EP 1110-1-8 Volume 3
November 2009
Construction Equipment Ownership and Operating Expense Schedule Region III
DEPARTMENT OF ARMY U.S. Army Corps of Engineers Washington, DC 20314-1000
This pamphlet supersedes EP 1110-1-8, dated 31 July 2007.
REPLY TO ATTENTION OF:
CECW-EC Pamphlet 30 November 2009 No. 1110-1-8, Vol. 3
CONSTRUCTION EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
1. Purpose. This pamphlet is authorized by and established in accordance with Federal Acquisition Regulation (FAR) 31.105 and Engineer Federal Acquisition Regulation (EFAR) SUBPART 31.105. This pamphlet establishes predetermined equipment ownership and operating expense rates for construction equipment. This pamphlet also establishes a method to calculate equipment ownership and operating expense rates for construction equipment when the predetermined rates are not considered appropriate. The overall intent of this pamphlet is to determine equipment costs that are fair and reasonable. Expense factors for calculating dredge plant and marine equipment costs are provided in chapter 4. 2. Applicability. This pamphlet applies to all USACE commands. It is applicable to all solicitations and contracts for construction expected to exceed the Simplified Acquisition Threshold of $100,000 when actual cost data for both ownership and operating costs cannot be determined. This volume is for use in Region III, which includes the following states: Alabama Arkansas Florida Georgia Louisiana
Mississippi Missouri (Panhandle South of 36° -30'00") North Carolina South Carolina Tennessee
3. References. See APPENDIX A. 4. Distribution Statement. Approved for public release, distribution is unlimited. FOR THE COMMANDER: 12 Appendixes STEPHEN L. HILL (See Table of Contents) Colonel, Corps of Engineers
Chief of Staff
EP 1110-1-8, Vol. 330 Nov 09
i
CONSTRUCTION EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
Table of Contents
CHAPTER 1.0 - INTRODUCTION
1.1 Use .................................................................................................................... 1-1 1.2 Decision Flow Process ...................................................................................... 1-1 1.3 How to Obtain Assistance.................................................................................. 1-1 1.4 How to Obtain CHECKRATE Spreadsheet........................................................ 1-2 1.5 How to Obtain this Publication........................................................................... 1-2
CHAPTER 2.0 - METHODOLOGY FOR CONSTRUCTION EQUIPMENT SECTION I. GENERAL...............................................................................................2-1 2.1 Contents ............................................................................................................ 2-1 2.2 Basis for Equipment Rates ................................................................................ 2-1 2.3 Total Hourly Rate............................................................................................... 2-1 SECTION II. OPERATING CONDITIONS...................................................................2-2 2.4 Average, Difficult, or Severe Conditions ............................................................ 2-2 2.5 Determination of Condition ................................................................................ 2-3 SECTION III. EQUIPMENT SELECTION....................................................................2-3 2.6 General.............................................................................................................. 2-3 2.7 Truck Selection.................................................................................................. 2-3 2.8 Crawler Tractor Selection .................................................................................. 2-3 2.9 Equipment Accessories ..................................................................................... 2-4 SECTION IV. EQUIPMENT VALUE ...........................................................................2-4 2.10 List Price and Accessories................................................................................. 2-4 2.11 Discount Code (DC) .......................................................................................... 2-4 2.12 Sales or Import Tax ........................................................................................... 2-4 2.13 Freight ............................................................................................................... 2-4 2.14 Total Equipment Value (TEV)............................................................................ 2-4 SECTION V. LIFE .......................................................................................................2-5 2.15 Economic Life (LIFE) ......................................................................................... 2-5 2.16 Working Hours Per Year (WHPY)...................................................................... 2-5 SECTION VI. SALVAGE VALUE ...............................................................................2-5 2.17 Salvage Value (SLV) ......................................................................................... 2-5 2.18 Salvage Value Percentage ................................................................................ 2-5
EP 1110-1-8, Vol. 330 Nov 09
ii
CONSTRUCTION EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
Table of Contents (Continued)
SECTION VII. OWNERSHIP COST............................................................................2-6 2.19 Ownership Elements ......................................................................................... 2-6 2.20 Depreciation ...................................................................................................... 2-6 2.21 Facilities Capital Cost of Money (FCCM)........................................................... 2-7 SECTION VIII. OPERATING COST............................................................................2-7 2.22 Operating Cost Elements .................................................................................. 2-7 2.23 Fuel Cost ........................................................................................................... 2-8 2.24 Filters, Oil, and Grease (FOG) Cost .................................................................. 2-9 2.25 Repair Cost...................................................................................................... 2-10 2.26 Tire Wear Cost ................................................................................................ 2-12 2.27 Tire Repair Cost .............................................................................................. 2-13 SECTION IX. STANDBY HOURLY RATE................................................................2-14 2.28 Standby Hourly Rate ....................................................................................... 2-14 SECTION X. RATE CALCULATION EXAMPLE......................................................2-14 2.29 Computation Example ..................................................................................... 2-14
CHAPTER 3.0 - ADJUSTMENTS TO HOURLY RATES
SECTION I. GENERAL...............................................................................................3-1 3.1 Contents ............................................................................................................ 3-1 3.2 Basis for Equipment Rates ................................................................................ 3-1 3.3 Equipment Rate Adjustment Tables .................................................................. 3-1 3.4 Determination for Use of Equipment Rates in Tables 2-1 and 2-2..................... 3-1 SECTION II. RATE ADJUSTMENTS..........................................................................3-2 3.5 Rate Adjustments .............................................................................................. 3-2 3.6 Changes in Operating Conditions...................................................................... 3-2 3.7 Change in Cost of Money Rate (CMR) .............................................................. 3-2 3.8 Actual Work Hours Greater than 40 Hours per Week........................................ 3-3 3.9 Changes in Fuel Cost ........................................................................................ 3-4 3.10 Adjustments to Fuel, Oil, and Grease (FOG) Cost ............................................ 3-5 3.11 Equipment of Different Age than Table 2-1 ....................................................... 3-5 3.12 Rate Adjustment for Overage Equipment .......................................................... 3-6 3.13 Standby Rate Adjustment for Equipment of a Different Age than Table 2-1...... 3-7 3.14 Equipment Purchased Used.............................................................................. 3-8 3.15 Rate Calculation Examples................................................................................ 3-8
EP 1110-1-8, Vol. 330 Nov 09
iii
CONSTRUCTION EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
Table of Contents (Continued)
CHAPTER 4.0 - METHODOLOGY FOR DREDGING PLANT AND MARINE EQUIPMENT
SECTION I. GENERAL...............................................................................................4-1 4.1 Contents ............................................................................................................ 4-1 4.2 General.............................................................................................................. 4-1 SECTION II. ANNUAL USE........................................................................................4-1 4.3 Time Available to Dredge .................................................................................. 4-2 SECTION III. LIFE ......................................................................................................4-2 4.4 Life..................................................................................................................... 4-2 4.5 Annual Hours Available ..................................................................................... 4-3 SECTION IV. SALVAGE VALUE ...............................................................................4-3 4.6 Salvage Value (SLV) ......................................................................................... 4-3 SECTION V. OWNERSHIP COST..............................................................................4-3 4.7 Ownership Cost ................................................................................................. 4-3 4.8 Depreciation Factor ........................................................................................... 4-4 4.9 The Cost of Money Rate (CMR) Factor ............................................................. 4-4 4.10 Other Ownership Elements................................................................................ 4-5 SECTION VI. OPERATING FACTORS ......................................................................4-5 4.11 Hourly Operating Cost ....................................................................................... 4-5 4.12 Prime and Secondary Power............................................................................. 4-5 4.13 Water, Lube, and Supplies (WLS) ..................................................................... 4-6 4.14 Repairs (RPR) ................................................................................................... 4-6 SECTION VII. STANDBY............................................................................................4-7 4.15 Standby Rate..................................................................................................... 4-7 SECTION VIII. NEGOTIATED PROCUREMENT .......................................................4-7 4.16 Rates ................................................................................................................. 4-7 4.17 Allowance for Additional Capital Improvements................................................. 4-8 4.18 Overage Plant.................................................................................................... 4-8 4.19 Dredging Plant Purchased Used ....................................................................... 4-8 SECTION IX. RATE CALCULATION EXAMPLE .......................................................4-8 4.20 Rate Calculation Example ................................................................................. 4-8
EP 1110-1-8, Vol. 330 Nov 09
iv
CONSTRUCTION EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE
Table of Contents (Continued)
List of Tables
Table 2-1. Hourly Equipment Ownership and Operating Expense ............................2-21 Table 2-2. Hourly Rate Elements.............................................................................2-253 Table 3-1. Equipment Age Adjustment Factors ...........................................................3-9 Table 3-2. Equipment Age Adjustment Factors .........................................................3-33 Table 4-1. Dredging Plant Cost Factors ......................................................................4-9
List of Figures
Figure 1-1. Methodology for Developing an Hourly Ownership and Operating
Rate for Construction Equipment..............................................................1-3 Figure 2-1. Equipment Rate Computation Worksheet ...............................................2-15 Figure 3-1. Total Hourly Rate Calculation for Overage Equipment............................3-25 Figure 3-2. Standby Hourly Rate Calculation for Overage Equipment.......................3-49 Figure 4-1. Months Available by Region......................................................................4-2 Figure 4-2. Dredging Plant Ownership and Operating Rate Worksheet ....................4-13
List of Appendixes Appendix A References .............................................................................................A-1 Appendix B Area Factors ...........................................................................................B-1 Appendix C Guide for Selecting Operating Conditions.............................................. C-1 Appendix D Equipment Hourly Calculation Factors................................................... D-1 Appendix E Economic Indexes for Construction Equipment ......................................E-1 Appendix F Tire Description and Tire Cost ................................................................F-1 Appendix G Tire Life and Tire Wear Factors ............................................................. G-1 Appendix H Manufacturer List ................................................................................... H-1 Appendix I Federal Cost-of-Money Rate.................................................................... I-1 Appendix J Equipment Accessories .......................................................................... J-1 Appendix K Ground Engaging Component Costs Included in Repairs (RCF)............K-1 Appendix L Guide for Estimating Drill Steel and Drill Bit Costs.................................. L-1 Glossary ...........................................................................................................Glossary-1 Index ..................................................................................................................... Index-1
EP 1110-1-8, Vol. 330 Nov 09
1-1
CHAPTER 1.0 - INTRODUCTION
1.1 Use
The use of this pamphlet is for rate determination on construction contracts, dredging contracts, and negotiated procurements and relates only to contractor-owned equipment. The overall intent of the pamphlet is to determine equipment costs that are fair and reasonable.
a. This pamphlet shall be used for determining hourly equipment rates that are contained in the independent government estimate.
b. In addition, the use of this pamphlet will be required by contractors for pricing contractor-owned equipment in negotiated procurements when:
(1) Cost or pricing data is not required, as defined in Federal Acquisition Regulation (FAR) Part 15.400, Contract Pricing.
(2) Cost or pricing data is required and the actual cost data to support either ownership or operating costs for equipment or equipment groups of similar model and series is not available.
(3) Cost or pricing data is required and available, but all or part of the data is determined not to be in accordance with the FAR cost principles.
1.2 Decision Flow Process
A flow chart (figure 1-1) is provided at the end of this chapter to help the user better understand the process for developing an hourly equipment rate. The flow chart shows the decision points that allow the user to decide whether to use the predetermined rate tables or calculate the rate using the method shown in figure 2-1 or using CHECKRATE (also see paragraph 3.4).
1.3 How to Obtain Assistance
When assistance is needed in understanding the methodology for calculating equipment rates, contact the Chief, Cost Engineering Branch, Engineering and Construction Division, Walla Walla District, U.S. Army Corps of Engineers, (CENWW-EC-X), 509-527-7511, 509-527-7510, or visit the Web site at http://www.nww.usace.army.mil/html/offices/ed/c/default.asp.
EP 1110-1-8, Vol. 330 Nov 09
1-2
1.4 How to Obtain CHECKRATE Spreadsheet
A Microsoft Excel® spreadsheet, named “CHECKRATE,” has been developed to calculate equipment rates using the methodology required by this pamphlet. The user must have Microsoft Excel® to run the application. The factors needed in the hourly cost calculations are located in the appendixes of this pamphlet. A copy of the spreadsheet may be obtained by choosing the CHECKRATE link on the following Web site: http://www.nww.usace.army.mil/html/offices/ed/c/default.asp.
1.5 How to Obtain this Publication
Volumes 1-12 of this pamphlet are available in portable document format (PDF) and can be viewed or downloaded at http://140.194.76.129/publications/eng-pamphlets. Copies of the pamphlet are also available on CD-ROM (Volumes 1-12) through the Superintendent of Documents or government bookstores (see appendix A). For additional information, telephone 202-512-1800, fax 202-512-2104, toll-free 866-512-1800, or access on the Internet at http://bookstore.gpo.gov/.
EP 1110-1-8, Vol. 330 Nov 09
Finished. The methodology in ths pamphlet should not be used for rental or leased equipment.
YES
YES
AVERAGE SEVERE
NO
YES
NO
DIFFICULT
Is the equipment contractor owned ?
Is the equipment in Table 2-1?
Is there equipment in Table 2-1 that is equivalent in configuration (size, capacity,
and horsepower) and value to the equipment for which you are determining a
rate?
Use the tables in chapter 2 for the actual or equivalent
equipment.
Is the equipment operating in average severe or difficult conditions? (see chapter 2, section II for definition)
Calculate a rate based on the step-by-step rate computation method shown in Figure 2-
1 or use CHECKRATE
Use the equipment rate shown in Table 2-1
From Table 2-2 use the arithmetic mean of the average and severe equipment rates.
(Note: if there is no severe rate for the equipment see guidance in chapter 2,
section II, paragraph 2-4.)
Use severe rate shown in Table 2-2. (Note: if there is no severe
rate for the equipment see guidance in chapter 2, section II,
paragraph 2-4.)
Is the use of this pamphlet required in accordance with Chapter 1, paragraph
1-1?
YES
NO
Use the contractor's actual cost and pricing data to determine a rate.NO
Figure 1-1. Methodology for Developing an Hourly Ownership and Operating Rate for Construction Equipment
START
Next Page
Is this land based or marine equipment?Land Based Equipment Marine equipment Use the methodology found in Chapter 4 for
determining a rate for Marine Equipment.
Is the equipment in Table 2-1 equivalent in configuration (size,
capacity, and horsepower) and value to the equipment for which you are
determining a rate?
YES
1-3
EP 1110-1-8, Vol. 330 Nov 09
NO
YES
NO
NO
FINISHED (except for standby)
YES
NO
Equipment is newer
If equipment is older than in Table 2-1 determine economic life by dividing LIFE by Working Hours Per Year. (see
chapter3 section II, Paragraph 3-11.a.)
Equipment is older
Equipment age does not exceed economic life Equipment age exceeds economic life
Is the Cost of Money Rate (CMR) different from that shown in chapter 2, section VII or Appendix B?
The Department of the Treasury adjusts the CMR (Prompt Payment Interest Rate) on or about 1 January and 1 July each year. For the current
Prompt Payment Interest Rate see http://www.publicdebt.treas.gov/opd/opdprmt2.htm.
If the cost of money rate shown in chapter 2, section VII, is not the current rate, the FCCM portion of the total hourly rate shall be adjusted. Adjust the Cost
of Money Rate per the instructions in chapter 3, section II, paragraph 3-7.
Is the cost of fuel 10% greater than or 10% less than the cost shown in Appendix B?
The contractor shall be required to furnish copies of all fuel supply contracts and invoices to the government to
support fuel cost adjustment. Request for upward adjustment in the rates will be considered only when fuel is supplied by recognized distributors of bulk quantities
If the contractor is able to furnish the above information, adjust the fuel cost per the instructions in chapter 3,
section II, paragraph 3-9.
If fuel costs are adjusted FOG costs also need to be adjusted by applying the same ratio used to adjust the
fuel cost.
Do the actual hours worked exceed 40 hours per week?
Make adjustments to the FCCM per the instructions in chapter 3,
section II, paragraph 3-8
Is the equipment's date of manufacure different from that in
Table 2-1 (see chapter 2 section 1, paragraph 2-2)?
Adjust the rate using Table 3-1 per the
instructions found in chapter3 section II, Paragraph 3-11.c.
Adjust the rate using Table 3-1 per the example found
in chapter3 section II, Paragraph 3-11.a.
Adjust the rate using Table 3-1 per the
instructions found in chapter3 section II,
Paragraph 3-12.
YES
Figure 1-1. Methodology for Developing an Hourly Ownership and Operating Rate for Construction Equipment
Continue from
previous page
1-4
EP 1110-1-8, Vol. 330 Nov 09
2-1
CHAPTER 2.0 - METHODOLOGY FOR CONSTRUCTION EQUIPMENT
SECTION I. GENERAL
2.1 Contents
This chapter provides the methodology used to compute the total hourly ownership and operating rates for construction equipment and marine equipment (except dredging plant). This detailed methodology includes the formulas and factors used to develop both total hourly rates and hourly standby rates. If the equipment is determined to be older than its estimated economic life (overage) or was purchased used, refer to chapter 3.
2.2 Basis for Equipment Rates
The hourly rates shown in table 2-1 reflect catalog list prices of equipment manufactured in 2006 (3 years old). List prices for equipment manufactured in years other than 2006 have been adjusted to a 2006 price level using economic indexes. Ownership and operating expenses are computed using area factors, found in appendix B, which are specific to each region and volume. This hourly rate methodology assumes that equipment furnished to the job is in sound, workable condition. Furthermore, the methodology applies only to equipment that prime contractors or subcontractors either own or control. These hourly rates and cost factors do not represent rental charges for those in the business of renting equipment.
2.3 Total Hourly Rate
Hourly rates for average conditions are shown in table 2-1 and are computed based on a 40-hour (hr) workweek. The hourly rate is the sum of ownership and operating costs. Table 2-2 contains all individual rate elements for both average and severe conditions. An example of the methodology used to compute the total hourly rate is shown in figure 2-1. For standby calculation, see section IX.
a. Ownership Cost Elements. The ownership portion of the rate consists of an allowance for depreciation (DEPR) and facilities capital cost of money (FCCM).
b. Operating Cost Elements. Operating costs include allowances for the following:
• Fuel • Filters, oil, and grease (FOG) (includes servicing) • Repairs (includes maintenance and major overhauls)
EP 1110-1-8, Vol. 330 Nov 09
2-2
• Tire wear (replacement) • Tire repair
c. Exclusions to Hourly Rates. Total hourly rates for owning and operating equipment do not include allowances for the following:
• Operating labor • Mobilization and demobilization • Field office overhead expenses • Home office or general and administrative (G&A) overhead expenses • Investment tax credit • Contingency allowance • Profit • Parts and labor escalation
It should also be noted that replacement cost is not included in the rates, as it is not an allowable item of cost per FAR 31.105(d)(2)(i).
d. Other Ownership Elements. The following elements of cost are not included in the total hourly rates. These costs are allowable and would normally be included in the contractor’s field office or home office overhead rate calculation.
(1) License fees, property taxes, storage, and insurance costs are considered indirect costs and are not included in the total hourly rates.
(2) Jobsite security, inspection fees, recordkeeping, mechanic training, and highway permits are also not included in the total hourly rates.
SECTION II. OPERATING CONDITIONS
2.4 Average, Difficult, or Severe Conditions
Operating conditions may be average, difficult, or severe. Hourly rates for both average and severe operating conditions are determined in accordance with appendix C. The rate for the difficult condition is the arithmetic mean of the average and the severe rates. When only the average rate is shown in table 2-2, the rate applies for all operating conditions or as determined by the contracting officer. Average condition rates are included in both tables 2-1 and 2-2. Only table 2-2 contains the severe condition rates.
EP 1110-1-8, Vol. 330 Nov 09
2-3
2.5 Determination of Condition
For contract modifications, the contracting officer determines the equipment operating condition to be used. This determination is based on contract specifications, site conditions, basis of any supporting evidence, and guidance in appendix C. Evaluation of operating conditions for equipment not listed in appendix C will be consistent with examples shown in appendix C. The operating condition of the equipment relates to the average and severe factors as detailed in appendix D.
SECTION III. EQUIPMENT SELECTION
2.6 General
Equipment shown in table 2-1 is representative of equipment that is used in general construction. Note that some equipment may require additional attachments or accessories. Each unit of equipment is grouped into a main group called a category (CAT) and a subgroup called a subcategory (SUB). This type of grouping is displayed in table 2-1 and appendix D. Also, an identification number (ID No.) is assigned to each unit of equipment. The ID No. consists of three parts. The first three characters are the CAT, the second two characters are the manufacturer's code, and the last three characters are the sequence number.
2.7 Truck Selection
Because of the large number of possible combinations of highway truck chassis and bodies, both are listed separately. For estimating purposes, use the gross vehicle weight (GVW) rating of the truck chassis to make a selection with the following conditions:
a. The combined weight of the truck chassis, truck body, and payload must not exceed the GVW rating shown for the truck chassis.
b. The gross combined weight (GCW) of the truck, trailer, and payload must not exceed the GCW rating shown.
