EWB-MAP Water Tank Project Construction Progress
description
Transcript of EWB-MAP Water Tank Project Construction Progress
![Page 1: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/1.jpg)
EWB-MAP Water Tank ProjectConstruction Progress
June 5-12, 2012
![Page 2: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/2.jpg)
Map of Las Delicias Water System
DOWNHILL
![Page 3: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/3.jpg)
260 Homes Served by Tanque 3
33 Homes Served
by Tanque 2291 Homes Served by Tanque 1
DOWNHILL
Map of current Las Delicias Water System from ADESCO with approx house locations indicated
![Page 4: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/4.jpg)
117 Homes Served by Tanque 3
33 Homes Served
by Tanque 2
154 Homes Served by Tanque 1
Proposed Water Distribution System
280 Homes Served by New Tank
DOWNHILL
![Page 5: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/5.jpg)
Map of Current Water System (section relevant for EWB-MAP modifications)
RED lines – supply lines to tank (uphill by pump)BLUE lines – distributions lines by gravity
DOWNHILL
New 17,000 gallon tank Exisiting
11,000 gallon tank
![Page 6: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/6.jpg)
Proposed update to Water System (section relevant for EWB-MAP modifications)
RED lines – supply lines to tank (uphill by pump)BLUE lines – distributions lines by gravity
NEW
SUP
PLY
LINE
1
NEW DISTRIBUTION LINE 2c
NEW DISTRIBUTION
LINE 2a
NEW
DI
STRI
BUTI
ON
LINE
2bNEW TANK
A
B
C
D
E
F
DOWNHILL
1. Tank Construction2. Pipe connections3. Pipeline Plans4. Distribution of Work
![Page 7: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/7.jpg)
DAY 1 – June 5, 2012
![Page 8: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/8.jpg)
![Page 9: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/9.jpg)
Photos
![Page 10: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/10.jpg)
Day 2 – Wednesday June 6, 9 AM
![Page 11: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/11.jpg)
Day 2 – 3 PM
![Page 12: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/12.jpg)
Day 2 – 3 PMDaniel Rivera
(Engineer from Rotary)
Miguel Delgado (driver/handyman)
from FIAT)
Miguel Martinez(Supervisor)
Holman (driver from
FIAT)
Sergio (LD ADESCO member)
Mario (LD resident)
![Page 13: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/13.jpg)
Day 3 – Thursday June 7, 9 AM
![Page 14: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/14.jpg)
Day 4 – Friday June 10, 11 AM
![Page 15: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/15.jpg)
![Page 16: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/16.jpg)
![Page 17: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/17.jpg)
Day 5 – Saturday June 9, noon
![Page 18: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/18.jpg)
Day 6 – June 11: noon
![Page 19: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/19.jpg)
Day 7 – June 12 noon
![Page 20: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/20.jpg)
Day 7 – 4 PM – ‘mesita’ complete
![Page 21: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/21.jpg)
Schedule for Completion of Tank
1. Wed June 13: start laying rocks/sand for base of foundation
2. Thur June 14: continue laying rocks/sand for base of foundation
3. Fri June 15 – Tue June 19: cut/tie rebar and prepare form for foundation
4. Wed June 20: pour foundation5. Rain could delay these tasks
![Page 22: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/22.jpg)
Photos
![Page 23: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/23.jpg)
Ordered tubing and fittings from local supply store in San Salvador
![Page 24: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/24.jpg)
Proposed update to Water System (section relevant for EWB-MAP modifications)
RED lines – supply lines to tank (uphill by pump)BLUE lines – distributions lines by gravity
NEW
SUP
PLY
LINE
1
NEW DISTRIBUTION LINE 2c
NEW DISTRIBUTION
LINE 2a
NEW
DI
STRI
BUTI
ON
LINE
2bNEW TANK
A
B
C
D
E
F
DOWNHILL
1. Tank Construction2. Pipe connections3. Pipeline Plans4. Distribution of Work
![Page 25: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/25.jpg)
Proposed update to Water System (section relevant for EWB-MAP modifications)
RED lines – supply lines to tank (uphill by pump)BLUE lines – distributions lines by gravity
NEW
SUP
PLY
LINE
1
NEW DISTRIBUTION LINE 2c
NEW
DI
STRI
BUTI
ON
LINE
2bNEW TANK
A
B
C
D
E
F
DOWNHILL
![Page 26: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/26.jpg)
Photos along Pipeline PathArea of Connection to Tubo Madre
NEW
SUP
PLY
LINE
1
NEW
DI
STRI
BUTI
ON
LINE
2b
NEW TANK
A
B
C
D
![Page 27: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/27.jpg)
Photos along Pipeline Path(location of valve box?)
NEW
SUP
PLY
LINE
1
NEW
DI
STRI
BUTI
ON
LINE
2b
NEW TANK
A
B
C
D
![Page 28: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/28.jpg)
Photos along Pipeline Path(location of valve box?)
