EPD CONSENT AGENDA PROGRESS REPORT

13
EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: OCTOBER 10, 2012

description

EPD CONSENT AGENDA PROGRESS REPORT REPORT DATE: OCTOBER 10, 2012. FY 2010 YEAR TO DATE TOTALS MANHOLE INSPECTIONS TAB 1 - PowerPoint PPT Presentation

Transcript of EPD CONSENT AGENDA PROGRESS REPORT

Page 1: EPD CONSENT AGENDA PROGRESS REPORT

 EPD CONSENT AGENDA

 PROGRESS REPORT

  REPORT DATE: OCTOBER 10, 2012

Page 2: EPD CONSENT AGENDA PROGRESS REPORT

FY 2010 YEAR TO DATE TOTALS    

MANHOLE INSPECTIONS TAB 1   MANHOLE REPAIRS TAB 2  TV INSPECTION TAB 3  ROOT CONTROL TAB 4  HYDRAULIC CLEANING TAB 5  EASEMENT CLEARING TAB 6  AERIAL STREAM CROSSING INSPECTIONS TAB 7 

COMBINED TOTALS BY FISCAL YEAR TAB 8

Page 3: EPD CONSENT AGENDA PROGRESS REPORT

MANHOLE INSPECTIONS   

INFLOW/INFILTRATION SECTION 3,920

SYSTEM MAINTENANCE 252        

 

TAB 1

Page 4: EPD CONSENT AGENDA PROGRESS REPORT

MANHOLE REPAIRS    

CONTRACTED (RAISED) 789 

GENERAL MAINTENANCE 145

TAB 2

Page 5: EPD CONSENT AGENDA PROGRESS REPORT

TV INSPECTION    

INFLOW/INFILTRATION SECTION 65,763’  SYSTEM MAINTENANCE 137,559’

TAB 3

Page 6: EPD CONSENT AGENDA PROGRESS REPORT

ROOT CONTROL

  PHASE 1 237,623’

BROOKHAVEN DRBUCKINGHAM CIRCAMBRIDGE DRCARROLLTON CTCHARRING CROSSCOTTONWOOD DRDILLARD DRENGLAND PLFERN VALLEY RDGETTYSBURG TRAILHAWKINS STORE RDLEE ANN DRMANHATTAN DRNOTTINGHAM DRPATRICK DRRAMBLING RDROCKBRIDGE RDSHALLOWFORD RDSUMTER DRVISTAWOOD DRWESTMORELAND DRWOODGATE DR

 

 

 

PHASE 2 274,878’

CEDARBROOK DRCHAPMAN DREDGEWOOD DRFARMBROOK TRLFLOYD DRGUILDHALL TRLHECK ROADHOLBROOK CTKENSINGTON WAYMAPLE FERRY DROAK FERRY DRPINE FERRY DRRAIL SPLITTER DRSTARMIST CTWOOD FOREST RD

TAB 4

Page 7: EPD CONSENT AGENDA PROGRESS REPORT

ROOT CONTROL

  PHASE 3 99,673’ PHASE 4 291,301’

AYRES RD AUSTELL CIRCREEK WOOD LN BLACK GUM CTDRIFTWOOD TRL BUTLER CREEK RDFELTON HILL RD FERN VALLEY DRFONTAINE RD MEADOWVIEW LNHIGHVIEW DR MOON STATION RDHURT RD PAIR RDLAKESHORE DR QUAIL RUNLANDERS DR QUINTO DRMAPLE VALLEY RD ROXBORO DRNORTHLAND RD SANDTOWN RDOAK HILLS RD SASANQUA LNPINELAND RD SHADOW RIDGE TRLSHANNON GREEN CIR SHADYSIDE RDVALLEY CREEK RD TIFFANY DR

  TWILLEY CIRWINDY HILL RDWOOD TRAIL LNWREN WAYYORKSHIRE DRZELMA ST

 

 

TAB 4

Page 8: EPD CONSENT AGENDA PROGRESS REPORT

HYDRAULIC CLEANING     

GENERAL MAINTENANCE 280,456’ (COUNTY WIDE)

TAB 5

Page 9: EPD CONSENT AGENDA PROGRESS REPORT

EASEMENT CLEARING

Quarterly Total YTD 

Quarter 1 808,275’ 808,275’ 

Quarter 2 276,344’ 1,084,619’

Quarter 3 707,241’ 1,791,860’

Quarter 4 795,616’ 2,587,476’

  

TAB 6

Page 10: EPD CONSENT AGENDA PROGRESS REPORT

AERIAL STREAM CROSSING INSPECTIONS  

INFLOW/INFILTRATION SECTION 1,211 

SYSTEM MAINTENANCE 27

TAB 7

Page 11: EPD CONSENT AGENDA PROGRESS REPORT

163,587

668,509

167,971

94,962

134,105

668,584

160,189

228,159

197,861

589,205

200,199

1,876,280

173,861

491,206

319,532

1,719,613

203,322

903,475

280,456

2,587,476

TV Inspection

Root Control

Hydraulic Cleaning

Easement Clearing

FY 2008 FY 2009 FY 2010 FY 2011 FY2012

Totals by Fiscal Year

Linear Feet

TAB 8

Page 12: EPD CONSENT AGENDA PROGRESS REPORT

5,104

5,092

5,462

6,112

4,409

2,738

2,799

0

971

5,129

0

853

0

789

4,172

Manhole Inspections

Global PositioningLocations

Manholes Raised

FY 2008 FY 2009 FY 2010 FY 2011 FY 2012

Each

Totals by Fiscal YearTAB 8

Page 13: EPD CONSENT AGENDA PROGRESS REPORT

49

6

562

42

1,958

58

846

47

1238

145

Aerial StreamCrossing Inspections

Manhole Repairs

FY 2012

FY 2011

FY 2010

FY 2009

FY 2008

Totals by Fiscal Year

Tab 8

Each