Executive Committee Meeting #11/16 was held at TRCA Head Office, on Friday, January 13, 2017. The Chair Maria Augimeri, called the meeting to order at 9:34 a.m. PRESENT Maria Augimeri Chair Mike Mattos Member PRESENT VIA TELECONFERENCE Michael Di Biase Vice Chair Jack Ballinger Member Vincent Crisanti Member Chris Fonseca Member Colleen Jordan Member Giorgio Mammoliti Member ABSENT David Barrow Member Glenn De Baeremaeker Member Jennifer Innis Member Ron Moeser Member RES.#B126/16 - MINUTES Moved by: Mike Mattos Seconded by: Michael Di Biase THAT the Minutes of Meeting #10/16, held on December 9, 2016, be approved. CARRIED ______________________________ 631

Transcript of Executive Committee Meeting #11/16 was held at TRCA … · The Chair Maria Augimeri, called the...

Page 1: Executive Committee Meeting #11/16 was held at TRCA … · The Chair Maria Augimeri, called the meeting to order at 9:34 a.m. PRESENT . ... West Launch Shaft and West Twin Tunnel

Executive Committee Meeting #11/16 was held at TRCA Head Office, on Friday, January 13, 2017. The Chair Maria Augimeri, called the meeting to order at 9:34 a.m. PRESENT Maria Augimeri Chair Mike Mattos Member PRESENT VIA TELECONFERENCE Michael Di Biase Vice Chair Jack Ballinger Member Vincent Crisanti Member Chris Fonseca Member Colleen Jordan Member Giorgio Mammoliti Member ABSENT David Barrow Member Glenn De Baeremaeker Member Jennifer Innis Member Ron Moeser Member RES.#B126/16 - MINUTES Moved by: Mike Mattos Seconded by: Michael Di Biase THAT the Minutes of Meeting #10/16, held on December 9, 2016, be approved. CARRIED

______________________________

631

Page 2: Executive Committee Meeting #11/16 was held at TRCA … · The Chair Maria Augimeri, called the meeting to order at 9:34 a.m. PRESENT . ... West Launch Shaft and West Twin Tunnel

Section III – Items for the Information of the Board RES.#B127/16 - VOLUNTARY PROJECT REVIEW OF WORKS UNDERTAKEN BY

ORGANIZATIONS EXEMPT FROM ONTARIO REGULATION 166/06, AS AMENDED

To report on progress of the TRCA Voluntary Project Review protocol established in 2014, regarding works undertaken by organizations exempt from Ontario Regulation 166/06, as amended – Toronto and Region Conservation Authority Regulation of Development, Interference with Wetlands and Alteration to Shorelines and Watercourses.

Moved by: Colleen Jordan Seconded by: Chris Fonseca THAT the staff report on projects reviewed through the Toronto and Region Conservation Authority (TRCA) Voluntary Project Review (VPR) process from 2014 through 2016 be received. CARRIED BACKGROUND In 2014, the TRCA fee schedule provided an option for organizations exempt from TRCA’s regulation, including but not limited to Crown corporations, railway companies and the telecommunication industry, to apply for TRCA review under the Voluntary Project Review process. These organizations are exempt from the Conservation Authorities Act Section 28 regulatory approval process and permits are not required. However, TRCA is concerned that infrastructure projects exempt from TRCA’s regulation are not meeting the tests of our permitting process, and as such, provincial and conservation authority interests including, but not limited to, flooding management, erosion hazard, impacts to watercourses and natural heritage systems may not be adequately addressed. To address this concern, in the interest of both public safety and best management practices, TRCA developed a process whereby the exempt party may voluntarily request TRCA to review and comment on detailed design activities associated to confirm that TRCA policies and procedures are being addressed. Once TRCA concerns are satisfied, a Voluntary Project Review Letter is provided by staff advising that TRCA objectives and requirements as set out in The Living City Policies and Ontario Regulation 166/06, as amended, have been satisfied. While TRCA works with multiple user groups in the environmental assessment and detailed design review stages of various projects, to date, only Metrolinx has committed to the VPR process. Metrolinx has formally committed to providing TRCA with detailed design and technical reports, and to working with staff in a streamlined and expeditious manner for all projects in order to ensure their projects meet the five tests of TRCA’s regulation including, flooding, erosion, conservation of land, pollution and dynamic beaches. Using the leadership of Metrolinx as an example, TRCA continues to seek a similar level of engagement with all other organizations exempt from TRCA’s regulation on a continual basis. Since the inception of the VPR process in 2014, TRCA has reviewed multiple projects related to both Metrolinx GO and Light Rail Transit (LRT), and issued 12 VPR letters. Details are provided below.

632

Page 3: Executive Committee Meeting #11/16 was held at TRCA … · The Chair Maria Augimeri, called the meeting to order at 9:34 a.m. PRESENT . ... West Launch Shaft and West Twin Tunnel

1. CFN 48976 – GO Transit Barrie Passing Track Phase 1 – issued on September 17, 2014 The purpose of the project was to construct and upgrade culverts at two locations on a section of the Barrie rail corridor south of Regional Road 7 at Tributary #2 (unnamed) and north of Regional Road 7 at Tributary #3 (unnamed) in order to facilitate and accommodate the construction of passing tracks, in the City of Vaughan and the Don River watershed. The proposed works involved the construction of a new headwall at each culvert and a culvert extension for widening of the track bed to accommodate the new passing track. Staff concerns regarding flood management, erosion hazards and impacts to watercourses and natural heritage system were addressed. 2. CFN 48977 – GO Transit Barrie Passing Track Phase 2 – issued on September 19, 2014 The purpose of the project was to construct a double track segment including the complete replacement of the existing culvert located on a section of the Barrie rail corridor north of Langstaff Road, in the City of Vaughan and the Don River watershed. Staff concerns regarding flood management, erosion hazards, pollution, impacts to the watercourse and natural heritage system were addressed. 3. CFN 54839 - Eglinton Crosstown Light Rail Transit (ECLRT) Watermain Relocation –

issued on January 26, 2016 The purpose of the project was to relocate a segment of an existing watermain on the north side of Eglinton Avenue West and west of Black Creek Drive, in the City of Toronto and the Black Creek subwatershed. The proposed works involved relocating the watermain on the north side of the road and installed within the roadway south of this watermain and reconnecting it to the same watermain continuing east. The watermain relocation formed part of the early utility relocations required to facilitate earthworks for the construction of the proposed Mount Dennis Station. Staff concerns regarding erosion hazards, pollution, impacts to the watercourses, valley corridor, natural heritage systems and conservation concerns were addressed. 4. CFN 55276 – Eglinton Crosstown LRT – EMSF Boreholes and Test Pits – issued on

January 26, 2016

The purpose of the project was to undertake geotechnical investigation (boreholes) within the valley lands at the Eglinton Maintenance and Storage Facility (EMSF), located at 3500 Eglinton Avenue West and just west of Black Creek Drive, in the City of Toronto and the Black Creek subwatershed. The geotechnical investigations were undertaken in advance of and to support the design of the proposed works on the EMSF site including the Light Rail Guideway and tracks, stormwater management pond, service road, parking lots and other components of the EMSF site. Staff concerns regarding erosion hazards, pollution, impacts to the watercourses, valley corridor and natural heritage system were addressed.

