ES Part 1 Appendix 7 - warrington.gov.uk · Immediately report any discrepencies on this document...
Transcript of ES Part 1 Appendix 7 - warrington.gov.uk · Immediately report any discrepencies on this document...
-
204 Extra MSA Group, Warrington MSA, J11 M62 - ES - ES Part 1
ES Part 1 Appendix 7
-
2
5
3
0
3
5
2
3
2
4
2
6
2
7
2
8
2
9
3
1
3
2
3
3
3
4
3
6
3
7
Long
Load
Park
ing
Silver Lane Brook
- Diversion
HGV FuelFilling StationTa
nker
Car Fuel FillingStation
FFL: 22.65mAOD
27.7m
M 62
POTENTIAL SLOPERE-GRADING
CLIENT:APDCHKDESCRIPTIONBYDATE
STATUS:
REV
TITLE:
PROJECT:
APPROVED:
FILE REF:
SCALE @ A3:
DRAWN:
CHECKED:
DATE:
PROJECT No:
DRAWING No:
REV:
ITM12377-SK-025
ITM12377WARRINGTON MSA, JUNCTION 11 M62
PRELIMINARY SITE ACCESS LAYOUT
EXTRA MSA GROUPFOR INFORMATION
1:1000
ITM12377 JB
JH SE
19.03.19
B
Z:\P
roje
cts\
1237
7ITM
M62
War
ringt
on M
SA\T
ech\
Acad
\i-Tr
ansp
ort D
raw
ings
\Wor
king
Dra
win
gs\S
K\IT
M12
377-
SK-0
25B.
dwg
UPDATED ROUNDABOUTLAYOUT
JB05.06.19A GJ GJ
Tel: 0161 830 2172Fax: 0161 830 2173
www.i-transport.co.uk
Centurion House, 129 DeansgateManchester, M3 3WR
REPRODUCED FROM THE ORDNANCE SURVEYMAP WITH THE PERMISSION OF THE
CONTROLLER OF HER MAJESTY'S STATIONERYOFFICE. LICENCE No. 100044286.
© CROWN COPYRIGHT RESERVED.
DRAWING ISSUED FOR FEASIBILITY CONSIDERATION AND PLANNING PURPOSES ONLY. DRAWINGNOT TO BE USED FOR CONSTRUCTION. I-TRANSPORT LLP ACCEPT NO RESPONSIBILITY FOR
ERRORS MADE BY OTHERS IN SCALING FROM THIS DRAWING. MEASUREMENTS SHOULD BETAKEN FROM FIGURED DIMENSIONS ONLY. CDM REQUIREMENTS CONSIDERED AT FEASIBILITY
STAGE ONLY. FURTHER CONSIDERATION REQUIRED BY DETAILED DESIGN TEAM. 0 25 50 100
SCALE BAR @ 1:1000
10
UPDATED SITE LAYOUTPH25.07.19B GJ GJ
-
Extra MSA Group, Warrington MSA, J11 M62 - ES Part 1 205
ES Part 1 Appendix 8
-
Track
GL 20.23CL 20.72
GL 21.67CL 22.08
GL 22.15CL 22.50
Scale Date
ASPECT HOUSEASPECT BUSINESS PARK
BENNERLEY ROADNOTTINGHAM. NG6 8WR
T: 01159 647280F: 01159 751576
LEGEND19
0812
-403
.080
62.0
0001
_War
ringt
on M
SA_L
M-1
-LC
-1-L
C-2
.dw
g
www.slrconsulting.com
© This drawing and its content are the copyright of SLR Consulting Ltd and may not be reproduced or amended except by prior written permission. SLR Consulting Ltd accepts no liability for any amendments made by other persons.
LC-1
1:5,000 @A2 AUG 2019
LANDSCAPE CONTEXTINDICATIVE WIDER LANDSCAPE
WARRINGTON MSA J11/M62
NEXISTING WOODLAND / TREE
FLOWER RICH ACIDGRASSLAND WITHIN MSA
AMENITY GRASSLAND WITHINMSA
CHILDREN'S PLAY AREA
APPLICATION SITE BOUNDARY
AMENITY BUILDING
FUEL FILLING STATION /ELECTRIC CHARGING STATION
PROPOSED DEVELOPMENT STRATEGY
GAS MAIN
PROPOSED AREA OF MIXEDWOODLAND / TREE AND SHRUBPLANTING
ROUGH GRASSLAND
EXISTING POND
EXISTING WATERCOURSE
WILDFLOWER MEADOW
EXISTING DEVELOPMENT
PERMISSIVE BRIDLEWAY
PERMISSIVE FOOTPATH
NEW STRATEGIC GREEN LINK
LANDSCAPE PROPOSALS
PUBLIC FOOTPATH
DIVERTED SILVER LANE BROOK,MARGINS AND/ MARSHY ACIDGRASSLAND
-
Scale Date
ASPECT HOUSEASPECT BUSINESS PARK
BENNERLEY ROADNOTTINGHAM. NG6 8WR
T: 01159 647280F: 01159 751576
LEGEND19
0812
-403
.080
62.0
0001
_War
ringt
on M
SA_L
M-1
-LC
-1-L
C-2
.dw
g
www.slrconsulting.com
© This drawing and its content are the copyright of SLR Consulting Ltd and may not be reproduced or amended except by prior written permission. SLR Consulting Ltd accepts no liability for any amendments made by other persons.
LM-1
1:2,500 @ A3 AUG 2019
LANDSCAPE MASTERPLANINDICATIVE LANDSCAPE MASTERPLAN
WARRINGTON MSA J11/M62
NEXISTING WOODLAND / TREES
TREE AND SHRUB PLANTING
FLOWER RICH ACID GRASSLAND
DIVERTED SILVER LANE BROOK,MARGINS AND/ MARSHY ACIDGRASSLAND
PUBLIC RIGHT OF WAY(DIVERTED)
PERMISSIVE FOOTPATH(WITHIN SITE)
AMENITY GRASSLAND
CHILDREN'S PLAY AREA
PROPOSED LANDSCAPE SCHEME
APPLICATION SITE BOUNDARY
PROPOSED DEVELOPMENT AREAS
PUBLIC RIGHT OF WAY (OFFSITE)
GAS MAIN
FACILITY BUILDING
FUEL FILLING STATION /ELECTRIC CHARGING STATION
PERMISSIVE ROUTE ONRESTORED LANDFILL
-
Track
GL 20.23CL 20.72
GL 21.67CL 22.08
GL 22.15CL 22.50
27
M 62
Pond
M 62
14
LEACRO
FT ROAD
SILVER LANE
Prestwood Court
1
8 9
1214
15
16
26
21
22
31
Drain
Drain
Pond
Pond
Drain
Drain
Drain
B1
D4
D5
New Hall Lane
D1D3D2
D6 D7
D8
D9 D10
C1
C2
Drain
EF
Drain Dr
ain
3233
Ward Bdy
CR
20
WAY
Ward
Bdy
22
CR
SILV
ER
M 62
LANE
M 62
SILVER LAN
E
Drain
Drain
Und
Def
Frank's Farm
Def
Def
Und
Brookfields
Pond
Track
Scale Date
ASPECT HOUSEASPECT BUSINESS PARK
BENNERLEY ROADNOTTINGHAM. NG6 8WR
T: 01159 647280F: 01159 751576
LEGEND19
0812
-403
.080
62.0
0001
_War
ringt
on M
SA_L
M-1
-LC
-1-L
C-2
.dw
g
www.slrconsulting.com
© This drawing and its content are the copyright of SLR Consulting Ltd and may not be reproduced or amended except by prior written permission. SLR Consulting Ltd accepts no liability for any amendments made by other persons.
RA-1
1:5,000 @ A3 AUG 2019
RECREATIONAL ACCESSINDICATIVE WIDER SITE CONTEXT
WARRINGTON MSA J11/M62
N
PUBLIC RIGHT OF WAYDIVERTED (PLANINGS)
PERMISSIVE FOOTPATH(GRASS)
APPLICATION SITE BOUNDARY
PERMISSIVE BRIDLEWAY (PLANINGS)
PERMISSIVE FOOTPATH (PLANINGS)
PUBLIC FOOTPATH (GRASS)
WIDER LANDSCAPE
MOTORWAY SERVICE AREA (MSA)
-
206 Extra MSA Group, Warrington MSA, J11 M62 - ES - ES Part 1
ES Part 1 Appendix 9
-
Gas Transmission Line
12m GTL Easement
12m GTL Easement
96m GTL Easement
Restored Risley Landfill Site
Silver Lane Broo
k - Diversion
M62J11
Tank
er
Service Yard
Car park entrance 1
Car park entrance 2
Car park entrance 3
Maintenance Access
Play Area
Long
Load
Par
king
Silver Lane Brook - Diversion
HGV Fuel Filling Station
Peat Habitat Zone
Public Footpath
Coach Parking(16 Spaces)
HGV Parking(105 Spaces)
Caravan Parking(15 spaces)
Car Fuel Filling Station
FFL: 22.55m AOD
Silver Lane
Facilities Building
FFL: 20.65m AOD
Car Parking (536 Spaces)
Document Reference:
Client:
Project No: Project Name:
Created By: Reviewed By: Scale at A1:Date:
Rev: Date: Description: By: Rvw:
This document is © architecture519 Ltd. If in doubt ASK. Drawing measurements shall not be
obtained by scaling. Verify all dimensions prior to construction or product manufacture.
Immediately report any discrepencies on this document to the Architect. This document shall be
read in conjunction with associated models, specifications and related consultants documents.
Status: Code Suitability description
Revision: Code Revision status
Planning
a. The Studio, Candle House, 1 Wharf
Approach, Granary Wharf,
Leeds, LS1 4GH
w. www.architecture519.com
t. 0113 213 5656
Project - Originator - Volume - Level - Type - Role - Number
1 : 1250
P9
INDICATIVE SITE PLAN
WARRINGTON MOTORWAY SERVICE AREA, J11 M622562
JLR 01.04.19TW
EXTRA MSA GROUP
RMS - 519 - ZZ - XX - DR - A - 0751
N
0 50 125 m25
KEYApplication Boundary
1:1250
NOTES:
The site boundary is based on Wardell Armstrong drawing no SH11739-006 with amendments discussed with Wardell Armstrong, Shoosmiths, Spawforths and i-transport and approved by Extra.
This red line boundary is to be used for planning purposes only.
Site and surrounding information based on Ordnance Survey Plan Information supplied by Spawforths. Licence no. 100022432.
Area of restored landfill site amended to reflect current site conditions.
This drawing is indicative and the plan, elevation, massing and detailing are all subject to change within the bounds of the parameter drawings submitted as part of this application.
