882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 124
Shaheed Benazir Bhutto CNG Bus Project(PPP Based Environment Friendly Public Transport
System for Karachi - Sponsored By GOP)
In Collaboration with
Presentationto
Advisor to Chief Minister SindhPlanning amp Development Department
1
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 224
Project Roadmap-CNGBus Project
Karachi Mass Transit Cell
Target
Year
No
Of
Years
Daily
Demand1
Daily
Passenger
Served
Percent
Pax
Served
Person
per bus
per day
Addition
of
Buses
Reqd
No of
Buses(Million Pax) (Million Pax)
Jun 2010-
Dec 2011 15 69 186 270 1289 - 1380
Jan 2012-
Dec 201320 93 344 370 1289 1286 2666
Jan 2014-
Jun 201515 116 516 445 1289 1334 4000
1 Persons to be served up to Dec 2011 are based on proposed 40 CNG Routes
2 For persons served beyond 2011 additional buses on 40 CNG routes as well as buses
on new routes may be required
1 ndash
Interpolated between 2008 amp 2015
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 324
Project Roadmap-CNGBus Project
Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 424
Fare level
On board security
Travel speed (time)
Drivers driving behavior
Frequency
Operation hours
RoutingConductors manner of service
On board comfort
Waiting time at bus stop
Access to bus stop
243
129
95
88
85
82
71
69
55
49
34
Pubic Concerns Addressed
Karachi Mass Transit Cell
(GOP Subsidy Import Duty and Local Tax Concession etc)
(Vig Sqd Comm Police IT CampC)
(Improved Infrastructure)
(Drivers Training by Operators)
(Route Survey Financial Model)
(Peak and off peak hours established)
(40 Green Routes notified)
(Mandatory Training under CA)
(Min Bus Specifications notified)
(Operators to notify bus timings)
(Accessibility of commuters ensured)
CONCERNS ADDRESSED
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 524
Rs 5 Billion subsidy approved ( 25 billion for Karachi)
4000 CNG buses in five years for Karachi
Immediate phase 500 ndash 1000 buses to be inducted in Karachi
Private sector bus investors minimum fleet of 25 new CNG buses
Max Debt to Equity ratio = 8020Repayment period 5 years
GOP will contribute a total of Rs677181- as subsidy over 5 yearstowards the cost of one bus
Rs300000- will be provided as upfront grant as part of downpayment and Rs377181- as interest subsidy payable in 5 years
New dedicated CNG Buses (CBU) shall be exempted from 15import duty
Project Modalities
Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 624
A Steering Committee (SC) for overall coordination support andmonitoring of the Project constituted under Chairmanship ofFederal Minister for Environment
Provincial Supervisory Committee (PSC) headed by ChiefSecretary Sindh will over see the project with special reference toits financial and technical dimensions to ensure smoothimplementation of the project on sustainable basis
An Implementation and Regulatory Committee (IRC) headed by
District Coordination Officer CDGK notified for effectiveexecution of the project including approval of route operationalplan fare structure etc
Project Implementation and Monitoring Unit (PIMU) to beestablished in KMTC-CDGK
Project Monitoring Mechanism
Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 724
Minimum Standard CNG Bus Specifications of 70 amp 100passengers carrying capacity notified by GOP
Seven Operators Investors pre-qualified
14 Suppliers Manufacturers pre-qualified for supply of Buses
of approved models
Concession Agreement finalized in consultation with allCommercial Banks State Bank of Pakistan and other stakeholders
Bus logo and color scheme with space provision forcommercial advertisement has been finalized
Enabling Environment
Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 824
Ministry of Petroleum and SSGC have shown their willingness
to set aside about 30 MMCFD on SSGCL system for CNG busproject in Karachi
Several Private Sector CNG Filling Stations have shown interestin supplying CNG to the project buses and also invest in highpressure CNG fuelling station HDIP is also setting one station
in public sectorEx- KTC Bus terminals depot sites to be used for smoothoperation of buses
Road Infrastructure improvements including Signal FreeCorridors have been developed by CDGK to ensure efficient
operation of CNG buses on sustainable basis
A confirmatory Green Route Study (40 Routes) conducted withthe financial support of IPDF for the facilitation of potentialOperators Investors
40 CNG Green Routes identified and notified for the Project
Karachi Mass Transit Cell
Enabling Environment
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 924
Project Outcome
Total investment in the project is about Rs21 billion includingGOP subsidy of Rs25 billion
With the induction of 4000 buses about 4 million passengers dailywill enjoy safe comfortable and efficient public transport facilityat affordable fare
About 20000 direct jobs will be generated besides several otherindirect job opportunities would be available in different activities
The project is in line with the Government Poverty alleviationProgram by providing job opportunities travel time savingminimum travelling expenditure and accessibility to remote areas
Enormous environmental benefit in the form of clean air andreduced noise pollution
Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1024
Sr
No Activities Target Date
1 RFP issued to 7 Operators 08-01-2010
2 Pre-bid meeting 18-01-2010
3
bull Last date of submission of Proposals
bull Extended(SBP issued circular on 04-03-2010)
bull Extended
bull Further Extended
11-02-2010
11-03-2010
31-03-2010
13-04-2010
4 Evaluation of Proposals 20-04-2010
5 Selection of Bidders 30-04-2010
6Concession agreement between KMTC-
CDGK amp Selected Bidders07-07-2010
7 Financial Closure 30-07-2010
8 Start Operation of Bus Service 30-09-2010
Project ImplementationTimeline
10Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1124
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1224
Ex- KTC Malir Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1324
Ex- KTC Landhi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1424
Ex- KTC Korangi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1524
Ex- KTC Gulastan-e- Jauhar Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1624
Ex- KTC Mehran Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1724
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1824
Ex- KTC Model Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1924
Ex- KTC Orangi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2024
Ex- KTC North Karachi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2124
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2224
Period Activities
17th May2010 Progress Review meeting held under the Chairmanship of Secretary
General to President of Pakistan in CM House
Chief secretary gave the presentation which was also attended by
Dy Governor SBP President NBP Administrator CDGK and others
19th May 2010 A follow up meeting in NBP headed by President NBP held with
Commercial Banks CDGK team and Operators President NBP waspleased to assure his leading role in Bus financing program and other
banks to follow
20th May 2010 Detailed deliberation held on funding modalities and unified Term sheet
of lending banks
23rd
May 2010 NBP provided term sheet developed by NBP and other 6 CommercialBanks
24th May 2010 NBP team leader Mr Atif Ikram visited CDGK depot sites and CNG
station along with KMTC team
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2324
Period Activities
26th May 2010 A team of NBP and other Commercial Banks visited CDGK depots and
CNG Stations
28th May2010 KMTCCDGK in coordination with rep of IPDF and ENERCON conveyed
response on Term Sheet and feedback queries by banks4th June2010 On the request of SBP for confirmation about the mode of payment of
GOP subsidy (vide letter No BPRD (Sld-06)29662010 dated 362010)
Administrator CDGK requested Secretary Environment GOP to resolve
the issue
10th June2010 ENERCON MOE GOP vide letter No ENCMOE Admin 2010CNG ndash
Bus conveyed their NOC for payment of upfront grant (Rs 300000=)
and receiving Rs 377181 interest subsidy to be paid during 5 years ( in
60 installations)
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2424
Period Activities
10th June2010 KMTC team visited CNG stations along route demanded by pre-qualified
operators for confirmation of CNG supply to the project buses
10th June2010 NBP conveyed their concerns about CDGK CNG Bus Project and CNG
supply to the Project Buses14th June2010 KMTC forwarded the reply along with field visit report of CNG stations
duly supported by the photographs and consultant report of 31 CNG
Stations
18th June2010 NBP held consultation meeting with 3 Operators Investors
23rd June2010 NBP held consultation meeting with 3 remaining Operators Investors
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 224
Project Roadmap-CNGBus Project
Karachi Mass Transit Cell
Target
Year
No
Of
Years
Daily
Demand1
Daily
Passenger
Served
Percent
Pax
Served
Person
per bus
per day
Addition
of
Buses
Reqd
No of
Buses(Million Pax) (Million Pax)
Jun 2010-
Dec 2011 15 69 186 270 1289 - 1380
Jan 2012-
Dec 201320 93 344 370 1289 1286 2666
Jan 2014-
Jun 201515 116 516 445 1289 1334 4000
1 Persons to be served up to Dec 2011 are based on proposed 40 CNG Routes
2 For persons served beyond 2011 additional buses on 40 CNG routes as well as buses
on new routes may be required
1 ndash
Interpolated between 2008 amp 2015
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 324
Project Roadmap-CNGBus Project
Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 424
Fare level
On board security
Travel speed (time)
Drivers driving behavior
Frequency
Operation hours
RoutingConductors manner of service
On board comfort
Waiting time at bus stop
Access to bus stop
243
129
95
88
85
82
71
69
55
49
34
Pubic Concerns Addressed
Karachi Mass Transit Cell
(GOP Subsidy Import Duty and Local Tax Concession etc)
(Vig Sqd Comm Police IT CampC)
(Improved Infrastructure)
(Drivers Training by Operators)
(Route Survey Financial Model)
(Peak and off peak hours established)
(40 Green Routes notified)
(Mandatory Training under CA)
(Min Bus Specifications notified)
(Operators to notify bus timings)
(Accessibility of commuters ensured)
CONCERNS ADDRESSED
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 524
Rs 5 Billion subsidy approved ( 25 billion for Karachi)
4000 CNG buses in five years for Karachi
Immediate phase 500 ndash 1000 buses to be inducted in Karachi
Private sector bus investors minimum fleet of 25 new CNG buses
Max Debt to Equity ratio = 8020Repayment period 5 years
GOP will contribute a total of Rs677181- as subsidy over 5 yearstowards the cost of one bus
Rs300000- will be provided as upfront grant as part of downpayment and Rs377181- as interest subsidy payable in 5 years
New dedicated CNG Buses (CBU) shall be exempted from 15import duty
Project Modalities
Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 624
A Steering Committee (SC) for overall coordination support andmonitoring of the Project constituted under Chairmanship ofFederal Minister for Environment
Provincial Supervisory Committee (PSC) headed by ChiefSecretary Sindh will over see the project with special reference toits financial and technical dimensions to ensure smoothimplementation of the project on sustainable basis
An Implementation and Regulatory Committee (IRC) headed by
District Coordination Officer CDGK notified for effectiveexecution of the project including approval of route operationalplan fare structure etc
Project Implementation and Monitoring Unit (PIMU) to beestablished in KMTC-CDGK
Project Monitoring Mechanism
Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 724
Minimum Standard CNG Bus Specifications of 70 amp 100passengers carrying capacity notified by GOP
Seven Operators Investors pre-qualified
14 Suppliers Manufacturers pre-qualified for supply of Buses
of approved models
Concession Agreement finalized in consultation with allCommercial Banks State Bank of Pakistan and other stakeholders
Bus logo and color scheme with space provision forcommercial advertisement has been finalized
Enabling Environment
Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 824
Ministry of Petroleum and SSGC have shown their willingness