5. CFN 55324 - Eglinton Crosstown Light Rail Transit (ECLRT) – Tunnel Works at the

West Launch Shaft and West Twin Tunnel (Keele Street to Yonge Street) – Permit issued on January 13, 2012, and VPR Letter issued on February 1, 2016

633

Page 4: Executive Committee Meeting #11/16 was held at TRCA … · The Chair Maria Augimeri, called the meeting to order at 9:34 a.m. PRESENT . ... West Launch Shaft and West Twin Tunnel

The purpose of the project was to continue the tunnel works at the Launch Shaft 1 (LS-1) to complete works as per the contract requirements for the 6.5 m diameter twin tunnels of the Eglinton Scarborough Crosstown Rapid Transit (ESC), near Keelesdale Park and east of Black Creek Drive, in the City of Toronto and the Black Creek subwatershed. The project limits included areas east of Black Creek Drive to just east of Bicknell Avenue. Staff concerns regarding flood hazards, erosion hazards, pollution, impacts to the watercourses, valley corridor and natural heritage system were addressed.

6. CFN 52941 – Stouffville GO Rail Corridor Expansion – Phase 1 – issued August 5,

2015

The purpose of the project was to undertake phase 1 works of the Stouffville GO Rail Corridor Expansion including the advance track layout and grading works for double tracking of the Stouffville Corridor, starting from just north of the existing Agincourt GO Station at Sheppard Avenue East (Mile 55.44), in the City of Toronto, to north of Kennedy Road and Steeles Avenue East (Mile 52.25), in the City of Markham and the Highland Creek watershed. Staff concerns regarding flood hazards, erosion hazards, pollution, impacts to the watercourse and natural heritage system including aquatic and terrestrial species and habitats, and conservation concerns were addressed.

7. CFN 55323 – Eglinton Crosstown Light Rail Transit (ECLRT) – East Twin Tunnels

(Yonge to Brentcliffe) – Permit issued September 13, 2013, and re-issued VPR Letter March 7, 2016

The purpose of the project was to continue tunnel works at the Launch Shaft 3 (LS-3) to complete works as per the contract requirements for the 6.5 m diameter twin tunnels of the Eglinton Crosstown Light Rail Transit (ECLRT), located approximately 150 m east of Brentcliffe Road, in the City of Toronto and the Don River watershed. Construction works at this location consisted of site set up, assembly and launch of the tunnel boring machines (TBMs). The construction staging site was also used to receive the tunnel liners and the spoils from the TBM during tunnelling and the spoils collected and trucked away to a waste disposal facility. Staff concerns regarding erosion hazards, pollution, impacts to the watercourse, valley corridor and natural heritage system including aquatic and terrestrial species and habitats, and water management were addressed.

8. CFN 55517 – Eglinton Crosstown Light Rail Transit – Stage 1 Vegetation Clearing and

Grubbing – issued April 7, 2016, and revised November 24, 2016 The purpose of the project was to undertake Stage 1 – vegetation clearing and site preparation activities related to the development of the Eglinton Maintenance and Storage Facility (EMSF), located at 3500 Eglinton Avenue West (former Kodak Lands) and Municipal Lands located north of Eglinton Avenue and west of Keelesdale Drive, in the City of Toronto and the Black Creek subwatershed. Staff concerns regarding flood hazards, erosion hazards, pollution and impacts to the valley corridor and natural heritage system were addressed. 9. CFN 55574 – Humber River East Abutment – issued August 12, 2016

634

Page 5: Executive Committee Meeting #11/16 was held at TRCA … · The Chair Maria Augimeri, called the meeting to order at 9:34 a.m. PRESENT . ... West Launch Shaft and West Twin Tunnel

The purpose of the project was to undertake stabilization of the river slopes and remediation of erosion and scour along the Pier 1 of the Metrolinx Humber River Bridge located just south of Highway 401, in the City of Toronto and the Humber River watershed. The proposed works involved remedial works including erosional mitigation measures at the pier and slope toe enhancement/protection works of the valley slope under the bridge. Staff concerns regarding erosion hazards, flood hazards, pollution, impacts to the watercourse, valley corridor and natural heritage system including aquatic and terrestrial species and habitats, and conservation concerns were addressed. 10. CFN 55805 – Cedarvale Park Storm Sewer Connection – issued November 1, 2016

The purpose of the project was to complete the connection between the existing two storm sewers at Cedarvale Park to decommission the portion of storm sewer currently located under Eglinton Subway Station in order to facilitate the development of Cedarvale Station, in the City of Toronto and the Don River watershed. The proposed works involved entering the storm sewer via an existing manhole and demolition of the wall. The demolition waste was removed via the manhole and disposed offsite and all disturbed areas within the park reinstated and restored. Staff concerns regarding erosion hazards and pollution concerns were addressed. 11. CFN 55909 – Eglinton Crosstown Light Rail Transit – Concrete Box Tunnel Launch

Shaft 1 – issued August 15, 2016

The purpose of the project was to prepare the existing shaft site, excavate and clear existing debris, and to construct a concrete box tunnel within the existing Launch Shaft 1 (LS-1) located on the south side of Eglinton Avenue and east of Black Creek Drive, in the City of Toronto and the Black Creek subwatershed. Staff concerns regarding flood hazards, erosion hazards, pollution, impacts to the watercourse, valley corridor and natural heritage system including aquatic and terrestrial species and habitats, and water management were addressed. 12. CFN 56617 - 407 ETR Patrol Yard Expansion - 6200 Steeles Avenue West – issued

November 25, 2016 The purpose is to expand the existing 407 ETR patrol yard at 6200 Steeles Avenue West, in the City of Vaughan and the Humber River watershed. Works include: a new access driveway off Steeles Avenue, a private entrance ramp from the yard onto Highway 407 West and Regional Road 27 north – south ramp, a realignment of Albion Creek to facilitate the new ramp and expansion of the patrol yard, a new salt storage building, and a new maintenance building. Staff concerns regarding flood hazards, impacts to the watercourses and natural heritage system including aquatic and terrestrial species and habitats were addressed. FINANCIAL DETAILS Fees are paid for the review of all VPR projects in accordance with either the current TRCA Administrative Fee Schedule for Environmental Assessment and Infrastructure Permitting Services or based on service level agreements with partner organizations. DETAILS OF WORK TO BE DONE

1. Staff will continue to advocate the importance and benefits of receiving TRCA permits related to environmental mitigation and hazard risk management at the detailed design stage to other organizations exempt from Conservation Authorities Act Section 28 regulatory approval process.

