ETAEnvironmental Health and Safety Monthly Metrics
August, 2015
ETA Accidents- 8/15
Type Date Div Description Severity Status
No ETA accidents reported in August
ETA Accidents- By Type
Aug '14 Sep '14 Oct '14 Nov '14 Dec '14 Jan '15 Feb '15 Mar '15 Apr '15 May '15 Jun '15 Jul '15 Aug '15
Strain-Arm/Hand NaN NaN NaN NaN NaN NaN NaN 1 NaN NaN NaN NaN NaN
Strain-Back/Leg 1 NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
Repetitive NaN NaN 1 NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
Fracture/Break NaN NaN NaN NaN NaN NaN NaN 1 NaN NaN NaN NaN NaN
Chem Contact NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN 1 NaN
Burn NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
Contusion NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
Cut/Abrasion NaN NaN 1 NaN NaN NaN 1 NaN NaN NaN NaN NaN NaN
Eye NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
Respiratory NaN 1 NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
Other NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
0.5
1.5
2.5
Strain-Back/LegRespiratory Repetitive
Cut/Abrasion
Cut/AbrasionStrain-Arm/Hand; 1
Fracture/Break
Chem Contact
ETA Accidents- Severity
Aug
'14
Sep
'14
Oct
'14
Nov
'14
Dec
'14
Jan
'15
Feb
'15
Mar
'15
Apr
'15
May
'15
Jun
'15
July
'15
Aug
'150
1
2
3
First Aid Recordable Lost Work
ETA Emergency Incidents- 8/15
Date Incident Area Status
8/17/15 Earthquake All Bldgs.
Early morning 4.0 earthquake. All lab areas checked and no damage/spills reported.
8/24/15 Power outage B62 Power outage originally planned. Issues with transformer identified. Power outage prolonged until 8/27/15. B62 currently connected temporarily to B67 power system until transformer is replaced.
ETA Ergonomic Assessments- By Month
Jul '14 Aug '14 Sep '14 Oct '14 Nov '14 Dec '14 Jan '15 Feb '15 Mar '15 Apr '15 May '15 Jun '15 Jul '15 Aug '15
Completed 6 6 3 4 6 3 3 4 2 2 2 0 3 0
Open 0 0 0 0 0 0 0 0 0 0 0 0 1 4
0.5
1.5
2.5
3.5
4.5
5.5
6.5
7.5
8.5
9.5
Ass
essm
ents
Open ETA Ergonomic Assessments
Date Requested
Dept. Type Status
8/27/15 ESDR Discomfort Actions Pending
8/17/15 EAEI Discomfort Actions Pending
8/17/15 BTUS Discomfort Actions Pending
8/6/15 EAEI Discomfort Actions Pending
7/27/15 EAEI Discomfort Actions Pending
31
1
Open Assessments by Div.
EAEIBTUSESDRETA
ETA Incomplete Training Assignments
Aug '13
Sep '13
Oct '13
Nov '13
Dec '13
Jan '14
Feb '14
Mar '14
Apr '14
May '14
Jun '14 Jul
'14Aug
'14Sep
'14Oct '1
4Nov
'14Dec '
14Jan
'15Feb
'15Mar '
15Apr '
15
May '15
Jun '15 Jul
'15Aug
'150
50
100
150
66 64
92
73
48
89 88
78
52
93
81
65
9297
69
84
75
91
73
4236
79
66
89
105
Incomplete Assignments
Training % Completion Status
Aug '14 Sep '14 Oct '14 Nov '14 Dec '14 Jan '15 Feb '15 Mar '15 Apr '15 May '15 Jun '15 Jul '15 Aug '1580
82
84
86
88
90
92
94
96
98
10098.5 98.5
9998.5
9998.5
9999.5 99.5
99 9998.5
98
95 9594
93 93 9394 94 94 94
93 93 93
ETA % LBNL %
%
Incomplete Training by Course Type(Total Incomplete Assignments = 105 )
Cyber Security; 17
Ergonomics; 15
UC C of I; 14
Electrical/LOTO; 13
Supervisor; 12
Fire Extinguisher; 7
GERT; 7
First Aid/CPR; 6
Ladder/Lift; 6
Hosting Foreign; 2ISM Principles; 2 Other; 2 Chemical; 1
Pressure; 1
Training Assignments Due (Total = 105)
Open Assignments by Division Open Assignments by Hire Date
< 1 Month 2 to 6 Months > 6 Month0
10
20
30
40
50
60
70
80
90
12 11
82
Assignments
BTUS; 42
EAEI; 34
ESDR; 16
ETA; 13
ETA Training Assignments Due
Career
Term Appt.
Affiliate
GSRA
Limite
d
Student A
sst.
Reh Retire
Post Doc.
