EQUITY STUDIO (PTY) LTDcsstudio.co.za/PDF/delft.pdfFFL. 53.300 IDU Facebrick Corrugated metal wall...

5
EQUITY STUDIO (PTY) LTD Address: 64 Ocean View Drive . Seapoint Cape Town . Tel: 021 433 1330 Fax: 021 433 1334 . Email: [email protected] . www.csstudio.co.za DELFT SYMPHONY WAY: NEW COMMUNITY DAY CENTRE LOCATION: DELFT, CAPE TOWN, SOUTH AFRICA DATE: 2011 BACKGROUND The site is located in Delft near the Airport in a new housing area on the corner of Silver Sands Main road and Outenikwa road. The site is 4900 m² and accessible from the old Stellenbosch Arterial road. It is currently surrounded by empty sandy plots with small RDP housing located to the south. This condition is typical of these new development areas which makes the context unpredictable. The building needs to be an urban landmark while it needs to relate to the urban scale of the area. DESIGN The design developed from the simple idea of creating a health village. Fabritsio Carola’s Moritania Hospital was one of the main inspirations for the design. Interactive spaces form part of the healing process while the idea of the family and extended family visiting the health facility is also an important consideration. The main entrance is on the South side onto Silver- sands Main Road. The pre-waiting area is an undercover space that gives protection against the elements due to the long hours people have to stand and wait.The front fascade will be decorated with ceramic murals and fenc- es that will be creatively constructed from re-cycled metal. All this work will be undertaken by local residents living near the clinic. The tall volume of the main waiting area gives a sense of orientation towards all the specialised units of the clinic. To the left will be the Infectious Disease Unit with its own sub-waiting area while the Records and Pharmacy will be clearly visible on the right. To the north of the main waiting area is a sunny courtyard around which all the units are loosely arranged. The prep area receives patients off the main waiting area and prepares them for the specialised units via the main corridor. To the left of the passage is radiology, followed by acute, chronic disease, re-hab and mother and child units. The staff block is connected to the secure staff parking and separate entrance area on the opposite end. The individual separated building units create external spaces ‘in between’ which can be occupied for other recreational and medical purposes such as rehabilitation exercises . It also allows for all rooms to have natural light and ventilation. The buildings will be constructed out of face brick walls, aluminium windows and doors with a sink-alume roof.

Transcript of EQUITY STUDIO (PTY) LTDcsstudio.co.za/PDF/delft.pdfFFL. 53.300 IDU Facebrick Corrugated metal wall...

  • EQUITY STUDIO (PTY) LTD

    Address: 64 Ocean View Drive . Seapoint Cape Town . Tel: 021 433 1330 Fax: 021 433 1334 . Email: [email protected] . www.csstudio.co.za

    DELFT SYMPHONY WAY: NEW COMMUNITY DAY CENTRE LOCATION: DELFT, CAPE TOWN, SOUTH AFRICA DATE: 2011

    BackgroundThe site is located in Delft near the Airport in a new housing area on the corner of Silver Sands Main road and Outenikwa road. The site is 4900 m² and accessible from the old Stellenbosch Arterial road. It is currently surrounded by empty sandy plots with small RDP housing located to the south. This condition is typical of these new development areas which makes the context unpredictable. The building needs to be an urban landmark while it needs to relate to the urban scale of the area. design The design developed from the simple idea of creating a health village. Fabritsio Carola’s Moritania Hospital was one of the main inspirations for the design. Interactive spaces form part of the healing process while the idea of the family and extended family visiting the health facility is also an important consideration.

    The main entrance is on the South side onto Silver-sands Main Road. The pre-waiting area is an undercover space that gives protection against the elements due to the long hours people have to stand and wait.The front fascade will be decorated with ceramic murals and fenc-es that will be creatively constructed from re-cycled metal. All this work will be undertaken by local residents living near the clinic.

    The tall volume of the main waiting area gives a sense of orientation towards all the specialised units of the clinic. To the left will be the Infectious Disease Unit with its own sub-waiting area while the Records and Pharmacy will be clearly visible on the right.

