Experimental Sectors

Ray Veness / AT-VACWith many thanks to

G.Foffano + W.Cameron TS/MMEPatrick Lepeule / AT-VAC

Page 2: Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.

LIUWG - 6 III 08 Experimental Sectors - R.Veness

Schematic Layout of Experimental Sectors

Experimental cavern

Detector

Experimental beampipesQ1 Q1

Sector Valve

VAX

Zone

TAS

Remote flange

The beamline equipment in this region is symmetric about the IP and identical in 1 and 5.

However:

-the detector shielding environment is different in ATLAS and CMS

- Additional equipment for pumping the sectors is installed on the left of both IPs

Experimental beampipes in 1 and 5 are also symmetric around the IP, but very different in design

Page 3: Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.

LIUWG - 6 III 08 Experimental Sectors - R.Veness

Contents

o ATLAS Experimental beampipeso Current situationo Required changes for a triplet upgradeo Future plans from the experiments (as understood by me)

o CMS experimental beampipeso Current situationo Required changes for a triplet upgradeo Future plans from the experiments (as understood by me)

o 19m to 22.8m zoneo Current situationo Options

o Summary

Page 4: Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.

LIUWG - 6 III 08 Experimental Sectors - R.Veness

ATLAS: Current Situation

IP

TAS

58mm ID 80mm ID 120mm ID

TAS

Page 5: Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.

LIUWG - 6 III 08 Experimental Sectors - R.Veness

ATLAS VJ chamber

VJ is integrated with a contilevered support and the LUCID detector.

The chamber is 80/120mm ID, but the bellows module interfacing with TAS goes down to 34mm ID

Page 6: Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.

LIUWG - 6 III 08 Experimental Sectors - R.Veness

ATLAS: Required Changes for the Triplet Upgrade

Bellows module with 34mm ID

Remote flange on the TAS – 34mm ID

Page 7: Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.

LIUWG - 6 III 08 Experimental Sectors - R.Veness

ATLAS: Future Plans from the Experiment

o Consolidation of VA chamberso Replace both chambers with low-Z versions in ~2009/10

shutdowno The diameter of the chamber is unlikely to change

o New VI chamber for B-layer or pixel upgradeo A new (beryllium) central chamber is being considered, either

in conjunction with a new B-layer or pixelo The schedule is not yet clear, but unlikely to be before 2011/12o The diameter would be ‘as small as possible’

o New forward chambers for SLHCo The whole forward region (currently VT and VJ) would be

changed with a machine luminosity upgradeo Higher luminosity would require low-z materials and perhaps

larger diameter chambers

Page 8: Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.

LIUWG - 6 III 08 Experimental Sectors - R.Veness

CMS: Current Situation

58mm ID

Variable diameter 58~320mm 55mm ID

80-100mm ID

Page 9: Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.

LIUWG - 6 III 08 Experimental Sectors - R.Veness

CMS: Required Changes for the Triplet Upgrade

Changes required in this region

Page 10: Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.

LIUWG - 6 III 08 Experimental Sectors - R.Veness

CMS: Required Changes for the Triplet Upgrade

The remote flange and bellows module have an aperture of 34mm

Page 11: Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.

LIUWG - 6 III 08 Experimental Sectors - R.Veness

CMS: Plans from the Experiment

o ‘Post-TOTEM’ Replacement of CT2 chamber (?)o The CT2 chamber was reduced to 55mm to accommodate

the TOTEM T2 telescope.

o CMS have plans to increase this diameter when TOTEM is removed, but the schedule and replacement diameter is not know (by me)

o SLHC Upgradeo CMS also have plans to replace the inner tracker, and

probably also the central beryllium pipe for a smaller diameter in time for an LHC luminosity upgrade

o It is likely that forward chambers will also change at this time

Page 12: Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.

LIUWG - 6 III 08 Experimental Sectors - R.Veness

Current 19-22.8m Region

ATLAS TAS are 20-30mm further away from the IP than nominal, due to the position of the ATLAS forward shielding

Page 13: Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.

LIUWG - 6 III 08 Experimental Sectors - R.Veness

Current 19-22.8m Region: TAS Chamber

Current TAS chamber is 34 ID / 60 OD

Page 14: Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.

LIUWG - 6 III 08 Experimental Sectors - R.Veness

19-22.8m Region: VAX Zone

o Valve and BPMSWo Both 63/60mm apertureo BPMSW is between 2 bellows to allow

independent alignment – supported from Q1

o The valve behind TAS is installed at the request of the experiments to allow replacement of BPM electrodes without full venting of experimental sectors

o VAX (Vacuum-assembly-experimental)o 63/60 mm apertureo Assembles pumps and gauges for the

experimental sectoro Connected to gas injection system for

pump-down and venting of sector on ‘-’ side

o Sector Valveo 63/60mm apertureo Separates cold triplet from warm

experimental sectoro Interlocked

Page 15: Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.

LIUWG - 6 III 08 Experimental Sectors - R.Veness

19-22.8m Region: VAX Zone

Access is very limited, and the VAX zone will become significantly activated!

VAC need access for maintenance of equipment. Survey and Beam instrumentation will also need access.

Page 16: Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.

LIUWG - 6 III 08 Experimental Sectors - R.Veness

19-22.8m Region: Options

o Replace the TAS chambero First mechanical analysis seems to confirm

that the TAS copper chamber could be re-made to 55ID/60OD – ie, in the same TAS body

o It may be necessary to change the alloy to OFS (copper-silver alloy) to maintain high temperature strength

o Replace warm bellows module between BPMSW and VAXo This module could potentially be reduced

from 200mm to 100mm long, allowing Q1 to advance 100mm towards the IP

o Assuming the ATLAS TAS can be re-positioned on nominal

o Assuming the access to the zone is not compromised

o Increase equipment diameter??o Will we need to increase the diameter from

60mm to reduce activation of these vacuum components?

Page 17: Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.

LIUWG - 6 III 08 Experimental Sectors - R.Veness

Summaryo Increasing the TAS aperture would require:

o Re-design and replace TAS chambers (4)

o Re-design, re-qualify and replace Experimental remote flanges (4)

o Re-design and replace ATLAS pumping modules (2) and CMS 18.6m bellows modules (2)

o Depending on the level of activation, experimental forward chambers may have to be replaced, as it may not be ‘ALARA’ to work on them

o Do we also need to increase from the 60mm in the VAX zone to minimise activation?

o Advancing the Q1o On first inspection, 100mm can be gained on the warm bellows module in front of

VAX

o More than this would require removal of equipment

o Apertures in the experimental beampipeso CMS CT2 pipe has a 55mm aperture at ~15m from the IP

o ATLAS VT pipe has a 58mm aperture at ~10m from the IP

o Both ATLAS and CMS have plans to reduce the pipe diameter in the ±4m from the IP region. They are currently informed that this is limited by injection optics. We should inform them quickly if the triplet upgrade may have an impact