Innovative Visual Navigation Solutions for ESA’s Lunar Lander Mission
ESA’s approach to quality control of the supply … › mews › jp › 27th › data ›...
Transcript of ESA’s approach to quality control of the supply … › mews › jp › 27th › data ›...
![Page 1: ESA’s approach to quality control of the supply … › mews › jp › 27th › data › 2_8_2.pdfRisk mitigations specified in design, manufacture and base material supply. New](https://reader033.fdocuments.us/reader033/viewer/2022042322/5f0c10f77e708231d43393eb/html5/thumbnails/1.jpg)
ESA’s approach to quality control of the supply chain for PCBs
Stan Heltzel European Space Agency
![Page 2: ESA’s approach to quality control of the supply … › mews › jp › 27th › data › 2_8_2.pdfRisk mitigations specified in design, manufacture and base material supply. New](https://reader033.fdocuments.us/reader033/viewer/2022042322/5f0c10f77e708231d43393eb/html5/thumbnails/2.jpg)
2
Outline
A. ESA‘s approach to supply chain control for PCBs
B. Case study: contamination in PCBs 1. Problem description
2. Risk mitigations
27th MEWS Tsukuba, Japan 23, 24 Oct 2014
![Page 3: ESA’s approach to quality control of the supply … › mews › jp › 27th › data › 2_8_2.pdfRisk mitigations specified in design, manufacture and base material supply. New](https://reader033.fdocuments.us/reader033/viewer/2022042322/5f0c10f77e708231d43393eb/html5/thumbnails/3.jpg)
3
PCB manufacturer ESA
Equipment manufacturer
Procurement: DR + MRR, Test, NCR
Qualification: Test, Audit, NCR
Projects: NRB, RFx,
reviews
ECSS: Standardisation
PCB/SMT WG: Harmonisation
R&D
27th MEWS Tsukuba, Japan 23, 24 Oct 2014
![Page 4: ESA’s approach to quality control of the supply … › mews › jp › 27th › data › 2_8_2.pdfRisk mitigations specified in design, manufacture and base material supply. New](https://reader033.fdocuments.us/reader033/viewer/2022042322/5f0c10f77e708231d43393eb/html5/thumbnails/4.jpg)
4
ECSS European Cooperation for Space Standardisation
ECSS-Q-ST-70-10C PCB qualifcation (revision ongoing) ECSS-Q-ST-70-11C PCB procurement (revision ongoing) ECSS-Q-ST-70-12C PCB design (first issued July 2014) In addition, Process Identification Documents (PID) describe qualified technology domain of each PCB manufatcurer.
27th MEWS Tsukuba, Japan 23, 24 Oct 2014
![Page 5: ESA’s approach to quality control of the supply … › mews › jp › 27th › data › 2_8_2.pdfRisk mitigations specified in design, manufacture and base material supply. New](https://reader033.fdocuments.us/reader033/viewer/2022042322/5f0c10f77e708231d43393eb/html5/thumbnails/5.jpg)
5
Harmonisation of electronic technologies
ECSS standardisation ecss.nl
PCB/SMT WG with industry in the Component Technology Board
technology roadmaps escies.org, spacecomponents.org
27th MEWS Tsukuba, Japan 23, 24 Oct 2014
![Page 6: ESA’s approach to quality control of the supply … › mews › jp › 27th › data › 2_8_2.pdfRisk mitigations specified in design, manufacture and base material supply. New](https://reader033.fdocuments.us/reader033/viewer/2022042322/5f0c10f77e708231d43393eb/html5/thumbnails/6.jpg)
6
Technology drivers
PCB are platform for placement and routing for complex components PCB ~2 keuro Area Array Device ~20 keuro PCBs need to be comparable to components in terms of reliability and complexity, but for a much lower cost. • High pint count causes complex routing • Miniaturization requires dense routing • Signal integrity requires short routing
27th MEWS Tsukuba, Japan 23, 24 Oct 2014
![Page 7: ESA’s approach to quality control of the supply … › mews › jp › 27th › data › 2_8_2.pdfRisk mitigations specified in design, manufacture and base material supply. New](https://reader033.fdocuments.us/reader033/viewer/2022042322/5f0c10f77e708231d43393eb/html5/thumbnails/7.jpg)
7
Reliability issues
