EWE Consulting Engineers Pvt. Ltd. www.ewe.co.in © EWE Sept 2012 Rev 03 E W E C o n s u l t i n g E n g i n e e r s P v t . L t d .

Transcript of EWE Consulting Engineers Pvt. Ltd.  · Water Ttreatment Plant 150 m3/day WTP Prebid Engineering of...

Page 1: EWE Consulting Engineers Pvt. Ltd.  · Water Ttreatment Plant 150 m3/day WTP Prebid Engineering of 60 MLD STP 2500 m3/day Sewage Treatment Plant 5 m3/d SBR Based STP D&E of 600,500

EWE Consulting Engineers Pvt. Ltd. www.ewe.co.in

© EWE Sept 2012 Rev 03

EWE Consulting Engineers Pvt. Ltd.

Page 2: EWE Consulting Engineers Pvt. Ltd.  · Water Ttreatment Plant 150 m3/day WTP Prebid Engineering of 60 MLD STP 2500 m3/day Sewage Treatment Plant 5 m3/d SBR Based STP D&E of 600,500

EWE Consulting Engineers Pvt. Ltd. www.ewe.co.in

© EWE Sept 2012 Rev 03

EWE Consulting Engineers Pvt. Ltd.

Administrative Office : G – 154 Sector 63, NOIDA 201307

Registered Office : E 231 Greater Kailash II, New Delhi – 110048

Navi Mumbai Kolkata Chennai

Page 3: EWE Consulting Engineers Pvt. Ltd.  · Water Ttreatment Plant 150 m3/day WTP Prebid Engineering of 60 MLD STP 2500 m3/day Sewage Treatment Plant 5 m3/d SBR Based STP D&E of 600,500

EWE Consulting Engineers Pvt. Ltd. www.ewe.co.in

© EWE Sept 2012 Rev 03

Year of Formation : 2008

Our Path of Growth

Year of Incorporation as a Private Limited Company : 2009

Graduated from Consulting Company to Engineering & Consultancy : 2010

Authorised Share Capital : 100 Lakhs

Debt / Equity ratio < 0.15

Team Members

Share Capital (Lac `)

Page 4: EWE Consulting Engineers Pvt. Ltd.  · Water Ttreatment Plant 150 m3/day WTP Prebid Engineering of 60 MLD STP 2500 m3/day Sewage Treatment Plant 5 m3/d SBR Based STP D&E of 600,500

EWE Consulting Engineers Pvt. Ltd. www.ewe.co.in

© EWE Sept 2012 Rev 03

Company Charter

Vision

Mission

Aspiration

Launch products & technologies that are Innovative and not simply incremental improvements to existing products or technologies.

EWE Company credo is manifested as below. This has evolved over the years as the company has grown.

To be a leading Environmental Organisation providing end to end reliable solutions.

To be India’s Top 5 Technology Company in the Environmental sector by 2020.

Page 5: EWE Consulting Engineers Pvt. Ltd.  · Water Ttreatment Plant 150 m3/day WTP Prebid Engineering of 60 MLD STP 2500 m3/day Sewage Treatment Plant 5 m3/d SBR Based STP D&E of 600,500

EWE Consulting Engineers Pvt. Ltd. www.ewe.co.in

© EWE Sept 2012 Rev 03

Market Segmentation Addressed

INDUSTRY REALTY MUNICIPAL & URBAN

INFRASTRUCTURE

Hospitals Hotels Resorts Spas Commercial

Establishments Shopping Complex

& Malls Residential Complexes Institutions

REALTY

Municipal Corporations Shipping Defence. Infrastructure. Public Health Engg

Department. Public Works

Department Other Government

Agencies.

Food & Beverage Automobile Steel Power Dairy Oil & Gas Petroleum Energy Pulp & Paper Sugar Pharma & Biotech Breweires & Distilleries Paint … etc

Page 6: EWE Consulting Engineers Pvt. Ltd.  · Water Ttreatment Plant 150 m3/day WTP Prebid Engineering of 60 MLD STP 2500 m3/day Sewage Treatment Plant 5 m3/d SBR Based STP D&E of 600,500

EWE Consulting Engineers Pvt. Ltd. www.ewe.co.in

© EWE Sept 2012 Rev 03

Company Synopsis

RENEWABLE ENERGY

WATER & WASTE WATER

ANALYTICAL

ENVIRONMENTAL ENVIRONMENTAL

Innovative water and waste water treatment solutions

Wide product range in terms of capacity and applications

ISO 9002 Certified.

