EPRTM Project Insights
Marion HORSTMANNOffer Director ČEZ
June 22nd, 2010
EPRTM in the Czech Republic –Marion Horstmann – June 22nd, 2010 - AREVA NP Propietary © AREVA NP p.3All rights are reserved, see liability notice.
Advantages of the EPR TM
in the Czech Republic
Designed for Safety
Designed in accordance to the EUR Safety features, which even exceed the EURLicensing experience in Europe
Designed for Operation
Attractive NPV as a result of:� 92% availability during 60 years lifetime� Best in class OPEX� High power density � maximize use of existing sites
Supply chain certainty
Supply chain philosophyOnly supplier who currently sources major equipment for new build NPP projects in the Czech RepublicSupplier Fair on June 25 in Prague
Construction certainty
Large experience feedback from the existing sites
Secure resources individually for the project in advance
Proximity to the design offices in Erlangen and Paris
EPRTM in the Czech Republic –Marion Horstmann – June 22nd, 2010 - AREVA NP Propietary © AREVA NP p.4All rights are reserved, see liability notice.
Agenda
The EPR™ design
EPR™ project status
Project execution: continuous improvement
Supply chain
1
2
3
4
EPRTM in the Czech Republic –Marion Horstmann – June 22nd, 2010 - AREVA NP Propietary © AREVA NP p.5All rights are reserved, see liability notice.
PWR 1650 MWeBWR 1250 MWe PWR 1100 MWe
AREVA’s reactor range
High Power OutputMedium Power Output
Pressurized Water ReactorsBoiling Water Reactor
The reference in Safety
Answer the varied customer needs with an adapted product portfolio
AREVA is the only player with a Gen3+ reactor range
DeployedMarket launch: 2010
Developed in partnership with MHI
EPRTM in the Czech Republic –Marion Horstmann – June 22nd, 2010 - AREVA NP Propietary © AREVA NP p.6All rights are reserved, see liability notice.
N4
KONVOI
4x100% independent Safety trains
Top mounted instrumentation
DBA: No spray system
Very High output: ~1600MWe
Very large core: 241 FA
Best-in-class APC
Very High steam pressure: 77,2 bar
Computerized MCR
Fuel building
Military aircraft resistance
4 independent Safety trains
Top mounted instrumentation
No spray system
High output (1475MWe)
Large core (205 FA)
Concrete cylindrical containment
High steam pressure (73,1 bar)
Computerized MCR
Fuel building
The EPR™ design combines and improves on the best fe atures of the French and German technologies
The EPR™ reactor:Building on the Achievements of the N4
and Konvoi Reactors
EPRTM in the Czech Republic –Marion Horstmann – June 22nd, 2010 - AREVA NP Propietary © AREVA NP p.7All rights are reserved, see liability notice.
EPR™ Business Performance:Better fuel utilization
The reflector allows better fuel utilization(uranium consumption reduced by ~3%)
Another benefit is the protection of RPV core shell against radiation embrittlement
»Divider plate
»Divider plate
»Pressure shell
»Bundle wrapper
»Double wrapper
»100 % feedwater
90 % recirculatedwater
10 % recirculatedwater
»Pressure shell
»Double wrapper
»Bundle wrapper
»Divider plate
»Divider plate
»Pressure shell
»Bundle wrapper
»Double wrapper
»100 % feedwater
90 % recirculatedwater
10 % recirculatedwater
»Pressure shell
»Double wrapper
»Bundle wrapper
Heavy neutron reflectorHeavy neutron reflector
Replacement of conventional core baffle assembly by a heavy reflector
Higher steam pressure => higher thermal efficiency (37%)
Steam generator economizerSteam generator economizer
Separating cold from hot leg on the secondary side and directing all the main feed water to the cold leg with a double wrapper
EPRTM in the Czech Republic –Marion Horstmann – June 22nd, 2010 - AREVA NP Propietary © AREVA NP p.8All rights are reserved, see liability notice.
EPR™ Business Performance:Higher availability
Redundant systemsRedundant systems
Highly redundant safety systems enable online maintenance: 4 x 100% safety trains on the EPR™ design
Reactor building accessReactor building access
Access to annular space during power operation thanks to the “two compartment concept”:
Design target: 92% availability
Four Train conceptand physical separation
1
2
3 4
EPRTM in the Czech Republic –Marion Horstmann – June 22nd, 2010 - AREVA NP Propietary © AREVA NP p.9All rights are reserved, see liability notice.