P1 20.03.19 i-Transpoty access plan added, amenity building updated TW TWP2 11.04.19 Context coordination. FFS update JLR TW
P3 02.05.19 Play area moved in line with HSE comments. Parking adjusted to accomodate revised playarea. Bus stop added following public consultation in line with Extra instruction. Pedestrianlink from car parking to PROW added in line with Spawforths comments.
TW TWP4 22.05.19 Planning Draft For Review TW NABP5 11.07.19 New site layout to incorporate peat habitat zone JLR TWP6 16.07.19 Site plan updated in accordace with comments from highway engineer JLR TWP7 19.07.19 Bulding plan updated. Additional colour and detail attached JLR TWP8 25.07.19 FFL's updated JLR TWP9 26.07.19 Outline Planning Issue JLR TW
-
SiteRestored Landfill Site Adjacent FieldDrainage Ditch Facilities Building Naturalised Silver Lane Brook
SiteM62 Adjacent FieldSite
Facilities BuildingFuel Filling StationNaturalised Silver Lane BrookNaturalised Silver Lane Brook
Restored Landfill in backgroundLevels shown approximately only
10752
20752
Document Reference:
Client:
Project No: Project Name:
Created By: Reviewed By: Scale at A1:Date:
Rev: Date: Description: By: Rvw:
This document is © architecture519 Ltd. If in doubt ASK. Drawing measurements shall not be
obtained by scaling. Verify all dimensions prior to construction or product manufacture.
Immediately report any discrepencies on this document to the Architect. This document shall be
read in conjunction with associated models, specifications and related consultants documents.
Status: Code Suitability description
Revision: Code Revision status
Planning
a. The Studio, Candle House, 1 Wharf
Approach, Granary Wharf,
Leeds, LS1 4GH
w. www.architecture519.com
t. 0113 213 5656
Project - Originator - Volume - Level - Type - Role - Number
As indicated
P2
INDICATIVE SITE SECTIONS
WARRINGTON MOTORWAY SERVICE AREA, J11 M622562
JLR 01.04.19TW
EXTRA MSA GROUP
RMS - 519 - ZZ - XX - DR - A - 0752
1 : 1250INDICATIVE SITE SECTION 01
1 : 1250INDICATIVE SITE SECTION 02
1 : 2500INDICATIVE SECTION KEY PLAN
N
0 100 250 m50
KEYApplication Boundary
1:2500
0 50 125 m25
1:1250
NOTES:
The site boundary is based on Wardell Armstrong drawing no SH11739-006 with amendments discussed with Wardell Armstrong, Shoosmiths, Spawforths and i-transport and approved by Extra.
This red line boundary is to be used for planning purposes only.
Site and surrounding information based on Ordnance Survey Plan Information supplied by Spawforths. Licence no. 100022432.
Area of restored landfill site amended to reflect current site conditions.
This drawing is indicative and the plan, elevation, massing and detailing are all subject to change within the bounds of the parameter drawings submitted as part of this application.
P1 22.05.19 Planning Draft For Review TW NABP2 26.07.19 Outline Planning Issue JLR TW
-
Facilites - Back of House
Facilities - Public Facility
Facilities - Lettable Area
Facilities - Plant
Facilities - Public Circulation
Hotel - Back Of House
Hotel - Bedrooms
Hotel - Circulation
Hotel - Front Of House
Hotel - Plant
Amenity - Lettable Area
Facilites - Back of House
Facilities - External Plant
Facilities - Lettable Area
Facilities - Public Circulation
Hotel - Back Of House
Hotel - Bedrooms
Hotel - Circulation
Hotel - Back Of House
Hotel - Bedrooms
Hotel - Circulation
Document Reference:
Client:
Project No: Project Name:
Created By: Reviewed By: Scale at A1:Date:
Rev: Date: Description: By: Rvw:
This document is © architecture519 Ltd. If in doubt ASK. Drawing measurements shall not be
obtained by scaling. Verify all dimensions prior to construction or product manufacture.
Immediately report any discrepencies on this document to the Architect. This document shall be
read in conjunction with associated models, specifications and related consultants documents.
Status: Code Suitability description
Revision: Code Revision status
Planning
a. The Studio, Candle House, 1 Wharf
Approach, Granary Wharf,
Leeds, LS1 4GH
w. www.architecture519.com
t. 0113 213 5656
Project - Originator - Volume - Level - Type - Role - Number
1 : 500
P2
INDICATIVE FLOOR PLANS
WARRINGTON MOTORWAY SERVICE AREA, J11 M622562
TW 21.03.19TW
EXTRA MSA GROUP
RMS - 519 - ZZ - XX - DR - A - 0760
1 : 500INDICATIVE GROUND FLOOR PLAN
1 : 500INDICATIVE FIRST FLOOR PLAN
1 : 500INDICATIVE SECOND FLOOR PLAN
P1 22.05.19 Planning Draft For Review TW NABP2 26.07.19 Outline Planning Issue JLR TW
NOTES:
The site boundary is based on Wardell Armstrong drawing no SH11739-006 with amendments discussed with Wardell Armstrong, Shoosmiths, Spawforths and i-transport and approved by Extra.
This red line boundary is to be used for planning purposes only.
Site and surrounding information based on Ordnance Survey Plan Information supplied by Spawforths. Licence no. 100022432.
Area of restored landfill site amended to reflect current site conditions.
This drawing is indicative and the plan, elevation, massing and detailing are all subject to change within the bounds of the parameter drawings submitted as part of this application.
1:500
N
0 25 50 m
-
30765
10765
20765
40765
Fuel Filling Station BuildingFFL 22.550
Car Fuel Filling Forecourt
HGV Fuel Filling ForecourtTa
nker
Bay
Long
Load
Par
king
HGV Parking
Document Reference:
Client:
Project No: Project Name:
Created By: Reviewed By: Scale at A1:Date:
Rev: Date: Description: By: Rvw:
This document is © architecture519 Ltd. If in doubt ASK. Drawing measurements shall not be
obtained by scaling. Verify all dimensions prior to construction or product manufacture.
Immediately report any discrepencies on this document to the Architect. This document shall be
read in conjunction with associated models, specifications and related consultants documents.
Status: Code Suitability description
Revision: Code Revision status
Planning
a. The Studio, Candle House, 1 Wharf
Approach, Granary Wharf,
Leeds, LS1 4GH
w. www.architecture519.com
t. 0113 213 5656
Project - Originator - Volume - Level - Type - Role - Number
As indicated
P2
INDICATIVE FUEL FILLING STATION PLANS ANDELEVATIONS
WARRINGTON MOTORWAY SERVICE AREA, J11 M622562
TW 22.05.19NAB
EXTRA MSA GROUP
RMS - 519 - ZZ - XX - DR - A - 0765
1 : 2500INDICATIVE FUEL FILLING STATION KEY PLAN
1 : 500INDICATIVE FUEL FILLING STATION GROUND FLOOR PLAN
1 : 50001 - FFS INDICATIVE NORTH MASSING ELEVATION
1 : 50002 - FFS INDICATIVE WEST MASSING ELEVATION
1 : 50003 - FFS INDICATIVE EAST MASSING ELEVATION
1 : 50004 - FFS INDICATIVE SOUTH MASSING ELEVATION
N
0 100 250 m50
KEYApplication Boundary
1:2500
0 25 50 m
1:500
P1 22.05.19 Planning Draft For Review TW NABP2 26.07.19 Outline Planning Issue JLR TW
NOTES:
The site boundary is based on Wardell Armstrong drawing no SH11739-006 with amendments discussed with Wardell Armstrong, Shoosmiths, Spawforths and i-transport and approved by Extra.
This red line boundary is to be used for planning purposes only.
Site and surrounding information based on Ordnance Survey Plan Information supplied by Spawforths. Licence no. 100022432.
Area of restored landfill site amended to reflect current site conditions.
This drawing is indicative and the plan, elevation, massing and detailing are all subject to change within the bounds of the parameter drawings submitted as part of this application.
-
30770
50770
10770
40770
60770 2
0770
10752
----
Restored Landfill in backgroundLevels shown approximately only
Document Reference:
Client:
Project No: Project Name:
Created By: Reviewed By: Scale at A1:Date:
Rev: Date: Description: By: Rvw:
This document is © architecture519 Ltd. If in doubt ASK. Drawing measurements shall not be
obtained by scaling. Verify all dimensions prior to construction or product manufacture.
Immediately report any discrepencies on this document to the Architect. This document shall be
read in conjunction with associated models, specifications and related consultants documents.
Status: Code Suitability description
Revision: Code Revision status
Planning
a. The Studio, Candle House, 1 Wharf
Approach, Granary Wharf,
Leeds, LS1 4GH
w. www.architecture519.com
t. 0113 213 5656
Project - Originator - Volume - Level - Type - Role - Number
1 : 500
P2
INDICATIVE MASSING ELEVATIONS, SECTIONS AND ROOFPLAN
WARRINGTON MOTORWAY SERVICE AREA, J11 M622562
TW 21.03.19TW
EXTRA MSA GROUP
RMS - 519 - ZZ - XX - DR - A - 0770
1 : 500INDICATIVE ROOF PLAN
1 : 50001 - INDICATIVE SOUTH MASSING ELEVATION
1 : 50002 - INDICATIVE EAST MASSING ELEVATION
1 : 50003 - INDICATIVE NORTH MASSING ELEVATION
1 : 50004 - INDICATIVE WEST MASSING ELEVATION
1 : 50005 - INDICATIVE SECTION 05
1 : 50006 - INDICATIVE SECTION 06
P1 22.05.19 Planning Draft For Review TW NABP2 26.07.19 Outline Planning Issue JLR TW
NOTES:
The site boundary is based on Wardell Armstrong drawing no SH11739-006 with amendments discussed with Wardell Armstrong, Shoosmiths, Spawforths and i-transport and approved by Extra.
This red line boundary is to be used for planning purposes only.
Site and surrounding information based on Ordnance Survey Plan Information supplied by Spawforths. Licence no. 100022432.
Area of restored landfill site amended to reflect current site conditions.
This drawing is indicative and the plan, elevation, massing and detailing are all subject to change within the bounds of the parameter drawings submitted as part of this application.
1:500
N
0 25 50 m
-
Extra MSA Group, Warrington MSA, J11 M62 - ES Part 1 207
ES Part 1 Appendix 10
-
NOTES
LEGEND
Scale Date
ASPECT HOUSEASPECT BUSINESS PARK
BENNERLEY ROADNOTTINGHAM. NG6 8WR
T: 01159 647280F: 01159 751576
1908
13-0
9361
.000
01_I
llust
rativ
e_C
ross
_Sec
tions
_SH
.dw
g
www.slrconsulting.com
© This drawing and its content are the copyright of SLR Consulting Ltd and may not be reproduced or amended except by prior written permission. SLR Consulting Ltd accepts no liability for any amendments made by other persons.
