Erbe ICC BP Service Procedure

download Erbe ICC BP Service Procedure

of 2

Transcript of Erbe ICC BP Service Procedure

  • 8/12/2019 Erbe ICC BP Service Procedure

    1/2

    Title: Erbe ICC Bipolar Date: 2-10-2013

    By: Erbe DISCLAIMER: THIS PROCEDURE PROVIDED "AS IS" AND WITHPOSSIBLE FAULTS. USER MUST VERIFY BEFORE USE. NEITHER

    PROVIDER NOR WEBSITE ASSUMES ANY RESPONSIBILITY FOR ITS USE.File = Erbe-ICC-BP.doc

    1. General

    pplie! to "odel #ICC BIP$%&'

    (peci)ication!: (ee ppendi*

    2. &e)erence Doc+"ent!

    Erboto" $peratin, In!tr+ction!.

    Erboto" (erice an+al /incl+de! "odel! ICC 0 and 0

    3. Tool! Fi*t+re! cce!!orie!

    Electro!+r,ical naly4er: e*: De"p!ey 553 or better.

    Bipolar CableForcep! /optional.

    (a)ety Te!ter

    5. Per)or"ance 6eri)ication!

    5.1. Initial In!pection

    C7ec8 +nit )or any da"a,e9 i.e. connector! po;er cord

    t7e )oot!;itc7 and it! cable.

    5.2.

  • 8/12/2019 Erbe ICC BP Service Procedure

    2/2

    APPENDIX

    POWER OUTPUT RELATIONSHIPS

    CUT and COAD LOAD CURVES

    Dial/Display =25

    10

    12

    14

    16

    18

    20

    22

    24

    26

    28

    0 100 200 300 400 500 600 700

    LOAD (Ohms)

    OutputP!"#($atts)

    CUT

    COAG

    OUTPUT VS D%SPLA&

    0

    10

    20

    30

    40

    50

    60

    0 10 20 30 40 50

    D%SPLA&

    OUTPUT(!atts)

    CUT (150 ohms)

    COAG EFF1 (150 ohms)

    COAG EFF2 (150 ohms)

    COAG EFF1 (500 ohms)

    COAG EFF2 (500 ohms)

    Erbe ICC Bipo!r Spei#i!$io%&

    Bipolar C+t coa,+late /bot7 ;it7 2 e))ect

    "ode!

    a*. ener,y o+tp+t / at rated o7"! p to 0 00 e))ect 2

    .2

    GEAE&T$& (olid-!tate

    Fre+ency 74 30

    6i!+al @e!

    +dible 5 tone!6ol+"e control @e!

    %ine 6olta,e 110120230250

    C$$%IAG (@(TE Conection

    $TE& (PECIFICTI$A( %o; con!tant olta,e9 a+to"aticpo;er ad+!t"ent9 de)ined bipolar

    !ine ;ae. eet! re+ire"ent! o)

    I F 1 C( EA 5>001 IEC

    >0>01-1 and >0>01-2-2 I($

    001(E6 and %.