EP- · 2020. 1. 15. · II RELEASE AUTHORIZATION DocumentNUmber: WHC-.SD-WM-PROC-REV0104, Document...

19

Transcript of EP- · 2020. 1. 15. · II RELEASE AUTHORIZATION DocumentNUmber: WHC-.SD-WM-PROC-REV0104, Document...

  • I

    $EP- 19g ENGINEERING DATA TRANSMITTAL 1 EDT6 0 29B4|

    Z. Tc; (Receiving Organization) 3. From' (Originating Organization) 4. Retated EDT No.=

    Technical Safety, K Basins Technical Safety, K Basins N/AEngi.neering . Engineering ......... ,,5. Proj,/Prog./Dept./Div.: 6. Cog. Engr.: 7. Purchase Order Nc.:

    K Basins Engineering,Spent E.N. Dodd, Jr. N/ANuclearFuel Project .................L 'B. Originator Remarks: 9. Equip./Con_x)nentNo.:

    This documentsthe procedureto be used by Surveillance .........N/A.SystemsEngineeringto performsludgedepth measurementsin 1o.System/Btdg./Facitity:the KW SandfilterBackwashPit. KW Basin

    , .,., ,, . , , , ,,,,,

    11. Receiver Remarks: 12. Major Assm. Dwg. No.:

    13. PermitPermit Application No.:

    N/A14. Required Response Date:

    L II IIII I II IIII i I 111111 I IIUI' ' '15. DATA TRANSMITTED ,, _F).......(G) (H) (I),,,,

    (A} (C) (D) Reason Odgl- Rees/v-

    Item (B) Document/DrawingNo, Sheet Rev, (E) Title or Descdptlonof Data Impact for nator erNo, No, No, Transmitted Level Trans- Dlspo- Dispo-

    mittal sttion sition

    I WHC-SD-WM-'PRoc-014'"N/A ' 0 Kw BasinBackwashPit S 1 "I 1',_!udgeMeasurement/Video

    ,,, _w=.. , ,. J

    , ,,,,

    , , , ,

    , , , ,, l, I ',, i ,, ,.,,, , ,,., ,._ ...._._

    16. KEY,, , ,.. , ,, , , ,,.... Impact Level iF) Reamonfor Transmittal (e) Disposition(H) & (I)• ,,,, ,

    1, 2, 3, or 4 (see 1, Approval 4. Review 1, Approved 4, Reviewed no/commentMRP 5,43) 2, Release 5, Post-Review 2, Approvedw/comment 5, Reviewedw/comment

    3, Information 6. Dist, (ReceiptAcknow, Required) 3, Di=approvedw/comment 6. Receiptacknowledged, ,, , ,.,,,,,....... L

    (G) (H) 17, SIGNATURE/DISTRIBUTION (G) (H)(See Impact Levelfor requiredsignatures)

    .,.......=.........,.._._._.. • , .,...,. , , ..,

    (M) MSIN (J) Name (K) Signature (I.) Date (M) MSIN Rea- D/sp,Rea-sonD/sp. (J) Name (K) Signature (L) Date . & j._/_l, son

    "' ] .I ... Cog.Eng. E.N. Dodd,' Jr i_(_u__/XO':36 J.P. schmidt _ 6/CV'.,_(3"73 3 .._

    OA ]_.. / J I ,..... _ m ....

    ........ N.. ,J, _. I

    ov. .................

    1 I 1 ,,........... °

    _._/__ 19_0__ _. _ (-"_-__'_C,LBenne. ' _"_,,//,/_/_/'1. '-2'1']' DOE APPROVAL (if 'r equired)i]ApprovedLtr'No.

    1

    E E/a,/_/ , "" "/_ u App_ov,d./:o_nts_gn-_-atureof EDT ' [_ Authorized RepremantativeDate Cognizant/Project D=te [] Disapproved w/commentsOriginator for ReceivingOrganization Engineer'=Manager .......

