EXPANSION OF BULA-GADUD HEALTH CENTER, JUBALAND … · Ring beam layout Electrical plan Elevations...

24
GSPublisherVersion 0.5.100.100 EXPANSION OF BULA - GADUD HEALTH CENTER , JUBALAND STATE , SOMALIA BULA - GADUD VILLAGE

Transcript of EXPANSION OF BULA-GADUD HEALTH CENTER, JUBALAND … · Ring beam layout Electrical plan Elevations...

Page 1: EXPANSION OF BULA-GADUD HEALTH CENTER, JUBALAND … · Ring beam layout Electrical plan Elevations Elevations Floor plan Floor plan and elevations 3D Projection 01 3D Projection 02

GSPublisherVersion 0.5.100.100

EXPANSION OF BULA-GADUDHEALTH CENTER, JUBALAND

STATE,SOMALIA

BULA-GADUDVILLAGE

Page 2: EXPANSION OF BULA-GADUD HEALTH CENTER, JUBALAND … · Ring beam layout Electrical plan Elevations Elevations Floor plan Floor plan and elevations 3D Projection 01 3D Projection 02

GSPublisherVersion 0.5.100.100

Sheet No. Content01/2202/22

Site layout

Health center

Section views

Roof plan

Truss detail

Ring beam layout

Electrical plan

Elevations

Elevations

Floor plan

Floor plan and elevations

3D Projection 01

3D Projection 02

3D Projection 033D Projection 04

Water tank and solar panels

3D Projection 05

3D Projection 06

3D Projection 07

03/22

04/22

05/22

06/22

07/22

08/22

09/22

10/22

11/22

12/22

13/22

14/22

15/22

16/22

17/22

18/22

19/22

20/22 3D Projection 08

Master plan

Foundation layout

3D projections

21/22 3D Projection 09

22/22 3D Projection 10

NOVEMBER 2018DRAWING INDEX

Page 3: EXPANSION OF BULA-GADUD HEALTH CENTER, JUBALAND … · Ring beam layout Electrical plan Elevations Elevations Floor plan Floor plan and elevations 3D Projection 01 3D Projection 02

GSPublisherVersion 0.5.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,

SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:ENG. Duale Salah

REVIEWED BY:

A3

AS SHOWN

November 2018

JUBALAND STATE,BULA-GADUD VILLAGE

LABEL

A Proposed health center

Existing rooms to remain

Existing toilets to rehabilitate

Proposed elevated water tank

Proposed solar panels

A

B

C

D

EB

C

D

E

Existing chain-link fenceto rehabilitated

Enterence

SITE LAYOUT

01/22

Local wood post to beremoved and replaced

in to CHS steel80cmx80cm

Existing toilets tobe cleaned, painted

to approval andprovied 2 doors

Existing buildingto remain

Existing chain-likn to bekept and reused afterremoved the local wood

posts

Toilets to be cleaned,painted,provided ventalation blocks,and

installed wooden doors to approval

Page 4: EXPANSION OF BULA-GADUD HEALTH CENTER, JUBALAND … · Ring beam layout Electrical plan Elevations Elevations Floor plan Floor plan and elevations 3D Projection 01 3D Projection 02

GSPublisherVersion 0.5.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,

SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:ENG. Duale Salah

REVIEWED BY:

A3

AS SHOWN

November 2018

JUBALAND STATE,BULA-GADUD VILLAGE

19,400

8,40

0

2,300

2,30

0

6,000

9,00

0

7,00

03,000

1,90

0

5,600

15,750

50,000

50,0

00

OPEN YARD

Ward

Consultationroom

Consultationroom

Delivery room

Labor room

Pharmacy

Passage

Ward

Ward

Existing chain-link fenceto rehabilitated

Enterence02/22

Page 5: EXPANSION OF BULA-GADUD HEALTH CENTER, JUBALAND … · Ring beam layout Electrical plan Elevations Elevations Floor plan Floor plan and elevations 3D Projection 01 3D Projection 02

GSPublisherVersion 0.5.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,

SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:ENG. Duale Salah

REVIEWED BY:

