Ethanol Infrastructure and Market
Development: A South Dakota Perspective
Presented by:
Hunter RobertsEnergy Policy Director
March 13, 2013
Presentation Outline
• Intro• SD Program• Do’s• Do not’s
South Dakota Program
Provide cash grants for the installation of ethanol blender pumps at retail locations
$25,000 for the first pump
$10,000 for each additional
Current program has $3.5 million over 5 years to encourage additional ethanol use.
South Dakota Ethanol Blender Pump Program Results
2010 Stimulus Program Results: 61 blender pumps installed at 29 stations with $610,000 in grants awarded
2012 South Dakota Ethanol Infrastructure Incentive Program: 26 blender pumps installed at 15 stations with $370,000 in grants paid. Department received 33 station applications requesting $1,155,000 in grants with $940,000 in available funding.
2013 South Dakota Ethanol Infrastructure Incentive Program: 6 blender pumps installed at 4 stations with $120,000 awarded thus far. Department has received 13 station applications requesting $480,000 in grants with $960,000 in available funding.
Do’s of a state blender pump program
• Do include the ethanol industry, petroleum marketers, equipment vendors and installers, and other interested parties
• Do keep it simple
• Do require UL 87A pumps, compatible infrastructure, and best practices hose configurations.
Do not's of a state blender pump program
• Do not assume people know about ethanol blender pumps and mid-level ethanol blends
• Do not presume equipment vendors to know the rules
• Do not expect installations to happen overnight
• Do not overpromise and under-deliver
Conclusion
Thank you.
Hunter RobertsEnergy Policy DirectorPhone: 605.773.3301