    BD'7400"172"2 (07/91) GEF097

    _- BD-74OO-172.1 (07/91)

    v

  • II

    RELEASE AUTHORIZATION

    DocumentNUmber: WHC-.SD-WM-PROC-014,REV0

    Document Title: KW BASIN BACKWASHPIT SLUDGEMEASUREMENT/VIDE0

    Release Date: 9/1/94..,.w..

    This document was reviewed following theprocedures described in WHC-CM-3-4 and is:

    APPROVED FOR PUBLIC RELEASE

    ' WHC Information Release Administration Specialist:

    • -'Kara_roz 9/I/94(Signature) (Date)

    -_ A-6001-400 (07194) _F_56

    ER; MAST

  • • SUPPORTING DOCUMENT 1. Totalp.g_ I_L_. ., I ' I I II Iii , I IEMIEIP Iq

    2. Title 3. Number 4. Rev No.

    ' KW Basin BackwashPit S]udgeMeasurement/Video.....WHC,SD-WM-PROC-014 0

    5. Key Words 6. Author

    K-West,SandfilterBackwashDepth,Pit, DepthTransfer Na¢_:,."_K. N. Dodr.N. Dodc_ Jr.Measurements,SFBWP,Sludge /'I"\ _t,\Channel,Video Record _7_-_;_. •

    APPROVED FOR. SignaturePUBLIC RELEASE code 2,A340/KK4LP

    7, Abstract

    NIA ,,

    8.P_ AND USE OF DOCUMENT - This document was prepared _ 10' RELEASE STAMPwithin_h

  • ' WHC-SD-WM-PROC-O14 REVOPage I of tIL

    Q

    KW BASIN ,SANDFILTERBACKWASHP!,T__S.LUDGEMEA_S.U.REMENT!YIDEO

    .....Obtain shift manager's(SM)signatureana date for authorizationto proceedwiththis inspection.

    Signature,Shift Manager Date

    Sc..hedulin.q!.nformati_o_n:

    This procedureshall be scheduledas required.

    Health physicstechnician(HPT) supportrequiredduring performanceof thisprocedure.

    Equipmentlocation' lOS-KWbasin sandfilterbackwashpit (SFBWP)

    Introduction:;,

    The purposeof this procedureis to gathervisualand depth informationand monitorunderwateractivitiesin the lOS-KW SFBWP and transferchannel. Profilelighting(the use of lightingand shadowsto show the surfacecontour)will be used to assessthe contourof the sludge surface. Selectmeasurementswill also be taken todeterminethe actualsludgedepth.

    The person-in-charge(PIC)will determineif additionalmeasurementsare necessary.

    The control/videostationwill be setup outsidethe radiationarea or in lowestpossibleexposurearea to reducepersonnelexposure(ALARA).

    This procedureis to providea mechanismto assist in fully characterizingthevolume and surfacetopologyof the sludgecurrentlydepositedin the sandfilterbackwashpit (SFBWP). SurveillanceSystemsEngineering(SSE)personnelwill gathervisual informationutilizinga closedcircuittelevision(CCTV)color camera,mounted to stainlesssteel extensionpoles. Connectionsallow the camerato beconnected'with a pan and tilt to allowbetterpositioningcapabilitiesand to get

    i good landscapeprofilingof the sedimentsurface. The informationwill bevideotapedto a one-halfinch NTSC or Y/C format. Underwater'lightingwill beaccomplishedby means of 500 watt underwaterlamps.

  • • , WHC-SD-WM-PROC-014REVOPage 2 of I_L

    i

    Duringthe performanceof this proceduredifferentlocations,angles,depths_andlightingschemeswill be utilized,as directedby the field lead, to providemaximuminformation•The grid patternshown in the procedurewill be utilizedas much aspractical.

