EUROPEAN GRID CONFERENCE European Parliament Brussels · • ENTSO-E’s first TYNDP was a timely...
Transcript of EUROPEAN GRID CONFERENCE European Parliament Brussels · • ENTSO-E’s first TYNDP was a timely...
1
EUROPEAN GRID CONFERENCE European Parliament
Brussels:
Grid Infrastructure: Super, Smart or SuperSmart?
by Konstantin Staschus, Ph.D. 10 November 2011 Secretary-General of ENTSO-E [email protected]
Key activities set out in Regulation 714/2009 (on cross-border electricity trade, part of the 3rd IEM Package) • Deliver network codes binding to all network users (through ‘Comitology’) • Deliver network plans European / regional view of system needs (“TYNDP”) • Deliver crucial aspects of market integration (“market coupling”) • R&D Plan (fully included in EEGI – European Electricity Grid Initiative, part of the SET Plan)
Through its members deliver the infrastructure to: • enable markets to function, • secure energy supply, • meet climate change objectives through connecting RES
ENTSO-E has significant role in delivering European energy and climate change objectives
41 TSOs from 34 countries 530 million people, 910 GW gen., 300 000 km transm.
Grid Infrastructure: Super, Smart or SuperSmart? | Konstantin Staschus| 10 Nov. 2011 Page 2
2
• Scenario elaboration & validation • Market studies
• Network studies • Project identification & valuation
• Report compilation At stake:
timely delivery consistent results limited resources
[MW]
Presently being investigated subject to adaptations &/o changes
Challenges for TYNDP 2012: Improve methodology, transparency, coordination, stakeholder involvement
Grid Infrastructure: Super, Smart or SuperSmart? | Konstantin Staschus| 10 Nov. 2011 Page 3
early 2015
12/2011 Consortium formation summer 2011; start 1/12
ENTSO-E study roadmap towards 2050: Modular Development Plan for an Electricity Highways System - in line w/ TYNDP, EEGI
Grid Infrastructure: Super, Smart or SuperSmart? | Konstantin Staschus| 10 Nov. 2011 Page 4
3
A Smart Grid model to define needed projects
Level 2: Smart Distribution network and processes
Level 3: Smart Integration
Level 4: Smart Energy Management
Level 1: Smart Pan-European Transmission network
Level 0: New generation technologies
DISTRIBUTION NETWORK
TRANSMISSION NETWORK
Electricity Generation
ESCO RETAILERS AGGREGATORS
Level 5: Smart Customers
Grid Infrastructure: Super, Smart or SuperSmart? | Konstantin Staschus| 10 Nov. 2011 Page 5
The 14 Functional Projects on transmission networks
Cluster 1: Pan-European Grid architecture Novel approaches to develop a pan-European Grid
Cluster 2: Power technologies Affordable technologies to make the transmission system more clever and flexible
Cluster 3: Network management and control Critical building blocks to operate the interconnected transmission system in real-time and reliably
Cluster 4: Market rules Market simulation techniques to develop a single European electricity market
SMA
RT
GR
IDS
Func
tiona
l lev
el
Level 1: Smart pan-European
Grid Infrastructure: Super, Smart or SuperSmart? | Konstantin Staschus| 10 Nov. 2011 Page 6
4
ENTSO-E R&D Plan: Research and innovation clusters Smart grids and cooperation with DSOs play a major part in the R&D Plan, partly because of the balancing challenge
Grid Infrastructure: Super, Smart or SuperSmart? | Konstantin Staschus| 10 Nov. 2011 Page 7
Public acceptance: substantial barrier to grid investment
Grid Infrastructure: Super, Smart or SuperSmart? | Konstantin Staschus| 10 Nov. 2011 Page 8
• TYNDP 2010 identified significant grid investment need • However: important barriers to grid investment:
Long permitting procedures Inadequate regulatory framework (access to capital markets) Public opposition to transmission infrastructure
• TSOs appreciate very much: The now widespread political realization how important
the grid is for RES and GHG reduction goals The support from RES initiatives such as RGI
EC’s 19 Oct draft infrastructure regulations are to streamline permitting • ... and to improve the regulatory framework for investments • Cost-benefit analyses for projects/for the system will play an even bigger role • This also brings chances to improve public acceptance
5
Summary
• EU policies on security of supply, market, and RES integration call for massive development of transmission grids, both between and within countries. • ENTSO-E’s first TYNDP was a timely initiative that enabled the policy debate. • Seamless integration of electricity highways into the 400 kV grids demands that TSOs
operate them and have strong ownership stakes. • Permitting and public acceptance is the key issue; without radical changes policy
objectives will not be met. • A huge financial effort requires new financing tools and regulatory stability. • Smart grid solutions and supergrid/Electricity Highways solutions will be needed to
make the future system work ENTSO-E R&D Plan, European Electricity Grid Initiative! Implementation is key to reaching the 20/20/20 goals and beyond.
ENTSO-E works to prepare the future power system associated with increasing variable RES generation, increasing need for demand response, increasing energy efficiency and steeply decreasing CO2 emissions.
Grid Infrastructure: Super, Smart or SuperSmart? | Konstantin Staschus| 10 Nov. 2011 Page 9