Reactor pit
IRWST
Spreading area
Sacrificialconcrete
EPR™ Outstanding safety:External and internal accident mitigation
Core catcherCore catcher
1. Temporary retention in the reactor pit
2. Spreading in the large surface dedicated area
3. Flooding and cooling of the spreading area using IRWST 1
The core catcher is a fully passive systemthat allows to mitigate and manage a coremelt:
1- In-containment Refueling Water Storage Tank
Resistance to both military and large commercial airplane
APC ShellAPC Shell
A reinforced concrete APC shell doubles the 1.8m thick pre-stressed concrete reactor building wall
1.8 m thick
EPRTM in the Czech Republic –Marion Horstmann – June 22nd, 2010 - AREVA NP Propietary © AREVA NP p.10All rights are reserved, see liability notice.
Award of the certificate attesting to the EPR™ reactor’s compliance with EUR to the AREVA group on July 15 2009
The EPR™ reactor meets more than 99% of the 4.675 requirements
0.1 % of non-compliances – all substantiated
The EPR™ reactor has outstripped the EUR specifications :
� Protection against airplane crash (large commercial aircrafts included)
� Spent fuel storage capacity
� Design lifetime of 60 years against 40 required by the EUR
High business and safety of the EPR™ design:validated by the EUR review
EPRTM in the Czech Republic –Marion Horstmann – June 22nd, 2010 - AREVA NP Propietary © AREVA NP p.11All rights are reserved, see liability notice.
EPR™ design currently being licensed by leading safety authorities
February 2005 April 2007
Licensing Launched
Submission June 2007
Design Certification Application
December 2007
Construction License
We have a unique experience in meeting different na tional licensing requirements and processes
AREVA supports a shorter licensing processby providing comprehensive reference documents
P8 –S1
October 2009
EPRTM in the Czech Republic –Marion Horstmann – June 22nd, 2010 - AREVA NP Propietary © AREVA NP p.12All rights are reserved, see liability notice.
Agenda
EPR™ development and licensing status
EPR™ project status
Project execution: continuous improvement
Supply chain
1
2
3
4
EPRTM in the Czech Republic –Marion Horstmann – June 22nd, 2010 - AREVA NP Propietary © AREVA NP p.13All rights are reserved, see liability notice.
4 EPR™ Units Under Construction
Flamanville 3
Taishan 1&2
Olkiluoto 3
The World’s First Gen III+ Fleet
to be deployed
EPRTM in the Czech Republic –Marion Horstmann – June 22nd, 2010 - AREVA NP Propietary © AREVA NP p.14All rights are reserved, see liability notice.
Olkiluoto 3Major Achievements
2006 2008 20102007 2009
Project Time-line
Installation ofBottom Part of
Containment Liner
May 2006 June 2007February 2008
September 2009January 2009
Reactor BuildingContainment Line
From -7 m to +16 m
Lifting of the ReactorDome onto the
Reactor Building
Steam GeneratorBlow Down Tank
Installation
Delivery of theReactor Pressure
Vessel
Polar craneno-load test
March 2010
EPRTM in the Czech Republic –Marion Horstmann – June 22nd, 2010 - AREVA NP Propietary © AREVA NP p.15All rights are reserved, see liability notice.
OL3 moving forward:Civil works final phase
March 10Reactor inner containment dome pouring
EPRTM in the Czech Republic –Marion Horstmann – June 22nd, 2010 - AREVA NP Propietary © AREVA NP p.16All rights are reserved, see liability notice.
Flamanville 3Major Achievements
2006 2008 20102007 2009
Project Time-line
Signature ofthe Contract
April 2007 December 2007May 2008 June 2009September
2008
First ConcretePouring
Delivery of FirstEmbedded Tank
(RPE)
Start of LinerPreparation
Installation ofSafeguard Piping
System
©E
DF
Safety I&C cabinetsdelivered in test bay
in Germany
November 2009
EPRTM in the Czech Republic –Marion Horstmann – June 22nd, 2010 - AREVA NP Propietary © AREVA NP p.17All rights are reserved, see liability notice.
FA3 moving forward:Components delivered and installed
February 10Erection of the first embedded tank(reactor coolant drain tank)
March 10Delivery of the Pressurizer
relief tank
EPRTM in the Czech Republic –Marion Horstmann – June 22nd, 2010 - AREVA NP Propietary © AREVA NP p.18All rights are reserved, see liability notice.
Taishan 1 & 2Major Achievements
2006 2008 20102007 2009
Project Time-line
Signature ofthe Contract
November 2007 May 2008August 2008 October
2008
First Concrete TS1Start of the SelfReliance program
ExcavationCeremony
Signature of theLOI to create a JVin Nuclear Reactor
Engineering
©CGNPC
First Concrete TS2
EPRTM in the Czech Republic –Marion Horstmann – June 22nd, 2010 - AREVA NP Propietary © AREVA NP p.19All rights are reserved, see liability notice.
