EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı...
Transcript of EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı...
![Page 1: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/1.jpg)
EXPERIENCE OF TURKISH TECHNICAL
CONSULTANCY SECTOR IN TURKEY
SİNAN AKER(Vice President)
Association of Turkish Consulting Engineers and Architects
1
10 APRIL 2013
![Page 2: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/2.jpg)
•ESTABLISHMENT OF ATCEA IN 1980
•JOINED FIDIC IN 1987
•JOINED EFCA IN 2001
•CONSULTING, ENGINEERING AND ARCHITECTURAL SERVICES
•WIDE RANGE OF FIELDS
•STATE ORGANISATIONS
(MUNICIPALITIES, MINISTRIES, KGM, DSİ, TOKİ AND ETC)
•PRIVATE SECTOR
EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR IN TURKEY
2
![Page 3: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/3.jpg)
•BUILDINGS
•WATER
•ENERGY
•INDUSTRIAL PLANTS
•TRANSPORTATION
•REGIONAL DEVELOPMENT
EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR IN TURKEY
3
![Page 4: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/4.jpg)
BUILDINGS
EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR IN TURKEY
4
![Page 5: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/5.jpg)
Various Buildings
Services performed:Architectural design
5
![Page 6: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/6.jpg)
Various BuildingsServices performed:Architectural design
6
![Page 7: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/7.jpg)
Various Buildings
İstanbul Greater City Municipality Service Building
Services performed:Structural design engineering services
Sarphan Finance Park
Via Venezia
7
![Page 8: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/8.jpg)
Varyap Meridian
Various Buildings
Uprise Elite Kartal Ali Sami Yen Project
8
![Page 9: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/9.jpg)
Total construction Area: 615.000 m2
Facilities:Arts of Performances Center5-Star HotelShopping CenterResidancesOffices
ZORLU Center
Services performed:•Construction Management and Supervision Services
9
![Page 10: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/10.jpg)
Consultancy Services for During and after Construction of 26590 Houses and Related Infrastructure with Landscape Works under 5 seperate contracts in 16 provinces
Construction Supervision of Houses and Related Infrastructure with Landscape Works
Services provided:•Review and approval of designs prepared by contractors, soil investigation report, As-Built drawings•Preparation of monthly progress payments•Preparation of progress reports•Contract/Claim management•Inspection of Health and Safety procedures at site•Construction supervision/inspection•Quality Control including approval of materials•Perform of acceptance procedures•Review of final payment certificates and submission to the Administration
10
![Page 11: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/11.jpg)
WATER
EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR IN TURKEY
11
![Page 12: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/12.jpg)
Planning, Final and Detail Design, Construction Supervision for more than 400 dams.
Various Dam and HEPPs in TURKEY
12
![Page 13: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/13.jpg)
249 m high double curvature thin arch dam670 MW (4 units)2.2 billion kWh/year
Deriner Dam and HEPP Project
Services performed:•Revision of Feasibility Study•Final design•Tender documents•Construction supervision
13
![Page 14: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/14.jpg)
169 m high rockfill dam with clay core2400 MW (8 units)8.9 billion kWh/year
Atatürk Dam and HEPP Project
Services performed:•Final design•Tender documents•Construction supervision
14
![Page 15: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/15.jpg)
179 m high concrete gravity dam1800 MW (6 units)7.4 billion kWh/year
Karakaya Dam and HEPP Project
Services performed:•Final design•Tender documents•Construction supervision
15
![Page 16: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/16.jpg)
Greater İstanbul Water Supply ProjectStage II, Melen System
Services performed:•Detail design•Tender documents•EIA Report•Construction supervision
160 km, Ø2.5 m pipeline, 270 mio m3/year12 km tunnel6 km sea crossing tunnel720,000 m3/day capacity treatment plant
16
![Page 17: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/17.jpg)
58 MW12 m3/s
İstanbul Water Supply Yeşilçay System –İsaköy Pump Station
