TORE SUPRA
AssociationEURATOM-CEA
3rd GOTA-PPE meeting Julien WAGREZ 16 December 2010
1
EFDA ITER - Goal Oriented Training Program Port Plug Engineering
-Maintainability associated to ITER Component
Lifecycle-
Supervisor : Delphine KELLER-
June 2009 to June 2012-
EFDA ITER - Goal Oriented Training Program Port Plug Engineering
-Maintainability associated to ITER Component
Lifecycle-
Supervisor : Delphine KELLER-
June 2009 to June 2012-
EFDA Goal Oriented Training ProgramPort Plug Engineering
TORE SUPRA
AssociationEURATOM-CEA
3rd GOTA-PPE meeting Julien WAGREZ 16 December 2010
2
EFDA Goal Oriented Training ProgramPort Plug Engineering
� Reminder of the 2009 activities• Grant TBM task T19
• TCS study with Samtech
� The 2010 activities• TCS study with Samtech*
• Grant TBM task T19*• TBM Pipe-Forest preliminary handling study
• TCS - Port tolerancing
� The 2011 foreseen activities• TCS study with Samtech
• PP11• Cycle
TORE SUPRA
AssociationEURATOM-CEA
3rd GOTA-PPE meeting Julien WAGREZ 16 December 2010
3
� Reminder of the 2009 activities• Kinematic & FE Analysis on the Transfer Cask System with Samtech
• Grant TBM Task T19
EFDA Goal Oriented Training ProgramPort Plug Engineering
Cask envelope
Pallet system
Building
AEU
Pipe Forest
Robot Arm
TORE SUPRA
AssociationEURATOM-CEA
3rd GOTA-PPE meeting Julien WAGREZ 16 December 2010
4
� The 2010 activities• TCS study with Samtech, the first
reports has been completed and an add-on has been released.
• 2nd TCS study with Samtech, a second analysis has started in October.
Reports given to ITERThe new FEA analysis TCS model
EFDA Goal Oriented Training ProgramPort Plug Engineering
•Interpretation of the ITER models
•Design support to Samtech
•Building of a relevant FEA models following the CAD rules of ITER
TORE SUPRA
AssociationEURATOM-CEA
3rd GOTA-PPE meeting Julien WAGREZ 16 December 2010
5
EFDA Goal Oriented Training ProgramPort Plug Engineering
� The 2010 activities• Grant TBM task T19
Report sent to F4E and validated in July 2010
•Design (CATIA, SolidWorks)•Models integration
•Building & running simulations using virtual reality tool (MagritteWorks)
•Pipe Forest specifications
Pipe insulation dis/mounting simulation
TORE SUPRA
AssociationEURATOM-CEA
3rd GOTA-PPE meeting Julien WAGREZ 16 December 2010
6
EFDA Goal Oriented Training ProgramPort Plug Engineering
� The 2010 activities• TBM Pipe-Forest preliminary
handling study, in the frame of the 3-months period in the HAS-KFKI.
Report given to KFKIIntegration of a tuned TCS for the Pipe
Forest Handling
•Study of the space booking
•Specification of the Pipe Forest•Design (CATIA)
•Static analysis
•Integration of RH equipments•Maintenance strategy
TORE SUPRA
AssociationEURATOM-CEA
3rd GOTA-PPE meeting Julien WAGREZ 16 December 2010
7
EFDA Goal Oriented Training ProgramPort Plug Engineering
� The 2010 activities• TCS - Port tolerancing, this
study has been presented to the SOFT conference.
Poster presented to the SOFTThe Inverse Geometrical Model
• Inverse Geometrical Model building :> EXCEL
– Building of a method to drive the Port misalignments
– Computation of the results
> CATIA
– Validate the EXCEL model
– Allow to drive the TCS model
TORE SUPRA
AssociationEURATOM-CEA
3rd GOTA-PPE meeting Julien WAGREZ 16 December 2010
8
� The 2011 foreseen activities
• 2nd TCS study with Samtech• Design support
• Conceptual design proposal
• PP11, integration of the Port Plug 01• Design of tools• RH study
• Cycle, maintenance of the ICRH antenna• Design of tools
• RH study
EFDA Goal Oriented Training ProgramPort Plug Engineering
TORE SUPRA
AssociationEURATOM-CEA
3rd GOTA-PPE meeting Julien WAGREZ 16 December 2010
9
EFDA Goal Oriented Training ProgramPort Plug Engineering
Thank you for your attention.
?Question