ESMAP Solar Mapping Pakistan

Solar Resource Measurement CampaignSummary

Islamabad

7 March 2017

Qazi Sabir Birk KraasPITCO Pvt Ltd CSP Services GmbH

Page 2: ESMAP Solar Mapping Pakistan Solar Resource ...pubdocs.worldbank.org/en/873351489521177981/CSPS-PITCO...ESMAP Solar Mapping Pakistan Solar Resource Measurement Campaign Summary Islamabad

ESMAP weather stations in Pakistan

• Tier 1 stations

– Islamabad

– Bahawalpur (QASP)

• Tier 2 stations

– Peshawar

– Lahore

– Multan

– Quetta

– Khuzdar

– Hyderabad

– Karachi Covering a wide range of different climates that exist

in Pakistan

Page 3: ESMAP Solar Mapping Pakistan Solar Resource ...pubdocs.worldbank.org/en/873351489521177981/CSPS-PITCO...ESMAP Solar Mapping Pakistan Solar Resource Measurement Campaign Summary Islamabad

Equipment: Tier1 stations

• High quality, research-grade solar sensors

• Sun tracker with pyrheliometer and pyranometers – one sensor for each component of solar irradiance (GHI, DNI, DHI)

• Additional meteorological sensors: Temperature, humidity, wind speed and direction at 10m, barometric pressure

Shading assembly w. shading ball

CMP21 Pyranometer (GHI, DHI) with ventilation unit

CHP1 Pyrheliometer (DNI)

Sun tracker

Page 4: ESMAP Solar Mapping Pakistan Solar Resource ...pubdocs.worldbank.org/en/873351489521177981/CSPS-PITCO...ESMAP Solar Mapping Pakistan Solar Resource Measurement Campaign Summary Islamabad

Equipment: Tier2 stations

• Robust solar sensors for field deployment

• Rotating shadowband irradiometer (RSI) and pyranometer

• Additional meteorological sensors: Temperature, humidity, wind speed and direction at 10m, barometric pressure

Silicon photodiode(s)CMP10 Pyranometer (GHI)

Motor

Rotating shadowband

RSI (GHI, DNI, DHI)

Page 5: ESMAP Solar Mapping Pakistan Solar Resource ...pubdocs.worldbank.org/en/873351489521177981/CSPS-PITCO...ESMAP Solar Mapping Pakistan Solar Resource Measurement Campaign Summary Islamabad

Installation of weather stations

* 3 months without DNI/DHI measurement due to tracker defect

** 3 months without DNI/DHI measurement due to tracker defect, 2 months no data due to power supply failure

Station Installation date Installed by Amount of data(months)

Islamabad 2014-10-25 CSPS, PITCO 28*

QASP 2014-10-16 CSPS, PITCO 26**

Peshawar 2015-04-10 PITCO 22

Lahore 2014-10-22 CSPS, PITCO 28

Multan 2014-10-20 CSPS, PITCO 28

Quetta 2015-09-17 PITCO 17

Khuzdar 2015-09-22 PITCO 17

Hyderabad 2015-04-21 PITCO 22

Karachi 2015-04-22 PITCO 22

Page 6: ESMAP Solar Mapping Pakistan Solar Resource ...pubdocs.worldbank.org/en/873351489521177981/CSPS-PITCO...ESMAP Solar Mapping Pakistan Solar Resource Measurement Campaign Summary Islamabad

Maintenance

• Ongoing maintenance by the station hosts:

– Sensor cleaning (Tier1: daily; Tier 2: weekly)

– Visual inspection

– Security against theft/vandalism

• Scheduled maintenance visits by PITCO

(green: normal operation; dark green: maintenance visit; orange: maintenance visit planned but not carried out

Page 7: ESMAP Solar Mapping Pakistan Solar Resource ...pubdocs.worldbank.org/en/873351489521177981/CSPS-PITCO...ESMAP Solar Mapping Pakistan Solar Resource Measurement Campaign Summary Islamabad

PITCO‘s Role

• Site assessment visits

• Co-ordination with site hosts

• Supervision of civil works

• Installation of Tier 1 and Tier 2 stations on 9 locations

• Regular Maintenance of all 9 solar measurement stations

• Provision of Data-Sims for regular data transfer from stations

Page 8: ESMAP Solar Mapping Pakistan Solar Resource ...pubdocs.worldbank.org/en/873351489521177981/CSPS-PITCO...ESMAP Solar Mapping Pakistan Solar Resource Measurement Campaign Summary Islamabad

Maintenance Visits

• Regular maintenance carried out for 9 solar measurement stations in Lahore, Islamabad, Karachi, Jamshoro, Peshawar, Multan, Bahawalpur, Quetta, and Khuzdar

• Close coordination with CSP Services and Station Hosts for successful execution of maintenance visits

• Excellent support received from both Site Hosts and CSP Services

Page 9: ESMAP Solar Mapping Pakistan Solar Resource ...pubdocs.worldbank.org/en/873351489521177981/CSPS-PITCO...ESMAP Solar Mapping Pakistan Solar Resource Measurement Campaign Summary Islamabad

Maintenance of Weather Stations

• Ensuring proper functioning and alignment of all sensors.

