt of a disaster warning or on

the occurrence of a disaster by the competent authority. The occurrence of a disaster may

be reported by the concerned monitoring authority to the Commissioner of Relief/SDMA

by the fastest means. The SDMA/SEC will activate all departments for emergency

response including the State EOC, District EOC, police personnels and ERCs. In

addition, they will issue instructions to include the following details:

i. Exact quantum of resources (in terms of manpower, equipments and essential items

from key departments/stakeholders) that is required.

ii. The type of assistance to be provided.

iii. The time limit within which assistance is needed.

iv. Details of other Task/Response Forces through which coordination should take place.

v. The State EOC, ERCs and other control rooms at the State level as well as district

control rooms should be activated with full strength.

1.7 Approval Mechanism of the Plan:

As defined in Section 30 of DM Act 2005, DDMA shall act as the district planning;

coordinating and implementing body for disaster management and take all measures for the

Page 9: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

9

purpose of disaster management in the district in accordance with the guidelines laid down

by the National Authority and the State Authority.

Accordingly, the District DM plan shall be prepared by the District Authority, after

consultation with the local authorities and having regard to the National DM Plan and the

State DM Plan.

1.8 Plan review and updation periodicity:

Training- After developing a plan, it must be disseminated and managers must be required

to train their personnel so that they have the knowledge, skills and abilities needed to perform

the tasks identified in the plan. Personnel should also be trained on the organization-specific

procedures necessary to support those plan tasks.

Exercise the Plan - Evaluating the effectiveness of plan involves a combination of training

events, exercises and real-world incidents to determine whether the goals, objectives,

decisions, actions and timing outlined in the plan led to a successful response. The purpose of

an exercise is to promote preparedness by testing polices plans and training personnel.

Revise and Maintain - Planning teams should establish a process for reviewing and revising

the plan. Reviews should be a recurring activity. Review on an annual basis is considered

minimum. It should be mandatory to consider reviewing and updating the plan after the

following events:

i. A major incident.

ii. A change in operational resources (e.g., policy, personnel, organizational structures,

Management processes, facilities, equipment).

iii. A formal update of planning guidance or standards.

iv. Each activation.

v. Major exercises.

vi. A change in the district‘s demographics or hazard or threat profile.

vii. The enactment of new or amended laws or ordinances.

The responsibility for the coordination of the development and revision of the basic plan,

annexes, appendices and implementing instructions must be assigned to the appropriate

person(s).

It is recommended that a DDMP be internally reviewed on a yearly basis and either be updated

or reaffirmed. The updates or reaffirmed document may also be used to summarize the

accomplishments of the past year and help the administration to prioritize mitigation goals for

the next year.

Page 10: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

10

CHAPTER 2:

HAZARD, VULNERABILITY, CAPACITY AND RISK ASSESSMENT

Planners need to visualize various situations based on the district profile and exposure to

hazards. Analysis of ―situation‖ will lead to prioritization of hazard and risks and define

training, equipment and exercise requirements. A hazard analysis determines:

1. What hazard can occur in the district

2. How often is it likely to occur

3. What damage it is likely to cause

4. How is it likely to affect the district or part of the district

5. How vulnerable is the district to each hazard

There are five steps in the hazard analysis process:

i. Identify hazards

ii. Profile each hazard

iii. Develop a plan for district

iv. Determine vulnerability

v. Create and apply scenarios

During the hazard analysis process, it is important to keep in mind that the hazard a

community faces may change over time because of new mitigation measures, the opening or

closing of facilities, local development activities or terrorist threats that were not considered

before.

The risk assessment is, hence, the basis for plan development. The assessment helps the

planning team decide what hazards or threats merit special attention, what actions must be

planned for and what resources are likely to be needed. The analysis method inventory

evaluates and provides loss estimates for assets deemed critical during the preparation,

response and recovery phases of an incident.

Address major ―natural and manmade‖ hazards that have or may affect that district, each

hazard should be addressed and examined individually; the statistics should be examined at

the district level and a summary of historical occurrences in the district, along with the

probability of future occurrences.

Potential - safety, health, economy and building damages should be explained for each of the

hazards and repetitive (historical) loss of properties noted and listed within this section.

Existing ―relief manuals‖ in each state is a good source of historical data with, of course,

other documents like State‘s flood manual etc.

A proper Hazard and Vulnerability Analysis will take time Thus, the DDMP should

attempt to get this done as soon as possible. In the meantime, an estimation of

vulnerabilities and risks may be done to draft an initial plan. There are subjective methods

which can be used for identification of hazards and vulnerabilities and regional priority for

their mitigation.

Page 11: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

11

Steps to be undertaken for hazard analysis:

Obtain hazard information. Sources can be:

1. Local administration / State administration

2. India Meteorological Department (IMD) / Central Water Commission (CWC) /

Survey of India

3. Ministry of Environment and Forests (MoE&F)

4. Survey of India

5. Indian Space Research Organisation (ISRO)

6. National Remote Sensing Centre (NRSC)

Developing a Hazard Profile:

A hazard profile should consider four factors:

1. Magnitude

2. Frequency

3. Duration

4. Speed of onset

Profile should be completed for each hazard the community or district is vulnerable to.

Figure3: Hazard Profile Worksheet (Parameters indicated under each category are based on

the Global best practices which may vary from country to country)

Page 12: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

12

Creating a District profile:

After completing the hazard analysis process, it is necessary to combine hazard specific

information with the profile of the community in the district to determine community‘s

vulnerability to the risk.