    Depth measurementswill be accomplishedusingthe camerain conjunctionwith a30 inch scale attachedto stainlesssteel extensionpoles by metal clamps. Thestainlesssteel poles are screwed-insectionsconnectedto providethe requiredtotal length. They are hollowwith a solidmetal core at the screw fittingtopreventradiation"shine"up the shaft. Theyare markedto show one inch incrementsand are standardequipmentfor this type of work, The steelscale is approximatelyone inch by one-halfinch and is equippedwith a knifeedge to allow for easy

    0 intrusioninto the sludge. The scale is incrementedto one-quarterof an inch. The. underwatervideo camerawill be used to place and monitorthe scale. One-halfinch° resolutionis the goal of the depth measurements. The purposeof the scale is to

    minimizethe intrusionintothe sedimentwhile maximizingthe accuracyof the depthmeasurement,

    Although the scale can be placedonly in locationswhere a straightshot existsfromthe water surfaceto the sedimentlayer, some abilityexiststo reach and seebeneathpit obstructionswith the camera• This abilitycombinedwith depthmeasurementdata should allow a full characterizationof sludge volume.

    The currentoperatorshave a lot of experiencewith sedimentobservationon theHanfordsite and will exercisecautionduringmeasurementsto minimizesedimentdisturbance. If clarityproblemsdevelop,time will be taken to allow the sedimentto settle out as determinedby the field lead.

    A referencepoint will be establishedat or above the surfaceof the pit to aid inthe mappingeffort. This will enable the performersof the procedureto establishwhetheror not there is unevennessin the floorof the pit or if they are gettingfull penetrationof the sedimentlayer in all areasof the pit. A stringor wiremay be extendedfrom the referencepoint selectedto allow easiermeasurements.

    At this time it is plannedthat multiplemeasurementswill be taken at selectedaccessiblelocations. Data will be recordedon all measurementsindependentof thevideo record which will also documentall measurementactivities. Includedwith thedepth measurementdata will be data to tie the measurementto a known physicalreferencepoint out of tilepit. SSE personnelwill also be verifyingthat as-builtSFBWP dimensionsmatch those shownon referencedrawings•

    Safetyharnessesor other fall protectionwill be requiredfor all personneltakingmeasurementdata. Any scaffoldingused will have handrails. A pre-jobbriefingwill addressfall hazardsand protection. Personnelaccessinto the pit, other thanby handrailedscaffoldingwill be prohibited•

    A radiationwork permit (RWP)has been writtenfor this activity. A pre-jobbriefingis requiredby the RWP.

  • • WHC-SD-WM-PROC-014REVOPage 3 of I_

    4

    References:

    WHC-CM-I-6,WHC RadiologicalControlManualWHC-CM-4-3,IndustrialSafetyManualH-I-21072

    SpeciAlTools,EQuipmentand.Supplies"

    I. CCTV color camera

    2. 30 feet of SS-polesconnectedas required

    3. 500 watt ROS underwaterlights

    4. Camera controlunit (CCU)

    5. Communicationequipment

    6. Coaxialcable

    7. VHS recorder,monitor,hand microphoneand video tapes

    8. Safetyharness

    9. Video charactergenerator,,

    10. Measurementdevice

    I]. Lanyardsand clamps

    12. Filteredwater as requiredto rinse equipment(approximately5 gallonsperequipmentexit from the basin).

    13. Radioactivecontaminationcontainerfor gloves

    : 14. Scaffoldingand railings.

    PrereQuisites"

    I. Complywith all RWP requirements. RWP NumberL-548

    2. Verify all equipmenthas been transportedto the examinationstagingarea._

    3. Notifythe Shift Managerprior to startingwork.

    4. NotifyHP group at least one week prior to start of work for preparationof= RWP.

    5. Verify at least 24 hours in advanceof work that HPT supportis availableonrequest.

    ,, ,, ,, ,,,,

  • . WHC-SD-WM-PROC-014REVOPage 4 of I_-

    • 6. Set up radioactivecontaminationcontainerat the work area for disposalofcontaminatedgloves,etc.