A3

AS SHOWN

November 2018

JUBALAND STATE,BULA-GADUD VILLAGE

1

1

2

2

3

3

4

4

5

5

7

7

F F

E E

D D

C C

B B

A A

6

6

3,800200

3,800200

3,800200

1,500200

5,300

19,400

4,000 4,000 4,000 1,700 1,800

3,800 1,5002,350 2,800 2,3501,500

5,600

5,900 7,900

1,400

1,50

0

11,300

3,80

020

03,

800

200

4,00

0

4,00

02,

300

1,70

02,

000

2,20

0

12,4

00

8,00

0

1,70

01,

500

2,00

01,

500

1,70

0

4,00

02,

300

1,70

02,

000

2,20

0

8,40

0

3,500

1,350 1,500 2,500 1,500 2,500 1,500 1,700 800 2,450 1,500 2,100

4,000 4,000 4,000 1,700 1,800 3,700

3,700

1,400Y-Y

Y-Y

X-X X-X

E01

E04

E03

E02

FLOOR PLAN

WardConsultation

roomConsultation

room

Delivery room

Labor room

Pharmacy

Passage

W.C

W.H.B

Ramp

P.V

P.V P.V P.V P.V

P.V

P.V

P.V

P.V

P.V

P.VP.VP.VP.VP.V

P.V

P.VUp

FLOOR PLAN

03/22

Page 6: EXPANSION OF BULA-GADUD HEALTH CENTER, JUBALAND … · Ring beam layout Electrical plan Elevations Elevations Floor plan Floor plan and elevations 3D Projection 01 3D Projection 02

GSPublisherVersion 0.5.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,

SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:ENG. Duale Salah

REVIEWED BY:

A3

AS SHOWN

November 2018

JUBALAND STATE,BULA-GADUD VILLAGE

1

1

2

2

3

3

4

4

5

5

7

7

A

A

B

B

C

C

D

D

E

E

F

F

6

6

450

3,40

0

1,4501,500 2,500 1,500 2,600 1,5001,425

450

3,40

0

2,20

0

1,5002,3501,500 2,8002,350

800

2,20

0

4,000 2,300 1,700 2,000 2,20012,400

4,000 4,000 4,000 1,700 1,80019,400

5,600

4,200

3,700

Right side Elevation E-02

P.VP.VP.V

+0.00(G.Level)

+0.45(G.Floor Level)

+3.85(Roof Level)

+0.00(G.Level)

+0.45(G.Floor Level)

+3.85(Roof Level)

Front Elevation E-01

Roof pitch = 25˚

ELEVATIONS

04/22

Page 7: EXPANSION OF BULA-GADUD HEALTH CENTER, JUBALAND … · Ring beam layout Electrical plan Elevations Elevations Floor plan Floor plan and elevations 3D Projection 01 3D Projection 02

GSPublisherVersion 0.5.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,

SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:ENG. Duale Salah

REVIEWED BY:

A3

AS SHOWN

November 2018

JUBALAND STATE,BULA-GADUD VILLAGE

6

6

5

5

4

4

3

3

2

2

1

1

F

F

E

E

D

D

C

C

B

B

A

A

5

5

1,800 1,700 4,000 4,000 4,000

19,400

4,000 80010

0

3,40

0

2,10

040

0

1,20

0

2,000

1,00

0

2,200 2,000 1,700 2,300 4,00012,200

1,00

01,

200

1,20

0

2,450 800 1,700 1,500 2,500 1,500 2,500 1,5001,500

450

3,40

0

3,700

Roof pitch = 25˚

Rear Elevation E-03

Left side Elevation E-04

P.V P.VP.VP.V

P.V P.V

+0.00(G.Level)

+0.45(G.Floor Level)

+3.85(Roof Level)

+0.00(G.Level)

+0.45(G.Floor Level)

+3.85(Roof Level)

ELEVATIONS

05/22

Page 8: EXPANSION OF BULA-GADUD HEALTH CENTER, JUBALAND … · Ring beam layout Electrical plan Elevations Elevations Floor plan Floor plan and elevations 3D Projection 01 3D Projection 02

GSPublisherVersion 0.5.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,

SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:ENG. Duale Salah

REVIEWED BY:

A3

AS SHOWN

November 2018

JUBALAND STATE,BULA-GADUD VILLAGE

F E D C B A

1 2 3 4 5 764,000 4,000 4,000 1,700 1,800

2,200 2,000 1,700 2,300 4,000

3,700

12mm thick chip-boardceiling on 50X50mmcypress brandering at600 mm centres

Corrugated GI sheets gauge 28, fixed on celcurised cypressstructure: 50x50mm Battens on 200X50mm Rafters @700mm, on 100X50mm Wall-plate bolted @ 1200mmcentres; structure to SE details. GI lining on ridges and cut-outs

200mm thick masonary blockwall with exterior qualityemulsion paint on wood - floatrender to approval.