to set aside about 30 MMCFD on SSGCL system for CNG busproject in Karachi
Several Private Sector CNG Filling Stations have shown interestin supplying CNG to the project buses and also invest in highpressure CNG fuelling station HDIP is also setting one station
in public sectorEx- KTC Bus terminals depot sites to be used for smoothoperation of buses
Road Infrastructure improvements including Signal FreeCorridors have been developed by CDGK to ensure efficient
operation of CNG buses on sustainable basis
A confirmatory Green Route Study (40 Routes) conducted withthe financial support of IPDF for the facilitation of potentialOperators Investors
40 CNG Green Routes identified and notified for the Project
Karachi Mass Transit Cell
Enabling Environment
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 924
Project Outcome
Total investment in the project is about Rs21 billion includingGOP subsidy of Rs25 billion
With the induction of 4000 buses about 4 million passengers dailywill enjoy safe comfortable and efficient public transport facilityat affordable fare
About 20000 direct jobs will be generated besides several otherindirect job opportunities would be available in different activities
The project is in line with the Government Poverty alleviationProgram by providing job opportunities travel time savingminimum travelling expenditure and accessibility to remote areas
Enormous environmental benefit in the form of clean air andreduced noise pollution
Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1024
Sr
No Activities Target Date
1 RFP issued to 7 Operators 08-01-2010
2 Pre-bid meeting 18-01-2010
3
bull Last date of submission of Proposals
bull Extended(SBP issued circular on 04-03-2010)
bull Extended
bull Further Extended
11-02-2010
11-03-2010
31-03-2010
13-04-2010
4 Evaluation of Proposals 20-04-2010
5 Selection of Bidders 30-04-2010
6Concession agreement between KMTC-
CDGK amp Selected Bidders07-07-2010
7 Financial Closure 30-07-2010
8 Start Operation of Bus Service 30-09-2010
Project ImplementationTimeline
10Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1124
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1224
Ex- KTC Malir Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1324
Ex- KTC Landhi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1424
Ex- KTC Korangi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1524
Ex- KTC Gulastan-e- Jauhar Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1624
Ex- KTC Mehran Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1724
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1824
Ex- KTC Model Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1924
Ex- KTC Orangi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2024
Ex- KTC North Karachi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2124
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2224
Period Activities
17th May2010 Progress Review meeting held under the Chairmanship of Secretary
General to President of Pakistan in CM House
Chief secretary gave the presentation which was also attended by
Dy Governor SBP President NBP Administrator CDGK and others
19th May 2010 A follow up meeting in NBP headed by President NBP held with
Commercial Banks CDGK team and Operators President NBP waspleased to assure his leading role in Bus financing program and other
banks to follow
20th May 2010 Detailed deliberation held on funding modalities and unified Term sheet
of lending banks
23rd
May 2010 NBP provided term sheet developed by NBP and other 6 CommercialBanks
24th May 2010 NBP team leader Mr Atif Ikram visited CDGK depot sites and CNG
station along with KMTC team
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2324
Period Activities
26th May 2010 A team of NBP and other Commercial Banks visited CDGK depots and
CNG Stations
28th May2010 KMTCCDGK in coordination with rep of IPDF and ENERCON conveyed
response on Term Sheet and feedback queries by banks4th June2010 On the request of SBP for confirmation about the mode of payment of
GOP subsidy (vide letter No BPRD (Sld-06)29662010 dated 362010)
Administrator CDGK requested Secretary Environment GOP to resolve
the issue
10th June2010 ENERCON MOE GOP vide letter No ENCMOE Admin 2010CNG ndash
Bus conveyed their NOC for payment of upfront grant (Rs 300000=)
and receiving Rs 377181 interest subsidy to be paid during 5 years ( in
60 installations)
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2424
Period Activities
10th June2010 KMTC team visited CNG stations along route demanded by pre-qualified
operators for confirmation of CNG supply to the project buses
10th June2010 NBP conveyed their concerns about CDGK CNG Bus Project and CNG
supply to the Project Buses14th June2010 KMTC forwarded the reply along with field visit report of CNG stations
duly supported by the photographs and consultant report of 31 CNG
Stations
18th June2010 NBP held consultation meeting with 3 Operators Investors
23rd June2010 NBP held consultation meeting with 3 remaining Operators Investors
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 324
Project Roadmap-CNGBus Project
Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 424
Fare level
On board security
Travel speed (time)
Drivers driving behavior
Frequency
Operation hours
RoutingConductors manner of service
On board comfort
Waiting time at bus stop
Access to bus stop
243
129
95
88
85
82
71
69
55
49
34
Pubic Concerns Addressed
Karachi Mass Transit Cell
(GOP Subsidy Import Duty and Local Tax Concession etc)
(Vig Sqd Comm Police IT CampC)
(Improved Infrastructure)
(Drivers Training by Operators)
(Route Survey Financial Model)
(Peak and off peak hours established)
(40 Green Routes notified)
(Mandatory Training under CA)
(Min Bus Specifications notified)
(Operators to notify bus timings)
(Accessibility of commuters ensured)
CONCERNS ADDRESSED
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 524
Rs 5 Billion subsidy approved ( 25 billion for Karachi)
4000 CNG buses in five years for Karachi
Immediate phase 500 ndash 1000 buses to be inducted in Karachi
Private sector bus investors minimum fleet of 25 new CNG buses
Max Debt to Equity ratio = 8020Repayment period 5 years
GOP will contribute a total of Rs677181- as subsidy over 5 yearstowards the cost of one bus
Rs300000- will be provided as upfront grant as part of downpayment and Rs377181- as interest subsidy payable in 5 years
New dedicated CNG Buses (CBU) shall be exempted from 15import duty
Project Modalities
Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 624
A Steering Committee (SC) for overall coordination support andmonitoring of the Project constituted under Chairmanship ofFederal Minister for Environment
Provincial Supervisory Committee (PSC) headed by ChiefSecretary Sindh will over see the project with special reference toits financial and technical dimensions to ensure smoothimplementation of the project on sustainable basis
An Implementation and Regulatory Committee (IRC) headed by
District Coordination Officer CDGK notified for effectiveexecution of the project including approval of route operationalplan fare structure etc
Project Implementation and Monitoring Unit (PIMU) to beestablished in KMTC-CDGK
Project Monitoring Mechanism
Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 724
Minimum Standard CNG Bus Specifications of 70 amp 100passengers carrying capacity notified by GOP
Seven Operators Investors pre-qualified
14 Suppliers Manufacturers pre-qualified for supply of Buses
of approved models
Concession Agreement finalized in consultation with allCommercial Banks State Bank of Pakistan and other stakeholders
Bus logo and color scheme with space provision forcommercial advertisement has been finalized
Enabling Environment
Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 824
Ministry of Petroleum and SSGC have shown their willingness
to set aside about 30 MMCFD on SSGCL system for CNG busproject in Karachi
Several Private Sector CNG Filling Stations have shown interestin supplying CNG to the project buses and also invest in highpressure CNG fuelling station HDIP is also setting one station
in public sectorEx- KTC Bus terminals depot sites to be used for smoothoperation of buses
Road Infrastructure improvements including Signal FreeCorridors have been developed by CDGK to ensure efficient
operation of CNG buses on sustainable basis
A confirmatory Green Route Study (40 Routes) conducted withthe financial support of IPDF for the facilitation of potentialOperators Investors
40 CNG Green Routes identified and notified for the Project
Karachi Mass Transit Cell
Enabling Environment
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 924
Project Outcome
Total investment in the project is about Rs21 billion includingGOP subsidy of Rs25 billion
With the induction of 4000 buses about 4 million passengers dailywill enjoy safe comfortable and efficient public transport facilityat affordable fare
About 20000 direct jobs will be generated besides several otherindirect job opportunities would be available in different activities
The project is in line with the Government Poverty alleviationProgram by providing job opportunities travel time savingminimum travelling expenditure and accessibility to remote areas
Enormous environmental benefit in the form of clean air andreduced noise pollution
Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1024
Sr
No Activities Target Date
1 RFP issued to 7 Operators 08-01-2010
2 Pre-bid meeting 18-01-2010
3
bull Last date of submission of Proposals
bull Extended(SBP issued circular on 04-03-2010)
bull Extended
bull Further Extended
11-02-2010
11-03-2010
31-03-2010
13-04-2010
4 Evaluation of Proposals 20-04-2010
5 Selection of Bidders 30-04-2010
6Concession agreement between KMTC-
CDGK amp Selected Bidders07-07-2010
7 Financial Closure 30-07-2010
8 Start Operation of Bus Service 30-09-2010
Project ImplementationTimeline
10Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1124
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1224
Ex- KTC Malir Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1324
Ex- KTC Landhi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1424
Ex- KTC Korangi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1524
Ex- KTC Gulastan-e- Jauhar Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1624
Ex- KTC Mehran Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1724
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1824
Ex- KTC Model Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1924
Ex- KTC Orangi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2024
Ex- KTC North Karachi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2124
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2224
Period Activities
17th May2010 Progress Review meeting held under the Chairmanship of Secretary
General to President of Pakistan in CM House
Chief secretary gave the presentation which was also attended by
Dy Governor SBP President NBP Administrator CDGK and others
19th May 2010 A follow up meeting in NBP headed by President NBP held with
Commercial Banks CDGK team and Operators President NBP waspleased to assure his leading role in Bus financing program and other
banks to follow
20th May 2010 Detailed deliberation held on funding modalities and unified Term sheet
of lending banks
23rd
May 2010 NBP provided term sheet developed by NBP and other 6 CommercialBanks
24th May 2010 NBP team leader Mr Atif Ikram visited CDGK depot sites and CNG
station along with KMTC team
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2324
Period Activities
26th May 2010 A team of NBP and other Commercial Banks visited CDGK depots and
CNG Stations
28th May2010 KMTCCDGK in coordination with rep of IPDF and ENERCON conveyed
response on Term Sheet and feedback queries by banks4th June2010 On the request of SBP for confirmation about the mode of payment of
GOP subsidy (vide letter No BPRD (Sld-06)29662010 dated 362010)
Administrator CDGK requested Secretary Environment GOP to resolve
the issue
10th June2010 ENERCON MOE GOP vide letter No ENCMOE Admin 2010CNG ndash
Bus conveyed their NOC for payment of upfront grant (Rs 300000=)
and receiving Rs 377181 interest subsidy to be paid during 5 years ( in
60 installations)