635

Page 6: Executive Committee Meeting #11/16 was held at TRCA … · The Chair Maria Augimeri, called the meeting to order at 9:34 a.m. PRESENT . ... West Launch Shaft and West Twin Tunnel

2. Staff will provide a summary report on issued VPR letters to the Executive Committee on an annual basis.

Report prepared by: Shirin Varzgani, extension 5785 Emails: [email protected] For Information contact: Beth Williston, extension 5217 Emails: [email protected] Date: December 9, 2016

______________________________

636

Page 7: Executive Committee Meeting #11/16 was held at TRCA … · The Chair Maria Augimeri, called the meeting to order at 9:34 a.m. PRESENT . ... West Launch Shaft and West Twin Tunnel

Section IV – Ontario Regulation 166/06, As Amended RES.#B128/16 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO

REGULATION 166/06, AS AMENDED Development, Interference with Wetlands and Alterations to Shorelines

and Watercourses. Pursuant to Ontario Regulation 166/06, as amended, written permission from the Authority is required for:

a) straightening, changing, diverting or interfering in any way with the existing channel of a

river, creek, stream or watercourse, or for changing or interfering in any way with a wetland; b) development, if in the opinion of the authority, the control of flooding, erosion, dynamic

beaches or pollution or the conservation of land may be affected by the development. A permit may be refused through a Hearing Process, if in the opinion of the Authority, the control of flooding, erosion, dynamic beaches, pollution or the conservation of land is affected. Moved by: Michael Di Biase Seconded by: Vincent Crisanti THAT permits be granted in accordance with Ontario Regulation 166/06, as amended, for the applications 10.1 – 10.6, inclusive, which are listed below. CARRIED PERMIT APPLICATIONS 10.1 - 10.6 ARE MAJOR APPLICATION - REGULAR Applications that involved a more complex suite of technical studies to demonstrate consistency with policies; applications that cover a significant geographic area (e.g. subdivisions, stormwater management ponds), extensive modifications to the landscape, major infrastructure projects, emergency infrastructure works, resolution of violations/after the fact permits, trail construction.

CITY OF MARKHAM 10.1 12 STATION LANE To construct, reconstruct, erect or place a building or structure, change a building or

structure so that it alters its use or potential use, increases its size or increases the number of dwelling units and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot G, Plan 335, (12 Station Lane), in the City of Markham, Rouge River Watershed. The purpose is to construct an addition to an existing dwelling within a Regulated Area of the Rouge River watershed at 12 Station Lane in the City of Markham.

CFN: 56386 - Application #: 0957/16/MARK Report Prepared by: Anthony Sun 5724 [email protected] For information contact: Anthony Sun 5724 [email protected] Date: December 22, 2016

637

Page 8: Executive Committee Meeting #11/16 was held at TRCA … · The Chair Maria Augimeri, called the meeting to order at 9:34 a.m. PRESENT . ... West Launch Shaft and West Twin Tunnel

CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA] 10.2 139 LAKE PROMENADE To construct, reconstruct, erect or place a building or structure on Lot 11, 12, Plan 1545,

(139 Lake Promenade), in the City of Toronto (Etobicoke York Community Council Area), Waterfront Watershed. The purpose is to acknowledge the construction of an enclosed frame porch to the rear of the existing single family detached dwelling at 139 Lake Promenade in the City of Toronto (Etobicoke York).

CFN: 56701 - Application #: 1013/16/TOR Report Prepared by: Nicole Moxley 5968 [email protected] For information contact: Steve Heuchert 5311 [email protected] Date: December 23, 2016 CITY OF VAUGHAN 10.3 18 RIVERSIDE BOULEVARD To construct, reconstruct, erect or place a building or structure and temporarily or

permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 32, Concession 1 Part Lot 100, Plan NO. 3765, (18 Riverside Boulevard), in the City of Vaughan, Don River Watershed. The purpose is to recognize the construction of a 35.19 sq. m. (378.78 sq. ft.) pergola structure at the rear of an existing single detached dwelling within a Regulated Area of the Don River Watershed. The described works were carried out without TRCA permits or municipal permits. As such, the applicant has paid double the permit application fee amount for this permit "after-the-fact'. The property is located on lands known municipally as 18 Riverside Boulevard, in the City of Vaughan.

CFN: 57035 - Application #: 1274/16/VAUG Report Prepared by: Stephen Bohan 5743 [email protected] For information contact: Coreena Smith 5269 [email protected] Date: December 20, 2016 10.4 350 VELLORE WOODS BOULEVARD To construct, reconstruct, erect or place a building or structure and temporarily or

permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 16, Concession 5 Block 224, Plan 65M-3498, Block 85, Plan 65M-3446, (350 Vellore Woods Boulevard), in the City of Vaughan, Don River Watershed. The purpose is to undertake works within TRCA's regulated area of the Don River Watershed in order to facilitate the construction of a 13.7 sq. m. (147.72 sq. ft.) covered patio and 7.4 sq. m. (80 sq. ft.) shed and recognize an existing 27.1 sq. m. (291.7 sq. ft.) deck. A portion of the works were constructed without TRCA or Municipal permits. As such, the applicant has paid double the application fee as required for a permit "after-the-fact" in association with the violation of Ontario Regulation 166/06. The subject property is located on lands known municipally as 350 Vellore Woods Boulevard, in the City of Vaughan.

638

Page 9: Executive Committee Meeting #11/16 was held at TRCA … · The Chair Maria Augimeri, called the meeting to order at 9:34 a.m. PRESENT . ... West Launch Shaft and West Twin Tunnel

CFN: 56886 - Application #: 1191/16/VAUG Report Prepared by: Stephen Bohan 5743 [email protected] For information contact: Coreena Smith 5269 [email protected] Date: December 14, 2016 TOWN OF CALEDON 10.5 80 JAMES STREET To construct, reconstruct, erect or place a building or structure on Lot 41, 42, 43, Plan

BOL-7, 80 James Street, in the Town of Caledon, Humber River Watershed. The purpose is to undertake works within TRCA's Regulated Area of the Humber River Watershed in order to facilitate the construction of a 9.7 m by 4.8 m (32 ft by 16 ft) detached garage located at the rear of an existing dwelling associated with a municipal building permit.

CFN: 56715 - Application #: 1023/16/CAL Report Prepared by: Nicholas Cascone 5927 [email protected] For information contact: Leilani Lee-Yates 5370 [email protected] Date: December 19, 2016 TOWN OF RICHMOND HILL 10.6 LESLIE ELGIN DEVELOPMENTS INC. To site grade and temporarily or permanently place, dump or remove any material,

originating on the site or elsewhere on Part 27, Part Lot 28 Lot , Concession 3 Block 10, Plan 65M-3997, (10961 and 11121 Leslie Street), in the Town of Richmond Hill, Rouge River Watershed as located on the property owned by Leslie Elgin Developments Inc.. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed to facilitate the construction of a new sanitary sewer and manholes crossing under Leslie Street through the combined use of trenchless technology and open cut in support of OMB approved draft plan of subdivision 19T(R)-04009.

