Public Workshop #3 Presentation January 17, 2017 ERINSBROOK PARK Master Plan

Transcript of Erinsbrook Park Master Plan Third Public Workshop Presentation · public workshop #3 presentation |...

Page 1: Erinsbrook Park Master Plan Third Public Workshop Presentation · public workshop #3 presentation | january 17, 2017 erinsbrook park master plan 6 hoa property (not included in project)

Public Workshop #3 PresentationJanuary 17, 2017

ERINSBROOK PARKMaster Plan

Page 2: Erinsbrook Park Master Plan Third Public Workshop Presentation · public workshop #3 presentation | january 17, 2017 erinsbrook park master plan 6 hoa property (not included in project)

Public Workshop #3 Presentation | January 17, 2017

ERINSBROOK PARKMaster Plan

• Schedule / Recap

• Program Development

• Site Analysis

• Development Diagram

• Concepts

• Next Steps

AGENDA

Page 3: Erinsbrook Park Master Plan Third Public Workshop Presentation · public workshop #3 presentation | january 17, 2017 erinsbrook park master plan 6 hoa property (not included in project)

Public Workshop #3 Presentation | January 17, 2017

ERINSBROOK PARKMaster Plan

Schedule / MilestonesERINSBROOK PARK MASTER PLAN

Project Schedule (rev. Dec. 13, 2016)

Meeting Task / Discussion Date Time LocationCPC #1 Introduction / Analysis / Program Development Thurs, Sept. 8, 2016 6:30 PM St. Francis / Cupertino

RoomPublic Workshop #1 Analysis / Site Walk / Initial Program Ideas Sat., Sept. 24, 2016 10:00 AM On-site / St. Francis /

Cupertino RoomDRT #1 Review analysis and input from CPC/Public Workshop Thurs, Oct. 20, 2016 10-11AM PRCR/RMB 609

CPC #2 Program Confirmation / Review Alternative Master Plan Concepts Tues., Oct. 25, 2016 6:30 PM St. Francis / Fellowship Hall

Public Workshop #2 Present Alternative Master Plan Concepts Thurs., Nov. 10, 2016 6:30 PM St. Francis / Cupertino Room

CPC #3 Review Draft Master Plan Tues., Dec. 13, 2016 6:30 PM St. Francis / Cupertino Room

Park Planning Review Draft Master Plan Wed., Dec. 14, 2016 1pm RMB 303

Development Services Review Draft Master Plan w/ staff (review city code implications) Mon., Dec. 19, 2016 11AM OEP Rm 701

DRT #2 Review Draft Master Plan and input received Thurs., Jan 5, 2017 10AM RMB 609

Public Workshop #3 Review Draft Master Plan Tues., Jan. 17, 2017 6:30 PM St. Francis / Cupertino Room

DRT #3 Review Draft Master Plan, Report, and input received from CPC #3 and public workshop #3 (email only)

Tues, Jan. 24, 2017 N/A Email to DRT

CPC #4 Present Final Draft Master Plan Tues., Feb 7, 2017 6:30 PM St. Francis / Cupertino Room

NWCAC Present Final Draft Master Plan Tues., Feb 14, 2017 7PM NW RPD Annex

PRGAB Present Final Draft Master Plan Thurs., March. 16, 2017

6PM TBD

PRGAB Action on Final Draft Master Plan Thurs., April 20, 2017 6PM TBD

City Council Present Final Master Plan Tues., May 2, 2017 1PM Council Chambers

LEGENDCPC : Citizen Planning CommitteeDRT : Design Review Team (City of Raleigh Parks, Rec, Cultural Resources staff)

Phas

e 2

Phas

e 3

Page 4: Erinsbrook Park Master Plan Third Public Workshop Presentation · public workshop #3 presentation | january 17, 2017 erinsbrook park master plan 6 hoa property (not included in project)

Public Workshop #3 Presentation | January 17, 2017

ERINSBROOK PARKMaster Plan

SITE WALK

ABOVE: Community members share information

RIGHT: Existing specimen trees are a focal point

Page 5: Erinsbrook Park Master Plan Third Public Workshop Presentation · public workshop #3 presentation | january 17, 2017 erinsbrook park master plan 6 hoa property (not included in project)