    7. Assign a field lead at the beginningof each day of work.

    8. Performa pre-jobsafetymeetingincludingdiscussionof RWP requirements.Documentthe meetingon a completionroster. Field lead will supervisethemeeting.

    9. Verify that scaffoldinghas been erectedand railingsinstalled.

    A. EquipmentSetup

    I. Set up controlstationoutsideof radiationarea or in a low exposurearea.

    2. Securecamera and lightingequipmentto pole.

    . 3. Performa functiontest of all equipmentprior to enteringthe radiationarea.

    ° 4. Route cablingto the backwashpit for performanceof the test.

    5. Lay out the backwashpit and transferchannel(Figure2) with a gridpatternwhich correspondsto Figure I.

    6. Label video tape with the following:

    a. Date.b. Projectname and file number.c. Location.

    B. Video of Sludge.SurfaceProfile

    * WARNIN._____G *

    * THE TWO MAN RULE IS IN EFFECTDURING *

    * PERFORMANCEOF THIS PROCEDURE *- W *

    =

    _

    1

    _

  • • WHC-SD-WM-PROC-014REVOPage 5 of ]_L

    I. Ensureall controlcablingis clear of obstaclesand is manageable.

    2. Verify the camerapole handleris wearinga safetyharnessor applicablesafetyprecautionshave been taken to preventfallinginto the backwashpit.

    3. Adjust the camera lighting,focusand iris using the CCU.

    * WARNING *

    * DONOT ALLOWEQUIPMENTTO PENETRATE *

    * THE SETTLEDSLUDGELAYER *

    4. Place equipmentinto the pit using lanyards,as required,to preventdropping intopit.

    5. Adjust the camera videomonitorwhen the system is in place in thewater.

    6. Set VCR to record,announcedate, projectname and number,and locationon audio portionof the tape or engagingvideo overlayfor same.

    7. Adjustcameravideo monitor,lighting,focus and iris as required.

    8. Visuallycheck to see that all controlstationequipmentis func'_ioning.

    9. Performunderwaterresolutioncheck with a 1/32 inch black line on an18 percentneutralgray backgroundat a distanceof approximatelytwofeet.

    10. Positionthe cameraand lightingimmediatelyabove the sludgesurfaceata locationselectedby the field lead, and adjustlightingas requiredfor the best profiling. Utilizeadditionallightingas required•

    i 11. Recordcamera and lightinggrid locations(see FigureI) on the audioportionof the tape or engagingvideo overlayfor same.

  • + WHC-SD-WM-PROC-014REVOPage 6 of I_L

    * WARNING *. ,. ** HPT MUST BE PRESENTBEFOREANY ** EQUIPMENTCAN BE REMOVEDFROMTHE ** BASIN *

    12. If camera equipmentadjustmentsare necessaryor a problemarises,stopthe examinationuntil tileproblemis solved.

    a. HOLD POINT: HPT shall be presentfor removalof materialfrom thebasin water to performdose rate and contaminationsurveys. HPTinitial/dateis requiredbelow if any material is removedfrombasin water.

    - ' '" ' f ' " " '" " I

    IHealthPhysicsTechnicianInitial/Date_l____ ,, ., .. , ,., " ,.., , ,

    i I I I I I..... /,_,.. . / ,, / .... /, / ....... /

    b. Equipmentremovedfrom the basin shouldbe rinsedwith filteredwater when possibleas directedby the HPl'.

    13. Manipulatethe cameraaroundthe pit as designatedby the field lead toget a completepictureof the backwashpit sludgeprofile. Recordgridlocationson tape.

    14. Turn all equipmentoff and record any requireddocumentation.

    C. Sludge Measurement

    NOTE: Performthe followingafter reviewof the profilelightingvideo andassessmentshave been made by the PIC to determinewhere actual sludgedepth measurementswill be taken. (Measurementswill be taken as closeto the centerof each grid rectangleas possible,barringas-builtobstructions.)