    To the north of the main waiting area is a sunny courtyard around which all the units are loosely arranged.

    The prep area receives patients off the main waiting area and prepares them for the specialised units via the main corridor. To the left of the passage is radiology, followed by acute, chronic disease, re-hab and mother and child units. The staff block is connected to the secure staff parking and separate entrance area on the opposite end.

    The individual separated building units create external spaces ‘in between’ which can be occupied for other recreational and medical purposes such as rehabilitation exercises . It also allows for all rooms to have natural light and ventilation.

    The buildings will be constructed out of face brick walls, aluminium windows and doors with a sink-alume roof.

  • EQUITY STUDIO (PTY) LTD

    Address: 64 Ocean View Drive . Seapoint Cape Town . Tel: 021 433 1330 Fax: 021 433 1334 . Email: [email protected] . www.csstudio.co.za

    NOTES:THE USE OF TRADE NAMES ON THIS DRAWING SIMPLY SERVES TOINDICATE A STANDARD ACCEPTABLE TO THE DEPARTMENT, ANYOTHER BRAND MAY BE USED WITH THE PRIOR WRITTEN APPROVALOF THE PROJECT LEADER.

    THE CONTRACTOR MUST WORK FROM FIGURED DIMENSIONS ONLY.CHECK ALL DIMENSIONS AND LEVELS ON SITE BEFORE COMMENCINGANY WORK. ALL DRAWINGS TO BE READ IN CONJUNCTION WITHDETAILS, SCHEDULES, DRAINAGE DRAWINGS, INTERNAL ELEVATIONS,ENGINEERS AND OTHER SPECIALIST'S DRAWINGS.

    REFER CONFLICTING INFORMATION TO THE ARCHITECT AND OTHERRESPONSIBLE CONSULTANTSTHE DESIGN ON THIS DRAWING IS THE PROPERTY OF THEPROVINCIAL GOVERNMENT: WESTERN CAPE- BRANCH WORKS ANDCOPY RIGHT IS RESERVED

    REFERENCE / LOCALITY PLAN

    REVISIONS

    EQUITY STUDIO

    NEW DELFT SYMPHONY WAYCOMMUNITY DAY CENTRETYGERBERG/NORTHERN SUB-STRUCTURE

    GROUND FLOOR PLANSERVICE CO-ORDINATION

    ME/JV/CA/SKT 1:100

    3/3/2B-2521WCDoH

    2521-005

    19/01/2012

    64 OCEAN VIEW DRIVESEA POINT8005

    NO

    RTH

    C

    C

    B

    B

    D

    D

    F

    F

    A

    GG

    E

    E

    WORKSTAGE 3

    MDB

    3x160mm∅

    ELECTRICAL

    SLEEVES

  • EQUITY STUDIO (PTY) LTD

    Address: 64 Ocean View Drive . Seapoint Cape Town . Tel: 021 433 1330 Fax: 021 433 1334 . Email: [email protected] . www.csstudio.co.za

    DAY CARE CENTRE

    PROPOSED EXTENSION

    SILVERSANDS

    MAIN ROAD

    OU

    TENIKW

    A RO

    AD

    PUBLIC OPEN SPACE

    NOTES:THE USE OF TRADE NAMES ON THIS DRAWING SIMPLY SERVES TOINDICATE A STANDARD ACCEPTABLE TO THE DEPARTMENT, ANYOTHER BRAND MAY BE USED WITH THE PRIOR WRITTEN APPROVALOF THE PROJECT LEADER.

    THE CONTRACTOR MUST WORK FROM FIGURED DIMENSIONS ONLY.CHECK ALL DIMENSIONS AND LEVELS ON SITE BEFORE COMMENCINGANY WORK. ALL DRAWINGS TO BE READ IN CONJUNCTION WITHDETAILS, SCHEDULES, DRAINAGE DRAWINGS, INTERNAL ELEVATIONS,ENGINEERS AND OTHER SPECIALIST'S DRAWINGS.