Public Workshop #3 Presentation | January 17, 2017

ERINSBROOK PARKMaster Plan

SITE WALK

LEFT: The meandering stream needs to be protected from erosion

RIGHT: Kids are naturally drawn to the stream that disects the site. Oppornity for education

Page 6: Erinsbrook Park Master Plan Third Public Workshop Presentation · public workshop #3 presentation | january 17, 2017 erinsbrook park master plan 6 hoa property (not included in project)

Public Workshop #3 Presentation | January 17, 2017

ERINSBROOK PARKMaster Plan

VISION AND PROGRAM IDEAS

VISION PROGRAM• PLAYGROUND

• NATURAL PLAY

• DOG PARK

• TRAILS - PAVED

• NATURE TRAILS

• SPLASH PAD

• FITNESS STATIONS*

• EDUCATION - INTERPRETIVE (TREES,

MAPS, WETLANDS)

• SINGLE TRACK BIKE TRAILS 18”*

• COMMUNITY CENTER*

• ZIP LINE*

• PICKLEBALL COURT

• PUMP TRACK*

• TREE HOUSES

• QUIET SPACE

• ENCLOSED SPACE

• DISC GOLF*

• REST ROOM

• PICNIC

• SLEDDING HILL*

• OPEN SPACE / PLAY

• NATURE

• WALKABLE /

ACCESSIBLE

• EDUCATION

• FAMILY

• FITNESS

Page 7: Erinsbrook Park Master Plan Third Public Workshop Presentation · public workshop #3 presentation | january 17, 2017 erinsbrook park master plan 6 hoa property (not included in project)

Public Workshop #3 Presentation | January 17, 2017

ERINSBROOK PARKMaster Plan

SITE ANALYSIS

LEESVILLE RD

DRAINAGE

EASEMENT

DRAINAGE

EASEMENT

BRIGMORE CT

ERINSBROOK DR

ENGL

EHAR

DT D

R EX

PANS

ION

BELLARD CT

RESIDENTIAL

RESIDENTIAL

HOA PROPERTY

FIRE STATION

ERIN

SBRO

OK

DR

SITE ANALYSIS: EXISTING FEATURES

EXISTING TREES

CREEK LINE

50’ NEUSE RIVER BUFFER LINESITE BOUNDARY

PROPERTY BOUNDARIES

THOROUGHFARE DISTRICT BUFFER

FUTURE SIDEWALK EXISTING PUMP STATION

SLOPE > 8%

EXISITING FORMER HOME SITE

ERINSBROOK PARK

PINE STANDPROPOSED RIGHT OF WAY

50’

20’

• Slope >8%

• Thoroughfare District Buffer

• 50’ Stream Buffer

• Pine Stand

• Existing Specimen Trees

• Existing former home site requires

further investigation

Page 8: Erinsbrook Park Master Plan Third Public Workshop Presentation · public workshop #3 presentation | january 17, 2017 erinsbrook park master plan 6 hoa property (not included in project)

Public Workshop #3 Presentation | January 17, 2017

ERINSBROOK PARKMaster Plan

DEVELOPMENT DIAGRAM

LEESVILLE RD

ERIN

SBRO

OK

DR

DRAINAGE

EASEMENT

DRAINAGE

EASEMENT

BRIGMORE CT

ERINSBROOK DR

ENGL

EHAR

DT D

R EX

PANS

ION

50’

20’

BELLARD CT

OPEN SPACE

NATURAL WOODS CONSERVATION

FUTURE GREENWAY

CONNECTION

RESIDENTIAL

RESIDENTIAL

FIRE STATION

WOODLAWNPROPERTY

OVERLOOK

OVERLOOK

PARKING

ACTIVITY SPACE

(SENSITIVE)

ACTIVITYSPACE(ACTIVE)

SITE ANALYSIS: EXISTING FEATURES

CREEK LINE

SITE BOUNDARY

PROPERTY BOUNDARIES

THOROUGHFARE DISTRICT BUFFERFUTURE SIDEWALK

EXISTING PUMP STATIONSLOPE > 8%

ERINSBROOK PARK

PROPOSED RIGHT OF WAYPOTENTIAL VEHICULAR ACCESSPOTENTIAL PEDESTRIAN ACCESS

• Parking / Active space on flat area to

North of site

• Overlook oportunities on high points

• Large conservation area for trails and

pathways

• Connection to Woodlawn

Neighborhood

Page 9: Erinsbrook Park Master Plan Third Public Workshop Presentation · public workshop #3 presentation | january 17, 2017 erinsbrook park master plan 6 hoa property (not included in project)