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2424
Period Activities
10th June2010 KMTC team visited CNG stations along route demanded by pre-qualified
operators for confirmation of CNG supply to the project buses
10th June2010 NBP conveyed their concerns about CDGK CNG Bus Project and CNG
supply to the Project Buses14th June2010 KMTC forwarded the reply along with field visit report of CNG stations
duly supported by the photographs and consultant report of 31 CNG
Stations
18th June2010 NBP held consultation meeting with 3 Operators Investors
23rd June2010 NBP held consultation meeting with 3 remaining Operators Investors
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 424
Fare level
On board security
Travel speed (time)
Drivers driving behavior
Frequency
Operation hours
RoutingConductors manner of service
On board comfort
Waiting time at bus stop
Access to bus stop
243
129
95
88
85
82
71
69
55
49
34
Pubic Concerns Addressed
Karachi Mass Transit Cell
(GOP Subsidy Import Duty and Local Tax Concession etc)
(Vig Sqd Comm Police IT CampC)
(Improved Infrastructure)
(Drivers Training by Operators)
(Route Survey Financial Model)
(Peak and off peak hours established)
(40 Green Routes notified)
(Mandatory Training under CA)
(Min Bus Specifications notified)
(Operators to notify bus timings)
(Accessibility of commuters ensured)
CONCERNS ADDRESSED
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 524
Rs 5 Billion subsidy approved ( 25 billion for Karachi)
4000 CNG buses in five years for Karachi
Immediate phase 500 ndash 1000 buses to be inducted in Karachi
Private sector bus investors minimum fleet of 25 new CNG buses
Max Debt to Equity ratio = 8020Repayment period 5 years
GOP will contribute a total of Rs677181- as subsidy over 5 yearstowards the cost of one bus
Rs300000- will be provided as upfront grant as part of downpayment and Rs377181- as interest subsidy payable in 5 years
New dedicated CNG Buses (CBU) shall be exempted from 15import duty
Project Modalities
Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 624
A Steering Committee (SC) for overall coordination support andmonitoring of the Project constituted under Chairmanship ofFederal Minister for Environment
Provincial Supervisory Committee (PSC) headed by ChiefSecretary Sindh will over see the project with special reference toits financial and technical dimensions to ensure smoothimplementation of the project on sustainable basis
An Implementation and Regulatory Committee (IRC) headed by
District Coordination Officer CDGK notified for effectiveexecution of the project including approval of route operationalplan fare structure etc
Project Implementation and Monitoring Unit (PIMU) to beestablished in KMTC-CDGK
Project Monitoring Mechanism
Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 724
Minimum Standard CNG Bus Specifications of 70 amp 100passengers carrying capacity notified by GOP
Seven Operators Investors pre-qualified
14 Suppliers Manufacturers pre-qualified for supply of Buses
of approved models
Concession Agreement finalized in consultation with allCommercial Banks State Bank of Pakistan and other stakeholders
Bus logo and color scheme with space provision forcommercial advertisement has been finalized
Enabling Environment
Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 824
Ministry of Petroleum and SSGC have shown their willingness
to set aside about 30 MMCFD on SSGCL system for CNG busproject in Karachi
Several Private Sector CNG Filling Stations have shown interestin supplying CNG to the project buses and also invest in highpressure CNG fuelling station HDIP is also setting one station
in public sectorEx- KTC Bus terminals depot sites to be used for smoothoperation of buses
Road Infrastructure improvements including Signal FreeCorridors have been developed by CDGK to ensure efficient
operation of CNG buses on sustainable basis
A confirmatory Green Route Study (40 Routes) conducted withthe financial support of IPDF for the facilitation of potentialOperators Investors
40 CNG Green Routes identified and notified for the Project
Karachi Mass Transit Cell
Enabling Environment
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 924
Project Outcome
Total investment in the project is about Rs21 billion includingGOP subsidy of Rs25 billion
With the induction of 4000 buses about 4 million passengers dailywill enjoy safe comfortable and efficient public transport facilityat affordable fare
About 20000 direct jobs will be generated besides several otherindirect job opportunities would be available in different activities
The project is in line with the Government Poverty alleviationProgram by providing job opportunities travel time savingminimum travelling expenditure and accessibility to remote areas
Enormous environmental benefit in the form of clean air andreduced noise pollution
Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1024
Sr
No Activities Target Date
1 RFP issued to 7 Operators 08-01-2010
2 Pre-bid meeting 18-01-2010
3
bull Last date of submission of Proposals
bull Extended(SBP issued circular on 04-03-2010)
bull Extended
bull Further Extended
11-02-2010
11-03-2010
31-03-2010
13-04-2010
4 Evaluation of Proposals 20-04-2010
5 Selection of Bidders 30-04-2010
6Concession agreement between KMTC-
CDGK amp Selected Bidders07-07-2010
7 Financial Closure 30-07-2010
8 Start Operation of Bus Service 30-09-2010
Project ImplementationTimeline
10Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1124
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1224
Ex- KTC Malir Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1324
Ex- KTC Landhi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1424
Ex- KTC Korangi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1524
Ex- KTC Gulastan-e- Jauhar Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1624
Ex- KTC Mehran Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1724
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1824
Ex- KTC Model Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1924
Ex- KTC Orangi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2024
Ex- KTC North Karachi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2124
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2224
Period Activities
17th May2010 Progress Review meeting held under the Chairmanship of Secretary
General to President of Pakistan in CM House
Chief secretary gave the presentation which was also attended by
Dy Governor SBP President NBP Administrator CDGK and others
19th May 2010 A follow up meeting in NBP headed by President NBP held with
Commercial Banks CDGK team and Operators President NBP waspleased to assure his leading role in Bus financing program and other
banks to follow
20th May 2010 Detailed deliberation held on funding modalities and unified Term sheet
of lending banks
23rd
May 2010 NBP provided term sheet developed by NBP and other 6 CommercialBanks
24th May 2010 NBP team leader Mr Atif Ikram visited CDGK depot sites and CNG
station along with KMTC team
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2324
Period Activities
26th May 2010 A team of NBP and other Commercial Banks visited CDGK depots and
CNG Stations
28th May2010 KMTCCDGK in coordination with rep of IPDF and ENERCON conveyed
response on Term Sheet and feedback queries by banks4th June2010 On the request of SBP for confirmation about the mode of payment of
GOP subsidy (vide letter No BPRD (Sld-06)29662010 dated 362010)
Administrator CDGK requested Secretary Environment GOP to resolve
the issue
10th June2010 ENERCON MOE GOP vide letter No ENCMOE Admin 2010CNG ndash
Bus conveyed their NOC for payment of upfront grant (Rs 300000=)
and receiving Rs 377181 interest subsidy to be paid during 5 years ( in
60 installations)
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2424
Period Activities
10th June2010 KMTC team visited CNG stations along route demanded by pre-qualified
operators for confirmation of CNG supply to the project buses
10th June2010 NBP conveyed their concerns about CDGK CNG Bus Project and CNG
supply to the Project Buses14th June2010 KMTC forwarded the reply along with field visit report of CNG stations
duly supported by the photographs and consultant report of 31 CNG
Stations
18th June2010 NBP held consultation meeting with 3 Operators Investors
23rd June2010 NBP held consultation meeting with 3 remaining Operators Investors
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 524
Rs 5 Billion subsidy approved ( 25 billion for Karachi)
4000 CNG buses in five years for Karachi
Immediate phase 500 ndash 1000 buses to be inducted in Karachi
Private sector bus investors minimum fleet of 25 new CNG buses
Max Debt to Equity ratio = 8020Repayment period 5 years
GOP will contribute a total of Rs677181- as subsidy over 5 yearstowards the cost of one bus
Rs300000- will be provided as upfront grant as part of downpayment and Rs377181- as interest subsidy payable in 5 years
New dedicated CNG Buses (CBU) shall be exempted from 15import duty
Project Modalities
Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 624
A Steering Committee (SC) for overall coordination support andmonitoring of the Project constituted under Chairmanship ofFederal Minister for Environment
Provincial Supervisory Committee (PSC) headed by ChiefSecretary Sindh will over see the project with special reference toits financial and technical dimensions to ensure smoothimplementation of the project on sustainable basis
An Implementation and Regulatory Committee (IRC) headed by
District Coordination Officer CDGK notified for effectiveexecution of the project including approval of route operationalplan fare structure etc
Project Implementation and Monitoring Unit (PIMU) to beestablished in KMTC-CDGK
Project Monitoring Mechanism
Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 724
Minimum Standard CNG Bus Specifications of 70 amp 100passengers carrying capacity notified by GOP
Seven Operators Investors pre-qualified
14 Suppliers Manufacturers pre-qualified for supply of Buses
of approved models
Concession Agreement finalized in consultation with allCommercial Banks State Bank of Pakistan and other stakeholders
Bus logo and color scheme with space provision forcommercial advertisement has been finalized
Enabling Environment
Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 824
Ministry of Petroleum and SSGC have shown their willingness
to set aside about 30 MMCFD on SSGCL system for CNG busproject in Karachi
Several Private Sector CNG Filling Stations have shown interestin supplying CNG to the project buses and also invest in highpressure CNG fuelling station HDIP is also setting one station
in public sectorEx- KTC Bus terminals depot sites to be used for smoothoperation of buses
Road Infrastructure improvements including Signal FreeCorridors have been developed by CDGK to ensure efficient
operation of CNG buses on sustainable basis
A confirmatory Green Route Study (40 Routes) conducted withthe financial support of IPDF for the facilitation of potentialOperators Investors
40 CNG Green Routes identified and notified for the Project
Karachi Mass Transit Cell
Enabling Environment
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 924
Project Outcome
Total investment in the project is about Rs21 billion includingGOP subsidy of Rs25 billion
With the induction of 4000 buses about 4 million passengers dailywill enjoy safe comfortable and efficient public transport facilityat affordable fare
About 20000 direct jobs will be generated besides several otherindirect job opportunities would be available in different activities
The project is in line with the Government Poverty alleviationProgram by providing job opportunities travel time savingminimum travelling expenditure and accessibility to remote areas
Enormous environmental benefit in the form of clean air andreduced noise pollution
Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1024
Sr
No Activities Target Date
1 RFP issued to 7 Operators 08-01-2010
2 Pre-bid meeting 18-01-2010
3
bull Last date of submission of Proposals
bull Extended(SBP issued circular on 04-03-2010)
bull Extended
bull Further Extended
11-02-2010
11-03-2010
31-03-2010
13-04-2010
4 Evaluation of Proposals 20-04-2010
5 Selection of Bidders 30-04-2010
6Concession agreement between KMTC-