BD-1
1:200 (OR AS SHOWN) A2 AUG 2019
ILLUSTRATIVE CROSS SECTIONSSILVER LANE BROOK DIVERSION
WARRINGTON MSA J11/M62
EXISTING LEVELS RETAINED TOPROTECT EXISTING TREES.
STAND-OFF AND EMBANKMENT TOBE MANAGED AS A SPECIES-RICH
GRASSLAND CORRIDOR
1) NORTHERN CHANNEL
2) EASTERN CHANNEL
3) SOUTHERN CHANNEL
PROPOSED GROUND LEVELPROFILE
EXISTING GROUND LEVELPROFILE
PARKING
RIVER DIVERSION. WATER SHOWN AT 0.5M DEPTH WITHSHALLOW MARGINS AND NATURAL REGENERATION OF
AQUATICS AND MARGINAL PLANTS.
PROPOSED TREE AND SHRUBPLANTING ADJACENT TO
ACCESS ROAD
STONE COBBLES, BOULDERS, PEBBLES ANDGRAVELS, AS WELL AS WOODY DEBRIS AND LOGS TO
PROVIDE A VARIED RIVER BED ENCOURAGINGRIFFLES AND AQUATIC BIODIVERSITY
EXCAVATED CHANNEL COVERED WITHSITE-DERIVED TOPSOIL LAYER.
FOLLOWED BY NATURAL REGENERATIONOF AQUATICS AND MARGINAL PLANTS
GAS MAIN
24M EASEMENT FOR GAS MAIN
PEATLAND HABITAT ZONE - TO BE A DIVERSE MIXTURE OFREGENERATING SCRUB, DRY AND WET HEATHLAND AND BOG
POOLS. LEVELS RAISED USING SITE DERIVED PEAT ANDSHAPED SO AS TO TIE IN WITH EXISTING GROUND LEVELS
THE PROPOSED DIVERSION AND ENHANCEMENTOF THE SILVER LANE BROOK INCORPORATESMEASURES TO INCREASE TREE COVER ANDPUBLIC ACCESS TO CONTRIBUTE POSITIVELY TOTHE OBJECTIVES OF THE MERSEY FOREST.
THESE SECTIONS ARE NOT BASED ON PRECISELOCATIONS, BUT THEY AIM TO DEMONSTRATETHE OVERALL APPROACH IN TERMSBIODIVERSITY AND LANDSCAPE ENHANCEMENTOF THE DIVERTED RIVER CORRIDOR.
ENGINEERED DETAILS, CROSSING POINTS ANDDRAINAGE CONNECTIONS ARE NOT SHOWN ANDARE TO BE DETERMINED.
PROPOSED NATIVE TREE AND SHRUBPLANTING ALONG SITE BOUNDARY TO
IMPROVE LANDSCAPING AND ECOLOGICALVALUE OF EXISTING TREE BELT ANDENCLOSURE OF THE DEVELOPMENT
RIVER DIVERSION. WATER SHOWN AT 0.5MDEPTH WITH SHALLOW MARGINS AND
NATURAL REGENERATION OF AQUATICSAND MARGINAL PLANTS
TREE LINED MARGINS (SUCH ASWILLOWS AND ALDER)
PROPOSED NATIVE TREE AND SHRUBPLANTING ALONG SITE BOUNDARY TO
IMPROVE LANDSCAPING AND ECOLOGICALVALUE OF EXISTING TREE BELT ANDENCLOSURE OF THE DEVELOPMENT
EXISTING LEVELS RETAINED TOMAINTAIN STAND-OFF TO GASMAIN. TO BE MANAGED AS ASPECIES-RICH GRASSLAND
CORRIDOR
EXISTING TREE / SHRUB
PROPOSED NATIVE TREE /SHRUB PLANTING
RIVER DIVERSION. WATER SHOWN AT 0.5M DEPTH WITHSHALLOW MARGINS AND NATURAL REGENERATION OF
AQUATICS AND MARGINAL PLANTS
PROPOSED TREE LINEDMARGINS (ALDER / WILLOW)
PROPOSED ADDITIONAL NATIVE TREE AND SHRUBPLANTING ALONG SITE BOUNDARY TO IMPROVE
LANDSCAPING AND ECOLOGICAL VALUE OF EXISTINGTREE BELT AND ENCLOSURE OF THE DEVELOPMENT
PROPOSED IN-CHANNEL FEATURESTO IMPROVE ECOLOGICAL AND
LANDSCAPE VALUE
ILLUSTRATIVE INSET TO CHANNEL BASE (1:50)
SKETCH PLAN VIEW
CURRENT
EDDY
EDDY
ROCKS OR COBBLES
GRAVELBARS
RIFFLES
WOODYDEBRIS
FOR SECTIONS
PERMISSIVE FOOTPATH
PERMISSIVEFOOTPATH
PERMISSIVEFOOTPATH
ILLUSTRATIVEBOUNDARYWITH M62
PEAT TO BE STRIPPEDOUT TO BASE ANDREPLACED WITHSTRUCTURAL FILL
CAR FUEL FILLING AREA
PEAT TO BE STRIPPEDOUT TO BASE ANDREPLACED WITHSTRUCTURAL FILL
STRUCTURAL FILLTO RAISE LEVELSTO FORMATION
INTERNALACCESS ROAD
AND GRASSVERGES
PROPOSED TREE AND SHRUBPLANTING ADJACENT TO ACCESS
ROAD
PROPOSED AMENITYGRASSLAND
PROPOSED FLOWER RICHGRASSLAND
IN-SITU GROUND /AREA OF FILL
INTERNALACCESS ROAD
AND GRASSVERGES
INTERNALACCESS ROAD
AND GRASSVERGES
-
DRG SIZE SCALE DATE
REV
DRAWN BY CHECKED BY APPROVED BY
DRG No.
PROJECT
CLIENT
22/07/2019
REVISION
DRAWING TITLE
CHK'D
© Copyright Reserved
DETAILS APP'D
1:2,500
DRAWNDATE
CRHSSW
A3
BSH11739/018
FIGURE 10.4PEAT DEPTH
WARRINGTON MOTORWAY SERVICE AREA,J11 M62
EXTRA MOTORWAY SERVICE AREA GROUP
CRCR
HSHS
SWSW
JULY 2019APRIL 2019
SITE BOUNDARY AMENDMENTSFIRST ISSUES
BA
Notes:
Survey undertaken in January 2019 by Wardell Armstrong.
Depths are below ground level and therefore include theupper approximately 0.36 m of peaty agricultural topsoil.
Aerial imagery shown for context purposes only.
Boundaries are indicative.
0.29 m 0.2 m 0.29 m 0.76 m 1.2 m0.26 m
1.3 m1.41 m0.79 m0.47 m0.41 m
0.69 m0.93 m 1.4 m 1.5 m 1.65 m
1.75 m1.41 m1.62 m0.83 m0.51 m
0.48 m 0.75 m 1.61 m 1.57 m0.54 m
1.64 m1.03 m0.2 m
0.33 m 0.27 m0.7 m
0.52 m0.29 m0.3 m
0.34 m 0.45 m 0.84 m
0.48 m0.48 m0.24 m
0.25 m0.26 m 0.23 m
0.4 m
0.25 m
0.3 m
0.28 m
0.33 m1.05 m
0.34 m
0.4 m
0.38 m
0.4 m
© 2019 Microsoft Corporation © 2019 DigitalGlobe ©CNES (2019) Distribution Airbus DS © 2019 HERE
0 100
Metres
KEYSite BoundaryPeat Depth Survey AreaSurvey Points
Peat Depth Interpolation0.0 ≤ x < 0.5 m0.5 ≤ x < 1.0 m1.0 ≤ x < 1.5 m1.5 ≤ x < 2.0 m
-
DRG SIZE SCALE DATE
REV
DRAWN BY CHECKED BY APPROVED BY
DRG No.
PROJECT
CLIENT
22/08/2019
REVISION
DRAWING TITLE
CHK'D
© Copyright Reserved
DETAILS APP'D
1:2,500
DRAWNDATE
CRHSSW
A3
CSH11739/034
FIGURE 10.5INDICATIVE PEAT DEPTH AND SITE LAYOUT
WARRINGTON MOTORWAY SERVICE AREA,J11 M62
EXTRA MOTORWAY SERVICE AREA GROUP
CRCRCR
HSHSHS
HMSWSW
07/201907/201904/2019
SITE LAYOUT AMENDEDSITE BOUNDARY AMENDMENTS
FIRST ISSUE
CBA
Notes:
Survey undertaken in January 2019 by Wardell Armstrong.
Depths are below ground level and therefore include theupper approximately 0.36 m of peaty agricultural topsoil.
Boundaries are indicative.