Public Workshop #3 Presentation | January 17, 2017

ERINSBROOK PARKMaster Plan

• Consolidated entry / exit, right in / out

• Parking lot - 20+ spaces

• Combination rest room / shelter

• Elevated platforms - 4

• Splash pad

• Dog park - 34,500 sf

• Separated junior playground

• Multiple pedestrian loops

• Open space - 6,500 sf

• Educational boardwalk bridges - 2

• Paved path - 4,250 ft

• Natural trails - 1,500 ft

• Low impact stormwater treatment

CONCEPT A

Page 10: Erinsbrook Park Master Plan Third Public Workshop Presentation · public workshop #3 presentation | january 17, 2017 erinsbrook park master plan 6 hoa property (not included in project)

Public Workshop #3 Presentation | January 17, 2017

ERINSBROOK PARKMaster Plan

CONCEPT B

• Separate entry / exit, right in / out

• Parking lot - 40+ spaces

• Combination rest room / shelter

• Hard court - Pickleball

• Tree houses - 4

• Overlook

• Open space - 30,000 sf

• Educational boardwalk bridge - 1

• Paved path - 3,750 ft

• Natural trails - 1,200 ft

• Stormwater treatment pond

Page 11: Erinsbrook Park Master Plan Third Public Workshop Presentation · public workshop #3 presentation | january 17, 2017 erinsbrook park master plan 6 hoa property (not included in project)

Public Workshop #3 Presentation | January 17, 2017

ERINSBROOK PARKMaster Plan

CONCEPT C

• Separate entry / exit Englehardt Dr - full service, Leesville Rd - right in / out

• Parking lot - 40+ spaces

• Rest room separated from shelter

• Nature play near creek - 5 Tree houses

• Raised tree-top overlook

• No open space

• Educational boardwalk bridges - 1

• Paved path - 3,500 ft

• Natural trails - 1,200 ft

• Stormwater treatment pond

Page 12: Erinsbrook Park Master Plan Third Public Workshop Presentation · public workshop #3 presentation | january 17, 2017 erinsbrook park master plan 6 hoa property (not included in project)

Public Workshop #3 Presentation | January 17, 2017

ERINSBROOK PARKMaster Plan

6

HOA PROPERTY(NOT INCLUDED IN

PROJECT)

POTENTIAL GREENWAY

CONNECTION

December 13, 2016

1. SHELTER2. REST ROOM3. WATER MISTERS4. DOG PARK5. PLATFORMS6. RAIN GARDEN7. NATURAL PLAYGROUND8. PLAYGROUND & SHADE SAIL9. OPEN SPACE10. PARKING LOT11. BOARDWALK12. OAK GROVE TRAIL13. OVERLOOK

LEGEND

A

A

C

C

B

B

11

7

3

4

5

5

5

8

9

10

12

11

13

11

2

DRAFT CONCEPT

• Right in- right out Parking lot. (48 spaces).

• Dog Park. (Approx. 1/2 acre).wo entry points. Double gate entry.

• Open Space. (Approx. 1/2 acre).

• Combination Restroom & Shelter. Close to playground on visual vantage point.

• Shelter. Overlooks open space. Located on visual axis to the arbor / overlook.

• Overlook & Arbor. (Overlook approx. 7’ high). Looks over rain garden and flowering trees.

• Traditional playground with shade sail. (Approx. 3,600 sf). Close to restroom and shelter.

• Natural Play area. (Approx. 6,300 sf).

• Water Misters. (Approx. 2,000 sf).

• Pathway loops. (Central Loop is approx. 1/3 mile). Path network is only fully accessible from parking lot to overlook. Overlook to creek follows natural topography.

• Boardwalks. (2). Opportunity to educate about stream ecology.

• Platforms. (3). Hang out spaces, raised overlooks, a place to get off the walking path and be surrounded by the existing woodland trees.

