ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN ENERGY SECTOR – INVESTMENT OPPORTUNITIES UK-ETHIOPIA TRADE & INVESTMENT FORUM 2015 October 21st 2015 LONDON, UK Azeb Asnake, CEO, Ethiopian Electric Power

Transcript of ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN …...ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN ENERGY SECTOR...

Page 1: ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN …...ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN ENERGY SECTOR – INVESTMENT OPPORTUNITIES UK-ETHIOPIA TRADE & INVESTMENT FORUM 2015 October 21st

ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN ENERGY SECTOR – INVESTMENT OPPORTUNITIES

UK-ETHIOPIA TRADE & INVESTMENT FORUM 2015 October 21st 2015

LONDON, UK

Azeb Asnake, CEO, Ethiopian Electric Power

Page 2: ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN …...ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN ENERGY SECTOR – INVESTMENT OPPORTUNITIES UK-ETHIOPIA TRADE & INVESTMENT FORUM 2015 October 21st

1. INSTITUTIONAL & REGULATORY FRAMEWORK

Ministry of Water Irrigation & Energy (MoWIE) is the lead institution for the Energy Sector.

It supervises Three Institutions: • Ethiopian Electric Power (EEP): Generation &

Transmission Construction and Operation, Universal Electric Access Program, Power Export

• Ethiopian Electric Utility (EEU): Distribution, Sales

• Ethiopian Energy Authority: Regulatory body for electricity and energy efficiency

Its responsibilities fall into Three Broad Categories: • Resource assessment and development, • Policy and regulatory, and • R&D

Energy study and Dev. Follow-up

Alternative Energy Technology Promotion &

Dissemination

Bio-fuel Development

Ministry of Water, Irrigation & Energy

Ethiopian Electric Power (EEP)

Petroleum Downstream operation Regulator

Ethiopian Electric Utility (EEU)

Ethiopian Energy

Authority (EEA)

Hydropower and Dams Administration

Page 3: ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN …...ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN ENERGY SECTOR – INVESTMENT OPPORTUNITIES UK-ETHIOPIA TRADE & INVESTMENT FORUM 2015 October 21st

2. ENERGY SECTOR POLICY

The Energy policy envisages to meet the following broad objectives: Giving high priority to RE Development and follows climate resilient green

economy strategy Considers Hydropower as the backbone of the country’s energy generation

and maximize its utilization ; Promoting and enhance other renewable energy sources development such

as solar, wind, geothermal and bio-mass to increase RE mix there by Improving security and reliability of energy supply and be a regional hub for renewable energy.

Enhancing regional and global cooperation in the energy sector to ensure exchange of know-how, information and transfer of technologies

Strengthening cross boarder energy trade. Increasing access to affordable and adequate modern energy. Promoting efficient, clean, and appropriate energy technologies and

conservation measure. Improving the energy efficiency of systems and operations. Strengthening energy sector governance and build strong energy institution

(EEPCo’s Transformation) Ensuring environmental and social safety and sustainability of energy supply

and utilization, and gender mainstreaming. Ensuring Capacity building and technology transfer Strengthening Energy Sector Financing. Exploring for natural gas and other hydrocarbon fuels • Encourages Public-Private Partnership in energy generation

3

Page 4: ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN …...ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN ENERGY SECTOR – INVESTMENT OPPORTUNITIES UK-ETHIOPIA TRADE & INVESTMENT FORUM 2015 October 21st

3. PRIVATE SECTOR PARTICIPATION Based on the Energy policy, enabling environment is created for both Public and Private investors. In any RE generation projects, private sector

can participate either in partnership with Public or independently without any limitation of generation capacity.

The public sector plays significant role in power sector development.

On the basis of the enabling environment for investment, many private developers showed keen interest to participate as an IPP for generation from hydro, wind, solar, and Geothermal.

Accordingly, PPA is signed for the first Geothermal IPP for 1000 MW generation at Corbetti with Icelandic- Reykjavik Geothermal Company.

