Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep...

35
Expansion of Hong Kong International Airport into a Three-Runway System Submission of Management Organisations May 2020

Transcript of Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep...

Page 1: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

Expansion of Hong KongInternational Airport into aThree-Runway SystemSubmission of Management Organisations

May 2020

Page 2: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

355482 06/09 6https://mottmac.sharepoint.com/teams/pj-c8123/do/06 Deliverables/09 EP Condition 2.4 -Management Organizations/7th Revision/20191104 Submission of ManagementOrganisations Version 7.docxMott MacDonald

3/F International Trade Tower348 Kwun Tong RoadKowloonHong Kong

T +852 2828 5757F +852 2827 1823mottmac.hk

Expansion of Hong KongInternational Airport into aThree-Runway SystemSubmission of Management Organisations

May 2020

Page 3: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

This Submission of Management Organizations

has been reviewed and certified by

the Environmental Team Leader (ETL) in accordance with

Condition 2.4 of Environmental Permit No. EP-489/2014.

Certified by: Terence Kong

Environmental Team Leader (ETL) Mott MacDonald Hong Kong Limited

Date 5 May 2020

Page 4: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

AECOM

8/F, Grand Central Plaza, Tower

2, 138 Shatin Rural Committee

Road, Shatin, Hong Kong

香港新界沙田鄉事會路 138 號新城

市中央廣場第 2 座 8 樓

www.aecom.com

+852 3922 9000 tel

+852 2317 7609 fax

Our Ref : 60440482/C/JCHL200506

By Email

Airport Authority Hong Kong

HKIA Tower, 1 Sky Plaza Road

Hong Kong International Airport

Lantau, Hong Kong

Attn: Mr. Lawrence M L Tsui, Principal Manager

6 May 2020

Dear Sir,

Contract No. 3102

3RS Independent Environmental Checker Consultancy Services

Management Organizations

Reference is made to the ET’s submission of updated Management Organizations under Condition 2.4

of the Environmental Permit No. EP-489/2014 certified by the ET Leader on 5 May 2020.

We would like to inform you that we have no comment on the captioned submission. Therefore we write

to verify the captioned submission in accordance with the requirement stipulated in Condition 2.4 of

EP-489/2014.

Should you have any query, please feel free to contact the undersigned at 3922 9376.

Yours faithfully,

AECOM Asia Co. Ltd.

Jackel Law

Independent Environmental Checker

Page 5: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System

355482 | 06/09 | 6 | May 2020

Contents

1 Introduction 1

2 Management Organisation of the Main Construction Companies 22.1 Advanced Works Contract 22.2 Deep Cement Mixing (DCM) Works Contracts 22.3 Main Reclamation Works Contract 22.4 Airfield Works Contracts 22.5 Third Runway Concourse and Integrated Airport Centres Works Contract 22.6 Terminal 2 Expansion Works Contracts 32.7 Automated People Mover Works Contracts 32.8 Baggage Handling System Works Contract 32.9 Airport Support Infrastructure and Logistic Works Contract 3

3 Management Organisation of the Environmental Team 7

4 Management Organisation of the Independent Environmental Checkerand His Team 8

Attachment 9

A. Organisation Chart of the Works Contracts 10

B. Organisation Chart of the ET and IEC 29

TablesTable 1: Contact Information of Key Personnel 4Table 2: Contact Information of ET 7Table 3: Contact Information of IEC 8

Page 6: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 1

EP Condition 2.4 – Management Organisations

1 Introduction

The Environmental Impact Assessment (EIA) Report (Register No.: AEIAR-185/2014) preparedfor the “Expansion of Hong Kong International Airport into a Three-Runway System” (the Project)has been approved by the Director of Environmental Protection, and an Environmental Permit(EP) (Permit No.: EP-489/2014) has been issued for the project under the Environmental ImpactAssessment Ordinance.

The purpose of this updated Management Organisations is to provide the latest information basedon the recent contracts awarded under this project. This updated Management Organsationsincludes the following information:

a) the management organisation of the main construction companies and/or any form ofjoint ventures associated with the construction of the Project (in Section 2);

b) the management organisation of the Environmental Team (ET) (in Section 3);c) the management organisation of the Independent Environmental Checker (IEC) and his

team (in Section 4); andd) organisation charts, names of responsible persons and their contact details.

