ESDEN - modernisation of data exchange in the ESS
-
Upload
quentin-shields -
Category
Documents
-
view
226 -
download
0
description
Transcript of ESDEN - modernisation of data exchange in the ESS
Eurostat
ESDEN - modernisation of data exchange in the ESS
Alvaro Diez Soto, Eurostat (B3)
DIME/ITDG Steering committee 18 November 2015 – item 6a
1
Eurostat
2
Introduction
•Objectives of the project•Status of the project•data exchange in numbers•Challenges on the data exchange•Next steps
Objectives of the project
Cross cutting project of the ESS.VIP programme to:• Provide value added services for exchange of
confidential and non-confidential statistical data among ESS partners
• Define the communication backbone for the future ESS common infrastructure
• Support business needs expressed in the ESS.VIP projects
3
Schedule of the project
Phase 1: Development of SIMSTAT communication
infrastructure ESDEN feasibility study
Phase 2: Evolution of the network architecture Integration of SIMSTAT developments
Phase 3: Migration to the new communication infrastructure
4SISAI-Metadata Working Group meeting 8-9.6.2015
Eurostat
5
ESDEN – Benefits of the project • secure exchange of data and metadata with high
agility, high security and high reliability• easier usage of new data sources in the production of
statistics• high volume of data (big data or micro-data exchange)• creation of efficient and robust statistical processes
Eurostat
6
ESDEN – Costs / Deployment actions for MS
• Provision of Hardware infrastructure to host the communication platform
• Creation of communication link between NSIs and the National authorities
• Deployment of communication component• Usage of standard protocols for Data Exchange• IT support for issues on the local infrastructure
Status of the project
• SIMSTAT network infrastructure delivered on time for the pilot exchange
• Ongoing support to the countries for the data exchange
7
SIMSTAT data exchange in numbers
8
From 3,500 to 14,000 messages per NSI exchanged with ESTAT so far
Total is over 200,000!
Variations among NSIs are due to local systems being off-line
Facts on data exchange – EDAMIS vs SIMSTAT 2015 (during SIMSTAT pilot exchange)
9
Eurostat
10
Challenges on the data exchange
Eurostat
11
ESDEN Phase 2 - Modernisation of the data exchange
Eurostat
12
ESDEN – next steps• Set up of the steering committee to guide the project
(Member States involvement)• Note to the VIG on next steps of the project• Connection of additional countries to the CCN network• Approval of ESSC for phase 2• Pilot project on Web forms and new protocols for the
data exchange• ESSNet for the creation of future interfaces and
modernisation of the data exchange
Eurostat
13
ESDEN – Steering Committee• Set up of the steering committee to guide the
project (Member States involvement)• Letter sent to the Member States in October 2015• First physical meeting foreseen this year• Additional teleconference meetings and a physical
meeting to prepare the ESSC meeting in 2016
Eurostat
14
ESDEN – ESSNet Modernisation of the ESS Network Infrastructure• WP 1 ESS physical connection for the data
exchange Recommendations, planning and implementation of secure
networks • WP 2 Modernisation of the ESS data exchange
platformAnalysis of standard protocols, analysis of impact of proposed solutions for data exchange platform modernisation
• WP 3 Pilot deployment and testing of the modernised ESS networkPilot implementation using new standard protocols and secure networks
Eurostat
15
Thank you for your attention!