2.8 Crawler Tractor Selection
A wide range of combinations of ripper and various blade options are available for each crawler tractor. For ease of use, all tractors include a universal blade attachment. Other blade and ripper attachments are shown separately and should be substituted for the universal blade to match actual equipment configuration. Only the hourly expense for those attachments that are required to perform the work shall be allowed.
EP 1110-1-8, Vol. 330 Nov 09
2-4
2.9 Equipment Accessories
Equipment accessories included on the major pieces of equipment in table 2-1 are listed in appendix J.
SECTION IV. EQUIPMENT VALUE
2.10 List Price and Accessories
The total list price includes those accessories normally purchased by the contractor plus required safety features.
2.11 Discount Code (DC)
A 7.5-percent discount is used for all equipment except highway trucks that are discounted at 15 percent. The total discounted price is derived by subtracting the appropriate discount from the total list price. The identification of the discount is shown in appendix D under column heading DC. Two codes are used to identify the discount, B equals the basic discount of 7.5 percent and S equals the special discount of 15 percent.
2.12 Sales or Import Tax
Total state sales tax (which includes local taxes) or import tax is computed as a percentage of the discounted price. The average tax for the region is shown in appendix B.
2.13 Freight
Estimated allowances for freight are provided in appendix B. This allowance includes preparation and delivery. Multiply the shipping weight based on hundredweight (cwt) by the freight rate to determine freight charges.
2.14 Total Equipment Value (TEV)
Freight is added to the total discounted price (which includes sales tax) to arrive at the TEV. The estimated TEV is indicated in table 2-1 under the column heading VALUE.
EP 1110-1-8, Vol. 330 Nov 09
2-5
SECTION V. LIFE
2.15 Economic Life (LIFE)
The expected economic life of the equipment will vary based on the type of equipment and the condition of use. It is established from manufacturers’ or equipment associations’ recommendations. The expected economic life in hours is given in appendix D, under the column heading LIFE, for both average and severe conditions.
2.16 Working Hours Per Year (WHPY)
Annual average operating hours have been established for equipment working within the region covered by this pamphlet. The number of WHPY as shown in appendix B is equivalent to 1 year’s use for a single shift operation. Average annual hours of use per year are determined by reducing the maximum available hours per year (40 hours per week, 52 weeks per year) to allow for lost working days due to the following factors:
• Weather • Employee holidays • Equipment maintenance and repairs • Mobilization and demobilization • Miscellaneous downtime
SECTION VI. SALVAGE VALUE
2.17 Salvage Value (SLV)
The salvage value for equipment is based on advertisements of used equipment for sale as displayed in current engineering and construction magazines, manufacturer’s recommendations, and the Green Guide Volumes I and II, Handbook of New and Used Construction Equipment Values, Equipment Watch.
2.18 Salvage Value Percentage
The salvage value percentage used for each type of equipment is listed in appendix D under the heading SLV as a percentage of the equipment value. It is equal for both average and severe conditions.
EP 1110-1-8, Vol. 330 Nov 09
SECTION VII. OWNERSHIP COST
2.19 Ownership Elements
The ownership portion of the rate consists of allowances for depreciation (DEPR) and facilities capital cost of money (FCCM). These two cost elements are computed based on the TEV. Other ownership elements may be allowed (see paragraph 2-3.d.). Total ownership rate per hour is expressed by formula, as follows:
Ownership Rate/hr = DEPR/hr + FCCM/hr
2.20 Depreciation
The straight-line method is used to compute depreciation.
a. For rubber-tired equipment, the tire cost index (TCI) must first be calculated to complete the depreciation formula.
b. Hourly depreciation is calculated by dividing the “depreciable" value (TEV less estimated salvage and tire cost) by the expected economic life of the unit of equipment in hours. Expressed by formula, depreciation cost equals the following:
( )( )[ ] ( )( )[ ][ ]LIFE
Cost TireTCI - SLV-1TEV DEPR/hr =
Where:
(1) TEV is the total equipment value found in table 2-1.
(2) SLV is the salvage value from appendix D.
(3) TCI is the tire cost index, which is determined by dividing the year of manufacture tire index by the present-year tire index. For table 2-1, the present year is 2009 and the year of manufacture is 2006 (3 years old). These indexes are listed as part of appendix E [see Economic Key (EK) 100, All Tires and Tubes].
(4) Tire cost is the total tire and/or conveyor belt cost. The total tire cost is the sum of the cost of all front, drive, and trailing tires. The tire cost for rubber-tired equipment is based on tire values at the time the equipment was manufactured.
(5) The LIFE is the economic life, which is based on the number of operating hours throughout the economic life of the equipment (see paragraph 2-15). Hours for LIFE are provided in appendix D.
2-6
EP 1110-1-8, Vol. 330 Nov 09
2.21 Facilities Capital Cost of Money (FCCM)
The FCCM, as defined in FAR 31.205-10, is included in the total hourly rates. This cost is computed by multiplying a discounted cost of money rate (CMR) by the average value of equipment and prorating the result over the annual operating hours. The January 2009 CMR [5.625 percent as shown in appendix I determined by the Secretary of the Treasury pursuant to Public Law 92-41 (85 Stat. 97)] is discounted by a reduction of 25 percent to avoid duplication when applying estimated markups for overhead and profit. The discounted CMR is then 4.50 percent. The Department of the Treasury adjusts the CMR on or about 1 January and 1 July each year; these revisions are printed in the Federal Register or can be found on the Internet at http://www.treasurydirect.gov/govt/rates/tcir/tcir_opdprmt2.htm. The CMR should be adjusted to the actual period that the equipment is used. Expressed by formula, FCCM cost equals the following:
( )( )( )(WHPY)
CMR discountedAVFTEV FCCM/hr =
Where:
(1) TEV is the total equipment value found in table 2-1.
(2) ( )( )[ ][ ] 2N /2 SLV 11-N (AVF) Factor Value Average ++= .
(a) Number of Years (N) in Depreciation Period = LIFE/WHPY.
(b) LIFE is the economic life, which is based on the number of operating hours throughout the economic life of the equipment (see paragraph 2-15). Hours for LIFE are provided in appendix D.
(3) Discounted CMR = 5.625% (Jan – Jun 2009 rate) / 1.25 = 4.50%.
(4) WHPY = Working hours Per Year found in appendix B.
SECTION VIII. OPERATING COST
2.22 Operating Cost Elements
The total operating cost is the sum of the following five elements: fuel, FOG, repairs, tire wear, and tire repair.
2-7
EP 1110-1-8, Vol. 330 Nov 09
2.23 Fuel Cost
Fuel costs are computed for each gas, diesel, or electric engine. When the unit of equipment has two engines, as in the case of a truck crane, this methodology treats each engine separately for fuel costs. The hourly fuel cost for each unit of equipment is shown under the column heading FUEL in tables 2-1 and 2-2. When the unit of equipment has no engine, no fuel cost will be shown. Hourly fuel costs are calculated for each engine, as expressed in the following formula:
Fuel Cost/hr = Horsepower (hp) x Fuel Cost/Gallon (gal) x Fuel Factor (gal/bhp-hr)
a. Horsepower is the engines rated horsepower. All horsepower ratings for engine-driven equipment are listed with the equipment description in table 2-1.
b. Fuel Cost/Gallon is based on values shown in appendix B. See chapter 3 for fuel cost adjustments.
c. Fuel Factor - Gas or Diesel Fuel. The fuel factor in gallons per brake horsepower-hour (bhp-hr) is listed in appendix D for both average and severe conditions. Fuel factors are also listed for both the engine powering the main equipment (prime engine) and the engine providing power to the carrier vehicle. For severe conditions, the fuel consumption rate is 30 percent greater than the average condition rate. Gas or diesel fuel factors are computed by using the following formula:
Gal per Fuel of lbshr-bhp per Fuel lbs x (HPF) Factor Horsepower hr)-(Gal/bhp Factor Fuel =
Where:
(1) The HPF is the horsepower factor used in the fuel and electricity consumption formulas and represents an average percent of full-rated horsepower being used by the engine. The fuel consumption factors, which are shown in appendix D under column headings Fuel Factor-Equipment and Fuel Factor-Carrier, are computed based on the HPF shown under these column headings. This HPF is an estimate of the engine load under average working conditions. It is necessary to modify the rated horsepower as engines and motors in actual production do not work at their full-rated horsepower at all times. Periods spent at idle, travel in reverse, traveling empty, close maneuvering at part throttle, and operating downhill are examples of conditions that reduce the HPF. Professional judgment regarding cycle time and equipment loading is applied to determine this average HPF. Normal field application can also vary according to: operator efficiency, type of material, type of work cycle, and overall jobsite efficiency. This pamphlet provides an estimated average HPF, not a specific factor.
2-8
EP 1110-1-8, Vol. 330 Nov 09
(2) Pounds (lbs) fuel per bhp-hr is an average based on a variety of engine applications from manufacturer engine data. The following represent an average of the normal application of equipment and are indicative of engine fuel consumption industry wide. Pounds fuel (consumed) per bhp-hr is based on the following averages and is used consistently throughout this pamphlet:
Gasoline = 0.55 lbs per bhp-hr Diesel = 0.34 lbs per bhp-hr
(3) Pounds fuel per gallon is the factor that determines the weight of the fuel consumed. The following are used as constants in this pamphlet:
Gasoline = 6 lbs per gal Diesel = 7 lbs per gal
d. Fuel Factor - Electricity. Assuming that an electric motor uses 1 kilowatt (kW) per horsepower (considering all inefficiencies), and using the same HPF for gas or diesel fuel consumption, the electricity consumption is computed by the following formula:
hr-hpelectric per kW 1 x HPF (kW/hr) Factor Fuel =
e. Fuel and Electricity Cost. The cost per gallon for gasoline and diesel fuel used to compute the hourly fuel cost is shown in appendix B. The hourly fuel cost for all gasoline-powered equipment, diesel-powered highway trucks, and truck crane carriers includes an allowance for Federal and state road taxes, sales taxes, and rental for fuel storage tanks and pumps. Cost per kilowatt-hour used to compute electricity cost are also shown in appendix B.
2.24 Filters, Oil, and Grease (FOG) Cost
The FOG cost is computed as a percentage of the hourly fuel costs.
a. The FOG contains items of cost for routine servicing of the equipment, which includes the following:
• Base wages for servicing labor • Fringe benefits and labor burden costs for servicing • Service truck, tools, and fuel truck allowance • Shop allowance when shop servicing is required • Other equipment costs for servicing • FOG material allowance • Taxes and shipping for FOG supplies • Handling and disposal of hazardous materials and oil
2-9
EP 1110-1-8, Vol. 330 Nov 09
b. The hourly FOG cost is calculated for each engine using the following formula:
LAF x Cost/hr Fuel x Factor FOG Cost/hr FOG =
Where:
(1) The FOG Factor is the percent allowance expressed as a decimal factor under each fuel type heading E (electricity), G (gas), or D (diesel). See appendix D.
(2) Fuel cost/hr is a calculated value shown under the column heading FUEL in tables 2-1 and 2-2.
(3) The LAF (labor adjustment factor) is a decimal factor to account for regional variations in labor and parts costs. This factor is provided in appendix B.
c. The FOG percentage allowance includes the cost for servicing. For equipment that is normally serviced by an oiler assigned to the unit of equipment, the FOG percentage is reduced. This reduction applies to the following equipment: cranes, draglines, hydraulic excavators, and shovels (except equipment under category numbers C75, C80.01, C85.11, C85.12, C85.21, C90.01, H25.11, H25.12, H30.01, H30.02, and M10.32).
d. When a unit of equipment has no engine (therefore no fuel costs calculated) and the equipment requires some type of fuel (i.e., propane, kerosene), an alternative hourly fuel and FOG allowance may be used in lieu of the regularly calculated fuel and FOG hourly costs. A FOG allowance may also be added when the equipment has no engine and has parts that require FOG. The alternative fuel allowance is added to the alternative FOG allowance for a total alternative fuel and FOG cost. (See figure 2-1, 5.c.)
2.25 Repair Cost
a. The repair cost accounts for equipment repairs, maintenance, and major overhauls (including undercarriage wear, ground engaging tools, and designated attachments) performed in either the field or the shop. Where tire cost is the cost of the tires when the equipment was manufactured, use the same TCI and tire cost as shown in the depreciation calculation (see section 2-20). The estimated hourly rate for repairs is computed as follows:
LIFERF x Cost)]] e[(TCI)(Tir-[(TEV) Cost/hr Repair =
2-10
EP 1110-1-8, Vol. 330 Nov 09
Where:
(1) TEV is the total equipment value found in table 2-1.
(2) TCI is the tire cost index, which is determined by dividing the year of manufacture tire index by the present-year tire index. For table 2-1, the present year is 2009 and the year of manufacture is 2006 (3 years old). These indexes are listed as part of appendix E [see Economic Key (EK) 100, All Tires and Tubes].
(3) Tire cost is the total tire and/or conveyor belt cost. The total tire cost is the sum of the cost of all front, drive, and trailing tires. The tire cost for rubber-tired equipment is based on tire values at the time the equipment was manufactured.
(4) Repair factor (RF) is calculated as follows:
LAF x EAF x RCF RF =
Where:
(a) The RCF (repair cost factor) is shown in appendix D. This factor varies depending on the operating condition of the equipment (average or severe).
(b) The EAF (economic adjustment factor) is used to adjust the RCF to current price levels. The EAF is equal to the economic index for the present year divided by the economic index for the year of manufacture. Indexes listed in appendix E are used to develop the EAF. Economic indexes are determined as follows:
Economic Index for the Present Year. This is the economic index for the present year (2009 for table 2-1 calculations). Obtain the economic index from appendix E. The index is located in the column with the present year and the row with the type of equipment in question. When the column for the present year has not been included, the index can be estimated using a straight-line projection.
Economic Index for the Year of Manufacture. This is the economic index for the year the equipment was manufactured (2006 for table 2-1 calculations). Obtain the economic index from appendix E. The index is located in the column with the year of manufacture and the row with the type of equipment in question. When the actual age of the equipment is beyond the last year of its economic life, the equipment is considered overage. Economic life is determined by dividing hours of LIFE (from appendix D) by WHPY (appendix B).
(5) The LIFE is the economic life, which is based on the number of operating hours throughout the economic life of the equipment (see paragraph 2-15). Hours for LIFE are provided in appendix D. 2-11
EP 1110-1-8, Vol. 330 Nov 09
b. Items Included in the Repair Cost Factor. The estimated percentage allowances for the RCF are shown in appendix D under the column heading RCF and are expressed as decimal factors. These RCFs (for both the average and severe conditions) compensate for the following cost elements:
(1) Mechanic’s labor includes base wages, fringe benefits, supervision, travel, and all other costs for labor associated with craft workers engaged in the direct repair of equipment either in the field or the shop.
(2) Repair parts and supplies include those items that are required for all repairs and major overhauls complete with applicable sales taxes and freight charges.
(3) Service trucks and other equipment used during field or shop repair and maintenance work including tools.
(4) Supporting repair facilities include field and main repair shops, complete with parts and supplies inventory, and shop overhead.
2.26 Tire Wear Cost
a. Tires included on rubber-tired equipment are generally the type and ply rating recommended as standard tires by the equipment manufacturer. Tire costs include both tire wear (replacement) and tire repair as individual elements of cost. Conveyor belt wear is also included under this cost element. The belt wear is treated like tire wear. The wear factors are listed in the front tire wear factor column in appendix D. Belt life and cost are listed in appendix F.
b. The formula for calculating tire wear applies to each tire position: front (FT), drive (DT), and trailing (TT). However, all tires performing the drive function are considered drive tires and are listed in the drive position. The total hourly tire wear cost for each unit of equipment is the sum of the hourly cost for each position. The total hourly tire wear cost equals the current cost of new tires plus the cost of one recapping divided by the expected life of the new tires plus the life of the recapped tires. This hourly allowance for determining tire wear cost is expressed in the following formula:
Life Tire Maximum x Factor WearTire x Factor Life TireCost Tire Current x Factor Cost Tire Cost/hr WearTire =
2-12
EP 1110-1-8, Vol. 330 Nov 09
Where:
(1) Tire Cost Factor is estimated at 1.5, which represents the purchase of the original tire plus one recap. It has been estimated that a recap costs approximately 50 percent of the new tire cost.
(2) Current Tire Cost is the estimated cost that applies to all tires on the equipment in that position. For example, four new drive tires valued at $500 each would result in an amount of $2,000 for total drive tire cost. The size and cost of each tire used in the pamphlet are listed for information in appendix F.
(3) Tire Life Factor is estimated at 1.8, which represents the original tire life plus one recap. It has been estimated that a recap lasts approximately 80 percent of the life of a new tire.
(4) Tire Wear Factor is based on the position of the tire, type of equipment, and condition of use. Tire wear factors have been developed and are listed in appendix D. These factors will provide a percentage reduction to the maximum tire life. Appendix G contains the methodology used to develop these factors and a computation example for a rear dump wagon.
(5) Maximum Tire Life expressed in hours is shown for various new tire types in appendix F. The tire life is estimated from information provided by Goodyear Tire and Rubber Company and by using the method and tables in Production and Cost Estimating of Material Movement with Earthmoving Equipment, Terex Corporation, Hudson, Ohio.
2.27 Tire Repair Cost
It has been estimated that tire repairs are 15 percent of the total hourly tire wear cost. The LAF is used to adjust the tire repair cost to account for regional variations in labor and parts costs. This cost element has been calculated and listed separately in table 2-2. It is expressed as a formula as follows:
LAF x 0.15 x Cost WearTireHourly Total Cost Repair Tire =
2-13
EP 1110-1-8, Vol. 330 Nov 09
SECTION IX. STANDBY HOURLY RATE
2.28 Standby Hourly Rate
The standby rate is computed by allowing the full FCCM hourly cost (based on a 40 hour workweek) plus one-half of the hourly depreciation. It is expressed as a formula, as follows:
( ) FCCM/hr 0.50 x DEPR/hr Rate/hrStandby +=
a. Paid standby shall not exceed 40 hours per week (7 calendar days) (based on a 40 hour workweek) per unit of equipment. Actual operating hours during a week will be credited against the 40 hours maximum standby allowance.
b. Standby costs will not be allowed during periods when the equipment would have otherwise been in idle status.
c. When the equipment is purchased used, standby will be computed on the basis that the equipment was purchased new by the contractor in the year it was actually manufactured. Refer to chapter 3 for rate adjustments.
SECTION X. RATE CALCULATION EXAMPLE
2.29 Computation Example
Figure 2-1 is an example of how the total hourly rates in table 2-1 are computed. A blank Equipment Rate Computation Worksheet is included in appendix A and can be copied as needed.
a. When an hourly rate for a specific unit of equipment is not included in this pamphlet and a rate must be computed, the methodology contained in chapter 2 shall be followed. However, when a unit of equipment is not included in this pamphlet and the necessary factors to compute a rate are not found in appendix D, please contact the Chief, Cost Engineering Branch, Engineering and Construction Division, Walla Walla District, U.S. Army Corps of Engineers, for assistance as explained in chapter 1. A Microsoft Excel® spreadsheet (CHECKRATE) is also available for rate computation (see chapter 1).
b. See chapter 3 for further guidance on the procedure for rate adjustments.
2-14
EP 1110-1-8, Vol. 330 Nov 09
1. EQUIPMENT INFORMATION AND EXPENSE FACTORS
a.(1)
(2) HC-238H II(3) 2009(4) 2006(5) 284(6) 430(7)
3 D-off
4 D-on(8) 1,913 cwt(9)
Size/Ply App F Code No. Unit Price Cost(a) Front (FT): 14-25/20 ANMB1 4 $1,206 $4,824(b) Drive (DT): 14-25/20 ANMB1 8 $1,206 $9,648(c) 0 $0 $0(d) $14,472
(10)$1,575,295 $0
b. 0.04c.
(1) 20(2) A AVERAGE(3) B 0.075(4) 20,000(5) 0.20(6) 0.024(7) 0.005(8) 0.110(9)
(a) 0.66(b) 0.58(c) 0.73
(10) 0.90
Use this worksheet to compute an hourly rate for equipment that is not in this pamphlet or is in the pamphlet but not equivalent in size, capacity, horsepower, or value (see appendix A for blank form).
Region 03
ID No: C90LB001
Example: The piece of equipment shown in this example is based on a known piece of equipment for illustration purposes only.