Page 7: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 2

EP Condition 2.4 – Management Organisations

2 Management Organisation of the MainConstruction Companies

2.1 Advanced Works ContractLangfang Huayuan Mechanical and Electrical Engineering Co., Ltd. (Contract P560(R)) is thecontractor appointed to undertake the diversion of the existing submarine aviation fuel pipelines.

Names of the responsible persons and their contact details are set out in Table 1 below.

2.2 Deep Cement Mixing (DCM) Works ContractsPenta-Ocean-China State-Dong-Ah Joint Venture (Contract 3201), Samsung-Build King JointVenture (Contract 3202), Sambo E&C Co., Ltd. (Contract 3203), China Road and Bridge-SamboJoint Venture (Contract 3204) and Bachy Soletanche-Sambo Joint Venture (Contract 3205) arethe contractors appointed to undertake the DCM ground improvement works. Construction worksof Contracts 3201, 3202, 3203 and 3204 have been completed.

Names of the responsible persons and contact details of Contract 3205 are set out in Table 1below.

2.3 Main Reclamation Works ContractZhen Hua Engineering Company Ltd.-China Communications Construction Company Ltd.-CCCCDredging (Group) Company Ltd. (ZHEC-CCCC-CDC) Joint Venture (Contract 3206) is thecontractor appointed to undertake the main reclamation works.

Names of the responsible persons and their contact details are set out in Table 1 below.

2.4 Airfield Works ContractsFujita Corporation-China Harbour Engineering Company Ltd.-Zhen Hua Engineering CompanyLtd. (FJT-CHEC-ZHEC) Joint Venture (Contract 3301) is the contractor appointed to undertakethe construction works for the north runway crossover taxiway.

China Road and Bridge Corporation (Contract 3302) is the contractor appointed to undertakeadvance works for the eastern vehicular tunnel.

Sinohydro Corporation Limited, Powerchina Airport Construction Company Limited, Paul Y.Construction Company Limited, and Rock-One Engineering Company Limited (SAPR) JointVenture (Contract 3303) is the contractor appointed to undertake the construction works for thenew runway, taxiways, and associated works.

Names of the responsible persons and their contact details are set out in Table 1 below.

2.5 Third Runway Concourse and Integrated Airport Centres Works ContractWing Hing Construction Co., Ltd. (Contract 3402) is the contractor appointed to undertakeenabling works for the new Integrated Airport Centres.

Sun Fook Kong Construction Limited (Contract 3403) is the contractor appointed to undertakebuilding and civil works for the new Integrated Airport Centres.

Page 8: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 3

EP Condition 2.4 – Management Organisations

China Road and Bridge Corporation – Bachy Soletanche Group Limited – LT Sambo Co., LtdJoint Venture (Contract 3405) is the contractor appointed to undertake foundation andsubstructure works for the Third Runway Concourse.

Names of the responsible persons and their contact details are set out in Table 1 below.

2.6 Terminal 2 Expansion Works ContractsBuild King Construction Ltd. (Contract 3501) is the contractor appointed to undertake theconstruction works for antenna farm and sewage pumping station.

Build King Construction Ltd. (Contract 3502) is the contractor appointed to undertake Terminal 2(T2) automated people mover (APM) depot modification works. Construction works of Contract3502 have been completed.

Leighton–Chun Wo Joint Venture (Contract 3503) is the contractor appointed to undertake T2foundation and substructure works.

Names of the responsible persons and their contact details of Contracts 3501 and 3503 are setout in Table 1 below.

2.7 Automated People Mover Works ContractsCRRC Puzhen Bombardier Transportation Systems Ltd. and CRRC Nanjing Puzhen Co., Ltd.(PBTS – CRRC PZ) consortium (Contract 3601) is the contractor appointed to undertake worksfor the new APM system (TRC Line).

Niigata Transys Company Ltd. (Contract 3602) is the contractor appointed to undertake theexisting APM system modification works.

Names of the responsible persons and their contact details are set out in Table 1 below.

2.8 Baggage Handling System Works ContractVanderlande Industries Hong Kong Limited and Shun Hing Systems Integration Company Limited(Contract 3603) is the contractor appointed to undertake the construction works of baggagehandling system (BHS).

Names of the responsible persons and their contact details are set out in Table 1 below.