PCB material selection driven by assembly and repair, not by space environment PCB build-up driven by capability and miniaturization, not by manufacturability ⇒ Material, build-up and metallisation processes affect
reliability of interconnections
⇒ Design and manufacturability are key
27th MEWS Tsukuba, Japan 23, 24 Oct 2014
![Page 8: ESA’s approach to quality control of the supply … › mews › jp › 27th › data › 2_8_2.pdfRisk mitigations specified in design, manufacture and base material supply. New](https://reader033.fdocuments.us/reader033/viewer/2022042322/5f0c10f77e708231d43393eb/html5/thumbnails/8.jpg)
8
Qualification
- Request for qualification: support, market, ESA projects
- Qualification ECSS-Q-ST-70-10
- Audit
- Qualified domain published in PID and on escies.org/pcb/
- Design & Procurement by OEMs
- Periodic audit and re-qualification
27th MEWS Tsukuba, Japan 23, 24 Oct 2014
![Page 9: ESA’s approach to quality control of the supply … › mews › jp › 27th › data › 2_8_2.pdfRisk mitigations specified in design, manufacture and base material supply. New](https://reader033.fdocuments.us/reader033/viewer/2022042322/5f0c10f77e708231d43393eb/html5/thumbnails/9.jpg)
9
PCB manufacturer ESA
Equipment manufacturer
Procurement: DR + MRR, Test, NCR
Qualification: Test, Audit, NCR
Projects: NRB, RFx,
reviews
ECSS: Standardisation
PCB/SMT WG: Harmonisation
R&D
27th MEWS Tsukuba, Japan 23, 24 Oct 2014
![Page 10: ESA’s approach to quality control of the supply … › mews › jp › 27th › data › 2_8_2.pdfRisk mitigations specified in design, manufacture and base material supply. New](https://reader033.fdocuments.us/reader033/viewer/2022042322/5f0c10f77e708231d43393eb/html5/thumbnails/10.jpg)
10
B. Case study: contamination - Outline
1. Problem description a. Latent short circuit failure b. Failure mechanism c. Contamination d. IR testing
2. Risk mitigations
a. Design b. Manufacture c. Base material supply
27th MEWS Tsukuba, Japan 23, 24 Oct 2014
![Page 11: ESA’s approach to quality control of the supply … › mews › jp › 27th › data › 2_8_2.pdfRisk mitigations specified in design, manufacture and base material supply. New](https://reader033.fdocuments.us/reader033/viewer/2022042322/5f0c10f77e708231d43393eb/html5/thumbnails/11.jpg)
11
1. Latent short circuit - Introduction
Short circuit failure occurred in PCBs for power distribution after prolonged functional testing in ambient lab environment or after thermal vacuum cycles.
27th MEWS Tsukuba, Japan 23, 24 Oct 2014
![Page 12: ESA’s approach to quality control of the supply … › mews › jp › 27th › data › 2_8_2.pdfRisk mitigations specified in design, manufacture and base material supply. New](https://reader033.fdocuments.us/reader033/viewer/2022042322/5f0c10f77e708231d43393eb/html5/thumbnails/12.jpg)
12
1. Latent short circuit - Failure Mechanism
Electromigration caused by: Pathway Electrolyte Bias voltage
Dendritic growth (SIR) Conductive Anodic Filament
27th MEWS Tsukuba, Japan 23, 24 Oct 2014
![Page 13: ESA’s approach to quality control of the supply … › mews › jp › 27th › data › 2_8_2.pdfRisk mitigations specified in design, manufacture and base material supply. New](https://reader033.fdocuments.us/reader033/viewer/2022042322/5f0c10f77e708231d43393eb/html5/thumbnails/13.jpg)
13
1. Latent short circuit - Pathway
Resin-glass interface Hollow glass fibers
Congolmerated flame retardant or fillers
Delamination Voids
Cracks [EA-2010-MAT-12B]
Contamination by foreign material
27th MEWS Tsukuba, Japan 23, 24 Oct 2014
![Page 14: ESA’s approach to quality control of the supply … › mews › jp › 27th › data › 2_8_2.pdfRisk mitigations specified in design, manufacture and base material supply. New](https://reader033.fdocuments.us/reader033/viewer/2022042322/5f0c10f77e708231d43393eb/html5/thumbnails/14.jpg)
