Experience the Serenity by the Riverfront LIMITED EDITION 3 BHK RESIDENCES BY THE RIVERBANK NOVEMBER 2020 MONTHLY UPDATE

Transcript of Experience the Serenity by the Riverfront...Floor completed/ E1- 3rd Floor MIVAN Part 2 assembling/...

  • Experience the Serenity by the Riverfront

    LIMITED EDITION 3 BHK RESIDENCESBY THE RIVERBANK

    NOVEMBER 2020MONTHLY UPDATE

  • Duville Estates Wishes all the Owners of Riverdale Residences

    A Happy and Prosperous Diwali

  • Riverdale Residences

    E2 & E3- Parking level Electrical & Panel Rooms block thwork complete/ E3 - Electrical cabling 11 Floor &

    thPlumbing upto 17 Floor completed/ E2-Flat Flooring th th9 & E3- Flat Flooring - 9 Floor in pro./ E1- Scooter

    Parking Plinth Beams & Floor PCC in progress

    E1 –Parking P3 complete & Podium Level part slab complete/ Scooter Parking Floor & Podium Level Club House RCC work-in-progress/ E2 & E3- Plumbing shaft drainage pipe lines �xing in prog.

    E1– Under Ground Water Tank RCC Raft and th thWalls/ E2- 14 Floor & E3- 14 Floor Door frame

    �xing work-in-progress/ E3- Texture – Surface preparation for external paint

    Ramp and Underground Water Tank RCC walls/E2 & E3- Scooter Parking VDF & Underground services Floor concreting & Podium & Parking level RCC Parapet in progress/ Electrical cabling

    th11 Floor in progress

    E2 – Parking External Plaster/ E3 – Fire Staircase thBlock work-in-progress/ E2- 8 Floor Toilet Dado

    th�xing & E3- Toilet Dado 11 Floor �xing in progress/ndE1 – Boundary wall work in progress & 2 Floor

    (Club House Roof) Part PT Slab complete

    ndE2- 22 Floor wall Gypsum work-in-progress/rdE3- 23 Floor wall Gypsum work-in-progress &

    E2 & E3 - Lift lobby wall Gypsum work in progress/ Lift Lobby AAC Block work in progress

    E2 & E3- Terrace complete and above Terrace RCC works in progress / E1 - Podium level slab complete/

    th thE2- Electrical upto 12 Floor & Plumbing upto 10 rdFloor completed/ E1- 3 Floor MIVAN Part 2 assembling/

    E2 & E3 - OHWT RCC & Balcony Texture works in progress

    th thE2- 11 Floor & E3 - 17 Floor Toilet Water-proo�ng/ th thE2- 12 Floor & E3- 20 Floor Toilet Concealed-

    Plumbing work-in-progress/ E2 & E3 - Toilet Flooring ndin prog./ E1- 2 Floor (Club House Roof) Part PT Slab

    shuttering & reinforcement in progress at E1 Podium Lvl.

    E2- Terrace Parapet shuttering work in progress/ th thE2- 16 & E3- 14 Floor Fire Fighting pipe installation/

    E2 & E3- Podium & Parking level RCC Parapet &thE2- 10 Floor Fire Fighting line installation in progressth thE2- 13 Floor & E3- 20 Floor Drainage piping/ th thE2- 10 & E3- 17 Floor Kitchen Platform in progress/

    ndKitchen Dado works in progress/ E1 - 2 Floor/ E1 - Club House multipurpose hall PT Slab completereinforcement in progress at E1 Podium Level

    Tower - E1 Tower - E2 & E3

  • Refer your family member to be a part of this Luxurious River front Community

    LIMITED EDITION LUXURIOUS 3 BHK RIVERFRONT RESIDENCES

    Referral Reward Slab