Services performed:• Final design• Tender documents• Construction supervision
17
![Page 18: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/18.jpg)
TR Northern Cyprus Water Supply Project
75 million m3/year37.76 million m3 potable water supply37.24 million m3 7 700 ha irrigate107 km pipeline, 2 dams, 2 pump stations
Services performed:•Feasibility Study•Final design•Application design
18
![Page 19: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/19.jpg)
Ankara İvedik Water Treatment Plant
Services performed:• Detailed design 1,128,00 m3/day capacity treatment plant
19
![Page 20: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/20.jpg)
Engineering and consultancy services for 8 contract packeges covering water distribution network, mains, pump stations, waste water treatment plant, sea outfall
Antalya Water Supply & Sanitation ProjectServices performed:•Evaluation of bids for construction works•Technical assistance during tendering•Construction supervision•Supervision during defects liability period
20
![Page 21: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/21.jpg)
Greater Ankara Sewerage and Stormwater Project (BAKAY)
Services performed:•Final design•Tender documents•Technical assistance during tendering•Construction supervision
33 km interceptor sewers103 km collectors sewers46 storm sewers11,000 ha network sewers7100 new manholes 2700 existing manholes
21
![Page 22: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/22.jpg)
Malatya Wastewater Treatment PlantServices performed:• Construction supervision• Commissioning
30.000 m3/h capacity treatment plant
22
![Page 23: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/23.jpg)
Mersin Waste Water Project
23
• WWTP Capacity 1 050 000 PE (190.000 m3/day)• Sea Outfall with 900 mm pipes L= 2 km
Services performed:• Technical
Assistance forProject Management Unit
![Page 24: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/24.jpg)
Central westewater pumping station and temporary sea outfall (2x5.8 km long mains+2.75 MW pump station, sea outfall appr. 2 km long)Western westewater pumping station (4,76 km long mains+400 kW pump station, sea outfall appr. 1.5 km long)
Mersin Sewerage Project Services performed:•Final design•Tender documents•Technical assistance during tendering•Construction supervision•Commissioning
24
![Page 25: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/25.jpg)
Total 920 ha of Industrial Area roads, water supply, sewerage, stormwater drainage.
Infrastructure Works for Aliağa OrganizedIndustrial Zone
Services performed:• Tender documents• Construction supervision
25
![Page 26: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/26.jpg)
Eskişehir Municipal Urban Development Project NaturalDisaster Risk Minimisation Project - Rehabilitation of Porsuk River
Services performed:• Design, • Preparation of Tender documents• Construction supervision
26
![Page 27: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/27.jpg)
• 14 km Double –track Light Rail, 24 Stations• WTP 120 000 m3/day• 80 km Inner Water Network, 160 km Water Network Extension• WWTP 37 500 m3/day, 125 km Sewerage Network• 2 New Weirs, 7 nr. Road Bridges, 4 nr. Footbridges
Eskişehir Municipal Urban Development ProjectServices performed:• Project Management • Technical Assistance
27
![Page 28: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/28.jpg)
Mardin – Ceylanpınar Main Channel Services performed:•Design Services of Structures on Main Channel
390.000 hectares
28
![Page 29: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/29.jpg)
Harran Plain Irrigation Project Section VIServices performed:•Mapping•Geological investigations•Detailed design
29
![Page 30: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/30.jpg)
Irrigation Area 36 000 ha
Kayseri Develi 2nd Stage Irrigation Project
Services performed:• Feasibility Revision• Detailed Design
30
![Page 31: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/31.jpg)
Şanlıurfa Tunnels
Ø7.62 m, 52.8 km (2 parallel)328 m3/s 0.5 million hectares
Services performed:•Final design•Tender documents•Construction supervision
31
![Page 32: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/32.jpg)
ENERGY
EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR IN TURKEY
32
![Page 33: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/33.jpg)
2 gas turbines 250-300 MW2 heat recovery steam generators