Site Layout taken from Site Layout Option B1
0.29 m 0.2 m 0.29 m 0.76 m 1.2 m0.26 m
1.3 m1.41 m0.79 m0.47 m0.41 m
0.69 m0.93 m 1.4 m 1.5 m 1.65 m
1.75 m1.41 m1.62 m0.83 m0.51 m
0.48 m 0.75 m 1.61 m 1.57 m0.54 m
1.64 m1.03 m0.2 m
0.33 m 0.27 m0.7 m
0.52 m0.29 m0.3 m
0.34 m 0.45 m 0.84 m
0.48 m0.48 m0.24 m
0.25 m0.26 m 0.23 m
0.4 m
0.25 m
0.3 m
0.28 m
0.33 m1.05 m
0.34 m
0.4 m
0.38 m
0.4 m
0 100
Metres
KEYSite BoundaryPeat Depth Survey AreaSurvey Points
Peat Depth Interpolation0.0 ≤ x < 0.5 m0.5 ≤ x < 1.0 m1.0 ≤ x < 1.5 m1.5 ≤ x < 2.0 m
Peat HabitatZone
-
A
A
B
B
C
C
D
D
Elevation (mAO
D) El
evat
ion
(mAO
D)
Longsection A(Vertical Exaggeration x2.50)
18.5019.00
20.00
21.00
22.00
23.00
18.5019.00
20.00
21.00
22.00
23.00
Distance (m)
Existing Levels
Proposed Levels
Base of Peat
2.50
5.00
7.50
10.0
0
12.5
0
15.0
0
17.5
0
20.0
0
22.5
0
25.0
0
27.5
0
30.0
0
32.5
0
35.0
0
37.5
0
40.0
0
42.5
0
45.0
0
47.5
0
50.0
0
52.5
0
55.0
0
57.5
0
60.0
0
62.5
0
65.0
0
67.5
0
70.0
0
72.5
0
75.0
0
77.5
0
80.0
0
82.5
0
85.0
0
87.5
0
90.0
0
92.5
0
95.0
0
97.5
0
20.6
8
20.7
0
20.7
1
20.7
3
20.7
5
20.7
8
20.8
1
20.8
4
20.8
6
20.8
9
20.9
2
20.9
4
20.9
6
20.9
9
21.0
1
21.0
3
21.0
5
21.0
6
21.0
8
21.0
9
21.0
8
21.0
6
21.0
5
21.0
2
20.9
8
20.9
1
20.9
1
20.9
1
20.9
1
20.9
0
20.8
9
20.8
9
20.8
8
20.8
7
20.8
6
20.8
5
20.8
9
20.9
4
20.9
9
21.4
7
22.4
3
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.2
9
21.3
1
Elevation (mAO
D) El
evat
ion
(mAO
D)
Longsection B(Vertical Exaggeration x2.50)
18.5019.00
20.00
21.00
22.00
23.00
18.5019.00
20.00
21.00
22.00
23.00
Distance (m)
Existing Levels
Proposed Levels
Base of Peat
2.50
5.00
7.50
10.0
0
12.5
0
15.0
0
17.5
0
20.0
0
22.5
0
25.0
0
27.5
0
30.0
0
32.5
0
35.0
0
37.5
0
40.0
0
42.5
0
45.0
0
47.5
0
50.0
0
52.5
0
55.0
0
57.5
0
60.0
0
62.5
0
65.0
0
67.5
0
70.0
0
72.5
0
75.0
0
77.5
0
80.0
0
82.5
0
85.0
0
87.5
0
90.0
0
92.5
0
95.0
0
97.5
0
21.3
5
21.3
7
21.4
0
21.4
2
21.4
4
21.4
7
21.4
8
21.4
5
21.4
3
21.4
0
21.3
7
21.3
5
21.3
2
21.2
9
21.2
7
21.2
6
21.2
6
21.2
6
21.2
7
21.2
7
21.2
8
21.2
8
21.2
8
21.2
4
21.2
1
21.1
8
21.1
6
21.0
5
21.0
4
21.0
5
21.0
6
21.0
7
21.0
7
21.0
6
21.0
5
21.0
3
21.0
2
21.0
2
21.0
2
21.6
7
22.6
3
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.7
0
21.7
3
Elevation (mAO
D) El
evat
ion
(mAO
D)
Longsection C(Vertical Exaggeration x2.50)
18.5019.00
20.00
21.00
22.00
23.00
18.5019.00
20.00
21.00
22.00
23.00
Distance (m)
Existing Levels
Proposed Levels
Base of Peat
2.50
5.00
7.50
10.0
0
12.5
0
15.0
0
17.5
0
20.0
0
22.5
0
25.0
0
27.5
0
30.0
0
32.5
0
35.0
0
37.5
0
40.0
0
42.5
0
45.0
0
47.5
0
50.0
0
52.5
0
55.0
0
57.5
0
60.0
0
62.5
0
65.0
0
67.5
0
70.0
0
72.5
0
75.0
0
77.5
0
80.0
0
82.5
0
85.0
0
87.5
0
90.0
0
92.5
0
95.0
0
97.5
0
21.6
3
21.6
3
21.6
4
21.6
4
21.6
3
21.6
2
21.6
1
21.6
0
21.5
8
21.5
7
21.5
6
21.5
5
21.5
4
21.5
2
21.5
0
21.4
9
21.4
9
21.4
9
21.4
8
21.4
8
21.4
6
21.4
5
21.4
3
21.4
2
21.4
0
21.2
7
21.2
7
21.2
7
21.2
7
21.2
8
21.2
9
21.3
0
21.3
0
21.3
1
21.3
2
21.3
3
21.3
3
21.3
8
21.4
5
21.9
5
22.9
0
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
7
21.9
1
Elevation (mAO
D) El
evat
ion
(mAO
D)
Longsection D(Vertical Exaggeration x2.50)
18.5019.00
20.00
21.00
22.00
23.00
18.5019.00
20.00
21.00
22.00
23.00
Distance (m)
Existing Levels
Proposed Levels
Base of Peat
2.50
5.00
7.50
10.0
0
12.5
0
15.0
0
17.5
0
20.0
0
22.5
0
25.0
0
27.5
0
30.0
0
32.5
0
35.0
0
37.5
0
40.0
0
42.5
0
45.0
0
47.5
0
50.0
0
52.5
0
55.0
0
57.5
0
60.0
0
62.5
0
65.0
0
67.5
0
70.0
0
72.5
0
75.0
0
77.5
0
80.0
0
82.5
0
85.0
0
87.5
0
90.0
0
92.5
0
95.0
0
97.5
0
21.9
8
21.7
9
21.9
8
21.9
9
22.0
0
22.0
1
22.0
1
22.0
2
22.0
0
21.9
8
21.9
7
21.9
5
21.9
3
21.9
1
21.9
0
21.8
8
21.8
6
21.8
4
21.8
3
21.8
1
21.7
9
21.7
8
21.7
6
21.7
4
21.7
2
21.7
0
21.6
9
21.6
7
21.5
6
21.5
7
21.5
4
21.5
1
21.4
8
21.4
5
21.4
5
21.4
5
21.4
4
21.4
4
21.4
4
21.9
9
22.7
8
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.8
9
22.1
8
20.0
5
20.0
0
19.9
4
19.8
9
19.8
3
19.7
8
19.7
3
19.7
2
19.7
1
19.6
9
19.6
7
19.6
5
19.6
3
19.6
1
19.5
9
19.5
7
19.5
5
19.5
3
19.5
1
19.4
9
19.4
7
19.4
6
19.4
4
19.4
2
19.4
1
19.3
9
19.3
9
19.4
1
19.4
8
19.5
3
19.6
1
19.6
8
19.7
6
19.8
3
19.9
1
19.9
8
20.0
5
20.1
3
20.2
0
Silver Lane Brook - Diversion
Silver Lane Brook
- Diversion
Peat HabitatZone
19.8
9
19.8
3
19.7
7
19.7
1
19.7
1
19.7
1
19.7
1
19.7
1
19.7
1
19.7
1
19.7
1
19.7
1
19.7
1
19.7
1
19.7
0
19.6
9
19.6
9
19.6
8
19.6
7
19.6
7
19.6
6
19.6
5
19.6
5
19.6
4
19.6
3
19.6
2
19.6
1
19.6
0
19.5
9
19.6
1
19.6
7
19.7
5
19.8
3
19.9
1
19.9
9
20.0
7
20.1
5
20.2
3
20.3
1
20.2
5
20.2
4
20.2
2
20.2
0
20.1
9
20.1
7
20.1
5
20.1
4
20.1
2
20.1
1
20.1
0
20.0
8
20.0
7
20.0
6
20.0
4
20.0
3
20.0
1
20.0
0
19.9
7
19.9
4
19.9
3
19.9
1
19.9
0
19.8
8
19.8
7
19.8
6
19.8
4
19.8
3
19.8
1
19.8
0
19.7
8
19.7
7
19.7
6
19.7
6
19.7
6
19.7
6
19.7
7
19.7
7
19.7
7
21.0
8
21.0
4
21.0
0
20.9
6
20.9
2
20.8
8
20.8
4
20.8
0
20.7
6
20.7
2
20.6
8
20.6
4
20.6
1
20.5
7
20.5
3
20.5
0
20.4
8
20.4
6
20.4
4
20.4
3
20.4
1
20.3
9
20.3
7
20.3
6
20.3
4
20.3
2
20.3
0
20.2
9
20.2
7
20.2
5
20.2
3
20.2
1
20.2
0
20.1
8
20.1
7
20.1
5
20.1
4
20.1
3
20.1
2
-1.62-1.62
-1.74-1.74
-2.13-2.13
-1.89-1.89
-1.43-1.43
-0.98-0.98
-1.65-1.65
-2.11-2.11
-2.62-2.62
-3.14-3.14
-3.38-3.38
-3.36-3.36
-3.33-3.33
-3.05-3.05
-2.36-2.36
-1.79-1.79
-1.48-1.48
-1.45-1.45
-1.70-1.70
-2.07-2.07
-2.47-2.47
-2.65-2.65
-2.42-2.42
-1.82-1.82
-0.97-0.97
-0.56-0.56
-1.73-1.73
-1.92-1.92
-2.43-2.43
-2.95-2.95
-3.23-3.23
-3.27-3.27
-3.32-3.32
-3.36-3.36
-3.39-3.39
-3.38-3.38
-3.36-3.36
-3.34-3.34
-3.31-3.31
-3.29-3.29
-3.27-3.27
-3.28-3.28
-3.28-3.28
-3.27-3.27
-3.26-3.26
-3.24-3.24
-3.23-3.23
-3.21-3.21
-2.57-2.57
-1.27-1.27
-0.93-0.93
-0.62-0.62
-1.47-1.47
-1.79-1.79
-2.29-2.29
-2.78-2.78
-3.08-3.08
-3.12-3.12
-3.15-3.15
-3.19-3.19
-3.23-3.23
-3.28-3.28
-3.32-3.32
-3.36-3.36
-3.39-3.39
-3.41-3.41
-3.38-3.38
-3.36-3.36
-3.34-3.34
-3.32-3.32
-3.31-3.31
-3.32-3.32
-3.32-3.32
-3.32-3.32
-3.30-3.30
-3.29-3.29
-3.27-3.27
-3.26-3.26
-3.26-3.26
-2.75-2.75
-1.50-1.50
-0.66-0.66
-1.57-1.57
-1.35-1.35
-1.63-1.63
-2.14-2.14
-2.65-2.65
-2.93-2.93
-2.97-2.97
-3.00-3.00
-3.04-3.04
-3.07-3.07
-3.11-3.11
-3.14-3.14
-3.19-3.19
-3.23-3.23
-3.28-3.28
-3.32-3.32
-3.37-3.37
-3.40-3.40
-3.42-3.42
-3.41-3.41
-3.38-3.38
-3.36-3.36
-3.35-3.35
-3.35-3.35
-3.36-3.36
-3.36-3.36
-3.36-3.36
-3.34-3.34
-3.33-3.33
-3.32-3.32
-3.31-3.31