4

Powerhouse

Aluto Geothermal

Page 5: ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN …...ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN ENERGY SECTOR – INVESTMENT OPPORTUNITIES UK-ETHIOPIA TRADE & INVESTMENT FORUM 2015 October 21st

4. INDIGENOUS ENERGY RESOURCES

Resource Unit Exploitable Reserve Exploited

Percent

Hydropower MW 45,000 <5%

Solar/day kWh/m2 Avg. 5.5 <1%

Wind: Power

Speed

GW

m/s

1,350

> 6.5

<1%

Geothermal MW 7000 <1%

Wood Million tons 1120 50%

Agricultural waste Million tons 15-20 30%

Natural gas Billion m3 113 0%

Coal Million tons 300 0%

Oil shale Million tons 253 0%

Page 6: ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN …...ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN ENERGY SECTOR – INVESTMENT OPPORTUNITIES UK-ETHIOPIA TRADE & INVESTMENT FORUM 2015 October 21st

5. RENEWABLE ENERGY POTENTIALS AND THEIR GEOGRAPHICAL DISTRIBUTION

Hydro Ethiopia’s plentiful hydropower resources are distributed in nine major

river basins and their innumerable tributaries is estimated to generate an economically affordable energy of about 260 TWH.

However, less than 5 % of the potential has been exploited so far.

Wind Ethiopia has total wind energy resource reserve of 3,030 Giga Watt and

the potential exploitable quantity of is 1,350 Giga Watt.

For technical and economic reasons appropriate wind regions for grid-based electricity generation are those with wind density of 300W/m2 (wind speed 6.5 m/s) and above. Ayisha in the Eastern part of the country has good potential.

Solar According to the revised Master Plan, Ethiopia’s average solar energy potential is 5.5 KWh/m2/day and mainly centralized in the north part of the country in Tigray and Afar regions.

Geothermal The best perspective areas are distributed along the Ethiopian Rift

valley system which runs for more than 1000 km from the Afar depression, at Red Sea to the Turkana depression southwards (NE-SW to N-S direction).

A total of 16 geothermal resource areas have been identified by various studies. These resource zones are all located within the rift valley system. (Aluto Langano, Tullu Moye Tendaho, Danakil Depression….)

Page 7: ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN …...ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN ENERGY SECTOR – INVESTMENT OPPORTUNITIES UK-ETHIOPIA TRADE & INVESTMENT FORUM 2015 October 21st

6. DEVELOPED HYDRO RESOURCE

Ethiopia’s Hydro potential (45,000 MW) constitutes 20% of the total technically feasible potential in Africa.

With this potential Ethiopia is usually referred as the power house of Africa.

However Ethiopia has utilized less than 5% of its potential so far.

Currently, Access to electricity in Ethiopia is ~ 55%.

Potential

Demand

Supply

7

Page 8: ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN …...ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN ENERGY SECTOR – INVESTMENT OPPORTUNITIES UK-ETHIOPIA TRADE & INVESTMENT FORUM 2015 October 21st

7. CURRENT STATUS OF ENERGY DEVELOPMENT IN ETHIOPIA

10

/23

/201

5

8

Substations 145

Distribution

189,000 Km

Transmission

12,825Km

Generation 2,360

MW (9018 GWh)

Hydro Potential

45,000 MW Developed

2,360 MW (4228 MW)

Access to electricity 55%

Annual Demand

growth 25-30%

No. of Customers 2,450,000

8,000 – 10,000 MW GTP I Gibe III =1,870 MW GERD = 6,000 MW

GD3 = 254 MW

Hydro, Wind, Geothermal, Biomass

Page 9: ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN …...ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN ENERGY SECTOR – INVESTMENT OPPORTUNITIES UK-ETHIOPIA TRADE & INVESTMENT FORUM 2015 October 21st

8. GENERATION PROJECTS UNDER CONSTRUCTION

9

Grand Ethiopian Renaissance Dam Project: 6000 MW installed capacity 48% Completed Fully Public Financed Project RCC & Rock fill Saddle Dam