    REFER CONFLICTING INFORMATION TO THE ARCHITECT AND OTHERRESPONSIBLE CONSULTANTSTHE DESIGN ON THIS DRAWING IS THE PROPERTY OF THEPROVINCIAL GOVERNMENT: WESTERN CAPE- BRANCH WORKS ANDCOPY RIGHT IS RESERVED

    REFERENCE / LOCALITY PLAN

    REVISIONS

    EQUITY STUDIO

    NEW DELFT SYMPHONY WAYCOMMUNITY DAY CENTRETYGERBERG/NORTHERN SUB-STRUCTURE

    ROOF PLAN LAYOUT

    JV 1:200

    3/3/2B-2521WCDoH

    2521-003

    15/12/2011

    64 OCEAN VIEW DRIVESEA POINT8005

    NORTH

    WORKSTAGE 3

  • EQUITY STUDIO (PTY) LTD

    Address: 64 Ocean View Drive . Seapoint Cape Town . Tel: 021 433 1330 Fax: 021 433 1334 . Email: [email protected] . www.csstudio.co.za

    SOUTH ELEVATION

    WEST ELEVATION

    PVC downpipes

    150x150x150mm aluminium box gutter

    Stainless steel mesh screen

    Corrugated roof profile canopy to detail

    FFL. 53.800CHRONIC / ACUTE

    150x150x150mm aluminium box gutter

    Stainless steel mesh screen

    Corrugated roof profile canopy to detail

    Corrugated metal wall cladding

    FFL. 53.800CHRONIC / ACUTE FFL. 53.550

    RADIOLOGYFFL. 53.300IDU

    Facebrick

    Corrugated metal wall cladding

    Stainless steel mesh screen

    Walkway roof

    Ceramic wall

    7731

    2950

    6524

    2950

    5000

    7880

    PVC downpipes

    150x150x150mm aluminium box gutter

    Stainless steel mesh screen

    •• • •• • • •• • • • ••• • •• ••• • ••• ••• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •

    Corrugated heat stop wall cladding

    •• • •• • • •• • • • ••• • •• ••• • ••• ••• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •

    Concrete slab over compressor room

    Ceramic wall

    Corrugated roof profile canopy to detail

    Facebrick

    NOTES:THE USE OF TRADE NAMES ON THIS DRAWING SIMPLY SERVES TOINDICATE A STANDARD ACCEPTABLE TO THE DEPARTMENT, ANYOTHER BRAND MAY BE USED WITH THE PRIOR WRITTEN APPROVALOF THE PROJECT LEADER.

    THE CONTRACTOR MUST WORK FROM FIGURED DIMENSIONS ONLY.CHECK ALL DIMENSIONS AND LEVELS ON SITE BEFORE COMMENCINGANY WORK. ALL DRAWINGS TO BE READ IN CONJUNCTION WITHDETAILS, SCHEDULES, DRAINAGE DRAWINGS, INTERNAL ELEVATIONS,ENGINEERS AND OTHER SPECIALIST'S DRAWINGS.

    REFER CONFLICTING INFORMATION TO THE ARCHITECT AND OTHERRESPONSIBLE CONSULTANTSTHE DESIGN ON THIS DRAWING IS THE PROPERTY OF THEPROVINCIAL GOVERNMENT: WESTERN CAPE- BRANCH WORKS ANDCOPY RIGHT IS RESERVED

    REVISIONS

    EQUITY STUDIO

    NEW DELFT SYMPHONY WAYCOMMUNITY DAY CENTRETYGERBERG/NORTHERN SUB-STRUCTURE

    LRM/CA

    3/3/2B-2521WCDoH

    19/01/2012

    ELEVATIONS

    2521-102

    1:100

    WORKSTAGE 3

    REFERENCE / LOCALITY PLAN

    REVISIONS

    58.800ROOF HEIGHT

    FFL. 53.300IDU

    58.800ROOF HEIGHT

    58.300ROOF HEIGHT

    58.800ROOF HEIGHT

    FFL. 53.300GUARD HOUSE

    FFL. 263.000REHAB

    3300

    6482

    8187

    2567

    PVC downpipes

    150x150x150mm aluminium box gutter

    Ceramic wall

    •• • •• • • •• • • • ••• • •• ••• • ••• ••• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •

