Barney Blackburn, PE, CPESC, CPSWQ
NCDOT – Roadside Environmental Unit
Soil & Water Engineering Section Supervisor
Erosion Control Design
for Stormwater Basins
![Page 2: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/2.jpg)
Background Information
• Environmental Planning Process Identifies:
• Locations for Stormwater Basins
• Type of Stormwater Basin
• Designed by NCDOT Hydraulics Unit
• Final Design Coordinated with Environmental Agencies
• Roadside Environmental Unit Evaluates for Erosion Control
![Page 3: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/3.jpg)
NCDOT Stormwater Basins
• Dry Detention Basin
• Wet Detention Basin
• Hazardous Spill Basin
• For Design Information, visit:
https://connect.nctdot.gov/resources/hydro/pages/default.aspx
![Page 4: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/4.jpg)
Design Criteria
• Maximum Drainage Area = 100 acres
• Minimum Surface Area (ft2) = 435 x Q10 (or Q25)
• Minimum Volume = 1800 ft3 per Disturbed Acre
• Dewatering Mechanisms: Skimmer + Riser Structure
• Minimum Dewatering Time = 48 hours
![Page 5: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/5.jpg)
Design Procedure
1. Determine flow (Q) to Basin
2. Determine Disturbed Area Draining to Basin
3. Compute Required Surface Area
4. Compute Required Sediment Storage
5. Compare Requirements to Stormwater Basin Dimensions
![Page 6: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/6.jpg)
Dewatering Analysis
• Size Skimmer Orifice based on Volume of Stormwater Basin
• Use Volume of Stormwater Basin 1 ft. above Basin Bottom
• Choose appropriate size Skimmer
• Check Primary Spillway (Riser) to Convey 2-yr Storm
• Entire System (Riser + Spillway) must convey 10-yr Storm
![Page 7: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/7.jpg)
Stormwater Basin & EC Plans
![Page 8: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/8.jpg)
Case Study: Timber Drive Project
• Located in Garner, NC
• Length of Project: 1.5 miles
• Construction began in July 2010
• Surrounding Land Use:
• Shopping Centers
• Private Home Sites
• Forests
![Page 9: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/9.jpg)
Satellite View of Project
Stormwater Basin Location
![Page 10: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/10.jpg)
Stormwater Basin Design Info (EC)
• Disturbed Area = 13.3 Acres
• Undisturbed Area = 0.02 Acres
• Q25* = 23.23 ft3/s
-*Neuse River Basin
![Page 11: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/11.jpg)
Initial EC Design
![Page 12: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/12.jpg)
Stormwater Basin Design Spreadsheet
![Page 13: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/13.jpg)
Initial Basin Construction
![Page 14: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/14.jpg)
All is well, until THIS happened!
![Page 15: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/15.jpg)
Downstream View!
![Page 16: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/16.jpg)
Cause No. 1 - Granite Rock…
![Page 17: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/17.jpg)
Cause No. 2 – Sandy Soil
![Page 18: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/18.jpg)
Construction Issues
• Rock Layer Close to Surface
• Sandy Loam Material Used for Berm
• Onsite
• Inadequate Compaction of Soil in Berm
![Page 19: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/19.jpg)
Repair Plan
• Interim EC Design with Temporary Berm
• Install Anti-Seep Collar(s) on Barrel Pipe
• Rebuild Embankment with Clay Material
• Achieve 90% Compaction of AASHTO T 99 Test
![Page 20: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/20.jpg)
Intermediate Design Information
• Disturbed Area = 9 Acres
• Undisturbed Area = 1 Acre
• Q25* = 21.75 ft3/s
-*Neuse River Basin
![Page 21: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/21.jpg)
Interim EC Design
![Page 22: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/22.jpg)
Reconstruction Methods
• Anti-Seep Collars Installed
• 2 ft. on 3 sides and extended down to bedrock
• 7 ft. spacing
• Core Constructed with Onsite Red Silty Clay
• Core Compacted to 90% Density of T99 Test
• Topsail Placed 1-2 ft. of Depth on Core
![Page 23: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/23.jpg)
Now a Permanent Stormwater Basin!