Geography

1

Property

2

Infrastructure

3

Demography

4

Response

Organisation

5 Major

geographic

features;

Typical weather

pattern

Numbers;

Types;

Ages;

Building Codes;

Critical facilities;

Potential Secondary

Hazard;

(Popular Places of

worships should be

included )

Economic

(telecommunication,

electricity, transportation,

energy etc.) and Social

(health (hospitals),

education (school, colleges

etc.), places of worships

(temples, Mosque, Church,

places of religious

congregations) and

housing ) infrastructures

Utilities - Construction,

Layout, access;

Communication system -

layout, features, backup;

Road systems;

Air and water support;

Population size,

distribution,

concentrations;

Number of people

in vulnerable

zones;

Special

Populations;

Animal

populations

Locations;

Points of Contacts;

Facilities;

Services;

Resources;

Table 1: Key factors in Creating Community profile

After gathering information about community, develop the community district profile by plotting

vulnerable areas on a district map.

Type of Information

1

Used in

2

Geography Predicting risk factors and the impact of

potential hazards and secondary hazard

Property Projecting consequence of the potential

hazards to the local area Identifying available

resources

Infrastructure Identifying points of vulnerability Preparing

evacuation routes, emergency communication

and projecting response and recovery

requirements

Demography Projecting consequence of disaster on

population Disseminating warning and public

information Planning evacuation and mass care

Response Organisation Identifying response capabilities

Table 2: Use of Community factors in District Profile

Page 13: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

13

Completing the Risk Analysis:

After completing the district profile, the next step is to quantify the community‘s risk by merging

the information. Risk is the predicted impact that hazard would have on the people, services and

specific facilities in the community. Quantifying risk enables district to focus on those hazards

that poses higher threat to life, property and environment. Quantifying risk involves:

i. Identifying the elements of the community that are potential at risk from specific hazard

ii. Develop Digital elevation model

iii. Develop response priorities

iv. Assign severity ratings based on potential impact to life, essential facilities and Critical

Infrastructure and Key Resources (CIKR)

v. Compiling risk data into the community risk profile that shows the areas of the

community that are at highest risk from hazard

In analyzing risks, it is helpful to develop the response priorities:

Priority 1: Life safety

Priority 2: Essential facilities

Priority 3: CIKR (Critical Infrastructure and Key Resources)

Severity Rating or Risk Index:

Develop a risk index for each hazard and assign a value to each characteristic. Use the following

values:

1 Catastrophic

2 Critical

3 Limited

4 Negligible

The rating for each of the following hazard data:

i. Magnitude

ii. Frequency

iii. Speed of onset

iv. Community Impact

One needs to average the value of all factors to determine the overall risk. The result of this

process will be a list of hazards that pose the greatest threat to the district. The planning team

should prepare plan for each hazard for which the risk index exceeds a predetermined threshold.

Severity

1

Expected Impact

2

Catastrophic

Multiple deaths

Complete shutdown of Critical Facilities (CF) for thirty days or more

Critical Injured or illness resulting into permanent disability

Complete shutdown of CF for at least two weeks

More than 25% of property severely damaged

Limited Injured or illness do not result into permanent disability

Complete shutdown of Critical Infrastructure (CI) for at least one week

More than 10% of the property severely damaged

Page 14: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

14

Negligible Injured or illness treated with the first aid

Minor quality of life lost

Shut down of critical facility for two hours or less

Less than 10% of the property severely damaged

Table -3: Risk Indexing (Parameters indicated under each category are based on the Global best

practices which may vary from country to country)

Fill-in the hazard analysis work sheet given below

S.No Hazard

Check if community

is prone to the

hazard

Historical Data

(1) (2) (3) Years of Occurrence

Frequency / Return Period

Category / Intensity

Duration

(a) (b) (c) (d)

1. Earthquake

2. Tsunami

3. Flood

4. Storm / Cyclone

5. Landslide

6. Drought

7. Accident (S)

8. Fire

9. Others

Table 4: Hazard Analysis – Historical data

S.No

Hazard

Historical Data

Yr. of

Occurr

ence

Number

of

Affected

Deaths

Num

ber of

Affec

ted

famil

ies

House School

Buildings

Hospitals Roads Agricultur

e

(1) (2) (3) (4) (5) (6) (7) (8) (9)

Number Econom

ic

Damage

Numb

er

Economi

c

Damage

Numb

er

Economi

c

Damage

Econo

mic

Damag

e

Damage &

Loss of Crop

Area

(a) (b) (a) (b) (a) (b)

1. Earthquake

2. Tsunami

3. Flood

Page 15: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

15

4. Storm /

Cyclone

5. Landslide

6. Draught

7. Fire

8. Other

Table 5: Vulnerability Analysis – Historical Data

Based on the review and analysis of inputs/data collected in tables given above, the most

important disaster risk with reference to the lowest administrative unit in the district needs to be

identified. After answering the questions in Col 1, 2 and 3, recommendations on the mitigation

measures can be listed under col 4 of the table given below.

Table 6: Risk Assessment Results

S.No. Vulnerability Analysis Answers

1 2 3

1 Result of hazard Analysis

What single or multiple hazards is the community

faced with? Which are most significant?

Referring to occurrence, frequency/return period,

intensity and duration as well as exposure of

affected families, how do these hazards compare?

Is there evidence of changing trends in the

hazards, or new hazards emerging?

2 Results of Vulnerability Analysis

What are the top five vulnerability of the

community?

Explain the vulnerabilities in relation to the

identified hazards affecting the community, and

how these make the community susceptible to

those hazards.

3 Results of Capacity Analysis

What are the top five capacities available in the

community?

Explain their relationship and how they increase

the resilience of the community.

Identify the top five weakness and discuss them

as part of another paragraph under vulnerabilities.

4 Recommendations to Mitigate. Prepare for.

and Respond to Disaster Impacts

Given the Hazard Vulnerability Capacity

Assessments identify the most pressing assistance

needed to reduce the vulnerabilities and increase

the capacities of the community.

