ETIHAD ESCO - HVACREXPODUBAITargets 1.7 TWh of Electricity to be saved by 2030 5.6 Billion IG of...
Transcript of ETIHAD ESCO - HVACREXPODUBAITargets 1.7 TWh of Electricity to be saved by 2030 5.6 Billion IG of...
1
ETIHAD ESCO
ETIHAD ESCO
Mission
To make Dubai’s built
environment a leading
example of energy efficiency
for the region and the world
Vision
To make Dubai one of the most
sustainable cities in the world
Established in 2013
Etihad – Vision, Mission and Goals
Targets
1.7 TWhof Electricity to be saved by 2030
5.6 Billion IGof Water to be saved by 2030
1 Million Tonsof CO2 to be abated by 2030
30,000 BldgsPotential for energy reduction out of 120,000
Etihad ES is a key driver and Program Manager of Dubai
Demand Side Management Strategy
DSM goal
8 DSM
programs
8 DSM
implementation
mechanisms
Outdoor
lighting
Standards &
labels for
appliances
&
equipment
Power and
water tariff
rates
Water
reuse and
efficient
irrigation
Building
regulation
Institutional setting and capacity building
Policies and regulations
Information systems
Public awareness
Governing by example
Technologies and studies
Financing mechanisms
Building
retrofits
Shams
Dubai
Measurement and verification
2 8
Dubai to become a role model in energy efficiency by implementing cost-effective electricity
and water demand saving measures and developing a green service market
District
Cooling
3
Our Integrated Service Lines
ETIHAD ENERGY
SERVICES
RETROFIT SOLAR M&V TAQATI
DISTRICT COOLING
BUILDING LABELLING
Etihad Retrofit
Conservation Areas
Solar
Lighting Retrofits
Cooling Retrofits
Water Fixture Retrofits
Building Envelope and
Other Retrofits
20 – 70 %
Potential Savings
Etihad Solar
Etihad Solar Projects
1,000 kWp on the roof top of WTC 3,000 kWp on the roofs of 640 villas in Hatta
Etihad Solar Projects
2,000 kWp on the roof top of Mai Dubai
Factory (under construction)
16,000 kWp on the roofs of Ghaffat
Reservoirs (under construction)
Hatta Solar Roof Top Projects (Residential) – 3 MWp
Dubai World trade Center - 1 MWp
Wasl Properties Dubai – 5 MWp
Al Jalila Cultural Centre for Children – 480 kWp
Dubai Airports –5 MWp
DEWA Water Reservoirs – 20 MWp
Dubai Festival City – 2.5 MWp
Etihad Projects and Accomplishments
Description Completion Year Saving (%)Savings in
mAED
Number of
Facilities
DEWA Lighting P-1 2016 74 6.82 6 Power Stations
DEWA Lighting P-2 2017 68 3.65 6 Power Stations
DEWA Building 2018 30 2.23 7 Buildings
DIFC 2017 75.2 4.71 14 Buildings
JAFZA P1 & P2 2017 30 22.13 156 Buildings
MBRH 2017 80 0.57 1656 Villas
ENOC 2018 36 0.14 1 Fuel Station
Total 40.25 1845
Projects Implementation Completed
Projects Under Implementation
DescriptionExpected
CompletionSaving (%)
Savings in
GWh
Savings in
mAEDNumber of Facilities
WASL* 2018 27 33.3 15 243 Buildings
Dubai Airport - Phase 1 2019 23 65.5 29.9 4 Buildings
Dubai Golf * 2018 27 7.53 4.42 35 Buildings
Dubai Healthcare City 2018 60 1.03 0.46 3 Buildings
DEWA Lighting P-3 2019 71 22.74 10.12 8 Power stations
Dry Docks * 2019 25.2 1.48 1.15 23
Seven Tides * 2019 14.8 13.25 7.3 22
Dubai Airport Lighting 2020 52 49.88 22.2 4
IACAD Phase 1 * 2019 20.4 4.69 3.1 117
JAFZA Package 3 * 2019 26 10.63 4.9 26