Tire Wear Factor:
Repair Cost Factor (RCF):
Front (FT):Drive (DT):Trailing (TT):
Filter, Oil, and Grease (FOG) Factor (E G D):
Economic Key (EK):
Trailing (TT):
Life in Hours (LIFE):Salvage Value Percentage (SLV):
Total Tire Cost:
Fuel Factor - Carrier (E G D):
Discount Code (DC): B = 7.5% (0.075) or S = 15.0% (0.15)
Fuel Factor - Equipment [Electric (E) Gas (G) Diesel (D)]:
OR actual purchase price:
Category and Subcategory Number:USE APPENDIX D TO COMPLETE THE FOLLOWING DATA:
List Price + Accessories: [at Year (yr) of Manufacture]
Hourly Expense Calculation Factors:
Condition (C): A=Average D=Difficult S=Severe
C90
Horsepower - Carrier:
Shipping Weight (cwt):
- Equipment: 0-None; 1-electric; 2-gasoline;3-diesel off-road; 4-diesel on-road; 5-marine gas;6-marine diesel
- Carrier: 0-None; 1-electric; 2-gasoline; 3-diesel off-road; 4-diesel on-road; 5-marine gas;6-marine diesel
Fuel type:
Tire size and number of tires: (Cost of tires based on present year, see 1.a.(3) and App. F):
Enter number from0 to 6 ==>
Enter number from0 to 6 ==>
Equipment Description:
Model and Series:
CRANES, MECHANICAL, LATTICE BOOM, TRUCK MTD, 150 TON / 260' BOOM, 8X4
Horsepower - Equipment:
Present Year or Year of Use:Year Manufactured:
Equipment Specification Data:
Figure 2-1. Equipment Rate Computation Worksheet Page 1 of 6
EP 1110-1-8, Vol. 330 Nov 09
2-15
2.
a. = $1,575,295
(1) Discount: (List Price + Accessories) x {1.a.(10)} {1.c.(3)}
($1,575,295 + $0.00) x 0.075 = -($118,147)
(2) $1,457,148
(3) Sales or Import Tax: Subtotal x Tax Rate {2.a.(2)} {'Appendix B}
$1,457,148 x 9.00% = $131,143
(4) $1,588,291
b. x{1.a.(8)} {Appendix B}
1,913 cwt x $8.01 /cwt = $15,323
c. TOTAL [2.]: = $1,603,614
3.
a. LIFE / {1.c.(4)} {Appendix B}
20,000 hr / 1,530 hr/yr = 13.07 yrs (N)
4.
a.
(1) Tire Cost Index (TCI):
Tire Index, Year of Manufacture,
{1.a.(4)} / =Tire Cost
Index (TCI) Appendix E, EK=100
2926 / 3382 = 0.865
(2) [TEV x (1.0-SLV) - (TCI x Tire Cost)] / LIFE{2.c.} {1.c.(5)} {4.a.(1)} {1.a.(9)(d)} {1.c.(4)}
[$1,603,614 x (1.0-0.20) - ( 0.865 x $14,472 )] / 20,000 hrs = $63.52 /hr
OWNERSHIP COST
Region 03
Freight:
EQUIPMENT VALUE
List Price + Accessories: [at Year (yr) of Manufacture]
Discount Code
Subtotal {2.a.} - {2.a.(1)}
Total Discounted Price: Subtotal: 2.a.(2) + 2.a.(3)
Subtotal =
{2.a.(4)} + {2.b} OR actual purchase price {1a.(10)}
Depreciation
(See chapter 3 for used and overage equipment rate adjustments.)
Subtotal =
Appendix E, EK=100
Working Hours Per Year (WHPY) = N
Shipping WeightFreight Rate per
cwt
TOTAL EQUIPMENT VALUE (TEV):
Tire Index, Present Year or Year of Use, {1.a.(3)}
DEPRECIATION PERIOD (N)
Figure 2-1. Equipment Rate Computation Worksheet Page 2 of 6
EP 1110-1-8, Vol. 330 Nov 09
2-16
4. OWNERSHIP COST (Continued)
b. Facilities Capital Cost of Money (FCCM):
(1) [( N - 1.0 ) x (1.0 + SLV) + 2.0] / (2.0 x N) =Avg Value
Factor{3.a.} {1.c.5.} {3.a.} (AVF)
[(13.07 yr - 1.0) x (1.0 + 0.20) + 2.0] / (2.0 x 13.07 yr) = 0.631
(2) TEV x AVF xAdjusted
Cost-of-Money / WHPY
{2.c.} {4.b.(1)} {Appendix B} {Appendix B}
$1,603,614 x 0.631 x 3.90% / 1,530 hr/yr = $25.79 /hr
c. TOTAL HOURLY OWNERSHIP COST: TOTAL [4.]: = $89.31 /hr
{4.a.(2)} + {4.b.(2)}
5. OPERATING COST
a. Fuel Costs:
(1) Equipment:
Fuel Factor x Horsepower (hp) xFuel Cost per Gallon (gal)
{1.c.(6)} {1.a.(5)} {Appendix B}
0.024 x 284 hp x $3.04 /gal = $20.72 /hr
(2) Carrier:{ 1.c.(4)}
Fuel Factor x Horse power (hp) x Fuel Cost per gal{1.c.(7)} {1.a.(6)} {Appendix B}
0.005 x 430 hp x $3.49 /gal = $7.50 /hr
(3) Total Hourly Fuel Cost: Total [5.a.] = $28.22 /hr{5.a (1)} + {5.a (2)}
b. FOG Cost:
(1) Equipment:
FOG Factor xEquipment Hourly
Fuel Cost xLabor Adjustment
Factor (LAF){1.c.(8)} {5.a.(1)} {Appendix B}
0.110 x $20.72 /hr x $ 0.86 /hr = $1.96 /hr
Region 03
Figure 2-1. Equipment Rate Computation Worksheet Page 3 of 6
EP 1110-1-8, Vol. 330 Nov 09
2-17
5.
(2) Carrier:
FOG Factor xCarrier Hourly
Fuel Cost x LAF {1.c.(8)} {5.a.(2)} {Appendix B}
0.110 x $7.50 /hr x 0.86 = $0.71 /hr
(3) Total [5.b.] = $2.67 /hr
c. Total [5.c.] = $0.00 hr
d.
(1)EK is from {1c. (1)}
/
6905 / 6543 = 1.055
(2) Repair Factor (RF):
RCF x EAF x LAF{1.c.(10)} {5.d.(1)} {Appendix B}
0.90 x 1.055 x 0.86 = 0.817
(3) Repair Cost:
[TEV - (TCI x Tire Cost)] x RF / LIFE {2.c.} {4.a.(1)} {1.a.(9)(d)} {5.d.(2)} {1.c.(4)}
[$1,603,614 - (0.865 x $14,472)] x 0.817 / 20,000
(4) Total [5.d.] = $65.00 /hr
(See table 3-1 for last year of economic life.)
Total Hourly Repair Cost:
Appendix E, EK={1.c.(1)} Appendix E, EK={1.c.(1)}
(See chapter 2, paragraph 2.24.d. for guidance on when to use.)
Repair Cost:
Economic Index, Present Year or Year of Use,{1.a.(3)}
Economic Index, Year of Manufacture, {1.a.(4)}
Economic Adjustment Factor (EAF):
OPERATING COST (Continued)
Region 03
Total Hourly FOG Cost:
Alternative Fuel/FOG Cost:
{5.b.(1)} + {5.b.(2)}
Figure 2-1. Equipment Rate Computation Worksheet Page 4 of 6
EP 1110-1-8, Vol. 330 Nov 09
2-18
5.
e.
(1) Front Tires (FT):
(1.5 x FT Cost) / (1.8 x FT Wear Factor x Maximum Tire Life Hours){1.a.(9)(a)} {1.c.(9)(a)} {Appendix F}
(1.5 x $4,824) / (1.8 x 0.66 x 2,500 hr) = $2.44 /hr
(2) Drive Tires (DT):
(1.5 x DT Cost) / (1.8 x DT Wear Factor x Maximum Tire Life Hours){1.a.(9)(b)} {1.c.(9)(b)} {Appendix F}
(1.5 x $9,648) / (1.8 x 0.58 x 2,500 hr) = $5.54 /hr
(3) Trailing Tires (TT):
(1.5 x TT Cost) / (1.8 x TT Wear Factor x Maximum Tire Life Hours){1.a.(9)(c)} {1.c.(9)(c)} {Appendix F}
(1.5 x $0.00) / (1.8 x 0.73 x 0 hr) = $0.00 /hr
(4) Total Tire Wear Cost: Total [5.e.] = $7.98 /hr
f.
Total Tire Wear Cost per Hour x (0.15 x LAF)
{5.e.(4)} {Appendix B}
$7.98 /hr x (0.15 x 0.86) Total [5.f.] = $1.03 /hr
g. Total [5.] = $104.90 /hrTOTAL HOURLY OPERATING COST:
Sum {5.e.(1)} through {5.e.(3)}
Sum {5.a.} through{ 5.f.}
Region 03
OPERATING COST (Continued)
Tire Repair Cost:
Tire Wear Cost: (Use current price levels. See Appendix F.)
Figure 2-1. Equipment Rate Computation Worksheet Page 5 of 6
EP 1110-1-8, Vol. 330 Nov 09
2-19
6.
a.
+ Operating Cost{4.c.} {5.g.}
$89.31 /hr + $104.90 /hr = $194.21 /hr
b.
Depreciation + (FCCM x 40 hr/wk / Work hr/wk) + Operating Cost
{4.a.(2)} {4.b.(2)} {5.g.}
$63.52 /hr + ($25.79 /hr x 40 hr/wk / 60 hr/wk) + $104.90 /hr = $185.61 /hr
c.
(Depreciation x 0.50) + FCCM {4.a.(2)} {4.b.(2)}
($63.52 /hr x 0.50) + $25.79 /hr = $57.55 /hr
Standby Hourly Rate:
(Refer to Chapter 2, paragraph 2.28 for guidance on use.)
See Chapter 3 if rate adjustments are necessary.
(Refer to Chapter 3, paragraph 3.12 for guidance for overage equipment.)
Region 03
Other Work Shifts Hourly Rate:
example:60 hr/wk
(example:60 hr/wk)
HOURLY RATES
Total Hourly Rate: [based on 40 hours per week (wk)]
(Refer to Chapter 3, Adjustments to Rates, for methodology.)
Ownership Cost
Figure 2-1. Equipment Rate Computation Worksheet Page 6 of 6
EP 1110-1-8, Vol. 330 Nov 09
2-20
Table 2-1. Hourly Equipment Ownership and Operating Expense
EXPLANATION OF TABLE HEADINGS
Example unit of equipment: Link Belt, Model HC-238H II, 150 Ton, 260’-boom.
CAT: C90 is the category number and identifies it as Cranes, Mechanical, Lattice Boom, Truck Mounted (from appendix D). ID No.: C90LB001 is the unique identification number for the above Link Belt crane. AM equals the manufacturer (see appendix H). 001 equals the numeric order of this unit of equipment within the manufacturer’s listing. MODEL: HC-238H II is the equipment model number. EQUIPMENT DESCRIPTION: Specific information for each particular unit of equipment is described, such as “150 ton with a 260-foot boom” for the Link Belt crane. ENGINE HORSEPOWER AND FUEL TYPE: The amount of horsepower and type of fuel used is stated for the main and carrier engines. The Link Belt crane carrier has a 430-horsepower engine, and the crane has a 207-horsepower engine. Both engines are diesel (D). VALUE (TEV): This column reflects the predetermined “equipment cost” used to compute the rates and is based on equipment purchased new in 2006. TOTAL HOURLY RATES ($/HR): All ownership and operating expenses for the average condition are included. All cost elements, including fuel, are totaled in the AVERAGE column. The STANDBY column includes the hourly allowance for equipment on legitimate standby status (see section 2-27 for more information). ADJUSTABLE ELEMENTS: This column shows ownership elements and fuel costs used to develop the average total hourly rates so they can be adjusted as indicated in chapter 3. Operating costs may be determined by subtracting the ownership cost elements (DEPR plus FCCM) from the total hourly rate for the average condition. CWT: The shipping weight of the equipment is stated in hundredweight.
2-21
EP 1110-1-8, Vol. 330 Nov 09
2-21
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
AGGREGATE / CHIP SPREADERSA100.10 SELF-PROPELLEDSUBCATEGORY
ROSCO, A LeeBoy COMPANY
152SPRHA10RS003 $110,469 10.83 1.91 15.71 1497.3340.05CHIP SPREADER, SELF PROPELLED, 10' WIDE, 1.70 CY, 2WD
HP D-off
152SPRHA10RS004 $111,162 10.90 1.92 15.71 1537.3740.19CHIP SPREADER, SELF PROPELLED, 11' WIDE, 1.80 CY, 2WD
HP D-off
152SPRHA10RS005 $111,674 10.95 1.93 15.71 1597.4140.30CHIP SPREADER, SELF PROPELLED, 12' WIDE, 2.03 CY, 2WD
HP D-off
152SPRHA10RS006 $111,954 10.98 1.93 15.71 1537.4240.35CHIP SPREADER, SELF PROPELLED, 13' WIDE, 2.28 CY, 2WD
HP D-off
152SPRHA10RS007 $113,258 11.11 1.95 15.71 1597.5140.62CHIP SPREADER, SELF PROPELLED, 15' WIDE, 2.53 CY, 2WD
HP D-off
205SPREADPROA10RS008 $218,843 21.55 3.78 21.19 15814.5668.46CHIP SPREADER, SELF PROPELLED, 16' WIDE, 4.50 CY, 4WD
HP D-off
0.20 TOWED & TAILGATESUBCATEGORY
AMERICAN ROAD MACHINERY, INC.
TG-505CA10AR001 $3,082 0.41 0.06 0.00 50.270.76CHIP SPREADER, TAILGATE, 8' WIDE (ADD DUMP TRUCK)
ODELL 900A10AR002 $14,946 1.99 0.27 0.00 221.273.88CHIP SPREADER, TOWED, 8' WIDE, 3 CY (ADD DUMP TRUCK)
SEALMASTER, INC.
R-1 E2310A10SE001 $12,872 1.72 0.23 0.00 211.093.17CHIP SPREADER, TAILGATE, 8' WIDE, 1.13 CY (ADD DUMP TRUCK)
EP 1110-1-8, Vol. 330 Nov 09
2-22
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
A10 SEALMASTER, INC. (continued)R-1 E2500A10SE002 $15,109 2.01 0.27 0.00 301.283.72CHIP SPREADER, TOWED, 8' WIDE, 1.13
CY (ADD DUMP TRUCK)
AIR COMPRESSORS, PORTABLEA150.10 ROTARY SCREWSUBCATEGORY
INGERSOLL RAND ROTARY-REC COMPRESSOR DIV
56P175WJDA15IA001 $22,576 1.78 0.38 6.13 211.2710.68AIR COMPRESSOR, 175 CFM, 100 PSI (ADD HOSE)
HP D-off
110HP300WCUA15IA002 $48,711 3.87 0.82 12.04 382.7621.69AIR COMPRESSOR, 300 CFM, 150 PSI (ADD HOSE)
HP D-off
174VHP400WCUA15IA003 $58,366 4.61 0.98 19.04 533.2931.08AIR COMPRESSOR, 400 CFM, 200 PSI (ADD HOSE)
HP D-off
174HP450WCUA15IA004 $58,366 4.61 0.98 19.04 533.2931.08AIR COMPRESSOR, 450 CFM, 150 PSI (ADD HOSE)
HP D-off
174XP525WCUA15IA005 $58,366 4.61 0.98 19.04 533.2931.08AIR COMPRESSOR, 525 CFM, 125 PSI (ADD HOSE)
HP D-off
300XHP650WCATA15IA006 $128,916 10.20 2.17 32.83 1367.2758.48AIR COMPRESSOR, 650 CFM, 350 PSI (ADD HOSE)
HP D-off
300XHP750WCATA15IA007 $135,167 10.70 2.28 32.83 1367.6359.56AIR COMPRESSOR, 750 CFM, 300 PSI (ADD HOSE)
HP D-off
335VHP825WCUA15IA008 $102,108 8.06 1.72 36.66 965.7558.11AIR COMPRESSOR, 825 CFM, 200 PSI (ADD HOSE)
HP D-off
310XP1000WCATA15IA009 $102,227 8.07 1.72 33.93 1045.7655.12AIR COMPRESSOR, 1,000 CFM, 125 PSI (ADD HOSE)
HP D-off
400XHP1070WCATA15IA010 $182,123 14.46 3.07 43.78 15210.3079.71AIR COMPRESSOR, 1,070 CFM, 350 PSI (ADD HOSE)
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-23
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
SULLAIR CORPORATION
76125DPQJDA15SR006 $16,409 1.28 0.28 8.32 240.9212.03AIR COMPRESSOR, 125 CFM, 100 PSI (ADD HOSE)
HP D-off
77130DPQJDA15SR007 $16,439 1.29 0.28 8.43 260.9312.16AIR COMPRESSOR, 130 CFM, 100 PSI (ADD HOSE)
HP D-off
78185A15SR004 $16,409 1.28 0.28 8.54 240.9212.27AIR COMPRESSOR, 185 CFM, 100 PSI (ADD HOSE)
HP D-off
80260A15SR005 $23,666 1.86 0.40 8.76 261.3313.77AIR COMPRESSOR, 260 CFM, 100 PSI (ADD HOSE)
HP D-off
123375HDPQJDA15SR008 $39,995 3.15 0.67 13.46 422.2521.78AIR COMPRESSOR, 375 CFM, 150 PSI (ADD HOSE)
HP D-off
124425DPQJDA15SR009 $39,995 3.15 0.67 13.57 422.2521.90AIR COMPRESSOR, 425 CFM, 100 PSI (ADD HOSE)
HP D-off
230600HDTQCAA15SR010 $83,099 6.54 1.40 25.17 1004.6742.17AIR COMPRESSOR, 600 CFM, 150 PSI (ADD HOSE)
HP D-off
300750HHDTQCAA15SR011 $97,825 7.72 1.65 32.83 1035.5153.14AIR COMPRESSOR, 750 CFM, 175 PSI (ADD HOSE)
HP D-off
440900XHA15SR002 $193,162 15.29 3.25 48.15 15710.9086.48AIR COMPRESSOR, 900 CFM, 350 PSI (ADD HOSE)
HP D-off
3001050DTQCAA15SR012 $96,308 7.60 1.62 32.83 1055.4252.88AIR COMPRESSOR, 1,050 CFM, 100 PSI (ADD HOSE)
HP D-off
4501300HDTQCAA15SR013 $168,338 13.36 2.84 49.25 1569.5283.37AIR COMPRESSOR, 1,300 CFM, 150 PSI (ADD HOSE)
HP D-off
4501600HDTQCAA15SR014 $183,251 14.45 3.09 49.25 16210.3286.05AIR COMPRESSOR, 1,600 CFM, 100 PSI (ADD HOSE)
HP D-off
5251900DTQCAA15SR015 $137,187 10.76 2.31 57.46 1647.6987.17AIR COMPRESSOR, 1,900 CFM, 100 PSI (ADD HOSE)
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-24
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
NO SPECIFIC MANUFACTURER
3085GA15XX019 $9,615 0.74 0.16 6.02 140.538.41AIR COMPRESSOR, 85 CFM, 100 PSI (ADD HOSE)
HP G
3085DA15XX020 $18,376 1.44 0.31 3.28 241.036.82AIR COMPRESSOR, 85 CFM, 100 PSI (ADD HOSE)
HP D-off
50100GA15XX021 $12,795 1.00 0.22 10.03 170.7213.45AIR COMPRESSOR, 100 CFM, 100 PSI (ADD HOSE)
HP G
35100DA15XX022 $18,816 1.48 0.32 3.83 171.067.50AIR COMPRESSOR, 100 CFM, 125 PSI (ADD HOSE)
HP D-off
65125GA15XX023 $13,466 1.05 0.23 13.04 200.7616.92AIR COMPRESSOR, 125 CFM, 100 PSI (ADD HOSE)
HP G
50130A15XX024 $21,182 1.67 0.36 5.47 181.209.72AIR COMPRESSOR, 130 CFM, 100 PSI (ADD HOSE)
HP D-off
60160GA15XX025 $14,714 1.15 0.25 12.04 230.8316.01AIR COMPRESSOR, 160 CFM, 125 PSI (ADD HOSE)
HP G
70175DA15XX026 $23,723 1.87 0.40 7.66 271.3412.56AIR COMPRESSOR, 175 CFM, 100 PSI (ADD HOSE)
HP D-off
90175GA15XX027 $15,301 1.20 0.26 18.05 240.8622.83AIR COMPRESSOR, 175 CFM, 125 PSI (ADD HOSE)
HP G
80185DA15XX028 $24,277 1.91 0.41 8.76 241.3713.87AIR COMPRESSOR, 185 CFM, 100 PSI (ADD HOSE)
HP D-off
70185GA15XX029 $16,543 1.29 0.28 14.04 230.9318.56AIR COMPRESSOR, 185 CFM, 125 PSI (ADD HOSE)
HP G
85250A15XX030 $32,122 2.54 0.54 9.30 311.8115.81AIR COMPRESSOR, 250 CFM, 100 PSI (ADD HOSE)
HP D-off
110300A15XX031 $46,876 3.72 0.79 12.04 372.6521.37AIR COMPRESSOR, 300 CFM, 125 PSI (ADD HOSE)
HP D-off
115375A15XX032 $42,777 3.37 0.72 12.59 372.4121.30AIR COMPRESSOR, 375 CFM, 125 PSI (ADD HOSE)
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-25
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
A15 NO SPECIFIC MANUFACTURER (continued)170450A15XX033 $57,126 4.46 0.96 18.60 893.1930.46AIR COMPRESSOR, 450 CFM, 125 PSI (ADD
HOSE) HP D-off
250600A15XX034 $79,212 6.23 1.33 27.36 994.4543.92AIR COMPRESSOR, 600 CFM, 150 PSI (ADD HOSE)
HP D-off
275750A15XX035 $84,348 6.64 1.42 30.10 934.7447.82AIR COMPRESSOR, 750 CFM, 125 PSI (ADD HOSE)
HP D-off
275825A15XX036 $90,865 7.16 1.53 30.10 1045.1148.94AIR COMPRESSOR, 825 CFM, 125 PSI (ADD HOSE)
HP D-off
310900A15XX037 $97,113 7.66 1.64 33.93 935.4754.24AIR COMPRESSOR, 900 CFM, 125 PSI (ADD HOSE)
HP D-off
3601200A15XX038 $147,408 11.68 2.48 39.40 1508.3268.91AIR COMPRESSOR, 1,200 CFM, 125 PSI (ADD HOSE)
HP D-off
4601300A15XX039 $154,280 12.20 2.60 50.34 1808.7082.19AIR COMPRESSOR, 1,400 CFM, 150 PSI (ADD HOSE)
HP D-off
5001600A15XX040 $166,104 13.15 2.80 54.72 1519.3889.06AIR COMPRESSOR, 1,600 CFM, 150 PSI (ADD HOSE)
HP D-off
0.20 SHOP TYPESUBCATEGORY
NO SPECIFIC MANUFACTURER
580/15A15XX041 $2,398 0.17 0.04 0.33 30.130.81AIR COMPRESSOR, 22 CFM, 80 GAL (ADD HOSE)
HP E
780/25A15XX042 $3,230 0.23 0.05 0.47 30.171.12AIR COMPRESSOR, 28 CFM, 80 GAL (ADD HOSE)
HP E
10120/35A15XX043 $4,863 0.34 0.08 0.67 40.251.62AIR COMPRESSOR, 41 CFM, 120 GAL (ADD HOSE)
HP E
15120/55A15XX044 $5,697 0.40 0.09 1.00 40.292.21AIR COMPRESSOR, 58 CFM, 120 GAL (ADD HOSE)
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-26
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
A15 NO SPECIFIC MANUFACTURER (continued)25120/90A15XX045 $8,118 0.58 0.13 1.67 40.423.51AIR COMPRESSOR, 89 CFM, 120 GAL (ADD
HOSE) HP E
30120/112A15XX046 $9,961 0.71 0.16 2.00 50.524.23AIR COMPRESSOR, 103 CFM, 120 GAL (ADD HOSE)
HP E
AIR HOSE, TOOLS & EQUIPMENTA200.10 AIR DRILL HOSESUBCATEGORY
NO SPECIFIC MANUFACTURER
A20XX001 $1,335 0.36 0.02 0.00 10.200.95AIR HOSE, 0.75", 100', HARDROCK A20XX002 $1,547 0.42 0.03 0.00 10.241.11AIR HOSE, 1.00", 100', HARDROCK A20XX003 $1,926 0.52 0.04 0.00 10.301.39AIR HOSE, 1.25", 100', HARDROCK A20XX004 $2,511 0.68 0.05 0.00 10.391.81AIR HOSE, 1.50", 100', HARDROCK A20XX005 $3,556 0.97 0.07 0.00 20.562.57AIR HOSE, 2.00", 100', HARDROCK A20XX006 $4,359 1.18 0.08 0.00 30.673.13AIR HOSE, 2.50", 100', HARDROCK A20XX007 $5,383 1.46 0.10 0.00 40.833.87AIR HOSE, 3.00", 100', HARDROCK A20XX008 $7,192 1.95 0.13 0.00 61.115.17AIR HOSE, 4.00", 100', HARDROCK
0.20 SANDBLAST HOSESUBCATEGORY
CLEMCO INDUSTRIES CORPORATION
A20CM017 $362 0.10 0.01 0.00 10.060.28SANDBLAST HOSE, 0.75"ID, 100' LONG USE AS SAND BLASTING ACCESSORY
A20CM018 $397 0.11 0.01 0.00 10.070.31SANDBLAST HOSE, 1.00"ID, 100' LONG USE AS SAND BLASTING ACCESSORY
EP 1110-1-8, Vol. 330 Nov 09
2-27
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
A20 CLEMCO INDUSTRIES CORPORATION (continued)
A20CM020 $423 0.11 0.01 0.00 10.070.32SANDBLAST HOSE, 1.25"ID, 100' LONG USE AS SAND BLASTING ACCESSORY
A20CM019 $519 0.14 0.01 0.00 10.080.40SANDBLAST HOSE, 1.50"ID, 100' LONG USE AS SAND BLASTING ACCESSORY
0.30 SANDBLASTERS, BREAKERS, & MISC. AIR TOOLSSUBCATEGORY
CHICAGO PNEUMATIC TOOL CO.