Page 10: ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN …...ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN ENERGY SECTOR – INVESTMENT OPPORTUNITIES UK-ETHIOPIA TRADE & INVESTMENT FORUM 2015 October 21st

8. GENERATION PROJECTS UNDER CONSTRUCTION (…continued)

10

Gibe III Hydropower Project 1900 MW Installed Capacity 93% Completed RCC Dam 246 m High

Dam & Reservoir: General View

Page 11: ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN …...ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN ENERGY SECTOR – INVESTMENT OPPORTUNITIES UK-ETHIOPIA TRADE & INVESTMENT FORUM 2015 October 21st

Gibe III: U/S & D/S Views

Page 12: ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN …...ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN ENERGY SECTOR – INVESTMENT OPPORTUNITIES UK-ETHIOPIA TRADE & INVESTMENT FORUM 2015 October 21st

8. GENERATION PROJECTS UNDER CONSTRUCTION (….continued)

12

Genale Dawa Hydropower Project 254 MW Installed Capacity 78% Completed

Rockfill Dam – Upstream Face

Spillway Concreting Works

Page 13: ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN …...ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN ENERGY SECTOR – INVESTMENT OPPORTUNITIES UK-ETHIOPIA TRADE & INVESTMENT FORUM 2015 October 21st

8. GENERATION PROJECTS UNDER CONSTRUCTION (….continued)

13

Adama II Wind Power Project: 153 MW Installed Capacity 96% Completed 1.5 MW Turbines

Page 14: ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN …...ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN ENERGY SECTOR – INVESTMENT OPPORTUNITIES UK-ETHIOPIA TRADE & INVESTMENT FORUM 2015 October 21st

Aluto Geothermal

Upgrading of the current Capacity to 70 MW

8. GENERATION PROJECTS UNDER CONSTRUCTION (….continued)

Page 15: ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN …...ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN ENERGY SECTOR – INVESTMENT OPPORTUNITIES UK-ETHIOPIA TRADE & INVESTMENT FORUM 2015 October 21st

8. GENERATION PROJECTS UNDER CONSTRUCTION (….continued)

15

Reppi Waste to Energy Project: 50 MW Installed Capacity Municipal Solid waste (Addis

Ababa) The first W to E Plant in Africa 68% completed

Tipping Hall, Waste Bunker Area and Boiler Hall Under Construction

Page 16: ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN …...ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN ENERGY SECTOR – INVESTMENT OPPORTUNITIES UK-ETHIOPIA TRADE & INVESTMENT FORUM 2015 October 21st

9. TRANSMISSION PROJECTS UNDER CONSTRUCTION (MAJOR)

Capacity (KV) Length (KM)

500 1,700

400 900

230 1,100

132 560

Total ~4,260 KM

Page 17: ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN …...ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN ENERGY SECTOR – INVESTMENT OPPORTUNITIES UK-ETHIOPIA TRADE & INVESTMENT FORUM 2015 October 21st

10. Power System Demand Forecast

Major Consumers include: 1. Transport Sector (Railway) 2. Agriculture Sector 3. Industrial Sector 4. Large-scale Housing

Programs 5. Universal Electricity Access

Program 6. Electricity Export Market

Dom.

39%

Com.

24%

Ind. 36%

2014 Internal Demand Composition

17

Dom. 18%

Serv. 14%

Ind. 46%

Agri. 14%

Trans 8%

2037 Internal Demand Composition

Page 18: ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN …...ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN ENERGY SECTOR – INVESTMENT OPPORTUNITIES UK-ETHIOPIA TRADE & INVESTMENT FORUM 2015 October 21st

-1000

4000

9000

2015 2020 2025 2030 2035 2037

513 1711

2976 4739

7354 8427

Transport Sector

Gen. (GWh)

Peak (MW) 0

10000

20000

2015 2020 2025 2030 2035 2037

623 3438

7178 10913

14580 15996

Agricultral Sector

Gen. (GWh)

Peak (MW)

