ESSENCE-POWERED SCRUM - A GENERIC APPROACH TO DESCRIBING PRACTICES USING ESSENCE KERNEL AND LANGUAGE PROFESSOR JUNE SUNG PARK, KAIST / SEMAT

Transcript of ESSENCE-POWERED SCRUM - omg.org · Scrum Event Composite Activity Scrum Master Role Sprint...

ESSENCE-POWERED SCRUM - A GENERIC APPROACH TO DESCRIBING PRACTICES USING ESSENCE KERNEL AND LANGUAGE

PROFESSOR JUNE SUNG PARK, KAIST / SEMAT

ESSENCE KERNEL

Alpha

Activity Space

Competency

2

ALPHA

Alpha represents things to

deal with in any software

engineering project.

3

Cu

sto

me

r So

luti

on

En

de

avo

r

Opportunity Stakeholders

Requirements Software System

Work Team

Way of Working

<provide

use an

d

con

sum

e> <p

rod

uces

scop

es and

co

nstrain

ts>

focu

ses>

<fulfills

<performs and plans

<set up

to ad

dress

Sup

po

rt>

* Alpha means “Abstract-Level

Progress Health Attribute.”

ALPHA STATE AND CHECKLIST 4

STATE OF SOFTWARE ENGINEERING PROJECT 5

How is the

project

going?

Oh, I guess

it’s going

OK?

STATE OF SOFTWARE ENGINEERING PROJECT 6

Yeah, this

is the

current

state.

Really?

You’re

sure?

ALPHA DECOMPOSITION AND EXTENSION

An alpha may have lower-level, more granule

sub-alphas whose states contribute to and drive

the state of the super-alpha.

• Association between super-alphas and sub-alphas

can be many-to-many.

An alpha may be Extended (i.e., have the values

of its attributes be changed) in the context of a

Practice (such as Scrum).

7

Alpha Sub-Alpha

Alpha Extended Alpha

ACTIVITY SPACE

Activity spaces are containers of activities performed in a project.

• An activity may be a part of another activity forming a work breakdown structure.

The association between activity spaces and activities can be many-to-many.

8

Cu

sto

me

r So

luti

on

En

de

avo

r

Explore Possibilities

Understand Stakeholder Needs

Ensure Stakeholder Satisfaction Use the System

Understand the Requirements

Shape the System

Implement the System

Test the System

Deploy the System

Operate the System

Prepare to do the Work

Coordinate the Activity Support Team Track Progress Stop the Work

ACTIVITY SPACE AND ALPHA STATE

Pre and post conditions of

each activity space are

suggested (as a reference)

in terms of alpha states in

the kernel.

9

Alpha States

Activity Spaces

Opportunity Stakeholder

Ide

nti

fie

d

Solu

tio

n

Ne

ed

ed

Val

ue

Es

tab

lish

ed

Via

ble

Ad

dre

sse

d

Be

nef

it

Acc

rue

d

Re

cogn

ize

d

Re

pre

sen

ted

Invo

lve

d

In A

gre

em

en

t

Sati

sfie

d f

or

De

plo

yme

nt

Sati

sfie

d

in U

se

Explore Possibilities

Understand Stakeholder Needs

Ensure Stakeholder Satisfaction

Use the System

ESSENCE KERNEL EXTENSION

Patterns can arrange language

elements into arbitrary

meaningful structures.

Resources can be attached to any

language element.

Tags add user defined information

to any language element.

User-Defined Types detail, explain,

and constrain the proper usage of

particular patterns, resources, or

tags.

10

ESSENCE LANGUAGE 11

METHOD DESCRIPTION IN ESSENCE LANGUAGE

There are probably hundred

thousands of methods applied in

SE projects worldwide.

There are about 300 well known

practices reusable across projects.

Those practices can be described

using Essence kernel and language.

A project method can be

composed of practices.

12

Practices

Methods

Custom Method A Custom Method B are composed of

are described using

are defined in terms of

Essence Kernel

Essence Language

OMG Standard

ESSENCE KERNEL AND METHOD 13

Alpha

Alpha State

Activity Space

Competency

Work Product

Activity

<has

ta

rgets

> defines

/

pro

duce

s /

updat

es>

Work

Task

< defines

Approach

defines

one w

ay t

o a

ccom

plis

h >

Practice

< is composed of

Method

PRACTICE DESCRIPTION IN ESSENCE LANGUAGE

A software engineering practice can be

described in Essence language by

mapping:

• work products to Alphas,

• activities to Activity Spaces

• roles to Competencies

Mapping a practice to Essence

produces a mapping from activities to

“default” state transitions.

14

Practice

Work Product

Activity

Role

Essence Kernel

Alpha

Alpha State

Activity Space

Competency

ACTIVITY AND STATE TRANSITION

Activities may change the alpha states of

the software engineering project.

Activities can be assigned target alpha

states or checkpoints (i.e. criteria of

done).

By mapping activities to activity spaces

you can get “default” target states of each

activity.

