Estimationof 1242sft

15
Total Area: 1242 sft Item Quantity Unit Bazri 27.324 CUM Binding Wire 24.84 Kg Bitumen 42.228 Kg Brick Blast 11.178 CUM Brick Tiles 4968 NOS Bricks 24094.8 NOS Cement 433.576 Bags Cement for Base Coarse 21.114 Bags Cement Paint 186.3 SqM CI Pipe 18.63 Meter Coarse Sand 14.904 CUM Commercial Hardwood 558.9 RFT Earth 11.178 CUM Fine Sand 17.388 CUM Glaze Tile 183.816 SqM Hard Wood Shutter 18.63 NOS Hardwood and Commercial Plyboard 4.968 NOS Hardwood Window Shutter 37.26 NOS Iron Grills 310.5 Kg Labour for Brick Sup. Str Labour for Brick Tiles Labour for Brick Work Foundation Labour for Ceiling Plaster Labour for Cement Concrete Labour for Ceramic Glaze Tile Labour for DPC A more accurate estimate can be prepared after reviewing the structural and elevation draw various cost involved in a construction project. Bill of Quantity (This is Get prices from multiple vendors and put in this sheet. Compare the cost of your project. No

description

house construction of 1242 sft

Transcript of Estimationof 1242sft

Page 1: Estimationof 1242sft

Total Area: 1242 sft

Item Quantity Unit

Bazri 27.324 CUM

Binding Wire 24.84 Kg

Bitumen 42.228 Kg

Brick Blast 11.178 CUM

Brick Tiles 4968 NOS

Bricks 24094.8 NOS

Cement 433.576 Bags

Cement for Base Coarse 21.114 Bags

Cement Paint 186.3 SqM

CI Pipe 18.63 Meter

Coarse Sand 14.904 CUM

Commercial Hardwood 558.9 RFT

Earth 11.178 CUM

Fine Sand 17.388 CUM

Glaze Tile 183.816 SqM

Hard Wood Shutter 18.63 NOS

Hardwood and Commercial Plyboard 4.968 NOS

Hardwood Window Shutter 37.26 NOS

Iron Grills 310.5 Kg

Labour for Brick Sup. Str

Labour for Brick Tiles

Labour for Brick Work Foundation

Labour for Ceiling Plaster

Labour for Cement Concrete

Labour for Ceramic Glaze Tile

Labour for DPC

A more accurate estimate can be prepared after reviewing the structural and elevation drawings of the building and by using the exact dimensions of each wall. This high level estimate is based on the square feet of constructed area and would help you in understanding breakup of

various cost involved in a construction project.

Bill of Quantity (This is an Estimate only. Exaxt quantity can be arrived after reviewing the plans. Write to [email protected])

Get prices from multiple vendors and put in this sheet. Compare the cost of your project. Note that actual quantity may vary depending upon the design.

Page 2: Estimationof 1242sft

Labour for Earth Excavation & Earth Filling

Labour for pipe including cost of Joints

Labour for Pointing

Labour for RCC

Labour for Steel RCC

Labour for Wall Plaster

MS Steel 2484 Kg

Oil Bound Distemper with Labour 521.64 SqM

Paint Work with Labour 248.4 SqM

Sand 38.502 CUM

Shuttering 1863 SFT

Stone Blast 24.84 CUM

White Cement 1.242 Bags

Item Quantity Unit

Cement 58.374 Bags

Stone Blast 24.84 CUM

Sand 12.42 CUM

Labour for Cement Concrete

Total for Cement Concrete 1:6:12

Labour for Brick Work Foundation

Sand 3.726 CUM

Cement 17.388 Bags

Bricks 6210 NOS

Total for Brick Work in Foundation with Cement Mortar 1:6

Labour for DPC

Bitumen 21.114 Kg

Cement 3.105 Bags

Coarse Sand 2.484 CUM

Bazri 4.968 CUM

Total for Horizontal DPC with Cement Concrete 1:2:4( 40MM)

Labour for Earth Excavation & Earth Filling

Brick Work in Foundation with Cement Mortar 1:6

Horizontal DPC with Cement Concrete 1:2:4( 40MM)

