EPC Analysis
-
Upload
vinaya-nayak -
Category
Documents
-
view
490 -
download
1
Transcript of EPC Analysis
![Page 1: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/1.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
1
EPC CONTRACTS: RISKS IN MEGA EPC PROJECTS
Agenda for Presentation
EPC Contract Fundamentals:
Fixed Price Contract
Economic Benefits
EPC Contract Fundamental: Some Questions
Contracting StrategyContract Performance Risks
Graphs and Figures
Revenue Profile For a Typical EPC ContractExecution Risk As EPC Contract ProgressesExecution Risk As Cost Plus Contract ProgressesRelative Risk Reward Profiles of Different Contract Strategies
EPC Contract Execution Risks: Owner Contractor Interactions
Owner Demands and OversightsContractor PressuresDisputes: Causes and Possible ReasonsSummary Research Findings: Risk Management
Case Study in Risk Management: “EPC Contract Risk Assessment and Mitigation During Economic Meltdown”
1/7/2010
1
![Page 2: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/2.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
2
EPC Contract: Advantages
Fixed Price Contract, Negligible Escalation
Design-build/engineer, procure, construct EPC contracting can potentially save millions of dollars up front, as well as dollars paid in change orders while construction proceeds.
Hardly any escalation in costs occur
Contractor brings to fore the best practices in project management
Timely Execution and Project earnings Start Faster
Life Cycle Cost of Project Diminishes.
![Page 3: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/3.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
3
EPC Contract Fundamental: Some Questions
� Owners often question whether the checks and balances are in place and question who really pays for alterations in design.
� Owners look toward the design-build/EPC contractor to be the one stop shop and the last stop for all the costs to be incurred for a project—from inception to project closeout.
� Thus, change becomes an issue that may not be well defined in today’s design build/ EPC construction environment.
![Page 4: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/4.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
4
EPC Contract Fundamentals: Some Questions
� In a changing world, what does uncertainty mean for the design-build/EPC industry?
� What do the current world economic conditions, as well as the current U.S. economic conditions mean to a design-build/EPC contractor wanting to play in the construction industry today?
� How do factors such as labor supply restrictions, loss of intellectual knowledge, and gap in fund availability for the infrastructure projects pose challenges to a design-build/EPC contractor wanting to play in say E&P or Power Sector.
![Page 5: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/5.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
5
EPC Contract Fundamentals: Contracting Strategy
Contracting Strategies
The design-build/EPC process merely establishes the roles and relationships among the key members of th e project team.
To achieve the specific project goals, however, the delivery system must be compatible with the owner’s contracting methodology and procurement process.
One of the single most important decisions that any design-build/EPC contractor will make is on the typ e of contract that it enters into with an owner.
The contract strategy represents the way in which t he delivery
![Page 6: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/6.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
6
EPC Contract Fundamentals: Contracting Strategy Contract Performance Risks
Systems are packaged and paid for by the owner.
Owner will insist via the contract provisions that the contractor, in return for being paid to execute tho se functions,
-also accepts the risks of performing-those functions according to the standards -and conditions laid down in the contract
![Page 7: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/7.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
7
EPC Contract Fundamentals: Contracting Strategy Contract Performance Risks
Typically, in fixed-price contracting, any unforese en cost is not strictly underwritten within the original contr act and likely to be assumed by the contractor.
The fixed price that envelops the contract should accommodate a worst-case scenario if execution risk s become a reality.
This buffer is calculated in the form of a continge ncy and can represent up to 15% of the asking price.
The best case scenario is that these are not exerci sed, in which situation they are released and materialize as additional “cream” on top of the base price/margin.
In the worst-case scenario, these risks exceed the contingencies put in place and erode the base margi n to an extent that the contractor loses money on the proje ct
![Page 8: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/8.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
8
EPC Contract Fundamentals: Contracting Strategy Contract Performance Risks
When the contractor provides a price for the design build/ EPC scope, it is obligating itself to provide the
project scope and quality that meets the owner’s requirements functionality,
affirms can be accomplished within the time required timeliness, and thus
affirms that its costs are sufficient to meet both requirements in terms of resources labor, equipment, and so on—all for a fixed cost.
![Page 9: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/9.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
9
Contractors initially welcomed the lion’s share of risk on EPC projects in return for the significant profit potential that could be derived from having simultaneous control over
design, procurement, and construction and any resulting efficiencies in cost and schedule.