Section X-X

Steel casement window tothe inside to schedule

Metal door toschedule

10cm thick Ground floor slabwith 6mm bars @ 20cm centres in bothdirections on 1000 gauge polythenedamp proof membrane (dpm ) on 5cmthick sand blinding on 15cm thick wellcompacted hardcore all to Eng's approva

200x200mm RCCLintel beam

50mm diameter,900mmhigh GI pipe handrail oneach side of the ramp to siteEng's approval

900mm high parapetwall with 100mmthick coping

200mmx200mmRCC column startedfrom grade beam

Corrugated GI sheets gauge 28, fixed oncelcurised cypress structure: 50x50mmBattens on 200X50mm Rafters @700mm,on 100X50mm Wall-plate bolted @1200mm centres; structure to SE details. GIlining on ridges and cut-outs

12mm thick chip-board ceilingon 50X50mm cypressbrandering at 600 mm centres

200x200mm RCCLintel beam Consultation room

Passage Verandah

Deliveryroom

VerandahPassage

Ward

900mm high parapetwall with 100mmthick coping

200mm thick masonary blockwall with exterior qualityemulsion paint on wood - floatrender to approval.

10cm thick Ground floor slabwith 6mm bars @ 20cm centres in bothdirections on 1000 gauge polythenedamp proof membrane (dpm ) on 5cmthick sand blinding on 15cm thick wellcompacted hardcore all to Eng's approva

Section Y-Y

SECTION VIEWS

06/22

Page 9: EXPANSION OF BULA-GADUD HEALTH CENTER, JUBALAND … · Ring beam layout Electrical plan Elevations Elevations Floor plan Floor plan and elevations 3D Projection 01 3D Projection 02

GSPublisherVersion 0.5.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,

SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:ENG. Duale Salah

REVIEWED BY:

A3

AS SHOWN

November 2018

JUBALAND STATE,BULA-GADUD VILLAGE

1

1

2

2

3

3

4

4

5

5

7

7

F F

E E

D D

C C

B B

A A

6

6

4,000 4,000 4,000 1,700 1,8002,

300

1,70

02,

000

2,20

0

4,000 4,000 4,000 1,700 1,800

4,00

0

4,00

02,

300

1,70

02,

000

2,20

0

3,700

3,700

ROOF PLAN

Corrugated GI sheets gauge 28,fixed on celcurised cypressstructure: 50x50mm Battens on200X50mm Rafters @700mm,on 100X50mm Wall-platebolted @ 1200mm centres;structure to SE details. GI liningon ridges and cut-outs

Gauge 28, 250mm girth benttwice GI gutters fixed with andincluding brackets on150X25mm HW facia (painted)

FALL FALLFALL

FALL FALLFALL

FALL

FALL

FALL

FALL

FALL

FALL

FALL

FALL

FALL

FALL

ROOF PLAN

07/22

Page 10: EXPANSION OF BULA-GADUD HEALTH CENTER, JUBALAND … · Ring beam layout Electrical plan Elevations Elevations Floor plan Floor plan and elevations 3D Projection 01 3D Projection 02

GSPublisherVersion 0.5.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,

SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:ENG. Duale Salah

REVIEWED BY:

A3

AS SHOWN

November 2018

JUBALAND STATE,BULA-GADUD VILLAGE

750

750

75075

0

125250

125

125

250

125

125250 250

12512525

025

0 125

12525

025

0 125

125250

250 125

800

DETAIL 'A'(SCALE 1:20)

2/100x50mm OR100x50mm THICKCOLLAR PLATE EACHFACE

NAILING AREA

12mm DIA. M.S HOLD DOWNBOLTS @ 1500 C/C

RING BEAM

(SCALE 1:20)

DETAIL 'B'

2/100x50mm THICK COLLAR PLATE

100x100x2mmx100 LONG ANGLECLEAT NAILED TO TRUSS ANDWALL PLATE (E.F.)