Page 16: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

16

S.No. Severity of Consequence Likelihood of Occurrence

1 2 3

Frequent Likely Occasional /

Possible

Unlikely

(a) (b) (c) (d)

1 Catastrophic Highest

Priority

2 Critical / Serious

3 Limited

4 Negligible

Page 17: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

17

CHAPTER 3:

INSTITUTIONAL ARRANGEMENTS FOR DM

The Disaster Management Act 2005 provides for an effective institutional mechanism for

drawing up and monitoring implementation of disaster management plan for prevention and

mitigating effects of disasters and for taking a holistic, coordinated and prompt response to

any disaster situation. Under Section 78 of the DM Act 2005, powers are conferred to the

State Government for making rules to carry out the provisions of this Act and notify such

rules in the official gazette.

The institutional mechanism for disaster management at the district level, as envisaged in the

national plan and other national guidelines, is as given below -

1. District Disaster Management Authority

2. District Disaster Management Advisory Committee

3. Local Self Government

4. District EOC

DISTRICT DISASTER MANAGEMENT AUTHORITY (DDMA)

Section 25 of DM Act 2005 & National Policy on DM 2009 – mandates establishment of

DDMA for every district and provides its composition. DDMA will be headed by the

respective District Magistrate/District Collector (DC)/Deputy Commissioner as the case may

be, with the elected representative of the Local Authority as the Co-Chairperson ex officio.

DDMA will act as the planning, coordinating and implementing body for DM at District

level and take all necessary measures for the purposes of DM in accordance with the

Guidelines laid down by the NDMA and SDMA. It will, inter alia, prepare the District DM

plan for the District and monitor the implementation of the National Policy, the State Policy,

the National Plan and the State Plan concerning its District.

The DDMA will also ensure that the Guidelines for prevention, mitigation, preparedness and

response measures laid down by NDMA and SDMA are followed by all Departments of the

State Government, at the District level and the Local Authorities in the District

District Disaster Management Advisory Committee

Section 28 of DM Act 2005 empowers DDMA to constitute a committee or sub committees

and also enables it to make payment of allowances to any person associated as an expert with

these committees. An expert committee can also be constituted to assist DDMA.

LOCAL SELF GOVERNMENT AUTHORITIES:

Local Authorities would include Panchayati Raj Institutions (PRIs), Municipal bodies,

District and Cantonment Boards and Town Planning Authorities, which control and manage

civic services. These bodies will prepare DM Plans in consonance with the Guidelines of

NDMA, SDMAs and DDMAs and will ensure capacity building of their officers and

employees for managing disasters, carry out relief, rehabilitation and reconstruction activities

in the affected areas.

Page 18: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

18

DISTRICT EMERGENCY OPERATIONS CENTRE (DEOC):

The DEOC will be the hub of activity in a disaster situation in the district. This is, however,

not to underestimate its normal time activities. The EOC should have the flexibility to

expand when demand increases and contract when the situation comes to normal. The DEOC

is connected with State EOC in the upstream (which further connects to National EOC) and

other EOC(s) in the downstream including other field offices during emergencies.

PLANNING CONSIDERATION:

Disaster Management Planning includes the key areas involved in addressing any threat or

hazard: prevention, mitigation, response and recovery.

PUBLIC PRIVATE PARTNERSHIPS:

Development activities involve both private and public enterprises. To mitigate disasters and

create better prepared society for disasters and other hazards, strong public-private

coordination is critical. In order to achieve community resilience and preparedness, public

and private owners of critical infrastructures and key resources like manpower, technical

expertise & equipment need to work together, before, during and after a disaster. The key

issue is to recognize and embrace the public-private interfaces that can improve the ability of

a community to manage the response and recovery phases of disaster management. DDMP

should spell out clear role and responsibilities of both Public and Private Sector and Private

sector must be involved closely into community development and organisation of mock drills

etc. A resource inventory be maintained indicating the capabilities in terms of human,

equipment and infrastructure both in public and private sector.

Page 19: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

19

CHAPTER 4:

PREVENTION AND MITIGATION MEASURES

Prevention consists of actions that reduce risk from natural or manmade disaster

incidents. It is required to list and elaborate all types of measures (like - building codes,

floodplain management, storm water management, coastal area zoning and

management plan, etc.) – planned and implemented by the districts as a part of

prevention measures.

It is good to have long term mitigation goals in place and connect these goals with

measures that district has planned and implemented. These goals may include (but not

limited to):

1. Provide better early warning methods for flood, storms, cyclone

2. Reduce the destruction and loss of life within buildings

3. Provide for safer environments for transportation systems

4. Eliminate flooding in populated areas

5. Ensure redundant water supply systems

6. Reduce environmental degradation and restoration of livelihood

7. Reduce effects of the natural environment on the infrastructure

8. Ensure redundant power systems on critical facilities

9. Ensure adequate materials available for road maintenance

Protection reduces or eliminates a threat to people, property and the environment.

Primarily focused on adversarial incidents, the protection of Critical Infrastructure and

Key Resources (CIKR) is vital to local districts, national security, public health & safety

and economic vitality. Protection includes actions or measures taken to cover or shield

assets from exposure, injury or destruction. Protective actions may occur before, during

or after an incident and prevent, minimize or contain the impact of an incident.

Mitigation, with its focus on the impact of a hazard, encompasses the structural and non-

structural approaches taken to eliminate or limit a hazard‘s exposure; impact on people,

property and the environment. Besides flood proofing, river desiltation, change in land

use pattern and shelter belt plantation, examples of mitigation activities also include:

1. Town Planning Act: Planning, adopting and enforcing stringent building codes,

flood-proofing requirements, seismic design standards and cyclone wind-bracing

requirements for new construction or repairing existing buildings.

