Expeditionary Systems Evaluation Division · 2017-05-19 · M201A1 Pyrotechnic Delay Hand Grenade...

15
1 02/23/10 Expeditionary Systems Evaluation Division NSWC Crane Division Detachment Fallbrook High Speed Digital Infrared Imaging of the M201A1 Grenade Fuze Initiation Train Presented to the NDIA Fuze Conference May 2010

Transcript of Expeditionary Systems Evaluation Division · 2017-05-19 · M201A1 Pyrotechnic Delay Hand Grenade...

Page 1: Expeditionary Systems Evaluation Division · 2017-05-19 · M201A1 Pyrotechnic Delay Hand Grenade Fuze Description ... Quantify surface temperature profile during function . 02/23/10.

102/23/10

Expeditionary Systems Evaluation DivisionNSWC Crane Division Detachment Fallbrook

High Speed Digital Infrared Imagingof the

M201A1 Grenade Fuze Initiation TrainPresented to the

NDIA Fuze ConferenceMay 2010

Page 2: Expeditionary Systems Evaluation Division · 2017-05-19 · M201A1 Pyrotechnic Delay Hand Grenade Fuze Description ... Quantify surface temperature profile during function . 02/23/10.

202/23/10

Expeditionary Systems Evaluation DivisionNSWC Crane Division Detachment Fallbrook

Co-Authors

• Dr. Ryan Olsen, T&E Board Chairman, NSWC Crane, Detachment Fallbrook, ESED

• Ms. Christine Grasinski, Mechanical Engineer, NSWC Crane, Detachment Fallbrook, ESED

• Mr. Jon Conner, Senior Scientist, National Technical Systems, Dana Point, CA

• Ms. Kathryn Hunt, Chemical Engineer, USMC MARCORSYSCOM, PM Ammo

Page 3: Expeditionary Systems Evaluation Division · 2017-05-19 · M201A1 Pyrotechnic Delay Hand Grenade Fuze Description ... Quantify surface temperature profile during function . 02/23/10.

302/23/10

Expeditionary Systems Evaluation DivisionNSWC Crane Division Detachment Fallbrook

Presentation Outline• Background

– M201A1 Pyrotechnic Delay Hand Grenade Fuze Description

• Approach– Digital IR Camera Description– Test Setup

• Test Results– Data Reduction Methodology

• Summary and Conclusions

Page 4: Expeditionary Systems Evaluation Division · 2017-05-19 · M201A1 Pyrotechnic Delay Hand Grenade Fuze Description ... Quantify surface temperature profile during function . 02/23/10.

402/23/10

Expeditionary Systems Evaluation DivisionNSWC Crane Division Detachment Fallbrook

M201A1 Fuze Description

• The M201A1 Fuze is used on a number of hand grenades including:

– M18 Colored Smoke– AN-M14 Incendiary Thermite (TH-3) – AN-M8 HC (Hexachloroethane) Smoke– M73A CS Riot Control– M83 TA Practice (Teraphthalic Acid) Smoke

• Failures of these grenades to function are often attributed to M201A1 Fuze misfire

Page 5: Expeditionary Systems Evaluation Division · 2017-05-19 · M201A1 Pyrotechnic Delay Hand Grenade Fuze Description ... Quantify surface temperature profile during function . 02/23/10.

502/23/10

Expeditionary Systems Evaluation DivisionNSWC Crane Division Detachment Fallbrook

M201A1 Fuze Description• Contains three stage initiation train:

– Primer– Delay Column– Ignition Charge

• Functional Sequence− Remove of Safety Pin− Release of Safety Lever− Spring loaded striker impacts

Percussion Primer− Delay Column initiated (2 sec delay)− Ignition Charge fires

Page 6: Expeditionary Systems Evaluation Division · 2017-05-19 · M201A1 Pyrotechnic Delay Hand Grenade Fuze Description ... Quantify surface temperature profile during function . 02/23/10.

602/23/10

Expeditionary Systems Evaluation DivisionNSWC Crane Division Detachment Fallbrook

Approach• Typical thermal output assessment tools

– Disassembly and dissection of energetics– Bomb Calorimetry– DSC (Differential Scanning Calorimetry)– TGA (Thermal Gravimetric Analysis)

• Approach– Measure thermal output of fuze initiation train without

disassembly– Perform high speed IR imaging of surface of fuze body– Quantify surface temperature profile during function

Page 7: Expeditionary Systems Evaluation Division · 2017-05-19 · M201A1 Pyrotechnic Delay Hand Grenade Fuze Description ... Quantify surface temperature profile during function . 02/23/10.

