escorts construction equipments limited

15

Click here to load reader

description

this is all about escorts construction wing. they have all the ranges of construction equipments

Transcript of escorts construction equipments limited

Page 1: escorts construction equipments limited
Page 2: escorts construction equipments limited

ESCORTS CONSTRUCTION EQUIPMENT HISTORY Launch of Escorts in 1944 by Mr. H.P. Nanda & Mr. Yudi

Nanda. Escorts Construction Equipment Department Formed in

1970. In1971,Escorts diversifies & starts manufacturing

construction equipment by introduces Pick n Carry Cranes & Front End Loaders.

In 1983,Rough Terrain Hydraulic Mobile Crane introduced.

In 1997,ECEL launched Franna All Terrain PNC Cranes.

Page 3: escorts construction equipments limited

ECEL launched HD-85-Tandem Vibratory Roller in 2001.

MAC 1214-a wreckage recovery crane was designed,launched & record 280 machines were sold in launch year 2002 by ECEL.

2420- 12 T Soil Vibratory & ED-30 : 3 T Mini Tandem Vibratory Roller were launched In 2005.

2006-HP 216, a new generation Pick n Carry Crane came in to existence.

ECEL launched TRX series of pick n carry in the category of 23 T,17 T & 16 T in 2007.

TRX 2319, a 23 T Crane being the largest crane in this category in the world.

Page 4: escorts construction equipments limited

ABOUT ECEL At Escorts Construction Equipment Limited, we have

defined the evolution of India's construction Equipment industry over the past 39 years. Our innovation Continued… Excavators, amongst the world’s most advanced, that revolutionized earth moving technology in India in the 90’s.

With Over 30 year experience in construction equipment Industry , Escorts has proven track record in:

Hydraulic Mobile Cranes Loaders Forklifts Vibratory Compactors

Page 5: escorts construction equipments limited

ECEL CONSTRUCTION EQUIPMENTS

F 15

Hydra 10

HP 216HP 216

Hydra 12

Page 6: escorts construction equipments limited

Hydra 10 SB Hydra 14 Hydra 12 SB Hydra 8

K 10 MAC 1214 TRX 2319

Page 7: escorts construction equipments limited

2400 EC5250 ED30 HD85

HELI-3000D1 HELIELECTRICHELIWAREHOUSING

Page 8: escorts construction equipments limited

DEPARTMENTS OF THE COMPANY•Product Engineering (P.E.)•Transmission Business Unit (T.B.U)•Assembly Business Unit (A.B.U)•Fabrication Business Unit (F.B.U)•Paint Business Unit (P.B.U)•Systems Department•Sales Administration•Human Resource•Central Services•Central Purchase•Marketing•Finance•Stores

Page 9: escorts construction equipments limited

In the production unit, two methods of painting are being used:•Powder painting•Liquid painting

LIQUID PAINTING Following steps are involved in liquid painting:LoadingPre-wipingDegreasingWater rinse # 1Surface activation

Page 10: escorts construction equipments limited

PhosphatingWater rinse # 2Air blowDry off ovenMaskingBase coat paintingTop coat paintingCuring ovenUnloading

Page 11: escorts construction equipments limited

LOADING STATION

Material is loaded from the fabrication unit over the overhead crane. Material handling overhead crane is divided into three divisions to operate differently over three different parts at a time. After that the three divisions are combined together to bring material over the single overhead crane. In the next step the material undergoes the shot blasting operation.

Page 12: escorts construction equipments limited

SHOT BLASTING MACHINE

This process removes mill scales, oxide bloom, slag left during welding and activating the surface in preparation for Phosphating. The shot blasting machine has a steel ball of the diameter 0.7mm and balls are shot at very high velocity on all sides of the component. A blower is attached to the shot blasting machine whose purpose is to overcome the very high suction within the shot blaster so as to avoid the suction of shot blasts. Roller belt drive is used to circulate the shot balls through the blaster. In this method all the oil, grease, dirt, mill scale, rust, corrosion products, oxides, paint or other foreign matter is completely removed from the surface by abrasive blasting.

Page 13: escorts construction equipments limited

DRY OFF OVEN After pre-treatment process the components become

wet. So it becomes necessary to dry these components. This drying process is carried out in the dry-off oven. The temperature of the oven is increased to about 100-110 degrees Celsius. This high temperature vaporizes all the water in the components. The treating time for components in the oven ranges from 7-10 minutes.

Liquid painting has the following disadvantages: Poor chip resistance Poor corrosion resistance Poor life Paint peel off Failure to be lead free

Page 14: escorts construction equipments limited

POWDER PAINTING FEATURES: Higher output than liquid painting process High corrosion resistance Lesser manpower needed Low maintenance charges The major objectives attained by the powder paint

plant are: The life of paint has exceeded up to 10 years. The quality of ecel machines has gone up resulting

in possibilities of export. Reduced warranty claims in terms of painted parts. Raised the customer perception of products. Catered for volume growth. 

Page 15: escorts construction equipments limited

THANK YOU