2. Zoning Regulations: Planning and adopting zoning ordinances that steer

development away from areas subject to flooding, storm surge or coastal erosion.

3. Development Control Regulations: Incorporate the disaster management concerns

into development. This should include all Government Sponsored Developmental

Programs and Schemes.

4. Undertaking retrofitting work on public buildings to withstand ground shaking or

cyclone-strength winds.

Page 20: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

20

5. Specificity of disaster:

5.1 Cyclone: In areas prone to cyclones, critical infrastructure, school and other

community buildings to be built at elevated places. Keep trees and shrubs

trimmed. Remove damaged and decayed parts of trees to make them resist wind

and reduce the potential for damage. Removal of hoardings before specified

period of cyclone.

6. Land use regulation: Planning and building community shelters and cyclone safe

rooms to help protect people in their homes, public buildings and schools in hurricane

and tornado-prone areas.

7. Safety norms for economic and social infrastructures including places of

worships and crowd management: Steps taken for developing and implementing

public safety norms for critical infrastructures and places of worships.

8. Capacity Building for Mitigation: Steps taken for human resource development and

capacity building for effective disaster mitigation at District Level.

9. Awareness generation on disaster mitigation.

10. DRR in all developmental activities.

Page 21: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

21

CHAPTER 5:

PREPAREDNESS MEASURES

Planning is the one of the key elements in the Preparedness cycle. Preparedness cycle

illustrates the way the plans are continuously evaluated and improved through a round of

planning, organizing, training, equipping, exercising, evaluating and taking corrective

actions.

1. IRT: As per NDMA‘s IRS guidelines which prescribe Incident Response Team (IRT)

at District, Sub-Division, Tehsil and Block level should be constituted under the

written directives of District Magistrate (DM). These teams will include experienced

officers / employees at all levels and respond to all natural and man-made disasters.

The lowest administrative unit (Sub-Division, Tehsil or Block) will be the first

responder as the case may be. IRT at all levels will have same structure, i.e. IC

supported with Operation, Planning and Logistic sections. The IRTs are to be pre-

designated at all levels.

2. District Emergency Operations Centre (DEOC): District Emergency Operations

Centre becomes a nodal point for overall coordination of planning and response. Its

main duty is to ensure that the EOC facility has required communication (connecting

all stakeholders vertically and horizontally), Decision support system, alert and

warning system in working conditions.

EOC SOP

1. Emergency numbers existing for Police, Fire and Medical support etc. are linked to

the EOC for response, command and control under an SOP. For e.g., if there is any

fire incident, the information should not only reach the fire station but also the EOC

and the nearest hospital to gear up the emergency medical service.

2. NGOs carry out their activities in an equitable and non-discriminatory manner. Set up

wherever possible an NGO Coordination Centre.

3. Ensure that telephone directory of all ESF is prepared and available with EOC and

members of IRTs.

4. Ensure that adequate exercises are conducted for testing the plan and gaps analyzed.

5. Outline plan to receive support from State and Central Government in a major

disaster (e.g. helipads, evacuation, food distribution, medical support).

Page 22: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

22

CHAPTER 6:

CAPACITY BUILDING AND TRAINING MEASURES

Developing a DDMP without building capacity or raising awareness amongst stake-

holders can be detrimental to the development of a successful and sustainable plan.

Stakeholders and communities are critical components to a successful, long-term,

sustainable disaster management plan. Capacity Building develops and strengthens skills,

competencies and abilities of both Government and non–government officials and

communities to achieve their desired results during and after disasters, as well as

preventing hazardous events from becoming disasters.

When undertaking disaster management planning assessments, it is important that the

indigenous traditions, methods and materials being used for disaster management locally

are considered and incorporated appropriately. Local residents are likely to be the first

emergency responders to such incidents, particularly in remote areas and, therefore,

critical to the successful outcome.

Developing institutional capacity is very important. At the same time, by making the

local community part of the process and solution would help in ensuring that disaster

mitigation measures are more likely to be implemented and maintained over time. The

capacity building plan should cater to the ‗differential capacity building needs‘ based on

the functional responsibilities assigned to stakeholders (refer table 8 giving sample of

functions). It should address - 1. Institutional capacity building

i. Officials / policy makers ii. Engineers, Architects, Masons, Doctors, Nurses, Teachers and other

professionals iii. State Police, Fire Services, State Disaster Response Force

2. Community capacity building and Community Based Disaster Management which

should also focus on vulnerable groups – women, children, aged persons and

persons with various kinds of disabilities.

3. Knowledge Management, networking and sharing

i. Community registries to collate basic contact information for persons with disabilities

4. Training of Trainers i. Civil Defense/Home Guards/Volunteers

5. Disaster Management Education i. Schools

ii. Colleges: medical, Engineering 6. Skill up gradation and follow up training programmes

7. Inventory of trained professionals, engineers, architects and masons, medical Professionals, rescue specialists etc.

Strengthening and capacity building of DM Institutions (SDMA and DDMAs) should be

the first priority towards DM capacity building in the State. Training module,

commensurate with the State / District specific requirements, should be designed and

Page 23: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

23

implemented in consultation with NIDM/NDMA. Capacity building requirement at all

levels in institutional hierarchy as well as society should be addressed adequately.

Training and capacity building program should be integrated with the monitoring and

evaluation system for effective revision of the program.

Page 24: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

24

CHAPTER 7:

RESPONSE AND RELIEF MEASURES Response planning provides rapid and disciplined incident assessment to ensure a quickly

scalable, adaptable and flexible response. It incorporates National and State response

doctrine, which defines basic roles and responsibilities for incident response across all levels

of government and the private sector.