20CP-0009AA20CK002 $949 0.14 0.02 0.00 10.090.40ROTARY / CHIP HAMMER, 8 LB, AIR (ADD 30 CFM COMPRESSOR & BIT COSTS)
CFM A
32CP-0014RRA20CK001 $1,574 0.24 0.03 0.00 10.150.66ROTARY / CHIP HAMMER, 15 LB, AIR (ADD 30 CFM COMPRESSOR & BIT COSTS)
CFM A
56CP-0022A20CK003 $1,678 0.25 0.03 0.00 10.160.70ROCK DRILL, 30 LB, AIR (ADD 50 CFM COMPRESSOR & BIT COSTS)
CFM A
130CP-0069A20CK005 $2,068 0.31 0.04 0.00 10.200.87ROCK DRILL, 55 LB, AIR (ADD 140 CFM COMPRESSOR & BIT COSTS)
CFM A
45CP-0111-CHLAA20CK006 $1,137 0.17 0.02 0.00 10.110.47BREAKER-FOUR BOLT, 25 LB (ADD 50 CFM COMPRESSOR & BIT COSTS)
CFM A
63CP-1230-S1.25A20CK008 $1,188 0.18 0.02 0.00 10.110.50BREAKER-FOUR BOLT, 60 LB (ADD 65 CFM COMPRESSOR & BIT COSTS)
CFM A
81CP-1240-S1.25A20CK010 $1,238 0.19 0.02 0.00 10.120.52BREAKER-FOUR BOLT, 90 LB (ADD 90 CFM COMPRESSOR & BIT COSTS)
CFM A
EP 1110-1-8, Vol. 330 Nov 09
2-28
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
CLEMCO INDUSTRIES CORPORATION
100PACKAGE TWOA20CM010 $3,945 0.59 0.07 0.00 40.371.71SANDBLASTER, 2 CF CAP, W/0.50" D X 25'L HOSE (ADD 100 CFM COMPRESSOR & NOZZLE COST)
CFM A
170PACKAGE FOUR
A20CM011 $5,082 0.76 0.09 0.00 50.472.18SANDBLASTER, 4 CF CAP, W/1.00"D X 25'L HOSE (ADD 170 CFM COMPRESSOR & NOZZLE COST)
CFM A
200PACKAGE SIXA20CM012 $5,705 0.86 0.10 0.00 60.532.52SANDBLASTER, 6 CF CAP, W/1.25"D X 25'L HOSE (ADD 200 CFM COMPRESSOR & NOZZLE COST)
CFM A
450A20CM013 $17,361 2.50 0.29 0.00 301.547.39SANDBLASTER, 60 CF CAP, W/1.25"D X 50'L HOSE (ADD 450 CFM COMPRESSOR & NOZZLE COST)
CFM A
700A20CM014 $22,026 2.95 0.37 0.00 351.859.15SANDBLASTER, 120 CF CAP, W/1.25"D X 50'L HOSE (ADD 700 CFM COMPRESSOR & NOZZLE COST)
CFM A
900A20CM015 $24,893 3.50 0.42 0.00 452.1710.59SANDBLASTER, 160 CF CAP, W/1.25"D X 50'L HOSE (ADD 900 CFM COMPRESSOR & NOZZLE COST)
CFM A
A20CM016 $14,883 2.23 0.25 0.00 691.376.51SANDBLAST ABRASIVE STORAGE HOPPER, 700 CF, 8' DEEP,10' WIDE & 23' HIGH (ADD SAND BLASTER & ACCESSORIES)
WACKER CORPORATION
2EHB11/BL/110A20WC002 $1,120 0.17 0.02 0.12 10.110.78BREAKER/DRILL, 40 LB, ELECTRIC (ADD 2 KW GENERATOR & BIT COSTS)
HP E
4BH 23A20WC004 $3,254 0.49 0.06 0.70 10.312.15BREAKER/DRIVER, 65 LB, W/POWER UNIT (ADD BIT COSTS)
HP G
EP 1110-1-8, Vol. 330 Nov 09
2-29
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
NO SPECIFIC MANUFACTURER
100STANDARD 25-30 LBS
A20XX021 $1,238 0.19 0.02 0.00 10.120.52PAVEMENT BREAKER, 25-30 LB, HAND HELD (ADD 100 CFM COMPRESSOR & BIT COSTS)
CFM A
100SILENCED 35-45 LBS
A20XX022 $1,444 0.22 0.02 0.00 10.130.60PAVEMENT BREAKER, 35-45 LB, HAND HELD (ADD 100 CFM COMPRESSOR & BIT COSTS)
CFM A
100SILENCED 60-65 LBS
A20XX023 $1,738 0.26 0.03 0.00 10.160.73PAVEMENT BREAKER, 60-65 LB, HAND HELD (ADD 100 CFM COMPRESSOR & BIT COSTS)
CFM A
100SILENCED 80-90 LBS
A20XX024 $1,793 0.27 0.03 0.00 10.170.75PAVEMENT BREAKER, 80-90 LB, HAND HELD (ADD 100 CFM COMPRESSOR & BIT COSTS)
CFM A
10055DRYA20XX025 $2,533 0.38 0.04 0.00 10.231.05ROCK DRILL, DRY, 55 LB, HAND HELD (ADD 100 CFM COMPRESSOR & BIT COSTS)
CFM A
ASPHALT PAVING DISTRIBUTORSA250.00 ASPHALT PAVING DISTRIBUTORSSUBCATEGORY
ROSCO, A LeeBoy COMPANY
MAXIMIZER 11A25RS006 $60,711 9.11 1.03 0.00 705.5919.49ASPHALT DISTRIBUTOR, 1,900 GAL, 400 GPM, TRUCK MTD (ADD 32,000 GVW TRUCK)
MAXIMIZER 11A25RS008 $69,563 10.43 1.18 0.00 976.4022.79ASPHALT DISTRIBUTOR, 3,000 GAL, 400 GPM, TRUCK MTD (ADD 42,000 GVW TRUCK)
EP 1110-1-8, Vol. 330 Nov 09
2-30
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
NO SPECIFIC MANUFACTURER
1100GA25XX001 $51,251 7.69 0.87 0.00 644.7216.11ASPHALT DISTRIBUTOR, 1,100 GAL, 400 GPM, TRUCK MTD (ADD 32,000 GVW TRUCK)
2600GA25XX002 $59,655 8.95 1.01 0.00 895.4919.51ASPHALT DISTRIBUTOR, 2,600 GAL, 400 GPM, TRUCK MTD (ADD 32,000 GVW TRUCK)
3600GA25XX003 $65,242 9.79 1.11 0.00 1046.0121.79ASPHALT DISTRIBUTOR, 3,600 GAL, 400 GPM, TRUCK MTD (ADD 42,000 GVW TRUCK)
ASPHALT PAVERS & MISCELLANEOUS ROAD EQUIPMENTA300.10 SELF PROPELLEDSUBCATEGORY
BARBER-GREENE COMPANY
98BG230A30BG007 $306,439 31.53 5.12 10.13 31420.8987.26ASPHALT FINISHER, 8' WIDE SCREED, WHEEL, W/15' 6" SCREED EXTENSION, 190 CF HOPPER
HP D-off
112BG225CA30BG004 $345,240 36.68 5.77 11.58 33624.1197.79ASPHALT FINISHER, 8' WIDE SCREED, CRAWLER, W/15' 6" SCREED EXTENSION, 177 CF HOPPER
HP D-off
139BG240CA30BG009 $332,344 34.10 5.56 14.37 37722.6196.79ASPHALT PAVER, 10' WIDE SCREED, WHEEL, W/19' 6" SCREED EXTENSION, 215 CF HOPPER
HP D-off
158BG245CA30BG005 $400,419 42.54 6.70 16.33 37427.97116.39ASPHALT FINISHER, 10' WIDE SCREED, CRAWLER, W/19' 6" SCREED EXTENSION, 215 CF HOPPER
HP D-off
158BG260CA30BG003 $399,734 40.40 6.68 16.33 38226.88116.46ASPHALT FINISHER, 10' WIDE SCREED, WHEEL, W/19' 6" SCREED EXTENSION, 215 CF HOPPER
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-31
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
BLAW KNOX CONSTRUCTION EQUIPMENT CORP.
47PF-150A30BK010 $158,840 16.20 2.66 4.86 15410.7644.37ASPHALT PAVER/FINISHER, 8' WIDE SCREED, WHEEL, 107 CF HOOPER
HP D-off
107PF-161A30BK011 $279,800 28.70 4.68 11.06 21019.0380.34ASPHALT PAVER/FINISHER, 8' WIDE SCREED, WHEEL, 181 CF HOPPER
HP D-off
145PF-3172A30BK013 $295,070 30.38 4.93 14.99 29920.1288.22ASPHALT PAVER/FINISHER, 10' WIDE SCREED, WHEEL, 182 CF HOPPER
HP D-off
184PF-3200A30BK015 $339,255 34.83 5.67 19.02 34023.09103.57ASPHALT PAVER/FINISHER, 10' WIDE SCREED, WHEEL, 225 CF HOPPER
HP D-off
184PF-5500A30BK017 $358,114 38.05 5.99 19.02 34025.02107.62ASPHALT PAVER/FINISHER, 10' WIDE SCREED, CRAWLER, 218 CF HOPPER
HP D-off
184PF-5510A30BK018 $368,770 39.18 6.17 19.02 32025.76110.19ASPHALT PAVER/FINISHER, 10' WIDE SCREED, CRAWLER, 218 CF HOPPER
HP D-off
105RW 100 AA30BK019 $217,411 22.77 3.64 10.85 24515.0364.58ASPHALT PAVER, SHOULDER PAVING MACHINE, 1'-10' WIDE, BITUMINOUS & AGGREGATE, WHEEL, 72.5 CF HOPPER
HP D-off
173RW 195 DA30BK020 $279,993 29.42 4.68 17.88 33019.3987.61ASPHALT PAVER, SHOULDER PAVING MACHINE, 2'-10' WIDE, BITUMINOUS & AGGREGATE, WHEEL, 73 CF HOPPER
HP D-off
176TITAN 325 EPMA30BK021 $362,682 38.53 6.06 18.19 39925.33107.80ASPHALT PAVER, 32.8' WIDE, CRAWLER W/DUAL TAMPER SCREED, 270 CF HOPPER
HP D-off
145PF-2181A30BK022 $276,104 28.37 4.62 14.99 28318.8183.64ASPHALT PAVER, 8' WIDE SCREED, WHEEL, 2 WHEEL DRIVE, 182 CF HOPPER
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-32
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
A30 BLAW KNOX CONSTRUCTION EQUIPMENT CORP. (continued)
145PF-4410A30BK023 $311,494 33.10 5.21 14.99 26921.7691.90ASPHALT PAVER, 8' WIDE SCREED, CRAWLER, 155 CF HOPPER
HP D-off
CATERPILLAR INC. ( MACHINE DIVISION)
121AP-650BA30CA013 $290,926 30.91 4.86 12.51 40220.3284.18ASPHALT PAVER, 8' WIDE SCREED, CRAWLER, 177 CF HOPPER
HP D-off
107AP-800CA30CA002 $288,600 29.68 4.83 11.06 31919.6782.31ASPHALT PAVER, 8' WIDE+2' EXT. PAVEMASTER SCREED, WHEEL, 195 CF HOPPER
HP D-off
153AP-900BA30CA014 $303,801 31.07 5.08 15.81 37820.6291.47ASPHALT PAVER, 10' WIDE SCREED, WHEEL, 215 CF HOPPER
HP D-off
174AP-1000BA30CA008 $335,583 34.52 5.61 17.98 46822.87101.58ASPHALT PAVER, 10' - 12' WIDE PAVEMASTER SCREED, WHEEL, 215 CF HOPPER
HP D-off
174AP-1050BA30CA015 $488,036 51.85 8.16 17.98 41534.09137.91ASPHALT PAVER, 10' WIDE EXTEND-A-MAT SCREED, CRAWLER, 215 CF HOPPER
HP D-off
173AP-1055BA30CA016 $378,104 40.17 6.32 17.88 41326.41111.19ASPHALT PAVER, 10' WIDE SCREED, CRAWLER, 215 CF HOPPER
HP D-off
173AP-1050BA30CA009 $412,588 43.84 6.90 17.88 41828.82119.55ASPHALT PAVER, 10' - 24' WIDE PAVEMASTER SCREED, CRAWLER, 215 CF HOPPER
HP D-off
CHAMPION ROAD MACHINERY-PRO PAV (WIRTGEN
110780WBA30CH001 $268,718 27.52 4.49 11.37 26518.2577.99ASPHALT PAVER, 8' WIDE SCREED, WHEEL, 190 CF HOPPER
HP D-off
152880WBA30CH002 $292,871 30.15 4.90 15.71 31519.9888.50ASPHALT PAVER, 8' WIDE SCREED, WHEEL, 190 CF HOPPER
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-33
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
A30 CHAMPION ROAD MACHINERY-PRO PAV (WIRTGEN (continued)
152880RTBA30CH003 $295,107 31.36 4.93 15.71 28220.6188.73ASPHALT PAVER, 8' WIDE SCREED, CRAWLER-RUBBER TRACK, 190 CF HOPPER
HP D-off
1521010WBA30CH004 $308,637 31.74 5.16 15.71 30521.0392.29ASPHALT PAVER, 10' WIDE SCREED, WHEEL, 205 CF HOPPER
HP D-off
1731110WBA30CH005 $336,818 34.66 5.63 17.88 34322.96101.77ASPHALT PAVER, 10' WIDE SCREED, WHEEL, 225 CF HOPPER
HP D-off
2001110RTB SWIFTRACK
A30CH006 $392,598 41.71 6.56 20.67 40227.42117.77ASPHALT PAVER, 10' WIDE SCREED, CRAWLER-RUBBER TRACK, 225 CF HOPPER
HP D-off
GEHL COMPANY
251448A30GC002 $38,675 4.03 0.65 2.58 672.6712.24ASPHALT PAVER, 8' WIDE SCREED, WHEEL, 80 CF HOPPER
HP D-off
411648A30GC004 $55,659 5.91 0.93 4.24 853.8918.13ASPHALT PAVER, 9' WIDE SCREED, CRAWLER, 120 CF HOPPER
HP D-off
0.20 TOWEDSUBCATEGORY
MIDLAND MACHINERY CO
80SP-8A30MP001 $134,383 10.75 2.26 7.54 1857.6431.56ASPHALT PAVER, SHOULDER PAVING MACHINE, 1'-8' WIDE, BITUMINOUS & AGGREGATE, WHEEL, 80 CF HOPPER
HP D-off
100SP-10A30MP002 $174,513 13.96 2.94 9.42 2759.9240.58ASPHALT PAVER, SHOULDER PAVING MACHINE, 1'-10' WIDE, BITUMINOUS & AGGREGATE, WHEEL, 80 CF HOPPER
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-34
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
0.30 SLURRY SEAL PAVERS (Cold mix)SUBCATEGORY
NO SPECIFIC MANUFACTURER
110MINIMACA30XX001 $147,249 9.67 2.44 9.70 1307.2829.70ASPHALT PAVER, SLURRY SEAL PAVER 8' WIDE, SELF PROPELLED, WHEEL, 80 CF HOPPER
HP D-off
110MACROPAVER 12B
A30XX002 $180,081 12.01 2.99 9.70 1759.0033.39ASPHALT PAVER, SLURRY SEAL PAVER 8' WIDE, TRUCK MTD, 12 CF HOPPER (ADD 40,000 GVW TRUCK)
HP D-off
0.40 MISCELLANEOUS ROAD EQUIPMENTSUBCATEGORY
BLAW KNOX CONSTRUCTION EQUIPMENT CORP.