CDGK amp Selected Bidders07-07-2010
7 Financial Closure 30-07-2010
8 Start Operation of Bus Service 30-09-2010
Project ImplementationTimeline
10Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1124
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1224
Ex- KTC Malir Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1324
Ex- KTC Landhi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1424
Ex- KTC Korangi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1524
Ex- KTC Gulastan-e- Jauhar Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1624
Ex- KTC Mehran Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1724
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1824
Ex- KTC Model Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1924
Ex- KTC Orangi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2024
Ex- KTC North Karachi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2124
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2224
Period Activities
17th May2010 Progress Review meeting held under the Chairmanship of Secretary
General to President of Pakistan in CM House
Chief secretary gave the presentation which was also attended by
Dy Governor SBP President NBP Administrator CDGK and others
19th May 2010 A follow up meeting in NBP headed by President NBP held with
Commercial Banks CDGK team and Operators President NBP waspleased to assure his leading role in Bus financing program and other
banks to follow
20th May 2010 Detailed deliberation held on funding modalities and unified Term sheet
of lending banks
23rd
May 2010 NBP provided term sheet developed by NBP and other 6 CommercialBanks
24th May 2010 NBP team leader Mr Atif Ikram visited CDGK depot sites and CNG
station along with KMTC team
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2324
Period Activities
26th May 2010 A team of NBP and other Commercial Banks visited CDGK depots and
CNG Stations
28th May2010 KMTCCDGK in coordination with rep of IPDF and ENERCON conveyed
response on Term Sheet and feedback queries by banks4th June2010 On the request of SBP for confirmation about the mode of payment of
GOP subsidy (vide letter No BPRD (Sld-06)29662010 dated 362010)
Administrator CDGK requested Secretary Environment GOP to resolve
the issue
10th June2010 ENERCON MOE GOP vide letter No ENCMOE Admin 2010CNG ndash
Bus conveyed their NOC for payment of upfront grant (Rs 300000=)
and receiving Rs 377181 interest subsidy to be paid during 5 years ( in
60 installations)
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2424
Period Activities
10th June2010 KMTC team visited CNG stations along route demanded by pre-qualified
operators for confirmation of CNG supply to the project buses
10th June2010 NBP conveyed their concerns about CDGK CNG Bus Project and CNG
supply to the Project Buses14th June2010 KMTC forwarded the reply along with field visit report of CNG stations
duly supported by the photographs and consultant report of 31 CNG
Stations
18th June2010 NBP held consultation meeting with 3 Operators Investors
23rd June2010 NBP held consultation meeting with 3 remaining Operators Investors
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 624
A Steering Committee (SC) for overall coordination support andmonitoring of the Project constituted under Chairmanship ofFederal Minister for Environment
Provincial Supervisory Committee (PSC) headed by ChiefSecretary Sindh will over see the project with special reference toits financial and technical dimensions to ensure smoothimplementation of the project on sustainable basis
An Implementation and Regulatory Committee (IRC) headed by
District Coordination Officer CDGK notified for effectiveexecution of the project including approval of route operationalplan fare structure etc
Project Implementation and Monitoring Unit (PIMU) to beestablished in KMTC-CDGK
Project Monitoring Mechanism
Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 724
Minimum Standard CNG Bus Specifications of 70 amp 100passengers carrying capacity notified by GOP
Seven Operators Investors pre-qualified
14 Suppliers Manufacturers pre-qualified for supply of Buses
of approved models
Concession Agreement finalized in consultation with allCommercial Banks State Bank of Pakistan and other stakeholders
Bus logo and color scheme with space provision forcommercial advertisement has been finalized
Enabling Environment
Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 824
Ministry of Petroleum and SSGC have shown their willingness
to set aside about 30 MMCFD on SSGCL system for CNG busproject in Karachi
Several Private Sector CNG Filling Stations have shown interestin supplying CNG to the project buses and also invest in highpressure CNG fuelling station HDIP is also setting one station
in public sectorEx- KTC Bus terminals depot sites to be used for smoothoperation of buses
Road Infrastructure improvements including Signal FreeCorridors have been developed by CDGK to ensure efficient
operation of CNG buses on sustainable basis
A confirmatory Green Route Study (40 Routes) conducted withthe financial support of IPDF for the facilitation of potentialOperators Investors
40 CNG Green Routes identified and notified for the Project
Karachi Mass Transit Cell
Enabling Environment
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 924
Project Outcome
Total investment in the project is about Rs21 billion includingGOP subsidy of Rs25 billion
With the induction of 4000 buses about 4 million passengers dailywill enjoy safe comfortable and efficient public transport facilityat affordable fare
About 20000 direct jobs will be generated besides several otherindirect job opportunities would be available in different activities
The project is in line with the Government Poverty alleviationProgram by providing job opportunities travel time savingminimum travelling expenditure and accessibility to remote areas
Enormous environmental benefit in the form of clean air andreduced noise pollution
Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1024
Sr
No Activities Target Date
1 RFP issued to 7 Operators 08-01-2010
2 Pre-bid meeting 18-01-2010
3
bull Last date of submission of Proposals
bull Extended(SBP issued circular on 04-03-2010)
bull Extended
bull Further Extended
11-02-2010
11-03-2010
31-03-2010
13-04-2010
4 Evaluation of Proposals 20-04-2010
5 Selection of Bidders 30-04-2010
6Concession agreement between KMTC-
CDGK amp Selected Bidders07-07-2010
7 Financial Closure 30-07-2010
8 Start Operation of Bus Service 30-09-2010
Project ImplementationTimeline
10Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1124
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1224
Ex- KTC Malir Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1324
Ex- KTC Landhi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1424
Ex- KTC Korangi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1524
Ex- KTC Gulastan-e- Jauhar Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1624
Ex- KTC Mehran Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1724
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1824
Ex- KTC Model Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1924
Ex- KTC Orangi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2024
Ex- KTC North Karachi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2124
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2224
Period Activities
17th May2010 Progress Review meeting held under the Chairmanship of Secretary
General to President of Pakistan in CM House
Chief secretary gave the presentation which was also attended by
Dy Governor SBP President NBP Administrator CDGK and others
19th May 2010 A follow up meeting in NBP headed by President NBP held with
Commercial Banks CDGK team and Operators President NBP waspleased to assure his leading role in Bus financing program and other
banks to follow
20th May 2010 Detailed deliberation held on funding modalities and unified Term sheet
of lending banks
23rd
May 2010 NBP provided term sheet developed by NBP and other 6 CommercialBanks
24th May 2010 NBP team leader Mr Atif Ikram visited CDGK depot sites and CNG
station along with KMTC team
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2324
Period Activities
26th May 2010 A team of NBP and other Commercial Banks visited CDGK depots and
CNG Stations
28th May2010 KMTCCDGK in coordination with rep of IPDF and ENERCON conveyed
response on Term Sheet and feedback queries by banks4th June2010 On the request of SBP for confirmation about the mode of payment of
GOP subsidy (vide letter No BPRD (Sld-06)29662010 dated 362010)
Administrator CDGK requested Secretary Environment GOP to resolve
the issue
10th June2010 ENERCON MOE GOP vide letter No ENCMOE Admin 2010CNG ndash
Bus conveyed their NOC for payment of upfront grant (Rs 300000=)
and receiving Rs 377181 interest subsidy to be paid during 5 years ( in
60 installations)
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2424
Period Activities
10th June2010 KMTC team visited CNG stations along route demanded by pre-qualified
operators for confirmation of CNG supply to the project buses
10th June2010 NBP conveyed their concerns about CDGK CNG Bus Project and CNG
supply to the Project Buses14th June2010 KMTC forwarded the reply along with field visit report of CNG stations
duly supported by the photographs and consultant report of 31 CNG
Stations
18th June2010 NBP held consultation meeting with 3 Operators Investors
23rd June2010 NBP held consultation meeting with 3 remaining Operators Investors
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 724
Minimum Standard CNG Bus Specifications of 70 amp 100passengers carrying capacity notified by GOP
Seven Operators Investors pre-qualified
14 Suppliers Manufacturers pre-qualified for supply of Buses
of approved models
Concession Agreement finalized in consultation with allCommercial Banks State Bank of Pakistan and other stakeholders
Bus logo and color scheme with space provision forcommercial advertisement has been finalized
Enabling Environment
Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 824
Ministry of Petroleum and SSGC have shown their willingness
to set aside about 30 MMCFD on SSGCL system for CNG busproject in Karachi
Several Private Sector CNG Filling Stations have shown interestin supplying CNG to the project buses and also invest in highpressure CNG fuelling station HDIP is also setting one station
in public sectorEx- KTC Bus terminals depot sites to be used for smoothoperation of buses
Road Infrastructure improvements including Signal FreeCorridors have been developed by CDGK to ensure efficient
operation of CNG buses on sustainable basis
A confirmatory Green Route Study (40 Routes) conducted withthe financial support of IPDF for the facilitation of potentialOperators Investors
40 CNG Green Routes identified and notified for the Project
Karachi Mass Transit Cell
Enabling Environment
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 924
Project Outcome
Total investment in the project is about Rs21 billion includingGOP subsidy of Rs25 billion
With the induction of 4000 buses about 4 million passengers dailywill enjoy safe comfortable and efficient public transport facilityat affordable fare
About 20000 direct jobs will be generated besides several otherindirect job opportunities would be available in different activities
The project is in line with the Government Poverty alleviationProgram by providing job opportunities travel time savingminimum travelling expenditure and accessibility to remote areas
Enormous environmental benefit in the form of clean air andreduced noise pollution
Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1024
Sr
No Activities Target Date
1 RFP issued to 7 Operators 08-01-2010
2 Pre-bid meeting 18-01-2010
3
bull Last date of submission of Proposals
bull Extended(SBP issued circular on 04-03-2010)
bull Extended
bull Further Extended
11-02-2010
11-03-2010
31-03-2010
13-04-2010
4 Evaluation of Proposals 20-04-2010
5 Selection of Bidders 30-04-2010
6Concession agreement between KMTC-
CDGK amp Selected Bidders07-07-2010
7 Financial Closure 30-07-2010
8 Start Operation of Bus Service 30-09-2010
Project ImplementationTimeline
10Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1124