Before taking up response activities, the DM (RO/IC as per IRS) will hold a meeting to take

stock of the situation, availability and mobilization of resources for listing out the various

tasks and to provide proper briefing to the responders. The Incident Action Plan will be

drawn and put into action based on the situation assessment. The DM / RO will nominate

Operation Section Commander (OSC) based on ―incident type‖ and rest will follow as per

IRS/IRT and other procedural guidelines issued by the state.

PLAN ACTIVATION:

The disaster response structure will be activated, on the receipt of disaster warning or on the

occurrence of the disaster, with approval from the competent authority. The occurrence of

disaster may be reported by the concerned monitoring authority to the Commissioner of

Relief / SDMA by the fastest means. The Commissioner of Relief (CoR) will activate all

departments for emergency response including the State EOC, District EOC and ERCs. Also,

they will issue instructions to include the following details:

Exact quantum of resources (in terms of manpower, equipment and essential items from key

departments/stakeholders) that is required.

The type of assistance to be provided

The time limit within which assistance is needed

Details of other Task/Response Forces through which coordination should take place

The State EOC and other control rooms at the State level as well as district control rooms

should be activated with full strength. The State Government may publish a notification in

the official gazette declaring such areas to be disaster-affected area under applicable Act /

Rule etc. Once the situation is totally controlled and normalcy is restored, the Commissioner

of Relief declares end of Emergency Response and issues instructions to withdraw the staff

deployed in emergency duties.

S.No.

1

Emergency

Management

Functions / Tasks

2

Function / Task

Lead

3

Support function officer /

agencies

4

1 Direction, Control,

Coordination

DM DDO, SP, Resident Dy. Collector

and Tahshildar

2 Information Collection,

Analysis and Damage

survey

DM DDO, SP, Resident Dy. Collector

(RDC), Tahshildar, DIC, Dy.

DDO, Ex. Engr., R&B, DAO

Page 25: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

25

3 Communication RDC Dy. Tahshildar, Mobile

Operators, TV,

Radio, Police, Forests, Fire

4 Alert and Warning RDC / SP EOC / Disaster Tahshildar,

District Information Officer

(DIO)

5 Transport (ESF,

Evacuation, relief

supply)

RTO/DTO RDC, DDO, DSO, SP, DMHO

6 SAR (Search and

Rescue)

SP / Civil

defense/SDRF/NDRF

Fire, civil defense, Home Guards

& SDRF (when magnitude of any

disaster would beyond coping

capabilities of these response

agencies; NDRF may be

requisitioned for search & rescue

operations.)

7 Emergency Public

Information

DIO EOC/Police/Transport/Forest

8 Law and Order / Public

Protection

SP Dy. SP, Home Guards

Commandant,

NGOs, Para-military and Armed

Forces

9 Public Works Ex. Engr.

R&B

Irrigation, Ex. Engr., Panchayat,

NGOs,

Water Supply Board,

Municipalities,

Home Guards, Police

10 Mass Care/Emergency

Assistance / Shelters

Dist. Primary

Education

Officer

School Principal, Teachers,

Health, PHC,

State Transport, Water Supply,

RTO,

Tahshildar, TDO

11 Health and Medical

Services, psycho social

care

Chief District

Health Officer

(CDHO)

Supt. Govt. Hospital,

Municipality, PHCs, CHCS, Red

Cross, Fire Brigade,

Civil Defense, R&B, NGOs,

Doctors, TDO, Tahshildar

12 Animal Health

& Welfare

Dy. Director Animal

Husbandry

Veterinary Inspector, NGOs

13 Water Supply and

Sanitation

Ex. Eng. Water

Works

Dy. Ex. Engr., Talati, Tahshildar,

TDO,

Health, Dy. Engineer

14 Power Supt. Engr.

Electricity board

Ex. Engr., Dy. Engr. Technical,

EB,

Transport

Page 26: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

26

15 Resource Management

(Including food and

relief supplies and other

logistic support)

DDO RTO, DSO, Private & Public

sector, Municipal Water Supply

Board,

Tahshildar, Dist. Supply

Tahshildar

Table 8: Typical Example of - District level Functional Responsibilities during

Emergency Response (Indicative)

Response plan is to develop and analyse courses of actions. This is important that while in the

process of generating solutions, aspects of scenario-based, functional and capabilities-based

planning are combined. Typically, such a process follows these steps:

1. Establish the timeline. Cover all mission areas in the timeline and typically use the speed of

incident onset to establish the timeline. The timeline may also change by phases and the type

of hazard. For example, a cyclone‘s speed of onset is typically days, while a major chemical

incident‘s speed of onset is minutes. The timeline for a cyclone might be in hours and days,

particularly during the pre and post-impact phases.

Placement of decision points and response actions on the timeline depicts how soon the different

entities enter the plan. Timeline and Responsibility matrix will be a part of Standard Operating

Procedure (SoP) to be drawn and annexed for each hazard relevant to district.

2. Identify and depict decision points. Decision points indicate the place in time, as incidents

unfold, when leaders anticipate making decisions about a course of action. They indicate

where and when decisions are required to provide the best chance of achieving an

intermediate objective or response goal (i.e. the desired end-state). They also help planners

determine how much time is available or needed to complete a sequence of actions.

3. Identify and depict operational tasks. For each operational task depicted, some basic

information is needed.

i. What is the action?

ii. Who is responsible for the action?

iii. When should the action take place?

iv. How long should the action take and how much time is actually available?

v. What has to happen before?

vi. What happens after?

vii. What resources does the person/entity performing the action need?

4. Select courses of action. Planners must compare the costs and benefits of each proposed

course of action against the mission, goals and objectives. Based on this comparison,

planners then select the preferred courses of action to move forward in the planning process.

To the extent possible and appropriate, senior officials should approve course of action

decisions during plan development.