    I. Shift Managerauthorizationrequiredprior to proceedingwith thissection.

    Signature,Shift Manager Date

    2. Specificlocationsfor depth measurementsare as noted on FigureI map.Deviationsfrom these locationsand/or additionalmeasurementlocationsmust be approvedby the PIC and concurredwith by the TechnicalSafetymanager,and so notedon FigureI.

    3. Attach a measurementdeviceto the camerapole, or an additionalpole asrequired.

  • " WHC-SD-WM-PROC-014REVOPage 7 of IS

    4. Layoutthe backwashpit with a grid patternwhich correspondstoFigure I.

    5. Establisha referencepoint at or abovethe surfaceof the pit to aid inthe mappingand measurementefforts.

    * CAUTION *

    * Minimize disturbance of the sludge *

    * during the measurement. *

    6. Carefullylower the measurementdeviceat the designatedlocationuntilit just reachesthe top of tilesludgelayer. Observeand recordthedistance in relationto the establishedpit referencepoint. Recordthedistance in Table I.

    7. Carefullyinsertmeasurementdevice throughsludgeat selectedlocationsuntil contactis made with bottomof pit. Observeand record sludgedepth with video cameraand recordingequipment.

    8. Recordthe grid locationon the video for each of the depth measurementstaken on the audio portionof the video or with an encodingunit.

    9. Observeand recordthe distanceto the pit bottomin relationto theestablishedreferencepoint. Recordthis distancein Table 2.

    10. If equipmentadjustmentsare necessaryor a problemarises,stop theexaminationuntil the problemis solved.

    a. HP HOLD POINT: HPT shall be presentfor removalof materialf_-omthe basin water to performdose rate and contaminationsurveys.HPT initial/dateis requiredbelow if any material is removedfrom basinwater.

    !'[ Health PhysicsTechnicianInitial/Datez ,,. ,,, .,

    I I I I I /

    I I I ......I I I

    b. Equipmentremovedfrom the basin shouldbe rinsed with filteredwater when possibleas directedby the HPT.

  • " WHC-SD-WM-PROC-014REVOPage 8 of 11L,

    J

    11. Recorddepth measurementsin Table 3, eitherduringperformanceof thesurvey or during a later review of the tape.

    12. Calculate differences between Table 1 and Table 2 measurements andrecord in Table 4.

    13. Take duplicate measurements at grid locations A3, BI, C5, and F4.Recordthe observedsludgedepth measurementsbelow.

    , ,,,,,, ,,, _ .....i

    Grid Location Depth Measurement

    • Top Bottom Video,,, , i iiiiA3

    , ,,,, , ,,

    B1._ ,,, , - ,.

    C5• , ,,

    F4, , ,,, -

    13. Turn all equipmentoff and recordany requireddocumentation.

    Table 1. TOP OF SLUDGEMEASUREMENTS

    AL , , , L

    B, ,,,, ,, , -

    C

    D, ,,,,,

    E

    F I

    G

    z

    i

  • ° WHC-SD-WM-PROC-014REVOPage 9 of I_

    Tabl.e_2.BOTTOMOF SLUDGEMEASUREMENTS

    • . • ' ' T1 ,' I,_ ,- , ',,,- - ' ' _,.

    J • ,, T- ,,, i ,, , ,_. , J, i , ,

    liJ

    __...#"'_ _ • ,,, ,, 1 ., ,,, ,_

    B,,_

    C

    D

    E, _1 ,, , ,

    F,,,,__ ,, ,

    G,_ , ,, ,,,,

    Table 3. VIDEO DEPTH M_LEASUREMENTS.,

    L__]i i,-i

    B

    C

    D..... ,,,,

    E

    F• ,,,, ,,, ,,I

    G,_, .... _.__ , ,,

    Table 4._TABLE,I/TABLE2DEPTHDIFFERENCES

    - .............._,......_...._ _.......I 2 3 4 5

    - llll"l'l.... il' l-- L l ,r ±±

    -- t ___ ' '""'

    B .......