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1224
Ex- KTC Malir Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1324
Ex- KTC Landhi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1424
Ex- KTC Korangi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1524
Ex- KTC Gulastan-e- Jauhar Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1624
Ex- KTC Mehran Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1724
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1824
Ex- KTC Model Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1924
Ex- KTC Orangi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2024
Ex- KTC North Karachi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2124
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2224
Period Activities
17th May2010 Progress Review meeting held under the Chairmanship of Secretary
General to President of Pakistan in CM House
Chief secretary gave the presentation which was also attended by
Dy Governor SBP President NBP Administrator CDGK and others
19th May 2010 A follow up meeting in NBP headed by President NBP held with
Commercial Banks CDGK team and Operators President NBP waspleased to assure his leading role in Bus financing program and other
banks to follow
20th May 2010 Detailed deliberation held on funding modalities and unified Term sheet
of lending banks
23rd
May 2010 NBP provided term sheet developed by NBP and other 6 CommercialBanks
24th May 2010 NBP team leader Mr Atif Ikram visited CDGK depot sites and CNG
station along with KMTC team
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2324
Period Activities
26th May 2010 A team of NBP and other Commercial Banks visited CDGK depots and
CNG Stations
28th May2010 KMTCCDGK in coordination with rep of IPDF and ENERCON conveyed
response on Term Sheet and feedback queries by banks4th June2010 On the request of SBP for confirmation about the mode of payment of
GOP subsidy (vide letter No BPRD (Sld-06)29662010 dated 362010)
Administrator CDGK requested Secretary Environment GOP to resolve
the issue
10th June2010 ENERCON MOE GOP vide letter No ENCMOE Admin 2010CNG ndash
Bus conveyed their NOC for payment of upfront grant (Rs 300000=)
and receiving Rs 377181 interest subsidy to be paid during 5 years ( in
60 installations)
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2424
Period Activities
10th June2010 KMTC team visited CNG stations along route demanded by pre-qualified
operators for confirmation of CNG supply to the project buses
10th June2010 NBP conveyed their concerns about CDGK CNG Bus Project and CNG
supply to the Project Buses14th June2010 KMTC forwarded the reply along with field visit report of CNG stations
duly supported by the photographs and consultant report of 31 CNG
Stations
18th June2010 NBP held consultation meeting with 3 Operators Investors
23rd June2010 NBP held consultation meeting with 3 remaining Operators Investors
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 824
Ministry of Petroleum and SSGC have shown their willingness
to set aside about 30 MMCFD on SSGCL system for CNG busproject in Karachi
Several Private Sector CNG Filling Stations have shown interestin supplying CNG to the project buses and also invest in highpressure CNG fuelling station HDIP is also setting one station
in public sectorEx- KTC Bus terminals depot sites to be used for smoothoperation of buses
Road Infrastructure improvements including Signal FreeCorridors have been developed by CDGK to ensure efficient
operation of CNG buses on sustainable basis
A confirmatory Green Route Study (40 Routes) conducted withthe financial support of IPDF for the facilitation of potentialOperators Investors
40 CNG Green Routes identified and notified for the Project
Karachi Mass Transit Cell
Enabling Environment
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 924
Project Outcome
Total investment in the project is about Rs21 billion includingGOP subsidy of Rs25 billion
With the induction of 4000 buses about 4 million passengers dailywill enjoy safe comfortable and efficient public transport facilityat affordable fare
About 20000 direct jobs will be generated besides several otherindirect job opportunities would be available in different activities
The project is in line with the Government Poverty alleviationProgram by providing job opportunities travel time savingminimum travelling expenditure and accessibility to remote areas
Enormous environmental benefit in the form of clean air andreduced noise pollution
Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1024
Sr
No Activities Target Date
1 RFP issued to 7 Operators 08-01-2010
2 Pre-bid meeting 18-01-2010
3
bull Last date of submission of Proposals
bull Extended(SBP issued circular on 04-03-2010)
bull Extended
bull Further Extended
11-02-2010
11-03-2010
31-03-2010
13-04-2010
4 Evaluation of Proposals 20-04-2010
5 Selection of Bidders 30-04-2010
6Concession agreement between KMTC-
CDGK amp Selected Bidders07-07-2010
7 Financial Closure 30-07-2010
8 Start Operation of Bus Service 30-09-2010
Project ImplementationTimeline
10Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1124
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1224
Ex- KTC Malir Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1324
Ex- KTC Landhi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1424
Ex- KTC Korangi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1524
Ex- KTC Gulastan-e- Jauhar Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1624
Ex- KTC Mehran Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1724
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1824
Ex- KTC Model Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1924
Ex- KTC Orangi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2024
Ex- KTC North Karachi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2124
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2224
Period Activities
17th May2010 Progress Review meeting held under the Chairmanship of Secretary
General to President of Pakistan in CM House
Chief secretary gave the presentation which was also attended by
Dy Governor SBP President NBP Administrator CDGK and others
19th May 2010 A follow up meeting in NBP headed by President NBP held with
Commercial Banks CDGK team and Operators President NBP waspleased to assure his leading role in Bus financing program and other
banks to follow
20th May 2010 Detailed deliberation held on funding modalities and unified Term sheet
of lending banks
23rd
May 2010 NBP provided term sheet developed by NBP and other 6 CommercialBanks
24th May 2010 NBP team leader Mr Atif Ikram visited CDGK depot sites and CNG
station along with KMTC team
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2324
Period Activities
26th May 2010 A team of NBP and other Commercial Banks visited CDGK depots and
CNG Stations
28th May2010 KMTCCDGK in coordination with rep of IPDF and ENERCON conveyed
response on Term Sheet and feedback queries by banks4th June2010 On the request of SBP for confirmation about the mode of payment of
GOP subsidy (vide letter No BPRD (Sld-06)29662010 dated 362010)
Administrator CDGK requested Secretary Environment GOP to resolve
the issue
10th June2010 ENERCON MOE GOP vide letter No ENCMOE Admin 2010CNG ndash
Bus conveyed their NOC for payment of upfront grant (Rs 300000=)
and receiving Rs 377181 interest subsidy to be paid during 5 years ( in
60 installations)
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2424
Period Activities
10th June2010 KMTC team visited CNG stations along route demanded by pre-qualified
operators for confirmation of CNG supply to the project buses
10th June2010 NBP conveyed their concerns about CDGK CNG Bus Project and CNG
supply to the Project Buses14th June2010 KMTC forwarded the reply along with field visit report of CNG stations
duly supported by the photographs and consultant report of 31 CNG
Stations
18th June2010 NBP held consultation meeting with 3 Operators Investors
23rd June2010 NBP held consultation meeting with 3 remaining Operators Investors
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 924
Project Outcome
Total investment in the project is about Rs21 billion includingGOP subsidy of Rs25 billion
With the induction of 4000 buses about 4 million passengers dailywill enjoy safe comfortable and efficient public transport facilityat affordable fare
About 20000 direct jobs will be generated besides several otherindirect job opportunities would be available in different activities
The project is in line with the Government Poverty alleviationProgram by providing job opportunities travel time savingminimum travelling expenditure and accessibility to remote areas
Enormous environmental benefit in the form of clean air andreduced noise pollution
Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1024
Sr
No Activities Target Date
1 RFP issued to 7 Operators 08-01-2010
2 Pre-bid meeting 18-01-2010
3
bull Last date of submission of Proposals
bull Extended(SBP issued circular on 04-03-2010)
bull Extended
bull Further Extended
11-02-2010
11-03-2010
31-03-2010
13-04-2010
4 Evaluation of Proposals 20-04-2010
5 Selection of Bidders 30-04-2010
6Concession agreement between KMTC-
CDGK amp Selected Bidders07-07-2010
7 Financial Closure 30-07-2010
8 Start Operation of Bus Service 30-09-2010
Project ImplementationTimeline
10Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1124
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1224
Ex- KTC Malir Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1324
Ex- KTC Landhi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1424
Ex- KTC Korangi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1524
Ex- KTC Gulastan-e- Jauhar Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1624
Ex- KTC Mehran Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1724
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1824
Ex- KTC Model Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1924
Ex- KTC Orangi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2024
Ex- KTC North Karachi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2124
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2224
Period Activities
17th May2010 Progress Review meeting held under the Chairmanship of Secretary
General to President of Pakistan in CM House
Chief secretary gave the presentation which was also attended by
Dy Governor SBP President NBP Administrator CDGK and others
19th May 2010 A follow up meeting in NBP headed by President NBP held with
Commercial Banks CDGK team and Operators President NBP waspleased to assure his leading role in Bus financing program and other
banks to follow
20th May 2010 Detailed deliberation held on funding modalities and unified Term sheet
of lending banks
23rd
May 2010 NBP provided term sheet developed by NBP and other 6 CommercialBanks
24th May 2010 NBP team leader Mr Atif Ikram visited CDGK depot sites and CNG
station along with KMTC team
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2324
Period Activities
26th May 2010 A team of NBP and other Commercial Banks visited CDGK depots and
CNG Stations
28th May2010 KMTCCDGK in coordination with rep of IPDF and ENERCON conveyed
response on Term Sheet and feedback queries by banks4th June2010 On the request of SBP for confirmation about the mode of payment of
GOP subsidy (vide letter No BPRD (Sld-06)29662010 dated 362010)
Administrator CDGK requested Secretary Environment GOP to resolve
the issue
10th June2010 ENERCON MOE GOP vide letter No ENCMOE Admin 2010CNG ndash
Bus conveyed their NOC for payment of upfront grant (Rs 300000=)
and receiving Rs 377181 interest subsidy to be paid during 5 years ( in
60 installations)
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2424
Period Activities
10th June2010 KMTC team visited CNG stations along route demanded by pre-qualified
operators for confirmation of CNG supply to the project buses
10th June2010 NBP conveyed their concerns about CDGK CNG Bus Project and CNG
supply to the Project Buses14th June2010 KMTC forwarded the reply along with field visit report of CNG stations
duly supported by the photographs and consultant report of 31 CNG
Stations
18th June2010 NBP held consultation meeting with 3 Operators Investors
23rd June2010 NBP held consultation meeting with 3 remaining Operators Investors