-3.28-3.28
-3.23-3.23
-3.09-3.09
-2.00-2.00
-1.02-1.02
-1.62-1.62
-1.59-1.59
-1.44-1.44
-1.58-1.58
-2.06-2.06
-2.53-2.53
-2.79-2.79
-2.81-2.81
-2.84-2.84
-2.88-2.88
-2.92-2.92
-2.96-2.96
-2.99-2.99
-3.03-3.03
-3.06-3.06
-3.10-3.10
-3.14-3.14
-3.19-3.19
-3.23-3.23
-3.28-3.28
-3.32-3.32
-3.37-3.37
-3.40-3.40
-3.42-3.42
-3.43-3.43
-3.41-3.41
-3.39-3.39
-3.39-3.39
-3.39-3.39
-3.40-3.40
-3.41-3.41
-3.40-3.40
-3.39-3.39
-3.37-3.37
-3.36-3.36
-3.33-3.33
-3.28-3.28
-3.24-3.24
-3.19-3.19
-3.14-3.14
-2.78-2.78
-1.93-1.93
-1.00-1.00
-1.69-1.69
-1.75-1.75
-1.56-1.56
-1.48-1.48
-2.48-2.48
-2.79-2.79
-2.80-2.80
-2.80-2.80
-2.81-2.81
-2.81-2.81
-2.82-2.82
-2.83-2.83
-2.87-2.87
-2.91-2.91
-2.95-2.95
-2.98-2.98
-3.02-3.02
-3.05-3.05
-3.10-3.10
-3.15-3.15
-3.19-3.19
-3.24-3.24
-3.28-3.28
-3.33-3.33
-3.37-3.37
-3.40-3.40
-3.43-3.43
-3.45-3.45
-3.44-3.44
-3.42-3.42
-3.43-3.43
-3.43-3.43
-3.44-3.44
-3.45-3.45
-3.44-3.44
-3.43-3.43
-3.41-3.41
-3.38-3.38
-3.34-3.34
-3.29-3.29
-3.24-3.24
-3.20-3.20
-3.15-3.15
-3.10-3.10
-3.06-3.06
-2.41-2.41
-0.68-0.68
-1.75-1.75
-1.82-1.82
-1.89-1.89
-1.72-1.72
-1.71-1.71
-2.76-2.76
-2.80-2.80
-2.82-2.82
-2.82-2.82
-2.83-2.83
-2.83-2.83
-2.84-2.84
-2.84-2.84
-2.85-2.85
-2.86-2.86
-2.90-2.90
-2.94-2.94
-2.97-2.97
-3.01-3.01
-3.06-3.06
-3.10-3.10
-3.15-3.15
-3.19-3.19
-3.24-3.24
-3.28-3.28
-3.33-3.33
-3.37-3.37
-3.40-3.40
-3.43-3.43
-3.46-3.46
-3.46-3.46
-3.46-3.46
-3.47-3.47
-3.48-3.48
-3.48-3.48
-3.49-3.49
-3.49-3.49
-3.47-3.47
-3.44-3.44
-3.39-3.39
-3.34-3.34
-3.30-3.30
-3.25-3.25
-3.06-3.06
-2.59-2.59
-2.12-2.12
-1.55-1.55
-0.97-0.97
-1.81-1.81
-1.88-1.88
-1.94-1.94
-2.01-2.01
-2.08-2.08
-1.31-1.31
-1.45-1.45
-2.20-2.20
-2.74-2.74
-2.78-2.78
-2.82-2.82
-2.84-2.84
-2.85-2.85
-2.85-2.85
-2.86-2.86
-2.86-2.86
-2.87-2.87
-2.87-2.87
-2.88-2.88
-2.89-2.89
-2.93-2.93
-2.97-2.97
-3.01-3.01
-3.06-3.06
-3.10-3.10
-3.15-3.15
-3.19-3.19
-3.24-3.24
-3.29-3.29
-3.33-3.33
-3.37-3.37
-3.40-3.40
-3.42-3.42
-3.43-3.43
-3.44-3.44
-3.46-3.46
-3.47-3.47
-3.49-3.49
-3.50-3.50
-3.52-3.52
-3.52-3.52
-3.49-3.49
-3.44-3.44
-3.21-3.21
-2.63-2.63
-2.10-2.10
-1.63-1.63
-1.16-1.16
-0.69-0.69
-1.80-1.80
-1.93-1.93
-2.00-2.00
-2.07-2.07
-2.14-2.14
-2.21-2.21
-2.28-2.28
-1.75-1.75
-1.40-1.40
-1.41-1.41
-1.42-1.42
-1.68-1.68
-2.26-2.26
-2.68-2.68
-2.72-2.72
-2.77-2.77
-2.81-2.81
-2.85-2.85
-2.87-2.87
-2.87-2.87
-2.88-2.88
-2.88-2.88
-2.89-2.89
-2.90-2.90
-2.91-2.91
-2.92-2.92
-2.93-2.93
-2.93-2.93
-2.97-2.97
-3.02-3.02
-3.06-3.06
-3.11-3.11
-3.15-3.15
-3.20-3.20
-3.24-3.24
-3.29-3.29
-3.33-3.33
-3.36-3.36
-3.37-3.37
-3.35-3.35
-3.32-3.32
-3.32-3.32
-3.35-3.35
-3.38-3.38
-3.41-3.41
-3.43-3.43
-3.46-3.46
-2.99-2.99
-2.46-2.46
-1.90-1.90
-1.34-1.34
-1.99-1.99
-2.06-2.06
-2.13-2.13
-2.20-2.20
-2.27-2.27
-2.33-2.33
-2.39-2.39
-2.43-2.43
-2.47-2.47
-2.51-2.51
-2.55-2.55
-2.59-2.59
-2.63-2.63
-2.67-2.67
-2.71-2.71
-2.75-2.75
-2.79-2.79
-2.83-2.83
-2.87-2.87
-2.90-2.90
-2.91-2.91
-2.93-2.93
-2.94-2.94
-2.96-2.96
-2.99-2.99
-3.01-3.01
-3.02-3.02
-2.99-2.99
-2.95-2.95
-2.99-2.99
-3.04-3.04
-3.08-3.08
-3.12-3.12
-3.17-3.17
-3.21-3.21
-3.25-3.25
-3.29-3.29
-3.32-3.32
-3.28-3.28
-3.24-3.24
-3.20-3.20
-3.17-3.17
-3.19-3.19
-3.22-3.22
-2.80-2.80
-2.36-2.36
-1.90-1.90
-1.44-1.44
-1.77-1.77
-2.12-2.12
-2.19-2.19
-2.26-2.26
-2.33-2.33
-2.38-2.38
-2.43-2.43
-2.46-2.46
-2.49-2.49
-2.53-2.53
-2.57-2.57
-2.61-2.61
-2.65-2.65
-2.69-2.69
-2.73-2.73
-2.77-2.77
-2.81-2.81
-2.85-2.85
-2.89-2.89
-2.93-2.93
-2.97-2.97
-3.01-3.01
-3.04-3.04
-3.07-3.07
-3.10-3.10
-3.13-3.13
-3.11-3.11
-3.02-3.02
-2.97-2.97
-3.01-3.01
-3.06-3.06
-3.10-3.10
-3.14-3.14
-3.19-3.19
-3.23-3.23
-3.27-3.27
-3.29-3.29
-3.23-3.23
-3.13-3.13
-3.06-3.06
-2.58-2.58
-2.11-2.11
-1.67-1.67
-1.23-1.23
-2.18-2.18
-2.25-2.25
-2.32-2.32
-2.38-2.38
-2.42-2.42
-2.45-2.45
-2.49-2.49
-2.52-2.52
-2.56-2.56
-2.60-2.60
-2.64-2.64
-2.68-2.68
-2.72-2.72
-2.76-2.76
-2.80-2.80
-2.84-2.84
-2.87-2.87
-2.91-2.91
-2.95-2.95
-2.99-2.99
-3.03-3.03
-3.07-3.07
-3.11-3.11
-3.15-3.15
-3.18-3.18
-3.15-3.15
-3.06-3.06
-2.99-2.99
-3.03-3.03
-3.08-3.08
-3.12-3.12
-3.16-3.16
-3.21-3.21
-3.25-3.25
-3.15-3.15
-2.64-2.64
-2.07-2.07
-1.52-1.52
-1.32-1.32
-2.31-2.31
-2.37-2.37
-2.41-2.41
-2.45-2.45
-2.48-2.48
-2.51-2.51
-2.55-2.55
-2.58-2.58
-2.62-2.62
-2.66-2.66
-2.70-2.70
-2.74-2.74
-2.78-2.78
-2.82-2.82
-2.86-2.86
-2.89-2.89
-2.93-2.93
-2.97-2.97
-3.01-3.01
-3.05-3.05
-3.09-3.09
-3.13-3.13
-3.17-3.17
-3.18-3.18
-3.18-3.18
-3.10-3.10
-3.02-3.02
-3.05-3.05
-3.10-3.10
-3.03-3.03
-2.59-2.59
-2.16-2.16
-1.71-1.71
-1.68-1.68
-2.41-2.41
-2.44-2.44
-2.47-2.47
-2.51-2.51
-2.54-2.54
-2.58-2.58
-2.61-2.61
-2.65-2.65
-2.69-2.69
-2.72-2.72
-2.76-2.76
-2.80-2.80
-2.84-2.84
-2.88-2.88
-2.91-2.91
-2.95-2.95
-2.99-2.99
-3.03-3.03
-3.07-3.07
-3.11-3.11
-3.15-3.15
-3.17-3.17
-3.18-3.18
-3.18-3.18
-2.85-2.85
-2.35-2.35
-1.94-1.94
-1.55-1.55
-1.39-1.39
-2.47-2.47
-2.50-2.50
-2.53-2.53
-2.57-2.57
-2.60-2.60
-2.64-2.64
-2.67-2.67
-2.71-2.71
-2.74-2.74
-2.78-2.78
-2.82-2.82
-2.86-2.86
-2.89-2.89
-2.93-2.93
-2.97-2.97
-3.01-3.01
-3.05-3.05
-3.09-3.09
-3.07-3.07
-2.68-2.68
-2.26-2.26
-1.85-1.85
-2.00-2.00
-2.56-2.56
-2.60-2.60
-2.63-2.63
-2.66-2.66
-2.70-2.70
-2.73-2.73
-2.76-2.76
-2.80-2.80
-2.84-2.84
-2.88-2.88
-2.91-2.91
-2.95-2.95
-2.75-2.75
-2.36-2.36
-1.98-1.98
-1.59-1.59
-1.43-1.43
-1.87-1.87
-2.20-2.20
-2.47-2.47
-2.75-2.75
-2.77-2.77
-2.57-2.57
-2.37-2.37
-2.05-2.05
-1.66-1.66 KEY:
EXISTING PROFILE
TOPSOIL STRIP LEVEL (360mm DEPTH)
BASE OF PEAT / TOP OF NATURAL CLAY
PROPOSED SITE LEVELS
CLAY BUND / TOP OF PEAT LEVEL
NOTES:
1. DRAWING IS FOR PLANNING PURPOSES ONLY.
2. CLAY BUND STRUCTURE SUBJECT TO DETAILEDDESIGN.
3. TOP OF PEAT LEVEL SUBJECT TO AGREEMENT,LEVEL SHOWN AT 22.9m AOD.
4. BUND TO BE 1 IN 2.5 GRADE MAX.
5. FOUNDATION FOR BUND SUBJECT TOCONFIRMATION AND DETAILED DESIGN.
6. ELEVATIONS SHOWN ARE BETWEEN BASE OFPEAT/TOP OF NATURAL CLAY LEVEL AND 22.9mAOD LEVEL.
7. TOTAL DEPTHS INCLUDE IN SITU PEAT AND PEATTRANSFERRED FROM DEVELOPMENT AREA.
8. PEAT DATA CALCULATED FROM PEAT SURVEYUNDERTAKEN BY WARDELL ARMSTRONG INJANUARY 2019.
Copyright Reservedc
DRAWN BY CHECKED BY
CLIENT
PROJECT
DRAWING TITLE
SCALE DATE
APPROVED BY
APP'DCHK'DREVISION DETAILS DATE DRAWN
DO NOT SCALE FROM THIS DRAWING
N:\SH\SH11739 - MOTORWAY SERVICES, WARRINGTON\03 - DESIGN\AUTOCAD\SH11739-006 - OVERALL PEAT DEPTHS & TYPICAL SECTIONS.DWG
DRG No.