Testing for Water, Waste Water, Air, Noise, Soil, Chemicals and Hazardous Waste.

Involved with cutting edge R&D in the field of Alternative Energy – Micro Wind Turbine, Waste to Energy and other alternate renewable energies.

Provider of innovative air pollution control system and solid waste management systems.

WATER & WASTE WATER

Page 7: EWE Consulting Engineers Pvt. Ltd.  · Water Ttreatment Plant 150 m3/day WTP Prebid Engineering of 60 MLD STP 2500 m3/day Sewage Treatment Plant 5 m3/d SBR Based STP D&E of 600,500

EWE Consulting Engineers Pvt. Ltd. www.ewe.co.in

© EWE Sept 2012 Rev 03

Water & Waste Water Division

Page 8: EWE Consulting Engineers Pvt. Ltd.  · Water Ttreatment Plant 150 m3/day WTP Prebid Engineering of 60 MLD STP 2500 m3/day Sewage Treatment Plant 5 m3/d SBR Based STP D&E of 600,500

EWE Consulting Engineers Pvt. Ltd. www.ewe.co.in

© EWE Sept 2012 Rev 03

Water is an elixir of life. Indians have traditionally considered the water sources as sacred.

Unfortunately today India falls in the category of water stressed country with less than 2.5 % of its water

reserves fit for human consumption.

With the rising rate of water used, the given consumption pattern and the cost of water it is imperative to treat

and reuse water.

We as specialists offer end to end water solutions integrating testing, technology, planning, design engineering,

project management, managing water supply & services.

Our solutions encompass all sectors such as drinking water, packaged drinking water, water for process, water

for power, ultrapure water, water for pharma etc.

Our in-depth understanding of the subject helps us provide the right solutions to meet customer satisfaction.

Water Treatment

Page 9: EWE Consulting Engineers Pvt. Ltd.  · Water Ttreatment Plant 150 m3/day WTP Prebid Engineering of 60 MLD STP 2500 m3/day Sewage Treatment Plant 5 m3/d SBR Based STP D&E of 600,500

EWE Consulting Engineers Pvt. Ltd. www.ewe.co.in

© EWE Sept 2012 Rev 03

WATER SOLUTIONS

PROCESS WATER TREATMENT RAW WATER TREATMENT

CLARIFICATION

FILTRATION

DISINFECTION

Product Portfolio : Water

ACCOP

CHEMICALS

DE MINERALISATION

ACCOP

EXTRACTOR

DEIONISATION / RO

FLOTATION

ULTRAFILTRATION & NANOFILTRATION

ELECTRO DEIONISATION

Page 10: EWE Consulting Engineers Pvt. Ltd.  · Water Ttreatment Plant 150 m3/day WTP Prebid Engineering of 60 MLD STP 2500 m3/day Sewage Treatment Plant 5 m3/d SBR Based STP D&E of 600,500

EWE Consulting Engineers Pvt. Ltd. www.ewe.co.in

© EWE Sept 2012 Rev 03

• EWE believes “Pollution prevention Pays” and “Waste is a misplaced resource”.

• The solutions and products offered are modular and are offered as a package pre-engineered

system and also customisable units for larger capacity and/or specific needs of the clients.

• As wastes are getting complex because of high levels of manufacturing and technology upgrades

EWE has set up a full-fledged Pilot Testing Laboratory for development of newer and advanced

Technologies such as OWS, ACCOP, Wet air oxidation, Resource recovery systems & In Pipe system.

• We offer these technologies as well as the conventional physico-chemical processes, Aerobic and

Anaerobic systems to treat Sewage & Industrial waste water.

• Solutions are offered after establishing results on the basis of full cycle of development.

Waste Water Treatment

Page 11: EWE Consulting Engineers Pvt. Ltd.  · Water Ttreatment Plant 150 m3/day WTP Prebid Engineering of 60 MLD STP 2500 m3/day Sewage Treatment Plant 5 m3/d SBR Based STP D&E of 600,500

EWE Consulting Engineers Pvt. Ltd. www.ewe.co.in

© EWE Sept 2012 Rev 03

Waste Water SolutionsWaste Water Solutions

Effuluent Treatment Sewage Treatment

REAP

Sequencing Batch Reactor (SBR)

Membrane Bio Reactor (MBR)

Product Portfolio : Waste Water

MBBR

Home STP

PHYSICO CHEMICAL ROCESS

ACCOP

Extractor

In Pipe System

Oil Water Separators

Anaerobic Reactor

Air Floatation

Wet Air Oxidation

Trickling Filters Rotating Biological Contactor (RBC)