CFN: 56573 - Application #: 1078/16/RH Report Prepared by: Doris Cheng 5306 [email protected] For information contact: Doris Cheng 5306 [email protected] Date: December 22, 2016 RES.#B129/16 - STANDARD DELEGATED PERMITS Moved by: Michael Di Biase Seconded by: Vincent Crisanti THAT standard delegated permits, permission for routine infrastructure works, and minor works letter of approval granted by Toronto and Region Conservation Authority staff, in accordance with Ontario Regulation 166/06, as amended, which are listed below, be received. CARRIED

639

Page 10: Executive Committee Meeting #11/16 was held at TRCA … · The Chair Maria Augimeri, called the meeting to order at 9:34 a.m. PRESENT . ... West Launch Shaft and West Twin Tunnel

10.7 STANDARD DELEGATED PERMITS Standard Permits, including Emergency Infrastructure Works permissions, are implemented by Planning and Development Division staff and are received monthly by the Executive Committee. Standard Permits , including Emergency Infrastructure Works permissions, are subject to the authorization of designated staff appointed as Enforcement Officers, as per Authority Res.#A198/13, #A199/13 and #A103/15, respectively. All standard and emergency infrastructure works are non-complex permissions consistent with TRCA approved policies and procedures and issued for a time period of two years of less.

CITY OF BRAMPTON MARKVIEW HOME CORP. - Humber River Watershed The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate grading operations associated with a plan of subdivision application to permit a residential development within the Vales of Humber Secondary Plan. CFN: 56722 - Application #: 1030/16/BRAM Report Prepared by: Adam Miller, extension 5244, email [email protected] For information contact: Adam Miller, extension 5244, email [email protected] Date: December 6, 2016 27 ALOMA CRESCENT - Etobicoke Creek Watershed The purpose is to undertake work within TRCA's Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of a new unit located in the basement of an existing dwelling associated with a municipal building permit. CFN: 56587 - Application #: 1094/16/BRAM Report Prepared by: Nicholas Cascone, extension 5927, email [email protected] For information contact: Nicholas Cascone, extension 5927, email [email protected] Date: December 6, 2016 CITY OF MARKHAM CIM MACKENZIE CREEK INC. - Rouge River Watershed The purpose is to conduct minor site grading and construct a temporary sales centre within a Regulated Area of the Rouge River watershed at 9900 Markham Road in the City of Markham. CFN: 56589 - Application #: 1096/16/MARK Report Prepared by: Anthony Sun, extension 5724, email [email protected] For information contact: Anthony Sun, extension 5724, email [email protected] Date: October 27, 2016 CITY OF MARKHAM - Rouge River Watershed The purpose is to develop a new neighborhood park including site grading and construction of a pathway using engineered fill.

640

Page 11: Executive Committee Meeting #11/16 was held at TRCA … · The Chair Maria Augimeri, called the meeting to order at 9:34 a.m. PRESENT . ... West Launch Shaft and West Twin Tunnel

CFN: 56553 - Application #: 1047/16/MARK Report Prepared by: Christine Furtado, extension 5310, email [email protected] For information contact: Harsha Gammanpila, extension 5629, email [email protected] Date: December 5, 2016 CITY OF PICKERING OSMI HOMES - Duffins Creek Watershed The purpose is to construct a new two-storey single family detached dwelling at 1969 Woodview Avenue in the City of Pickering. CFN: 56212 - Application #: 0691/16/PICK Report Prepared by: Vanessa Aubrey, extension 5662, email [email protected] For information contact: Steve Heuchert, extension 5311, email [email protected] Date: December 6, 2016 OSMI HOMES - Duffins Creek Watershed The purpose is to construct a new two storey single family detached dwelling on the vacant residential lot at 1971 Woodview Avenue in the City of Pickering. CFN: 56213 - Application #: 0692/16/PICK Report Prepared by: Vanessa Aubrey, extension 5662, email [email protected] For information contact: Steve Heuchert, extension 5311, email [email protected] Date: December 6, 2016 CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA] CITY OF TORONTO - Humber River Watershed The purpose is to carry out emergency repairs on an exposed 300mm cast iron watermain below the bridge carrying Trethewey Drive over Black Creek, east of Black Creek Drive. Works will involve reinforcement of the exposed watermain, followed by restoration of the site. This permit was issued in accordance with TRCA's Permission for Emergency Infrastructure Works Review Protocol (Authority Res. #A105/15). The warm water construction timing window of July 1 to March 31 will apply to this proposal. CFN: 56790 - Application #: 1207/16/TOR Report Prepared by: Daniel Brent, extension 5774, email [email protected] For information contact: Daniel Brent, extension 5774, email [email protected] Date: December 5, 2016 13 HUMBER BOULEVARD SOUTH - Humber River Watershed The purpose is to construct a detached garage in the rear yard of the existing dwelling on lands municipally described as 13 Humber Boulevard in the City of Toronto (Etobicoke York).

641

Page 12: Executive Committee Meeting #11/16 was held at TRCA … · The Chair Maria Augimeri, called the meeting to order at 9:34 a.m. PRESENT . ... West Launch Shaft and West Twin Tunnel

CFN: 56716 - Application #: 1024/16/TOR Report Prepared by: Nicole Moxley, extension 5968, email [email protected] For information contact: Steve Heuchert, extension 5311, email [email protected] Date: December 14, 2016 32 HALFORD AVENUE - Humber River Watershed The purpose is to construct a covered porch and first floor vestibule to the south side of the existing dwelling and a second storey addition at 32 Halford Avenue in the City of Toronto (Etobicoke York). The existing side yard covered porch is to be demolished. CFN: 56885 - Application #: 1190/16/TOR Report Prepared by: Nicole Moxley, extension 5968, email [email protected] For information contact: Steve Heuchert, extension 5311, email [email protected] Date: December 8, 2016 66 HUMBER BOULEVARD - Humber River Watershed The purpose is to construct a two-storey rear addition to the existing single family detached dwelling at 66 Humber Boulevard in the City of Toronto (Etobicoke York). The ground floor portion of the rear addition is a replacement. CFN: 56817 - Application #: 1170/16/TOR Report Prepared by: Nicole Moxley, extension 5968, email [email protected] For information contact: Steve Heuchert, extension 5311, email [email protected] Date: December 12, 2016 219 EDENBRIDGE DRIVE - Humber River Watershed The purpose is to construct a new two-storey single family detached dwelling and in-ground pool at 219 Edenbridge Drive in the City of Toronto (Etobicoke York). The existing dwelling and pool are to be demolished/removed.

