05/02/08EUROnu, Elena Wildner, CERN,
05/02/2008 1
EUROBeta BeamsKick-off meeting
Elena Wildner, CERN
![Page 2: EURO n Beta Beams Kick-off meeting 05-02-08](https://reader035.fdocuments.us/reader035/viewer/2022062720/568134a8550346895d9bb3c9/html5/thumbnails/2.jpg)
05/02/08EUROnu, Elena Wildner, CERN,
05/02/2008 2
Outline
FP6 baseline Some important issues
FP7 Contributions from participants
Timeline Deliverables Milestones
![Page 3: EURO n Beta Beams Kick-off meeting 05-02-08](https://reader035.fdocuments.us/reader035/viewer/2022062720/568134a8550346895d9bb3c9/html5/thumbnails/3.jpg)
05/02/08EUROnu, Elena Wildner, CERN,
05/02/2008 3
Outline
FP6 baseline Some important issues
FP7 Contributions from participants
Timeline Deliverables Milestones
![Page 4: EURO n Beta Beams Kick-off meeting 05-02-08](https://reader035.fdocuments.us/reader035/viewer/2022062720/568134a8550346895d9bb3c9/html5/thumbnails/4.jpg)
05/02/08EUROnu, Elena Wildner, CERN,
05/02/2008 44
.
Neutrino Source
Decay Ring
Ion production ISOL target &
Ion source
Proton Driver
Decay ring
B = 1500 Tm B = ~6 T C = ~6900 m Lss= ~2500 m
6He: = 100 18Ne: = 100
SPS
Acceleration to medium energy
RCS, 1.5 GeV
PS
Acceleration to final energy
PS & SPS
Beam to experiment
Ion acceleration Linac
Beam preparation ECR
pulsed
Ion production Acceleration Neutrino source
Detector in the Frejus tunnel
Existing!!!
8.7 GeV
93 GeV
Beta Beam Baseline Scenario
![Page 5: EURO n Beta Beams Kick-off meeting 05-02-08](https://reader035.fdocuments.us/reader035/viewer/2022062720/568134a8550346895d9bb3c9/html5/thumbnails/5.jpg)
FP6 – Accelerator Chain Beta Beam baseline parameters A. Fabich, E. Wildner / CERN RCS preliminary design – A. Lachaize, A. Tkatchenko /
CNRS/IN2P3/IPN Orsay Decay ring preliminary design - A. Chancé and J. Payet /
CEA/DSM/DAPNIA Preliminary study of the collimation and absorbers in the
Decay Ring – E. Wildner, A. Fabich, M. Stockner / CERN Assymetric bunch merging in the Decay Ring – S. Hancock,
M. Benedikt / CERN PS activation and collimation studies M. Kirk, P. Spiller, J.
Stadlmann, C. Omet / GSI Darmstadt Decay losses along the accelerator chain of the beta beam
A. Fabich, M. Benedikt / CERN
![Page 6: EURO n Beta Beams Kick-off meeting 05-02-08](https://reader035.fdocuments.us/reader035/viewer/2022062720/568134a8550346895d9bb3c9/html5/thumbnails/6.jpg)
FP6 – Production Production of 6He and 18Ne for EURISOL DS - T. Stora and EURISOL
task 3 participants / CERN + CEA Saclay 6He from a BeO target surrounding a n converter – optimization N. Thiollière
and coworkers CEA Saclay 18Ne from a MgO target - Factor 5 below requirements
Direct production, alternative production methods – M. Loiselet S. Mitrofanov / UCL Laboratoire du Cyclotron 7Li (p,2p)6He 16O (3He,n) 18Ne – Interesting, large targets and intense 3He beams
Ionization and cooling ring - C. Rubbia, A. Ferrari, Y. Kadi, V. Vlachoudis et al. / CERN Novel ideas with new baseline isotopes 8Li and 8B A general concept - could be used beyond EURISOL and beta beams
Ionization and bunching - T. Lamy and T. Thuillier/ LPSC Grenoble 60 GHz ion source design – EURISOL task 9
An accumulation ring at low energy – A. Källberg M. Lindroos / MSL and CERN
![Page 7: EURO n Beta Beams Kick-off meeting 05-02-08](https://reader035.fdocuments.us/reader035/viewer/2022062720/568134a8550346895d9bb3c9/html5/thumbnails/7.jpg)