Page 12: EWE Consulting Engineers Pvt. Ltd.  · Water Ttreatment Plant 150 m3/day WTP Prebid Engineering of 60 MLD STP 2500 m3/day Sewage Treatment Plant 5 m3/d SBR Based STP D&E of 600,500

EWE Consulting Engineers Pvt. Ltd. www.ewe.co.in

© EWE Sept 2012 Rev 03

Analytical Division

Page 13: EWE Consulting Engineers Pvt. Ltd.  · Water Ttreatment Plant 150 m3/day WTP Prebid Engineering of 60 MLD STP 2500 m3/day Sewage Treatment Plant 5 m3/d SBR Based STP D&E of 600,500

EWE Consulting Engineers Pvt. Ltd. www.ewe.co.in

© EWE Sept 2012 Rev 03

Analytical Testing

“The first step of any change is measurement. Whatever can be measured can be changed.” - Anonymous

In lines with this policy EWE set up an in house Laboratory (an ISO Certified Analytical Laboratory) to Test parameters for Water, Waste Water, Air, Solid Waste, Hazardous Waste, Chemicals, Noise & soil.

The in-house Laboratory helps in providing extended support for Product Development, Quality control, Optimisation study & Plant Performance.

Page 14: EWE Consulting Engineers Pvt. Ltd.  · Water Ttreatment Plant 150 m3/day WTP Prebid Engineering of 60 MLD STP 2500 m3/day Sewage Treatment Plant 5 m3/d SBR Based STP D&E of 600,500

EWE Consulting Engineers Pvt. Ltd. www.ewe.co.in

© EWE Sept 2012 Rev 03 © EWE Sept 2012 Rev 03

Analytical Testing – Facilities & Infrastructure

• Water & Waste Water - Physical - Chemical - Bacteriological • Noise • Soil • Air • Chemicals • Hazardous Waste • Treatability Studies

• Flame Photometer • UV – VIS Spectrophotometer • pH – EC – TDS – Temperature meter • DO meter • Bacteriological incubator. • COD Digester • Autoclave. • Atomic Absorption Spectro Photometer • Hot air oven & Muffle Furnace • Freezer • PM 10 & PM 2.5 Apparatus • High Volume Sampler • Stack Kit • Noise meter • Lux meter • Electon Microscope • Laminar Flow • UV Chamber • Centrifuge • Distillation Apparatus ….. To name a few.

• Water & Waste Water

Testing Facilities:

• Flame Photometer

Testing Infrastructure available:

Page 15: EWE Consulting Engineers Pvt. Ltd.  · Water Ttreatment Plant 150 m3/day WTP Prebid Engineering of 60 MLD STP 2500 m3/day Sewage Treatment Plant 5 m3/d SBR Based STP D&E of 600,500

EWE Consulting Engineers Pvt. Ltd. www.ewe.co.in

© EWE Sept 2012 Rev 03

Renewable Energy Division

Page 16: EWE Consulting Engineers Pvt. Ltd.  · Water Ttreatment Plant 150 m3/day WTP Prebid Engineering of 60 MLD STP 2500 m3/day Sewage Treatment Plant 5 m3/d SBR Based STP D&E of 600,500

EWE Consulting Engineers Pvt. Ltd. www.ewe.co.in

© EWE Sept 2012 Rev 03

Renewable Energy

• Our vision guides us to work on green technology and reduce the green house emission of gases.

• The product has been developed considering a standalone / Grid integrated system for individual units requiring up to 50 KWh Power

• These units would find application in remote / coastal areas and areas using

– Micro Wind Turbines

– Solar

– Waste to Energy

– Waste to Fuel

• These would reduce the dependency on the Grid and enhance National security

• Insitu generation thereby saving 32 % of T&D Losses on National Exchequre.

“ Let us leave a sustainable environment for our future generations” - Anonymous

Page 17: EWE Consulting Engineers Pvt. Ltd.  · Water Ttreatment Plant 150 m3/day WTP Prebid Engineering of 60 MLD STP 2500 m3/day Sewage Treatment Plant 5 m3/d SBR Based STP D&E of 600,500

EWE Consulting Engineers Pvt. Ltd. www.ewe.co.in

© EWE Sept 2012 Rev 03

Portfolio Renewable Energy

PV Based Concentric Pipe Parobolic

Concentrators for Cooking, Heating and allied applications.

Technologies comprising of Incineration and / or Biomethenation to generate power from solid waste, Sewage sludge and Industrialwaste.

Designed for Low CIS Simple & Compact Bird Friendly Silent & Vibration

Free Operation. Life of 15 Years Simple Roof Top

installation.

