Experiencia de CITCEA en proyectos europeos · “Decentralized renewable energy production and...

10
Experiencia de CITCEA en proyectos europeos Ejemplo: EMPOWER H2020 Mònica Aragüés Peñalba

Transcript of Experiencia de CITCEA en proyectos europeos · “Decentralized renewable energy production and...

Page 1: Experiencia de CITCEA en proyectos europeos · “Decentralized renewable energy production and storage will soon revolutionise the energy sector.” Our ambition: “Developand verify

Experiencia de CITCEA en proyectos europeos

Ejemplo: EMPOWER H2020

Mònica Aragüés Peñalba

Page 2: Experiencia de CITCEA en proyectos europeos · “Decentralized renewable energy production and storage will soon revolutionise the energy sector.” Our ambition: “Developand verify

Call: “Competitive Low-Carbon Energy” of the HORIZON 2020 work programme 2014-2015

Topic: “Modernising the European electricity grid: LCE 7 – 2014: Distribution grid and retail market”

2

The project: EMPOWER H2020

local Electricity retail Markets for Prosumer smart grid pOWER services

Page 3: Experiencia de CITCEA en proyectos europeos · “Decentralized renewable energy production and storage will soon revolutionise the energy sector.” Our ambition: “Developand verify

“Decentralized renewable energy production and storage will soon

revolutionise the energy sector.”

Our ambition: “Develop and verify a local market place and innovative

business models, including operational methods to encourage micro-

generation and active participation of prosumers to exploit the flexibility

that this creates, for the benefit of all connected to the local grid.”

3This project has received funding from the European Union’s Horizon 2020 Research and

Innovation programme under Grant Agreement No 646476.

The context

Page 4: Experiencia de CITCEA en proyectos europeos · “Decentralized renewable energy production and storage will soon revolutionise the energy sector.” Our ambition: “Developand verify

4

EV EV

EV EV

EV EV

++

++

+

EVEV

+

EVEV

..

.+

EVEV

DER installations Prosumer 1 Prosumer n-1 Prosumer n

Process

Field

Station

Enterprise

Operation

Market

SMLCSMLCSMLCSMSMSM

SCADA + HMI

DOMAINS

Distribution grid

ZONES

LCLCLC

SESP

Market system

Metering systemControl

system

DSO

DSO

The achievement

Design and development of a trading platform for promoting local electricity

markets and integrating prosumer in electrical power exchanges

Page 5: Experiencia de CITCEA en proyectos europeos · “Decentralized renewable energy production and storage will soon revolutionise the energy sector.” Our ambition: “Developand verify

Real implementation

5

Hvaler

(Norway)

Wolpertshausen

(Germany)

Gozo

(Malta)

Page 6: Experiencia de CITCEA en proyectos europeos · “Decentralized renewable energy production and storage will soon revolutionise the energy sector.” Our ambition: “Developand verify

Hvaler pilot site

6

Transformer capacity: 800 kVA

Supply Voltage: 400V TN

Battery Storage: 240 kWh

EV Charging: 10 Terminals

Customers: 1

Generation:

PV (1200 m2, 175 kWp)

Wind (1 mill, 3 kWp)

Annual production: est. 169 MWh

Consumption: est. 200 MWh

Peak Load: est. 300 kW

The Sandbakken site: a recycling facility owned and operated by the Municipality of Hvaler (Norway)

Page 7: Experiencia de CITCEA en proyectos europeos · “Decentralized renewable energy production and storage will soon revolutionise the energy sector.” Our ambition: “Developand verify

Fases del proyecto: Preparación

Topic: Participant Portal

• Specific Challenge

• Scope

• Expected Impact

• TRL

• Budget

Consortium

Trabajo colaborativo

Consultores externos

Ayuda CTT

7

6 steps to success. Source: European Commission

Page 8: Experiencia de CITCEA en proyectos europeos · “Decentralized renewable energy production and storage will soon revolutionise the energy sector.” Our ambition: “Developand verify

CTT: Proyecto competitivo

Gestión del proyecto compleja

• Reuniones mensuales vía Skype con todo el consorcio

• Reuniones presenciales con todo el consorcio

• Reuniones bilaterales.

Reporting interno

• Gasto en material

• Personal

8

Fases del proyecto: Ejecución

Page 9: Experiencia de CITCEA en proyectos europeos · “Decentralized renewable energy production and storage will soon revolutionise the energy sector.” Our ambition: “Developand verify

Reporting: CTT

• Personal: Time sheets (Planificación necesaria!)

• Material

• Auditoria

• Viajes con Agenda

Reviews

• Report escrito

• 3 FP7/ 2 H2020

• Officer: Responsable en la EC o en INEA del proyecto

• Presentación

• Defensa del proyecto

9

Fases del proyecto: Cierre (reviews)

Page 10: Experiencia de CITCEA en proyectos europeos · “Decentralized renewable energy production and storage will soon revolutionise the energy sector.” Our ambition: “Developand verify

Thank you for your attention

[email protected]

10