CFN: 56679 - Application #: 0980/16/TOR Report Prepared by: Nicole Moxley, extension 5968, email [email protected] For information contact: Steve Heuchert, extension 5311, email [email protected] Date: December 8, 2016 PARK LAWN LIMITED PARTNERSHIP - Humber River Watershed The purpose is to undertake re-grading and construct an envirolok retaining wall to restore a failed slope near existing headstones at Parklawn Cemetery located at 2845 Bloor Street West in the City of Toronto (Etobicoke York Community Council Area). CFN: 48484 - Application #: 0989/12/TOR Report Prepared by: Jessica Bester, extension 5250, email [email protected] For information contact: Mark Rapus, extension 5259, email [email protected] Date: December 12, 2016

642

Page 13: Executive Committee Meeting #11/16 was held at TRCA … · The Chair Maria Augimeri, called the meeting to order at 9:34 a.m. PRESENT . ... West Launch Shaft and West Twin Tunnel

SYMESBRIDGE INC. - Humber River Watershed The purpose is to carry out site grading and servicing associated with the renovation of two existing buildings, reconstruction of the existing site entrance and associated parking areas. CFN: 56883 - Application #: 1188/16/TOR Report Prepared by: Mark Rapus, extension 5259, email [email protected] For information contact: Mark Rapus, extension 5259, email [email protected] Date: December 12, 2016 THE RESIDENCES OF ISLINGTON TERRACE INC./CITY OF TORONTO - Mimico Creek Watershed The purpose is to construct a new pedestrian stairwell with switchback ramp within the City road right of way (ROW) that connects from Islington Avenue to the residential development located at 64-70 Cordova Avenue in the City of Toronto (Etobicoke York Community Council Area). CFN: 56627 - Application #: 1143/16/TOR Report Prepared by: Jessica Bester, extension 5250, email [email protected] For information contact: Mark Rapus, extension 5259, email [email protected] Date: December 2, 2016 CITY OF TORONTO [NORTH YORK COMMUNITY COUNCIL AREA] 355 BLYTHWOOD ROAD - Don River Watershed The purpose is to construct a swim spa with dry-laid paving stone patio and associated grading and landscaping at 355 Blythwood Road in the City of Toronto (North York Community Council Area). CFN: 54411 - Application #: 0757/15/TOR Report Prepared by: Jessica Bester, extension 5250, email [email protected] For information contact: Steve Heuchert, extension 5311, email [email protected] Date: December 20, 2016 CITY OF TORONTO - Don River Watershed The purpose is to carry out upgrades to the existing Bermondsey Transfer Station site, located at 188 Bermondsey Road, south of Eglinton Avenue East. Works will involve landscaping activities. No in-water works are within the scope of this project. CFN: 56766 - Application #: 1109/16/TOR Report Prepared by: Daniel Brent, extension 5774, email [email protected] For information contact: Daniel Brent, extension 5774, email [email protected] Date: November 28, 2016 7 MASON BOULEVARD - Don River Watershed The purpose is to construct a two-storey replacement dwelling with front porch, integral garage and rear deck at 7 Mason Boulevard in the City of Toronto (North York Community Council Area).

643

Page 14: Executive Committee Meeting #11/16 was held at TRCA … · The Chair Maria Augimeri, called the meeting to order at 9:34 a.m. PRESENT . ... West Launch Shaft and West Twin Tunnel

CFN: 55382 - Application #: 0111/16/TOR Report Prepared by: Anna Lim, extension 5284, email [email protected] For information contact: Mark Rapus, extension 5259, email [email protected] Date: December 15, 2016 72 DON RIVER BOULEVARD - Don River Watershed The purpose is to construct a deck to the rear of the existing dwelling at 72 Don River Boulevard in the City of Toronto (North York Community Council Area). CFN: 56569 - Application #: 1072/16/TOR Report Prepared by: Anna Lim, extension 5284, email [email protected] For information contact: Steve Heuchert, extension 5311, email [email protected] Date: December 16, 2016 CITY OF TORONTO [SCARBOROUGH COMMUNITY COUNCIL AREA] THE CENTENNIAL COLLEGE OF APPLIED ARTS AND TECHNOLOGY - Highland Creek Watershed The purpose is to formalize an existing gravel parking lot with new asphalt parking lot containing permeable pavers, lighting and associated landscaping at Centennial College located at 941 Progress Avenue in Toronto (Scarborough Community Council Area). CFN: 55980 - Application #: 0553/16/TOR Report Prepared by: Jessica Bester, extension 5250, email [email protected] For information contact: Mark Rapus, extension 5259, email [email protected] Date: November 30, 2016 UNIVERSITY OF TORONTO SCARBOROUGH - Highland Creek Watershed The purpose is to construct two new shade structures, a shed, new site servicing upgrades and the installation of an outdoor wifi network within the area of the existing tennis courts at the University of Toronto's Scarborough Campus located at 130 Old Kingston Road in the City of Toronto (Scarborough Community Council Area). CFN: 56637 - Application #: 1166/16/TOR Report Prepared by: Jessica Bester, extension 5250, email [email protected] For information contact: Steve Heuchert, extension 5311, email [email protected] Date: December 20, 2016 CITY OF TORONTO [TORONTO AND EAST YORK COMMUNITY COUNCIL AREA] CITY OF TORONTO - Don River Watershed The purpose is to construct a new sanitary sewer connection at 3 Stinson Circle. This permit was issued in accordance with TRCA's Permission for Emergency Infrastructure Works Review Protocol (Authority Res. #A105/15). No in-water works are within the scope of this project.

644

Page 15: Executive Committee Meeting #11/16 was held at TRCA … · The Chair Maria Augimeri, called the meeting to order at 9:34 a.m. PRESENT . ... West Launch Shaft and West Twin Tunnel

CFN: 56439 - Application #: 0872/16/TOR Report Prepared by: Daniel Brent, extension 5774, email [email protected] For information contact: Daniel Brent, extension 5774, email [email protected] Date: December 21, 2016 2 BEECHWOOD CRESCENT - Don River Watershed The purpose is to construct an above ground hot tub to the east of the existing single family detached dwelling at 2 Beechwood Crescent, in the City of Toronto (Toronto and East York Community Area). CFN: 55705 - Application #: 0322/16/TOR Report Prepared by: Anna Lim, extension 5284, email [email protected] For information contact: Mark Rapus, extension 5259, email [email protected] Date: November 29, 2016 CITY OF VAUGHAN CITY OF VAUGHAN - Humber River Watershed The purpose is to undertake rehabilitation of a pedestrian bridge abutment near Pine Grove Road southeast of Islington Avenue and Langstaff Road. The Ministry of Natural Resources and Forestry (MNRF) Redside Dace timing window will apply to the works unless otherwise specified in writing by MNRF. CFN: 56055 - Application #: 0639/16/VAUG Report Prepared by: Christine Furtado, extension 5310, email [email protected] For information contact: Harsha Gammanpila, extension 5629, email [email protected] Date: December 7, 2016 MET RESIDENCES CORP. - Humber River Watershed The purpose is to undertake the excavation and foundation construction associated with a multi-unit development at 7895 Jane Street, in the City of Vaughan. CFN: 57016 - Application #: 1245/16/VAUG Report Prepared by: Jonathan Pounder, extension 5304, email [email protected] For information contact: Jonathan Pounder, extension 5304, email [email protected] Date: December 8, 2016