Ambarlı Fuel-Oil Power Plant Units 4 and 5Services performed:Multidisciplinary engineering services as a part of EPC Contract to increase the installed capacity from 300 to 816 MW
33
![Page 34: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/34.jpg)
First phase 600 MWSecond phase 600 MW4.3 billion kWh annual production/unit
Atlas Energy (1+1)x600 MWİskenderun Coal-Fired Thermal Power Plant Services performed:•Final design•Tender documents•Construction supervision
34
![Page 35: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/35.jpg)
Biga Auto Power Plant, Unit 1 and 2
2x135 MW Thermal Power Plant•Main block turbine hall, deaerator and coal bunker bay•Boiler house
• Electrostatic precipitator• Induced draft fan
supporting frame• Stack (height: 150 m)• Bed, coarse, fine ash silo• Pipe supports• Water treatment• Coal dry shed• Milling house• Coal conveyor bridges• Roads
Services performed:Civil engineering design
35
![Page 36: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/36.jpg)
Bandırma Combined Cycle Natural Gas PP919 MW Power Plant
Steam design and generator turbine buildings
TransformersHRSG foundationsDemin plantCooling water pump houseFire fighting buildingSea pit, sea basinPipe racksElectrical building, administration
building, workshop and store building
Other foundations
Services performed:Detailed design engineering services
36
![Page 37: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/37.jpg)
• 2000 km pipeline, • Ø56’’, 31 bcm/year
Nabucco Natural Gas Pipeline ProjectTurkish Section Feed Design Services
Services performed:•Route Selection •Preparation of Row and Land Acquisition Files
•Topographical and Geotechnical Surveys •Design for Pipeline and Above Ground Installations
•EIA Reporting
37
![Page 38: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/38.jpg)
1025 km 34’’ and 42’’ pipeline4 pump stations, 28 block valve stationsUp to 50 million metric tonnes of crude oil per annum
Baku-Tblisi-Ceyhan Crude Oil Pipeline Project
Services performed:• Detailed Engineering Services (for Turkish
Section )
38
![Page 39: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/39.jpg)
INDUSTRIAL PLANTS
EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR IN TURKEY
39
![Page 40: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/40.jpg)
2,500,000 tons of hot rolled steel900,000 tons of cold rolled steel800,000 tons of galvanised steel400,000 tons of painted steel
MMK-Atakaş Dörtyol Iron and Steel Plant ProjectServices performed:•Multidisciplinary design engineering services
40
![Page 41: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/41.jpg)
Çimko Narlı Cement FactoryServices performed:Multidisciplinary engineering services as a part of EPC Contract for 7500 tons/day capacity cement factory
41
![Page 42: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/42.jpg)
Factory buildings of 93,100 m2 and Administration Building of 5,150 m2
ASAS Aluminium Foil Manufacturing & Plate Cutting Factory
Services performed:Architectural, Structural, Civil, Detailed Design and Technical Consulting
42
![Page 43: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/43.jpg)
TRANSPORTATION
EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR IN TURKEY
43
![Page 44: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/44.jpg)
• 24.3 km 2x3 Lane Urban Expressway• 6 AT-grade Intercharges• 8 Grade Seperated Intercharges• Viaducts and Intercharge Bridges L: 12 500 m• Longest Viaduct L= 1 950 m
İZMİR Urban Expressway
Services performed:• Detailed Design
Engineering Services
44
![Page 45: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/45.jpg)
• 132,4 km • 8 Viaducts (total length: 1 833 m)• 9 Interchanges• 11 River bridges• 58 Underpasses• 19 Overbridges• 421 Box culverts
Toprakkale-İskenderun Motorway Services performed:• Construction supervision
45
![Page 46: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/46.jpg)
28 km state road13 tunnels (total length 6.25 km)8 bridges (total length 700 m)4 balanced cantilever bridges (total length 1.2 km)3 viaducts (total length 750 m)Retaining walls (total length 6.5 km)
Artvin – Erzurum Highway
Services performed:•Final and application design
46
![Page 47: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/47.jpg)
• 85.8 km 2x2 Dual Carriageway• 29 nr. Grade Seperated Intercharges• 2 nr. Double Tunnels (L: 2 450 m, L: 821 m)• 40 nr. Bridges and Viaducts