15

Activity Space

Competency

Activity

targ

ets>

pro

du

ces

/ u

pd

ates

>

Alpha

Alpha State

Work Product

<has

COMPETENCY AND ROLE

The role can be modeled as a Pattern.

Patterns can arrange language elements into

arbitrary meaningful structures.

16

Cu

sto

mer

So

luti

on

E

nd

eavo

r

Stakeholder Representation

Analysis Development Testing

Leadership Management

Role

profiles>

Is q

ual

ifie

d

to p

erfo

rm>

organizes> Alpha

Alpha State

Activity Space

Competency

Activity

<has

ta

rget

s>

pro

du

ces

/ u

pd

ate

s>

Work Product

PRACTICE DESCRIPTION APPROACH

1. Build an Ontology of the Terms used in the Practice

Parse the text description of the Practice to build a Glossary.

Classify the Terms in the Glossary into Work Products, Activities, Roles, etc.

Add missing Terms such as activities for producing or updating work products and vice versa.

2. Map the Terms to Essence Language Elements.

Determine alphas, alpha states and checkpoints corresponding to each work product.

Determine activity spaces, beginning and target alpha states, target checkpoints corresponding to each activity.

Determine competencies required of different roles.

3. Decompose and Extend Essence Kernel Elements to represent detailed concepts, composite constructs and complex relationships.

Define sub-alphas, sub-activity spaces, patterns, resources and tags to represent concepts in the practice.

17

Build Practice

Ontology

Map Terms to Essence

Language Elements

Decompose and

Extend Essence Kernel

Elements if necessary

SCRUM PRACTICE 18

Development Team

Task

Breakdown

Product Increment

Jeff Sutherland and Ken Schwaber, The Scrum Guide, 2013. (http://www.scrumguides.org/)

SCRUM GLOSSARY

Key Terms Classification Relationship

Added Terms Role Activity Work Product

Daily Scrum Activity Development Team Sprint Plan, Total Work Remaining

Definition of Done Work Product Sprint Retrospective Increment, Product Backlog Refinement

Developer Role

Development Team Role Daily Scrum Sprint Backlog, Development Work, Increment

Development Work Activity Sprint Backlog, Development Work Plan, Work Unit,

Increment

Development Work

Plan

Improvement Plan Work Product Sprint Retrospective

Increment Work Product Sprint Review Sprint Plan, Sprint Goal, Sprint Backlog, Definition of

Done

Product Backlog Work Product Product Owner Product Backlog Refinement,

Sprint Review Product Backlog Item

Product Backlog

Creation

Product Backlog Item Work Product Product Backlog

Product Backlog Refinement Activity Product Backlog

Product Owner Role

Product Backlog Creation,

Product Backlog Refinement,

Sprint Review

Product Backlog Product Backlog

Creation

Scrum Event Composite Activity

Scrum Master Role Sprint Retrospective

Scrum Team Work Product PO, DT, SM

Sprint Milestone

Sprint Backlog Work Product Development Team Product Backlog, Sprint Goal, Development Work

Sprint Goal Work Product Sprint Planning Sprint Planning

Sprint Plan Composite Work Product

Sprint Planning Activity Sprint Plan

Sprint Retrospective Activity Scrum Master Sprint Plan, Definition of Done,

Sprint Review Activity Stakeholders, Increment, Product Backlog, Total Work Remaining,