NAILING AREA

EACH FACE(SCALE 1:20)

DETAIL 'C'

100x50mm THICK COLLAR PLATEEACH FACE

NAILING AREA

150x50mm

TYPICAL NAILING PATTERN(SCALE 1:20)

150x50mmTRUSS MEMBER B

TRUSS MEMBER

TRUSS MEMBER150x50mm

COLLAR PLATE50mm THICK

B

COLLAR PLATE50mm THICK

TRUSS MEMBER

3Y12-01

2Y12-02R8-03-200

300x200 RB1(SCALE 1:25)

TRUSS

08/22

Page 11: EXPANSION OF BULA-GADUD HEALTH CENTER, JUBALAND … · Ring beam layout Electrical plan Elevations Elevations Floor plan Floor plan and elevations 3D Projection 01 3D Projection 02

GSPublisherVersion 0.5.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,

SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:ENG. Duale Salah

REVIEWED BY:

A3

AS SHOWN

November 2018

JUBALAND STATE,BULA-GADUD VILLAGE

1

1

2

2

3

3

4

4

5

5

7

7

F F

E E

D D

C C

B B

A A

6

6

4,000 4,000 4,000 1,700 1,800

3,600400

3,600400

3,600400

1,300400

5,100

19,6008,

600

12,6

00

5,800

6,100

7,700

6,30

0

3,600400

1,300

1,300400

3,300

3,60

040

03,

600

400

3,80

0

4,00

02,

300

1,70

02,

000

2,20

0

2,30

01,

700

2,00

02,

200

7,80

040

040

0

4,000 4,000 4,000 1,700 1,800

2,550 3,000 2,5502,

300

3,15

03,

150

1,30

0

1,60

01,

800

3,700

3,700

FOUNDATION LAYOUT

Ward

Consultationroom

Consultationroom

Delivery room

Labor room

Pharmacy

Verandah

W.C A142

BRC MESHA142

BRC MESH

A142

BRC MESH

A142

BRC MESH

A142

BRC MESH

A142

BRC MESH

A142

BRC MESH

FOUNDATION PLAN

09/22

Page 12: EXPANSION OF BULA-GADUD HEALTH CENTER, JUBALAND … · Ring beam layout Electrical plan Elevations Elevations Floor plan Floor plan and elevations 3D Projection 01 3D Projection 02

GSPublisherVersion 0.5.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,

SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:ENG. Duale Salah

REVIEWED BY:

A3

AS SHOWN

November 2018

JUBALAND STATE,BULA-GADUD VILLAGE

1

1

2

2

3

3

4

4

5

5

6

6

F F

E E

D D

C C

B B

A A

6

6

4,000 4,000 4,000 1,700 5,500

19,400

4,000 4,000 4,000 1,700 1,800

5,600

5,900

4,00

02,

300

1,70

02,

000

2,20

0

12,4

00

4,00

02,

300

1,70

02,

000

2,20

0

8,40

0

3,700

6,30

0

4,00

0

5,3003,800

4,00

0

3,800

4,00

0

8,00

03,800

3,80

03,

800

3,5001,500

8,3001,50

01,500

1,500

1,80

02,

000

3,500

2,30

0

RING BEAM LAYOUT

RING BEAM 01 RING BEAM 01 RING BEAM 01 RING BEAM 01 RING BEAM 01

RING BEAM 02 RING BEAM 02 RING BEAM 02

RING BEAM 03

RING BEAM 04 RING BEAM 05

RING BEAM 06

RIN

G B

EAM

07

RIN

G B

EAM

07

RIN

G B

EAM

08

RIN

G B

EAM

08

RIN

G B

EAM

08

RIN

G B

EAM

11

RIN

G B

EAM

09

RIN

G B

EAM

10

10/22

Page 13: EXPANSION OF BULA-GADUD HEALTH CENTER, JUBALAND … · Ring beam layout Electrical plan Elevations Elevations Floor plan Floor plan and elevations 3D Projection 01 3D Projection 02

GSPublisherVersion 0.5.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,

SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:ENG. Duale Salah

REVIEWED BY:

A3

AS SHOWN

November 2018

JUBALAND STATE,BULA-GADUD VILLAGE

IOMMOG114

516-AAZ-MOG114

PROPOSED REHABILITATIONOF LOWYA CADE WARD -ABDUL AZIZ DISTRICT.

-ABDUL AZIZ DISTRICT-

JULY 2013

AHMED KIRISH

ALI HUSSEIN

PETER M.M.

