Eric Tweit Spring 2014

18
Eric Tweit Spring 2014 Mercer Corridor Project: West Phase Project update

description

Mercer Corridor Project: West Phase Project update. Eric Tweit Spring 2014. SDOT’s mission & vision. Mission: delivering a first-rate transportation system for Seattle. Vision: a vibrant Seattle with connected people, places, and products. SDOT’s values. Presentation overview. - PowerPoint PPT Presentation

Transcript of Eric Tweit Spring 2014

Page 1: Eric Tweit Spring 2014

Eric TweitSpring 2014

Mercer Corridor Project: West Phase Project update

Page 2: Eric Tweit Spring 2014

SDOT’s mission & visionMission: delivering a first-rate transportation system for Seattle.

Vision: a vibrant Seattle with connected people, places, and products.

Page 3: Eric Tweit Spring 2014

SDOT’s valuesKeep it safe

Focus on the basics

Build healthy

communities

Support a thriving

economy

Provide great

service

Page 4: Eric Tweit Spring 2014

Presentation overview• Project description

• Schedule

•Construction update

• Existing conditions

• Upcoming changes

• Broad St. closure

Page 5: Eric Tweit Spring 2014

Project description

Page 6: Eric Tweit Spring 2014

A better roadway for everyone• Wider sidewalks• Bicycle path• Two-way traffic on Mercer and Roy streets• Replace SR 99 Bridge

6

Page 7: Eric Tweit Spring 2014

Project schedule

Page 8: Eric Tweit Spring 2014

Existing conditions

Page 9: Eric Tweit Spring 2014

• Replaced bridge over SR 99

• Updated utilities• Widened Mercer St. to

the south

Construction UpdateMercer underpass

9

Page 10: Eric Tweit Spring 2014

• New signals• ADA improvements• Improved sidewalks• New trolley poles &

wires

Construction UpdateQueen Anne Ave. N to 5th Ave. N

10

Page 11: Eric Tweit Spring 2014

Coming in May and June

11

• Mercer and Roy– Two-way between 5th Ave. N and Queen Anne Ave. N

• Mercer– Modified two-way (two lanes each direction) between 5th

Ave. N and 9th Ave. N

• Broad St.– CLOSED

Page 12: Eric Tweit Spring 2014

Phase I • Restrictions on Queen Anne Ave. N

begin• Restrictions on Mercer St. continue

Page 13: Eric Tweit Spring 2014

Phase II• Two-way traffic on Mercer St. west of 5th Ave. N open• Restrictions on Roy St. begin• Restrictions on Queen Anne Ave. N continue

Page 14: Eric Tweit Spring 2014

Phase III• Broad St. CLOSED• Two-way traffic on Mercer St. east of 5th Ave. N open• Two-way traffic on Roy St. open• Two-way traffic on Queen Anne Ave. N open

Page 15: Eric Tweit Spring 2014

Broad St. closure• Fill Broad St.• Demo bridge at Mercer St.

and Dexter Ave. N• Install utilities in Mercer St.

and Dexter Ave. N• Capacity restrictions at

Mercer St. & Dexter Ave. N• WSDOT North Access (in

Broad St. right-of-way July 1, 2014)

Post-closure activities

15

Page 16: Eric Tweit Spring 2014

Traffic with Broad St. closed

Page 17: Eric Tweit Spring 2014

[email protected] | (206) 419-5818

http://www.seattle.gov/Transportation/mercercorridor.htm

Page 18: Eric Tweit Spring 2014

Thanks for joining us today!

http://www.seattle.gov/transportation