EXCEPTIONAL WORKS EXCEPTIONAL WORKS CONSTRUCTED BY ADIF ON THE CONSTRUCTED BY ADIF ON THE
SPANISH HIGH SPEED LINESSPANISH HIGH SPEED LINES
IINTRODUCTIONNTRODUCTION
THE ADMINISTRATOR OF RAILWAYS INFRAESTRUCTURES (ADIF) has the objective
of constructing the high speed network in Spain.
ADIF is a public business body that was created after the Railway Sector Act came into
force on the 1st of January 2005.
The following are noteworthy among the exceptional infrastructure works carried out
by ADIF:• The Ebro Viaduct
• The Vinaixa Viaduct• The Arroyo del Valle Viaduct
• The Montblanc Tunnels• The Guadarrama Tunnels
Huesca
Lleida Barcelona
Tarragona
Zaragoza
Soria
Valladolid
Guadalajara
Segovia
Madrid
TÚNELES DEGUADARRAMA
VIADUCTOARROYO DEL VALLE
TÚNELES DEMONTBLANC
VIADUCTODEL EBRO
VIADUCTO DEVINAIXA
Construction SitesConstruction Sites
MADRID
GUADALAJARA
SEGOVIA
VALLADOLID
MEDITERRANEAN SEA
ZARAGOZA
BA
RC
EL
ON
A
SPAIN
LLEIDA
TARRAGONA
TTHEHE EbroEbro VVIADUCTIADUCT
THE EBRO VIADUCT. CONSTRUCTIVE DESCRIPTION AND PROCESSTHE EBRO VIADUCT. CONSTRUCTIVE DESCRIPTION AND PROCESS
The deck comprises a non-homogeneous
longitudinal section, with the presence of circular weight reductions in the
core.
Original “Vierendel” beam design in
prestressed concrete.
Length: 546 m
Consisting of 13 spans
60 m
60 m
120 m
42 m
60 m
6 x 24 m + 16 m
Direction of thrust
42 m
This process consists of constructing the arch-stones on the
two viaduct abutments and, by means of successive thrusts,
position the already constructed parts in their definitive locations.
TTHEHE VVINAIXAINAIXA VVIADUCTIADUCT
THE VINAIXA VIADUCT. CONSTRUCTIVE DESCRIPTION AND PROCESSTHE VINAIXA VIADUCT. CONSTRUCTIVE DESCRIPTION AND PROCESS
Length: 1.044 m
Consisting of 22 spans
This viaduct is exceptional because of the construction of two arch piers that permit the passage of the existing railway line and a future expansion to a double track.
The deck consists of a caisson section with vertical cores and two 4-metre wide
overhangs.Mixed concrete and steel
structure.
41 m
24 mHollow shaft piles, with rectangular
sections, 0.35 m thick
6.00
BALASTO
523.733
3. 000
9. 500
0.350
1.9 00
0. 350
0.10 0
HORMIGON DE
NIVELACION
2.50
0
2. 500
2 .500
R22.600
2.84
36
.753
12.9
30
7.065 6.3845.701
R55. 000
R 11.0
0 0
3.000
TERRENO
2 .600
2.84
36
.753
13.9
67
1.667
501.196
7.0656.724 5.701
ZAPATA
SUR
1 .0 00
HORMIGON DE
NIVELACION
3.0 00
0.1 00
9.50 0
2. 600 500.16
ZAPATA
NORTE
PK. 306+366.425
ALZADO
TTHEHE AARROYO DEL RROYO DEL VVALLE ALLE VVIADUCT IADUCT
SEGOVIAMADRID
THE ARROYO DEL VALLE VIADUCT. CONSTRUCTIVE DESCRIPTION & PROCESSTHE ARROYO DEL VALLE VIADUCT. CONSTRUCTIVE DESCRIPTION & PROCESS
The following activities are carried out:• Monitoring movement at the pillar head• Monitoring cracking at the pillar base which
acts as a prop.• Folding down of each semi-arch
(approximately 12 hours)• Concreting of arch keystone• Blocking of abutment imposts and
concreting of the semi-arch springing
• Deck execution by means of self-supporting formwork
Length: 1.755 m
Consisting of 27 spans
This viaduct is exceptional because, at the centre, the pillars are in the form of semi-arches, which
are constructed “in situ” and then folded it down.
23 m66 m132 m
TTHE HE MMONTBLANC ONTBLANC TTUNNELSUNNELS
MONTBLANC TUNNELS. CONSTRUCTIVE DESCRIPTION AND PROCESSMONTBLANC TUNNELS. CONSTRUCTIVE DESCRIPTION AND PROCESS
Floor demolishingFloor demolishing
Excavation to circular sectionExcavation to circular section
Excavation sealingExcavation sealing
ShotShot--blastingblasting
ConcretingConcreting
Limestone
ArgilliteMarls
CAMP MAGRÉ TUNNEL
LILLA TUNNEL
Limestone
Argillite
MarlsPUIG CABRER TUNNEL
Verified phenomena of expansivitywith pressures of 3.5 MPa, the
tunnel floor had to be reinforced
In view of the significant deformation, it was decided to construct an inverted
circular vault using self-compacting HA 80 reinforced concrete
The Lilla, Camp Magré y PuigCabrer tunnels with a total length of 3.046 m and an
inside diameter of between12.0 and 14.0 m
TTHE HE GGUADARRAMA UADARRAMA TTUNNELS UNNELS
THE GUADARRAMA TUNNELS, CONSTRUCTIVE DESCRIPTION AND PROCESSTHE GUADARRAMA TUNNELS, CONSTRUCTIVE DESCRIPTION AND PROCESS
These works are a tunnel with a 28.4-kilometre base length, the route of which crosses the mountainous massifs of the Central Systems at the maximum elevation of 1,200 m
with a maximum coverage of 992 m under the Peñalara massif.
250 m
30 m
The design consists of two main tubes for a single track, with 9.51
m of excavation diameter, a 30-metre separation between axes and 24 m2 connection galleries
every 250 m.
The constructive method consisted of “double-shield” very hard rock tunnelling equipment.
The “double-shield” type permits simultaneous excavation with the installation of prefabricated lining, which also provide terrain support and reduces execution time to a
minimum.
The tunnel lining comprises prefabricated reinforced concrete rings, executed on-
site, which the actual machine itself installs as it advances.