0

5000

10000

15000

20000

2013 2015 2020 2025 2030 2037

1758 2209 3403 5568

8784

15392

Service Sector

Gen. (GWh)

Peak (MW)0

20000

40000

60000

2013 2015 2020 2025 2030 2037

3244 7326 20761

29169 36431

51155

447 1007 2845 3994 4986 7002

Industrial sector

Gen. (GWh)

Peak (MW)

0

10000

20000

30000

3122 3966 5593 8241 12842

18302 20271

Large scale dwelling houses and UEAP

Gen. (GWh)

Peak (MW)

0

20000

40000

60000

2015 2020 2025 2030 2035 2037

2759 12075

30585 38469 41754 41754

Power Export Forecast

Energy GWh

Capacity MW

Page 19: ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN …...ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN ENERGY SECTOR – INVESTMENT OPPORTUNITIES UK-ETHIOPIA TRADE & INVESTMENT FORUM 2015 October 21st

19

Ethiopia is already connected to

Sudan, Djibouti and the Border towns of Kenya.

Ethiopia – Kenya 500 KV D.C. line under construction (up to 2000 MW) ;

Exports to Egypt 2000 MW and additional 1200 MW to Sudan are planned for implementation soon.

MoUs signed to Exports to Tanzania, Rwanda, Burundi, South Sudan and Yemen

Cairo

Aswan

Merowe

Khartoum

Roseries

Gedaref

Asmara

Djibouti

Berbera

Hargessa

Nairobi

Addis Ababa

M.Wakena

GD-06

GD-08

KokaD.Dawa

Mekele

Shire

Hum

era

BelesB.Dar

GonderShehedi

GG-III

GG-II

GG-I

Finchaa

Mandaya

Bord

er K.Dobi

HVDC Link

500 kV

400 kV

230 kV Sub-marine Cable

220 kV

230 kVSubstation at 230 kV and above

Substation with Generation Facility

(Switchyard at 230 kV and above)

Town

AC/DC Station

(Converter/Inverter)

Possible Interconnection Lines

with Neighboring Countries

SUD

AN

KENYA

SOMALIA

SOMALILAND

YEMENERITREA

EGYPT

DJIBOUTITekeze

Mogadishu

Kisimayou

80 km 370 km

465

km

590

km

100

km

225 km500 km

201

km82

km

120

km

80 k

m

157 km

37 km

26 km

Mega

Pawie

LEGEND

LEGEND

GD-03

185 km

90 km 170 km

ELDORET

MALAKAL

JUBA

11. Over View of Existing and Planned Interconnection

Page 20: ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN …...ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN ENERGY SECTOR – INVESTMENT OPPORTUNITIES UK-ETHIOPIA TRADE & INVESTMENT FORUM 2015 October 21st

Sept 29, 2015

JUBA

11. Over View of Existing and Planned Interconnection

Page 21: ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN …...ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN ENERGY SECTOR – INVESTMENT OPPORTUNITIES UK-ETHIOPIA TRADE & INVESTMENT FORUM 2015 October 21st

12.GTPII : UPCOMING PROJECTS (2016-2020)

Planned Generation Projects

Hydro = 11,015 MW

Wind = 1,520 MW

Geothermal = 1,270 MW

Solar = 300 MW

Biomass= 420 MW

Total = 14,615 MW

Planned Transmission Projects

500 KV = 1,229 km

400 kv = 2,137 km

230 kv = 3,343 km

132kv = 3,041 km

< 132 kv = 250 km

Total = 10,000 km

Planned Substation Construction

115 New

63 Rehabilitation/Upgrading

Total = 178

No. RE Source Project Installed Capacity (MW) Energy (GWh) Indicative Cost (MUSD) Planned Year of Completion

1

HYDRO

Geba I & II 372 1709 572 2020 2 Genale Dawa VI 256 1532 588 2020 3 Werabesa + Halele 422 1973 886 2020 4 Yeda 1 + Yeda 2 280 1089 540 2020 5 Gibe IV 2000 6200 2000 2020 6 Tams 1700 5760 4214 2020 7 Upper Dabus 326 1460 628 2020 8 Wabi Shebele 88 691 1100 2020 9 Karadobi 1600 7857 2576 2021

