Es820 Offshore Windfarm Map Update Jan2014

1
30 29 28 4 15 27 26 25 24 2 7 8 34 35 5 17 22 23 21 13 14 18 16 9 11 33 12 6 1 3 32 20 31 19 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 16 17 Robin Rigg (182MW) Gunfleet Sands 1 and 2 (164MW) Barrow (90MW) Walney 1 and 2* (364MW) Sheringham Shoal (315MW) Ormonde (150MW) Thanet (300MW) Greater Gabbard (500MW) Lincs (250MW) London Array Phase 1 (630MW) Gwynt y Môr (565MW) West of Duddon Sands (382MW) Humber Gateway (220MW) Westermost Rough (205MW) Walney extension (752MW) Dudgeon (400MW) Race Bank (500MW) Triton Knoll (600-900MW) Moray Firth (1500MW) Firth of Forth (3690MW) Dogger Bank (6000MW - tbc) Hornsea (4000MW) East Anglia (7200MW) Rampion (664MW) Navitus Bay (1200MW) Atlantic Array (on hold) Celtic Array (3000MW - tbc) Islay (690MW - tbc) Argyll Array (on hold) Beatrice (1000MW) Inch Cape (1050MW) Neart na Gaoithe (450MW) Burbo Bank Extension (234MW) Galloper (Greater Gabbard Extension) (500MW) London Array 2 (204MW) Transitional Round 1 Potential Future Projects Transitional Round 2 10 Anticipated Tender Round 3 Project Current and potential Offshore Transmission projects map *Walney 1 and 2 are being tendered as two separate projects under Transitional Round 1. Each project is 184MW. 18 Source: Figures sourced from Crown Estate, National Grid and developer websites. Updated: November 2013.

Transcript of Es820 Offshore Windfarm Map Update Jan2014

Page 1: Es820 Offshore Windfarm Map Update Jan2014

30

29

28

415

27

26

2524

2

7

834

35

5

17

22

23

21

13

14

18

169

11 33

12

6

1

3

3220

31

19

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

16

17

Robin Rigg (182MW)Gunfleet Sands 1 and 2 (164MW)Barrow (90MW)Walney 1 and 2* (364MW)Sheringham Shoal (315MW)Ormonde (150MW)Thanet (300MW)Greater Gabbard (500MW)Lincs (250MW)London Array Phase 1 (630MW)Gwynt y Môr (565MW)West of Duddon Sands (382MW)Humber Gateway (220MW)Westermost Rough (205MW)Walney extension (752MW)Dudgeon (400MW)Race Bank (500MW)Triton Knoll (600-900MW)

Moray Firth (1500MW)Firth of Forth (3690MW)Dogger Bank (6000MW - tbc)Hornsea (4000MW)East Anglia (7200MW)Rampion (664MW)Navitus Bay (1200MW)Atlantic Array (on hold)Celtic Array (3000MW - tbc)Islay (690MW - tbc)Argyll Array (on hold)Beatrice (1000MW)Inch Cape (1050MW)Neart na Gaoithe (450MW)Burbo Bank Extension (234MW)Galloper (Greater Gabbard Extension) (500MW)London Array 2 (204MW)

TransitionalRound 1

Potential FutureProjects

TransitionalRound 2

10

AnticipatedTender Round3 Project

Current and potential Offshore Transmission projects map

*Walney 1 and 2 are being tendered as two separate projects under Transitional Round 1. Each project is 184MW.

18

Source: Figures sourced from Crown Estate, National Grid and developer websites.Updated: November 2013.