184MC-330A30BK024 $352,243 27.55 5.93 17.34 43019.7180.54ASPHALT PAVER, MOBILE CONVEYOR, 60" WIDE BELT, WHEEL (ADD ASPHALT PAVER UNIT)
HP D-off
CATERPILLAR INC. ( MACHINE DIVISION)
107BG-650A30CA007 $122,418 9.50 2.06 10.08 1716.8132.51ASPHALT PAVER, ASPHALT WINDROW ELEVATOR, WHEEL (ADD ASPHALT PAVER UNIT)
HP D-off
LEE-BOY
1103000A30LD001 $143,078 10.94 2.41 10.37 1987.8836.69ASPHALT PAVER, ASPHALT FORCE FEED LOADER, 30" WIDE BELT, WINDROW OR LOOSE, WHEEL (ADD ASPHALT PAVER UNIT)
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-35
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
ROADTEC ( ASTEC INDUSTRIES COMPANY)
275SB-1500A30RT001 $508,291 40.63 8.56 25.92 60028.88116.55ASPHALT PAVER, ASPHALT MATERIAL TRANSFER VEHICLE, 15 TON HOPPER, 600 TPH, 65" WIDE CONVEYOR, WHEEL
HP D-off
275SB-2500BA30RT002 $533,372 42.60 8.99 25.92 79030.29120.94ASPHALT PAVER, ASPHALT MATERIAL TRANSFER VEHICLE, 25 TON HOPPER, 1000 TPH, 69" WIDE CONVEYOR, WHEEL
HP D-off
ASPHALT PAVING KETTLESA350.00 ASPHALT PAVING KETTLESSUBCATEGORY
AEROIL PRODUCTS COMPANY, INC.
5KEB-80KEA35AE001 $10,301 1.30 0.18 0.87 90.835.73ASPHALT/PAVEMENT KETTLE, 80 GAL, TRAILER W/PUMP & HOSE
HP G
5KEB-115KEA35AE002 $10,667 1.35 0.19 0.87 110.876.54ASPHALT/PAVEMENT KETTLE, 115 GAL, TRAILER W/PUMP & HOSE
HP G
5KEB-170KEA35AE003 $11,426 1.48 0.20 0.87 150.947.12ASPHALT/PAVEMENT KETTLE, 170 GAL, TRAILER W/PUMP & HOSE
HP G
5KEB-260KEA35AE004 $12,503 1.62 0.22 0.87 191.038.32ASPHALT/PAVEMENT KETTLE, 260 GAL, TRAILER W/PUMP & HOSE
HP G
5KEB-360KEA35AE005 $13,746 1.74 0.25 0.87 201.1210.83ASPHALT/PAVEMENT KETTLE, 360 GAL, TRAILER W/PUMP & HOSE
HP G
EP 1110-1-8, Vol. 330 Nov 09
2-36
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
ASPHALT & CONCRETE MILLERS / PROFILERS / PLANERS / ROTARY GRINDERSA400.00 ASPHALT & CONCRETE MILLERS / PROFILERS / PLANERS / ROTARY GRINDERSSUBCATEGORY
CATERPILLAR INC. ( MACHINE DIVISION)
500PM-465A40CA008 $488,077 65.08 8.73 68.40 50541.27226.64ASPHALT COLD PLANER, 75" W X 10" D, CRAWLER (ADD CUTTING TEETH COSTS)
HP D-off
625PM-565BA40CA009 $686,697 91.56 12.29 85.50 73558.07307.05ASPHALT COLD PLANER, 83" W X 12" D, CRAWLER (ADD CUTTING TEETH COSTS)
HP D-off
TEREX - CMI (TEREX ROADBUILDING)
950PR-950A40CW001 $808,961 107.86 14.48 129.96 1,20568.41393.94ASPHALT PROFILER, MAX 12.5' W X 15" D, CRAWLER (ADD CUTTING TEETH COSTS)
HP D-off
ROADTEC ( ASTEC INDUSTRIES COMPANY)
230RX-20BA40RT001 $332,245 42.82 5.95 31.46 32427.36136.79ASPHALT COLD PLANER, 40" W X 10" D, WHEEL (ADD CUTTING TEETH COSTS)
HP D-off
250RX-25A40RT002 $434,239 57.90 7.77 34.20 42036.72172.26ASPHALT COLD PLANER, 52" W X 8" D, CRAWLER (ADD CUTTING TEETH COSTS)
HP D-off
460RX-45BA40RT003 $535,171 71.36 9.58 62.93 61745.26235.21ASPHALT COLD PLANER, 78" W X 12" D, CRAWLER (ADD CUTTING TEETH COSTS)
HP D-off
800RX-68BA40RT005 $733,999 97.87 13.13 109.44 83062.07348.08ASPHALT COLD PLANER, 98" W X 12" D, CRAWLER (ADD CUTTING TEETH COSTS)
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-37
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
A40 ROADTEC ( ASTEC INDUSTRIES COMPANY) (continued)
800RX-70BA40RT006 $812,929 108.39 14.55 109.44 92068.75372.54ASPHALT COLD PLANER, 150" W X 8" D, CRAWLER (ADD CUTTING TEETH COSTS)
HP D-off
ASPHALT RECYCLERS & SEALERSA450.00 ASPHALT RECYCLERS & SEALERSSUBCATEGORY
AEROIL PRODUCTS COMPANY, INC.
HEPR-52VA45AE001 $9,170 1.42 0.17 0.00 110.8810.27ASPHALT RESURFACER-PATCHER, 4' WIDE, 17.3 SF, 600,000 BTU INFRA-RED HEATER, TRAILER MTD
HEPR-96VA45AE002 $17,873 2.81 0.33 0.00 161.7420.46ASPHALT RESURFACER-PATCHER, 8' WIDE, 32.0 SF, 1,200,000 BTU INFRA-RED HEATER, TRAILER MTD
HEPR-120VA45AE003 $21,051 3.32 0.39 0.00 172.0524.18ASPHALT RESURFACER-PATCHER, 10' WIDE, 40.0 SF, 1,420,000 BTU INFRA-RED HEATER, TRAILER MTD
ROSCO, A LeeBoy COMPANY
80RA-2000A45RS001 $47,889 7.58 0.88 7.54 604.6725.48ASPHALT SPRAY PATCHER, 300 GAL, ARTICULATED BOOM - 17' R, TRAILER MTD
HP D-off
210RA-300A45RS002 $153,686 24.59 2.83 22.72 17915.1379.30ASPHALT SPRAY PATCHER, 400 GAL, TELESCOPIC BOOM - 22' EXT, TRUCK MTD
HP D-on
EP 1110-1-8, Vol. 330 Nov 09
2-38
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
SEALMASTER, INC.
30SP300 DUALA45SE003 $37,707 5.95 0.69 2.83 433.6718.27ASPHALT SEALCOATER, 320 GAL, 75 GPM, 108" WIDE DUAL SPRAY, SQUEEGEE, SELF PROPELLED
HP D-off
13TR-1000A45SE004 $24,019 3.67 0.44 2.26 522.2811.26ASPHALT SEALCOATER, 1000 GAL, 50 GPM, 88'' WIDE SPRAY BAR, TRAILER MTD
HP G
BATCH PLANTS, ASPHALT & CONCRETEB100.20 CONCRETESUBCATEGORY
CEMEN TECH
18MCD2-50HTB10CC007 $47,441 4.64 0.82 3.13 803.1417.66BATCH PLANT, CONCRETE DISPENSER, 15 CY/HR MAX, W/TWO AGGREGATE BINS, 2 CY/ 1 CY CEMENT BIN/ 7' LONG SLOPING 8" DIA SCREW WET MIXER/DELIVERER/ 250 GAL WATER TANK/ & METERING PUMP, 2 CY LOAD, TRAILER MTD
HP G
163MCD5-100HB10CC008 $129,865 12.66 2.24 28.37 1328.5765.94BATCH PLANT, CONCRETE DISPENSER, 30 CY/HR MAX, W/TWO AGGREGATE BINS, 5.5 CY/ 1.9 CY CEMENT BIN/ 9' LONG SLOPING 9" DIA SCREW WET MIXER/DELIVERER/ 250 GAL WATER TANK/ & METERING PUMP, 5 CY LOAD, TRUCK MTD
HP G
EP 1110-1-8, Vol. 330 Nov 09
2-39
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
B10 CEMEN TECH (continued)200MCD8-100HB10CC009 $146,148 14.06 2.52 34.81 1949.5577.33BATCH PLANT, CONCRETE DISPENSER,
30 CY/HR MAX, W/TWO AGGREGATE BINS, 9.3 CY/ 3.1 CY CEMENT BIN/ 9' LONG SLOPING 12" DIA SCREW WET MIXER/DELIVERER/ 250 GAL WATER TANK/ & METERING PUMP, 8 CY LOAD, TRUCK MTD
HP G
200MCD8-150HB10CC010 $157,522 15.20 2.72 34.81 20410.3280.27BATCH PLANT, CONCRETE DISPENSER, 60 CY/HR MAX, W/TWO AGGREGATE BINS, 9.6 CY/ 3.1 CY CEMENT BIN/ 9' LONG SLOPING 12" DIA SCREW WET MIXER/DELIVERER/ 250 GAL WATER TANK/ & METERING PUMP, 8 CY LOAD, TRUCK MTD
HP G
18210 BBLB10CC012 $21,637 2.16 0.37 3.13 351.459.35BATCH PLANT, SILO, CEMENT, 830 CF, 210 BARREL (BATCH PLANT ATTACHMENT)
HP G
20HS-240B10CC011 $21,966 2.20 0.38 1.16 451.487.83BATCH PLANT, SILO, CEMENT, 38 TON HORIZONTAL 240 BARREL (BATCH PLANT ATTACHMENT)
HP E
18300 BBLB10CC013 $26,134 2.61 0.45 3.13 481.7610.47BATCH PLANT, SILO, CEMENT, 1,200 CF, 300 BARRL (BATCH PLANT ATTACHMENT)
HP G
5B10CC014 $6,779 0.68 0.12 0.29 100.462.52BATCH PLANT, CEMENT LOADING AUGER, 6" DIA, 19' LONG (BATCH PLANT ATTACHMENT)
HP E
CON-E-CO
200MTM 12B10CL025 $279,620 27.79 4.83 11.57 13018.7382.30BATCH PLANT, CONCRETE MIXER, 12 CY, TILT DRUM, 11.67' DIA, REMOVABLE AXLES, TRAILER MTD (ADD DRY BATCH PLANT)
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-40
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
B10 CON-E-CO (continued)35VERSA-PLANT
10B10CL021 $86,137 8.31 1.49 2.02 1905.6523.07BATCH PLANT, CONCRETE AGGREGATE
DRY, 40CY/HR, 10 CY AGGREGATE BATCHER, W/30" X 40' LOADING CONVEYOR, SCALES & WATER METER INCLUDED, TRAILER MTD (ADD 5 KW GENERATOR, WATER TANK & WET BATCHER)
HP E
30PLP MODEL 12B10CL015 $160,936 15.57 2.78 1.74 38010.5742.74BATCH PLANT, CONCRETE AGGREGATE DRY, 200 CY/HR, W/TWO AGGREGATE BINS, 81 TON, 60 CY/ 36"X20' CONVEYOR/ 3 BIN 12 CY AGGREGATE BATCHER/ 30"X33.5' LOADING CONVEYOR/ & 475 BARREL, 88 TON CEMENT SILO, TRAILER MTD (ADD 110 KW GENERATOR)
HP E
120LO-PRO 10B10CL005 $302,338 29.67 5.22 6.94 41020.0682.98BATCH PLANT, CONCRETE AGGREGATE DRY, 275 CY/HR, W/TWO AGGREGATE BINS, 65 TON, 50 CY/ 36"X20' CONVEYOR/ 10 CY AGGREGATE BATCHER/ 36"X36' LOADING CONVEYOR/ & 215 BARREL, 35 TON CEMENT SILO, TRAILER MTD (ADD 140 KW GENERATOR)
HP E
120LO-PRO 12B10CL006 $307,338 30.17 5.30 6.94 42620.3984.15BATCH PLANT, CONCRETE AGGREGATE DRY, 275 CY/HR, W/TWO AGGREGATE BINS, 65 TON, 50 CY/ 36"X20' CONVEYOR/ 12 CY AGGREGATE BATCHER/ 36"X36' LOADING CONVEYOR/ & 215 BARREL, 35 TON CEMENT SILO, TRAILER MTD (ADD 140 KW GENERATOR)
HP E
B10CL027 $21,315 2.13 0.37 0.00 1441.445.04BATCH PLANT, CEMENT SILO, 1,910 CF, 475 BARREL (BATCH PLANT ATTACHMENT)
EP 1110-1-8, Vol. 330 Nov 09
2-41
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
B10 CON-E-CO (continued)5B10CL042 $3,250 0.33 0.06 0.29 50.231.19BATCH PLANT, SCREW CONVEYOR, 6"
DIA, 10' LONG (CEMENT SILO ATTACHMENT)
HP E
10B10CL045 $4,161 0.42 0.07 0.58 110.281.81BATCH PLANT, SCREW CONVEYOR, 6" DIA, 20' LONG (CEMENT SILO ATTACHMENT)
HP E
8B10CL036 $3,556 0.36 0.06 0.46 90.241.49BATCH PLANT, SCREW CONVEYOR, 9" DIA, 10' LONG (CEMENT SILO ATTACHMENT)
HP E
20B10CL040 $4,920 0.49 0.08 1.16 160.332.80BATCH PLANT, SCREW CONVEYOR, 9" DIA, 20' LONG (CEMENT SILO ATTACHMENT)
HP E
10B10CL032 $4,255 0.43 0.07 0.58 100.291.83BATCH PLANT, SCREW CONVEYOR, 12" DIA, 10' LONG (CEMENT SILO ATTACHMENT)
HP E
20B10CL034 $8,511 0.85 0.15 1.16 200.583.65BATCH PLANT, SCREW CONVEYOR, 12" DIA, 20' LONG (CEMENT SILO ATTACHMENT)
HP E
EXCEL MACHINERY LTD.
25EXCEL PORT-A-PUG
B10EM001 $436,296 42.71 7.53 4.35 59028.89110.04BATCH PLANT, CONCRETE CONTINUOUS PUGG MILL MIXER, 400 CY/HR MAX, W/12 CY AGGREGATE STORAGE BIN/ 48"X18' METERING CONVEYOR/ CEMENT SILO, 44 TON, 34.8 CY/ 30" X 37' CONVEYOR, TRAILER MTD (ADD 200 KW GENERATOR)
HP G
10B10EM002 $30,229 2.75 0.52 0.58 451.908.83BATCH PLANT, CEMENT SILO, 45 TON HORIZONTAL 350 BARREL (BATCH PLANT ATTACHMENT)
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-42
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
B10 EXCEL MACHINERY LTD. (continued)B10EM003 $27,688 2.77 0.48 0.00 2221.876.54BATCH PLANT, CEMENT SILO, 2,200 CF
(BARREL CAP 550 MAX / 450 MIN) W/DRIVE-THRU TYPE UNDERSTRUCTURE (BATCH PLANT ATTACHMENT)
JOHNSON-ROSS (TEREX ROADBUILDING)
15BANDIT 5B10RC007 $148,046 14.45 2.55 0.87 3,0009.7838.54BATCH PLANT, CONCRETE AGGREGATE DRY, 100 CY/HR, W/TWO AGGREGATE BINS, 65 TON, 48 CY/ 36" X 20' CONVEYOR/ 2 BIN 5 CY BATCHER/ 30" X 33.5' LOADING CONVEYOR/ & 257 BARREL, 48 TON CEMENT SILO, TRAILER MTD (ADD 100 KW GENERATOR)
HP E
50RUSTLER IIIB10RC032 $211,843 20.59 3.66 2.89 53613.9658.35BATCH PLANT, CONCRETE AGGREGATE DRY, 160 CY/HR, W/TWO AGGREGATE BINS, 28 TON, 21 CY/ 2 BIN 12 CY BATCHER/ 30" X 33.5' LOADING CONVEYOR/ & 400 BARREL, 75 TON CEMENT SILO, TRAILER MTD (ADD 130 KW GENERATOR)
HP E
46RUSTLER IIB10RC006 $195,141 18.92 3.37 2.63 48912.8354.03BATCH PLANT, CONCRETE AGGREGATE DRY, 160 CY/HR, W/3 AGGREGATE BINS, 71 TON, 52 CY/ 36" X 20' CONVEYOR/ 3 BIN 12 CY BATCHER/ 30" X 33.5' LOADING CONVEYOR/ 375 BARREL, 70 TON CEMENT SILO, TRAILER MTD (ADD 130KW GENERATOR)
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-43
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
B10 JOHNSON-ROSS (TEREX ROADBUILDING) (continued)
30BANDIT 12 BTRB10RC008 $163,975 16.04 2.83 1.74 25010.8543.53BATCH PLANT, CONCRETE AGGREGATE DRY, 200 CY/HR, W/THREE AGGREGATE BINS, 65 TON, 48 CY/ 36" X 20' CONVEYOR/ 3 BIN 12 CY BATCHER/ 30" X 33.5' LOADING CONVEYOR/ & 720 BARREL, 134 TON CEMENT SILO, TRAILER MTD (ADD 100 KW GENERATOR)
HP E
40B10RC027 $149,088 14.91 2.57 2.31 3410.0340.48BATCH PLANT, CONCRETE MIXER, 4.5 CY, TILT DRUM, SKID MTD (ADD DRY BATCH PLANT)
HP E
60B10RC028 $167,463 16.75 2.89 3.47 4511.2746.71BATCH PLANT, CONCRETE MIXER, 6.0 CY, TILT DRUM, SKID MTD (ADD DRY BATCH PLANT)
HP E
80B10RC029 $189,256 18.93 3.27 4.63 6012.7453.75BATCH PLANT, CONCRETE MIXER, 8.0 CY, TILT DRUM, SKID MTD (ADD DRY BATCH PLANT)
HP E
100B10RC030 $206,191 20.62 3.56 5.79 7513.8760.64BATCH PLANT, CONCRETE MIXER, 10.0 CY, TILT DRUM, SKID MTD (ADD DRY BATCH PLANT)
HP E
120B10RC031 $217,676 21.77 3.76 6.94 9014.6565.22BATCH PLANT, CONCRETE MIXER, 12.0 CY, TILT DRUM, SKID MTD (ADD DRY BATCH PLANT)
HP E
75MOBILE MIXERB10RC016 $240,242 23.43 4.15 4.34 42015.8768.10BATCH PLANT, CONCRETE MIXER, 4.5CY, TILT DRUM TYPE, REVOLVING LIFT STAND, TRAILER MTD (ADD DRY BATCH PLANT & POWER)
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-44
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
STEPHENS MANUFACTURING CO., INC.