10 Beko Abo 935 6632 1260 2022 11 Upper Mendaya 1700 8582 2436 2023 12 Birbir River 467 2724 1231 2023 13 Baro 1 + Baro 2 + Genji 859 3524 1794 2024 14 Genale V 100 575 298 2025

Total 11,105 50,308 20,123 1

Wind

Iteya I 200 613 380 2016 2 Iteya II 200 312 420 2016 3 Dila 100 306 210 2018 4 Iteya II 200 613 380 2017 5 Assela 100 307 190 2018 6 Debire Birihan 100 613 380 2017 7 Ayisha I & II 420 1577 760 2017 8 Sululta 100 306 210 2019 9 Mega Maji 100 306 210 2019 Total 1520 4955 3140 1

Solar Different Sites

100 175 180 2016 2 100 175 180 2016 3 100 175 180 2016

Total 300 525 540 1

Geothermal

Corbetti 1000 7096 4000 2017 - 2022 2 Aluto Langano II 70 552 280 2018 3 Aluto Langano III 100 788 364 2017 4 Tendaho 100 788 364 2016

Total 1270 9224 5008

1 Biomass Any Resourceful site 420 2940 525 2009

Grand Total 14,615 67,427 23,624

Inline with the 25 Years Power

Sector Master Plan , the following projects are planned for implementation

in the GTP II:

Page 22: ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN …...ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN ENERGY SECTOR – INVESTMENT OPPORTUNITIES UK-ETHIOPIA TRADE & INVESTMENT FORUM 2015 October 21st

13. Profile of GTP II Generation Projects Intended for IPP/PPP Modality

1.UPPER MENDAYA and BEKO ABO Hydropower Project

Installed Capacity: 2635 MW Reconnaissance Study Indicative Cost Estimate: USD 3.3 Billion Located Third Cascade of Abay/Nile River, Western Ethiopia

2. TAMS Hydropower Project

Installed Capacity: 1700 MW

Prefeasibility Study Completed

Indicative Cost Estimate: USD 3.2 Billion

Located on Baro River, Western Ethiopia

3. KARADOBI Hydropower Project

Installed Capacity: 1600 MW

Prefeasibility Study Completed

Indicative Cost Estimate: USD 3.5 Billion

First Cascade of Abay/Nile River

4.Baro I & II and Genji Hydropower Project

Installed Capacity: 859 MW

Prefeasibility Study

Indicative Cost Estimate: USD 1.8 Billion

Located Baro River, Western Ethiopia

22

Page 23: ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN …...ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN ENERGY SECTOR – INVESTMENT OPPORTUNITIES UK-ETHIOPIA TRADE & INVESTMENT FORUM 2015 October 21st

13. Profile of GTP II Generation Projects Intended for IPP/PPP Modality (… Continued)

4.Birbir Hydropower Project Installed Capacity: 467 MW

Reconnaissance Study

Indicative Cost Estimate: USD 1.6 Billion

Located on Birbir River South-West Ethiopia

5.HALELE WERABESSA Hydropower Project Installed Capacity: 436 MW Feasibility Study Completed Indicative Cost Estimate: USD 1.1 Billion

6. UPPER DABUS Hydropower Project Installed Capacity: 326 MW Prefeasibility Study Completed Indicative Cost Estimate: USD 848 Million Located in Dabus River, Western Ethiopia

7. CHEMOGA YEDA Hydropower Project Installed Capacity: 280 MW Prefeasibility Study Completed Indicative Cost Estimate: USD 729 Million

8. GENALE DAWA VI Hydropower Project Installed Capacity: 256 MW Prefeasibility Study Completed Indicative Cost Estimate: USD 794 Million Located in the Genale Dawa River Basin, Southern Ethiopia

23