Sprint Plan

Stakeholders Role Sprint Review

Total Work Remaining Work Product Sprint Review, Daily Scrum

Work Unit Work Product Sprint Backlog, Development Work

19

SCRUM ONTOLOGY 20

SCRUM TO ESSENCE KERNEL MAPPING 21

Scrum

Product Backlog

Product Backlog Item

Sprint Backlog

Scrum Team

Development Work Plan

Work Unit

Increment

Total Work Remaining

Improvement Plan

Requirements

Software System

Work

Team

Way of Working

Sprint Goal

Definition of Done

Opportunity

Product Backlog Refinement

Sprint Review

Sprint Planning

Daily Scrum

Sprint Retrospective

Ensure Stakeholder Satisfaction

Understand the Requirements

Coordinate the Activity

Support the Team

Track Progress

Product Backlog Creation

Development Work Implement the System

Test the System

Shape the System

Understand Stakeholder Needs

Explore Possibilities

COMPOSITE CONSTRUCTS IN SCRUM 22

Sprint Review

Sprint Planning

Daily Scrum

Sprint Retrospective

Sprint Plan

Product Backlog Item

Sprint Backlog

Development Work Plan Work Unit

Sprint Goal

produces

provides input to

may change

Sprint Increment

Scrum Event

Development Work

Produces

Conducts

Product Owner

Development Team

Scrum Master

Manages Product Backlog

Creates

Performs

Ensures enactment of Scrum

Scrum Team

WORK PRODUCT TO ALPHA STATE MAPPING 23

Work Product Alpha Alpha State

Begin In Target

Product Backlog Requirements Bounded Acceptable

Opportunity Solution Needed Viable

Sprint Goal Requirements Bounded Coherent

Sprint Backlog Requirements Coherent Acceptable

Definition of Done Requirements Acceptable Fulfilled

Development Work Plan Work Initiated Prepared

Increment Software System Architecture Selected Ready

Work Prepared Concluded

Total Work Remaining Work Started Under Control

Scrum Team Team Seeded Performing

Improvement Plan Way of Working Foundation Established Working Well

WORK PRODUCT TO ALPHA STATE MAPPING 24

Product Backlog Sprint

Goal

Sprint

Backlog

Definition

of Done

Dev Work

Plan

Increment

Increment

Scrum

Team

Improve

Plan

TWR

WORK PRODUCT DEFINITION CARD 25

Scrum Practice

Product Backlog Item

Sprint Backlog

Development Work Plan

Work Unit

Requirements

Coherent

Acceptable

The stakeholders accept that the requirements describe an acceptable solution. The rate of change to the agreed requirements is relatively low and under control. The value provided by implementing the requirements is clear. The parts of the opportunity satisfied by the requirements are clear. The requirements are testable.

Work

Initiated

Prepared

Commitment is made. Cost and effort of the work are estimated. Resource availability is understood. Governance policies and procedures are clear. Risk exposure is understood. Acceptance criteria are defined and agreed with client. The work is broken down sufficiently for productive work to start. Tasks have been identified and prioritized by the team and stakeholders. A credible plan is in place. Funding to start the work is in place. The team or at least some of the team members are ready to start the work. Integration and delivery points are defined.

Sprint Planning Understand the Requirements

Coordinate the Activity

Understand Stakeholder Needs

ACTIVITY TO ALPHA STATE MAPPING 26

Activity

Alpha States

Activity Spaces

Opportunity Requirement Software System Team Work Way of Working

Iden

tifi

ed

So

luti

on

N

eed

ed

V

alu

e

Est

ab

lish

ed

Via

ble

Ad

dre

ssed

Ben

efi

t A

ccru

ed

Co

nceiv

ed

Bo

un

ded

Co

here

nt

Accep

tab

le

Ad

dre

ssed

Fu

lfille

d

Arc

hit

ectu

re

Sele

cte

d

Dem

on

st-

rab

le

Usa

ble

Read

y

Op

era

tio

nal

Reti

red

Seed

ed

Fo

rmed

Co

llab

o-

rati

ng

Perf

orm

ing

Ad

jou

rned

Init

iate

d

Pre

pare

d

Sta

rted

Un

der

Co

ntr

ol

Co

nclu

ded

Clo

sed

Pri

ncip

les

Est

ab

lish

ed

F

ou

nd

ati

on

E

stab

lish

ed

In U

se

In P

lace

Wo

rkin

g

Well

Reti

red

Product

Backlog

Creation

Explore Possibilities

Understand Reqts

Product

Backlog

Refinement

Understand St. Needs

Understand Reqts

Sprint

Planning

Understand St. Needs

Understand Reqts

Coordinate Activity

Development

Work

Shape the System

Implement / Test

Daily Scrum Track Progress

Sprint

Review

Ensure St. Satisfaction

Track Progress

Sprint Retro. Support the Team

ACTIVITY DEFINITION CARD 27

Scrum Practice

Opportunity

Viable

Addressed

A usable system that demonstrably addresses the opportunity is available. The stakeholders agree that the available solution is worth deploying. The stakeholders are satisfied that the solution produced addresses the opportunity.

Work

Under Control

Concluded

All outstanding tasks are administrative housekeeping or related to preparing the next piece of work. Work results have been achieved. The stakeholders have accepted the resulting software system.

Sprint Review

Ensure Stakeholder Satisfaction

Track Progress Product Owner Development Team Scrum Master Stakeholder

Product Backlog

Sprint Backlog Increment

Sprint Goal

SCRUM WORKFLOW 28

METHOD COMPOSITION 29

Scrum

Product Backlog Refinement

Sprint Review

Sprint Planning

Daily Scrum

Sprint Retrospective

Ensure Stakeholder Satisfaction

Understand the Requirements

Coordinate the Activity

Support the Team

Track Progress

Product Backlog

Product Backlog

Item

Sprint Backlog

Scrum Team

Development Work Plan

Work Unit

Increment

Total Work Remaining

Improvement Plan

Requirements

Software System

Work

Team

Way of Working

Product Backlog Creation

Sprint Goal

Development Work Implement the System

Test the System

Shape the System Definition of

Done

Opportunity Understand

Stakeholder Needs

Explore Possibilities Stakeholder

Business Requirements

Agile Modeling

Opportunity

Software Requirement Model

Software Architecture

Business Analysis

Model Storming

Spike

METHOD COMPOSITION 30

Kernel elements additionally covered by Agile Modeling

Kernel elements covered by Scrum

Add XP

Add

Dev

Ops

Add

SPM

CONCLUSION

You can use Essence kernel to:

Describe practices

Merge them into a project method

Monitor health and progress of the project

Adaptively determine project goals and activities based on

the current state assessment.

31 We’d better

learn and

use Essence.

I think so, too. It

really makes

defining and using

methods easy.