    C,,, ___ ,,, _ ,,

    _,,,, __

    = E_ ,,, __

    F__ __ ,, ___ ,,, -

    = LG..... _r.-_ l':___: " : l".....___ II _-- .l,,tl ,,l ,, .

  • iili_,

    " WHC-SD-WM-PROC-014REVOPage 10 of I_

    q

    D. Comoletl on and Notif_

    i. H.PiiOLDPO!HT: HPT sf,all be present for removal of any material frombelow the basin water surface. The HPT shall perform dose rate andcontamination surveys. HPT initial/date required to verify material was

    ' surveyed. If no material was removed from the basin, the HPT shallverify this o_ initialing the appropriate line below. Check one'

    H.pTInitial/Date_a. Completion of section B.

    Equipment removed and surveyed L__/No equipmentremoved / I L-

    b. Completionof sectionC.E_uipmentremovedand surveyed Lm/No equipmentremoved _L____/ _ _/ I'

    2. Withdrawall equipment,a_,required,from the basin. Equipmentremovedfrom the basin shouldbe rinsedwith filteredwater when possibleasdirectedby the HPT.

    3. Have HPT surveyequipmentprior to removingfrom establishedsurfacecontami_lationarea (SCA).

    4. Decontaminateand stage equipmentper HPT directionin accordancewith• RWP instructions.

    5. Notify the Shift Manager,HP supervisor,lOS-KWbuildingsupervisorandthe SSE managerthat the job has beenc_mpleted. The KW basinsupervisorshall r,otify the K Basinsmanager,when the job is complete.

    6. Sto}"ethe originalcopieso'Fthe video tapes in the SSE video library.

    =

    _1 ......... Ir'1,_''' PI" RI ............ II]''I:I4e '_'" '1'_'If"_l'qne,'"_I' ' "_.... _p,,'9 .... lllrll_'''llr" _'''q' m_',e', _ mmlpi,m_,"'V_l_'_l'' lPR"_I''l'Ir in_If_,rll- ..... _F_er,qqrl,rqlr_liqp1"VlIHIp_,nllilHll'rlr"lq;rll_rli'P' I_II,

  • • WHC-SD-WM-PROC-014REVOPage 11 of 11L

    K WEST BACKWASH PITMEASUREMENT SCHEMATIC

    1 3 5

    A x x , xi

    B x x x

    C X X X

    II

    I

    ' XX X :2 4 _I

    E x x

    ........... t...............

    X =" MEASUREMENT POINY

    F x x (NOTToscALE)

    II

    G x i xt

    Figure I

  • • WHC-SD-WM-PROC-014REVOPage 12 of ]_k

    Figure2. PLAN VIEW SAND FILTERBACKWASHPIT

    I B5.25 III

    F-I.. 7,,

    1 BACKWASHPIT(25' 9" DEPTH)*1 1" 111.4" _ 4.25" [

    - 5,, _ -J 6_" 20,75" 85.5" .... 20.25"

    _' 16.25t . ] [_

    ....26"_3c' 6" 6"

    TRANSFER

    CHANNEL(20' 9"DEPTH)*

    BASI N ------DOOR, 'BASI N'

    .... 38"_

    * Below operatingfloor

  • Centimeter1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 mm

    1 2 3 4 5

    Inches R_,_l,_i++llltt+___+__t++I+11+i+,.,i. i+

    t. iLl,L+

    + !!IliNIIII1IIIi1

    '+'+'h, _ ' '

    ++++++_+,-+;+_ ++ +_:+,o: _,:';+__ HIqNUFIqCTUREDTO IqITM STRNDIqRDS "+_++++ BY RPPLIED IMRGE, INC. ,.,_ +

    ',, +_ll, _ _i i+ ..... qll '' PI_IP' 1_1 " "IIIIII qll Hpi_ II I _ I

  • I

    ]

  • I

    °