EPC Contract Fundamentals: Contracting Strategy Contract Performance Risks
![Page 10: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/10.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
10
Revenue Profile Rebased to 1 for a Typical EPC Cont ract
![Page 11: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/11.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
11
Typical Amplification of Execution Risk As EPC Cont ract Progresses
![Page 12: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/12.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
12
Typical Amplification of Execution Risk With Cost P lus Contract
![Page 13: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/13.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
13
Relative Risk Reward Profiles of Different Contract Strategies
![Page 14: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/14.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
14
EPC Contract Execution Owner Contractor Interactions: Owner Demands
However many owners demand
Increased role in the design process, Heightened fast-track completion requirements, Enhanced performance guarantiesOwner supplied equipment
With no corresponding assumption of risk, and witho ut a proper change management process defined in the EPC Contract for such interventions.
![Page 15: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/15.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
15
EPC Contract Execution Owner Contractor Interactions: Contractor Pressures
Risks associated with third-party technology and equipment supplied by owner equipment manufacturers (OEMs) increasingly shifted to the contractor.
Contractors bid on EPC projects where they were
Unable to adequately utilize value engineering
Unable to Innovate to Balance
Forced to swallow increase in risk.
![Page 16: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/16.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
16
EPC Contract Execution Owner Contractor Interactions: Consequences
Profit margins declined,
Owner penalties increased, EPC contractors were caught in the squeeze.
Not surprisingly, contractors met the increase in riskwith higher pricing, thereby depriving owners of thecost savings EPC projects were intended to provide.
Even worse, the incidence of disputes soared, oftenfollowed by protracted and costly litigation.
![Page 17: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/17.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
17
EPC Contract Execution Owner Contractor Interactions: Disputes
A recent survey of construction trends in Power
Plants in US, Europe and Asia and Middle East
By BASmS Business Intelligence Group
found that there has been a significant
Increase in construction related disputes over
the past few months
The survey also found that the disputes were
much more prevalent on complex projects
costing more than $500 million
![Page 18: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/18.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
18
EPC Contract Execution Owner Contractor Interactions: Disputes
Thus the major causes of disputes and claims:
1.Architect/engineer error and omission,
2.Excessive change orders and owner/contractor interference.
Less frequent causes mentioned were
differing site conditions,
acceleration issues and
non-performance of subcontractors.
![Page 19: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/19.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
19
EPC Contract Execution Owner Contractor Interactions: DisputesPossible Reasons
Tighter current global economic environment…fight harder for every dollar
leads to hard-line negotiations,
tough contract terms and
strict enforcement of contract language.
![Page 20: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/20.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
20
� Recent project experience and recent trends within the construction industry indicate that executing projects is going to be more difficult and more risky in the future.
� Understanding these risks and their legal implications will be critical so that both the owners and the design-build/EPC contractors can be successful.
� EPC Contracting with negotiated alliance and change management processes built in may be more viable alternatives.
� Rigorous Use of Risk Management Techniques will become a necessity for EPC Contractors while Bidding, Planning and Executing.
Summary of Research Findings
![Page 21: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/21.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
21
Managing Risks
As an integral part of sound projectmanagement practices, Risk management is a systematic andproactive approach to reduce uncertainties
![Page 22: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/22.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
22
![Page 23: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/23.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
23
![Page 24: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/24.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
24
Case Study in Risk Management: EPC Contract Risk Assessment and Mitigation During Economic Meltdown.
![Page 25: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/25.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
25
EPC Contract Risk Assessment and Mitigation During Economic Meltdown.
