ESLEA at UKLight 1

Some Network Developments

UKLight – a new facility & opportunitySuperJanet Development Network PlansSuperJanet 5 Requirements GatheringEGEE

Page 2: ESLEA at UKLight1 Some Network Developments UKLight – a new facility & opportunity SuperJanet Development Network Plans SuperJanet 5 Requirements Gathering.

ESLEA at UKLight 2

Some Network Developments

UKLight – a new facility & opportunitySuperJanet Development Network PlansSuperJanet 5 Requirements GatheringEGEE

Page 3: ESLEA at UKLight1 Some Network Developments UKLight – a new facility & opportunity SuperJanet Development Network Plans SuperJanet 5 Requirements Gathering.

ESLEA at UKLight 3

Requirements

# of users

C

A

B

A -> Lightweight users, browsing, mailing, home use

B -> Business applications, multicast, streaming, VPN’s, mostly LAN

C -> Special scientific applications, computing, data grids, virtual-presence

(3 of 12)

Picture from Cees DeLaatUniversity of Amsterdam

Page 4: ESLEA at UKLight1 Some Network Developments UKLight – a new facility & opportunity SuperJanet Development Network Plans SuperJanet 5 Requirements Gathering.

ESLEA at UKLight 4

Requirements

Total BW

C

A

B

A -> Need full Internet routing, one to many

B -> Need VPN services and full Internet routing, several to several

C -> Doesn’t need internet routing, Need very fat pipes, limited multiple Virtual Organizations, few to few

(4 of 12)

Page 5: ESLEA at UKLight1 Some Network Developments UKLight – a new facility & opportunity SuperJanet Development Network Plans SuperJanet 5 Requirements Gathering.

ESLEA at UKLight 5

Normal Traffic Normal Traffic +Radio Astronomy Data

500 Mbit/s

Normal Traffic +Radio Astronomy Data +Less Than Best Effort

2.0 Gbit/s

Time

Page 6: ESLEA at UKLight1 Some Network Developments UKLight – a new facility & opportunity SuperJanet Development Network Plans SuperJanet 5 Requirements Gathering.

ESLEA at UKLight 6

UKLight

Page 7: ESLEA at UKLight1 Some Network Developments UKLight – a new facility & opportunity SuperJanet Development Network Plans SuperJanet 5 Requirements Gathering.

ESLEA at UKLight 7

Figure 1: TransLight Lambdas

European lambdas to US–6 GigEs Amsterdam—Chicago–2 GigEs CERN—Chicago–8 GigEs London—ChicagoCanadian lambdas to US–8 GigEs Chicago—Canada—NYC

–8 GigEs Chicago—Canada—SeattleUS lambdas to Europe–4 GigEs Chicago—Amsterdam–2 GigEs Chicago—CERNEuropean lambdas–8 GigEs Amsterdam—CERN –2 GigEs Prague—Amsterdam–2 GigEs Stockholm—Amsterdam–8 GigEs London—AmsterdamIEEAF lambdas (blue)–8 GigEs Seattle—Tokyo –8 GigEs NYC—Amsterdam

Page 8: ESLEA at UKLight1 Some Network Developments UKLight – a new facility & opportunity SuperJanet Development Network Plans SuperJanet 5 Requirements Gathering.

ESLEA at UKLight 8GEANT

UKLightLondonStarLight

Chicago

NetherLightAmsterdam

CERN

CzechLight

UK Researchers

Extended JANETDevelopment Network

Local Research Equipment

International Point-of-Access

CA*net

Abilene

UKLight – showing connections to selected International peer facilities

10Gb/s

10Gb/s

10Gb/s

10Gb/s

10Gb/s

2.5Gb/s

Existing connections

Proposedconnections

Page 9: ESLEA at UKLight1 Some Network Developments UKLight – a new facility & opportunity SuperJanet Development Network Plans SuperJanet 5 Requirements Gathering.