![Page 24: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/24.jpg)
General Design Constraints
• Rock Layer Close to Surface
• Soils
• High Water Table
• Topography
• Width of Stormwater Basin
![Page 25: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/25.jpg)
Dry Detention Basin on Slope
8% slope!
• Width of Stormwater Basin = 240 ft.
• Width of Skimmer Basin = 80 ft.
![Page 26: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/26.jpg)
Dry Detention Basin Constructed
![Page 27: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/27.jpg)
Dry Detention Basin Constructed
![Page 28: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/28.jpg)
Small Hazardous Spill Basin
Hazardous Spill Basin
![Page 29: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/29.jpg)
Basin with Skimmer and Stone Spillway
![Page 30: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/30.jpg)
Hazardous Spill Basin with Skimmer
![Page 31: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/31.jpg)
Hazardous Spill Basin with Pool
![Page 32: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/32.jpg)
Hazardous Spill Basin Dewatering
![Page 33: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/33.jpg)
Detention Basin with Skimmer
![Page 34: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/34.jpg)
Skimmer with Corrugated Steel Pipe
![Page 35: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/35.jpg)
Construction Specifications
• Minimum of 3 Baffles with Equal Spacing
• Anti-Seep Collars
• ftp://ftp-fc.sc.egov.usda.gov//IL/engineer/supplements/6-36.1.pdf
• Berm Material
• Construct with Soils Classified as Clays (ch, cl or sc)
• Compact Embankment to at least 90-95% of AASHTO T 99 Test
![Page 36: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/36.jpg)
Slope Stabilization
• Permanent Seed Mix
• Matting (Excelsior at minimum)
• Permanent Matting (TRM)
• Geotextile (NCDOT Type 4, 8 mil., etc.)
• Interim
• Impermeable
![Page 37: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/37.jpg)
Stormwater Basin Cleanout
Komatsu D155 W Bulldozer In Action
![Page 38: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/38.jpg)
Enhancements to Stormwater Basins
• Forebays / Energy Dissipators
• Incorporation of Flocculants
• Infiltration
![Page 39: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/39.jpg)
Energy Dissipator in Basin
![Page 40: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/40.jpg)
Flocculant in Basin
![Page 41: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/41.jpg)
Permanent Basin with Infiltration
![Page 42: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/42.jpg)
General Design Tips
• Convey Runoff to Basin in Non-erosive Manner
• Remember Volumes for Skimmer Orifice
• Volume of Stormwater Basin
• Volume of Basin 1 ft. above bottom
• Include ALL Construction Specifications
![Page 43: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/43.jpg)
Before Basin becomes Permanent…
• ALL Drainage Areas to Basin Stabilized
• Drainage System Completely Installed
• Interior Slopes Stabilized
• Sediment in Basin Removed
![Page 44: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/44.jpg)
Detention Basin Needs Maintenance
![Page 45: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/45.jpg)
Skimmer in Sediment
![Page 46: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/46.jpg)
![Page 47: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/47.jpg)
Reference Web Sites
• Stormwater Basin Design Spreadsheet http://www.ncdot.gov/doh/operations/dp_chief_eng/roadside/soil_water/erosion_control/downloads.html
• Details
http://www.ncdot.gov/doh/operations/dp_chief_eng/roadside/soil_water/Details/
• Special Provisions
http://www.ncdot.gov/doh/operations/dp_chief_eng/roadside/soil_water/special_provisions/
![Page 48: Erosion Control Design for Stormwater Basins - … Control Design for Stormwater Basins . Background Information ... Design Criteria • Maximum Drainage Area = 100 acres](https://reader031.fdocuments.us/reader031/viewer/2022022509/5ad7fc787f8b9a991b8cbbe6/html5/thumbnails/48.jpg)
Questions?