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1024
Sr
No Activities Target Date
1 RFP issued to 7 Operators 08-01-2010
2 Pre-bid meeting 18-01-2010
3
bull Last date of submission of Proposals
bull Extended(SBP issued circular on 04-03-2010)
bull Extended
bull Further Extended
11-02-2010
11-03-2010
31-03-2010
13-04-2010
4 Evaluation of Proposals 20-04-2010
5 Selection of Bidders 30-04-2010
6Concession agreement between KMTC-
CDGK amp Selected Bidders07-07-2010
7 Financial Closure 30-07-2010
8 Start Operation of Bus Service 30-09-2010
Project ImplementationTimeline
10Karachi Mass Transit Cell
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1124
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1224
Ex- KTC Malir Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1324
Ex- KTC Landhi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1424
Ex- KTC Korangi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1524
Ex- KTC Gulastan-e- Jauhar Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1624
Ex- KTC Mehran Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1724
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1824
Ex- KTC Model Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1924
Ex- KTC Orangi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2024
Ex- KTC North Karachi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2124
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2224
Period Activities
17th May2010 Progress Review meeting held under the Chairmanship of Secretary
General to President of Pakistan in CM House
Chief secretary gave the presentation which was also attended by
Dy Governor SBP President NBP Administrator CDGK and others
19th May 2010 A follow up meeting in NBP headed by President NBP held with
Commercial Banks CDGK team and Operators President NBP waspleased to assure his leading role in Bus financing program and other
banks to follow
20th May 2010 Detailed deliberation held on funding modalities and unified Term sheet
of lending banks
23rd
May 2010 NBP provided term sheet developed by NBP and other 6 CommercialBanks
24th May 2010 NBP team leader Mr Atif Ikram visited CDGK depot sites and CNG
station along with KMTC team
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2324
Period Activities
26th May 2010 A team of NBP and other Commercial Banks visited CDGK depots and
CNG Stations
28th May2010 KMTCCDGK in coordination with rep of IPDF and ENERCON conveyed
response on Term Sheet and feedback queries by banks4th June2010 On the request of SBP for confirmation about the mode of payment of
GOP subsidy (vide letter No BPRD (Sld-06)29662010 dated 362010)
Administrator CDGK requested Secretary Environment GOP to resolve
the issue
10th June2010 ENERCON MOE GOP vide letter No ENCMOE Admin 2010CNG ndash
Bus conveyed their NOC for payment of upfront grant (Rs 300000=)
and receiving Rs 377181 interest subsidy to be paid during 5 years ( in
60 installations)
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2424
Period Activities
10th June2010 KMTC team visited CNG stations along route demanded by pre-qualified
operators for confirmation of CNG supply to the project buses
10th June2010 NBP conveyed their concerns about CDGK CNG Bus Project and CNG
supply to the Project Buses14th June2010 KMTC forwarded the reply along with field visit report of CNG stations
duly supported by the photographs and consultant report of 31 CNG
Stations
18th June2010 NBP held consultation meeting with 3 Operators Investors
23rd June2010 NBP held consultation meeting with 3 remaining Operators Investors
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1124
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1224
Ex- KTC Malir Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1324
Ex- KTC Landhi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1424
Ex- KTC Korangi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1524
Ex- KTC Gulastan-e- Jauhar Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1624
Ex- KTC Mehran Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1724
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1824
Ex- KTC Model Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1924
Ex- KTC Orangi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2024
Ex- KTC North Karachi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2124
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2224
Period Activities
17th May2010 Progress Review meeting held under the Chairmanship of Secretary
General to President of Pakistan in CM House
Chief secretary gave the presentation which was also attended by
Dy Governor SBP President NBP Administrator CDGK and others
19th May 2010 A follow up meeting in NBP headed by President NBP held with
Commercial Banks CDGK team and Operators President NBP waspleased to assure his leading role in Bus financing program and other
banks to follow
20th May 2010 Detailed deliberation held on funding modalities and unified Term sheet
of lending banks
23rd
May 2010 NBP provided term sheet developed by NBP and other 6 CommercialBanks
24th May 2010 NBP team leader Mr Atif Ikram visited CDGK depot sites and CNG
station along with KMTC team
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2324
Period Activities
26th May 2010 A team of NBP and other Commercial Banks visited CDGK depots and
CNG Stations
28th May2010 KMTCCDGK in coordination with rep of IPDF and ENERCON conveyed
response on Term Sheet and feedback queries by banks4th June2010 On the request of SBP for confirmation about the mode of payment of
GOP subsidy (vide letter No BPRD (Sld-06)29662010 dated 362010)
Administrator CDGK requested Secretary Environment GOP to resolve
the issue
10th June2010 ENERCON MOE GOP vide letter No ENCMOE Admin 2010CNG ndash
Bus conveyed their NOC for payment of upfront grant (Rs 300000=)
and receiving Rs 377181 interest subsidy to be paid during 5 years ( in
60 installations)
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2424
Period Activities
10th June2010 KMTC team visited CNG stations along route demanded by pre-qualified
operators for confirmation of CNG supply to the project buses
10th June2010 NBP conveyed their concerns about CDGK CNG Bus Project and CNG
supply to the Project Buses14th June2010 KMTC forwarded the reply along with field visit report of CNG stations
duly supported by the photographs and consultant report of 31 CNG
Stations
18th June2010 NBP held consultation meeting with 3 Operators Investors
23rd June2010 NBP held consultation meeting with 3 remaining Operators Investors
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1224
Ex- KTC Malir Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1324
Ex- KTC Landhi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1424
Ex- KTC Korangi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1524
Ex- KTC Gulastan-e- Jauhar Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1624
Ex- KTC Mehran Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1724
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1824
Ex- KTC Model Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1924
Ex- KTC Orangi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2024
Ex- KTC North Karachi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2124
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2224
Period Activities
17th May2010 Progress Review meeting held under the Chairmanship of Secretary
General to President of Pakistan in CM House
Chief secretary gave the presentation which was also attended by
Dy Governor SBP President NBP Administrator CDGK and others
19th May 2010 A follow up meeting in NBP headed by President NBP held with
Commercial Banks CDGK team and Operators President NBP waspleased to assure his leading role in Bus financing program and other
banks to follow
20th May 2010 Detailed deliberation held on funding modalities and unified Term sheet
of lending banks
23rd
May 2010 NBP provided term sheet developed by NBP and other 6 CommercialBanks
24th May 2010 NBP team leader Mr Atif Ikram visited CDGK depot sites and CNG
station along with KMTC team
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2324
Period Activities
26th May 2010 A team of NBP and other Commercial Banks visited CDGK depots and
CNG Stations
28th May2010 KMTCCDGK in coordination with rep of IPDF and ENERCON conveyed
response on Term Sheet and feedback queries by banks4th June2010 On the request of SBP for confirmation about the mode of payment of
GOP subsidy (vide letter No BPRD (Sld-06)29662010 dated 362010)
Administrator CDGK requested Secretary Environment GOP to resolve
the issue
10th June2010 ENERCON MOE GOP vide letter No ENCMOE Admin 2010CNG ndash
Bus conveyed their NOC for payment of upfront grant (Rs 300000=)
and receiving Rs 377181 interest subsidy to be paid during 5 years ( in
60 installations)
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2424
Period Activities
10th June2010 KMTC team visited CNG stations along route demanded by pre-qualified
operators for confirmation of CNG supply to the project buses
10th June2010 NBP conveyed their concerns about CDGK CNG Bus Project and CNG
supply to the Project Buses14th June2010 KMTC forwarded the reply along with field visit report of CNG stations
duly supported by the photographs and consultant report of 31 CNG
Stations
18th June2010 NBP held consultation meeting with 3 Operators Investors
23rd June2010 NBP held consultation meeting with 3 remaining Operators Investors
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1324
Ex- KTC Landhi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1424
Ex- KTC Korangi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1524
Ex- KTC Gulastan-e- Jauhar Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1624
Ex- KTC Mehran Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1724
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1824
Ex- KTC Model Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1924
Ex- KTC Orangi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2024
Ex- KTC North Karachi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2124
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2224
Period Activities
17th May2010 Progress Review meeting held under the Chairmanship of Secretary
General to President of Pakistan in CM House
Chief secretary gave the presentation which was also attended by
Dy Governor SBP President NBP Administrator CDGK and others
19th May 2010 A follow up meeting in NBP headed by President NBP held with
Commercial Banks CDGK team and Operators President NBP waspleased to assure his leading role in Bus financing program and other
banks to follow
20th May 2010 Detailed deliberation held on funding modalities and unified Term sheet
of lending banks
23rd
May 2010 NBP provided term sheet developed by NBP and other 6 CommercialBanks
24th May 2010 NBP team leader Mr Atif Ikram visited CDGK depot sites and CNG
station along with KMTC team
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2324
Period Activities
26th May 2010 A team of NBP and other Commercial Banks visited CDGK depots and
CNG Stations
28th May2010 KMTCCDGK in coordination with rep of IPDF and ENERCON conveyed
response on Term Sheet and feedback queries by banks4th June2010 On the request of SBP for confirmation about the mode of payment of
GOP subsidy (vide letter No BPRD (Sld-06)29662010 dated 362010)
Administrator CDGK requested Secretary Environment GOP to resolve
the issue
10th June2010 ENERCON MOE GOP vide letter No ENCMOE Admin 2010CNG ndash
Bus conveyed their NOC for payment of upfront grant (Rs 300000=)
and receiving Rs 377181 interest subsidy to be paid during 5 years ( in
60 installations)
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2424
Period Activities
10th June2010 KMTC team visited CNG stations along route demanded by pre-qualified
operators for confirmation of CNG supply to the project buses
10th June2010 NBP conveyed their concerns about CDGK CNG Bus Project and CNG
supply to the Project Buses14th June2010 KMTC forwarded the reply along with field visit report of CNG stations
duly supported by the photographs and consultant report of 31 CNG
Stations
18th June2010 NBP held consultation meeting with 3 Operators Investors