DRG SIZE
REV
A1
WWW.WARDELL-ARMSTRONG.COM
MANCHESTER
LONDON
NEWCASTLE UPON TYNE | TEL 0191 232 0943
GLASGOW
EDINBURGH
CARLISLE
CARDIFF
BOLTON
BIRMINGHAM
SHEFFIELD
STOKE ON TRENT
EXTRA MSA GROUP
MOTORWAY SERICES, WARRINGTON
INDICATIVE PEAT DEPTHSWITH PEAT HABITAT ZONE
SH11739-006 -
1:500 23.07.19
AS HS JS
-
208 Extra MSA Group, Warrington MSA, J11 M62 - ES - ES Part 1
ES Part 1 Appendix 11
-
GV
RS
RS
RS
RS
GP
GP
BH
BH
BH
BH
BH
BH
MH
GAS
393600N 393600N
393700N 393700N
393800N 393800N
393900N 393900N
366800E
366900E
367000E
367100E
367200E
21.9321.23
20.94
20.76
20.77
20.81
20.81
20.76
21.00
20.79
20.74
20.77
20.59
20.61
20.77
20.76
20.62
20.61
21.28
21.05
20.91
20.77
21.01
21.18
21.22
21.26
21.21
21.15
21.13
21.04
21.00
21.00
20.96
20.74
20.46
20.16
21.12
21.08
20.71
20.39
20.17
20.29
20.52
20.73
20.85
20.95
20.97
21.04
21.0121.32
21.33
21.30
21.17
21.1521.75
21.08
20.95
20.70
20.64
20.50
20.54
20.09
20.03
20.35
20.36
20.17
20.03
20.13
20.07
20.18
19.94
19.96
19.54
19.76
19.43
19.27
19.49
19.44
19.39 19.44
19.20
19.45
19.53
19.30 19.44
19.11
19.16
19.18
19.08
19.0519.11
19.25
19.32
19.40 19.04
19.04
19.1219.09
19.18
19.3019.17
19.30
19.17
19.13
19.06
19.12
19.13
19.08
19.1419.04
19.0119.15
19.10
19.31
19.1219.25
19.31
19.07
19.1519.14
19.01
19.2419.20
19.15
19.3519.08
19.21
19.5719.19
19.33
19.14
19.2019.34
19.1819.20
19.1619.07
19.30
19.27 19.35
19.48
19.55
19.46
19.4019.36
19.51
19.61
19.69
19.55
19.59
19.53
19.59
19.73
19.59
19.3019.43
19.30
19.2319.23
19.27
19.18
19.16
19.18
19.1719.19
19.13
19.18
19.30
19.52
19.76
19.94
20.11
20.07
19.93
19.95
20.02
20.10
20.16
20.01
19.99
19.88
19.87
19.77
19.85
19.98
19.81
19.69
19.50
19.28
19.19
19.19
19.30
19.35
19.38
19.50
19.63
19.76
19.91
19.92
19.84
19.83
19.91
20.02
20.10
20.10
20.10
20.10
20.07
19.94
19.88
19.84
19.95
19.85
19.66
19.58
19.52
19.44
19.39
19.3019.31
19.41
19.55
19.80
19.63
19.75
19.86
19.94
19.89
19.91
20.07
20.12
20.16
20.21
20.37
20.62
20.92
20.68
20.58
20.45
20.35
20.31
20.18
20.14
19.99
19.95
19.83
19.84
19.76
19.83
19.68
19.45
19.41
19.27
19.28
19.38
19.46
19.59
19.75
19.77
19.83
19.86
20.01
20.15
20.05
20.09
20.30
20.31
20.37
20.42
20.56
20.6520.6320.65
20.51
20.46
20.39
20.37
20.20
20.07
20.10
20.04
20.20
20.26
20.38
20.52
20.57
20.59
20.61
20.51
20.44
20.33
20.23
20.21
20.13
20.37
20.36
20.59
20.56
20.61
20.43
20.54
20.55
20.36
20.14
20.59
20.34
20.33
20.07
20.04
20.04
20.01
19.99
19.91
19.83
20.18
20.02
19.87
19.79
19.77
19.71
19.62
19.52
19.41
19.34
19.41
19.44
19.43
19.55
19.57
19.60
19.69
19.82
19.62
19.57
19.52
19.46
19.44
19.43
19.3419.34
19.44
19.52
19.55
19.48
19.57
19.53
19.57
19.51
19.41
19.41
19.4319.43
19.34
19.28 19.39
19.4319.26
19.3519.55
19.6019.53
19.52
19.45
19.53
19.41
19.51
19.70
19.68
19.79
19.91
19.82
19.78
20.65
19.82
19.78
19.74
19.68
19.78
19.81
19.81
19.84
19.97
19.97
19.97
19.84
19.75
19.83
19.81
19.80
19.76
19.76
19.90
19.94
20.10
20.17
20.32
20.32
20.10
20.21
20.32
20.23
20.10
20.21
20.19
20.20
20.25
20.40
20.50
20.45
20.45
20.50
20.44
20.66 21.58
20.84
22.1621.77
20.92
21.08
20.81
22.0621.42
21.06
20.98
21.26
21.18
20.86
20.95
22.45
23.56
24.33
24.44
24.46
24.29
23.40
21.90
21.68
23.15
24.29
24.32
23.12
21.58
20.23
22.89
22.22
22.98
26.09
25.86
26.0226.02
25.93
25.97
25.73
25.45
25.1025.15
25.32
24.70
24.53
24.93
24.80 24.53
22.6524.0624.58
24.79
24.63
23.79
23.51
23.88
24.17
24.39
23.58
23.73
20.54
21.52
21.46
21.89
21.24
22.31
21.98
21.87
21.36
20.44
20.35
20.41
20.72
20.38
21.53
21.74
20.40
20.91
20.89
19.90
19.74
19.53
19.54
19.63
19.72
19.76
19.71
21.11
20.15
20.75
21.35
21.18
20.70
20.80
20.55
20.08
20.02
20.12
20.02
19.83
19.78
19.79
19.8920.49
19.69
19.81
19.87
19.74
19.6119.69
19.60
19.73
19.9620.12
20.4320.08
19.64
19.58
19.66
19.61
20.0520.29
20.58
20.67
19.6919.86
19.72
19.62
19.92
19.87
19.84
20.23
20.42
20.67
20.06
19.96
20.2720.83
20.15
19.88
20.28
20.96
21.03
20.29
20.29
20.50
20.89
21.17
20.55
20.29
20.32
20.33
20.58
20.35
20.45
20.29
20.05
20.17
20.37
25
25
25
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
2020
20
20
20
20
1.5m Post & R
ail Fence
Brambles
Bushes
1.2m Stoc
kproof Fe
nce
1.2m Stockproof Fence
Trac
k
Bushes
Wooded Area
Derelict Buildings
900mm dia Pipe
Area not Cultivated
Marshy Area
Marshy Area
Brambles
300mm Dia PipeINV - 19.33
WL - 19.31
INV - 19.18
INV - 19.18
WL - 19.91
WL - 19.70900mm dia PipeINV - 19.41
INV - 19.29
Woodland
Dry D
itch with Trees G
rowing on Eastern Slope
Dry D
itch with Trees G
rowing on Eastern Slope
SITE BOUNDARY
TOP OF SLOPE
BOTTOM OF SLOPE
EDGE OF TRACK
EDGE OF PAVING
ROAD CHANNEL
STOCKPROOF FENCE
POST & RAIL FENCE
PALLISADE FENCE
BARRIER
GATE
EDGE OF SCRUB/TREE COVER
INDIVIDUAL TREES
BOLLARD
BOREHOLE
ELECTRICITY POST
GAS MARKER
MANHOLE
ROAD GULLEY
TELECOM COVER
LAMP POST
SIGN POST
SPOT LEVELS
WATER LEVELS
REFERENCE
GU
RS
MH
BH
EP
BT
GAS
LP
Bol
23.26
WL - 22.88
NOTE
SITE SURVEYED BY GPS (OSTN15) & LEVELSSHOWN ARE IN METRES AOD.
Copyright Reservedc
DRAWN BY CHECKED BY
CLIENT
PROJECT
DRAWING TITLE
SCALE DATE
APPROVED BY
APP'DCHK'DREVISION DETAILS DATE DRAWN
DO NOT SCALE FROM THIS DRAWING
N:\SH\SH11739 - MOTORWAY SERVICES, WARRINGTON\03 - DESIGN\DRAWINGS\SH11739-019-A.DWG
DRG No.