25DC-12B10SN031 $76,419 6.99 1.32 1.45 3404.8221.14BATCH PLANT, CONCRETE AGGREGATE DRY, 100 CY/HR, W/2 BIN 12 CY BATCHER/ 24" X 41' LOADING CONVEYOR/ & 311 BARREL, 58 TON CEMENT SILO, TRAILER MTD (ADD 100 KW GENERATOR)
HP E
30DC COLTB10SN033 $143,544 13.71 2.48 1.74 3409.3437.56BATCH PLANT, CONCRETE AGGREGATE DRY, 100 CY/HR, W/2 BIN 12 CY BATCHER/ 30" X 33.5' LOADING CONVEYOR/ & 311 BARREL, 58 TON CEMENT SILO, TRAILER MTD (ADD 100 KW GENERATOR)
HP E
30MUSTANG 5B10SN032 $116,860 11.03 2.02 1.74 4207.5431.50BATCH PLANT, CONCRETE AGGREGATE DRY, 160 CY/HR, W/3 AGGREGATE STORAGE BINS, 29.6 TON, 40 CY/ 3 BIN 5 CY BATCHER/ 30" X 33.5' LOADING CONVEYOR/ & 251 BARREL, 47 TON CEMENT SILO, TRAILER MTD (ADD 115 KW GENERATOR)
HP E
20STALLIONB10SN034 $155,754 14.92 2.69 1.16 36010.1539.63BATCH PLANT, CONCRETE AGGREGATE DRY, 160 CY/HR, W/3 AGGREGATE BIN STORAGE, 70 TON, 48 CY/ 2 BIN 10 CY BATCHER/ 30" X 33.5' LOADING CONVEYOR/ & 374 BARREL, 70 TON CEMENT SILO, TRAILER MTD (ADD 100 KW GENERATOR)
HP E
45MUSTANG 10B10SN036 $152,676 14.61 2.63 2.60 5009.9441.17BATCH PLANT, CONCRETE AGGREGATE DRY, 160 CY/HR, W/3 AGGREGATE BIN STORAGE, 75 TON, 55 CY/ 2 BIN 10 CY BATCHER/ 30" X 33.5' LOADING CONVEYOR/ & 351 BARREL, 65 TON CEMENT SILO, TRAILER MTD (ADD 115 KW GENERATOR)
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-45
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
B10 STEPHENS MANUFACTURING CO., INC. (continued)
30THOROUGH-BRED
B10SN035 $163,624 15.70 2.82 1.74 30010.6742.44BATCH PLANT, CONCRETE AGGREGATE DRY, 180 CY/HR, W/4 AGGREGATE BIN STORAGE, 65 TON, 48 CY/ 2 BIN 12 CY BATCHER/ 30" X 33.5' LOADING CONVEYOR/ & 374 BARREL, 70 TON CEMENT SILO, TRAILER MTD (ADD 100 KW GENERATOR)
HP E
0.30 PUGMILLSUBCATEGORY
KOLBERG - PIONEER, INC
9552 PORTABLE PUGMILL
B10KB001 $173,776 13.64 2.93 5.50 1909.7541.13BATCH PLANT, PUGMILL, CONTINUOUS MIXER, 48" DIA TWIN SHAFT X 6' LONG, W/9 CY FEEDER HOPPER/ 36" X 11.5' BELT FEEDER/ 30" X 27' CONVEYOR/ WATER OR ASPHALT PUMP & METER (ADD 95 KW GENERATOR & ANY MATERIAL FEEDS)
HP E
22052S PORTABLE PUGMILL
B10KB002 $309,593 24.47 5.22 12.73 23017.4677.39BATCH PLANT, PUGMILL, CONTINUOUS MIXER, 48" DIA TWIN SHAFT X 8' LONG, W/13 CY FEEDER HOPPER/ TWO - 36" X 11.5' BELT FEEDERS/ 2ND 11 CY FEEDER HOPPER/ 30" X 27' CONVEYOR/ WATER OR ASPHALT PUMP & METER (ADD 220 KW GENERATOR & ANY MATERIAL FEEDS)
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-46
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
BROOMS, STREET SWEEPERS & FLUSHERSB150.00 BROOMS, STREET SWEEPERS & FLUSHERSSUBCATEGORY
BROCE MANUFACTURING COMPANY
80RJ-350B15BM001 $45,369 5.10 0.74 7.54 453.2918.45BROOM, 8' BROOM PATH, PAVEMENT, SELF PROPELLED
HP D-off
ELGIN SWEEPER COMPANY
100PELICAN PB15EC002 $125,402 13.94 2.03 9.42 1289.0038.47STREET SWEEPER, 10' BROOM PATH, 3.5 CY HOPPER, 180 GAL WATER TANK, SELF PROPELLED
HP D-off
49EAGLE FB15EC001 $189,625 21.05 3.07 8.18 15013.6051.58170 HP D-onSTREET SWEEPER, 10' BROOM PATH, 4.5 CY HOPPER, 280 GAL WATER TANK, DUAL ENGINE, SELF PROPELLED
HP D-off
230BROOM BEAR FL42H
B15EC003 $177,878 19.97 2.88 21.68 21312.8763.68STREET SWEEPER, 12' BROOM PATH, 4.5 CY HOPPER, 350 GAL WATER TANK, SELF PROPELLED
HP D-off
M-B COMPANIES, INC.
MT-ARB15MB001 $8,038 0.90 0.13 0.00 100.581.89STREET SWEEPER, 7' BROOM PATH, W/SPRINKLER AND 152 GAL WATER TANK, PTO DRIVE (ADD 45-100 HP TRACTOR)
HTB15MB002 $9,710 1.09 0.16 0.00 120.712.31STREET SWEEPER, 7' BROOM PATH, W/SPRINKLER AND 152 GAL WATER TANK, PTO DRIVE (ADD 45-100 HP TRACTOR)
EP 1110-1-8, Vol. 330 Nov 09
2-47
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
B15 M-B COMPANIES, INC. (continued)53TB15MB003 $14,127 1.54 0.23 0.00 181.003.40STREET SWEEPER, 7' BROOM PATH,
W/SPRINKLER AND 152 GAL WATER TANK, TOWED, HYDRAULIC (ADD TOWING UNIT)
1853MHB15MB004 $16,299 1.78 0.26 3.13 171.157.03STREET SWEEPER, 7' BROOM PATH, W/SPRINKLER AND 152 GAL WATER TANK, TOWED (ADD TOWING UNIT)
HP G
ROSCO, A LeeBoy COMPANY
80CHALLENGER IIB15RS005 $52,046 5.77 0.84 7.54 753.7319.98STREET SWEEPER, 7' BROOM PATH, W/SPRINKLER AND 125 GAL WATER TANK, SELF PROPELLED
HP D-off
80RB-48B15RS001 $40,032 4.45 0.65 7.54 522.8817.28STREET SWEEPER, 8' BROOM PATH, W/SPRINKLER AND 150 GAL WATER TANK, SELF PROPELLED
HP D-off
TERRAMITE CONSTRUCTION EQUIPMENT
37TSS46B15TB001 $22,822 2.51 0.37 3.49 341.638.99STREET SWEEPER, 6' BROOM PATH, W/SPRINKLER AND 2 - 50 GAL WATER TANKS, SELF PROPELLED
HP D-off
37TSS48B15TB002 $22,966 2.53 0.37 3.49 341.649.02STREET SWEEPER, 8' BROOM PATH, W/SPRINKLER AND 2 - 50 GAL WATER TANKS, SELF PROPELLED
HP D-off
WALDON, INC.
80SWEEPMASTER 250
B15WD001 $35,891 3.98 0.58 7.54 482.5716.35BROOM, 7.5' BROOM PATH, PAVEMENT, SELF PROPELLED
HP D-off
80SWEEPMASTER 250
B15WD002 $37,206 4.13 0.60 7.54 482.6716.64BROOM, 90" BROOM PATH, PAVEMENT, W/SPRINKLER AND 180 GAL WATER TANK, SELF PROPELLED
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-48
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
BRUSH CHIPPERSB200.00 BRUSH CHIPPERSSUBCATEGORY
BANDIT INDUSTRIES, INC.
2565B20BN001 $11,287 1.25 0.18 4.35 200.817.51BRUSH CHIPPER, 6" CAPACITY, DISC TYPE, TRAILER MTD
HP G
7190W-XPB20BN002 $17,966 1.99 0.29 12.36 321.2918.04BRUSH CHIPPER, 9" CAPACITY, DISC TYPE, TRAILER MTD
HP G
140200XPB20BN003 $22,718 2.52 0.37 24.37 581.6332.57BRUSH CHIPPER, 12" CAPACITY, DISC TYPE, TRAILER MTD
HP G
701290B20BN005 $19,569 2.16 0.32 12.18 441.4018.21BRUSH CHIPPER, 12" CAPACITY, DRUM TYPE, TRAILER MTD
HP G
1191690B20BN006 $21,699 2.40 0.35 20.71 441.5528.24BRUSH CHIPPER, 16" CAPACITY, DRUM TYPE, TRAILER MTD
HP G
1251890B20BN007 $39,586 4.33 0.64 11.78 782.8122.30BRUSH CHIPPER, 18" CAPACITY, DRUM TYPE, TRAILER MTD
HP D-off
MORBARK, INC.
862070XLB20MQ001 $22,146 2.48 0.36 8.10 401.6014.14BRUSH CHIPPER, 10" CAPACITY, DRUM TYPE, TRAILER MTD
HP D-off
14013B20MQ003 $30,831 3.43 0.50 13.19 682.2221.80BRUSH CHIPPER, 13" CAPACITY, DRUM TYPE, TRAILER MTD
HP D-off
2502400XLB20MQ004 $36,050 3.92 0.58 23.56 942.5434.46BRUSH CHIPPER, 18" CAPACITY, DRUM TYPE, TRAILER MTD
HP D-off
65022 RXLB20MQ005 $388,661 43.38 6.30 61.26 70027.99160.49BRUSH CHIPPER, LOG CHIPPER, 22" CAPACITY, DISC TYPE, TRAILER MTD
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-49
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
BUCKETS, CLAMSHELLB250.00 BUCKETS, CLAMSHELLSUBCATEGORY
HAWCO MANUFACTURING COMPANY, LLC
HD-050B25HB001 $19,072 2.15 0.31 0.00 301.393.97BUCKET, CLAMSHELL, 0.5 CY, HEAVY DUTY/DIGGING
HD-100B25HB003 $30,639 3.45 0.50 0.00 482.236.38BUCKET, CLAMSHELL, 1.0 CY, HEAVY DUTY/DIGGING
HD-150B25HB005 $39,792 4.48 0.65 0.00 662.898.29BUCKET, CLAMSHELL, 1.5 CY, HEAVY DUTY/DIGGING
HD-200B25HB007 $46,974 5.28 0.76 0.00 783.409.77BUCKET, CLAMSHELL, 2.0 CY, HEAVY DUTY/DIGGING
HD-250B25HB008 $54,754 6.16 0.89 0.00 913.9711.40BUCKET, CLAMSHELL, 2.5 CY, HEAVY DUTY/DIGGING
HD-300B25HB009 $60,316 6.79 0.98 0.00 1034.3812.56BUCKET, CLAMSHELL, 3.0 CY, HEAVY DUTY/DIGGING
HD-350B25HB010 $63,478 7.14 1.03 0.00 1314.6013.21BUCKET, CLAMSHELL, 3.5 CY, HEAVY DUTY/DIGGING
HD-400B25HB011 $65,178 7.33 1.06 0.00 1454.7313.56BUCKET, CLAMSHELL, 4.0 CY, HEAVY DUTY/DIGGING
HD-450B25HB012 $68,925 7.75 1.12 0.00 1655.0014.34BUCKET, CLAMSHELL, 4.5 CY, HEAVY DUTY/DIGGING
HD-500B25HB013 $71,179 8.01 1.15 0.00 1735.1614.81BUCKET, CLAMSHELL, 5.0 CY, HEAVY DUTY/DIGGING
HD-550B25HB014 $74,365 8.37 1.21 0.00 1785.4015.48BUCKET, CLAMSHELL, 5.5 CY, HEAVY DUTY/DIGGING
HD-600B25HB015 $77,023 8.67 1.25 0.00 1995.5916.03BUCKET, CLAMSHELL, 6.0 CY, HEAVY DUTY/DIGGING
EP 1110-1-8, Vol. 330 Nov 09
2-50
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
NO SPECIFIC MANUFACTURER
1/4SSNB25XX001 $8,618 0.97 0.14 0.00 140.631.79BUCKET, CLAMSHELL, 0.2 CY, SQUARE NOSE, STANDARD
1/2SSNB25XX002 $12,758 1.44 0.21 0.00 270.932.66BUCKET, CLAMSHELL, 0.5 CY, SQUARE NOSE, STANDARD
3/4SSNB25XX003 $15,729 1.77 0.25 0.00 351.143.27BUCKET, CLAMSHELL, 0.7 CY, SQUARE NOSE, STANDARD
1SSNB25XX004 $17,218 1.94 0.28 0.00 431.253.59BUCKET, CLAMSHELL, 1.0 CY, SQUARE NOSE, STANDARD
1-1/4SSNB25XX005 $20,061 2.26 0.33 0.00 491.464.18BUCKET, CLAMSHELL, 1.2 CY, SQUARE NOSE, STANDARD
1-1/2SSNB25XX006 $22,564 2.54 0.37 0.00 641.644.70BUCKET, CLAMSHELL, 1.5 CY, SQUARE NOSE, STANDARD
1-3/4SSNB25XX007 $24,098 2.71 0.39 0.00 671.755.01BUCKET, CLAMSHELL, 1.7 CY, SQUARE NOSE, STANDARD
2SSNB25XX008 $28,164 3.17 0.46 0.00 762.055.87BUCKET, CLAMSHELL, 2.0 CY, SQUARE NOSE, STANDARD
2-1/2SSNB25XX009 $29,560 3.33 0.48 0.00 922.156.16BUCKET, CLAMSHELL, 2.5 CY, SQUARE NOSE, STANDARD
3SSNB25XX010 $31,481 3.54 0.51 0.00 982.286.55BUCKET, CLAMSHELL, 3.0 CY, SQUARE NOSE, STANDARD
3-1/2SSNB25XX011 $32,985 3.71 0.53 0.00 1082.396.86BUCKET, CLAMSHELL, 3.5 CY, SQUARE NOSE, STANDARD
4SSNB25XX012 $36,847 4.15 0.60 0.00 1192.687.67BUCKET, CLAMSHELL, 4.0 CY, SQUARE NOSE, STANDARD
4-1/2SSNB25XX013 $49,617 5.58 0.80 0.00 1453.5910.32BUCKET, CLAMSHELL, 4.5 CY, SQUARE NOSE, STANDARD
5SSNB25XX014 $52,953 5.96 0.86 0.00 1543.8411.02BUCKET, CLAMSHELL, 5.0 CY, SQUARE NOSE, STANDARD
EP 1110-1-8, Vol. 330 Nov 09
2-51
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
B25 NO SPECIFIC MANUFACTURER (continued)5-1/2SSNB25XX015 $64,032 7.20 1.04 0.00 1584.6413.32BUCKET, CLAMSHELL, 5.5 CY, SQUARE
NOSE, STANDARD 6SSNB25XX016 $64,554 7.26 1.05 0.00 1664.6813.43BUCKET, CLAMSHELL, 6.0 CY, SQUARE
NOSE, STANDARD 6-1/2SSNB25XX017 $69,712 7.84 1.13 0.00 1775.0514.50BUCKET, CLAMSHELL, 6.5 CY, SQUARE
NOSE, STANDARD 7SSNB25XX018 $66,120 7.44 1.07 0.00 1854.7913.76BUCKET, CLAMSHELL, 7.0 CY, SQUARE
NOSE, STANDARD 7-1/2SSNB25XX019 $74,013 8.33 1.20 0.00 1925.3715.40BUCKET, CLAMSHELL, 7.5 CY, SQUARE
NOSE, STANDARD
BUCKETS, CONCRETEB300.10 GENERAL PURPOSE, MANUAL TRIPSUBCATEGORY
GAR-BRO MANUFACTURING COMPANY
413-GB30GB018 $3,256 0.39 0.05 0.00 40.250.70BUCKET, CONCRETE, GENERAL PURPOSE, 0.5 CY
433-GB30GB001 $4,097 0.49 0.06 0.00 60.310.88BUCKET, CONCRETE, GENERAL PURPOSE, 1.0 CY
442-GB30GB002 $5,359 0.64 0.08 0.00 80.401.15BUCKET, CONCRETE, GENERAL PURPOSE, 1.5 CY
462-GB30GB003 $6,607 0.78 0.10 0.00 100.491.40BUCKET, CONCRETE, GENERAL PURPOSE, 2.0 CY
493-GB30GB004 $9,554 1.13 0.15 0.00 140.722.04BUCKET, CONCRETE, GENERAL PURPOSE, 3.0 CY
4123-GB30GB005 $11,402 1.35 0.18 0.00 180.862.44BUCKET, CONCRETE, GENERAL PURPOSE, 4.0 CY
EP 1110-1-8, Vol. 330 Nov 09
2-52
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
0.20 LAYDOWNSUBCATEGORY
GAR-BRO MANUFACTURING COMPANY
425-AB30GB006 $21,073 2.50 0.33 0.00 261.584.62BUCKET, CONCRETE, LAYDOWN, 1.0 CY, HEAVY DUTY AIR GATE
465-AB30GB007 $22,813 2.71 0.36 0.00 321.725.01BUCKET, CONCRETE, LAYDOWN, 2.0 CY, HEAVY DUTY AIR GATE
495-AB30GB008 $25,285 3.00 0.40 0.00 401.905.55BUCKET, CONCRETE, LAYDOWN, 3.0 CY, HEAVY DUTY AIR GATE
4125-AB30GB009 $28,838 3.42 0.45 0.00 512.166.32BUCKET, CONCRETE, LAYDOWN, 4.0 CY, HEAVY DUTY AIR GATE
4155-AB30GB010 $35,625 4.23 0.56 0.00 732.687.82BUCKET, CONCRETE, LAYDOWN, 5.0 CY, HEAVY DUTY AIR GATE
0.30 LOWBOYSUBCATEGORY
CAMLEVER
LB-375B30CR001 $4,886 0.58 0.08 0.00 20.371.10BUCKET, CONCRETE, LOWBOY, 0.38 CY, AIR GATE
LB-050B30CR002 $5,240 0.62 0.08 0.00 20.391.18BUCKET, CONCRETE, LOWBOY, 0.5 CY, AIR GATE
LB-075B30CR003 $5,653 0.67 0.09 0.00 30.431.27BUCKET, CONCRETE, LOWBOY, 0.75 CY, AIR GATE
LB-100B30CR004 $5,837 0.69 0.09 0.00 50.441.31BUCKET, CONCRETE, LOWBOY, 1.0 CY, AIR GATE
LB-150B30CR005 $6,873 0.82 0.11 0.00 60.521.55BUCKET, CONCRETE, LOWBOY, 1.5 CY, AIR GATE
LXB-150B30CR009 $7,232 0.86 0.11 0.00 60.541.63BUCKET, CONCRETE, LOWBOY, 1.5 CY, AIR GATE
EP 1110-1-8, Vol. 330 Nov 09
2-53
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
B30 CAMLEVER (continued)LB-200B30CR006 $8,079 0.96 0.13 0.00 80.611.82BUCKET, CONCRETE, LOWBOY, 2.0 CY,
AIR GATE LXB-200B30CR010 $8,440 1.00 0.13 0.00 60.631.90BUCKET, CONCRETE, LOWBOY, 2.0 CY,
AIR GATE LXB-300B30CR011 $10,007 1.19 0.16 0.00 60.762.26BUCKET, CONCRETE, LOWBOY, 3.0 CY,
AIR GATE LXB-400B30CR012 $11,562 1.37 0.18 0.00 60.872.60BUCKET, CONCRETE, LOWBOY, 4.0 CY,
AIR GATE
0.40 LOW SLUMPSUBCATEGORY
GAR-BRO MANUFACTURING COMPANY
440-AB30GB011 $16,676 1.98 0.26 0.00 201.253.75BUCKET, CONCRETE, LOW SLUMP, 1.0 CY, AIR GATE
450-AB30GB012 $17,291 2.05 0.27 0.00 211.303.89BUCKET, CONCRETE, LOW SLUMP, 1.5 CY, AIR GATE
460-AB30GB013 $17,930 2.13 0.28 0.00 241.354.04BUCKET, CONCRETE, LOW SLUMP, 2.0 CY, AIR GATE
493-AB30GB014 $23,519 2.79 0.37 0.00 491.775.29BUCKET, CONCRETE, LOW SLUMP, 3.0 CY, AIR GATE
4139-AB30GB015 $24,364 2.89 0.38 0.00 521.835.48BUCKET, CONCRETE, LOW SLUMP, 4.0 CY, AIR GATE
4200-AB30GB016 $35,007 4.16 0.55 0.00 782.637.89BUCKET, CONCRETE, LOW SLUMP, 6.0 CY, AIR GATE
4250-AB30GB017 $42,121 5.00 0.66 0.00 903.169.48BUCKET, CONCRETE, LOW SLUMP, 8.0 CY, AIR GATE
EP 1110-1-8, Vol. 330 Nov 09
2-54
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
BUCKETS, DRAGLINEB350.10 LIGHT WEIGHTSUBCATEGORY
HENDRIX MANUFACTURING COMPANY, INC.