ESLEA at UKLight 9

UKLIGHT is a research network connecting UK toNetherLight (Amsterdam)StarLight (Chicago)

UKLIGHT is fully funded, out to tenderUK PoP at ULCC (London)Hope for 10G linksDue to start operation in Jan 2004

UKLIGHT is an opportunity any reasonable project which has needs not easily satisfied by the IP production network may apply to make use of itHPC remote compute and visualisationRadio AstronomyHEP Data transport……….see next section

Page 10: ESLEA at UKLight1 Some Network Developments UKLight – a new facility & opportunity SuperJanet Development Network Plans SuperJanet 5 Requirements Gathering.

ESLEA at UKLight 10

UKLight open meeting

What is UKLightWhat is the International ‘Light’ infrastructureHow projects might use it3rd NovemberWill publicise through UKERNA & NeSC web sitesIf anyone wants to go let me know !!!!!!!!

Page 11: ESLEA at UKLight1 Some Network Developments UKLight – a new facility & opportunity SuperJanet Development Network Plans SuperJanet 5 Requirements Gathering.

ESLEA at UKLight 11

Some Network Developments

UKLight – a new facility & opportunity

SuperJanet Development Network PlansSuperJanet 5 Requirements GatheringEGEE

Page 12: ESLEA at UKLight1 Some Network Developments UKLight – a new facility & opportunity SuperJanet Development Network Plans SuperJanet 5 Requirements Gathering.

ESLEA at UKLight 12

NorMAN

YHMAN

EMMAN

EastNet

External Links

LMN

Kentish MAN

LeNSESWERN

South WalesMAN

TVN

MidMAN

NorthernIreland

North WalesMAN

NNWC&NLMAN

Glasgow Edinburgh

WarringtonLeeds

ReadingLondon

Bristol Portsmouth

EaStMAN

UHI Network

Clydenet

AbMAN

University CollegeLondon connectionto development network

ExternalLinks

University ofManchesterconnection todevelopmentnetwork

10Gbit/smultiplexed4*2.5Gbit/schannels

FaTMAN

RAL

Core Point of Presence

Backbone Access Router Location

External Links

Development Network

Page 13: ESLEA at UKLight1 Some Network Developments UKLight – a new facility & opportunity SuperJanet Development Network Plans SuperJanet 5 Requirements Gathering.

ESLEA at UKLight 13

Core Point of PresenceC-PoP

Backbone Access RouterR-PoP

North WalesMAN

LeNSESWERN

Kentish MAN

NorMAN

YHMAN

EMMAN

EastNet

LMN

South WalesMAN

TVN

MidMAN

NorthernIreland

NNW

C&NLMAN

Glasgow Edinburgh

Warrington Leeds

Reading London

Bristol Portsmouth

EaStMAN

UHI Network

ClydenetAbMAN

FaTMAN

L

S

C

T

L

L

L

L

L

L

L

L

L

C

C

C

C

C

C

C

T

T

T

TT

T

S S

S

T

T

Key for components.

C-PoP C

Link associated L

Extension to 2.5G BAR S

Extension to 10G BAR T

Diagram illustrating component oriented approach to costing extensions to the development network using uncommitted bandwidth within the SuperJANET Worldcom contract. Add costs for components C, L, S, and T for the combination of C-PoPs, backbone links and BARs required.

Model for Extension of the SuperJANET Development Network

Page 14: ESLEA at UKLight1 Some Network Developments UKLight – a new facility & opportunity SuperJanet Development Network Plans SuperJanet 5 Requirements Gathering.

ESLEA at UKLight 14

Cambridge

UKLight International Point of AccessLondon - ULCC

Warrington

London

Figure 1: Extended Development Network – Stage 1

Core Point of PresenceC-PoP

Backbone Access RouterR-PoPManchester

Page 15: ESLEA at UKLight1 Some Network Developments UKLight – a new facility & opportunity SuperJanet Development Network Plans SuperJanet 5 Requirements Gathering.

ESLEA at UKLight 15

Cambridge

UKLight

Warrington

London

HEP proposals in progress to use extended Development Network

Manchester

Manchester HEP

UCL HEP

Lancaster HEP

CERNFNAL

RAL

Page 16: ESLEA at UKLight1 Some Network Developments UKLight – a new facility & opportunity SuperJanet Development Network Plans SuperJanet 5 Requirements Gathering.