DRG SIZE
REV
A0
WWW.WARDELL-ARMSTRONG.COMBOLTON | TEL 01204 227 227
BIRMINGHAM
CARDIFF
CARLISLE
EDINBURGH
GLASGOW
LONDON
MANCHESTER
NEWCASTLE UPON TYNE
SHEFFIELD
STOKE ON TRENT
WARINGTON MSAJ11 M62 MOTORWAY
POTENTIAL WARRINGTON MSA
TOPOGRAPHICAL SURVEYAS AT 19TH JANUARY 2019
PLAN 1
SH11739-019 A
1:500 21/01/19
SG TH AD
-
LP
LP
LP
LP
LP
LP
LP
GU
GU
GU
GU
GU
GUGU
GU
GU
GU
GU
GU
GV
BT
GU
GU
Bol
Bol
BolBolBolBol
BolBolBol
Bol
Bol
Bol
Bol
Bol
Bol
BolBol
RSRS
RS
RS
RS
RS
RSRS
MH
MH
BH
BH
BH
BH
BH
BH
BH
BH
BH
EP
GAS
393300N 393300N
393400N 393400N
393500N 393500N
393600N 393600N
366800E
366900E
367000E
367100E
367200E
26.74
26.64
26.6
6
26.4
826
.39
26.68
26.53
26.38
26.2
6
26.3
7
26.43
26.45
21.9321.23
22.69
23.07
23.5923.11
23.0423.26
21.9221.49
22.1521.88
21.53
21.41
21.2821.50
21.7721.98
22.0222.17
22.3422.3722.47
22.68
22.9022.96
22.9823.0523.03
22.90
22.63
22.12
21.58
21.39
21.19
21.00
20.89
20.75
20.66
20.50
20.63
20.93
20.94
20.76
20.77
20.81
20.81
20.76
21.00
21.00
20.71
20.61
20.65
20.72
20.82
20.97
21.18
21.47
21.80
22.05
22.56
22.74
22.85
22.82
22.5622.53
22.27
22.25
21.65
21.19
21.60
22.05
22.47
22.65
22.8922.79
22.51
22.37
22.18
21.81
21.34
21.02
20.83
20.69
20.64
20.62
20.75
20.88
21.14
21.54
21.90
22.15
22.29
22.43
22.71
22.51
22.24
22.19
22.08
21.95
21.74
21.54
21.17
20.89
20.73
20.58
20.72
20.79
20.74
20.77
20.59
20.61
20.77
20.84
20.84
21.11
21.45
21.65
21.82
21.99
22.03
22.02
22.06
22.16
22.28 22.19
21.96
21.96
21.92
21.84
21.79
21.69
21.69
21.66
21.40
21.15
21.16
20.76
20.62
20.61
22.14 22.14
22.07
22.05
22.00
21.84
21.75
21.65
21.56
21.39
21.48
21.58
21.28
21.05
20.91
20.77
21.01
21.18
21.22
21.24
21.48
21.39
21.46
21.50
21.63
21.71
21.83
21.8821.89
21.91
22.02
22.0321.90
21.79
21.75
21.68
21.54
21.49
21.47
21.41
21.39
21.48
21.26
21.21
21.15
21.13
21.7621.61
21.52
21.51
21.50
21.41
21.38
21.33
21.28
21.25
21.26
21.27
21.10
21.04
21.00
21.00
20.96
20.74
20.46
20.16
21.12
21.08
20.71
20.39
20.17
20.29
20.52
20.73
20.85
20.95
20.97
21.04
21.01
21.09
21.30
21.34
21.33
21.37
21.38
21.38
21.46
21.52
21.58
21.64
21.39
21.62
21.70
21.5822.04
21.58
21.73
21.72
21.73
21.62
21.49
21.63
21.62
21.64
21.47
21.32
21.33
21.30
21.17
21.1521.75
21.08
20.95
20.70
20.64
20.35
20.16
20.0120.10
20.10
20.10
20.10
20.16
20.21
20.37
20.62
20.92
20.68
20.58
20.45
20.35
20.31
20.31
20.37
20.42
20.56
20.6520.6320.65
20.51
20.46
20.39
20.37
20.26
20.38
20.52
20.57
20.59
20.61
20.51
20.44
20.33
20.23
20.13
20.37
20.36
20.59
20.56
20.61
20.43
20.54
20.55
20.36
20.14
20.59
20.34
20.33
20.07
20.04
20.19
20.20
20.25
20.40
20.50
20.45
20.45
20.50
20.44
20.66 21.58
20.84
22.1621.77
20.92
21.08
20.81
22.0621.42
21.06
20.98
21.26
21.18
20.86
20.95
20.78
20.9121.13
21.05
20.95
20.79
20.8120.96 21.62
20.91
20.94
20.87
21.07
21.1620.91
20.87
20.93
20.87
21.1621.73
21.4721.55
21.27
21.35
21.27
21.15
21.33
21.2521.86
20.96
21.17
20.96
20.85
21.16
20.83
20.78 21.15
21.1120.84
20.90
20.98
20.80
21.55
22.52
22.83
21.19
21.4621.17
24.03
24.41
24.32
26.11
26.39
26.35
26.82
26.90
26.8426.79
26.79 26.78
26.78
26.72
26.62
26.64
26.93
26.94
26.3926.44
26.48
26.63
26.71
25.43
25.0525.06
23.05
24.85
22.98
24.39
23.04
22.80
23.6122.55
22.18
26.18
23.32
26.85
26.80
24.51
24.51
25.01
25.01
26.15
24.07
26.29
26.28
26.65
26.78
26.86
26.99
26.87
26.80
26.85
23.40
23.3924.78
24.28
25.25
26.09
26.07
25.32
23.87
24.57
25.13
24.99
24.81
24.23
22.75
23.20
24.00
23.55
23.15
25.43
25.13
24.79
24.34
23.52
23.35
24.58
23.26
23.34
23.31
23.37
23.87
24.20
23.98
23.77
24.93
25.16
25.93
26.60
26.48
25.72
25.47
25.21
25.3025.22
25.2125.32
25.47
25.30
26.3526.86
26.9226.18
24.41
24.22
23.7626.03
26.66
25.9124.24
22.57
23.20
24.99
25.21
25.06
24.79
23.06
22.10
23.9024.81
24.90
24.79
24.60
23.2822.15
22.2323.67
24.50
24.67
24.49
24.40
23.47
21.94
22.45
23.56
24.33
24.44
24.46
24.29
23.40
21.90
21.68
23.15
24.29
24.32
23.12
21.58
20.23
22.89
22.22
22.98
25.73
25.45
25.1025.15
25.32
24.70
24.53
24.93
24.80 24.53
22.6524.0624.58
24.79
24.63
23.79
23.51
21.98
21.87
21.36
20.44
20.35
20.41
20.72
20.38
21.53
21.74
20.40
20.91
20.89
21.11
20.15
20.75
21.35
21.18
20.6720.28
20.96
21.03
20.29
20.29
20.50
20.89
21.17
20.55
20.29
20.32
20.33
20.58
20.35
26.66
26.54
26.48
26.49
26.54
26.68
26.74
26.83
26.91
26.9
2
27.0
327
.11
27.4
4
27.34
27.33
27.26 27.45
27.09
27.11
27.00
26.99
27.06
27.04
27.03
26.92
26.72
26.7526.77
27.08
27.05
27.05 26.99
26.93
27.18
27.14
26.70
26.79
25
25
25
25
25
25
25
20
20
20
20
20
20
20
20
20
20
20
20
20
1.2m Stockproof Fence
1.5m Post & R
ail Fence
Brambles
Temporary Fence 1.5m Post & Rail Fence
1.5m Post & Rail Fence
1.2m Stockproof Fence
Trac
k
1.5m
Pos
t & R
ail F
ence
Brambles
Temporary Fence1.5m Post & Rail Fence
Dense Undergrowth
Wooded Area
Wooded Area
Wooded Area
Wooded Area
Stone Wall
Footpa
th
Footpath
Bushes
Bush
es
Bush
es
Bush
es
1.2m
Sto
ckpr
oof F
ence
Trac
k
Wooded Area
900mm dia Pipe
1.5m Post & Rail Fence
Temporary fence
Electricty
M62 S
lip R
oad
M62 Slip Road
2.4m Pallisade Fence
Lifebelt
Brambles
Water
Asph
alt
Brambles
Electricty
300mm dia PipeINV - 20.21
WL - 19.91
WL - 19.70900mm dia PipeINV - 19.41
INV - 19.29
900mm dia PipeINV - 19.76
WL - 20.19
WL - 22.88
Dry D
itch with Trees G
rowing on Eastern Slope
Dry D
itch with Trees G
rowing on Eastern Slope
SITE BOUNDARY
TOP OF SLOPE
BOTTOM OF SLOPE
EDGE OF TRACK
EDGE OF PAVING
ROAD CHANNEL
STOCKPROOF FENCE
POST & RAIL FENCE
PALLISADE FENCE
BARRIER
GATE
EDGE OF SCRUB/TREE COVER
INDIVIDUAL TREES
BOLLARD
BOREHOLE
ELECTRICITY POST
GAS MARKER
MANHOLE
ROAD GULLEY
TELECOM COVER
LAMP POST
SIGN POST
SPOT LEVELS
WATER LEVELS
REFERENCE
GU
RS
MH
BH
EP
BT
GAS
LP
Bol
23.26
WL - 22.88
NOTE
SITE SURVEYED BY GPS (OSTN15) & LEVELSSHOWN ARE IN METRES AOD.
Copyright Reservedc
DRAWN BY CHECKED BY
CLIENT
PROJECT
DRAWING TITLE
SCALE DATE
APPROVED BY
APP'DCHK'DREVISION DETAILS DATE DRAWN
DO NOT SCALE FROM THIS DRAWING
N:\SH\SH11739 - MOTORWAY SERVICES, WARRINGTON\03 - DESIGN\DRAWINGS\SH11739-019-A.DWG
DRG No.
DRG SIZE
REV
A0
WWW.WARDELL-ARMSTRONG.COMBOLTON | TEL 01204 227 227
BIRMINGHAM
CARDIFF
CARLISLE
EDINBURGH
GLASGOW
LONDON
MANCHESTER
NEWCASTLE UPON TYNE
SHEFFIELD
STOKE ON TRENT
WARINGTON MSAJ11 M62 MOTORWAY
POTENTIAL WARRINGTON MSA
TOPOGRAPHICAL SURVEYAS AT 19TH JANUARY 2019
PLAN 2
SH11739-019 A
1:500 21/01/19
SG TH AD
-
Extra MSA Group, Warrington MSA, J11 M62 - ES Part 1 209
ES Part 1 Appendix 12
-
EXTRA MSA GROUP
Warrington Motorway Service Area, J11 M62
Framework Construction Environmental Management Plan
August 2019
-
Wardell Armstrong
36 Park Row Leeds, LS1 5JL, United Kingdom Telephone: +44 (0)113 831 5533 www.wardell-armstrong.com
Wardell Armstrong is the trading name of Wardell Armstrong LLP, Registered in England No. OC307138.