23rd June2010 NBP held consultation meeting with 3 remaining Operators Investors
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1424
Ex- KTC Korangi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1524
Ex- KTC Gulastan-e- Jauhar Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1624
Ex- KTC Mehran Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1724
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1824
Ex- KTC Model Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1924
Ex- KTC Orangi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2024
Ex- KTC North Karachi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2124
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2224
Period Activities
17th May2010 Progress Review meeting held under the Chairmanship of Secretary
General to President of Pakistan in CM House
Chief secretary gave the presentation which was also attended by
Dy Governor SBP President NBP Administrator CDGK and others
19th May 2010 A follow up meeting in NBP headed by President NBP held with
Commercial Banks CDGK team and Operators President NBP waspleased to assure his leading role in Bus financing program and other
banks to follow
20th May 2010 Detailed deliberation held on funding modalities and unified Term sheet
of lending banks
23rd
May 2010 NBP provided term sheet developed by NBP and other 6 CommercialBanks
24th May 2010 NBP team leader Mr Atif Ikram visited CDGK depot sites and CNG
station along with KMTC team
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2324
Period Activities
26th May 2010 A team of NBP and other Commercial Banks visited CDGK depots and
CNG Stations
28th May2010 KMTCCDGK in coordination with rep of IPDF and ENERCON conveyed
response on Term Sheet and feedback queries by banks4th June2010 On the request of SBP for confirmation about the mode of payment of
GOP subsidy (vide letter No BPRD (Sld-06)29662010 dated 362010)
Administrator CDGK requested Secretary Environment GOP to resolve
the issue
10th June2010 ENERCON MOE GOP vide letter No ENCMOE Admin 2010CNG ndash
Bus conveyed their NOC for payment of upfront grant (Rs 300000=)
and receiving Rs 377181 interest subsidy to be paid during 5 years ( in
60 installations)
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2424
Period Activities
10th June2010 KMTC team visited CNG stations along route demanded by pre-qualified
operators for confirmation of CNG supply to the project buses
10th June2010 NBP conveyed their concerns about CDGK CNG Bus Project and CNG
supply to the Project Buses14th June2010 KMTC forwarded the reply along with field visit report of CNG stations
duly supported by the photographs and consultant report of 31 CNG
Stations
18th June2010 NBP held consultation meeting with 3 Operators Investors
23rd June2010 NBP held consultation meeting with 3 remaining Operators Investors
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1524
Ex- KTC Gulastan-e- Jauhar Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1624
Ex- KTC Mehran Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1724
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1824
Ex- KTC Model Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1924
Ex- KTC Orangi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2024
Ex- KTC North Karachi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2124
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2224
Period Activities
17th May2010 Progress Review meeting held under the Chairmanship of Secretary
General to President of Pakistan in CM House
Chief secretary gave the presentation which was also attended by
Dy Governor SBP President NBP Administrator CDGK and others
19th May 2010 A follow up meeting in NBP headed by President NBP held with
Commercial Banks CDGK team and Operators President NBP waspleased to assure his leading role in Bus financing program and other
banks to follow
20th May 2010 Detailed deliberation held on funding modalities and unified Term sheet
of lending banks
23rd
May 2010 NBP provided term sheet developed by NBP and other 6 CommercialBanks
24th May 2010 NBP team leader Mr Atif Ikram visited CDGK depot sites and CNG
station along with KMTC team
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2324
Period Activities
26th May 2010 A team of NBP and other Commercial Banks visited CDGK depots and
CNG Stations
28th May2010 KMTCCDGK in coordination with rep of IPDF and ENERCON conveyed
response on Term Sheet and feedback queries by banks4th June2010 On the request of SBP for confirmation about the mode of payment of
GOP subsidy (vide letter No BPRD (Sld-06)29662010 dated 362010)
Administrator CDGK requested Secretary Environment GOP to resolve
the issue
10th June2010 ENERCON MOE GOP vide letter No ENCMOE Admin 2010CNG ndash
Bus conveyed their NOC for payment of upfront grant (Rs 300000=)
and receiving Rs 377181 interest subsidy to be paid during 5 years ( in
60 installations)
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2424
Period Activities
10th June2010 KMTC team visited CNG stations along route demanded by pre-qualified
operators for confirmation of CNG supply to the project buses
10th June2010 NBP conveyed their concerns about CDGK CNG Bus Project and CNG
supply to the Project Buses14th June2010 KMTC forwarded the reply along with field visit report of CNG stations
duly supported by the photographs and consultant report of 31 CNG
Stations
18th June2010 NBP held consultation meeting with 3 Operators Investors
23rd June2010 NBP held consultation meeting with 3 remaining Operators Investors
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1624
Ex- KTC Mehran Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1724
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1824
Ex- KTC Model Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1924
Ex- KTC Orangi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2024
Ex- KTC North Karachi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2124
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2224
Period Activities
17th May2010 Progress Review meeting held under the Chairmanship of Secretary
General to President of Pakistan in CM House
Chief secretary gave the presentation which was also attended by
Dy Governor SBP President NBP Administrator CDGK and others
19th May 2010 A follow up meeting in NBP headed by President NBP held with
Commercial Banks CDGK team and Operators President NBP waspleased to assure his leading role in Bus financing program and other
banks to follow
20th May 2010 Detailed deliberation held on funding modalities and unified Term sheet
of lending banks
23rd
May 2010 NBP provided term sheet developed by NBP and other 6 CommercialBanks
24th May 2010 NBP team leader Mr Atif Ikram visited CDGK depot sites and CNG
station along with KMTC team
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2324
Period Activities
26th May 2010 A team of NBP and other Commercial Banks visited CDGK depots and
CNG Stations
28th May2010 KMTCCDGK in coordination with rep of IPDF and ENERCON conveyed
response on Term Sheet and feedback queries by banks4th June2010 On the request of SBP for confirmation about the mode of payment of
GOP subsidy (vide letter No BPRD (Sld-06)29662010 dated 362010)
Administrator CDGK requested Secretary Environment GOP to resolve
the issue
10th June2010 ENERCON MOE GOP vide letter No ENCMOE Admin 2010CNG ndash
Bus conveyed their NOC for payment of upfront grant (Rs 300000=)
and receiving Rs 377181 interest subsidy to be paid during 5 years ( in
60 installations)
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2424
Period Activities
10th June2010 KMTC team visited CNG stations along route demanded by pre-qualified
operators for confirmation of CNG supply to the project buses
10th June2010 NBP conveyed their concerns about CDGK CNG Bus Project and CNG
supply to the Project Buses14th June2010 KMTC forwarded the reply along with field visit report of CNG stations
duly supported by the photographs and consultant report of 31 CNG
Stations
18th June2010 NBP held consultation meeting with 3 Operators Investors
23rd June2010 NBP held consultation meeting with 3 remaining Operators Investors
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1724
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1824
Ex- KTC Model Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1924
Ex- KTC Orangi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2024
Ex- KTC North Karachi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2124
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2224
Period Activities
17th May2010 Progress Review meeting held under the Chairmanship of Secretary
General to President of Pakistan in CM House
Chief secretary gave the presentation which was also attended by
Dy Governor SBP President NBP Administrator CDGK and others
19th May 2010 A follow up meeting in NBP headed by President NBP held with
Commercial Banks CDGK team and Operators President NBP waspleased to assure his leading role in Bus financing program and other
banks to follow
20th May 2010 Detailed deliberation held on funding modalities and unified Term sheet
of lending banks
23rd
May 2010 NBP provided term sheet developed by NBP and other 6 CommercialBanks
24th May 2010 NBP team leader Mr Atif Ikram visited CDGK depot sites and CNG
station along with KMTC team
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2324
Period Activities
26th May 2010 A team of NBP and other Commercial Banks visited CDGK depots and
CNG Stations
28th May2010 KMTCCDGK in coordination with rep of IPDF and ENERCON conveyed
response on Term Sheet and feedback queries by banks4th June2010 On the request of SBP for confirmation about the mode of payment of
GOP subsidy (vide letter No BPRD (Sld-06)29662010 dated 362010)
Administrator CDGK requested Secretary Environment GOP to resolve
the issue
10th June2010 ENERCON MOE GOP vide letter No ENCMOE Admin 2010CNG ndash
Bus conveyed their NOC for payment of upfront grant (Rs 300000=)
and receiving Rs 377181 interest subsidy to be paid during 5 years ( in
60 installations)
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2424
Period Activities
10th June2010 KMTC team visited CNG stations along route demanded by pre-qualified
operators for confirmation of CNG supply to the project buses
10th June2010 NBP conveyed their concerns about CDGK CNG Bus Project and CNG
supply to the Project Buses14th June2010 KMTC forwarded the reply along with field visit report of CNG stations
duly supported by the photographs and consultant report of 31 CNG
Stations
18th June2010 NBP held consultation meeting with 3 Operators Investors
23rd June2010 NBP held consultation meeting with 3 remaining Operators Investors
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1824
Ex- KTC Model Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1924
Ex- KTC Orangi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2024
Ex- KTC North Karachi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2124
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2224
Period Activities
17th May2010 Progress Review meeting held under the Chairmanship of Secretary
General to President of Pakistan in CM House
Chief secretary gave the presentation which was also attended by
Dy Governor SBP President NBP Administrator CDGK and others
19th May 2010 A follow up meeting in NBP headed by President NBP held with
Commercial Banks CDGK team and Operators President NBP waspleased to assure his leading role in Bus financing program and other
banks to follow
20th May 2010 Detailed deliberation held on funding modalities and unified Term sheet
of lending banks
23rd
May 2010 NBP provided term sheet developed by NBP and other 6 CommercialBanks
24th May 2010 NBP team leader Mr Atif Ikram visited CDGK depot sites and CNG
station along with KMTC team
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2324
Period Activities
26th May 2010 A team of NBP and other Commercial Banks visited CDGK depots and
CNG Stations
28th May2010 KMTCCDGK in coordination with rep of IPDF and ENERCON conveyed
response on Term Sheet and feedback queries by banks4th June2010 On the request of SBP for confirmation about the mode of payment of
GOP subsidy (vide letter No BPRD (Sld-06)29662010 dated 362010)