Page 27: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

27

5. Identify resources. Initially, the planning team identifies resources needed to accomplish

operational tasks in an unlimited manner. Once the planning team identifies all the

requirements, they begin matching available resources to requirements. The EOP should

account for unsolvable resource shortfalls so that they are not just ―assumed away.‖

6. Identify information needs. Planners identify a ―list‖ of the information needs for each of the

response participants, including the time they need it, to derive decisions and trigger critical

actions.

7. Assess progress. This process should be periodically ―frozen‖ so the planning team can:

i. Identify progress made towards the end-state

ii. Identify goals and objectives met and new needs or demands

iii. Identify ―single point failures‖ (i.e., tasks that, if not completed, would cause the

operation to fall apart)

iv. Check for omissions or gaps

v. Check for inconsistencies in organizational relationships.

The planning team should work through this process by using tools that help members visualize

operational flow.

8. Hazard, Threat or Incident Specific SOP /Annexes

The contents of hazard, threat or incident specific annexes focus on the special planning

needs generated by the subject hazard. These annexes contain unique and regulatory response

details that apply to a single hazard.

9. Managing Crowds in public places

Recent incidents of stampedes in public places (including in places of worship) and

conglomerations warrant special attention. An SOP for each of these events needs to be

made.

10. Special Attention to marginalized section

Ensure that all relief personnel as well as persons dealing with emergencies on a day to day

basis are sensitized and trained to cater to the needs of persons with disabilities women and

children.

11. Out of box solutions to be explored depending upon protocol availability

These may include use of railway containers as shelters in cyclone prone areas. In areas

where roads infrastructure or connectivity is likely to be affected, helipads to be planned.

Page 28: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

28

CHAPTER 8:

RECONSTRUCTION, REHABILITATION AND RECOVERY MEASURES

Recovery encompasses both short-term and long-term efforts for the rebuilding and

revitalization of affected communities. Recovery planning must provide for a near-seamless

transition from response activities to short-term recovery operations—including restoration

of interrupted utility services, re-establishment of transportation routes and the provision of

food and shelter to displaced persons. Planners should design long-term recovery plans to

maximize results through the efficient use of resources and incorporate national recovery

doctrine.

Following should form a part of this section: -

1. Damage assessment mechanism

2. Restoration of basic infrastructure

Short term - Restoration of Basic Infrastructure including roads, bridges, drinking water

supply, electricity, communication network and roads/ paths leading to the villages;

Restoration/ Repair of the lifelines/critical buildings – repair/reconstruct the lifeline

buildings /critical buildings which are necessary for treating the affected people or

rehabilitation in these buildings as shelters.

3. Reconstruction and Repairs

4. Recovery program (both short and long term)

The nodal departments are to be assigned the responsibilities of reconstruction and

restoration activities, perform these activities diligently and restore the minimum basic

infrastructure in the area which is vital for sustaining human life in the area. These

departments are PWD, Health & family welfare, Electricity Boards, Development authority,

Roads and Buildings, water supply and sanitation departments.

Page 29: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

29

CHAPTER 9:

FINANCIAL RESOURCES FOR IMPLEMENTATION OF DDMP

District Disaster Response Funds and District Disaster Mitigation Funds are proposed to be

created at the District Level as mandated by Section 48 of the DM Act. The disaster response

funds at the district level would be used by the DDMA towards meeting expenses for emergency

response, relief, rehabilitation in accordance with the guidelines and norms laid down by the

Government of India and the State Government.

All State Government Departments, Boards, Corporations, PRIs and ULBs would prepare their

DM plans, including the financial projections to support these plans. The necessary financial

requirements would be made a part of their annual budgetary allocations and ongoing

programmes and used for mitigation and preparedness measures. They will also identify

mitigation projects and project them for funding in consultation with the SDMA/DDMAs to the

appropriate funding agency. The guidelines issued by the NDMA vis–a-vis various disasters

should be considered while preparing mitigation projects.

Other financing options for restoration of infrastructure / livelihoods. Like utilization of flexi

fund within Central Sponsored Scheme for mitigation/restoration activities in the event of

natural calamities in accordance with the broad objective of the Central Sector Scheme.

DDMA should also look at other options of new financial tools like catastrophe risk financing,

risk insurance, micro-insurance etc. to compensate for massive losses on account of disasters.

Opportunities of CSR investments should also be explored and elaborated under this section by

the DDMA for increasing district resilience.

Page 30: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

30

CHAPTER 10:

PROCEDURE AND METHODOLOGY FOR MONITORING,

EVALUATION, UPDATION AND MAINTENANCE OF DDMP

Evaluating the effectiveness of plans involves a combination of training events, exercises etc. to

determine whether the goals, objectives, decisions, actions and timing outlined in the plan will

result in an effective response. Indicative guidelines for monitoring and evaluation of the plan

are as given below:

1. Regularly review the implementation of the plan.

2. Check the efficacy of the plan after any major disaster/emergency in the district and see

what did work and what did not work and make amendments to the plan accordingly.

3. As per Sub Section (4) of Section 31 of the Disaster Management Act, 2005, the plan

would be reviewed and updated annually and the year in which the plan has been

reviewed would be clearly mentioned in shape of header in each page of the plan.

4. Keep District, State and National Disaster Resource Inventory updated (SDRN / IDRN)

and connected with the plan.

5. Update coordinates of responsible personnel and their roles / responsibility every six

months or whenever a change happens. Names and contact details of the officers/officials

who are the nodal officers or the in-charge of resources to be updated on regular basis.

6. Plan should be web enabled with access on intra and internet.

7. Plan should be circulated to all stakeholder departments, agencies and organisations so

that they know their role and responsibilities and also prepare their own plans.

