ERCOT IT Update Ken Shoquist VP, CIO Information Technology Board Meeting May 2004.

11
ERCOT IT Update Ken Shoquist VP, CIO Information Technology Board Meeting May 2004

Transcript of ERCOT IT Update Ken Shoquist VP, CIO Information Technology Board Meeting May 2004.

Page 1: ERCOT IT Update Ken Shoquist VP, CIO Information Technology Board Meeting May 2004.

ERCOT IT Update

Ken ShoquistVP, CIO Information Technology

Board Meeting

May 2004

Page 2: ERCOT IT Update Ken Shoquist VP, CIO Information Technology Board Meeting May 2004.

Page 2

May 2004

EMMS Release 3 and Release 4

Disaster Recovery

TML Portal

Project Update

AgendaAgenda

Page 3: ERCOT IT Update Ken Shoquist VP, CIO Information Technology Board Meeting May 2004.

Page 3

May 2004

Planned Migration Schedule MOS/EMP2.1.1 on 6/2 Market Oversight Monitoring System (MOMS) on 7/2 SMP/EMP2.2 in July Resource plan improvement and XML in July

Site Acceptance Test (SAT) ends for MOS/EMP 2.1.1 this week SAT for SMP/EMP2.2 scheduled to start next week

Market User Acceptance Test (UAT) in progress

QSE training completed and operator training is in progress

EMMS Release 3EMMS Release 3

Page 4: ERCOT IT Update Ken Shoquist VP, CIO Information Technology Board Meeting May 2004.

Page 4

May 2004

Completed Provided display for gen output, limits, monitored Pts Displayed PF and SCADA on single one line System map (Power World)

June 2004 Stop oscillation of constraint management

PR30044 Elimination of Resource Specific Deployment Used

for Energy Balance Purpose (CAT4)PRR424

UBES-DBES ramp rates PRR 349

OOM as instructed deviationPRR373

Unit resource testingPRR332

Archival of shift factorsPR30167

Handling of equipment name changesPR30169

Critical addition for summer operations Unconstrained ancillary services June

2004 CA/RAP enhancements (RTCA flag addition) June

2004

EMMS Release 3 EMMS Release 3 (cont.)(cont.)

EMMS Release 3 Addressed a Total of 23 Projects

Page 5: ERCOT IT Update Ken Shoquist VP, CIO Information Technology Board Meeting May 2004.

Page 5

May 2004

July 2004 EMP 2.2 upgrade PR30144 EMS front-end replacement PR30050 Load rollover during line outage PR20159 Enhance STNET to run multiple selected time ranges PR30074 VSAT/TSAT interface upgrade ESCA to PTI download PR30096 Implement selected contingency in PF PR40170 Improve resource plan 50% complete PRR359 Resource plan change indicator PR30059 Display print resource plan PR30068 Display expected schedule changes PR30097

EMMS Release 3 EMMS Release 3 (cont.)(cont.)

Page 6: ERCOT IT Update Ken Shoquist VP, CIO Information Technology Board Meeting May 2004.

Page 6

May 2004

22 items under consideration at “Pens Down” 2/29 Two projects Eight PRRs One PIP One SCR

Business requirements completed on 3/31 Final detail scope definition in progress

RMR automation and dynamic ratings deferred to R5 Firm scope on 10 projects Negotiations continue on scope of three projects Scope of four projects spread between R4 and R5

EMMS Release 4EMMS Release 4

Page 7: ERCOT IT Update Ken Shoquist VP, CIO Information Technology Board Meeting May 2004.

Page 7

May 2004

Firm scope Improve real time local congestion management PR40001 Load forecast metrics (in-house) PR40001 Improvements to VSA/DSA (scope in R4 & R5) PR40001 OOME participation in providing ancillary services PR40051 EMS archive comparison tool (scope in R4 & R5) PR40059 AS simultaneous selection (carryover from R3) PRR342 RPRS procurement process

PRR413/PIP137/PRR211 Out of Merit Zonal Dispatch Instructions and electronic

recording of VDI and VDI as Instructed Deviation PRR422/PRR423 Resource plan improvement

(Carryover from R3) (Scope in R4 & R5) PRR359/SCR723 PUCT market oversight division projects PR40048/40049/40062 Unit-specific bid limits based on generic cost PRR485

EMMS Release 4 EMMS Release 4 (cont.)(cont.)

Page 8: ERCOT IT Update Ken Shoquist VP, CIO Information Technology Board Meeting May 2004.

Page 8

May 2004

Under Negotiation CSC thermal limits (Scope in R4 & R5) PR30084 Special protection schemes

PR30085

Deferred to R5 RMR automation PRR428 Dynamic ratings (extend pilot program functionality) PR30016

EMMS Release 4 CandidatesEMMS Release 4 Candidates

Page 9: ERCOT IT Update Ken Shoquist VP, CIO Information Technology Board Meeting May 2004.

Page 9

May 2004Commercial Systems DR Test Commercial Systems DR Test

Successfully completed March 2004! Major functionalities Included

Retail transactions Registration Load profiling Data aggregation Settlements

Targeted recovery time of 48 hours – test recovery time of 18.5 hours well within the targeted window

Test requires both IT and business resources Current policies under review in consideration of possible revision EMMS (Energy Management and Market Systems) have been

tested on a monthly basis since the market opened

Page 10: ERCOT IT Update Ken Shoquist VP, CIO Information Technology Board Meeting May 2004.

Page 10

May 2004

Released to market with three known issues – scheduled for correction 5/11/04 No significant issues reported from market As of 5/5/04 TML

receiving 10-15% of web traffic used by 20 market participants

TML UpdateTML Update

Page 11: ERCOT IT Update Ken Shoquist VP, CIO Information Technology Board Meeting May 2004.

Page 11

May 2004IT Project PerformanceIT Project Performance

Project Process Improvements In 2004 Four completed 48 in progress 61 in planning

Market Operations CART (Continuous Analysis & Requirements Teams) stood up in April

Project Activity Project Performance

0

10

20

30

40

50

60

70

Jan Feb Mar Apr

Completed In Planning In Progress

0%

20%

40%

60%

80%

100%

Jan Feb Mar Apr

On Time On Budget Deliverables

April 2004 Projects