Registered office: Sir Henry Doulton House, Forge Lane, Etruria, Stoke-on-Trent, ST1 5BD, United Kingdom
UK Offices: Stoke-on-Trent, Birmingham, Bolton, Cardiff, Carlisle, Edinburgh, Glasgow, Leeds, London, Manchester, Newcastle upon Tyne and Truro. International Offices: Almaty and Moscow
ENERGY AND CLIMATE CHANGE ENVIRONMENT AND SUSTAINABILITY
INFRASTRUCTURE AND UTILITIES LAND AND PROPERTY
MINING AND MINERAL PROCESSING MINERAL ESTATES
WASTE RESOURCE MANAGEMENT
DATE ISSUED: August 2019
JOB NUMBER: SH11739
REPORT NUMBER: 0001
VERSION:
STATUS:
V0.1
EXTRA MSA GROUP
Warrington Motorway Service Area, J11 M62
Framework Construction Environmental Management Plan
August 2019
PREPARED BY:
Helen Simpson Associate Director
APPROVED BY:
Andy Dunhill Director
This report has been prepared by Wardell Armstrong LLP with all reasonable skill, care and diligence, within the terms of the Contract
with the Client. The report is confidential to the Client and Wardell Armstrong LLP accepts no responsibility of whatever nature to third
parties to whom this report may be made known.
No part of this document may be reproduced without the prior written approval of Wardell Armstrong LLP.
-
EXTRA MSA GROUP Warrington Motorway Service Area, J11 M62 Framework Construction Environmental Management Plan
SH11739/0001/ August 2019
CONTENTS
1 INTRODUCTION .................................................................................................................. 1
1.1 Background .................................................................................................................. 1
1.2 Aims and objectives .................................................................................................... 1
1.3 Structure of this Framework CEMP ............................................................................. 2
2 DESCRIPTION OF THE PROPOSED DEVELOPMENT ............................................................ 4
2.1 The Site ........................................................................................................................ 4
2.2 The Proposed Development........................................................................................ 6
2.3 Key sensitive receptors ............................................................................................... 6
2.4 Development programme ........................................................................................... 7
3 PROJECT IMPLEMENTATION FRAMEWORK ....................................................................... 8
3.1 Introduction................................................................................................................. 8
3.2 Implementation Framework ....................................................................................... 8
3.3 Project and Site Level Organisation Structure ............................................................ 8 3.4 Roles and responsibilities ............................................................................................ 9
3.5 Training and Awareness ............................................................................................ 13
3.6 Tool Box Training Topics and Training ...................................................................... 14 4 COMMUNICATIONS ......................................................................................................... 15
4.1 Communications-General ......................................................................................... 15
4.2 Communication between Contractors ...................................................................... 15 4.3 External Communication ........................................................................................... 16
5 INSPECTIONS, DOCUMENT CONTROL AND REPORTING ................................................. 17
5.1 Audits and Inspections .............................................................................................. 17
5.2 Monthly Reporting .................................................................................................... 17
5.3 Records ...................................................................................................................... 17
5.4 Approval and Review of Plan .................................................................................... 18
6 PRE-CONSTRUCTION SURVEYS AND GROUND INVESTIGATION ...................................... 18
6.1 Introduction............................................................................................................... 18
6.2 Ecology surveys ......................................................................................................... 18
6.3 Ground investigations ............................................................................................... 21
6.4 Archaeological investigations .................................................................................... 22
7 GENERAL SITE OPERATIONS ............................................................................................. 23
7.1 Introduction............................................................................................................... 23
7.2 General working arrangements ................................................................................ 23
7.3 Health and Safety ...................................................................................................... 24
-
EXTRA MSA GROUP Warrington Motorway Service Area, J11 M62 Framework Construction Environmental Management Plan
SH11739/0001/ August 2019
7.4 Storage of oils, fuels and chemicals .......................................................................... 28
7.5 Operation and Refuelling of Plant and Equipment ................................................... 31
7.6 Plant Maintenance .................................................................................................... 34
7.7 Concrete batching ..................................................................................................... 35
7.8 Waste management .................................................................................................. 36
8 OUTLINE CONSTRUCTION ACTIVITIES .............................................................................. 38
8.1 Construction site layout and appearance ................................................................. 38
8.2 Internal access roads ................................................................................................. 39
8.3 Creation of the Peat Habitat Zone ............................................................................ 39
9 ENVIRONMENTAL SITE MANAGEMENT PRACTICES ........................................................ 41
9.1 Introduction............................................................................................................... 41
9.2 Ecology ...................................................................................................................... 41
9.3 Soils and peat handling, storage and re-use on site ................................................. 46
9.4 Hydrology and hydrogeology .................................................................................... 48 9.5 Traffic Management .................................................................................................. 52
9.6 Dust Management ..................................................................................................... 53
9.7 Noise Management ................................................................................................... 55 9.8 Management of Vibration ......................................................................................... 56
10 MONITORING, REVIEW AND REPORTING ........................................................................ 57
10.1 Monitoring ................................................................................................................. 57 10.2 Reporting ................................................................................................................... 58
10.3 Environmental Incidents ........................................................................................... 58
10.4 Complaints ................................................................................................................. 59
11 EMERGENCY PREPAREDNESS & RESPONSE ..................................................................... 61
11.2 Environmental Emergency Preparedness ................................................................. 61
11.3 Potential Environmental Incidents ............................................................................ 61
11.4 Spill Kits ..................................................................................................................... 65
-
EXTRA MSA GROUP Warrington Motorway Service Area, J11 M62 Framework Construction Environmental Management Plan
SH11739/0001/ August 2019
Page 1
1 INTRODUCTION
1.1 Background
1.1.1 This document is the Framework Construction Environmental Management Plan
(CEMP) for the proposed new Motorway Service Area (MSA) to the north of Junction
11 of the M62, on the north-eastern edge of Warrington, in Cheshire (the Proposed
Development).
1.1.2 Wardell Armstrong has been commissioned by the client, the Extra MSA Group, to
prepare this framework CEMP as part of the outline planning application for the
Proposed Development.
1.2 Aims and objectives
1.2.1 The framework CEMP sets the framework within which the finalised, more detailed CEMP for the Site would be developed, in advance of works commencing on site and
following receipt of planning permission.
1.2.2 The detailed CEMP will ensure that all environmental mitigation measures outlined within the consent are fully incorporated into the construction phase of the proposed
development. It will be prepared in accordance with all relevant UK legislation and
Regulations, environmental guidelines, approved Codes of Practice and industry standards and the general guidance provided in the CIRIA C741 ‘Environmental good
practice on site guide’. 4th edition, 2015.
1.2.3 The detailed CEMP will include a Schedule of Environmental Legislation relevant to the Proposed Development and the site location / its baseline conditions. This will be
maintained up to date for the duration of the construction works on Site.
1.2.4 This framework CEMP has been prepared based on the information available at the
time of submission of the outline planning application. Once planning permission is
granted, a number of detailed aspects of the Proposed Development will require to
be finalised and the information used in that process will be expected to feed into the
development of the finalised CEMP.
1.2.5 It is likely that the detailed investigations will form part of the conditions attached to
the planning permission, that will require to be discharged prior to development
commencing on site. Once these site investigations have been completed and the
design of the site has been finalised, a detailed CEMP will be produced.
-
EXTRA MSA GROUP Warrington Motorway Service Area, J11 M62 Framework Construction Environmental Management Plan
SH11739/0001/ August 2019
Page 2
1.2.6 Following this, it is anticipated that the CEMP will be subject to approval by
Warrington Borough Council (WBC) and any relevant statutory consultees.
1.2.7 The CEMP will remain an active document for the full duration of the construction
period on Site and will be subject to review and updating where necessary. This will
ensure that the construction operations of the Proposed Development meet all
existing and emerging good industry practice standards, as well as reflecting any
changes to conditions found on Site.
1.2.8 The Applicant and Principal Contractor will be responsible for updating the content of
the future CEMP. The Applicant, together with all contractors and subcontractors, will
be required to adhere to the CEMP in its final approved form.
1.3 Structure of this framework CEMP
1.3.1 This framework CEMP is structured as follows:
• Section 1 – introduction, aims and objectives, and structure of the CEMP.
• Section 2 – a description of the proposed development, key sensitive receptors and the anticipated programme for construction.
• Section 3 – sets out the roles and responsibilities of the various key personnel involved in the management of construction on the site.
• Section 4 – identifies the preliminary surveys and ground investigations anticipated as part of the development of the detailed design for the site, and their
relevance to the environmental management of the construction activities on site.
• Section 5 – describes the general site operations anticipated and includes general working arrangements, health and safety, storage of oils and fuels, arrangements for concrete batching, silt traps and waste management.
• Section 6 – provides an outline of the construction activities that will take place on site and the management of these.
• Section 7 – addresses the anticipated need for environmental site management practices, using information from the Environmental Statement (ES) prepared for
the site. Aspects addressed are: ecology; peat handling, storage and re-use on
site; hydrology and hydrogeology; cultural heritage and archaeology; construction
noise and vibration; and construction air quality.
-
EXTRA MSA GROUP Warrington Motorway Service Area, J11 M62 Framework Construction Environmental Management Plan
SH11739/0001/ August 2019
Page 3
• Section 8 – provides a summary of considerations to be given to monitoring, review and reporting procedures during construction, together with a suggested
complaints procedure.
1.3.2 As part of the development of the detailed CEMP, a sensitive receptors figure will be
prepared, showing the locations of the nearby residential properties, ecology sites and
other sensitive features present within or close to the boundary of the Site. These
sensitive receptors must be considered during the construction phase of the Proposed
Development.
1.3.3 In addition, it will be relevant that the detailed CEMP is considered in conjunction with
a number of other reports and management plans, either comprising part of the
outline planning application or to be produced once consent is granted. These are
identified below.
1.3.4 The finalised CEMP will be consistent with the aims and objectives of all the supporting
reports and management plans for the project.
-
EXTRA MSA GROUP Warrington Motorway Service Area, J11 M62 Framework Construction Environmental Management Plan
SH11739/0001/ August 2019
Page 4
2 DESCRIPTION OF THE PROPOSED DEVELOPMENT
2.1 The Site
2.1.1 The Site is located to the northeast of the urban area of Warrington, approximately
8.5km (5 miles) from the centre of Warrington. The centre of Manchester is located
approximately 17.5km (11 miles) to the east of the Site and the centre of Liverpool,
approximately 32 km (20 miles) to the west.
2.1.2 The Site is located to the north of the M62 Motorway at Junction 11, and has direct
access to Junction 11 via a spur to the motorway junction roundabout (Birchwood
Way). The M62 Motorway also provides access to the wider Strategic Road Network,
with the M6 Motorway running north/south, approximately 4km (2.5 miles) to the
west of the Site, and the M60 Motorway, which runs around Manchester, approximately 10km (6.1 miles) to the east of the Site.
2.1.3 Junction 11 of the M62 Motorway also provides access to the A574 Birchwood Way
and the Birchwood area of Warrington, which is located to the south of the M62 Motorway corridor and consists of Birchwood Park (a business park) and beyond this,
residential areas of Gorse Covert and Oakwood, which are suburbs to Warrington.
2.1.4 Immediately to the west of the Site is a former landfill site (Risley Landfill), where landfilling began in 1979, but which has now cease