645

Page 16: Executive Committee Meeting #11/16 was held at TRCA … · The Chair Maria Augimeri, called the meeting to order at 9:34 a.m. PRESENT . ... West Launch Shaft and West Twin Tunnel

TORONTO TRANSIT COMMISSION - Humber River Watershed The purpose is to complete final grading and site restoration works within the valley land on the west side of the Black Creek, stormwater management pond area and north of the access bridge to Highway 407 Station site, on the west side of Jane Street and south side of the Highway 407 ETR, in the City of Vaughan. The proposed final grading and site restoration works were approved under the Permit No C-10432 on May 7, 2010 and re issued Permit No. C-120323R on May 15, 2012. The reissued permit expired on May 14, 2014. All approved works except the final grading and site restoration/planting works were completed under the previously issued permits. This permit application is for final grading and site restoration works that have not been completed to date. TYSSE has confirmed that there are no changes on the perviously reviewed/approved grading and restoration plans.. CFN: 56623 - Application #: 1131/16/VAUG Report Prepared by: Manirul Islam, extension 5715, email [email protected] For information contact: Manirul Islam, extension 5715, email [email protected] Date: December 14, 2016 141 CAMLAREN CRESCENT - Humber River Watershed The purpose is to undertake works within TRCA's Regulated Area of the Humber River Watershed in order to facilitate the construction of a 361.83 sq. m. (3894.66 sq. ft.) single detached dwelling associated with a municipal building permit. The subject property is located on lands known municipally as 141 Camlaren Crescent, in the City of Vaughan. CFN: 55304 - Application #: 0086/16/VAUG Report Prepared by: Stephen Bohan, extension 5743, email [email protected] For information contact: Colleen Bonner, extension 5307, email [email protected] Date: November 23, 2016 TOWN OF CALEDON 12 LINN ROAD - Humber River Watershed The purpose is to undertake works within TRCA's Regulated Area of the Humber River Watershed in order to construct a 9.1 m by 3.6 m (30 ft by 12 ft) shed and 2.1 m (7 ft) high replacement retaining wall located adjacent to an existing dwelling associated with a municipal site plan application (Town File # SPA 16-0053) and building permit. CFN: 56913 - Application #: 1204/16/CAL Report Prepared by: Nicholas Cascone, extension 5927, email [email protected] For information contact: Adam Miller, extension 5244, email [email protected] Date: December 6, 2016 REGIONAL MUNICIPALITY OF PEEL - Humber River Watershed The purpose is to rehabilitate an existing bridge over the Main Humber River on Queen Street North, north of King Street East. The Redside Dace construction timing window will be applied to this project unless otherwise specified in writing by the Ministry of Natural Resources and Forestry (MNRF).

646

Page 17: Executive Committee Meeting #11/16 was held at TRCA … · The Chair Maria Augimeri, called the meeting to order at 9:34 a.m. PRESENT . ... West Launch Shaft and West Twin Tunnel

CFN: 56495 - Application #: 1124/16/CAL Report Prepared by: Leila Sotoudeh, extension 5925, email [email protected] For information contact: Leila Sotoudeh, extension 5925, email [email protected] Date: December 6, 2016 TOWN OF RICHMOND HILL 6 MACLEOD ESTATE COURT - Humber River Watershed The purpose is to undertake works within the TRCA's Regulated Area of the Philips-Bond-Thompson Wetland Complex on a property that straddles the boundary between the Humber (western portion of the subject property) and Rouge (eastern portion of the subject property) River Watersheds in order to facilitate the construction of a new two-storey dwelling approximately 183 square metres (1,970 square feet) in size and a new driveway. The proposed works are associated with a municipal building permit. CFN: 56802 - Application #: 1133/16/RH Report Prepared by: Lisa Hosale, extension 5687, email [email protected] For information contact: Doris Cheng, extension 5306, email [email protected] Date: November 18, 2016 27 GEORGE STREET - Humber River Watershed The purpose is to undertake works within TRCA's Regulated Area of the Humber River Watershed in order to facilitate the construction of a 4,510 square foot, 2 storey replacement dwelling associated with a municipal building permit. CFN: 56721 - Application #: 1029/16/RH Report Prepared by: Nicholas Cascone, extension 5927, email [email protected] For information contact: Nicholas Cascone, extension 5927, email [email protected] Date: December 6, 2016 TOWN OF WHITCHURCH STOUFFVILLE 11750 AND 11782 9TH LINE PROPERTIES INC. - Rouge River Watershed The purpose is to undertake works within TRCA's Regulated Area of the Rouge River Watershed in order to facilitate the construction of a 87.64 sq. m. temporary sales office and associated parking lot, associated with a condominium development on the same site. The subject property is located on lands known municipally as 11750 & 11782 9th Line, in the Town of Whitchurch-Stouffville. CFN: 56647 - Application #: 1184/16/WS Report Prepared by: Jonathan Pounder, extension 5304, email [email protected] For information contact: Jonathan Pounder, extension 5304, email [email protected] Date: December 9, 2016

647

Page 18: Executive Committee Meeting #11/16 was held at TRCA … · The Chair Maria Augimeri, called the meeting to order at 9:34 a.m. PRESENT . ... West Launch Shaft and West Twin Tunnel

TOWNSHIP OF KING 3945 KING ROAD - Humber River Watershed The purpose is to undertake works within TRCA's Regulated Area of the Humber River Watershed in order to facilitate the construction of a pond feature. The subject property is located on lands known municipally as 3945 King Road, in the Township of King. CFN: 55398 - Application #: 0102/16/KING Report Prepared by: Stephen Bohan, extension 5743, email [email protected] For information contact: Coreena Smith, extension 5269, email [email protected] Date: December 7, 2016 PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS Permission for Routine Infrastructure Works Letter of Approval including Emergency Infrastructure Works permissions are subject to authorization by staff designated as Enforcement Officers as per Auth. Res. #A198/13 and #A103/15, respectively. All routine and emergency infrastructure works are located within a Regulated Area, generally within or adjacent to the hazard or natural feature and in the opinion of staff do not affect the control of flooding, erosion, dynamic beaches, pollution or the conservation of land.