EURISOL DS task 12:“Beta Beam aspect”D1 Design of low energy ring(s)
No Milestones and expected results of this task Months due achieved
D1 /M1.1 Final choice on baseline design 4 √
D1 /M2.1 Freeze in/out parameters 9 √
D1 /M2.2 First order optics design 18 √
D1 /M2.3 First design low energy ring(s) 45
D2 Ion acceleration scenarios in PS and SPS
No Milestones and expected results of this task Months due achieved
D2 /M3.1 Freeze in/out parameters 9 √
D2 /M3.2 Identification of limitation 18 √
D2 /M3.3 Study of ion acceleration in PS and SPS and possible upgrade 45
D3 Design of decay ring
No Milestones and expected results of this task Months due achieved
D3 /M4.1 Freeze input parameters 9 √
D3 /M4.2 First order optics design 18 √
D3 /M4.3 Decay ring design 45
D4 Conceptual design report for a beta beam facility
M. Benedikt and M. Lindroos
![Page 8: EURO n Beta Beams Kick-off meeting 05-02-08](https://reader035.fdocuments.us/reader035/viewer/2022062720/568134a8550346895d9bb3c9/html5/thumbnails/8.jpg)
05/02/08EUROnu, Elena Wildner, CERN,
05/02/2008 8
Outline
FP6 baseline Some important issues
FP7 Contributions from participants
Timeline Deliverables Milestones
![Page 9: EURO n Beta Beams Kick-off meeting 05-02-08](https://reader035.fdocuments.us/reader035/viewer/2022062720/568134a8550346895d9bb3c9/html5/thumbnails/9.jpg)
05/02/08EUROnu, Elena Wildner, CERN,
05/02/2008 9
Ion production
6He (tungsten or liquid metal as neutron converter and BeO as target)
18Ne (spallation, direct on magnesium oxide) Short-fall of ions if classical methods used Proposal to produce other isotopes
Isotopes like 8Li and 8B better Higher Q -> higher energy neutrinos
![Page 10: EURO n Beta Beams Kick-off meeting 05-02-08](https://reader035.fdocuments.us/reader035/viewer/2022062720/568134a8550346895d9bb3c9/html5/thumbnails/10.jpg)
05/02/08EUROnu, Elena Wildner, CERN,
05/02/2008 10
Ion acceleration
Linac Multiple charge state acceleration?
Accumulation in the PS of 20 RCS bunches PS2?
SPS, new 40 MHz and 200 MHz systems give 10 ns long bunches into the decay ring.
![Page 11: EURO n Beta Beams Kick-off meeting 05-02-08](https://reader035.fdocuments.us/reader035/viewer/2022062720/568134a8550346895d9bb3c9/html5/thumbnails/11.jpg)
05/02/08EUROnu, Elena Wildner, CERN,
05/02/2008 11
Neutrino production
Decay ring 7000 m 36 % straight sections, 5T superconducting magnets (6He up to =150)
Stacking (dilated life-time) by assymetric merging Do we need it? If we can relax on the dutyfactor we can fill
the complete Decay Ring and we can use a ”barrier bucket filling scheme” (ref. FNAL anti-protons)
Collimation and absorption of decayed ions
![Page 12: EURO n Beta Beams Kick-off meeting 05-02-08](https://reader035.fdocuments.us/reader035/viewer/2022062720/568134a8550346895d9bb3c9/html5/thumbnails/12.jpg)
05/02/08EUROnu, Elena Wildner, CERN,
05/02/2008 12
Outline
FP6 baseline Some important issues
FP7 Contributions from participants
Timeline Deliverables Milestones
![Page 13: EURO n Beta Beams Kick-off meeting 05-02-08](https://reader035.fdocuments.us/reader035/viewer/2022062720/568134a8550346895d9bb3c9/html5/thumbnails/13.jpg)
05/02/08EUROnu, Elena Wildner, CERN,
05/02/2008 13
New ions: Production Ring (CERN) Gas target or liquid metal film target?
Supersonic gas target Argonne National lab. liquid metal film target?
