Excel Projects-Cascade

15
Excel Projects Julie Helligso

Transcript of Excel Projects-Cascade

Page 1: Excel Projects-Cascade

Excel ProjectsJulie Helligso

Page 2: Excel Projects-Cascade

Emergency Department Staffing Model SpreadsheetOutcome: staffing restructuring and a new position were created based patient discharge trends.

Design: Data was imported from the Electronic Medical Records (EMR) as a discharge date only. I de-limited the data to break into Date, Day, and Time by creating formulas to extrapolate the requested data.

Page 3: Excel Projects-Cascade

Emergency Department Staffing Model

Formula view of above data

Page 4: Excel Projects-Cascade

Emergency Department Staffing Model Pivot table and chart creation based on

time and specified day(s) of week

Page 5: Excel Projects-Cascade

Emergency Department Staffing Model

Pivot table and chart creation based on Festival weekends with Field list.

Page 6: Excel Projects-Cascade

Quality Improvement and Feedback FormsUse: Track improvement initiatives identified by staff.

Structure: Drop down boxes across all columns for continuity.

Purpose: Used by Chief of Operations to monitor and establish quality improvements and reported to the QI Team and QI Board Oversight.

Other Feedback Forms: Quality Management Memos, Patient Feedback Forms

Page 7: Excel Projects-Cascade

Quality Improvement and Feedback Forms

Page 8: Excel Projects-Cascade

PharmacyMedicare Formulary consisting of 11,362 rows of data and 18 columns. Segments of this data had to be imported into Cascade’s Formulary based on certain criteria.

Outcome: Data was used by our pharmacist and informatics for uploading into our EMR

Page 9: Excel Projects-Cascade

Pharmacy

First data was filtered in Cascade’s Master list.The green, blue, and pink column data was retrieved from the Medicare Formulary using a V-Look up formula based on the blue. Populate the 788 rows of data for easy reference.=VLOOKUP(A7,'G:\Databases created\Pharmacy\[Copy of 2014-04-05_xwalkfinalversion_ (2).xlsx]04-05-2014 NDC-HCPCS XWalk'!$A:$P,16)

Page 10: Excel Projects-Cascade

Patient Satisfaction Surveys

Data is collected for each provider on separate sheets Data is aggregated into a summary for all providers

Page 11: Excel Projects-Cascade

Patient Satisfaction SurveysClose shot of Patient Satisfaction Summary Sheet

Page 12: Excel Projects-Cascade

Patient Satisfaction Survey

Calculated increase/decrease

USE: Department head quality improvement, reported at the intra-departmental QI Team and reported to the QI Board Oversight.

Page 13: Excel Projects-Cascade

Patient Satisfaction SurveyExamples of charts

Charts linked to data

Page 14: Excel Projects-Cascade

Surveys created

Page 15: Excel Projects-Cascade

Surveys createdUse: QI and patient safety Outcome: staffing decisions, safety, behavior modifications

Data is calculated and then exported to a spreadsheet where further calculations and analysis are completed.