14
1. Latent short circuit - Contamination
Sources: PCB manufacturing processes Base material supply
Types: Cl-bearing particles Metallic debris Organic residue Dust Fibers FR4 resin dust in polyimide etc
27th MEWS Tsukuba, Japan 23, 24 Oct 2014
![Page 15: ESA’s approach to quality control of the supply … › mews › jp › 27th › data › 2_8_2.pdfRisk mitigations specified in design, manufacture and base material supply. New](https://reader033.fdocuments.us/reader033/viewer/2022042322/5f0c10f77e708231d43393eb/html5/thumbnails/15.jpg)
15
1. Latent short circuit – IR test
fiber contaminated no contamination observed
http://www.ipcoutlook.org/pdf/insulation_resistance_dieelectric_materials_ipc.pdf
T0 after 200TC after 500TC T0 after 200TC after 500TC
27th MEWS Tsukuba, Japan 23, 24 Oct 2014
![Page 16: ESA’s approach to quality control of the supply … › mews › jp › 27th › data › 2_8_2.pdfRisk mitigations specified in design, manufacture and base material supply. New](https://reader033.fdocuments.us/reader033/viewer/2022042322/5f0c10f77e708231d43393eb/html5/thumbnails/16.jpg)
• Fiber contamination provides pathway for electromigration
16
1. Latent short circuit – IR test conclusions
27th MEWS Tsukuba, Japan 23, 24 Oct 2014
![Page 17: ESA’s approach to quality control of the supply … › mews › jp › 27th › data › 2_8_2.pdfRisk mitigations specified in design, manufacture and base material supply. New](https://reader033.fdocuments.us/reader033/viewer/2022042322/5f0c10f77e708231d43393eb/html5/thumbnails/17.jpg)
IPC-2221 ECSS-Q-ST-70-12 “Space product assurance – PCB design“ Example: 4 mil laminate with 2 oz Cu can have a min projected peak-to-peak dielectric thickness of 68 µm. Take account of tolerances in dielectric thickness Take account of etching tolerances for in-plane clearances Margin for double insulation of critical signals Presence of non-functional pads 2 sheets of glass reinforcement between copper layers
17
2. Risk mitigation – PCB design www.ecss.nl
27th MEWS Tsukuba, Japan 23, 24 Oct 2014
![Page 18: ESA’s approach to quality control of the supply … › mews › jp › 27th › data › 2_8_2.pdfRisk mitigations specified in design, manufacture and base material supply. New](https://reader033.fdocuments.us/reader033/viewer/2022042322/5f0c10f77e708231d43393eb/html5/thumbnails/18.jpg)
a) Incoming sample inspection on base laminate
18
2. Risk mitigation – PCB manufacturer
27th MEWS Tsukuba, Japan 23, 24 Oct 2014
![Page 19: ESA’s approach to quality control of the supply … › mews › jp › 27th › data › 2_8_2.pdfRisk mitigations specified in design, manufacture and base material supply. New](https://reader033.fdocuments.us/reader033/viewer/2022042322/5f0c10f77e708231d43393eb/html5/thumbnails/19.jpg)
b) Inspection on etched inner layers: 100% visual inspection on light table
19
2. Risk mitigation – PCB manufacturer
27th MEWS Tsukuba, Japan 23, 24 Oct 2014
![Page 20: ESA’s approach to quality control of the supply … › mews › jp › 27th › data › 2_8_2.pdfRisk mitigations specified in design, manufacture and base material supply. New](https://reader033.fdocuments.us/reader033/viewer/2022042322/5f0c10f77e708231d43393eb/html5/thumbnails/20.jpg)
b) Inspection on etched inner layers: AOI
20
2. Risk mitigation – PCB manufacturer
27th MEWS Tsukuba, Japan 23, 24 Oct 2014
![Page 21: ESA’s approach to quality control of the supply … › mews › jp › 27th › data › 2_8_2.pdfRisk mitigations specified in design, manufacture and base material supply. New](https://reader033.fdocuments.us/reader033/viewer/2022042322/5f0c10f77e708231d43393eb/html5/thumbnails/21.jpg)
c) Cleanliness control plan QT/2013/730/SH