1..EPC Risk Dynamics Measures of Economic Downturn and Macro Impacts
Six Macro Economic FactorsGDPGlobal EquitiesExchange Rates, Capital Flows and Chinese YuanManufacturing and Industrial ProductionOil Price Volatility and E&P SpendingOil Price Volatility and E&P Cost Dynamics
2.EPC Risk Analysis and Mitigation :Risk AllocationInsurance and Hedging
3.EPC Projects Data : Value at RiskProjects AffectedResearch Findings
4.World’s Largest EPC ContractorsBacklog and Impact on Global Forward Manufacturing
5. Thank You
![Page 26: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/26.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
26
Economic Downturn and Macro Impacts: The Six Factor s
![Page 27: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/27.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
27
Economic Downturn and Macro Impacts on GDP Growth
![Page 28: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/28.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
28
Economic Downturn and Macro Impacts on Global Equit ies
![Page 29: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/29.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
29
Economic Downturn and Macro Impacts on Exchange Rates and Capital Inflows
![Page 30: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/30.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
30
Economic Downturn and Macro ImpactsChinese Yuan: Government Manipulated Exchange Rates
![Page 31: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/31.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
31
Economic Downturn and Macro Impacts on Manufacturin g
![Page 32: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/32.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
32
Economic Downturn and Macro Impacts on Industrial P roduction
![Page 33: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/33.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
33
Economic Downturn and Macro Impacts: E&P Costs Escalate and Fall In Meltdown
E&P IHS/CERA Upstream Capital Costs Index
Dynamics Of Risks
![Page 34: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/34.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
34
Economic Downturn and Macro Impacts: Oil Price Volatility andExploration and Production Spending
![Page 35: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/35.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
35
![Page 36: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/36.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
36
![Page 37: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/37.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
37
![Page 38: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/38.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
38
Risk Analysis Mitigation Insurance
![Page 39: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/39.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
39
Risk Analysis Mitigation Risk Transfer Instruments
![Page 40: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/40.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
40
![Page 41: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/41.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
41
The Projects Affected During Transition
1.Ras Tanura Integrated Project (RTIP)2.Pearl GTL3.Petro Rabigh Refinery Upgrade4.Shah Sour Gas Field Development5.Khurais Oilfield6.Manifa Offshore Oilfield7.Saudi Kayan Petrochemicals Complex8.Hassyan Power & Desalination Plant9.Ras Girtas Power Project10.Shaybah Phase 2 Expansion
Total cost: $114.5 billion
The countries behind our project list are Saudi Arabia, Qatar and the UAE, where energy and infrastructure projects on a world-leading scale continue to progress. With almost US$120 billion worth of critical energy and infrastructure projects up for grabs
MANAGING EPC RISKS IN MEGA EPC PROJECTSRECOVERY FROM THE DOWNTURN
![Page 42: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/42.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
42
MANAGING EPC RISKS IN MEGA EPC PROJECTSRECOVERY FROM THE DOWNTURNEPC Companies Who Matter
1. Bechtel (USA)
2. Technip (France)
3. Aker Solutions (Norway)
4. Chiyoda Corporation (Japan)
5. SNC-Lavalin Group (Canada)
6. J. Ray McDermott (USA)
7. JGC Corporation (Japan)
8. Hyundai Heavy Industries (South Korea)
9. Foster Wheeler (USA)
10. Daelim Industrial Company (South Korea)
![Page 43: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/43.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
43
MANAGING EPC RISKS IN MEGA EPC PROJECTSRECOVERY FROM THE DOWNTURNEPC Companies Who Matter..Contd
Fluor, Foster Wheeler, Shaw Group, Jacobs, Technip, Toyo, JGC, Toyota, and GS Engineering in Korea, they typically win the majority of the work. As their backlogs increase that’s a clear barometer that equipment will be ordered going forward and are signals for the manufacturers to start forward Planning.
![Page 44: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/44.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
44
Projects Today
1. Nassiriya Oilfield (Iraq)
2. Integrated Gas Development Project(UAE)
3. South Pars Gas Field (Iran)
4. Jubail Export Refinery (Saudi Arabia)
5. Tianjin Petrochemicals Complex(China)
6. Touat Gas Field (Algeria)
7. Gassi Touil Gas Field (Algeria)
8. Skikda Refinery Upgrade (Algeria)
9. Sipchem Polyvinyl Plants (Saudi Arabia)
10. Borouge (UAE)
![Page 45: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/45.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
45
Projects Today
1. Trans Sahara Pipeline
2. Al-Shaheen Refinery
3. Nabucco Pipeline
4. Yanbu Export Refinery
5. Khalifa Point & FujairahRefineries
6. Jubail Export Refinery
7. Integrated Gas Development
8. Abu Dhabi Crude Oil Pipeline
9. Kuwait Oil Co drilling platforms
10. Oman oilfield services contract
![Page 46: EPC Analysis](https://reader036.fdocuments.us/reader036/viewer/2022081716/54e9ca674a7959e7158b48c3/html5/thumbnails/46.jpg)
Presented at the W
orld Engineering C
ongress Bangkok 4th
and 5th May 2009 by
Dr. H
imadri B
anerji CM
D B
AS
mS
Pvt. Ltd.
46
�Thank You
46