Licensors of a European Technology across South East Asia.

Page 18: EWE Consulting Engineers Pvt. Ltd.  · Water Ttreatment Plant 150 m3/day WTP Prebid Engineering of 60 MLD STP 2500 m3/day Sewage Treatment Plant 5 m3/d SBR Based STP D&E of 600,500

EWE Consulting Engineers Pvt. Ltd. www.ewe.co.in

© EWE Sept 2012 Rev 03

Environmental Division

Page 19: EWE Consulting Engineers Pvt. Ltd.  · Water Ttreatment Plant 150 m3/day WTP Prebid Engineering of 60 MLD STP 2500 m3/day Sewage Treatment Plant 5 m3/d SBR Based STP D&E of 600,500

EWE Consulting Engineers Pvt. Ltd. www.ewe.co.in

© EWE Sept 2012 Rev 03

Environmental Portfolio : Solid Waste Bioprocessing

Solid waste generated in India will touch a figure of 150,000

MT/Day on pan India basis by the year 2015 and expected

to grow @ 5.0 % pa while the urban population is expected

to grow @ 3.5 % pa.

The facilities to handle Solid Waste can be Solid Waste to

Manure, Solid Waste to power, waste to fuel and waste to

Engineered Sanitary Landfill (ESLF).

Over the last 3 years EWE has worked on an innovative design of an 1800 TPD eSLF facility for a leading

EPC player.

The technologies worked out by EWE are compact and efficient; thereby saving a significant cost in

transportation and treatment.

The IBT Technology reduces the composting time from 200 hours to 30 hours, with 75% savings in space

and without any odour emission.

Over the last 3 years EWE has worked on an innovative design of an 1800 TPD eSLF facility for a leading

Page 20: EWE Consulting Engineers Pvt. Ltd.  · Water Ttreatment Plant 150 m3/day WTP Prebid Engineering of 60 MLD STP 2500 m3/day Sewage Treatment Plant 5 m3/d SBR Based STP D&E of 600,500

EWE Consulting Engineers Pvt. Ltd. www.ewe.co.in

© EWE Sept 2012 Rev 03

Environmental Portfolio : Air Pollution Control

It is a proven fact that we can live 3 days without water but barely 3 minutes without air.

Environmental Portfolio : Air Pollution Control

A case in point is the aftermath of leaked industrial vapours from Union Carbide factory in Bhopal

in 1984. An economic study of the health impacts and associated costs of air pollution of

Southern California shows that more than 3800 people die prematurely (approximately 14 years

earlier than normal) each year because air pollution.

EWE and its design team treats major pollutants such as SOx, NOx, CO, CO2, VOC, PM, CFC,

persistent free radicals & Organic pollutants, PAN, SMOG etc.

Control devices offered by EWE range from Cyclones, Multicyclones, Bag Filters, Scrubbers (Wet &

Dry), ESP, Fume & Dust Extraction systems etc.

Page 21: EWE Consulting Engineers Pvt. Ltd.  · Water Ttreatment Plant 150 m3/day WTP Prebid Engineering of 60 MLD STP 2500 m3/day Sewage Treatment Plant 5 m3/d SBR Based STP D&E of 600,500

EWE Consulting Engineers Pvt. Ltd. www.ewe.co.in

© EWE Sept 2012 Rev 03

Air Pollution Control SystemsAir Pollution Control Systems

Wet ProcessWet Process Dry ProcessDry Process

ScrubbersScrubbers Wet ESPWet ESP Bag FilterBag Filter

Electro Static PrecipitatorElectro Static Precipitator

Catalytic ConvertersCatalytic Converters

CycloneCyclone

MulticycloneMulticyclone

Dry ScrubberDry Scrubber

VenturiVenturi Venturi ScrubberScrubber

Impingement ScrubberImpingement Scrubber

FluidisedFluidised Fluidised Bed ScrubberBed Scrubber

Product Portfolio : Air Pollution Control Systems

Page 22: EWE Consulting Engineers Pvt. Ltd.  · Water Ttreatment Plant 150 m3/day WTP Prebid Engineering of 60 MLD STP 2500 m3/day Sewage Treatment Plant 5 m3/d SBR Based STP D&E of 600,500

EWE Consulting Engineers Pvt. Ltd. www.ewe.co.in

© EWE Sept 2012 Rev 03

Services & Expertise

Page 23: EWE Consulting Engineers Pvt. Ltd.  · Water Ttreatment Plant 150 m3/day WTP Prebid Engineering of 60 MLD STP 2500 m3/day Sewage Treatment Plant 5 m3/d SBR Based STP D&E of 600,500

EWE Consulting Engineers Pvt. Ltd. www.ewe.co.in

© EWE Sept 2012 Rev 03

Our Ambit of Services

Retrofit – Upgradation of Existing Plants

Optimisation of Dosing Chemicals

Automation

Integration and Remote monitoring of systems

Consulting.