ESLEA at UKLight 16

Some Network Developments

UKLight – a new facility & opportunitySuperJanet Development Network Plans

SuperJanet 5 Requirements GatheringEGEE

Page 17: ESLEA at UKLight1 Some Network Developments UKLight – a new facility & opportunity SuperJanet Development Network Plans SuperJanet 5 Requirements Gathering.

ESLEA at UKLight 17

Towards SuperJANET5

Slides from David Salmon, UKERNA(thanks)

e-Science All Hands Conference4th July 2003 – East Midlands Conference Centre

Page 18: ESLEA at UKLight1 Some Network Developments UKLight – a new facility & opportunity SuperJanet Development Network Plans SuperJanet 5 Requirements Gathering.

ESLEA at UKLight 18

Timescales

early 2004

pre-procurement activities

mid 2004 formal backbone procurement

early 2005

roll out new backbone

mid 2005 close SuperJANET4 backbone

mid 2003 requirements analysis

end 2005 end of initial term of SuperJANET4 contract with MCI (WorldCom)

late 2003

obtain funding authorizations

Page 19: ESLEA at UKLight1 Some Network Developments UKLight – a new facility & opportunity SuperJanet Development Network Plans SuperJanet 5 Requirements Gathering.

ESLEA at UKLight 19

Funding & Requirements gathering and analysis

No funding assumed

Requirements gathering and analysis process in progress

User Requirements Event – 3rd JulyPresentations - www.ja.net/conferences_training/SJ5/prog.html

Page 20: ESLEA at UKLight1 Some Network Developments UKLight – a new facility & opportunity SuperJanet Development Network Plans SuperJanet 5 Requirements Gathering.

ESLEA at UKLight 20

SuperJANET5 – a Hybrid Routed/Switched Network ?

The key concept is parallelism at the transmission level

Coarse grained paths/circuits– Multiple fibres– Multiple wavelengths

Finer grained multiplexed paths/circuits– Structuring each wavelength

Foundation infrastructure provides switched pathsThe ‘standard’ IP service would be provided over one or more sets of these pathsSpecific paths could be set up for and between e-Science and Research groups

Page 21: ESLEA at UKLight1 Some Network Developments UKLight – a new facility & opportunity SuperJanet Development Network Plans SuperJanet 5 Requirements Gathering.

ESLEA at UKLight 21

RouterRouter

Page 22: ESLEA at UKLight1 Some Network Developments UKLight – a new facility & opportunity SuperJanet Development Network Plans SuperJanet 5 Requirements Gathering.

ESLEA at UKLight 22

A possible set of services could be:Production IP service

– High reliability & availability

High capacity research & e-Science connections – network layers 3/2/1 as required

– Mutual protection from production traffic

Network R&D – potentially any or all of Layers 3/2/1– Sequestered from production network

Institutions would take the combination of services they required Integrated infrastructure – separate servicesFlexible architecture – enable integration, access and evolution

Page 23: ESLEA at UKLight1 Some Network Developments UKLight – a new facility & opportunity SuperJanet Development Network Plans SuperJanet 5 Requirements Gathering.

ESLEA at UKLight 23

Consultation: Research & e-Science

SJ5 Overview paperSet background – context for consultation

Open processAnyone can respond – information on web

– www.ja.net/superjanet5

UKERNA will write toHeads of Research Councils, RC Networking Contacts, DTI/OST

Research & e-Science Workshop - November (5th/6th)……

Page 24: ESLEA at UKLight1 Some Network Developments UKLight – a new facility & opportunity SuperJanet Development Network Plans SuperJanet 5 Requirements Gathering.

ESLEA at UKLight 24

Research & e-Science Requirements Workshop

By invitation - participation from the following groups

Research Council– Policy makers / IT strategists

‘Network knowledgeable’ scientists from each Council’s communityE-Science

– Centre Directors and Technical Directors Nominees

Network research communitySpecial Interest Groups

– Particle Physics & Astronomy (PPNCG)– Others ?

Page 25: ESLEA at UKLight1 Some Network Developments UKLight – a new facility & opportunity SuperJanet Development Network Plans SuperJanet 5 Requirements Gathering.