2.9 Airport Support Infrastructure and Logistic Works ContractChina State Construction Engineering (Hong Kong) Ltd. (Contract 3721) is the contractor appointed toundertake the construction support infrastructure works up to the completion of the 3RS Project.

Tapbo Construction Company Limited and Konwo Modular House Limited Joint Venture (Contract3722) is the contractor appointed to undertake works for construction support facilities in westernsupport area.

China State Construction Engineering (Hong Kong) Ltd. (Contract 3801) is the contractor appointed toundertake the construction works of APM and BHS tunnels on existing airport island.

Gammon Construction Limited (Contract 3901B) is the licensee appointed to establish, operate, andmaintain the concrete batching facility at the Project site.

Names of the responsible persons and their contact details are set out in Table 1 below.

Page 9: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 4

EP Condition 2.4 – Management Organisations

Table 1: Contact Information of Key PersonnelParty Position Name Telephone EmailContract P560(R)Aviation FuelPipeline DiversionWorks(Langfang HuayuanMechanical andElectrical EngineeringCo., Ltd.)

Project Manager Wei Shih 2117 0566 [email protected]

EnvironmentalOfficer

Lyn Liu 5172 6543 [email protected]

Contract 3205DCM (Package 5)(Bachy Soletanche-Sambo Joint Venture)

Deputy ProjectDirector

Min Park 9683 0765 [email protected]

EnvironmentalOfficer

William Chan 5408 3045 [email protected]

Contractor 3206Main ReclamationWorks(ZHEC-CCCC-CDCJoint Venture)

Project Manager Kim Chuan Lim 3763 1509 [email protected]

EnvironmentalOfficer

Kwai Fung Wong 3763 1452 [email protected]

Contract 3301North RunwayCrossover Taxiway(FJT-CHEC-ZHECJoint Venture)

Deputy ProjectDirector

Kin Hang Chung 9800 0048 [email protected]

EnvironmentalOfficer

Joe Wong 6182 0351 [email protected]

Contract 3302Eastern VehicularTunnel AdvanceWorks(China Road andBridge Corporation)

Project Manager Wan Cheung Lee 6100 6075 [email protected]

EnvironmentalOfficer

Dennis Ho 5645 0563 [email protected]

Contract 3303Third Runway andAssociated Works(SAPR Joint Venture)

Project Manager Andrew Keung 6277 6628 [email protected]

EnvironmentalOfficer

Max Chin 6447 5707 [email protected]

Contract 3402New IntegratedAirport CentresEnabling Works(Wing HingConstruction Co., Ltd.)

Contract Manager Michael Kan 9206 0550 [email protected]

EnvironmentalOfficer

Lisa He 5374 3418 [email protected]

Contract 3403New IntegratedAirport CentresBuilding and CivilWorks(Sun Fook KongConstruction Ltd.)

Project Manager Alice Leung 9220 3162 [email protected]

EnvironmentalOfficer

Alpha Chia 9626 1114 [email protected]

Page 10: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 5

EP Condition 2.4 – Management Organisations

Party Position Name Telephone EmailContract 3405Third RunwayConcourseFoundation andSubstructure Works(China Road andBridge Corporation –Bachy SoletancheGroup Limited – LTSambo Co., Ltd. JointVenture.)

Project Manager Francis Choi 9423 3469 [email protected]

EnvironmentalOfficer

K M Lui 5113 8223 [email protected]

Contract 3501Antenna Farm andSewage PumpingStation(Build KingConstruction Ltd.)

Contracts Manager Vincent Kwan 9833 1313 [email protected]

EnvironmentalOfficer

Edward Tam 9287 8270 [email protected]

Contract 3503T2 Foundation andSubstructure Works(Leighton–Chun WoJoint Venture)

Project Manager Eric Wu 3973 1718 [email protected]

EnvironmentalOfficer

Malcolm Leung 3973 0850 [email protected]

Contract 3601New APM System(TRC Line)(CRRC PuzhenBombardierTransportationSystems Limited andCRRC Nanjing PuzhenCo., Ltd. Joint Venture)

Project Manager Hongdan Wei 158 61809450

[email protected]

EnvironmentalOfficer

K F Li 9086 1793 [email protected]

Contract 3602Existing APM SystemModification Works(Niigata Transys Co.,Ltd.)