Recommendations: Cleanliness control between Cu oxidation and lay-up Restrictions on the use of materials that show static charging Class 100‘000 cleanroom in lay-up area Class 1‘000 cleanroom on flow bench De-ionisation equipment at lay-up
21
2. Risk mitigation – PCB manufacturer
www.escies.org/pcb/
27th MEWS Tsukuba, Japan 23, 24 Oct 2014
![Page 22: ESA’s approach to quality control of the supply … › mews › jp › 27th › data › 2_8_2.pdfRisk mitigations specified in design, manufacture and base material supply. New](https://reader033.fdocuments.us/reader033/viewer/2022042322/5f0c10f77e708231d43393eb/html5/thumbnails/22.jpg)
d) Cleaning and inspection of ecthed inner layers and prepreg
Clean • ‘tacky‘ roller • vacuum hovering Inspect • UV fluorescence • bright light
22
2. Risk mitigation – PCB manufacturer
27th MEWS Tsukuba, Japan 23, 24 Oct 2014
![Page 23: ESA’s approach to quality control of the supply … › mews › jp › 27th › data › 2_8_2.pdfRisk mitigations specified in design, manufacture and base material supply. New](https://reader033.fdocuments.us/reader033/viewer/2022042322/5f0c10f77e708231d43393eb/html5/thumbnails/23.jpg)
e) Inspection on external layers Note: these are laminates, not prepreg
23
2. Risk mitigation – PCB manufacturer
27th MEWS Tsukuba, Japan 23, 24 Oct 2014
![Page 24: ESA’s approach to quality control of the supply … › mews › jp › 27th › data › 2_8_2.pdfRisk mitigations specified in design, manufacture and base material supply. New](https://reader033.fdocuments.us/reader033/viewer/2022042322/5f0c10f77e708231d43393eb/html5/thumbnails/24.jpg)
f) High resistance electrical testing
V drop during ramp up is a failure Direct resistive testing 1.27 mm adjacency
24
2. Risk mitigation – PCB manufacturer
IPC-9252 IPC6012 class 3/a QT/2013/681/SH 10 V 250 V 250 V
10 MΩ 100 MΩ 1 GΩ
www.escies.org/pcb/
27th MEWS Tsukuba, Japan 23, 24 Oct 2014
![Page 25: ESA’s approach to quality control of the supply … › mews › jp › 27th › data › 2_8_2.pdfRisk mitigations specified in design, manufacture and base material supply. New](https://reader033.fdocuments.us/reader033/viewer/2022042322/5f0c10f77e708231d43393eb/html5/thumbnails/25.jpg)
25
2. Risk mitigation – IPC-4101 base laminate
• Test frequency • Pass/fail criteria • Consequences of failure
27th MEWS Tsukuba, Japan 23, 24 Oct 2014
![Page 26: ESA’s approach to quality control of the supply … › mews › jp › 27th › data › 2_8_2.pdfRisk mitigations specified in design, manufacture and base material supply. New](https://reader033.fdocuments.us/reader033/viewer/2022042322/5f0c10f77e708231d43393eb/html5/thumbnails/26.jpg)
Proposal for cleaner class of base materials [QT/2013/378/SH] Prepreg delivered as b-stage cured sheets Prepreg for manufacture of laminate ⇒ Increase inspection frequency to 100% Laminate ⇒ Reduce permittable fibre length from 13 mm to 0.5 mm ⇒ Increase sample frequency to 2% ⇒ Reject entire lot if test is non-compliant
26
2. Risk mitigation – IPC-4101 base laminate
27th MEWS Tsukuba, Japan 23, 24 Oct 2014
![Page 27: ESA’s approach to quality control of the supply … › mews › jp › 27th › data › 2_8_2.pdfRisk mitigations specified in design, manufacture and base material supply. New](https://reader033.fdocuments.us/reader033/viewer/2022042322/5f0c10f77e708231d43393eb/html5/thumbnails/27.jpg)
27
Conclusions
Interactions in supply chain identified contamination problems. Risk mitigations specified in design, manufacture and base material supply. New procurement specification in use and proposed to IPC-4101.
27th MEWS Tsukuba, Japan 23, 24 Oct 2014
![Page 28: ESA’s approach to quality control of the supply … › mews › jp › 27th › data › 2_8_2.pdfRisk mitigations specified in design, manufacture and base material supply. New](https://reader033.fdocuments.us/reader033/viewer/2022042322/5f0c10f77e708231d43393eb/html5/thumbnails/28.jpg)
Thank you for your attention!