LSB35HE001 $7,845 0.88 0.13 0.00 150.571.63BUCKET, DRAGLINE, 0.75 CY, LIGHT WEIGHT/PERFORATED
LSB35HE002 $9,194 1.03 0.15 0.00 180.671.91BUCKET, DRAGLINE, 1.0 CY, LIGHT WEIGHT/PERFORATED
LSB35HE003 $13,024 1.47 0.21 0.00 260.952.71BUCKET, DRAGLINE, 1.5 CY, LIGHT WEIGHT/PERFORATED
LSB35HE004 $15,721 1.77 0.25 0.00 321.143.27BUCKET, DRAGLINE, 2.0 CY, LIGHT WEIGHT/PERFORATED
LSB35HE005 $18,002 2.03 0.29 0.00 371.313.75BUCKET, DRAGLINE, 2.5 CY, LIGHT WEIGHT/PERFORATED
LSB35HE006 $22,448 2.53 0.36 0.00 461.634.67BUCKET, DRAGLINE, 3.0 CY, LIGHT WEIGHT/PERFORATED
LSB35HE007 $24,414 2.75 0.40 0.00 501.785.09BUCKET, DRAGLINE, 3.5 CY, LIGHT WEIGHT/PERFORATED
LSB35HE008 $32,059 3.61 0.52 0.00 652.336.67BUCKET, DRAGLINE, 4.0 CY, LIGHT WEIGHT/PERFORATED
LSB35HE009 $33,623 3.78 0.55 0.00 692.447.00BUCKET, DRAGLINE, 4.5 CY, LIGHT WEIGHT/PERFORATED
LSB35HE010 $38,876 4.37 0.63 0.00 852.828.09BUCKET, DRAGLINE, 5.0 CY, LIGHT WEIGHT/PERFORATED
LSB35HE011 $42,090 4.74 0.68 0.00 923.058.76BUCKET, DRAGLINE, 6.0 CY, LIGHT WEIGHT/PERFORATED
LSB35HE012 $46,035 5.18 0.75 0.00 1013.349.58BUCKET, DRAGLINE, 7.0 CY, LIGHT WEIGHT/PERFORATED
EP 1110-1-8, Vol. 330 Nov 09
2-55
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
B35 HENDRIX MANUFACTURING COMPANY, INC. (continued)
LSB35HE013 $51,013 5.74 0.83 0.00 1123.7010.62BUCKET, DRAGLINE, 8.0 CY, LIGHT WEIGHT/PERFORATED
LSB35HE014 $58,372 6.57 0.95 0.00 1284.2412.15BUCKET, DRAGLINE, 9.0 CY, LIGHT WEIGHT/PERFORATED
LSB35HE015 $63,450 7.14 1.03 0.00 1394.6013.21BUCKET, DRAGLINE, 10.0 CY, LIGHT WEIGHT/PERFORATED
LSB35HE016 $75,788 8.53 1.23 0.00 1665.5015.78BUCKET, DRAGLINE, 12.0 CY, LIGHT WEIGHT/PERFORATED
LSB35HE017 $87,192 9.81 1.41 0.00 1916.3218.14BUCKET, DRAGLINE, 14.0 CY, LIGHT WEIGHT/PERFORATED
SAUERMAN (NATIONAL OILWELL VARCO)
SC-1050-KB35SA001 $19,716 2.22 0.32 0.00 151.434.10BUCKET, DRAGLINE, 1.0 CY, CRESCENT
SC-1070-KB35SA003 $29,550 3.32 0.48 0.00 252.146.15BUCKET, DRAGLINE, 2.0 CY, CRESCENT
SC-1090-KB35SA004 $40,516 4.56 0.66 0.00 362.948.44BUCKET, DRAGLINE, 3.0 CY, CRESCENT
SC-1100-KB35SA005 $50,767 5.71 0.82 0.00 493.6810.56BUCKET, DRAGLINE, 4.0 CY, CRESCENT
SC-1110-KB35SA006 $59,841 6.73 0.97 0.00 584.3412.45BUCKET, DRAGLINE, 5.0 CY, CRESCENT
SC-1120-KB35SA007 $67,316 7.57 1.09 0.00 684.8814.00BUCKET, DRAGLINE, 6.0 CY, CRESCENT
SC-1130-KB35SA008 $79,410 8.93 1.29 0.00 885.7616.52BUCKET, DRAGLINE, 8.0 CY, CRESCENT
EP 1110-1-8, Vol. 330 Nov 09
2-56
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
B35 SAUERMAN (NATIONAL OILWELL VARCO) (continued)
SC-1140-KB35SA009 $100,786 11.34 1.63 0.00 1067.3020.97BUCKET, DRAGLINE, 10.0 CY,CRESCENT
SC-1150-KB35SA010 $123,026 13.84 1.99 0.00 1328.9125.60BUCKET, DRAGLINE, 12.0 CY,CRESCENT
NO SPECIFIC MANUFACTURER
6-1/2LB35XX001 $31,078 3.50 0.50 0.00 942.256.47BUCKET, DRAGLINE, 6.5 CY, LIGHT WEIGHT
7-1/2LB35XX002 $34,947 3.93 0.57 0.00 1062.547.27BUCKET, DRAGLINE, 7.5 CY, LIGHT WEIGHT
8-1/2LB35XX003 $38,645 4.35 0.63 0.00 1162.818.05BUCKET, DRAGLINE, 8.5 CY, LIGHT WEIGHT
9-1/2LB35XX004 $44,073 4.96 0.71 0.00 1323.199.17BUCKET, DRAGLINE, 9.5 CY, LIGHT WEIGHT
11LB35XX005 $49,484 5.57 0.80 0.00 1483.5910.30BUCKET, DRAGLINE, 11.0 CY, LIGHT WEIGHT
13LB35XX006 $60,884 6.85 0.99 0.00 1784.4212.67BUCKET, DRAGLINE, 13.0 CY, LIGHT WEIGHT
0.20 MEDIUM WEIGHTSUBCATEGORY
HENDRIX MANUFACTURING COMPANY, INC.
TSB35HE018 $8,477 0.85 0.14 0.00 170.571.59BUCKET, DRAGLINE, 0.75 CY, MEDIUM WEIGHT
TSB35HE019 $9,710 0.97 0.16 0.00 190.651.82BUCKET, DRAGLINE, 1.0 CY, MEDIUM WEIGHT
TSB35HE020 $13,856 1.39 0.22 0.00 280.922.59BUCKET, DRAGLINE, 1.5 CY, MEDIUM WEIGHT
EP 1110-1-8, Vol. 330 Nov 09
2-57
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
B35 HENDRIX MANUFACTURING COMPANY, INC. (continued)
TSB35HE021 $17,485 1.75 0.28 0.00 361.163.26BUCKET, DRAGLINE, 2.0 CY, MEDIUM WEIGHT
TSB35HE022 $20,167 2.02 0.32 0.00 411.333.76BUCKET, DRAGLINE, 2.5 CY, MEDIUM WEIGHT
TSB35HE023 $24,098 2.41 0.39 0.00 491.604.50BUCKET, DRAGLINE, 3.0 CY, MEDIUM WEIGHT
TSB35HE024 $26,579 2.66 0.42 0.00 541.754.96BUCKET, DRAGLINE, 3.5 CY, MEDIUM WEIGHT
TSB35HE025 $34,440 3.44 0.55 0.00 702.276.42BUCKET, DRAGLINE, 4.0 CY, MEDIUM WEIGHT
TSB35HE026 $35,172 3.52 0.56 0.00 722.326.56BUCKET, DRAGLINE, 4.5 CY, MEDIUM WEIGHT
TSB35HE027 $42,606 4.26 0.68 0.00 932.817.95BUCKET, DRAGLINE, 5.0 CY, MEDIUM WEIGHT
TSB35HE028 $44,055 4.41 0.70 0.00 962.918.22BUCKET, DRAGLINE, 6.0 CY, MEDIUM WEIGHT
TSB35HE029 $50,797 5.08 0.81 0.00 1113.359.47BUCKET, DRAGLINE, 7.0 CY, MEDIUM WEIGHT
TSB35HE030 $55,976 5.60 0.89 0.00 1223.6910.44BUCKET, DRAGLINE, 8.0 CY, MEDIUM WEIGHT
TSB35HE031 $68,113 6.81 1.09 0.00 1494.5012.71BUCKET, DRAGLINE, 9.0 CY, MEDIUM WEIGHT
TSB35HE032 $72,574 7.26 1.16 0.00 1594.7913.54BUCKET, DRAGLINE, 10.0 CY, MEDIUM WEIGHT
TSB35HE033 $92,471 9.25 1.48 0.00 2026.1117.25BUCKET, DRAGLINE, 12.0 CY, MEDIUM WEIGHT
EP 1110-1-8, Vol. 330 Nov 09
2-58
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
B35 HENDRIX MANUFACTURING COMPANY, INC. (continued)
TSB35HE034 $103,044 10.30 1.65 0.00 2256.8019.22BUCKET, DRAGLINE, 14.0 CY, MEDIUM WEIGHT
NO SPECIFIC MANUFACTURER
6-1/2MB35XX007 $35,138 3.51 0.56 0.00 1012.326.55BUCKET, DRAGLINE, 6.5 CY, MEDIUM WEIGHT
7-1/2MB35XX008 $40,171 4.02 0.64 0.00 1172.657.49BUCKET, DRAGLINE, 7.5 CY, MEDIUM WEIGHT
8-1/2MB35XX009 $43,255 4.33 0.69 0.00 1262.868.07BUCKET, DRAGLINE, 8.5 CY, MEDIUM WEIGHT
9-1/2MB35XX010 $51,456 5.15 0.82 0.00 1523.409.60BUCKET, DRAGLINE, 9.5 CY, MEDIUM WEIGHT
11MB35XX011 $56,899 5.69 0.91 0.00 1693.7610.61BUCKET, DRAGLINE, 11.0 CY, MEDIUM WEIGHT
13MB35XX012 $72,113 7.21 1.15 0.00 2114.7613.45BUCKET, DRAGLINE, 13.0 CY, MEDIUM WEIGHT
0.30 HEAVY WEIGHTSUBCATEGORY
HENDRIX MANUFACTURING COMPANY, INC.
MH-SB35HE035 $31,642 2.85 0.50 0.00 691.935.36BUCKET, DRAGLINE, 2.75 CY, HEAVY WEIGHT
MH-SB35HE036 $33,017 2.97 0.52 0.00 722.015.59BUCKET, DRAGLINE, 3.0 CY, HEAVY WEIGHT
MH-SB35HE037 $37,141 3.34 0.59 0.00 812.266.29BUCKET, DRAGLINE, 3.5 CY, HEAVY WEIGHT
MH-SB35HE038 $50,441 4.54 0.80 0.00 1103.078.54BUCKET, DRAGLINE, 4.0 CY, HEAVY WEIGHT
EP 1110-1-8, Vol. 330 Nov 09
2-59
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
B35 HENDRIX MANUFACTURING COMPANY, INC. (continued)
MH-SB35HE039 $56,407 5.08 0.89 0.00 1233.439.55BUCKET, DRAGLINE, 4.5 CY, HEAVY WEIGHT
MH-SB35HE040 $58,233 5.24 0.92 0.00 1273.549.86BUCKET, DRAGLINE, 5.0 CY, HEAVY WEIGHT
MH-SB35HE041 $62,362 5.61 0.98 0.00 1363.7910.55BUCKET, DRAGLINE, 6.0 CY, HEAVY WEIGHT
MH-SB35HE042 $80,248 7.22 1.27 0.00 1754.8813.59BUCKET, DRAGLINE, 7.0 CY, HEAVY WEIGHT
MH-SB35HE043 $82,541 7.43 1.30 0.00 1805.0213.97BUCKET, DRAGLINE, 8.0 CY, HEAVY WEIGHT
MH-SB35HE044 $107,305 9.66 1.69 0.00 2346.5218.16BUCKET, DRAGLINE, 9.0 CY, HEAVY WEIGHT
MH-SB35HE045 $111,106 10.00 1.75 0.00 2436.7518.81BUCKET, DRAGLINE, 10.0 CY, HEAVY WEIGHT
MH-SB35HE046 $132,136 11.89 2.08 0.00 2898.0322.36BUCKET, DRAGLINE, 12.0 CY, HEAVY WEIGHT
MH-SB35HE047 $140,665 12.66 2.22 0.00 3098.5523.81BUCKET, DRAGLINE, 14.0 CY, HEAVY WEIGHT
NO SPECIFIC MANUFACTURER
3/4HB35XX013 $8,870 0.80 0.14 0.00 200.541.50BUCKET, DRAGLINE, 0.75 CY, HEAVY WEIGHT
1HB35XX014 $9,963 0.90 0.16 0.00 230.611.69BUCKET, DRAGLINE, 1.0 CY, HEAVY WEIGHT
1-1/2HB35XX015 $14,813 1.33 0.23 0.00 350.902.50BUCKET, DRAGLINE, 1.5 CY, HEAVY WEIGHT
EP 1110-1-8, Vol. 330 Nov 09
2-60
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
B35 NO SPECIFIC MANUFACTURER (continued)2HB35XX016 $16,907 1.52 0.27 0.00 421.032.86BUCKET, DRAGLINE, 2.0 CY, HEAVY
WEIGHT 2-1/2HB35XX017 $18,464 1.66 0.29 0.00 481.123.12BUCKET, DRAGLINE, 2.5 CY, HEAVY
WEIGHT 5-1/2HB35XX018 $39,457 3.55 0.62 0.00 1132.406.68BUCKET, DRAGLINE, 5.5 CY, HEAVY
WEIGHT 6-1/2HB35XX019 $42,117 3.79 0.66 0.00 1252.567.12BUCKET, DRAGLINE, 6.5 CY, HEAVY
WEIGHT 7-1/2HB35XX020 $47,536 4.28 0.75 0.00 1352.898.05BUCKET, DRAGLINE, 7.5 CY, HEAVY
WEIGHT 8-1/2HB35XX021 $51,733 4.66 0.82 0.00 1593.158.77BUCKET, DRAGLINE, 8.5 CY, HEAVY
WEIGHT 9-1/2HB35XX022 $65,316 5.88 1.03 0.00 1813.9711.06BUCKET, DRAGLINE, 9.5 CY, HEAVY
WEIGHT 11HB35XX023 $69,975 6.30 1.10 0.00 1984.2511.84BUCKET, DRAGLINE, 11.0 CY, HEAVY
WEIGHT
CHAIN SAWSC050.00 CHAIN SAWSSUBCATEGORY
OLYMPYK CHAIN SAWS
2941C05OL001 $345 0.16 0.01 0.55 10.091.19CHAIN SAW, 16"-18" BAR HP G
5962C05OL002 $546 0.25 0.01 1.12 10.142.16CHAIN SAW, 16"-24" BAR HP G
5970C05OL003 $664 0.30 0.02 1.24 10.172.49CHAIN SAW, 16"-36" BAR HP G
6980C05OL004 $723 0.33 0.02 1.36 10.192.73CHAIN SAW, 16"-42" BAR HP G
EP 1110-1-8, Vol. 330 Nov 09
2-61
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
COMPACTORS, WALK-BEHIND OR REMOTE CONTROLLERC100.10 COMPACTORS, RAMMERS / TAMPERS & VIBRATORY PLATESSUBCATEGORY
COMPACTION AMERICA (BOMAG)
3BT 60/4C10BO001 $4,664 1.11 0.08 0.72 20.643.30COMPACTOR, RAMMER, TAMPER, 11" X 13.2" SHOE, 2,630 LBS IMPACT
HP G
4BP 10/36-2C10BO003 $2,544 0.60 0.05 0.96 20.352.41COMPACTOR, VIBROPLATE, 14.2" X 22" PLATE, 2,250 LBS IMPACT
HP G
6BP 18/45-2C10BO004 $2,827 0.67 0.05 1.43 20.393.07COMPACTOR, VIBROPLATE, 17.7" X 22" PLATE, 4,050 LBS IMPACT
HP G
4BPR 30/38D-3C10BO007 $11,546 2.74 0.21 0.52 51.586.80COMPACTOR, VIBROPLATE, 22.8" X 31.1" PLATE, REVERSIBLE, 7,200 LBS IMPACT
HP D-off
9BPR 55/65DC10BO008 $15,710 3.73 0.28 1.18 102.159.76COMPACTOR, VIBROPLATE, 25.6" X 35.4" PLATE, REVERSIBLE, 11,250 LBS IMPACT
HP D-off
WACKER CORPORATION
4DS 70C10WC003 $3,853 0.92 0.07 0.52 20.532.66COMPACTOR, RAMMER, 13" X 13" SHOE, 3,550 LBS IMPACT
HP D-off
6BPU 2540 AC10WC006 $4,715 1.12 0.08 1.31 30.643.96COMPACTOR, VIBROPLATE, 19.5" X 25.5" PLATE, REVERSIBLE, 5,600 LBS IMPACT
HP G
9BPU 3545AC10WC007 $7,205 1.71 0.13 2.15 70.996.23COMPACTOR, VIBROPLATE, 23.5" X 35.5" PLATE, REVERSIBLE, 7,550 LBS IMPACT
HP G
9DPU 4045HC10WC008 $13,015 3.09 0.23 1.18 71.788.30COMPACTOR, VIBROPLATE, 24" X 35.5" PLATE, REVERSIBLE, 9,000 LBS IMPACT
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-62
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
C10 WACKER CORPORATION (continued)14DPU 7060C10WC015 $26,025 6.18 0.47 1.83 153.5616.04COMPACTOR, VIBROPLATE, 25.5" X 42"
PLATE, REVERSIBLE, 15,600 LBS IMPACT
HP D-off
0.20 ROLLERS, VIBRATORYSUBCATEGORY
COMPACTION AMERICA (BOMAG)
4BW 55EC10BO009 $6,588 1.40 0.12 0.96 30.824.43COMPACTOR, ROLLER, VIBRATORY, 22"W X 15.7"DIA, SINGLE SMOOTH DRUM, WALK BEHIND, 2,273 LBS IMPACT
HP G
5BW65S-2C10BO015 $15,139 3.22 0.28 0.65 131.898.51COMPACTOR, ROLLER, VIBRATORY, 25.6"W X 15.7"DIA, DOUBLE SMOOTH DRUMS, WALK BEHIND, 2,655 LBS IMPACT
HP D-off
8BW 65HC10BO011 $17,618 3.74 0.33 1.05 162.2010.22COMPACTOR, ROLLER, VIBRATORY, 25.6"W X 15.7"DIA, DOUBLE SMOOTH DRUMS, WALK BEHIND, 1,980 LBS IMPACT
HP D-off
9BW75S-2C10BO016 $22,101 4.70 0.42 1.18 202.7712.68COMPACTOR, ROLLER, VIBRATORY, 29.5"W X 18.9"DIA, DOUBLE SMOOTH DRUMS, WALK BEHIND, 4,455 LBS IMPACT
HP D-off
19BMP851C10BO013 $46,528 9.89 0.88 2.48 455.8326.70COMPACTOR, TRENCH ROLLER, VIBRATORY, 33.5"W X 19.7"DIA, DOUBLE TAMPING FOOT DRUMS, WALK BEHIND, 18,000 LBS IMPACT
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-63
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
RAMMAX MACHINERY CO.
8P23/16FMC10RX001 $30,624 6.51 0.58 1.05 163.8416.93COMPACTOR, TRENCH ROLLER, VIBRATORY, 23"W X 14.6"DIA, QUAD PADFOOT DRUMS, WALK BEHIND, 7,875 LBS IMPACT
HP D-off
14P33/24FMRC10RX002 $42,286 8.99 0.80 1.83 305.3023.80COMPACTOR, TRENCH ROLLER, VIBRATORY, 33"W X 21.7"DIA, QUAD PADFOOT DRUMS, WALK BEHIND, 15,652 LBS IMPACT
HP D-off
33P47/40KMC10RX003 $70,743 15.03 1.33 4.31 668.8541.16COMPACTOR, TRENCH ROLLER, VIBRATORY, 47"W X 22"DIA, QUAD PADFOOT DRUMS, RIDE ON, 21,600 LBS IMPACT
HP D-off
WACKER CORPORATION
11RSS800AC10WC010 $9,814 2.09 0.18 2.63 111.237.92COMPACTOR, ROLLER, VIBRATORY, 28"W X 22"DIA, SINGLE SMOOTH DRUM, WALK BEHIND, 3,400 LBS IMPACT
HP G
9RD7HC10WC017 $12,984 2.76 0.24 1.18 161.627.97COMPACTOR, ROLLER, VIBRATORY,25.5"W X 16.5"DIA, DOUBLE SMOOTH DRUM, WALK BEHIND, 2,925 LBS IMPACT
HP D-off
20RT 56-SCC10WC019 $30,506 6.48 0.57 2.61 313.8118.56COMPACTOR, ROLLER, VIBRATORY, 22"W X 20"DIA, DOUBLE SMOOTH DRUM, WALK BEHIND, 7,000/14,000 LBS IMPACT
HP D-off
20RT 82-SCC10WC016 $32,175 6.84 0.61 2.61 334.0319.44COMPACTOR, TRENCH ROLLER, VIBRATORY, 32"W X 20"DIA, DOUBLE TAMPING FOOT DRUMS, WALK BEHIND, 7,000/14,000 LBS IMPACT
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-64
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
CONCRETE CLEANERS / ABRASIVE BLASTERSC150.10 WALK BEHINDSUBCATEGORY
US FILTER/BLASTRAC
21-8 & TURBO VAC
C15BL001 $10,152 2.03 0.19 0.12 21.215.05CONCRETE BLASTER CLEANING SYSTEM, WALK BEHIND, 8" PATH (ADD 4 KVA GENERATOR & BLAST MEDIA COST)
HP E
101-10D & 6-54 DCC15BL003 $48,649 9.73 0.93 0.62 75.8023.43CONCRETE BLASTER CLEANING SYSTEM, WALK BEHIND, 10" PATH (ADD 30 KVA GENERATOR & BLAST MEDIA COST)
HP E
151-15D & 6-54-DCC15BL004 $56,932 11.39 1.09 0.93 86.7927.72CONCRETE BLASTER CLEANING SYSTEM, WALK BEHIND, 15" PATH (ADD 30 KVA GENERATOR & BLAST MEDIA COST)
HP E
302-20D & 8-54-DCC15BL005 $83,449 16.69 1.60 1.87 129.9540.81CONCRETE BLASTER CLEANING SYSTEM, WALK BEHIND, 20" PATH (ADD 75 KVA GENERATOR & BLAST MEDIA COST)
HP E
EQUIPMENT DEVELOPMENT CO., INC. (EDCO)
9CPM-8C15ED002 $4,582 0.92 0.09 1.67 20.553.85CONCRETE GRINDER, WALK BEHIND, TRAFFIC LINE REMOVER, 8'' CUTTING PATH
HP G
11TLR-7C15ED001 $7,380 1.48 0.14 2.04 50.885.47CONCRETE GRINDER, WALK BEHIND, TRAFFIC LINE REMOVER, 7'' CUTTING WIDTH
HP G
0.20 TRUCK/TRAILER MOUNTEDSUBCATEGORY
US FILTER/BLASTRAC
3504800C15BL006 $3,471 0.35 0.06 47.88 2550.2453.55CONCRETE BLASTER, SELF PROPELLED, 48'' PATH
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-65
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
NO SPECIFIC MANUFACTURER
86C15XX001 $135,170 13.35 2.33 26.64 1389.0159.74180 HP D-offCONCRETE CLEANER/ABRASIVE BLASTER, TRUCK MOUNTED, GINDER/BLASTER, 4" - 16" CLEANING PATH WIDTH
HP D-on
CONCRETE BUGGIESC200.00 CONCRETE BUGGIESSUBCATEGORY
WACKER CORPORATION
13WB 16AC20WC002 $11,677 2.14 0.22 2.42 131.297.07CONCRETE BUGGY, 16 CF BUCKET, 2,500 LBS, WALK & RIDE, 4X2
HP G
NO SPECIFIC MANUFACTURER
810GC20XX001 $8,189 1.51 0.16 1.49 100.924.75CONCRETE BUGGY, 10 CF BUCKET, 1,500 LBS
HP G
CONCRETE FINISHERS/SCREEDS/SPREADERSC250.10 FINISHERS/TROWELSSUBCATEGORY
ALLEN ENGINEERING CORP.