Earth Work in Excavation in Foundation and Filling under Floors

Foundation

Cement Concrete 1:6:12

Page 3: Estimationof 1242sft

Total for Earth Work in Excavation in Foundation and Filling

under Floors

Labour for RCC

Shuttering 1863 SFT

Bazri 22.356 CUM

Coarse Sand 11.178 CUM

Cement 199.962 Bags

Total for RCC without Steel Cement Concrete 1:1.5:3

Labour for Steel RCC

MS Steel 2484 Kg

Binding Wire 24.84 Kg

Total for MS Steel For RCC

Labour for Brick Sup. Str

Cement 44.712 Bags

Sand 9.936 CUM

Bricks 17884.8 NOS

Total for Brick Work in Super Structure Cement Mortar 1:6

Earth 11.178 CUM

Sand 1.242 CUM

Cement 11.178 Bags

Labour for Brick Tiles

Brick Tiles 4968 NOS

Bitumen 21.114 Kg

Total for Brick Tile Tracing on Roof

CI Pipe 18.63 Meter

Labour for pipe including cost of Joints

Total for Rain Water Pipe

Glaze Tile 121.716 SqM

Cement 23.095 Bags

White Cement 1.242 Bags

Cement for Base Coarse 21.114 Bags

Brick Work in Super Structure Cement Mortar 1:6

Brick Tile Tracing on Roof

Rain Water Pipe

Flooring

Ceramic Glaze Tiles Flooring 300X300 MM First Quality with course

Super Structure

RCC without Steel Cement Concrete 1:1.5:3

MS Steel For RCC

Page 4: Estimationof 1242sft

Fine Sand 17.388 CUM

Brick Blast 11.178 CUM

Coarse Sand 1.242 CUM

Labour for Ceramic Glaze Tile

Total for Ceramic Glaze Tiles Flooring 300X300 MM First Quality

with course

Sand 2.484 CUM

Cement 13.662 Bags

Labour for Ceiling Plaster

Total for Plaster on Ceiling (Roof) Cement Mortar 1:4

Labour for Wall Plaster

Cement 49.68 Bags

Sand 7.452 CUM

Total for Plaster on Walls Cement Mortar 1:4

Sand 1.242 CUM

Labour for Pointing

Cement 12.42 Bags

Total for Cement Pointing Cement Mortar 1:2

Glaze Tile 62.1 SqM

Total for Glazed Tiles in Dado or Skirting in Bathroom snd

Kitchen Walls

Hard Wood Shutter 18.63 NOS

Total for Hardwood Door

Commercial Hardwood 558.9 RFT

Total for Hardwood Frame Including Labour

Hardwood Window Shutter 37.26 NOS

Total for Hardwood Window

Hardwood Frame Including Labour

Hardwood Window

Hard Wood Frame and Commercial Plyboard Shutter

Plaster on Ceiling (Roof) Cement Mortar 1:4

Plaster on Walls Cement Mortar 1:4

Cement Pointing Cement Mortar 1:2

Glazed Tiles in Dado or Skirting in Bathroom snd Kitchen Walls

Door,Window,Cupboard shutter,Iron Grills

Hardwood Door

Plastering/Wall tiles

Page 5: Estimationof 1242sft

Hardwood and Commercial Plyboard 4.968 NOS

Total for Hard Wood Frame and Commercial Plyboard Shutter

Iron Grills 310.5 Kg

Total for Iron Grilling with Labour

Paint Work with Labour 248.4 SqM

Total for Paint on Wooden Doors and Windows

Oil Bound Distemper with Labour 521.64 SqM

Total for Oil Bound Distemper with Filling on Walls

Cement Paint 186.3 SqM

Total for Exterior Finish Cement Paint Snowcem

Oil Bound Distemper with Filling on Walls

Exterior Finish Cement Paint Snowcem

Add 10% for Electric fitting wiring & Labor:

Add 10% for Water Supply fitting & Sanitary:

Add 5% for Sewerage:

Grand Total:

Iron Grilling with Labour

Paint

Paint on Wooden Doors and Windows

Page 6: Estimationof 1242sft

Ask question from Experts See Elevation/Interior Designs

Project Cost in Rs.: 1598446.238 Project Labor Cost in Rs.: 190957.5

Project Cost Rs. Per SFT: 1287 Project Labor Rs. Cost Per SFT: 154

Rate Total Amount Knowledgebase Links Vendor 1

1400 38253.6 Guidelines for Bazri

70 1738.8 Guidelines for Binding Wire

60 2533.68 Guidelines for Bitumen

600 6706.8 Guidelines for Brick Blast

7 34776 Guidelines for Brick Tiles

6 144568.8 Guidelines for Bricks

320 138743.82 Guidelines for Cement

320 6756.48 Guidelines for Cement for Base Coarse

35 6520.5 Guidelines for Cement Paint

500 9315 Guidelines for CI Pipe

1300 19375.2 Guidelines for Coarse Sand

201 112338.9 Guidelines for Commercial Hardwood

220 2459.16 Guidelines for Earth

975 16953.3 Guidelines for Fine Sand

800 147052.8 Guidelines for Glaze Tile

4380 81599.4 Guidelines for Hard Wood Shutter

4590 22803.12

Guidelines for Hardwood and Commercial

Plyboard

1030 38377.8 Guidelines for Hardwood Window Shutter

70 21735 Guidelines for Iron Grills

18630 Guidelines for Labour for Brick Sup. Str

13662 Guidelines for Labour for Brick Tiles

6210

Guidelines for Labour for Brick Work

Foundation

4968 Guidelines for Labour for Ceiling Plaster

8694 Guidelines for Labour for Cement Concrete

16146 Guidelines for Labour for Ceramic Glaze Tile

621 Guidelines for Labour for DPC

Construction Cost Estimate. A high level rough estimate.