Taishan 1 getting off the ground:First liner ring
March ‘10First liner ring in place
EPRTM in the Czech Republic –Marion Horstmann – June 22nd, 2010 - AREVA NP Propietary © AREVA NP p.20All rights are reserved, see liability notice.
Agenda
EPR™ development and licensing status
EPR™ project status
Project execution: continuous improvement
Supply chain
1
2
3
4
EPRTM in the Czech Republic –Marion Horstmann – June 22nd, 2010 - AREVA NP Propietary © AREVA NP p.21All rights are reserved, see liability notice.
Improving project execution and delivery:AREVA Continuous improvement Cycle
Capture
Communicate/Close
Improve
Analyse
Experience feedback:►Construction►Design and licensing►Project management►Technology►Supply chain►Localization
Improvement of EPR™project execution:
Customer Satisfaction
Main source is the 4 units under construction, but other sources exist:
� Licensing ongoing in US, UK, China, India, France, Finland
� Offer process, in 2009:• Large offers submitted : South
Africa, UAE and India• Offer process started in CZ, UK
and Netherlands
EPRTM in the Czech Republic –Marion Horstmann – June 22nd, 2010 - AREVA NP Propietary © AREVA NP p.22All rights are reserved, see liability notice.
Learning Curve
OLKILUOTO 3
FLAMANVILLE 3
Next Projects with Serial EPR™ units
Olkiluoto 3
Flamanville 3
Taishan 1&2
TIME
EX
PE
RIE
NC
E G
AIN
ED
Thanks to this Continuous Improvement process:AREVA can manage the configuration of the Serial EPR™ units to the benefit of our customers on future bids and project s
TAISHAN
EPRTM in the Czech Republic –Marion Horstmann – June 22nd, 2010 - AREVA NP Propietary © AREVA NP p.23All rights are reserved, see liability notice.
Agenda
EPR™ development and licensing status
EPR™ project status
Project execution: continuous improvement
Supply chain
1
2
3
4
EPRTM in the Czech Republic –Marion Horstmann – June 22nd, 2010 - AREVA NP Propietary © AREVA NP p.24All rights are reserved, see liability notice.
Supply chain
SUPPLY CHAIN
1. Secure supply chain with qualified subcontractors
2. Optimize quality, safety, delivery, cost and securits of supply
3. Mature process for:� Qualification of supplies
� Performance monitoring
4. Identification:� Screening in global market
� Sourcing in local market for specific offers
Source locally ����
Qualify globally
EPRTM in the Czech Republic –Marion Horstmann – June 22nd, 2010 - AREVA NP Propietary © AREVA NP p.25All rights are reserved, see liability notice.
Global Purchasing Strategy Localization Approach
Start Local – Become Global
Benefits of Localization approach:� involve partners with knowledge of local peculiarit ies, e.g.
• specific rules & regulations• sub-supplier base downstream• Site specifics
� avoid linguistic problems� start relationship with suppliers‘ domestic market� follow the perspective of global partnership
Long-term partnerships with selected subcontractors in order to:� Respond to local requirements� Offer competitive solutions to our customers� Strengthen our worldwide subcontractor base
EPRTM in the Czech Republic –Marion Horstmann – June 22nd, 2010 - AREVA NP Propietary © AREVA NP p.26All rights are reserved, see liability notice.
Czech Supplier DayPrague, June 25, 2010
To register your company please enter our supplier porta l.
http:// [email protected]
EPRTM in the Czech Republic –Marion Horstmann – June 22nd, 2010 - AREVA NP Propietary © AREVA NP p.27All rights are reserved, see liability notice.
Advantages of the EPR TM
in the Czech Republic
Designed for Safety
Designed in accordance to the EUR Safety features, which even exceed the EURLicensing experience in Europe
Designed for Operation
Attractive NPV as a result of:� 92% availability during 60 years lifetime� Best in class OPEX� High power density � maximize use of existing sites
Supply chain certainty
Supply chain philosophyOnly supplier who currently sources major equipment for new build NPP projects in the Czech RepublicSupplier Fair on June 25 in Prague
Construction certainty
Large experience feedback from the existing sites
Secure resources individually for the project in advance
Proximity to the design offices in Erlangen and Paris
Your Questions ?
EPRTM in the Czech Republic –Marion Horstmann – June 22nd, 2010 - AREVA NP Propietary © AREVA NP p.29All rights are reserved, see liability notice.
Any reproduction, alteration, transmission to any third party or publication in whole or in part of this document and/or its content is prohibited unless AREVA has provided its prior and written consent.
This document and any information it contains shall not be used for any other purpose than the one for which they were provided. Legal action may be taken against any infringer and/or any person breaching the aforementioned obligations.