Executive Order: 1998-03-02 G-70-162-A (Exhibit 2) Steel ... · This document, created or posted by...

1
G-70-162-A -5- 1 4 7 5 6 9 8 10 15 14 3 2 12 13 15 16 11 16 Exhibit 2 Executive Order G-70-162-A Steel Tank Institute Fireguard Aboveground Tank Filling/Dispensing Vapor Recovery System Tank construction shall include a minimum of 3 inches of proprietary insulating material between the interior holding tank and the exterior containment tank. A reduction to a minimum of 2 inches of proprietary insulating material is allowed along the top of the tank. The tank vent line shall extend to a minimum height of 12 feet above grade. Notes:

Transcript of Executive Order: 1998-03-02 G-70-162-A (Exhibit 2) Steel ... · This document, created or posted by...

Page 1: Executive Order: 1998-03-02 G-70-162-A (Exhibit 2) Steel ... · This document, created or posted by the California Air Resources Board, contains information regarding: Executive Order:

G-70-162-A -5-

1

4

7

5 6

98

10

15

14

3

2

12

13

15

1611

16

Exhibit 2

Executive Order G-70-162-A

Steel Tank Institute Fireguard Aboveground Tank

Filling/Dispensing Vapor Recovery System

Tank construction shall include a minimum of 3 inches of proprietary insulating material between the interior holding tank and the exterior containment tank. A reduction to a minimum of 2 inches of proprietary insulating material is allowed along the top of the tank.

The tank vent line shall extend to a minimum height of 12 feet above grade.