Y. R. Roblin, G2P review, 1/17/2011 2011 HALLA G2P readiness review Yves Roblin, CASA.
EXPERIMENTAL BEAM TRANSPORT: g2P / geP Experiment
description
Transcript of EXPERIMENTAL BEAM TRANSPORT: g2P / geP Experiment
EXPERIMENTAL BEAM TRANSPORT:g2P / geP Experiment
HALL A g2P/ geP EXPERIMENTAL BEAM TRANSPORT TEAM
DESIGNERS FABRICATION • Stephanie Worthington -Lead Larry Munk• Danovic Spell SUPPORT GROUPS• Bruce Reinhart HALL A coordinator’s Team ENGINEERS Accelerator: Installation• L. A. Dillon-Townes Alignment• Marie Ivanco Vacuum• Shirley Yang Electrical Groups
CURRENT BEAMLINE CONFIGURATION
EP Superharp Girder
PIVOT
CURRENT BEAMLINE CONFIGURATION
g2P/geP BEAMLINE CONFIGURATION
REGION 1 REGION 2 REGION 3REGION 4
REGION 5
EP Superharp Girder
PIVOT
TargetPivot
87.693 cm
FZ1 & FZ2
CalorimeterSlow Raster
REGION 1
REGION 2
UPSIDE DOWN GIRDER
REGION 3
CURRENT STATUS• Finalizing Region 3 Magnet Support Structures• Finalizing FZ2 movement mechanism• Finalizing delivery and installation plans