CITY OF MARKHAM BOX GROVE HILL DEVELOPMENTS INC. To undertake off-line stormwater management pond maintenance on Box Grove Collector Road and 14th Avenue in the City of Markham, Rouge River Watershed as located on the property owned by Box Grove Hill Developments Inc. The purpose is to undertake routine maintenance of an existing offline stormwater management pond. CFN: 56554 - Application #: 1040/16/MARK Report Prepared by: Christine Furtado, extension 5310, email [email protected] For information contact: Christine Furtado, extension 5310, email [email protected] Date: December 12, 2016 CITY OF MARKHAM To undertake maintenance on an off-line stormwater management pond (Pond #8) at Austin Drive Park, near Highway 7 and Bullock Drive, in the City of Markham, Rouge River Watershed as located on the property owned by City of Markham. The purpose is to undertake maintenance of an off-line stormwater management pond (Pond #8) by placing aggregate and stone on eroded portions of berm. CFN: 56575 - Application #: 1083/16/MARK Report Prepared by: Christine Furtado, extension 5310, email [email protected] For information contact: Christine Furtado, extension 5310, email [email protected] Date: December 19, 2016

648

Page 19: Executive Committee Meeting #11/16 was held at TRCA … · The Chair Maria Augimeri, called the meeting to order at 9:34 a.m. PRESENT . ... West Launch Shaft and West Twin Tunnel

CITY OF MARKHAM To undertake maintenance of an off-line stormwater management pond (Pond #75) at Berczy Park North, on the north side of Bur Oak Avenue, east of The Bridle Walk, near Kennedy Road, in the City of Markham, Rouge River Watershed as located on the property owned by City of Markham. The purpose is to undertake maintenance of an off-line stormwater management pond (Pond #75) by placing aggregate and stone on eroded portions of berm. CFN: 56576 - Application #: 1084/16/MARK Report Prepared by: Christine Furtado, extension 5310, email [email protected] For information contact: Christine Furtado, extension 5310, email [email protected] Date: December 7, 2016 CITY OF MARKHAM To undertake on-line stormwater management pond maintenance south of Raymerville Drive, east of Burwell Crescent near Bullock Drive, in the City of Markham, Rouge River Watershed as located on the property owned by City of Markham. The purpose is to undertake maintenance of an on-line stormwater management pond (Pond#42), by placing aggregate and stone between a weir and bridge abutment. The Redside dace construction timing window will apply to this project unless otherwise specified in writing by the Ministry of Natural Resources and Forestry (MNRF). CFN: 56577 - Application #: 1085/16/MARK Report Prepared by: Christine Furtado, extension 5310, email [email protected] For information contact: Christine Furtado, extension 5310, email [email protected] Date: December 7, 2016 REGIONAL MUNICIPALITY OF YORK To undertake sewer and watermain or utility watercourse crossing by trenchless technology on Kennedy Road from Helen Avenue to South Unionville Avenue, in the City of Markham, Rouge River Watershed as located on the property owned by Regional Municipality of York. The purpose is to install a 4" High Density Polyethylene (HDPE) pipe and a fibre optic cable for the York Telecom Network on the east side of Kennedy Road, from Helen Avenue to South Unionville Avenue, in the City of Markham. The proposed HDPE pipe will be installed below the existing concrete culvert. CFN: 56597 - Application #: 1108/16/MARK Report Prepared by: Harsimrat Pruthi, extension 5744, email [email protected] For information contact: Harsimrat Pruthi, extension 5744, email [email protected] Date: December 13, 2016 CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA] BELL CANADA To undertake sewer and watermain or utility installation or maintenance within an existing roadway on Forty Third Street and 4 Forty Third Street, near Lake Shore Boulevard West and Forty Third Street, in the City of Toronto (Etobicoke York Community Council Area), Etobicoke Creek Watershed, as located on property owned by the City of Toronto and privately owned property. The purpose is to place new service ducts and install a new pole. No in-water works are within the scope of this project.

649

Page 20: Executive Committee Meeting #11/16 was held at TRCA … · The Chair Maria Augimeri, called the meeting to order at 9:34 a.m. PRESENT . ... West Launch Shaft and West Twin Tunnel

CFN: 56516 - Application #: 0961/16/TOR Report Prepared by: Heather Wright, extension 5766, email [email protected] For information contact: Heather Wright, extension 5766, email [email protected] Date: December 2, 2016 CITY OF TORONTO [NORTH YORK COMMUNITY COUNCIL AREA] BELL CANADA To undertake sewer and watermain or utility installation or maintenance within an existing roadway on Colleen Court, Denbigh Court and Blaydon Avenue in the City of Toronto (North York Community Council Area), Humber River Watershed, as located on the property owned by the City of Toronto. The purpose is to install new conduit and structures. No in-water works are within the scope of this project. CFN: 56758 - Application #: 1102/16/TOR Report Prepared by: Heather Wright, extension 5766, email [email protected] For information contact: Heather Wright, extension 5766, email [email protected] Date: December 21, 2016 CITY OF TORONTO [SCARBOROUGH COMMUNITY COUNCIL AREA] BELL CANADA To undertake sewer and watermain or utility installation or maintenance within an existing roadway on Meandering Trail, near Sheppard Avenue East and Dean Park Road, in the City of Toronto (Scarborough Community Council Area), Rouge River Watershed, as located on property owned by the City of Toronto. The purpose is to place new conduit and grade level Bell boxes. No in-water works are within the scope of this project. CFN: 56520 - Application #: 1053/16/TOR Report Prepared by: Heather Wright, extension 5766, email [email protected] For information contact: Heather Wright, extension 5766, email [email protected] Date: December 19, 2016 CITY OF TORONTO [TORONTO AND EAST YORK COMMUNITY COUNCIL AREA] BELL CANADA To undertake sewer and watermain or utility installation or maintenance within an existing roadway on Glen Road, Binscarth Road, and Roxborough Drive, near Mount Pleasant Road and Bloor Street East, in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed, as located on property owned by the City of Toronto. The purpose is to undertake telephone service upgrades. Works will involve removal and replacement of the existing telephone conduits. No in-water works are within the scope of this project. CFN: 56127 - Application #: 0724/16/TOR Report Prepared by: Daniel Brent, extension 5774, email [email protected] For information contact: Daniel Brent, extension 5774, email [email protected] Date: November 30, 2016

650

Page 21: Executive Committee Meeting #11/16 was held at TRCA … · The Chair Maria Augimeri, called the meeting to order at 9:34 a.m. PRESENT . ... West Launch Shaft and West Twin Tunnel

CITY OF TORONTO To undertake sewer, watermain or utility installation or maintenance within an existing roadway on Elmont Drive, from Rexleigh Drive to the south limit of Elmont Drive, in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed, as located on the property owned by City of Toronto. The purpose is to replace existing watermain. No in-water works are within the scope of this project.. CFN: 56861 - Application #: 1147/16/TOR Report Prepared by: Heather Wright, extension 5766, email [email protected] For information contact: Heather Wright, extension 5766, email [email protected] Date: December 7, 2016 CITY OF TORONTO To undertake sewer and watermain or utility installation or maintenance within an existing roadway on , (St. Clair Avenue East - from Alvin Avenue to Clifton Road; Mount Pleasant Road - from St. Clair Avenue East to Merton Street; Millwood Road/Laird Drive - from Millwood Road to Lair Drive - near Mount Pleasant Road), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property owned by City of Toronto. The purpose is to resurface an existing roadway. No in-water works are within the scope of this project. CFN: 56865 - Application #: 1217/16/TOR Report Prepared by: Heather Wright, extension 5766, email [email protected] For information contact: Heather Wright, extension 5766, email [email protected] Date: December 7, 2016 TORONTO PORT LANDS CO. To undertake structure maintenance on near Don Roadway at Lake Shore Boulevard East, in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property owned by Toronto Port Lands Co.. The purpose is to repair of the existing Don River bridge located at Mile 0.27 of the Toronto Harbour Spur Line, located just west of the Don Roadway, east of the Gardiner Expressway, in the City of Toronto. No in-water works are within the scope of this project. CFN: 56548 - Application #: 1002/16/TOR Report Prepared by: Renee Afoom-Boateng, extension 5714, email [email protected] For information contact: Renee Afoom-Boateng, extension 5714, email [email protected] Date: December 13, 2016

