EP 95 00 30 03 SP FM 02 Application For Connection€¦ · Application for Connection – Cover...

3
TN 008: 2015 For queries regarding this document [email protected] www.asa.transport.nsw.gov.au Technical Note TN 008: 2015 Issued date 12 February 2015 Effective dates 12 February 2015 Subject: Withdrawal of Electrical Standard Forms EP 95 00 30 03 SP FM 01, EP 95 00 30 03 SP FM 02 and EP 95 00 30 03 SP FM 03 This technical note is issued by the Asset Standards Authority as a notification to remove from use the following RailCorp Electrical standard forms: EP 95 00 30 03 SP FM 01 Application for Connection – Cover Letter, Version 1.0 EP 95 00 30 03 SP FM 02 Application for Connection, Version 1.0 EP 95 00 30 03 SP FM 03 Application for Temporary Connection, Version 1.0 These are legacy forms and should be used for reference purposes only. The following ASA Electrical standard forms supersede the above respectively: T HR EL 17001 F1 Information Regarding Application for Connection, Version 1.0 T HR EL 17001 F2 Application for Connection, Version 1.0 T HR EL 17001 F3 Application for Temporary Connection, Version 1.0 Authorisation Technical content prepared by Checked and approved by Interdisciplinary coordination checked by Authorised for release Signature Name Ron Walsh Neal Hook David Spiteri Graham Bradshaw Position Principal Engineer Electrical Network Lead Electrical Engineer Chief Engineer Rail Principal Manager Network Standards & Services Asset Standards Authority © State of NSW through Transport for NSW Page 1 of 1

Transcript of EP 95 00 30 03 SP FM 02 Application For Connection€¦ · Application for Connection – Cover...

Page 1: EP 95 00 30 03 SP FM 02 Application For Connection€¦ · Application for Connection – Cover Letter, Version 1.0 • EP 95 00 30 03 SP FM 02 Application for Connection, Version

TN 008: 2015

For queries regarding this document [email protected]

www.asa.transport.nsw.gov.au

Technical Note TN 008: 2015

Issued date 12 February 2015 Effective dates 12 February 2015

Subject: Withdrawal of Electrical Standard Forms EP 95 00 30 03 SP FM 01, EP 95 00 30 03 SP FM 02 and EP 95 00 30 03 SP FM 03

This technical note is issued by the Asset Standards Authority as a notification to remove from

use the following RailCorp Electrical standard forms:

• EP 95 00 30 03 SP FM 01 Application for Connection – Cover Letter, Version 1.0

• EP 95 00 30 03 SP FM 02 Application for Connection, Version 1.0

• EP 95 00 30 03 SP FM 03 Application for Temporary Connection, Version 1.0

These are legacy forms and should be used for reference purposes only.

The following ASA Electrical standard forms supersede the above respectively:

• T HR EL 17001 F1 Information Regarding Application for Connection, Version 1.0

• T HR EL 17001 F2 Application for Connection, Version 1.0

• T HR EL 17001 F3 Application for Temporary Connection, Version 1.0

Authorisation

Technical content prepared by

Checked and approved by

Interdisciplinary coordination checked by

Authorised for release

Signature

Name Ron Walsh Neal Hook David Spiteri Graham Bradshaw

Position Principal Engineer Electrical Network

Lead Electrical Engineer

Chief Engineer Rail Principal Manager Network Standards & Services

Asset Standards Authority © State of NSW through Transport for NSW Page 1 of 1

Page 2: EP 95 00 30 03 SP FM 02 Application For Connection€¦ · Application for Connection – Cover Letter, Version 1.0 • EP 95 00 30 03 SP FM 02 Application for Connection, Version

Sup

erse

ded

by T

HR

EL

1700

1 F2

Application For Connection

To be completed by a Licensed Electrician with all sections completed and ticked, then submit to the appropriate contact overleaf. If necessary ring the contact for assistance.

CUSTOMER DETAILS for Billing Purposes OR Project Manager (as appropriate) Company Name :

Contact person :

Postal Address :

City : Post Code :

Phone : Fax :

INSTALLATION ADDRESS (If necessary provide sketch of site on accompanying sheet) Address :

City : Post Code :

SERVICE / LOCATION RailCorp Service: YES NO Local Distributor Service: YES NO Dual Service: YES NO (please tick)

Switchboard Location : DETAILS of EXISTING SWITCHBOARD for NEW / ALTERED LOAD

Rating of CB Protecting Switchboard : (amps) Existing Load Single Phase: (amps)

or Load Three Phase: A… B… C… (amps)

REASON FOR NEW / ALTERED LOAD

NEW / ALTERED LOAD DETAILS (If insufficient space please attach list)

No. of Units Description Calc. Max. Demand

(Amps) Comments

Example : 20 10 x 100w B.C. (4.16A) 10 x 40w Fl (4.16A) 8.32 New lighting circuit

Lights :

GPO’s :

Air-conditioning :

Lifts :

Machinery :

Water Heater :

Other (specify) : TOTAL NEW / ALTERED LOAD IN AMPS:

Arranged per phase (3-phase) if applicable: A… B… C… (amps) Installation Power factor : Is this a ‘Backup Supply’: YES NO (please tick)

ELECTRICAL CONTRACTOR DETAILS Company :

Address :

City : Post Code :

Phone : Mobile :

License No. : Fax :

Name : Signed : Date :

Office Use Only: Capacity Available : Yes / No Application : Approved / Not Approved Database updated : Yes / No

Comments : Signed : Date :

© RailCorp 1 of 2 EP 95 00 30 03 SP FM 02 Version: 1.0

Page 3: EP 95 00 30 03 SP FM 02 Application For Connection€¦ · Application for Connection – Cover Letter, Version 1.0 • EP 95 00 30 03 SP FM 02 Application for Connection, Version

Application For Connection

To the Applicant: Submission of the Application is to be made via the RailCorp Project Manager where applicable and signed approval gained before proceeding with the installation.

DISTRICT CONTACT FAX PHONE MOBILE

NORTH North Strathfield to Newcastle Wollstonecraft to Hornsby ECRL

Mark Zwan 4353 9157 4353 9168 0401 710 190

CENTRAL City Circle Central to Waverton, Lidcombe (via Macdonaldtown), Sefton / Lidcombe (via Marrickville) and Olympic Park Loop Bondi Junction to Sydenham Sydenham to Cooks River / Botany

John Primmer 9379 4492 9379 2712 0421 054 462

WEST Auburn to Lithgow, Richmond, Carlingford and Liverpool Liverpool to Chester Hill

Ken Limby 9848 9407 9848 9549 0437 158 338

ILLAWARRA Tempe to Cronulla, Port Kembla and Bomaderry Wolli Creek to Macarthur and Casula

John Whiddett 4223 5865 4223 5449 0413 008 678

AIRPORT LINE Central to Wolli Creek (via Mascot) Contact Airport Link Company

Hicham Boussi

8337 8413

8337 8409

0403 219 107

Site Sketch:

© RailCorp 2 of 2 EP 95 00 30 03 SP FM 02 Version: 1.0

Sup

erse

ded

by T

HR

EL

1700

1 F2