Facu
lty
Visit R
esearch
Contracto
r0
10
20
30
40
50
60
49
20
117 5 4 4 3 2 0 0
Assignments due by Job Type
<1 Month
1-2 Months
>2 Months
0 5 10 15 20 25 30
26
11
2
Renewal Training Assignments- 39 Total
ETA “Activity Manager” Set-up Status(103 Total Work Activities)
Developing EHS Collaboration Approvals Active0
10
20
30
40
50
60
70
80
90
100
7
41
1
21
33
Risk 3Risk 2Risk 1
ETA “Activity Manager” AssignmentsETA Total Personnel- 674
Assigned Not Accepted101%
Opt Out11417%
Assigned Accepted55082%
Electrical Equipment Inspection Failure Status (Red Dot)
Nov '14 Dec '14 Jan '15 Feb '15 Mar '15 Apr '15 May '15 Jun '15 July '15 Aug '150
2
4
6
8
10
12
14
16
18
16 17 1715 15 16 16
1311 11
# Failed Items
# Failed Items
Equipment listed in the EEIP database as “failed” and requires repair prior to use.
ETA Failed Electrical Equipment Status (8/31/15)
Barcode Building Room Equipment Name Responsible Person DIV
41961 70 289 Pump Destaillats, Hugo EAEI
48472 51F 101 MFC Pump Hotchi, Toshifumi EAEI
45082 71 210 Emitters Iain Walker BTUS
39288 70 278 Power Source Maddalena, Randy EAEI
39289 70 278 AC Line Conditioner Maddalena, Randy EAEI
39304 70 278 Transistorized Power Supply Maddalena, Randy EAEI
28735 70 278 AC Power Source 400-5D Maddalena, Randy EAEI
38777 70 289 Blower Maddalena, Randy EAEI
2444 51F 101 Aethalometer Singer, Brett EAEI
38881 70 173 Turbine Meter Readout Therkelsen, Peter BTUS
2892 70 173 Power Supply Therkelsen, Peter BTUS
Corrective Action Reports (CATS)- 8/15
CAT # Date Description Lead Status
9819 4/17/15 Transfer of ownership for existing radiation authorization when PI retires
M. Foure/R. Scholtz
Determining if HR exit checkout sheet can be modified to account for change in ownership.
3862 7/31/15 Waste acid container not properly labeled or capped. SAA inspection item.
G. Liu Bottle properly labeled, capped, and placed into SAA. Nitric treatment.
3863 7/31/15 Bag of contaminated wipes/gloves not properly identified as hazardous waste.
E. Cairns Safety Alert issued regarding proper identification of wastes.
9881 8/31/15 Ensure all glove boxes are NRTL approved or EEIP inspected.
R. Scholtz Self-assessment action item
9882 8/31/15 Ensure all glove boxes have hazard and e-power information affixed.
R. Scholtz Self-assessment action item
Audits and Inspection Status- 8/15
Type Date Lead Status
Quarterly SAA Inspections
TBD R. Scholtz Will be scheduled for the end of October 2015.
Lab Area Chemical Spill Self-Assessment
9/3/15 R. Scholtz Check sheet developed. Worker survey implemented.
Fire Marshal Inspection- Building 51F
TBD- End of Sept.
S. Synarski Inspection being scheduled. Reviewing report from last inspection.
Significant Safety Achievements- 8/15• Activity Manager system implementation is complete.
– A total of 103 work activities have been generated for ETA.– 7 work activities remain in EHS collaboration. All relate to ETA lab work that is not yet being
performed.
• The old chemical clean-out in 70-264 has been completed.– Several pieces of equipment were decontaminated prior to salvage.– Remaining chemicals were relocated to other areas.– The CMS inventory has been updated as needed.
• The Glove Box Self Assessment project has been completed and the final report is out for signatures prior to submittal. Two CATS requests were issued to address findings.
• Provided assistance during the B62 power outage. Ensured that equipment was maintained in a safe condition. Coordinated issues identified with EHS.
• A survey was sent out to determine which self assessment projects will be performed in 2016.
• The Chemical Spill Preparedness Self Assessment project has started. A survey has been sent to all lab area workers. A walkthrough is scheduled for 9/3/15.
Short Term Safety Outlook 9/15
• Complete the final 7 Work Activities pending in EHS collaboration. These are for B33 JCESR and 70-291.
• Complete the Lab Area Chemical Spill Preparedness Self-Assessment project. Prepare the final report for submittal.
• Continue to address ETA equipment on the electrical equipment “fail” list
• Complete the set-up for new lab areas B33 JCESR, and B60 air conditioning test chambers.
• Complete and submit the ETA Self Assessment Plan for FY2016.• Complete CATS items identified from glove box self-assessment
project.