A more accurate estimate can be prepared after reviewing the structural and elevation drawings of the building and by using the exact dimensions of each wall. This high level estimate is based on the square feet of constructed area and would help you in understanding breakup of

Bill of Quantity (This is an Estimate only. Exaxt quantity can be arrived after reviewing the plans. Write to [email protected])

Get prices from multiple vendors and put in this sheet. Compare the cost of your project. Note that actual quantity may vary depending upon the design.

Page 7: Estimationof 1242sft

24840

Guidelines for Labour for Earth Excavation &

Earth Filling

3105

Guidelines for Labour for pipe including cost

of Joints

14904 Guidelines for Labour for Pointing

13662 Guidelines for Labour for RCC

7452 Guidelines for Labour for Steel RCC

19872 Guidelines for Labour for Wall Plaster

50 124200 Guidelines for MS Steel

62 32341.68

Guidelines for Oil Bound Distemper with

Labour

60 14904 Guidelines for Paint Work with Labour

975 37539.45 Guidelines for Sand

20 37260 Guidelines for Shuttering

1050 26082 Guidelines for Stone Blast

850 1055.7 Guidelines for White Cement

Sub Total: 1278756.99

Rate Total Amount

Guidelines for Foundation

Guidelines for Cement Concrete 1:6:12

320 18679.68

1050 26082

975 12109.5

8694

65565.18

Guidelines for Brick Work in Foundation with

Cement Mortar 1:6

6210

975 3632.85

320 5564.16

6 37260

52667.01

Guidelines for Horizontal DPC with Cement

Concrete 1:2:4( 40MM)

621

60 1266.84

320 993.6

1300 3229.2

1400 6955.2

13065.84

Guidelines for Earth Work in Excavation in

Foundation and Filling under Floors

24840

Page 8: Estimationof 1242sft

24840

Guidelines for Super Structure

Guidelines for RCC without Steel Cement

Concrete 1:1.5:3

13662

20 37260

1400 31298.4

1300 14531.4

320 63987.84

160739.64

Guidelines for MS Steel For RCC

7452

50 124200

70 1738.8

133390.8

Guidelines for Brick Work in Super Structure

Cement Mortar 1:6

18630

320 14307.84

975 9687.6

6 107308.8

149934.24

Guidelines for Brick Tile Tracing on Roof

220 2459.16

975 1210.95

320 3576.96

13662

7 34776

60 1266.84

56951.91

Guidelines for Rain Water Pipe

500 9315

3105

12420

Guidelines for Flooring

Guidelines for Ceramic Glaze Tiles Flooring

300X300 MM First Quality with course

800 97372.8

320 7389.9

850 1055.7

320 6756.48

Page 9: Estimationof 1242sft

975 16953.3

600 6706.8

1300 1614.6

16146

153995.58

Guidelines for Plastering/Wall tiles

Guidelines for Plaster on Ceiling (Roof)

Cement Mortar 1:4

975 2421.9

320 4371.84

4968

11761.74

Guidelines for Plaster on Walls Cement

Mortar 1:4

19872

320 15897.6

975 7265.7

43035.3

Guidelines for Cement Pointing Cement

Mortar 1:2

975 1210.95

14904

320 3974.4

20089.35

Guidelines for Glazed Tiles in Dado or

Skirting in Bathroom snd Kitchen Walls

800 49680

49680

Guidelines for Door,Window,Cupboard

shutter,Iron Grills

Guidelines for Hardwood Door

4380 81599.4

81599.4

Guidelines for Hardwood Frame Including

Labour

201 112338.9

112338.9

Guidelines for Hardwood Window

1030 38377.8

38377.8

Guidelines for Hard Wood Frame and

Commercial Plyboard Shutter

Door,Window,Cupboard shutter,Iron Grills

Page 10: Estimationof 1242sft

4590 22803.12

22803.12

Guidelines for Iron Grilling with Labour

70 21735

21735

Guidelines for Paint

Guidelines for Paint on Wooden Doors and

Windows

60 14904

14904

Guidelines for Oil Bound Distemper with

Filling on Walls

62 32341.68

32341.68

Guidelines for Exterior Finish Cement Paint

Snowcem

35 6520.5

6520.5

Sub Total: 1278756.99

127875.699

127875.699

63937.8495

1598446.238

Page 11: Estimationof 1242sft

Price Quoted by Vendor 1 Vendor 2 Price Quoted by Vendor 2

A more accurate estimate can be prepared after reviewing the structural and elevation drawings of the building and by using the exact dimensions of each wall. This high level estimate is based on the square feet of constructed area and would help you in understanding breakup of

Bill of Quantity (This is an Estimate only. Exaxt quantity can be arrived after reviewing the plans. Write to [email protected])

Page 12: Estimationof 1242sft
Page 13: Estimationof 1242sft
Page 14: Estimationof 1242sft
Page 15: Estimationof 1242sft