ep bomba 02

download ep bomba 02

of 1

Transcript of ep bomba 02

  • 8/10/2019 ep bomba 02

    1/1

    9236-

    - Flow l /h Press

    Item No.

    FLENDER- Lubric. Type

    Connect.

    Suction

    Discharge

    Case

    Impeller

    BrgsCoupling

    Packing

    Mech. Seal :

    SPECIFICATION

    CENTRIFUGAL PUMPS

    Reference Rev

    Unit

    No. Pumps Req'd

    OPERATING CONDITIONS ( EACH PUMP)

    1

    2

    4

    3

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    1718

    19

    20

    21

    22

    CONSTRUCTION

    AUXILIARY PIPING

    MOTOR

    23

    24

    25

    26

    27

    28

    29

    30

    31

    32

    33

    PERFORMANCE

    SHOP TEST

    MATERIALS

    VERTICAL PUMP

    WEIGHTS

    34

    3536

    37

    38

    39

    40

    41

    42

    43

    44

    46

    4748

    49

    50

    51

    52

    45

    53

    55

    56

    57

    58

    59

    54

    60

    62

    63

    61

    LiquidPump. Temp.

    Density at P.T.

    Vap. Press. P. T.

    Viscos. at P.T.

    Corr / Erosion

    Flow

    Disch. Press.Suction Press.

    Diff. Press.

    Tot. Diff. Head

    NPSH a

    Contract: Customer: Date Page

    C

    Kg/m

    Kg/cm

    Cp

    m/h

    Kg/cm-aKg/cm-a

    Kg/cm

    m

    m

    Service

    Size / Type / Code

    Size Specif. Facing Location

    - Mount :

    - Aux. Conn.:

    - Diam

    - Type / Mount

    - Type- Mfr

    - Spacer

    - Mfr & Model

    - Size & No. Rings

    - Mfr & Model

    Butyl alcohol/acetate (7)20 - 126

    800-900

    0 - 1

    25

    2.681.11

    1.57

    18.5

    1.3

    80 DIN PN16 AXIAL

    50 DIN PN16 VERTICAL

    16 Kg/cm

    265Max.: Desc.: Min.: 220235

    (2) (8) (8)

    YES

    n.a

    DOUBLE (3)

    H080-100

    - Press :

    n.a

    EP - 9236-0910-01 1

    14/06/2011

    KLAUS UNION NOV 080-050-250Pump Mfr.

    Reactor recirculation pump

    1

    10-B-51

    Water Cooling Req'd

    Total Cooling Water Req'd

    Packing Cooling Req'd

    Flush Conn. Req'd

    Flushing Aux. Fluid

    Quench Conn.

    Quench Aux. Fluid

    yes Material (2)

    (2) l/h (2)Nec, Fluid- Kg/cm-

    - Material -

    - Material -

    - Flow l /h Press- Kg/cm-

    - Flow l /h Press- Kg/cm-

    l/h

    l/h

    Pump

    Baseplate

    Motor

    Total Weight

    Depth Vessel

    Min. Subm. Req'd

    Column Pipe

    Shaft

    Brgs. Lube

    Case

    Packing

    Joints

    Impeller

    Case wear parts

    Impeller wear parts

    Shaft

    Baseplate

    Hydrotest

    Running Performance

    NPSH

    Inspection After Test

    X

    X

    X

    117

    67

    37

    223.8

    Kg

    Kg

    Kg

    Kg

    SS 316

    PTFE

    SS 316

    SS 316

    CS

    Curve No.

    RPMEff %

    Max BHP

    Max Head

    Rotation (viewed from cplg. end)

    No. Stages 1

    1450 NPSH Rq'd 0.566m(2) BHP 1.95 KW

    KW

    m

    2.4

    19

    EL ALLAMIA

    X

    Notes:

    1.- Design Temperature:130 C

    2.- By KLAUS UNION.

    3.- Manufacturer John Crane. Double mechanical seal, cartridge type, with barrier liquid reservoir: API Plan 53A. The valves,

    fittings and instruments of API Plan 53A must be included. Cooling water coil included. The API plan must include a tem-

    perature switch low alarm contact (TSH). Dual cartridge type 4620P with thermosiphon system CTS-101D

    4.- Motor power to be confirmed by the supplier. Oversize minimun 20%.

    5.- ATEX Clasification. Internal: Not classified External: II 2G EEXe IIT3

    6.- Pump construction according ISO 5199. Sizes according DIN EN 733.

    7.- Boiling liquid with column liquid height.

    8.- Suitable to dusty area (The dust don't explodes).

    9.- Pump with inducer if required.

    10.- Paint: RAL 5009 acc. 5885.0328

    11.- Ambient temperature: -20C a +45C

    Specialist :

    Project :

    JH

    MC

    0.3 - 1

    (5)

    KW RPM Frame

    Mfr.

    Type

    Volt

    3.6 1440 112M

    (2)

    IM B3Enclosure IP-55

    380 Phase III Cycles 50Insulation F

    Incr. Safety

    10-Solvents Unit