702/23/10

Expeditionary Systems Evaluation DivisionNSWC Crane Division Detachment Fallbrook

Digital IR Camera Description• FLIR Systems Thermovision SC4000 InSb Camera System

– Wavelength: 3.0-5.0 µm– Resolution: 320 x 256 Pixels– Full Frame Rate: 420 Hz– Sensor Cooling: Stirling Closed Cycle– Lens: 100 mm InSb lens, f/2.3– Sensitivity: 0.018 ºC– Thermovision ExaminIR MAX Software

• Sub-Windowing allowed higher effective frame rate– Max frame rate used in test: 160 x 128 pixel frame @ 1324 fps

Page 8: Expeditionary Systems Evaluation Division · 2017-05-19 · M201A1 Pyrotechnic Delay Hand Grenade Fuze Description ... Quantify surface temperature profile during function . 02/23/10.

802/23/10

Expeditionary Systems Evaluation DivisionNSWC Crane Division Detachment Fallbrook

Test Setup• Test Fixture Design

– Rigid mount allowed viewing of the fuze body during function– Pneumatic actuator to remove safety pin

Page 9: Expeditionary Systems Evaluation Division · 2017-05-19 · M201A1 Pyrotechnic Delay Hand Grenade Fuze Description ... Quantify surface temperature profile during function . 02/23/10.

902/23/10

Expeditionary Systems Evaluation DivisionNSWC Crane Division Detachment Fallbrook

Test Setup• Test Layout

– High speed digital IR Camera System Positioned to allow fuze body to fill the field of view

Page 10: Expeditionary Systems Evaluation Division · 2017-05-19 · M201A1 Pyrotechnic Delay Hand Grenade Fuze Description ... Quantify surface temperature profile during function . 02/23/10.

1002/23/10

Expeditionary Systems Evaluation DivisionNSWC Crane Division Detachment Fallbrook

Test Results• Pyrotechnic Reaction Sequence – “Good Fuze”

QE 138, Frame 1 QE 138, Frame 250 QE 138, Frame 500

QE 138, Frame 750 QE 138, Frame 1000 QE 138, Frame 1250

Page 11: Expeditionary Systems Evaluation Division · 2017-05-19 · M201A1 Pyrotechnic Delay Hand Grenade Fuze Description ... Quantify surface temperature profile during function . 02/23/10.

1102/23/10

Expeditionary Systems Evaluation DivisionNSWC Crane Division Detachment Fallbrook

Test Results• Pyrotechnic Reaction Sequence – Misfire

QE 137, Frame 1 QE 137, Frame 250 QE 137, Frame 500

QE 137, Frame 750 QE 137, Frame 1000 QE 137, Frame 1250

Page 12: Expeditionary Systems Evaluation Division · 2017-05-19 · M201A1 Pyrotechnic Delay Hand Grenade Fuze Description ... Quantify surface temperature profile during function . 02/23/10.

1202/23/10

Expeditionary Systems Evaluation DivisionNSWC Crane Division Detachment Fallbrook

Comparative High Speed Video Images

QE 365, Manufactured in 2000 QE 429, Manufactured in 1968

Page 13: Expeditionary Systems Evaluation Division · 2017-05-19 · M201A1 Pyrotechnic Delay Hand Grenade Fuze Description ... Quantify surface temperature profile during function . 02/23/10.

1302/23/10

Expeditionary Systems Evaluation DivisionNSWC Crane Division Detachment Fallbrook

Data Reduction MethodologyFuze Lot MEI85E001-005, QE #396

(approximately 24 years old at time of test) Fuze Lot MEI85E001-005, QE #396

10

20

30

40

50

60

70

80

90

100

0 10 20 30 40 50 60 70 80 90

output <------> primer

Tem

pera

ture

(C)

Frame 516, Just Prior to Output Charge

Fuze Lot NYI-1633-12, QE #3 (approximately 47 years old at time of test)

Fuze Lot NYI-1633-12, QE #3

10

20

30

40

50

60

70

80

90

100

0 10 20 30 40 50 60 70 80 90

output <------> primer

Tem

pera

ture

(C)

Frame 467, Just Prior to Output Charge

Page 14: Expeditionary Systems Evaluation Division · 2017-05-19 · M201A1 Pyrotechnic Delay Hand Grenade Fuze Description ... Quantify surface temperature profile during function . 02/23/10.

1402/23/10

Expeditionary Systems Evaluation DivisionNSWC Crane Division Detachment Fallbrook

Example Temperature Profiles

60

80

100

120

140

160

180

200

220

240

260

0 0.5 1 1.5 2 2.5 3 3.5

Distance (inches)

Tem

pera

ture

(Deg

rees

F)

Page 15: Expeditionary Systems Evaluation Division · 2017-05-19 · M201A1 Pyrotechnic Delay Hand Grenade Fuze Description ... Quantify surface temperature profile during function . 02/23/10.

1502/23/10

Expeditionary Systems Evaluation DivisionNSWC Crane Division Detachment Fallbrook

Summary and Conclusions• High Speed Digital IR Camera Systems are

effective in quantifying thermal output of pyrotechnic initiation trains

• Technique may be utilized on other pyrotechnic type items