Team Caterpillar:
EUROPEAN PROJECT SEMESTER 2
What is the project about?
Plan to achieve the goal:•Scrubber•Catalyst•Boiler•Exhaust Gas Silencer•Funnel•Example exhaust gas cleaning system
Content
EUROPEAN PROJECT SEMESTER 3
To create a catalogue of optimum configurations of exhaust gas cleaning systems for different types of HFO diesel engines to fulfill the IMO 3 criterias
Other main focusses:
•cost of equipment•cost of equipment in action •cost of service•repairing situation and spare parts•place in ship
Goal
EUROPEAN PROJECT SEMESTER 4
IMO 3
EUROPEAN PROJECT SEMESTER 5
EUROPEAN PROJECT SEMESTER 6
Exhaust gas cleaning system?
I would suggest to put also another schema, with more detailed graphics (if exists... )
EUROPEAN PROJECT SEMESTER 7
Exhaust gas cleaning system
Wet exhaust gas cleaning system Dry exhaust gas cleaning systemAn effective and advanced exhaust system must achieve and ensure four main objectives :1 - To reduce noise level by between 40% and 90% through the insertion of silencers end/or silencer-separators;2 - To cool the exhaust, and eject the engine cooling water through the exhaust without excessive back pressure;3 - To site the outlets at the stern of the boat to minimise exhaust fumes on board;4 - To minimize, by the insertion of an adeguate capacity silencer, the risk of water running back up the exhaust and into the engine cylinders, causing serious engine damages.
EUROPEAN PROJECT SEMESTER 8
Time plan
achieve information about system
material, function, cost, dimensions
suppliers of components
examples for existing configurations
create own configurations
EUROPEAN PROJECT SEMESTER 9
ScrubberHow does it work?
Sulphur Oxides SOx (SO2) dissolves within water vapour forming airborne acids.
What is it made of?
Formed from sulphur contained in oil during combustion and refining processes.
EUROPEAN PROJECT SEMESTER 10
Scrubber1. Water ph is elevated with
alkalitysodium hydroxide ( NaOH )
2. Entering exhaust gas streamsulphur oxides are capturedand neutralized by scrubbingwater chemically forming sulphates
3. Cleaned exhaust gas exits
4. Water and sulphides return toprocess collection tank
EUROPEAN PROJECT SEMESTER 11
Scrubber (OPEN LOOP)
EUROPEAN PROJECT SEMESTER 12
Scrubber (CLOSED LOOP)
EUROPEAN PROJECT SEMESTER 13
Scrubber
EUROPEAN PROJECT SEMESTER 14
Scrubber
EUROPEAN PROJECT SEMESTER 15
Summary of integrated scrubberAvoid increased exhaust gas back pressure caused by
cleaning devices.Reduce the amount of equipment needed for SOx-cleaning of
exhaust gases from all relevant combustion units onboard.Provide a higher cleaning performance in port conditions where
the total flow of exhaust gases is smaller than in normal seagoing
conditions, utilising such higher performance as inherent
in some exhaust gas cleaning devices when operated at
reduced exhaust gas flow. Thus all combustion units can use
the same fuel in all areas and all conditions.
Scrubber
EUROPEAN PROJECT SEMESTER 16
Scrubber•Scrubbing is the cheapest way to comply
•Fresh water scrubber is the only technology to:Make zero effluent discharge possibleBe always in control of reduction efficiencyHave the smallest energy consumptionHave no creation of CO2 caused by neutralization process
•Wärtsilä fresh water scrubber solutions are fit for new
building and retrofit, for any engines and boilers’ brands.
EUROPEAN PROJECT SEMESTER 17
Scrubber
EUROPEAN PROJECT SEMESTER 18
Boiler
What is the purpose ?To obtain boiled water by heating water or other fluid in a closed vessel.
What is it made of ?Made of steel or wrought iron, assembly by rivetting
EUROPEAN PROJECT SEMESTER 19
Which fuel ?
Combustion : wood, coal, oil or natural gas
Electric steam boilers : resistance or immersion-type heating elements
Boiler
EUROPEAN PROJECT SEMESTER 20
Fire-tube boiler• Tubes of hot gases running through a sealed container of water
•High-pressure
•Horizontal or vertical
Boiler
EUROPEAN PROJECT SEMESTER 21
Boiler
Water-tube boiler• Tubes of water heated externally by the fire
•High-pressure
•Vertical
EUROPEAN PROJECT SEMESTER 22
Fire-tube boiler• Used on all steam
locomotives
BoilerWater-tube boiler• Used on ships
(marine)
EUROPEAN PROJECT SEMESTER 23
For diesel engine, one or two smaller boilers are used on the ship
Boiler on ships
EUROPEAN PROJECT SEMESTER 24
Boiler on ships
Suppliers
•Aalborg Industries•Mitsubishi Heavy Industries, LTD•Kangrim•Garioni Naval•Chromalox
EUROPEAN PROJECT SEMESTER 25
Exhaust Gas Silencer
EUROPEAN PROJECT SEMESTER 26
Exhaust Gas SilencerOverview
Typical applicationsabsorption principle
exhaust gas goes through a zylindric flow channel, which is surounded by noise absorbing, thermic high strengh material.
stainless steel/aluminized steel perforized pipes reducing exhaust gas pressure
seamless welding offerts a long service lifestainless steel wool contains high durability
different net shape
EUROPEAN PROJECT SEMESTER 27
Exhaust Gas SilencerFeatures
low skin temperature (LST) design extra layer of packed acustic/thermal insulation that
reduces heat and noiseonly low flow loss
maximum aceptable exhaust gas speed between 20-40m/sec
Easy installation in any positionAdvanced acustical design
Thick wall construction for high transmission lossReduces noxious fumes and odors
Long life serviceWeight from 125-1755kg
EUROPEAN PROJECT SEMESTER 28
SuppliersHUSSLBF
LindenbergLS Luhe-Stahl
Silencer MarineVetusPuckTaylor
UniversalKaeferMaximAGSD
EUROPEAN PROJECT SEMESTER 29
Funnel
EUROPEAN PROJECT SEMESTER 30
FunnelFunktions:
removal of smoke and exhaus gas identification of the ship-owner company direct the smoke up in the air to disturb nocody bypass the friction resistance don`t foul the decks and ship structures
Appendagevery high funnels little fins to turbulate the exhaus gas and guide it to the horizontal direction
How does it workGas inside is warm and therefor have a lower weight than the cold air outside.So they have to climp up the funnel pipe. They build a room with less air pressure, in which the cold air is going. Gauge pressure is about 0,0009-0,0015 bar, depends on the resistance.
EUROPEAN PROJECT SEMESTER 31
FunnelFunnel area
The required funnel cross-sectional area is determined by the volume of exhaust gases produced by the propulsion plant. Often this area is too great for a single funnel. Early steam vessels needed multiple funnels had 5 when launched, but as efficiency increased new machinery needed fewer funnels.
SuppliersDitco
EUROPEAN PROJECT SEMESTER 32
EUROPEAN PROJECT SEMESTER 33
Dry exhaust gas cleaning system
EUROPEAN PROJECT SEMESTER 34
EUROPEAN PROJECT SEMESTER 35
EUROPEAN PROJECT SEMESTER 36
EUROPEAN PROJECT SEMESTER 37
EUROPEAN PROJECT SEMESTER 38