Experiences of the German Army with marking, monitoring and protection of
mined areas
CDR Udo H. SchmidtCDR Udo H. Schmidt
DA German EmbassyDA German Embassy
General Information :
Following the Ottawa Convention:• The German Army does not have any
Anti Personal Mines ( except a small number for trial purposes)
• The three types of Anti Tank Mines of the German Army are in accordance with the Ottawa Convention
• The German army has in war time the order to mark, to fence and to guard every mine field to protect the civilian population and the own troops. Additionally the civilians have to be warned.
Agenda
• Difference Military Demining / Humanitarian Demining
• Mine clearing vehicles of the German Army
• Testing Project Minebreaker Kabul 2002
• The future intents of the German Armyin this field
Difference Military Demining / Humanitarian Demining
Time pressure, possible casualities, day and night, every season, a reduced clearing rate sometimes will be accepted
Time pressure, possible casualities, day and night, every season, a reduced clearing rate sometimes will be accepted
No time pressure, carefully planed, not in winter time, a clearing rate of 99,9 %
No time pressure, carefully planed, not in winter time, a clearing rate of 99,9 %
Mine clearing vehicles of the German Army
KEILER Mine Breaching Tank
Height over cross arm: 3,20 m
Total length: 10,95 mWidth: 4,51 m
Weight: 49 toSpeed: max 4km/h
Demining depth 0 - 50cm
Demining speed: 1-20 m/min
clearing path: approx. 4,60 m wide
clearing rate: nearly 100 %
clearing speed: 120 m / 10 min
MINEBREAKER Mine Clearing Vehicle
Protection and Fencing Equipment
Metal sticks sticks
Warning plates
Plastic strings
General Information about GPS
The effectiveness of GPS depends on the used GPS system and on the conditions of the area. Some GPS systems are very exact with a limit of tolerance under 1 cm, others do have a limit of tolerance of some meters.
The effectiveness of GPS depends on the used GPS system and on the conditions of the area. Some GPS systems are very exact with a limit of tolerance under 1 cm, others do have a limit of tolerance of some meters.
Testing Project Minebreaker Kabul 2002
The only project where the German Army conducted mine clearing according to humanitarian demining standards including reporting the results with GPS.
The only project where the German Army conducted mine clearing according to humanitarian demining standards including reporting the results with GPS.
cleared area by the Minebreaker cleared area by the Minebreaker
At this project the vehicle cleared more than 1000 AP and approximately 100 AT mines without any serious damage.
At this project the vehicle cleared more than 1000 AP and approximately 100 AT mines without any serious damage.
Original Daily Report:
Mine clearing vehicle “Minebreaker”
Kabul 2002
Grids of the GPS have been transfered with the System PC-Map directly inside a digital map
Clearing area north of the bridgeClearing area north of the bridgeZone 42 E 525408 N 3866997Zone 42 E 525408 N 3866997
Date: 05th of December 2002
Cleared area: 400 m²:No detonation
Cleared area: 300 m²:No detonation
Original digital map:
Produced with GPS and PC MAP
Kabul 2002
Experience of the German Army reporting mine fields with GPS
The GPS system did not work while military operations with support of the Air Force have been conducted.
The GPS system did not work while military operations with support of the Air Force have been conducted.
The future intents of the German Armyin this field:A system, which can be used + mounted under protection
+ at every daytime and every weather conditions+ for digital distanced survey – for locating the position+ for digital interception, processing and transfer of recce results
+ mounted under protection+ at every daytime and every weather conditions+ for digital distanced survey – for locating the position+ for digital interception, processing and transfer of recce results
The aims:
91 cm
Locate and identify of explosive ordnance :
•By daylight up to 7000m
•By night up to 5000m
•Magnification 2x –30x
Locate and identify of explosive ordnance :
•By daylight up to 7000m
•By night up to 5000m
•Magnification 2x –30x
Possible Survey
• without reflector
• up to 3000m
• Deviation 1cm per 500m
Possible Survey
• without reflector
• up to 3000m
• Deviation 1cm per 500m
This project would include the possibility to produce digital reports of minefields.
This project would include the possibility to produce digital reports of minefields.