Bozüyük-Mekece Highway Improvement Project
Services performed:• Construction supervision and
consultancy Services
47
![Page 48: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/48.jpg)
• 13.5 km railway / metro line with Bosphorus Crossing
• 4 nos stations
Marmaray İstanbul Strait Railway Crossing
Services performed:• Final design• Construction Management
and Supervision
48
![Page 49: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/49.jpg)
600 km Railway Line
Ankara-İzmir Railway Project
Services performed:• Final Design• Technical Specifications• Tender Documents
49
![Page 50: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/50.jpg)
İstanbul Metro 4. Levent-Hacıosman Section
Services performed:• Preliminary Design• Final Design• Detailed Design
50
• 7 km alignment• 7 km NATM Tunnel Design• 6 Underground Station• Depot and Workshop Building
![Page 51: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/51.jpg)
İzmir MetroServices performed:• Consulting and Engineering• Construction Supervision
51
• 11,3 km Alignment• 4,7 km Viaduct• 2,9 km twin bored tunnel by NATM and TBM• 2,3 km At-grade• 4 Underground Stations• 2 Viaduct and 4 At-grade station• Depot Area and Workshop
![Page 52: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/52.jpg)
Haydarpaşa Port construction consists of ro-ro quay having 8m water depth and 74 m length, breakwater (length is 650 m), Ferry –boat quay (length is 310 m.)
Haydarpaşa Port
52
Services performed:• Geotechnical investigation• Detail design of ro-ro quay• Detail design of breakwater• Detail design of ferry-quaywall• Detail design of infrastucture of
harbours
![Page 53: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/53.jpg)
Construction of passenger block type quay wall (length is 305 m and water depth is 12 m), ferryboat quay wall ( length is 200 m and water depth is 8 m), 2700 sqm floating pier. Marmaris marine capacity is 700 yacht.
Marmaris Marina
53
Services performed:• Detail design of passenger quay• Detail Design of ferry-boat quay wall• Detail design of onshore and offshore facilities• Detail design of infrastructures,
electrical and mechanical facilities• Supervision Services during the
construction phase
![Page 54: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/54.jpg)
REGIONAL DEVELOPMENT
EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR IN TURKEY
54
![Page 55: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/55.jpg)
Yeşilırmak Region, Regional Development Plan(TR 83)
•Urban and rural infrastructure•Social structure•Economical structure•Environment
Services performed:Regional development plan for 5, 10 and 20 years terms for TR83 Region covering Amasya, Çorum, Samsun, Tokat •Existing situation•Strategy and restructuring scenarious•Regional Development Main Plan
55
![Page 56: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/56.jpg)
KONYA ÇUMRA III STAGE PLANNING
• 252.000 hectares of irrigation• 50.6 MW, 148 million kWh energy
production• Water supply• Flood control• Environmental impact
Services performed:•Large scale planning•Environmental Impact Assesment Studies
56
![Page 57: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/57.jpg)
Planning all modes of transport within Turkey for integration with European Union transport systems
Technical Assistance to Transportation Infrastructure (TINA) Needs Assessment
Services performed:• Planning• Prioritisation
57
![Page 58: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/58.jpg)
Regional Development Planning for GAP Region including 45 settlements based on Agriculture and Agro-Industry Development
GAP Regional Transportation andInfrastructural Development and Planning Study
Services performed:• Planning
58
![Page 59: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/59.jpg)
water supply, wastewater collection, treatment and solid waste systems for 43 settlements along 1600 km in Aegean and Mediterranean Coastal Region
Southwest Coast Environmental Project (GAÇ)
Services performed:• Planning • Design
59
![Page 60: EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR … · 2 heat recovery steam generators Ambarlı Fuel-Oil Power Plant Units 4 and 5 Services performed: Multidisciplinary engineering](https://reader031.fdocuments.us/reader031/viewer/2022011907/5f536043991a8c7f73691b2b/html5/thumbnails/60.jpg)
THANK YOU
EXPERIENCE OF TURKISH TECHNICAL CONSULTANCY SECTOR IN TURKEY
60