NOVEMBER 2020MONTHLY UPDATE
-
Duville Estates Wishes all the Owners of Riverdale Residences
A Happy and Prosperous Diwali
-
Riverdale Residences
E2 & E3- Parking level Electrical & Panel Rooms block thwork complete/ E3 - Electrical cabling 11 Floor &
thPlumbing upto 17 Floor completed/ E2-Flat Flooring th th9 & E3- Flat Flooring - 9 Floor in pro./ E1- Scooter
Parking Plinth Beams & Floor PCC in progress
E1 –Parking P3 complete & Podium Level part slab complete/ Scooter Parking Floor & Podium Level Club House RCC work-in-progress/ E2 & E3- Plumbing shaft drainage pipe lines �xing in prog.
E1– Under Ground Water Tank RCC Raft and th thWalls/ E2- 14 Floor & E3- 14 Floor Door frame
�xing work-in-progress/ E3- Texture – Surface preparation for external paint
Ramp and Underground Water Tank RCC walls/E2 & E3- Scooter Parking VDF & Underground services Floor concreting & Podium & Parking level RCC Parapet in progress/ Electrical cabling
th11 Floor in progress
E2 – Parking External Plaster/ E3 – Fire Staircase thBlock work-in-progress/ E2- 8 Floor Toilet Dado
th�xing & E3- Toilet Dado 11 Floor �xing in progress/ndE1 – Boundary wall work in progress & 2 Floor
(Club House Roof) Part PT Slab complete
ndE2- 22 Floor wall Gypsum work-in-progress/rdE3- 23 Floor wall Gypsum work-in-progress &
E2 & E3 - Lift lobby wall Gypsum work in progress/ Lift Lobby AAC Block work in progress
E2 & E3- Terrace complete and above Terrace RCC works in progress / E1 - Podium level slab complete/
th thE2- Electrical upto 12 Floor & Plumbing upto 10 rdFloor completed/ E1- 3 Floor MIVAN Part 2 assembling/
E2 & E3 - OHWT RCC & Balcony Texture works in progress
th thE2- 11 Floor & E3 - 17 Floor Toilet Water-proo�ng/ th thE2- 12 Floor & E3- 20 Floor Toilet Concealed-
Plumbing work-in-progress/ E2 & E3 - Toilet Flooring ndin prog./ E1- 2 Floor (Club House Roof) Part PT Slab
shuttering & reinforcement in progress at E1 Podium Lvl.
E2- Terrace Parapet shuttering work in progress/ th thE2- 16 & E3- 14 Floor Fire Fighting pipe installation/
E2 & E3- Podium & Parking level RCC Parapet &thE2- 10 Floor Fire Fighting line installation in progressth thE2- 13 Floor & E3- 20 Floor Drainage piping/ th thE2- 10 & E3- 17 Floor Kitchen Platform in progress/
ndKitchen Dado works in progress/ E1 - 2 Floor/ E1 - Club House multipurpose hall PT Slab completereinforcement in progress at E1 Podium Level
Tower - E1 Tower - E2 & E3
-