7/28/2019 Example of Power System Planning http://slidepdf.com/reader/full/example-of-power-system-planning 1/5 Example of Power System Planning Wirote Buaklee ManagerofPowerSystemPlanning ProvincialElectricityAuthority(PEA) 1)TransmissionPlanning Existingsystem  – 20MWload  – 1Overheadline,20kmwith240/40mm 2 (Al/St),impedance0.15+j0.38ohm/km, ratedcurrent:I r =645A 20 MW-Existing 80 MW-future Existing Line Planned Line 230/115 kV

Transcript of Example of Power System Planning

Page 1: Example of Power System Planning

7/28/2019 Example of Power System Planning

http://slidepdf.com/reader/full/example-of-power-system-planning 1/5

Example of Power System Planning

Wirote Buaklee

ManagerofPowerSystemPlanning

ProvincialElectricityAuthority(PEA)

1)TransmissionPlanning

Existingsystem

 – 20MWload

 – 1Overheadline,20kmwith240/40mm2

(Al/St),impedance0.15+j0.38ohm/km,ratedcurrent:Ir =645A

20 MW-Existing

80 MW-future

Existing Line

Planned Line

230/115 kV

Page 2: Example of Power System Planning

7/28/2019 Example of Power System Planning

http://slidepdf.com/reader/full/example-of-power-system-planning 2/5

Newdevelopmentplanforthearea

expectedloadgrowthfrom20MWto

80MW

 Asecondlineshallbeestablished

 – PossibilityA:20kmoverheadline(same

dataasexistingline)cost:5Mil.Baht/km

 – PossibilityB:10kmundergroundcable

500mm2 (Al),impedance0.07+j0.11

ohm/km,ratedcurrent:Ir=540A,cost:

11Mil.Baht/km

1.CalculateforpossibilityAandBfortotalloadof80MW,0.9pf.

1.1totalcurrent

1.2thecurrentoneachline

1.3thelossesonbothlines2.Comparetheinvestmentforboth

possibilities

3.Comparetheannualcostoflossesandthepresentvalueofthesecostsforbothpossibilities

- Specificcostoflosses:5000Baht/kW.yr- Interestrate:7%/yr

- Consideredperiod:20years

Page 3: Example of Power System Planning

7/28/2019 Example of Power System Planning

http://slidepdf.com/reader/full/example-of-power-system-planning 3/5

4.Comparethetotalpresentvalues

(investment+losses)

5.Comparethenumberofoutage/yrwith

bothlinesoutofservice-numberoffaultsontheline/year:

overheadline:2/year

cable:0.5/year

- outofserviceformaintenance,repair

orotherwork:

overheadline:2days/year

cable:14days/year

2)SubstationPlanning

Questions:

Whichplanisthebestbetweenbuilding

newsubstationandadditional22kVLine?

2005: 1 MW

2010: 20 MW2020: 40 MW

d = 10 kmSub. A Area B

Page 4: Example of Power System Planning

7/28/2019 Example of Power System Planning

http://slidepdf.com/reader/full/example-of-power-system-planning 4/5

 Alternatives  AlternativeA:

1996:- 115/22kVSubstationwith2x40MVAtransformerinareaB

 AlternativeB:

1996:- additional1x40MVAtransformerinexistingsubstationA

- three22kVlines95mm2(AL)fromsubstationAintoareaB

2005:- 115/22kVSubstationwith2x40MVAtransformerinareaB

 Alternatives  AlternativeC:

1996:- additional1x40MVAtransformerin

existingsubstationA- three22kVlines95mm2(AL)from

substationAintoareaB

2005:- Buildforth22kVlines95mm2(AL)

fromsubstationAintoareaB

Page 5: Example of Power System Planning

7/28/2019 Example of Power System Planning

http://slidepdf.com/reader/full/example-of-power-system-planning 5/5

Costofconstruction

1x40MVAtransformer 2,500,000Baht

115kVSwitchgear 4,000,000Baht

115kVline 400,000Baht/km

Extension115kVswitchgear 1,000,000Baht

22kVline 180,000Baht/km

Interestrate 7%/year

Transformerresistance 0.03Ohm

115kVlineresistance 0.15Ohm/km

22kVlineresistance 0.31Ohm/km

Costoflosses 300Baht/kW.year

 Assumeallequipmenthavelineardedication