8. Regular Drills / exercises should be conducted to test the efficacy of the plan and check

the level of preparedness of various departments and other stakeholders. It would ensure

that all parties understand their roles and responsibilities clearly and understand the

population size and needs of vulnerable groups.

9. Regular training and orientation of the officers/officials responsible to implement the

plan should be done so that it becomes useful document to the district administration.

10. Army, NDRF, SDRF and other agencies should be integrated into the plan exercise

regularly.

11. DDMA should hold Regular interaction and meetings with the Army or any other central

government agencies for strengthening coordination during disasters.

12. The DEOC should be made responsible for keeping the plan in updated form and

collecting, collating and processing the information.

Page 31: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

31

CHAPTER 11:

COORDINATION MECHANISM FOR IMPLEMENTATION OF DDMP

Dealing with a major disaster requires resources from outside the district. When the

capacities of a district administration are overwhelmed, higher levels are called upon to

assist. Likewise, assets and capabilities in the corporate and non-governmental sectors

available around the district may be brought to bear.

There are many actions undertaken by participants in disaster management that support this

goal, both pre-disaster (to forestall or reduce potential damage) and post-disaster (to recover

from actual damage) and ideally these activities would reduce the potential effects of a

disaster significantly. For achieving this objective, the plan should have a pre-established and

practiced mechanism for Inter, intra and extra agency coordination.

Communication is the most important tool for effective coordination. Generally, Emergency

Operation centre (EOC) is the enabler of communication and coordination. EOC

communication and coordination plan (EoC-SoP) should specify procedures for interfacing

with different stakeholders during all phases of emergency, as stated in the DDMP

framework.

Pre-Disaster meetings to review the DDMP with all stakeholders should also be planned.

Page 32: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

32

CHAPTER 12:

STANDARD OPERATING PROCEDURES (SOPs) AND CHECK LIST

1. SOPs –

1.1 Standard Operating Procedures (SOPs)

1.2 Maps

1.3 Forms

Standard Operating procedures (SOPs)

Standard Operating Procedures (SOPs) are a common method of implementing instructions.

SOPs provide response protocols for carrying out specific responsibilities. They describe who,

what, when and how SOPs are appropriate for complex tasks requiring step-by-step instructions

for performing a task. It is necessary to prepare and annex - SOPs for all relevant hazards to

one‘s district – like – Earthquake, Flood, Cyclone, Landslide, Tsunami, Manmade disasters

(CBRN, Stampede etc.) .

Hazard or incident specific annexes usually identify hazard specific risk areas and evacuation

routes, specify provisions and protocols for warning the public and disseminating emergency

public information and also specify the types of protective equipment and detection devices

required by responders.

The annexes have work aids for items including maps, charts, tables, checklists, resource

inventories and summaries of critical information. As indicated previously, hazard-specific

annexes follow the basic plan‘s content organization. Hazard-specific operations information

includes:

I. Assessment and control of the hazard (natural and manmade including mass

gathering at places of congregation).

II. Identification of unique prevention and CIKR protection activities to be

undertaken to address the hazard or threat, as appropriate

III. Selection of protective actions

IV. Conduct of public warning

V. Implementation of protective actions

VI. Implementation of short-term stabilization actions

VII. Implementation of recovery actions.

Maps:

I. Geographical boundaries and features

II. District boundaries

III. Locations of the key facilities

IV. Transportation and evacuation routes

Forms:

Common forms used for implementing instructions as given in IRS guidelines may be included

under this portion.

Page 33: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

33

Example of implementation instruction – evacuation annex may be made clearer by attaching

maps with evacuation routes marked. Similarly, location of shelters may be marked on maps

supporting the mass care annex.

2. (i) Resource Management annexure – Give resource(s) list. Describes the means,

organisation and process by which district will find, obtain and allocate resources to satisfy

needs that are generated during different phases of disaster cycle. The list will also include

resources (equipment and personnel) for fire response.

(ii) This annexure will also include list of contact / access numbers of all important resources

(including man, material and machineries). The list of equipments, assets including human

resources details/skill of persons etc of both public and private sector to be uploaded by the

district authorities on the Indian Disaster Resources Network at the website www.idrn.gov.in.

(iii)Helipads / Runways:

Details of runways and helipads (non-classified) with geo-coordinates, their status

(operational/non-operational etc.) and specification should be incorporated into the resources

list. Details of department/ministry holding information on runways / helipads falling under

classified category should be reflected in the resource management annexure.

(iv) On-Line Application:

Online application should be developed for mapping crucial real time information, reflecting

exactly what is happening, what is most needed, and precisely where. Such applications

should be integrated with the State portal and tested from time to time.

3. Communication annex – describes total communication system and how it will be used.

4. Warning annex – describes warning system in place and responsibilities and procedures for

using them.

5. Emergency Public information annex – provides the procedures for giving public accurate,

timely and useful information and instructions through the emergency period

6. Evacuation annex – describes the provisions that have been made to ensure the safety and

orderly evacuation of people threatened by hazards that the district faces.

7. The mass care annex – deals with the actions that are to be taken to protect evacuees and

other disaster victims from the effects of disasters including providing temporary shelters,

food, medical care, clothing, drinking water and other essential needs.

8. The health and medical annex- describes policies and procedures for mobilising and

managing health and medical services during all phases of disaster cycle.

9. Mutual aid / partnerships with other agencies annex – MoU with corporate sectors,

telecom service providers, pharmaceutical industries, heavy machinery users / manufacturers,

NGOs etc.

10. Damage assessment annex In case of CIKR and the places of congregation the responsible

owner/agency/organisation/trust would prepare on-site and off-site DM plan, as per the

available guidelines, in consultation with DDMA.