NEW
SUP
PLY
LINE
1
NEW
DI
STRI
BUTI
ON
LINE
2b
NEW TANK
A
B
C
D
![Page 29: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/29.jpg)
Photos along Pipeline Path
NEW
SUP
PLY
LINE
1
NEW
DI
STRI
BUTI
ON
LINE
2b
NEW TANK
A
B
C
D
![Page 30: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/30.jpg)
Photos along Pipeline Path
NEW
SUP
PLY
LINE
1
NEW
DI
STRI
BUTI
ON
LINE
2b
NEW TANK
A
B
C
D
![Page 31: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/31.jpg)
Photos along Pipeline Path
NEW
SUP
PLY
LINE
1
NEW
DI
STRI
BUTI
ON
LINE
2b
NEW TANK
A
B
C
D
![Page 32: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/32.jpg)
Photos along Pipeline Path
NEW
SUP
PLY
LINE
1
NEW
DI
STRI
BUTI
ON
LINE
2b
NEW TANK
A
B
C
D
![Page 33: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/33.jpg)
Photos along Pipeline Path
NEW
SUP
PLY
LINE
1
NEW
DI
STRI
BUTI
ON
LINE
2b
NEW TANK
A
B
C
D
![Page 34: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/34.jpg)
Photos along Pipeline Path
NEW
SUP
PLY
LINE
1
NEW
DI
STRI
BUTI
ON
LINE
2b
NEW TANK
A
B
C
D
![Page 35: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/35.jpg)
Photos along Pipeline Path
NEW
SUP
PLY
LINE
1
NEW
DI
STRI
BUTI
ON
LINE
2b
NEW TANK
A
B
C
D
![Page 36: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/36.jpg)
Meeting with Mayor to discuss installation of pipeline
• Alcalde (Mayor) Ingeniero Romeo Jose Barillas ([email protected], 2331-3001)
• Travelled to Alcaldia (Mayor’s office) with Alfredo Torres (member of LD ADESCO) on Tuesday June 12, 2012)
• Got on waiting list at 8:30 & met with Mayor at 10:45• Requested help digging trench and installing PVC tubing. Alfredo had official letter
from ADESCO• Mayor knew about project (had been contacted by Ana Maria de Keene – honorary
consul of El Salvador in Philadelphia) and agreed to help with everything including supplying the 4” (supply) and 2” (distribution) pipes.
• Questions from mayor:– Is 160 PSI PVC acceptable?– Do you want cemented PVC or rapid connection?– Will send an engineer to evaluate poject.
• Other questions (from RAC)– Location of valve boxes, air bleeds, T’s, cleanouts– Should prepare detailed plan to send to mayor ASAP
![Page 37: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/37.jpg)
Distribution of Work• EWB-MAP
– Overall project management and communication between parties– Updating design verifying that work meets design specs.– Long term planning
• FIAT (Sister Gloria)– Purchase of last minute supplies, order trucks of materials, submission of receipts to
Rotary for reimbursement. Storage of supplies.– Organizing volunteers, hiring one mason
• Las Delicias ADESCO– Organizing community labor (each house volunteers 1 day or pays $6 for another
person to do the work)– Ensuring secure storage of supplies– Communication with Alcaldia
• Daniel Rivera (Rotary San Salvador)– Purchase of supplies (1 week notice): rebar, concrete– Payment of supervisor and mason (hire one mason)– Local project management and oversight of supervisor (Miguel Martinez)
• Alcaldia San Juan Opico– Installation of two lines (4” supply and 2” distribution) of tubing in the same trench
between Calle Principal and Tanks.
![Page 38: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/38.jpg)
Project Expenses (Thru June 11)
TOTALS--> 1,812.70$ 1,543$ 120$ -$ 150$ -$ 1,812.70$ Date Expense Item Amt Qty Total Paid by Detail FIAT CRSS MAP LD Team Total2
1-Jun photocopies 4.70$ 1 4.70$ FIAT for CRSS 5$ 4.70$ 4-Jun tools 196.50$ 1 196.50$ FIAT for CRSS 197$ 196.50$ 6-Jun Rocks (trucks ~6m^3) 145.00$ 2 290.00$ FIAT for CRSS 290$ 290.00$ 7-Jun Arena (sand trucks ~6 m^3) 70.00$ 2 140.00$ FIAT for CRSS 140$ 140.00$ 8-Jun Tierra Blanca (trucks ~6m^3) 70.00$ 2 140.00$ FIAT for CRSS 140$ 140.00$ 9-Jun Cement (bags 42.5 kg) 8.26$ 40 330.50$ FIAT for CRSS 331$ 330.50$ 9-Jun Transportation of materials 40.00$ 1 40.00$ FIAT for CRSS 40$ 40.00$
11-Jun Pipe for tank connections 331.00$ 1 331.00$ FIAT for CRSS 331$ 331.00$
11-JunSupervisor (Miguel) paid daily 6 days/wk 20.00$ 6 120.00$ CRSS 120$ 120.00$
11-Jun Laborers (from LD) paid daily 6.00$ 25 150.00$ LD 150$ 150.00$ 11-Jun Tierra Blanca (trucks ~6m^3) 70.00$ 1 70.00$ FIAT for CRSS 70$ 70.00$
![Page 39: EWB-MAP Water Tank Project Construction Progress](https://reader036.fdocuments.us/reader036/viewer/2022062815/56816945550346895de0ced8/html5/thumbnails/39.jpg)
Contacts
• FIAT guest house: 2-226-7610• Miguel Delgado (FIAT driver/helper) cell: 7-
570-8675• Rene (LD President): 7-458-4150• Miguel Martinez (Supervisor on work site): 7-
465-0654• Alcalde (Mayor) Ingeniero Romeo Jose Barillas
([email protected], 2-331-3001)