Administrator CDGK requested Secretary Environment GOP to resolve
the issue
10th June2010 ENERCON MOE GOP vide letter No ENCMOE Admin 2010CNG ndash
Bus conveyed their NOC for payment of upfront grant (Rs 300000=)
and receiving Rs 377181 interest subsidy to be paid during 5 years ( in
60 installations)
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2424
Period Activities
10th June2010 KMTC team visited CNG stations along route demanded by pre-qualified
operators for confirmation of CNG supply to the project buses
10th June2010 NBP conveyed their concerns about CDGK CNG Bus Project and CNG
supply to the Project Buses14th June2010 KMTC forwarded the reply along with field visit report of CNG stations
duly supported by the photographs and consultant report of 31 CNG
Stations
18th June2010 NBP held consultation meeting with 3 Operators Investors
23rd June2010 NBP held consultation meeting with 3 remaining Operators Investors
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 1924
Ex- KTC Orangi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2024
Ex- KTC North Karachi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2124
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2224
Period Activities
17th May2010 Progress Review meeting held under the Chairmanship of Secretary
General to President of Pakistan in CM House
Chief secretary gave the presentation which was also attended by
Dy Governor SBP President NBP Administrator CDGK and others
19th May 2010 A follow up meeting in NBP headed by President NBP held with
Commercial Banks CDGK team and Operators President NBP waspleased to assure his leading role in Bus financing program and other
banks to follow
20th May 2010 Detailed deliberation held on funding modalities and unified Term sheet
of lending banks
23rd
May 2010 NBP provided term sheet developed by NBP and other 6 CommercialBanks
24th May 2010 NBP team leader Mr Atif Ikram visited CDGK depot sites and CNG
station along with KMTC team
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2324
Period Activities
26th May 2010 A team of NBP and other Commercial Banks visited CDGK depots and
CNG Stations
28th May2010 KMTCCDGK in coordination with rep of IPDF and ENERCON conveyed
response on Term Sheet and feedback queries by banks4th June2010 On the request of SBP for confirmation about the mode of payment of
GOP subsidy (vide letter No BPRD (Sld-06)29662010 dated 362010)
Administrator CDGK requested Secretary Environment GOP to resolve
the issue
10th June2010 ENERCON MOE GOP vide letter No ENCMOE Admin 2010CNG ndash
Bus conveyed their NOC for payment of upfront grant (Rs 300000=)
and receiving Rs 377181 interest subsidy to be paid during 5 years ( in
60 installations)
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2424
Period Activities
10th June2010 KMTC team visited CNG stations along route demanded by pre-qualified
operators for confirmation of CNG supply to the project buses
10th June2010 NBP conveyed their concerns about CDGK CNG Bus Project and CNG
supply to the Project Buses14th June2010 KMTC forwarded the reply along with field visit report of CNG stations
duly supported by the photographs and consultant report of 31 CNG
Stations
18th June2010 NBP held consultation meeting with 3 Operators Investors
23rd June2010 NBP held consultation meeting with 3 remaining Operators Investors
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2024
Ex- KTC North Karachi Depot
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2124
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2224
Period Activities
17th May2010 Progress Review meeting held under the Chairmanship of Secretary
General to President of Pakistan in CM House
Chief secretary gave the presentation which was also attended by
Dy Governor SBP President NBP Administrator CDGK and others
19th May 2010 A follow up meeting in NBP headed by President NBP held with
Commercial Banks CDGK team and Operators President NBP waspleased to assure his leading role in Bus financing program and other
banks to follow
20th May 2010 Detailed deliberation held on funding modalities and unified Term sheet
of lending banks
23rd
May 2010 NBP provided term sheet developed by NBP and other 6 CommercialBanks
24th May 2010 NBP team leader Mr Atif Ikram visited CDGK depot sites and CNG
station along with KMTC team
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2324
Period Activities
26th May 2010 A team of NBP and other Commercial Banks visited CDGK depots and
CNG Stations
28th May2010 KMTCCDGK in coordination with rep of IPDF and ENERCON conveyed
response on Term Sheet and feedback queries by banks4th June2010 On the request of SBP for confirmation about the mode of payment of
GOP subsidy (vide letter No BPRD (Sld-06)29662010 dated 362010)
Administrator CDGK requested Secretary Environment GOP to resolve
the issue
10th June2010 ENERCON MOE GOP vide letter No ENCMOE Admin 2010CNG ndash
Bus conveyed their NOC for payment of upfront grant (Rs 300000=)
and receiving Rs 377181 interest subsidy to be paid during 5 years ( in
60 installations)
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2424
Period Activities
10th June2010 KMTC team visited CNG stations along route demanded by pre-qualified
operators for confirmation of CNG supply to the project buses
10th June2010 NBP conveyed their concerns about CDGK CNG Bus Project and CNG
supply to the Project Buses14th June2010 KMTC forwarded the reply along with field visit report of CNG stations
duly supported by the photographs and consultant report of 31 CNG
Stations
18th June2010 NBP held consultation meeting with 3 Operators Investors
23rd June2010 NBP held consultation meeting with 3 remaining Operators Investors
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2124
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2224
Period Activities
17th May2010 Progress Review meeting held under the Chairmanship of Secretary
General to President of Pakistan in CM House
Chief secretary gave the presentation which was also attended by
Dy Governor SBP President NBP Administrator CDGK and others
19th May 2010 A follow up meeting in NBP headed by President NBP held with
Commercial Banks CDGK team and Operators President NBP waspleased to assure his leading role in Bus financing program and other
banks to follow
20th May 2010 Detailed deliberation held on funding modalities and unified Term sheet
of lending banks
23rd
May 2010 NBP provided term sheet developed by NBP and other 6 CommercialBanks
24th May 2010 NBP team leader Mr Atif Ikram visited CDGK depot sites and CNG
station along with KMTC team
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2324
Period Activities
26th May 2010 A team of NBP and other Commercial Banks visited CDGK depots and
CNG Stations
28th May2010 KMTCCDGK in coordination with rep of IPDF and ENERCON conveyed
response on Term Sheet and feedback queries by banks4th June2010 On the request of SBP for confirmation about the mode of payment of
GOP subsidy (vide letter No BPRD (Sld-06)29662010 dated 362010)
Administrator CDGK requested Secretary Environment GOP to resolve
the issue
10th June2010 ENERCON MOE GOP vide letter No ENCMOE Admin 2010CNG ndash
Bus conveyed their NOC for payment of upfront grant (Rs 300000=)
and receiving Rs 377181 interest subsidy to be paid during 5 years ( in
60 installations)
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2424
Period Activities
10th June2010 KMTC team visited CNG stations along route demanded by pre-qualified
operators for confirmation of CNG supply to the project buses
10th June2010 NBP conveyed their concerns about CDGK CNG Bus Project and CNG
supply to the Project Buses14th June2010 KMTC forwarded the reply along with field visit report of CNG stations
duly supported by the photographs and consultant report of 31 CNG
Stations
18th June2010 NBP held consultation meeting with 3 Operators Investors
23rd June2010 NBP held consultation meeting with 3 remaining Operators Investors
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2224
Period Activities
17th May2010 Progress Review meeting held under the Chairmanship of Secretary
General to President of Pakistan in CM House
Chief secretary gave the presentation which was also attended by
Dy Governor SBP President NBP Administrator CDGK and others
19th May 2010 A follow up meeting in NBP headed by President NBP held with
Commercial Banks CDGK team and Operators President NBP waspleased to assure his leading role in Bus financing program and other
banks to follow
20th May 2010 Detailed deliberation held on funding modalities and unified Term sheet
of lending banks
23rd
May 2010 NBP provided term sheet developed by NBP and other 6 CommercialBanks
24th May 2010 NBP team leader Mr Atif Ikram visited CDGK depot sites and CNG
station along with KMTC team
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2324
Period Activities
26th May 2010 A team of NBP and other Commercial Banks visited CDGK depots and
CNG Stations
28th May2010 KMTCCDGK in coordination with rep of IPDF and ENERCON conveyed
response on Term Sheet and feedback queries by banks4th June2010 On the request of SBP for confirmation about the mode of payment of
GOP subsidy (vide letter No BPRD (Sld-06)29662010 dated 362010)
Administrator CDGK requested Secretary Environment GOP to resolve
the issue
10th June2010 ENERCON MOE GOP vide letter No ENCMOE Admin 2010CNG ndash
Bus conveyed their NOC for payment of upfront grant (Rs 300000=)
and receiving Rs 377181 interest subsidy to be paid during 5 years ( in
60 installations)
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2424
Period Activities
10th June2010 KMTC team visited CNG stations along route demanded by pre-qualified
operators for confirmation of CNG supply to the project buses
10th June2010 NBP conveyed their concerns about CDGK CNG Bus Project and CNG
supply to the Project Buses14th June2010 KMTC forwarded the reply along with field visit report of CNG stations
duly supported by the photographs and consultant report of 31 CNG
Stations
18th June2010 NBP held consultation meeting with 3 Operators Investors
23rd June2010 NBP held consultation meeting with 3 remaining Operators Investors
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2324
Period Activities
26th May 2010 A team of NBP and other Commercial Banks visited CDGK depots and
CNG Stations
28th May2010 KMTCCDGK in coordination with rep of IPDF and ENERCON conveyed
response on Term Sheet and feedback queries by banks4th June2010 On the request of SBP for confirmation about the mode of payment of
GOP subsidy (vide letter No BPRD (Sld-06)29662010 dated 362010)
Administrator CDGK requested Secretary Environment GOP to resolve
the issue
10th June2010 ENERCON MOE GOP vide letter No ENCMOE Admin 2010CNG ndash
Bus conveyed their NOC for payment of upfront grant (Rs 300000=)
and receiving Rs 377181 interest subsidy to be paid during 5 years ( in
60 installations)
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2424
Period Activities
10th June2010 KMTC team visited CNG stations along route demanded by pre-qualified
operators for confirmation of CNG supply to the project buses
10th June2010 NBP conveyed their concerns about CDGK CNG Bus Project and CNG
supply to the Project Buses14th June2010 KMTC forwarded the reply along with field visit report of CNG stations
duly supported by the photographs and consultant report of 31 CNG
Stations
18th June2010 NBP held consultation meeting with 3 Operators Investors
23rd June2010 NBP held consultation meeting with 3 remaining Operators Investors
Latest Development
882019 Ex KTC Depot Maps
httpslidepdfcomreaderfullex-ktc-depot-maps 2424
Period Activities
10th June2010 KMTC team visited CNG stations along route demanded by pre-qualified
operators for confirmation of CNG supply to the project buses
10th June2010 NBP conveyed their concerns about CDGK CNG Bus Project and CNG
supply to the Project Buses14th June2010 KMTC forwarded the reply along with field visit report of CNG stations
duly supported by the photographs and consultant report of 31 CNG
Stations
18th June2010 NBP held consultation meeting with 3 Operators Investors
23rd June2010 NBP held consultation meeting with 3 remaining Operators Investors
Latest Development