Page 13: Erinsbrook Park Master Plan Third Public Workshop Presentation · public workshop #3 presentation | january 17, 2017 erinsbrook park master plan 6 hoa property (not included in project)

Public Workshop #3 Presentation | January 17, 2017

ERINSBROOK PARKMaster Plan

SECTION A - Upper ParkNE - SW

SECTION B - Upper ParkNW - SE

SECTION C - Lower ParkNW - SE

RALEIGH, NORTH CAROLINA

ERINSBROOK PARK

10’ WALK

STREAM

PLATFORM

PLATFORM24” OAK24” POP32” BEECH

10’ WALK

10’ WALK

AA

B B

C

C

470

490

450

460

480

440

480

500

460

490

510

470

500

480

510

490

EXISTING WOODLAND 50’ STREAM BUFFER

20’ PERIMETER

BUFFER

RAIN GARDENEXISTING WOODLAND

FLOWERINGTREES

OVERLOOK / ARBOR NATURAL PLAY AREA OPEN SPACE

December 13, 2016

8’ WALK

10’ WALK

10’ WALK OVERLOOKWATER MISTERSPLAYGROUND WITH SHADE STRUCTUREPLANTINGTO DOG PARK NATURAL PLAY AREA

FLOWERINGTREES RESTROOM / SHELTER

BUILDING

DRAFT CONCEPT

Page 14: Erinsbrook Park Master Plan Third Public Workshop Presentation · public workshop #3 presentation | january 17, 2017 erinsbrook park master plan 6 hoa property (not included in project)

Public Workshop #3 Presentation | January 17, 2017

ERINSBROOK PARKMaster Plan

SECTION A - Upper ParkNE - SW

SECTION B - Upper ParkNW - SE

SECTION C - Lower ParkNW - SE

RALEIGH, NORTH CAROLINA

ERINSBROOK PARK

10’ WALK

STREAM

PLATFORM

PLATFORM24” OAK24” POP32” BEECH

10’ WALK

10’ WALK

AA

B B

C

C

470

490

450

460

480

440

480

500

460

490

510

470

500

480

510

490

EXISTING WOODLAND 50’ STREAM BUFFER

20’ PERIMETER

BUFFER

RAIN GARDENEXISTING WOODLAND

FLOWERINGTREES

OVERLOOK / ARBOR NATURAL PLAY AREA OPEN SPACE

December 13, 2016

8’ WALK

10’ WALK

10’ WALK OVERLOOKWATER MISTERSPLAYGROUND WITH SHADE STRUCTUREPLANTINGTO DOG PARK NATURAL PLAY AREA

FLOWERINGTREES RESTROOM / SHELTER

BUILDING

DRAFT CONCEPT

Page 15: Erinsbrook Park Master Plan Third Public Workshop Presentation · public workshop #3 presentation | january 17, 2017 erinsbrook park master plan 6 hoa property (not included in project)

Public Workshop #3 Presentation | January 17, 2017

ERINSBROOK PARKMaster Plan

SECTION A - Upper ParkNE - SW

SECTION B - Upper ParkNW - SE

SECTION C - Lower ParkNW - SE

RALEIGH, NORTH CAROLINA

ERINSBROOK PARK

10’ WALK

STREAM

PLATFORM

PLATFORM24” OAK24” POP32” BEECH

10’ WALK

10’ WALK

AA

B B

C

C

470

490

450

460

480

440

480

500

460

490

510

470

500

480

510

490

EXISTING WOODLAND 50’ STREAM BUFFER

20’ PERIMETER

BUFFER

RAIN GARDENEXISTING WOODLAND

FLOWERINGTREES

OVERLOOK / ARBOR NATURAL PLAY AREA OPEN SPACE

December 13, 2016

8’ WALK

10’ WALK

10’ WALK OVERLOOKWATER MISTERSPLAYGROUND WITH SHADE STRUCTUREPLANTINGTO DOG PARK NATURAL PLAY AREA

FLOWERINGTREES RESTROOM / SHELTER

BUILDING

DRAFT CONCEPT

Page 16: Erinsbrook Park Master Plan Third Public Workshop Presentation · public workshop #3 presentation | january 17, 2017 erinsbrook park master plan 6 hoa property (not included in project)

Public Workshop #3 Presentation | January 17, 2017

ERINSBROOK PARKMaster Plan

Next Steps

CPC #4

Present Final Draft Master Plan

Tues., February 7, 2017

6:30 PM, St. Francis / Cupertino Room

NW CAC

Present Final Draft Master Plan

Tues., February 14, 2017

7 PM, NW Raleigh Police Annex