Disaster Management Plan (DMP)

Environmental Impact Assesment (EIA)

Environmental Audits

Energy Audits

Process Audits

Performance Studies.

Spares and Consumable for all makes

Treatability & Feasibility Services

Operation & Maintenance

Page 24: EWE Consulting Engineers Pvt. Ltd.  · Water Ttreatment Plant 150 m3/day WTP Prebid Engineering of 60 MLD STP 2500 m3/day Sewage Treatment Plant 5 m3/d SBR Based STP D&E of 600,500

EWE Consulting Engineers Pvt. Ltd. www.ewe.co.in

© EWE Sept 2012 Rev 03

Our Ambit of Services

Page 25: EWE Consulting Engineers Pvt. Ltd.  · Water Ttreatment Plant 150 m3/day WTP Prebid Engineering of 60 MLD STP 2500 m3/day Sewage Treatment Plant 5 m3/d SBR Based STP D&E of 600,500

EWE Consulting Engineers Pvt. Ltd. www.ewe.co.in

© EWE Sept 2012 Rev 03

Partial List of Clients Serviced

UPSIDC, Kanpur

Birla Technical Services., New Delhi

Wood Group Engineering PLC.

Poddar Developers Limited, Mumbai

Knitrile Apparel Limited, Navi Mumbai

JMC Projects India Ltd., Mumbai

Adarsh Nagar Jail., Lucknow

Trina Quebec Gears Limited, Bahadurgarh

ACME Enviro Solutions Pvt. Ltd., Gurgaon

LEENA Developers Pvt. Ltd., Mumbai

Nuchem weir India Limited., Faridabad

Jindal Pipes Limited, Ghaziabad

Nivtriti Textiles, Perundarai

Akshya Infrastructure Pvt Ltd., Navi Mumbai

Parmeshwari Exports, Karur

EIA, Design & Engg of CETP

1800 TPD eSLF Facility

Piping Stress Analysis

Water Ttreatment Plant

150 m3/day WTP

Prebid Engineering of 60 MLD STP

2500 m3/day Sewage Treatment Plant

5 m3/d SBR Based STP

D&E of 600,500 & 400 m3/d STP

250 m3/d STP

D&E of Effuent Treatment Plants

Piping Stress analysis

300 m3/day RO Plant

35 m3/d STP

500 m3/d Zero Liquid Discharge

Page 26: EWE Consulting Engineers Pvt. Ltd.  · Water Ttreatment Plant 150 m3/day WTP Prebid Engineering of 60 MLD STP 2500 m3/day Sewage Treatment Plant 5 m3/d SBR Based STP D&E of 600,500

EWE Consulting Engineers Pvt. Ltd. www.ewe.co.in

© EWE Sept 2012 Rev 03

B-472 First Floor- Anna Salai Nandanam

Chennai- 600035, INDIA

Level 6, Constantania Building

11, U N Brahmachari Road,

Kolkatta 700 017

Mr.Giasuddin Ahmed – 9711202874

G-154, Sector 63, Noida

NCR – 201 307

Mr. Bikram Singh – 9711202878

C 302 Groma House, Plot 14C,

Sector 19, Vashi

Navi Mumbai – 400 703

Mr. Avijit Choudhary – 9223412444

NORTH

WEST EAST

SOUTH

Our Locations

Page 27: EWE Consulting Engineers Pvt. Ltd.  · Water Ttreatment Plant 150 m3/day WTP Prebid Engineering of 60 MLD STP 2500 m3/day Sewage Treatment Plant 5 m3/d SBR Based STP D&E of 600,500

EWE Consulting Engineers Pvt. Ltd. www.ewe.co.in

© EWE Sept 2012 Rev 03

@ : [email protected]

T : 0120 240 6448-50

F : 07838654634

Page 28: EWE Consulting Engineers Pvt. Ltd.  · Water Ttreatment Plant 150 m3/day WTP Prebid Engineering of 60 MLD STP 2500 m3/day Sewage Treatment Plant 5 m3/d SBR Based STP D&E of 600,500

EWE Consulting Engineers Pvt. Ltd. www.ewe.co.in

© EWE Sept 2012 Rev 03