DEWA Initiative Ph 2 * 2019 70 6.9 2.6 2,200 Villas
Total 217 101 2,685
Our Clients
Success Stories
Success Stories
DEWA - Buildings
Retrofit of 7 DEWA Buildings
Replacement of the Chiller Plant
Significant Retrofit of HVAC System
Improvement in the comfort level
Guaranteed Saving
Phase
5 GWh/year
0.4 MIG/year
30 %
~ 2 mil/year
savings
savingsAED
Success Stories
DEWA - BuildingsGuaranteed Saving
Phase
24%
• Replacing existing chiller with high efficiency VFD centrifugal chiller
46%
• Time control for chiller, pump, AHU’s & FAHU’s, Split Unit
6%• Retrofit chilled water pumps with VFD drive
23%• Other HVAC ECM
KEY HVAC ECM vs Saving
HVAC saving represents 99% of the total electrical saving
JAFZA – Labor Accommodations
Retrofit of 157 Labor Accommodations
Retrofit Scope ~ 11,000 DX Unit
Retrofit Scope ~ 81,000 Lighting Fixture
26.4 GWh/year
199.7 MIG/year
30 %
~ 22 mil/year
savings
savingsAED
Guaranteed Saving
Phase
JAFZA – Labor AccommodationsGuaranteed Saving
Phase
45%
• Replacement of window units with high efficiency Split AC units
16%
• Retrofit existing window units with energy saving device/ Aircosaver
KEY HVAC ECM vs Saving
HVAC saving represents 61% of the total electrical saving
Wasl Properties
Retrofit of 243 Wasl Building
Residential, Commercial & Offices
Significant HVAC Retrofit
5 MW of Solar Power Generation
33 GWh/year
26%
15 mil/year
savings
savingsAED
Project
Implementation
Wasl PropertiesProject
Implementation
9%
• Replacing existing chiller with high efficiency chiller
7%• Retrofit chilled water pumps with VFD drive
5%• Condenser Pre-Cooler
6%• Other HVAC ECM
KEY HVAC ECM vs Saving
HVAC saving represents 27% of the total electrical saving
Dubai Airports
Retrofit of 4 Facilities
Significant HVAC & Solar Retrofit
Terminal 1,2,3 and Concourse B
Project Status: Under Implementation
23 %
~ 29.9 mil/year
savings
savingsAED
65.5 GWh/year
21 MIG/year
Project
Implementation
Dubai AirportsProject
Implementation
34%• AHU optimization
23%• Chilled water consumption
13%
• Secondary Fresh Air Fans Supply and Exhaust Fans Optimization
15%• Other HVAC ECM
KEY HVAC ECM vs Saving
HVAC saving represents 85% of the total electrical saving
Dubai GolfProject
Implementation
Retrofit of 3 Facilities
HVAC, Lighting, Water retrofitting
Project Status: Under Implementation
20 %savings
8.5 GWh/year
11.7 MIG/year
Dubai GolfProject
Implementation
15%
• Replacement of Window Units with high efficiency inverter type split units
16%
• Replacement the existing reciprocating chillers with Inverter Driven Single Screw with variable speed & advanced “VVR” Technology Chillers
5%
• Optimization of the chillers energy performance by installation Chiller Management System
18%• Other HVAC ECM
KEY HVAC ECM vs Saving
HVAC saving represents 54% of the total electrical saving
Business Model
Audit & ConsultingTendering & Bid NegotiationProject ManagementM&V of Savings
Upgrade ControlRetrofit Existing EquipmentEquipment ReplacementSelf Power Generation
Financing
Retrofit WorkSavings Guarantee
FinancialInstitution
Repayments
Payments
Payments
SOLAR
INSTALLERSESCOs
Specialized
Technical
Contractors
Upgrade in ControlUpgrade in EquipmentIncrease in Comfort LevelGuaranteed Saving
CLIENT
THANK YOU