    Facebrick

    Corrugated heat stop wall cladding

    •• • ••• • •• • • • ••• • •• ••• • •• ••• • • • • • • • • • • • • • • • • • • • • • • • • • • • • •

    Roof over delivery area

    Stainless steel mesh screen

    Ceramic wall

    Facebrick

    Corrugated wall cladding

    Ceramic wall

    Stainless steel mesh screen

    58.800ROOF HEIGHT

    58.800ROOF HEIGHT

    FFL. 53.800REHAB/MOTHER AND CHILD

    53.800CHRONIC / ACUTE

    EAST ELEVATION

    NORTH ELEVATION

    150x150x150mm aluminium box gutter

    Stainless steel mesh screen

    Ceramic wall

    Ceramic wall

    150x150x150mm aluminium box gutter

    Stainless steel mesh screen

    Pvc Downpipes

    58.230ROOF HEIGHT

    58.230ROOF HEIGHT

    Translucent cladded south light

    IBR roofsheeting profile

    IBR roofsheeting profile

    8905

    7506

    8907

    8920

    7507

    FFL. 263.000IDU

    FFL. 263.000IDU

    3200

    2200

    4000

    3000

    FFL. 53.300IDU

    FFL. 53.300GUARD HOUSE

    56.300ROOF HEIGHT

    56.300ROOF HEIGHT

  • EQUITY STUDIO (PTY) LTD

    Address: 64 Ocean View Drive . Seapoint Cape Town . Tel: 021 433 1330 Fax: 021 433 1334 . Email: [email protected] . www.csstudio.co.za

    3790 2920 2920 4050

    5

    CHANGE IN ORIENTATION OF GRID

    4249 3350 41712950292029202950

    3000

    2800

    3347

    5185 6

    761

    8920

    7607

    7732

    3000

    4200

    3000

    200

    1000

    5512

    2891 2891 2891 2891 2891

    NOTES:THE USE OF TRADE NAMES ON THIS DRAWING SIMPLY SERVES TOINDICATE A STANDARD ACCEPTABLE TO THE DEPARTMENT, ANYOTHER BRAND MAY BE USED WITH THE PRIOR WRITTEN APPROVALOF THE PROJECT LEADER.

    THE CONTRACTOR MUST WORK FROM FIGURED DIMENSIONS ONLY.CHECK ALL DIMENSIONS AND LEVELS ON SITE BEFORE COMMENCINGANY WORK. ALL DRAWINGS TO BE READ IN CONJUNCTION WITHDETAILS, SCHEDULES, DRAINAGE DRAWINGS, INTERNAL ELEVATIONS,ENGINEERS AND OTHER SPECIALIST'S DRAWINGS.

    REFER CONFLICTING INFORMATION TO THE ARCHITECT AND OTHERRESPONSIBLE CONSULTANTSTHE DESIGN ON THIS DRAWING IS THE PROPERTY OF THEPROVINCIAL GOVERNMENT: WESTERN CAPE- BRANCH WORKS ANDCOPY RIGHT IS RESERVED

    REVISIONS

    EQUITY STUDIO

    NEW DELFT SYMPHONY WAYCOMMUNITY DAY CENTRETYGERBERG/NORTHERN SUB-STRUCTURE

    LRM/CA

    3/3/2B-2521WCDoH

    20/01/2012

    SECTIONS

    2521-101

    1:100

    WORKSTAGE 3

    REFERENCE / LOCALITY PLAN

    REVISIONS

    SECTION C- C

    SECTION F - F

    4321

    PVC downpipes

    150x150x150mm aluminium box gutter

    Stainless steel mesh screen

    •• • •• • • •• • • • ••• • •• ••• •• ••• ••• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •

    Heatstop and Alupanelwall cladding

    Ceiling panels in T-section grid

    AC installation as per Mech eng

    Corrugated wall cladding

    Translucent sheet southlight

    Timber screen

    Concrete roof slab Timber slatted pole ceiling

    Ceiling panels in T-section grid

    Timber columns

    Facebrick