• Checking all equipment for damage.

• Correcting, any detected problems, and gather information which might help to correct measurement data (also data previously measured), e.g. wind direction, sensor misalignment, irradiation sensor misalignment, soiling of irradiation sensor etc.

• Going through the daily/weekly cleaning procedure with the site hosts

Page 10: ESMAP Solar Mapping Pakistan Solar Resource ...pubdocs.worldbank.org/en/873351489521177981/CSPS-PITCO...ESMAP Solar Mapping Pakistan Solar Resource Measurement Campaign Summary Islamabad

Maintenance Visit Pictures (Tier 1)

Levelling of

Pyranometers

Alignment of

Pyrheliometer

Page 11: ESMAP Solar Mapping Pakistan Solar Resource ...pubdocs.worldbank.org/en/873351489521177981/CSPS-PITCO...ESMAP Solar Mapping Pakistan Solar Resource Measurement Campaign Summary Islamabad

Maintenance Visit Pictures (Tier 1)

Visual Inspection

Page 12: ESMAP Solar Mapping Pakistan Solar Resource ...pubdocs.worldbank.org/en/873351489521177981/CSPS-PITCO...ESMAP Solar Mapping Pakistan Solar Resource Measurement Campaign Summary Islamabad

Maintenance Visit Pictures (Tier 2)

Levelling of

LI-COR Sensor

Pyranometer is

misaligned

Page 13: ESMAP Solar Mapping Pakistan Solar Resource ...pubdocs.worldbank.org/en/873351489521177981/CSPS-PITCO...ESMAP Solar Mapping Pakistan Solar Resource Measurement Campaign Summary Islamabad

Data acquisition and data quality control

• CSP Services collects data via GSM

• Daily data quality check

– Automatic tests (consistency, gaps, physical limits, …)

– Visual check by experienced operators

• Daily excel reports by email to all interested parties

• Data published on www.energydata.info

FREE OF COST !

Page 14: ESMAP Solar Mapping Pakistan Solar Resource ...pubdocs.worldbank.org/en/873351489521177981/CSPS-PITCO...ESMAP Solar Mapping Pakistan Solar Resource Measurement Campaign Summary Islamabad

Measurement data completeness

Page 15: ESMAP Solar Mapping Pakistan Solar Resource ...pubdocs.worldbank.org/en/873351489521177981/CSPS-PITCO...ESMAP Solar Mapping Pakistan Solar Resource Measurement Campaign Summary Islamabad

Measurement data completeness

• Mostly very good data completeness and smooth operation

• Three main events prevented 100% completeness

– Tracker hardware defect in QASP Dec 2014, tracker from Islamabad moved to QASP, and long time for replacing (issues with customs clearance caused a long delay)

– Power supply outage in QASP mid 2016 (defect in the surge protection)

– Recently trouble with power supply at Lahore station

StationAvg. Data completeness

GHI DNI DHI

Islamabad 100 % 88 % 88%

QASP 92 % 80% 80 %

Peshawar 100 % 100 % 100 %

Lahore 97 % 97 % 97 %

Multan 100 % 100 % 100 %

Quetta 100 % 100 % 100 %

Khuzdar 100 % 100 % 100 %

Hyderabad 100 % 100 % 100 %

Karachi 100 % 100 % 100 %

Page 16: ESMAP Solar Mapping Pakistan Solar Resource ...pubdocs.worldbank.org/en/873351489521177981/CSPS-PITCO...ESMAP Solar Mapping Pakistan Solar Resource Measurement Campaign Summary Islamabad

Cleaning schedule adherence

• All station hosts have provided the cleaning of sensors free of cost, and voluntary !

• It is a huge task to carry this out over two years !

Our sincere gratitude to all station hosts

Page 17: ESMAP Solar Mapping Pakistan Solar Resource ...pubdocs.worldbank.org/en/873351489521177981/CSPS-PITCO...ESMAP Solar Mapping Pakistan Solar Resource Measurement Campaign Summary Islamabad

Measurement data uncertainty

Measurement uncertainty: difference between theoretical datasheet accuracy (controlled environment) and field conditions

– Tier1:

• Theoretical*: DNI ±2%GHI ±3%

• Achieved: DNI ~ 2%GHI ~ 3-4%

– Tier 2:

• Theoretical**: DNI ±3%, GHI ±2%

• Achieved: 3-5% (depending on cleaning schedule adherence)

*NREL Best Practices Handbook for the Collection and Use of Solar Resource Data for Solar Energy Applications

** S. Wilbert, Uncertainty of RSI and Si-Pyranometers including the spectral irradiance error

Page 18: ESMAP Solar Mapping Pakistan Solar Resource ...pubdocs.worldbank.org/en/873351489521177981/CSPS-PITCO...ESMAP Solar Mapping Pakistan Solar Resource Measurement Campaign Summary Islamabad

Summary

• 24 months solar irradiation measurement campaign carried out, extended by 6 months

• Data with good quality was measured

• Data is used for adaptation and validation of satellite models

• Data is available for the general public