Project Manager Kunihiro Tatecho 9755 0351 [email protected]

EnvironmentalOfficer

Yolanda Gao 5399 3509 [email protected]

Contract 3603Baggage HandlingSystem(VanderlandeIndustries Hong KongLtd. and Shun HingSystems IntegrationCo., Ltd.)

Project Manager K C Ho 9272 9626 [email protected]

EnvironmentalOfficer

Eric Ha 9215 3432 [email protected]

Contract 3721ConstructionSupportInfrastructure Works(China StateConstructionEngineering (HongKong) Ltd.)

Site Agent Thomas Lui 9011 5340 [email protected]

EnvironmentalOfficer

Xavier Lam 9493 2944 [email protected]

Page 11: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 6

EP Condition 2.4 – Management Organisations

Party Position Name Telephone EmailContract 3722Western SupportArea – ConstructionSupport Facilities(Tapbo ConstructionCompany Limited andKonwo Modular HouseLtd. Joint Venture.)

Deputy ProjectDirector

Philip Kong 9049 3161 [email protected]

EnvironmentalOfficer

Sampson Lo 9752 9118 [email protected]

Contract 3801APM and BHSTunnels on ExistingAirport Island(China StateConstructionEngineering (HongKong) Ltd.)

Project Manager Tony Wong 9642 8672 [email protected]

Federick Wong 9842 2703 [email protected]

Contract 3901BConcrete BatchingFacility(GammonConstruction Ltd.)

Senior ProjectManager

Gabriel Chan 2435 3260 [email protected]

EnvironmentalOfficer

Rex Wong 2695 6319 [email protected]

Attachment A presents the organisation charts of all the above-mentioned contractors required under EP Condition 2.4.

Page 12: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 7

EP Condition 2.4 – Management Organisations

3 Management Organisation of theEnvironmental Team

The management organisation of the Environmental Team (ET), including names of the ETLeader and Deputy ET Leaders and their contact details are set out in Table 2 below:

Table 2: Contact Information of ETName Position Telephone EmailTerence Kong ET Leader 2828 5919 [email protected]

Heidi Yu Deputy ET Leader 2828 5704 [email protected]

Daniel Sum Deputy ET Leader 2585 8495 [email protected]

Attachment B presents an organisation chart of the ET (together with that for the IEC, as de-scribed in Section 4 below) required under EP Condition 2.4.

Page 13: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 8

EP Condition 2.4 – Management Organisations

4 Management Organisation of theIndependent Environmental Checker and HisTeam

The management organisation of the Independent Environmental Checker (IEC), includingnames of the IEC and Deputy IEC are set out in Table 3 below:

Table 3: Contact Information of IECName Position Telephone EmailJackel Law IEC 3922 9376 [email protected]

Roy Man Deputy IEC 3922 9141 [email protected]

Attachment B presents an organisation chart of the IEC required under EP Condition 2.4.

Page 14: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 9

EP Condition 2.4 – Management Organisations

Attachment

A. Organisation Chart of the Works Contracts 10B. Organisation Chart of the ET and IEC 29

Page 15: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 10

EP Condition 2.4 – Management Organisations

A. Organisation Chart of the WorksContracts

Page 16: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 11

EP Condition 2.4 – Management Organisations

Project Director

Zhanhua Shi

Project Manager

Wei Shih

Deputy Project Manager

ProcurementTeam

Aviation FuelSystem

ConstructionTeam

HorizontalDirectional

DrillingConstruction

Team

EnvironmentalManagement

Team

Environmental Officer:

Lyn Liu

Safety

Team

QA/QC

Team

Organisation Chart of Langfang Huayuan Mechanical and Electrical Engineering Co., Ltd (Contract P560(R)) for the Aviation FuelPipeline Diversion Works

Project Manager

Feng Shi

DesignSupport

Consultants

Page 17: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 12

EP Condition 2.4 – Management Organisations

Project Director

Derek Yung

Administrative& HR Dept.

IMS Department

Organisation Chart of Bachy Soletanche-Sambo Joint Venture (Contract 3205) for Deep Cement Mixing Works (Package 5)

EngineeringDept.

Quality/ GeotechnicalManager

Deputy Project Director

Min Park

AccountDept.

ProgramDept.