Page 34: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

34

SAMPLE / EXAMPLE

SOP for Earthquake (without warning situation)

Earthquakes can neither be predicted nor prevented. When an earthquake strikes, the district

team must be ready to respond. To survive, the administration and neighbourhood community

members should be prepared with ‗survival plans‘. Preparing for an earthquake takes time and

effort. The basic approach should be: (a) Avoid injury to self and help others; (b) minimize

damage to CIKR installations and property; (c) Be prepared to survive and function for at least

72 hours after an earthquake without help from external aid.

Special Hazards / Precautions:

1. Earthquake impact can cause damage to critical infrastructures including telecom, power

transmission, water supply, gas or oil pipelines resulting in pipe rupture or blast from

ignition of accumulated associated well gas and vaporization of crude oil pool.

2. Each agency must immediately shut down all operations and supply in pipeline /

transmission lines as per their on-site emergency response plan.

3. Depending upon the intensity, <6 Magnitude evacuation may be required for both within

the facility as well as for neighbouring community to assemble in designated open

ground/ muster point.

4. Fire fighting, search and rescue teams to be kept in standby for any emergency rescue

operations.

5. Emergency coordination team to monitor the situation.

6. Only after proper safety inspection, critical infrastructure facilities may be asked to

resume their operation.

Emergency Response Resource Requirements:

1. Emergency Communication

i. Sat phones for wide area communication

ii. Wireless for local area communication

2. Fire management services:

i. Mobile fire protection system

3. Specialised resources (Pre-contracted under MoU)

i. SAR

ii. Specialised equipment‘s for SAR

4. Manpower:

i. Additional fire fighters / support personnel

5. Medical

i. Ambulances

ii. Doctors

iii. Nurses

iv. Stretchers

v. Pharmacy supply / First aid kits

6. Law and Order

i. Police

INCIDENT ACTION PLAN (IAP):

Page 35: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

35

It is important that activities indicated in the IAP are connected with the functional responsibility

matrix given under the plan activation section in basic plan.

S.No.

1

Task / Function / Activity

2

Department/

Officer

Responsible

3

Time

4

1 Raise alarm

2 The staff to follow ‗drop-cover-hold‘ procedures and

assemble at pre-designated safe muster points

3 Emergency Alarm/Notification/ Notify Authorities &

external agencies (Refer Emergency

Contact in Appendix)

4 Issue instructions to shut down all operations immediately

on CIKR

5 Assess situation, make evacuation plan and evacuation

6 Activate special resources for SAR including JCBs, Earth-

movers, Steel cutters

7 Establish Unified Command (for liaison with responding

agencies)

8 Coordinate and mobilize specialized medical teams with

mobile operation theatres

9 Coordinate and mobilize transport and logistics

10 Assess Hazards – potential for leakage and consequent

explosion

11 Cordon off the area – Establish ―hazard zone‖ and secure

area from unauthorized entry.

Community Evacuation Plan

12 Trigger alarm/early warning siren and evacuate community

to pre-designated open ground

13 Ensure speedy coordination for evacuation

14 Attend the injured with first aid and transport them to

hospital

15 Assure the people by sharing the real impact of incident and

seek their cooperation

16 Provide temporary shelter with water, food and sanitation

facilities

Conduct damage assessment

17 Only after thorough check-up and formal clearance,

community can be permitted to return to their habitation

Page 36: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

36

SOP for Flood and Flash Flood (with warning situation)

Preparing for Flood/Flash Flood

Describe vulnerability of your district to flood / flash flood in couple of lines with impact

assumptions.

Precautions:

1. Flooding can disrupt continuity of Governance and the life of the community

2. Flooding can lead to disruption in electrical supply and communication and cause

damage to roads, bridges and other infrastructure.

3. Depending upon the level and quantum of water inundation evacuation required for

community to move to safe zones.

4. Search and rescue teams to be kept in standby for any emergency rescue operations

5. Emergency coordination team to monitor the situation

6. Ensure that drainage channels / ―nalla"s” are de-silted and bunds are periodically

maintained.

Emergency Response Resources:

Specialist Resources

1. Search and rescue teams (divers/swimmers, Emergency Medical )

2. Specialized equipment- like boats, life jackets (helicopters), etc.

Manpower

1. Support Personnel

Medical Support

1. Ambulances (complete with emergency medication)

2. Doctors

3. Nurses

4. Stretcher Bearers

5. Oral Rehydration Satchets (ORS)

Law & Order Agencies

1. Police

Other Essentials

1. Water storage tanks

2. Chlorine tablets

3. Temporary shelters with sanitation facilities

4. Temporary common kitchen or food packets

Incident Action Plan (IAP)

It is important that activities indicated in the IAP are connected with the functional

responsibility matrix given under the plan activation section in basic plan.

Page 37: Explanatory Notes for Preparation of District ... - Telangana › Events › HTW › DDMP... · i. District Profile (Socio, economic, demographic, geographic, critical infrastructures,

37

Task / Function / Activity

1

Department/

Officer

Responsible

2

Time

3

Raise alarm / Mass messaging / Community siren system

look out for regular updates from Indian

Meteorological Department (IMD) and Central Water

Commission (CWC) for forecast and follow up action.

Alert all ESF to start working on their role

Raise alarm if water level is reaching critical level of

jeopardizing safety of infrastructure

Assess situation, make evacuation plan and move community

to safer zones

Activate special resources

Search and rescue (divers/swimmers, boats, life jackets,

searchlights, nylon ropes

Specialized equipment (helicopters, sandbags,

crowbars, spades, portable motor pumps)

Establish Unified Command (for liaison with responding

agencies)

Close / cordon flooded roads and areas from entry

Assess situation hour to hour in close contact with IMD/CWC

and other agencies

Conduct damage assessment

Only after thorough check-up and formal clearance,

community can be permitted to return to their habitation

(Note: The list is indicative and needs to be expanded)