EPSC Module 3 Unit 3

9
UNIT 3 Module 3

Transcript of EPSC Module 3 Unit 3

Page 1: EPSC Module 3 Unit 3

UNIT 3

Module 3

Page 2: EPSC Module 3 Unit 3

“Green” - What is it?

Green Infrastructure / Low Impact Development

• Not traditional storm water management – rapid conveyance of water via storm sewers to surface waters

• Green Infrastructure- practices designed & constructed for infiltration of water into ground water table.– retains and promotes rainfall infiltration

– mimics natural infiltration

Page 3: EPSC Module 3 Unit 3

Design ConsiderationsWhat we are learning

• Protecting the green practice while normal construction is progressing?

– Phasing BMP’s

• Delineating green areas (signage, fencing, etc.)

• Prevent construction traffic from compacting area

– Installing green practice when appropriate

• Allowing plant material to establish

– Protection up to 100yr storm

Page 5: EPSC Module 3 Unit 3

Phasing: When to Install?Follow Plans

Page 6: EPSC Module 3 Unit 3

Protect the Investment

• Ensuring controls are in place and maintained to prevent sediment from green practice until stabilization is achieved.– Sediment prohibits infiltration

Page 7: EPSC Module 3 Unit 3

Protect the Investment

• Maintaining controls to keep sediment out of infiltration area.

Page 8: EPSC Module 3 Unit 3

Subcontractor Communication

• Educate / Train subs.

• Allowing pollutants/ sediment into green practice will prohibit infiltration and result in reconstructing green practice.

Page 9: EPSC Module 3 Unit 3

End of Module 3

• Add questions