OperationsDept.

CostControlDept.

CommercialDept.

Environmental OfficerWilliam Chan

Safety Manager

Page 18: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 13

EP Condition 2.4 – Management Organisations

Project Director

Heng Liang

Stone ColumnTeam

EnvironmentalManager

Organisation Chart of ZHEC-CCCC-CDC Joint Venture (Contract 3206) for Main Reclamation Works

PVD & VibroFlotation Team

Project Manager

Kim Chuan Lim

ReclamationTeam

DCMTeam

Seawall &OutfallTeam

Environmental OfficerKwai Fung Wong

Deputy Project Managers

EnvironmentalSupervisors

EnvironmentalConsultant

Page 19: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 14

EP Condition 2.4 – Management Organisations

Project Director

Makoto Fujii

Deputy Project Director

Kin Hang Chung

Construction Manager

Alan Lam

Organisation Chart of FJT-CHEC-ZHEC Joint Venture (Contract 3301) for North Runway Crossover Taxiway

Environmental Officer

Joe Wong

Page 20: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 15

EP Condition 2.4 – Management Organisations

Project Director

Yan Hua Wang

Construction Manager

Organisation Chart of China Road and Bridge Corporation (Contract 3302) for Eastern Vehicular Tunnel Advance Works

Deputy Project Director

William Kwok

Project Manager

Wan Cheung Lee

Safety, Health &Environmental Manager

Calvin Ho

Engineers SuperintendentEnvironmental Officer

Dennis Ho

EnvironmentalSupervisors

Page 21: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 16

EP Condition 2.4 – Management Organisations

Project Director

Yazhang Xie

Chief Construction Manager

Organisation Chart of SAPR Joint Venture (Contract 3303) for Third Runway and Associated Works

Deputy Project Director

Wyllie FungZhiqiang Zhan

Zhongpan Wang

Project Manager

Andrew Keung

Safety, Health &Environmental Manager

CY Yeung

Engineers Superintendent

Environmental Officer

Max Chin

Page 22: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 17

EP Condition 2.4 – Management Organisations

Contract Manager

Michael Kan

Coordination Manager

Jerry Tam

Organisation Chart of Wing Hing Construction Co., Ltd. (Contract 3402) for New Integrated Airport Centres Enabling Works

Environmental Officer

Lisa He

Foremen

Environmental Supervisor

Kelvin Wong

Page 23: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 18

EP Condition 2.4 – Management Organisations

Project Manager

Alice Leung

Site Agent

Chow Chong Kei

Organisation Chart of Sun Fook Kong Construction Limited (Contract 3403) for New Integrated Airport Centres Building and CivilWorks

Environmental Officer

Alpha Chia

Environmental SupervisorConstruction Supervisor

Ko Chuen Ho

Page 24: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 19

EP Condition 2.4 – Management Organisations

Project DirectorYan Hua Wang

Project ManagerFrancis Choi

QualityManagement

Team

Deputy Project Managers

Organisation Chart of China Road and Bridge Corporation – Bachy Soletanche Group Limited – LT Sambo Co., Ltd. Joint Venture(Contract 3405) for Third Runway Concourse Foundation and Substructure Works

AdministrationTeam

EngineeringTeam

Interfacing andCoordination

Team

Safety Officer Environmental OfficerKam Man Lui

Environmental Supervisor

Planning andProgramme

Team

RiskManagement

Team

Occupational Health &Safety and

EnvironmentalManagement Team

Senior Construction Managers

CommercialManagement

Team

SurveyTeam

Safety andEnvironmental

Manager

Deputy Project Directors

ConstructionTeam

LogisticTeam

Page 25: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 20

EP Condition 2.4 – Management Organisations

Project Director

Simon Liu

Deputy Project Director

C. K. Chan

QA Team

Contracts Manager/Contractor’s Representative

Vincent Kwan

Organisation Chart of Build King Construction Ltd. (Contract 3501) for Antenna Farm and Sewage Pumping Station

SafetyTeam

E&M Team

Environmental Officer

Edward Tam

EnvironmentalTeam

Project Team CommercialTeam

SurveyingTeam

Environmental Supervisor

Page 26: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 21

EP Condition 2.4 – Management Organisations

Project Director

QA & EnvironmentalManager

Project Manager

Eric Wu

Organisation Chart of Leighton – Chun Wo Joint Venture (Contract 3503) for Terminal 2 Foundation and Substructure Works

