EXECUTIVE SUMMARY PROGRESSIVE STAMPING DIE

12
EXECUTIVE SUMMARY 3TTO5/3TT06 PROJECT August 24 2012 Prepared by Julian Kalac, P.Eng 1

Transcript of EXECUTIVE SUMMARY PROGRESSIVE STAMPING DIE

Page 1: EXECUTIVE SUMMARY PROGRESSIVE STAMPING DIE

EXECUTIVE SUMMARY 3TTO5/3TT06 PROJECT

August 24 2012

Prepared by Julian Kalac, P.Eng

1

Page 2: EXECUTIVE SUMMARY PROGRESSIVE STAMPING DIE

BUSINESS SITUATION• Don Park (DP) makes over 440,000 3TT05”/3TTO6” a

year.

• Both products are SKU’s for all customers including Home Depot

• Current capacity is 550,000 pcs/year , at peak season customer demands exceed machine capacity

• The cost of producing 1- 3TTO6” is $1.28/pc with a Labour cost of $0.59

• There are 2 critical labour intensive operations that cost $0.26/pc and are BOTTLENECKS preventing additional capacity—continue next slide

2

Page 3: EXECUTIVE SUMMARY PROGRESSIVE STAMPING DIE

3

Page 4: EXECUTIVE SUMMARY PROGRESSIVE STAMPING DIE

TOP-TO-BOTTOM TAKE-OFF

4

3TT06”

Page 5: EXECUTIVE SUMMARY PROGRESSIVE STAMPING DIE

BAND SAW

5

BLANK SIZE FROM CUT 2 LENGHT

BAND SAW CUT PATTERN

Page 6: EXECUTIVE SUMMARY PROGRESSIVE STAMPING DIE

1-BAND SAW-LABOUR INTENSIVE

6

REQUIRES SKILL, STRENGHT AND EXTENSIVE LABOUR

Page 7: EXECUTIVE SUMMARY PROGRESSIVE STAMPING DIE

FISHLOCKING

7

Page 8: EXECUTIVE SUMMARY PROGRESSIVE STAMPING DIE

1-FISHLOCKER MACHINE

8

FISH-LOCK MACHINE IS THE MAIN

BOTTLENECK IN THE BOOT

PRODUCTION.

ONLY 1 M/C and NO BACK-UP. NO

SPARE PARTS/TOOLS,

WIP BOX

Page 9: EXECUTIVE SUMMARY PROGRESSIVE STAMPING DIE

SOLUTION HIGH SPEED STAMPING PRESS

9

Page 10: EXECUTIVE SUMMARY PROGRESSIVE STAMPING DIE

USING PROGRESSIVE DIE

10

2 Operations @ 1 TIME

Page 11: EXECUTIVE SUMMARY PROGRESSIVE STAMPING DIE

BENEFITS

• Increased capacity by over 1,000,000 units/year

• Increase profitability and become more competitive

• Reduced labour cost from$0.59/pc to $0.30/pc

• Current Std cost= $1.28/pc

• Future Cost =$0.98/pc

• Total savings= $158,000/Year

• 1.26 Payback period, ROI= 77%

• Ability to run a Lean 1-piece flow instead of a Batch & Que type of production

11

Page 12: EXECUTIVE SUMMARY PROGRESSIVE STAMPING DIE

QUESTIONS/COMMENTS?