N.T.S

IOM GRANT NO:A3

PROJECT. CLIENT. IMPLEMENTING AGENCY. SCALE

DATE

DRAWN BY:

DRAWING TITLE:

DRAWING NO:

PROJECT NO:SHEET NO:

DAN GUUD

REVIEWED AND APPROVED BY:

ECOTECH LIMITED

P.O. Box 5527-00100,Nairobi - KenyaTel: +254 712 388815Fax: +254 20 250809Email: [email protected]: www.ecotech.co.keLocation: Ecotech House, Woodlands Road, off Lenana Road, Nairobi - Kenya

BENADIR REGIONALADMINISTRATION,MOGADISHU,SOMALIA

CONSULTANT:-

IOM GRANT NO:

NOTES.

All drawings and concepts remain the propertyof ecotech limited

- All dimensions are in mm unless stated otherwise

- Any discrepancies in the drawings should be reported to the consultants before the contractor commences work on site.

ss

wp

s

SYMBOL MEANING

CEILING MOUNTEDLIGHT FIXTURE.CEILING MOUNTEDLIGHT FIXTURE (PENDANT)

WALL MOUNTED LIGHT FIXTURE

RECESSED SPOT LIGHT

FLUORESCENT LIGHT FIXTURE

FLUORESCENT LIGHT FIXTUREUNDER FALSE CEILING

WIRING CONNECTION

SINGLE PLEX RECEPTACLE

DUPLEX RECEPTACLE

SPECIAL RECEPTACLE & OUTLET(WITH PILOT LIGHT)

FLUORESCENT LIGHT FIXTURE WITHSHAVER SOCKET & LOCALISED SWITCHFLUORESCENT LIGHT FIXTURE WITHLOCALISED SWITCH

WATER PROOF RECEPTACLE (SINGLE)

CONSUMER UNIT

TELEPHONE/TV JACK

ALARM KEYPAD

DOORBELL PUSH BUTTON

DOORBELL TRANSFORMER

S3

S2

S

3 gang switch

2 gang switch

Single pole switch

Flood lamp

S SS

OFFICE 01 OFFICE 02 OFFICE 03 OFFICE 04 OFFICE 05

N E W C A N O P Y

SS

T-1 T-2

S3

31371-516-ELEC-09

ELECTRICAL DETAILS ELECTRICAL

09/09

19,400

12,4

00

3,9001,700

4,200 1,700

8,40

0

7,900

6,30

0

2,30

0

ELECTRICAL PLANS S S S

S

S

S2

S

S2

S3

S2

ELECTRICAL PLAN

11/22

Page 14: EXPANSION OF BULA-GADUD HEALTH CENTER, JUBALAND … · Ring beam layout Electrical plan Elevations Elevations Floor plan Floor plan and elevations 3D Projection 01 3D Projection 02

GSPublisherVersion 0.5.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,

SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:ENG. Duale Salah

REVIEWED BY:

A3

AS SHOWN

November 2018

JUBALAND STATE,BULA-GADUD VILLAGE

2

2

1

1

B B

A A

2 22 2

2

22

2

2,000

2,00

0

2,00

0

2,000

2,300

2,30

0

2,30

0

2,3003,

650

3,35

01,7002,300

600

300

3,35

060

0

4,10

0

E01

600mm highparapet wall

plastic storagewater tank withcapacity of 10m3

Metal steelvertical ladder

N.G.LN.G.L

Solar panels - top view

Solar panels - rear view

Solar panels - front view

side view

water tank - floor plansection view Elevation

BOUNDARY WALL

11/22

Page 15: EXPANSION OF BULA-GADUD HEALTH CENTER, JUBALAND … · Ring beam layout Electrical plan Elevations Elevations Floor plan Floor plan and elevations 3D Projection 01 3D Projection 02

GSPublisherVersion 0.5.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,

SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:ENG. Duale Salah

REVIEWED BY:

A3

AS SHOWN

November 2018

JUBALAND STATE,BULA-GADUD VILLAGE

3D 01

13/22

Solar panels

Page 16: EXPANSION OF BULA-GADUD HEALTH CENTER, JUBALAND … · Ring beam layout Electrical plan Elevations Elevations Floor plan Floor plan and elevations 3D Projection 01 3D Projection 02

GSPublisherVersion 0.5.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,

SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:ENG. Duale Salah

REVIEWED BY:

A3

AS SHOWN

November 2018

JUBALAND STATE,BULA-GADUD VILLAGE

3D 02

14/22

Existing chain-linkfence to rehabilitate

Page 17: EXPANSION OF BULA-GADUD HEALTH CENTER, JUBALAND … · Ring beam layout Electrical plan Elevations Elevations Floor plan Floor plan and elevations 3D Projection 01 3D Projection 02

GSPublisherVersion 0.5.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,

SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:ENG. Duale Salah

REVIEWED BY:

A3

AS SHOWN

November 2018

JUBALAND STATE,BULA-GADUD VILLAGE

3D 03

15/22

Existing roomsto remain

Existing latrinesto rehabilitate

Proposed elevatedwater tank

Page 18: EXPANSION OF BULA-GADUD HEALTH CENTER, JUBALAND … · Ring beam layout Electrical plan Elevations Elevations Floor plan Floor plan and elevations 3D Projection 01 3D Projection 02

GSPublisherVersion 0.5.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,

SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:ENG. Duale Salah

REVIEWED BY:

A3

AS SHOWN

November 2018

JUBALAND STATE,BULA-GADUD VILLAGE

3D 04

16/22

Page 19: EXPANSION OF BULA-GADUD HEALTH CENTER, JUBALAND … · Ring beam layout Electrical plan Elevations Elevations Floor plan Floor plan and elevations 3D Projection 01 3D Projection 02

GSPublisherVersion 0.5.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,

SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:ENG. Duale Salah

REVIEWED BY:

A3

AS SHOWN

November 2018

JUBALAND STATE,BULA-GADUD VILLAGE

3D 05

17/22

Proposed elevatedwater tank

Proposed healthcenter

Page 20: EXPANSION OF BULA-GADUD HEALTH CENTER, JUBALAND … · Ring beam layout Electrical plan Elevations Elevations Floor plan Floor plan and elevations 3D Projection 01 3D Projection 02

GSPublisherVersion 0.5.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,

SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:ENG. Duale Salah

REVIEWED BY:

A3

AS SHOWN

November 2018

JUBALAND STATE,BULA-GADUD VILLAGE

3D 06

18/22

Page 21: EXPANSION OF BULA-GADUD HEALTH CENTER, JUBALAND … · Ring beam layout Electrical plan Elevations Elevations Floor plan Floor plan and elevations 3D Projection 01 3D Projection 02

GSPublisherVersion 0.5.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,

SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:ENG. Duale Salah

REVIEWED BY:

A3

AS SHOWN

November 2018

JUBALAND STATE,BULA-GADUD VILLAGE

3D 07

19/22

Page 22: EXPANSION OF BULA-GADUD HEALTH CENTER, JUBALAND … · Ring beam layout Electrical plan Elevations Elevations Floor plan Floor plan and elevations 3D Projection 01 3D Projection 02

GSPublisherVersion 0.5.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,

SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:ENG. Duale Salah

REVIEWED BY:

A3

AS SHOWN

November 2018

JUBALAND STATE,BULA-GADUD VILLAGE

3D 08

20/22

Page 23: EXPANSION OF BULA-GADUD HEALTH CENTER, JUBALAND … · Ring beam layout Electrical plan Elevations Elevations Floor plan Floor plan and elevations 3D Projection 01 3D Projection 02

GSPublisherVersion 0.5.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,

SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:ENG. Duale Salah

REVIEWED BY:

A3

AS SHOWN

November 2018

JUBALAND STATE,BULA-GADUD VILLAGE

3D 09

21/22

Page 24: EXPANSION OF BULA-GADUD HEALTH CENTER, JUBALAND … · Ring beam layout Electrical plan Elevations Elevations Floor plan Floor plan and elevations 3D Projection 01 3D Projection 02

GSPublisherVersion 0.5.100.100

Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.

3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.

4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.

5. All reinforced concrete works to be done accordingto structural detail drawings

No: Date: Description:

REVISION

Implemented by:

Client:

THE FEDERAL REPUBLICOF SOMALIA

Project Title:

Sheet No.

EXPANSION OF HEALTH CENTER INBULA-GADUD, JUBALAND STATE,

SOMALIA

Drawing Title:

SCALE:

DATE:

DRAWN BY:ENG. Duale Salah

REVIEWED BY:

A3

AS SHOWN

November 2018

JUBALAND STATE,BULA-GADUD VILLAGE

3D 10

22/22