Zone One SectionManager

Environmental Officer

Malcolm Leung

Zone Two SectionManager

Zone Three SectionManager

Page 27: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 22

EP Condition 2.4 – Management Organisations

Project Manager

Hong Dan Wei

Organisation Chart of PBTS – CRRC PZ Consortium (Contract 3601) for New Automated People Mover System (TRC Line)

E&M and APMConstruction

Manager

APM SystemDesign Manager

Senior QuantitySurveyor

AdministrationOfficer

Civil WorksConstruction

Manager

Environmental Officer

Kim Fai LiHealth & Safety Officer

Page 28: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 23

EP Condition 2.4 – Management Organisations

Project Director

S. Yasuda

Project Manager

Kunihiro Tatecho

Organisation Chart of Niigata Transys Co., Ltd. (Contract 3602) for Existing Automated People Mover System Modification Works

EnvironmentalOfficer

Yolanda Gao

Risk Manager Administrator EngineeringManager/ Site

Manager

Procurement QA / QC

Page 29: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 24

EP Condition 2.4 – Management Organisations

Project Director

Project Manager

K C Ho

Organisation Chart of Vanderlande Industries Hong Kong Ltd. and Shun Hing Systems Integration Company Ltd. (Contract 3603)for Baggage Handling System Works

Environmental Officer

Eric Ha

EnvironmentalSupervisors

Construction Manager

Site Engineers/Supervisors

Page 30: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 25

EP Condition 2.4 – Management Organisations

Site Agent

Thomas Lui

Organisation Chart of China State Construction Engineering (Hong Kong) Ltd. (Contract 3721) for Construction SupportInfrastructure Works

Environmental Officer

Xavier Lam

EnvironmentalSupervisors

Section Agents

Project Director

Victor Wu

Deputy Site Agent

Gary Yeung

Foremen

Page 31: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 26

EP Condition 2.4 – Management Organisations

Deputy Project Director

Philip Kong

Organisation Chart of Tapbo Construction Company Limited and Konwo Modular House Limited Joint Venture (Contract 3722) forWestern Support Area – Construction Support Facilities

Project Director

Billy Lo

Construction ManagerQuality/ Safety/Environmental Manager

Design/ MethodManager(SupportFacilities)

CommercialManager

MaintenanceTeam

Environmental Officer

Sampson Lo

Page 32: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 27

EP Condition 2.4 – Management Organisations

Project DirectorVictor Wu

Project ManagerTony Wong

Airport SystemCoordinator

Site Manager

Organisation Chart of China State Construction Engineering (Hong Kong) Ltd. (Contract 3801) for Automated People Mover andBaggage Handling System Tunnels on Existing Airport Island

AdministrationTeam

CommercialTeam

Risk &NECTeam

Safety Officer

Assistant SafetyOfficer

Environmental OfficerFederick Wong

Environmental Supervisors

PlanningTeam

ConstructionTeam

Safety & EnvironmentalTeam

Site Agent

Assistant Site Manager

E&MTeam

QualityAssurance& Control

Team

LandSurveyTeam

DesignTeam

Safety Manager

Eric Lai

Safety Supervisor

Page 33: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 28

EP Condition 2.4 – Management Organisations

Senior Project Manager

Gabriel Chan

Organisation Chart of Gammon Construction Limited (Contract 3901B) for Concrete Batching Facility

General Manager

Herbert Zheng

Environmental Officer

Rex WongSenior Plant Supervisor

Senior EnvironmentalManager

Plant Foremen/ Operators

Subcontractors and otheremployees

Page 34: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 29

355482 | 06/09 | 6 | May 2020EP Condition 2.4 – Management Organisations

B. Organisation Chart of the ET and IEC

Page 35: Expansion of Hong Kong International Airport into a Three ...env.threerunwaysystem.com/ep submissions/202005 Management... · the Environmental Team Leader (ETL) in accordance with

Mott MacDonald | Expansion of Hong Kong International Airport into a Three-Runway System 30

355482 | 06/09 | 6 | May 2020EP Condition 2.4 – Management Organisations

Roy Man3922 9141

[email protected]

Daniel Sum2585 8495