FFAG or ”classical” ring lattice
Production Ring
“Beam Cooling with ionisation losses”C. Rubbia, A. Ferrari, Y. Kadi, V. Vlachoudis
![Page 14: EURO n Beta Beams Kick-off meeting 05-02-08](https://reader035.fdocuments.us/reader035/viewer/2022062720/568134a8550346895d9bb3c9/html5/thumbnails/14.jpg)
05/02/08EUROnu, Elena Wildner, CERN,
05/02/2008 14
ECR (LPSC, GHMFL)
60 GHz ECR for bunching studies 6He and 18Ne contunued for reach of high efficiencies.
Study and first tests on bunching 8Li and 8B
Ion source technology (magnetic structures)
![Page 15: EURO n Beta Beams Kick-off meeting 05-02-08](https://reader035.fdocuments.us/reader035/viewer/2022062720/568134a8550346895d9bb3c9/html5/thumbnails/15.jpg)
05/02/08EUROnu, Elena Wildner, CERN,
05/02/2008 15
Collection Device ( UCL, INFN) Prototype of production ring collection device
extraction efficiency of 8Li measured 8B extraction tested on-line
Release efficiencies
Production cross sections (theory & experiment)
![Page 16: EURO n Beta Beams Kick-off meeting 05-02-08](https://reader035.fdocuments.us/reader035/viewer/2022062720/568134a8550346895d9bb3c9/html5/thumbnails/16.jpg)
05/02/08EUROnu, Elena Wildner, CERN,
05/02/2008 16
Decay Ring ( CERN, CEA) New baseline scenario for new beta emmitters
Superconducting Dipoles
Magnet Protection
Collimation
Revise stacking process
![Page 17: EURO n Beta Beams Kick-off meeting 05-02-08](https://reader035.fdocuments.us/reader035/viewer/2022062720/568134a8550346895d9bb3c9/html5/thumbnails/17.jpg)
05/02/08EUROnu, Elena Wildner, CERN,
05/02/2008 17
Decay Ring, stacking ( CERN)
Stacking (dilated life-time) by assymetric merging. If we can relax on the dutyfactor we can fill the complete
Decay Ring and we can use a ”barrier bucket filling scheme” (ref. FNAL anti-protons)”
He
Ne
![Page 18: EURO n Beta Beams Kick-off meeting 05-02-08](https://reader035.fdocuments.us/reader035/viewer/2022062720/568134a8550346895d9bb3c9/html5/thumbnails/18.jpg)
05/02/08EUROnu, Elena Wildner, CERN,
05/02/2008 18
Other contributions Supersonic Gas injector (PPPL)
Alternative ION collection devices (ANL)
Beam tracking code ACCIM (TRIUMF)
Analysis and theoretical work on results at LPSC (The institute of Applied Physics in Nizhny Novgorod)
Princeton Plasma Physics LaboratoryLaboratoire de Physique Subatomique et de Cosmologie de Grenoble
![Page 19: EURO n Beta Beams Kick-off meeting 05-02-08](https://reader035.fdocuments.us/reader035/viewer/2022062720/568134a8550346895d9bb3c9/html5/thumbnails/19.jpg)
05/02/08EUROnu, Elena Wildner, CERN,
05/02/2008 19
Outline
FP6 baseline Some important issues
FP7 Contributions from participants
Timeline Deliverables Milestones
![Page 20: EURO n Beta Beams Kick-off meeting 05-02-08](https://reader035.fdocuments.us/reader035/viewer/2022062720/568134a8550346895d9bb3c9/html5/thumbnails/20.jpg)
05/02/08EUROnu, Elena Wildner, CERN,
05/02/2008 20
FP7
![Page 21: EURO n Beta Beams Kick-off meeting 05-02-08](https://reader035.fdocuments.us/reader035/viewer/2022062720/568134a8550346895d9bb3c9/html5/thumbnails/21.jpg)
05/02/08EUROnu, Elena Wildner, CERN,
05/02/2008 21
Staff effort
![Page 22: EURO n Beta Beams Kick-off meeting 05-02-08](https://reader035.fdocuments.us/reader035/viewer/2022062720/568134a8550346895d9bb3c9/html5/thumbnails/22.jpg)
05/02/08EUROnu, Elena Wildner, CERN,
05/02/2008 22
Kick-off FP7 WP4 beta beams
A kick-off meeting will be organized in spring 2008
Thanks to: P.Delahaye M.Lindroos A.Fabich and M.Benedikt!