651

Page 22: Executive Committee Meeting #11/16 was held at TRCA … · The Chair Maria Augimeri, called the meeting to order at 9:34 a.m. PRESENT . ... West Launch Shaft and West Twin Tunnel

CITY OF VAUGHAN BELL CANADA To undertake sewer and watermain or utility installation or maintenance within an existing roadway on Clark Avenue and Joseph Aaron Boulevard, near Dufferin Street and Steeles Avenue West, in the City of Vaughan, Don River Watershed as located on the property owned by the City of Vaughan. The purpose is to undertake installation of a new Bell conduit and equipment within the road right-of-way. CFN: 55466 - Application #: 0231/16/VAUG Report Prepared by: Christine Furtado, extension 5310, email [email protected] For information contact: Manirul Islam, extension 5715, email [email protected] Date: December 21, 2016 TOWN OF CALEDON REGIONAL MUNICIPALITY OF PEEL To undertake structure maintenance on Highway 50, south of Old School Drive in the Town of Caledon, Humber River Watershed as located on the property owned by Regional Municipality of Peel. The purpose is to rehabilitate two arch culverts on Highway 50, south of Old Church Road in the Town of Caledon. The cold water construction timing window will be applied to this project. CFN: 55776 - Application #: 0388/16/CAL Report Prepared by: Caroline Mugo, extension 5689, email [email protected] For information contact: Caroline Mugo, extension 5689, email [email protected] Date: November 30, 2016 REGIONAL MUNICIPALITY OF PEEL To undertake structure maintenance on Highway 50, at Palgrave Pond and a bridge located just south of Buckstown Trail in the Town of Caledon, Humber River Watershed as located on the property owned by Regional Municipality of Peel. The purpose is to rehabilitate two bridges on Highway 50, at Palgrave Pond bridge and a bridge located just south of Buckstown Trail in the Town of Caledon. The cold water construction timing window will be applied to this project. CFN: 55777 - Application #: 0389/16/CAL Report Prepared by: Caroline Mugo, extension 5689, email [email protected] For information contact: Caroline Mugo, extension 5689, email [email protected] Date: November 30, 2016 TOWNSHIP OF KING ENBRIDGE GAS DISTRIBUTION INC. To undertake sewer, watermain or utility installation or maintenance within an existing roadway at 22 Winter Road approximately 118 m south of Collard Drive, in the Township of King, Humber River Watershed as located on the property owned by a private landowner to whom Enbridge Gas Distribution Inc. is providing a service. The purpose is to install a 1" gas main to service a residential dwelling.

652

Page 23: Executive Committee Meeting #11/16 was held at TRCA … · The Chair Maria Augimeri, called the meeting to order at 9:34 a.m. PRESENT . ... West Launch Shaft and West Twin Tunnel

CFN: 56656 - Application #: 1266/16/KING Report Prepared by: Tony To, extension 5798, email [email protected] For information contact: Tony To, extension 5798, email [email protected] Date: December 21, 2016 MINOR WORKS LETTER OF APPROVAL Permission for Minor Works Letter of Approval are implemented by Planning and Development Division staff and are received monthly by the Executive Committee. The permission of minor works is subject to authorization by the Director, Planning and Development and signed by an appointed enforcement officer. All minor works are located within a Regulated Area, outside of the flood plain and in the opinion of staff do not affect the control of flooding, erosion, dynamic beaches, pollution or the conservation of land.

CITY OF BRAMPTON 24 FINLAYSON CRESCENT To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 405, Plan, (24 Finlayson Crescent), in the City of Brampton, Humber River Watershed. CFN: 56643 - Application #: 1180/16/BRAM Report Prepared by: Nicholas Cascone, extension 5927, email [email protected] For information contact: Nicholas Cascone, extension 5927, email [email protected] Date: December 9, 2016 36 KENPARK AVENUE To install a swimming pool on Lot 66, Plan 43M520, (36 Kenpark Avenue), in the City of Brampton, Etobicoke Creek Watershed. CFN: 56879 - Application #: 1176/16/BRAM Report Prepared by: Nicholas Cascone, extension 5927, email [email protected] For information contact: Nicholas Cascone, extension 5927, email [email protected] Date: December 9, 2016 CITY OF TORONTO [TORONTO AND EAST YORK COMMUNITY COUNCIL AREA] 26 EAST LYNN AVENUE To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Part Lot 140, Plan 461-E, (26 East Lynn Avenue), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. CFN: 57013 - Application #: 1242/16/TOR Report Prepared by: Anna Lim, extension 5284, email [email protected] For information contact: Mark Rapus, extension 5259, email [email protected] Date: December 14, 2016

653

Page 24: Executive Committee Meeting #11/16 was held at TRCA … · The Chair Maria Augimeri, called the meeting to order at 9:34 a.m. PRESENT . ... West Launch Shaft and West Twin Tunnel

CITY OF VAUGHAN 107 RIDGEWAY COURT To undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) and construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 3, Plan 65M-3196, (107 Ridgeway Court), in the City of Vaughan, Don River Watershed. CFN: 57023 - Application #: 1255/16/VAUG Report Prepared by: Stephen Bohan, extension 5743, email [email protected] For information contact: Stephen Bohan, extension 5743, email [email protected] Date: December 19, 2016 69 CARD LUMBER CRESCENT To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 110, Plan 65M4374, (69 Card Lumber Crescent), in the City of Vaughan, Humber River Watershed. CFN: 56638 - Application #: 1167/16/VAUG Report Prepared by: Stephen Bohan, extension 5743, email [email protected] For information contact: Coreena Smith, extension 5269, email [email protected] Date: December 5, 2016 TOWN OF CALEDON 4085 KING STREET To construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 27, Concession 3, (4085 King Street), in the Town of Caledon, Humber River Watershed. CFN: 57011 - Application #: 1240/16/CAL Report Prepared by: Nicholas Cascone, extension 5927, email [email protected] For information contact: Nicholas Cascone, extension 5927, email [email protected] Date: December 20, 2016

______________________________

TERMINATION

ON MOTION, the meeting terminated at 9:35 a.m., on Friday, January 13, 2017.