ESLEA at UKLight 25

Super Janet 5 Planning is just starting

Currently there is little evidence to motivate an upgrade from 10 -> 100 Gbit/s as SJ4 is empty …

However there is a realisation that it may be a “Multi service network.”

There is about to be a “Research Needs” focused workshop (5/6 Nov)

HEP has submitted a large “requirements” survey as part of an e-Science requirements exercise

Page 26: ESLEA at UKLight1 Some Network Developments UKLight – a new facility & opportunity SuperJanet Development Network Plans SuperJanet 5 Requirements Gathering.

ESLEA at UKLight 26

Aggregate bandwidths from a summation of many specific e-Science flows

0

2

4

6

8

10

12

Req

uir

ed B

and

wid

th (

Gb

ps)

EastNet-in

LMN-in TVN-in NNW-in MidMAN-in

ScotGLA-in

ScotEdin-in

EastNet-out

LMN-out TVN-out NNW-out

ScotGLA-out

ScotEdin-out

Regional MANs

Geographic Distribution of required bandwidth over regional MANs (years 2003, 2004, 2006)

2003

2004

2006

Survey of e-Science ApplicationsCapacity

0

2

4

6

8

10

12

14

Req

uir

ed B

and

wid

th (

in G

bp

s)

LON-POR LON-READ POR-BRI READ-LON READ-MAN MAN-GLA MAN-READ GLA-MAN GLA-EDINBackbone Links

Geographic Distribution of required bandwidth over backbone links (years 2003, 2004, 2006)

2003

2004

2006

2 Gbit/s

2 Gbit/sRegional Network

SJ4 Core Link

Page 27: ESLEA at UKLight1 Some Network Developments UKLight – a new facility & opportunity SuperJanet Development Network Plans SuperJanet 5 Requirements Gathering.

ESLEA at UKLight 27

Some Network Developments

UKLight – a new facility & opportunitySuperJanet Development Network PlansSuperJanet 5 Requirements Gathering

EGEE

Page 28: ESLEA at UKLight1 Some Network Developments UKLight – a new facility & opportunity SuperJanet Development Network Plans SuperJanet 5 Requirements Gathering.

ESLEA at UKLight 28

EGEE GEANTPeter [email protected]

Page 29: ESLEA at UKLight1 Some Network Developments UKLight – a new facility & opportunity SuperJanet Development Network Plans SuperJanet 5 Requirements Gathering.

ESLEA at UKLight 29

Network Performance information measurement and publication

NREN Geant Inet-2

Globally Agreed interface

Domain Specific

Web Services XML Schemas

DiagnosticServices for NOCs

Grid Resource Information System

Page 30: ESLEA at UKLight1 Some Network Developments UKLight – a new facility & opportunity SuperJanet Development Network Plans SuperJanet 5 Requirements Gathering.

ESLEA at UKLight 30

Network Performance information measurement and

publication

• By construction this will be completely in line with• DANTE Perf Initiative• Internet-2 e2e pipes• GGF Net Mon WG• Global schema work • [PERT]

• EGEE effort will provide the Grid application parts

Page 31: ESLEA at UKLight1 Some Network Developments UKLight – a new facility & opportunity SuperJanet Development Network Plans SuperJanet 5 Requirements Gathering.

ESLEA at UKLight 31

Application Resource Provider

GeantGeantNREN-A

NREN-A

NREN-B

NREN-B SiteSiteSiteSite

AAA AAA AAA AAA AAA

Configure Configure Configure Configure Configure

Network Resource Allocation and Reservation

Page 32: ESLEA at UKLight1 Some Network Developments UKLight – a new facility & opportunity SuperJanet Development Network Plans SuperJanet 5 Requirements Gathering.

ESLEA at UKLight 32

Application Resource Provider

GeantGeantNREN-A

NREN-A

NREN-B

NREN-B SiteSiteSiteSite

Start “simple”

ConfigureConfigure

AAA AAA

Static SLA Static SLA Static SLA Static SLA

[Note: For example, GRS project of S.Bhatti, UCL]