20PRO 900C25AJ015 $12,499 2.00 0.23 3.72 71.238.27CONCRETE TROWEL, RIDING, 2 - 36" DIA ROTORS, 8 BLADES
HP G
20PRO 1050C25AJ016 $13,104 2.10 0.24 3.72 81.298.48CONCRETE TROWEL, RIDING, 2 - 42" DIA ROTORS, 8 BLADES
HP G
25PRO 1200C25AJ018 $15,200 2.43 0.28 4.65 101.5010.20CONCRETE TROWEL, RIDING, 2 - 46" DIA ROTORS, 8 BLADES
HP G
28SUPER PRO 400C25AJ019 $22,032 3.53 0.41 5.20 132.1813.09CONCRETE TROWEL, RIDING, 2 - 46" DIA ROTORS, 8 BLADES
HP G
EP 1110-1-8, Vol. 330 Nov 09
2-66
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
STOW MANUFACTURING, INC.
8SCT36H80C25ST001 $2,592 0.41 0.05 1.49 30.262.51CONCRETE FINISHER, WALK BEHIND, ROTO TROWEL, 36" DIA ROTOR, 4 BLADES
HP G
9SCT46H80C25ST002 $2,658 0.43 0.05 1.67 30.272.74CONCRETE FINISHER, WALK BEHIND, ROTO TROWEL, 46" DIA ROTOR, 4 BLADES
HP G
WACKER CORPORATION
8CT48ADPC25WC002 $3,217 0.51 0.06 1.49 30.322.72CONCRETE FINISHER, WALK BEHIND, POWER TROWEL, 48" DIA ROTOR, 4 BLADES
HP G
0.20 VIBRATORY SCREEDSUBCATEGORY
ALLEN ENGINEERING CORP.
612HEDC25AJ003 $6,632 1.06 0.12 1.12 50.653.44CONCRETE, VIBRATORY SCREED, 12.5' WIDE
HP G
612 HDC25AJ001 $4,693 0.75 0.09 1.12 40.472.80CONCRETE, VIBRATORY SCREED, 20' WIDE
HP G
812HEDC25AJ004 $9,480 1.52 0.17 1.49 80.934.79CONCRETE, VIBRATORY SCREED, 30' WIDE
HP G
1112HEDC25AJ005 $11,133 1.78 0.20 2.04 101.095.95CONCRETE, VIBRATORY SCREED, 40' WIDE
HP G
1112HEDC25AJ006 $13,223 2.12 0.24 2.04 121.306.64CONCRETE, VIBRATORY SCREED, 50' WIDE
HP G
1112HEDC25AJ007 $14,064 2.25 0.26 2.04 131.396.92CONCRETE, VIBRATORY SCREED, 55' WIDE
HP G
EP 1110-1-8, Vol. 330 Nov 09
2-67
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
0.25 VIBRATORY LASER SCREEDSUBCATEGORY
SOMERO ENTERPRISES, INC.
30S-100C25SV003 $146,140 12.63 2.67 2.83 728.9929.15CONCRETE, VIBRATORY LASER SCREED, 8' WIDE X 12' BOOM
HP D-off
65SXP (VERSATILE)
C25SV002 $290,939 25.29 5.32 6.13 12617.9758.53CONCRETE, VIBRATORY LASER SCREED, 8' WIDE X 20' BOOM
HP D-off
65SXP (PRODUCTIVE)
C25SV001 $309,563 26.86 5.66 6.13 15119.0961.84CONCRETE, VIBRATORY LASER SCREED, 12' WIDE X 20' BOOM
HP D-off
0.30 MATERIAL/TOPPING SPREADERSSUBCATEGORY
ALLEN ENGINEERING CORP.
6SP23HC25AJ008 $15,988 1.40 0.29 0.96 110.993.94CONCRETE, MATERIAL/TOPPING SPREADER, 12.5' WIDE
HP G
6SP23HC25AJ009 $16,977 1.49 0.31 0.96 121.064.12CONCRETE, MATERIAL/TOPPING SPREADER, 20' WIDE
HP G
6SP23HC25AJ010 $18,143 1.59 0.33 0.96 131.134.32CONCRETE, MATERIAL/TOPPING SPREADER, 30' WIDE
HP G
6SP23HC25AJ011 $19,433 1.70 0.36 0.96 141.214.55CONCRETE, MATERIAL/TOPPING SPREADER, 40' WIDE
HP G
6SP23HC25AJ012 $20,628 1.80 0.38 0.96 151.284.76CONCRETE, MATERIAL/TOPPING SPREADER, 50' WIDE
HP G
6SP23HC25AJ013 $21,838 1.91 0.40 0.96 171.364.97CONCRETE, MATERIAL/TOPPING SPREADER, 60' WIDE
HP G
EP 1110-1-8, Vol. 330 Nov 09
2-68
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
CONCRETE GUNITERS / SHOTCRETERSC350.00 CONCRETE GUNITERS / SHOTCRETERSSUBCATEGORY
AIRPLACO EQUIPMENT CO., INC.
9C-10SLC35AF002 $14,773 1.56 0.27 0.00 61.055.64CONCRETE GUNITER/SHOTCRETER, DRY/SEMI-WET, HOPPER/PUMP/SPRAY, 12 CY/HR, 2" HOSE & 1 GUN (ADD 600 CFM COMPRESSOR)
CFM A
6001900 HD NUCRETOR
C35AF001 $27,162 2.88 0.49 0.00 111.936.99CONCRETE GUNITER/SHOTCRETER, DRY MIX, 2 - 15 CY/HR, W/2 PRESSURIZED TANKS/ 100' - 2" DIA HOSE (ADD 600 CFM COMPRESSOR)
CFM A
30634 Mix ElevatorC35AF004 $43,233 4.59 0.78 3.28 453.0816.28CONCRETE GUNITER/SHOTCRETER, DRY BATCH MIXER, 13 CY/HR, W/FEEDER, TRAILER MTD (ADD SHOTCRETE MACHINE)
HP D-off
54734 Mix ElevatorC35AF005 $64,507 6.82 1.16 5.91 814.5724.41CONCRETE GUNITER/SHOTCRETER, DRY BATCH MIXER, W/20 CY/HR ELEVATOR FEEDER/ 45 CF SAND HOPPER/ 4 CF CEMENT HOPPER/ & PREDAMPENING SPRAY BAR, TRAILER MTD (ADD SHOTCRETE MACHINE)
HP D-off
ALLENTOWN EQUIPMENT
5GRH-610 ROTARY GUN
C35AL003 $15,555 1.51 0.28 0.33 111.044.44CONCRETE GUNITER/SHOTCRETER, ROTARY PUMP, WET/DRY, 1 - 6 CY/HR, W/HOPPER/ 100' - 1.5" DIA HOSE/ & NOZZLE, CART MTD, (ADD 250 - 600 CFM COMPRESSOR)
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-69
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
C35 ALLENTOWN EQUIPMENT (continued)9AG-15
AUTOMATIC GUN
C35AL013 $13,177 1.33 0.24 0.00 150.913.62CONCRETE GUNITER/SHOTCRETER, ROTARY PUMP, WET/DRY, 3 - 15 CY/HR, W/HOPPER/ 100' - 1.5" DIA HOSE/ & NOZZLE (ADD 300 - 900 CFM COMPRESSOR)
CFM A
9N-2 PNEUMATIC GUN
C35AL008 $25,439 2.73 0.46 0.00 131.836.59CONCRETE GUNITER/SHOTCRETER, DRY MIX, 2 - 8 CY/HR, W/2 PRESSURIZED TANKS/ 100' - 1.5" DIA HOSE/ & NOZZLE (ADD 200 - 900 CFM COMPRESSOR)
CFM A
30R-900 BATCH MIX RIG
C35AL002 $43,651 4.52 0.79 3.28 473.0515.35CONCRETE GUNITER/SHOTCRETER, DRY BATCH MIXER, 10 TON/HR, W/ELEVATOR FEEDER/ 20 CF CEMENT HOPPER/ 8 CF MIXER/ & PREDAMPENING SPRAY BAR, TRAILER MTD (ADD SHOTCRETE MACHINE OR ROTARY PUMP)
HP D-off
61POWER CRETER 10
C35AL014 $66,760 7.11 1.20 6.68 304.7624.33CONCRETE GUNITER/SHOTCRETER, GROUT/MUD JACK/ SHOTCRETE, 10 CY/HR, 2,085 PSI, W/30 GAL HOPPER/ 74 GAL MIXER, TRAILER MTD (ADD 3" HOSE LINE)
HP D-off
ALIVA LTD.
7AL 246C35AV008 $28,453 3.05 0.51 0.47 92.049.69CONCRETE GUNITER/SHOTCRETER, DRY/SEMI-WET, 1.4 - 2.3 CY/HR, W/1 GAL HOPPER/ ROTARY PUMP/ 100' - 1.5" DIA HOSE/ NOZZLE/ & AIR COMPRESSOR
HP E
16AL 252C35AV009 $34,637 3.71 0.62 1.07 182.4812.06CONCRETE GUNITER/SHOTCRETER, DRY/SEMI-WET, 5 - 10 CY/HR, W/4.2 GAL HOPPER/ ROTARY PUMP/ 100' - 2.36" DIA HOSE/ NOZZLE/ & AIR COMPRESSOR
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-70
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
C35 ALIVA LTD. (continued)26AL 262C35AV010 $62,470 6.69 1.13 1.74 274.4819.88CONCRETE GUNITER/SHOTCRETER,
WET/DRY, 9 - 13 CY/HR, W/4.2 GAL HOPPER/ ROTARY PUMP/ 100' - 2.36" DIA HOSE/ NOZZLE/ & AIR COMPRESSOR
HP E
20AL 285C35AV006 $95,490 10.16 1.72 1.34 336.8027.46CONCRETE GUNITER/SHOTCRETER, WET/DRY, 11 - 27.5 CY/HR, W/6.6 GAL HOPPER/ ROTARY PUMP/ 100' - 2.55" DIA HOSE/ NOZZLE/ & AIR COMPRESSOR
HP E
12AL 302C35AV011 $48,015 5.14 0.87 0.80 503.4414.99CONCRETE GUNITER/SHOTCRETER, SHOTCRETE HYDRAULIC SPRAYER ARM, 25.6 ' HIGH (ADD TRUCK OR SMALL TRAILER & SHOTCRETE UNIT)
HP E
20AL 307C35AV012 $143,187 15.34 2.58 1.34 6810.2539.76CONCRETE GUNITERS / SHOTCRETERS, SHOTCRETE HYDRAULIC SPRAYER ARM, 52.5' HIGH (ADD TRUCK OR SMALL TRAILER & SHOTCRETE UNIT)
HP E
CONCRETE MIXING UNITSC400.00 CONCRETE MIXING UNITSSUBCATEGORY
CEMEN TECH
10SCD2-50HC40CC001 $26,458 4.23 0.49 0.62 232.619.63CONCRETE MIXERS, STATIONARY CONCRETE DISPENSER, 15 CY/HR, 2 - 4.5 CY MATERIAL CAPACITY
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-71
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
MULTIQUIP, INC.
8WM 70SH8C40MU001 $3,230 0.48 0.06 1.49 80.302.70CONCRETE MIXERS, MIXER, PLASTER/MORTAR, 7 CF, TRAILER MTD
HP G
13WM 120SHHC40MU002 $6,560 1.02 0.12 2.42 110.634.84CONCRETE MIXERS, MIXER, PLASTER/MORTAR, 12 CF, TRAILER MTD
HP G
8MC 64SH8C40MU003 $3,271 0.49 0.06 1.49 70.312.71CONCRETE MIXERS, MIXER, CONCRETE, 6 CF, TRAILER MTD
HP G
8MC 94SH8C40MU004 $3,731 0.56 0.07 1.49 80.352.86CONCRETE MIXERS, MIXER, CONCRETE, 9 CF, TRAILER MTD
HP G
STOW MANUFACTURING, INC.
1CMS44EC40ST001 $2,193 0.32 0.04 0.03 50.200.94CONCRETE MIXERS, MIXER, CONCRETE, 4 CF, TRAILER MTD
HP E
6CMS44HC40ST002 $2,401 0.35 0.04 1.02 50.221.90CONCRETE MIXERS, MIXER, CONCRETE, 4 CF, TRAILER MTD
HP G
2CMS64EC40ST003 $2,798 0.42 0.05 0.12 70.261.32CONCRETE MIXERS, MIXER, CONCRETE, 6 CF, TRAILER MTD
HP E
2CMS94EC40ST005 $3,670 0.56 0.07 0.09 80.351.62CONCRETE MIXERS, MIXER, CONCRETE, 9 CF, TRAILER MTD
HP E
NO SPECIFIC MANUFACTURER
28EC40XX001 $3,511 0.56 0.06 0.12 70.341.52CONCRETE MIXERS, MIXER, PLASTER/MORTAR, 8 CF, ELECTRIC, PORTABLE
HP E
78GC40XX002 $3,756 0.60 0.07 1.30 70.372.69CONCRETE MIXERS, MIXER, PLASTER/MORTAR, 8 CF, GAS, PORTABLE
HP G
EP 1110-1-8, Vol. 330 Nov 09
2-72
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
C40 NO SPECIFIC MANUFACTURER (continued)310EC40XX003 $5,360 0.86 0.10 0.19 90.532.25CONCRETE MIXERS, MIXER,
PLASTER/MORTAR, 10 CF, ELECTRIC, PORTABLE
HP E
810GC40XX004 $5,399 0.86 0.10 1.49 100.533.44CONCRETE MIXERS, MIXER, PLASTER/MORTAR, 10 CF, GAS, PORTABLE
HP G
512EC40XX005 $7,057 1.13 0.13 0.31 110.703.03CONCRETE MIXERS, MIXER, PLASTER/MORTAR, 12 CF, ELECTRIC, PORTABLE
HP E
516EC40XX006 $9,812 1.57 0.18 0.31 120.973.94CONCRETE MIXERS, MIXER, PLASTER/MORTAR, 16 CF, ELECTRIC, PORTABLE
HP E
916GC40XX007 $9,145 1.46 0.17 1.67 130.904.88CONCRETE MIXERS, MIXER, PLASTER/MORTAR, 16 CF, GAS, PORTABLE
HP G
CONCRETE PAVING MACHINESC450.00 CONCRETE PAVING MACHINESSUBCATEGORY
GOMACO CORPORATION
36C-450C45GO026 $55,540 7.41 0.99 7.22 644.7025.27CONCRETE PAVING MACHINES, CYLINDER FINISHER, SINGLE DRUM, FINISHING WIDTH 9'-137'
HP G
50C-650-FC45GO027 $70,577 9.41 1.26 5.47 915.9727.90CONCRETE PAVING MACHINES, CYLINDER FINISHER, DOUBLE DRUM, FINISHING WIDTH 19'-51'
HP D-off
50C-650-SC45GO028 $112,331 14.98 2.01 5.47 1269.5040.84CONCRETE PAVING MACHINES, CYLINDER FINISHER, DOUBLE DRUM, FINISHING WIDTH 19'-51'
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-73
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
C45 GOMACO CORPORATION (continued)36C-750C45GO029 $74,664 9.96 1.34 7.22 916.3231.21CONCRETE PAVING MACHINES,
CYLINDER FINISHER, DOUBLE DRUM, FINISHING WIDTH 8'-156'
HP G
92GT-3200C45GO013 $128,693 17.16 2.30 10.07 13010.8850.98CONCRETE PAVING MACHINES, CURB/GUTTER SLIPFORM PAVER, CRAWLER, 3-TRACK, 36" WIDE MOLD/FORM
HP D-off
92COMMANDER II /GT6200
C45GO010 $155,035 20.67 2.77 10.07 20013.1159.14CONCRETE PAVING MACHINES, CURB/GUTTER SLIPFORM PAVER, CRAWLER, 2-TRACK, 36'' WIDE MOLD/FORM
HP D-off
98GT-3600C45GO014 $177,378 23.65 3.17 10.73 21015.0066.79CONCRETE PAVING MACHINES, CURB/GUTTER SLIPFORM PAVER, CRAWLER, 3-TRACK, 24'' WIDE MOLD/FORM
HP D-off
185COMMANDER III/GT6300
C45GO011 $238,806 31.84 4.27 20.25 30020.1996.32CONCRETE PAVING MACHINES, CURB/GUTTER SLIPFORM PAVER, CRAWLER, 3-TRACK, 36'' WIDE MOLD/FORM
HP D-off
169COMMANDER IIIC45GO012 $319,877 42.65 5.72 18.50 36927.05119.51CONCRETE PAVING MACHINES, CURB/GUTTER SLIPFORM PAVER, CRAWLER , 4-TRACK, 36'' WIDE MOLD/FORM
HP D-off
230GP-2600C45GO016 $349,859 46.65 6.26 25.17 75029.59136.16CONCRETE PAVING MACHINES, SLIPFORM PAVER, CRAWLER, 2-TRACK, 24'-32' PAVING WIDTH
HP D-off
335GHP-2800C45GO018 $436,252 58.17 7.81 36.66 70036.90175.61CONCRETE PAVING MACHINES, SLIPFORM PAVER, CRAWLER, 2-TRACK, 24'-32' PAVING WIDTH
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-74
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
C45 GOMACO CORPORATION (continued)450GP-4000C45GO020 $521,320 69.51 9.33 49.25 88044.09215.84CONCRETE PAVING MACHINES,
SLIPFORM PAVER, CRAWLER, 2-TRACK, 12'-50' PAVING WIDTH
HP D-off
3859500C45GO031 $423,806 56.51 7.58 42.13 72935.84177.76CONCRETE PAVING MACHINES, TRIMMER/PLACER, W/16'-8'' TRIMMER HEAD
HP D-off
MILLER SPREADER CO.
15MC 650C45MJ001 $7,542 1.01 0.13 3.01 80.645.70CONCRETE PAVING MACHINES, CURB BUILDER, SLIPFORM PAVER, 6.1 CF HOPPER 6" AUGER
HP G
M-B-W, INC.
26C101C45MW00 $46,566 6.15 0.83 2.85 273.9117.55CONCRETE PAVING MACHINES, CURB ONLY SLIPFORM PAVER, RUBBER TIRED, 12"
HP D-off
26CG200C45MW00 $59,137 7.81 1.06 2.85 344.9721.46CONCRETE PAVING MACHINES, CURB/GUTTER SLIPFORM PAVER, RUBBER TIRED, 48"
HP D-off
CONCRETE PUMPSC550.00 CONCRETE PUMPSSUBCATEGORY
MAYCO PUMP - MULTIQUIP INC.
46C-30HDGC55M3001 $23,661 2.63 0.38 8.55 271.7015.39CONCRETE PUMP, 25 CY/HR, SINGLE, TRAILER MTD
HP G
60LS-400C55M3002 $53,118 5.98 0.86 6.20 423.8519.96CONCRETE PUMP, 45 CY/HR, SINGLE, TRAILER MTD
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-75
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
C55 MAYCO PUMP - MULTIQUIP INC. (continued)
106LS-600C55M3003 $62,470 7.03 1.01 10.96 474.5327.52CONCRETE PUMP, 70 CY/HR, SINGLE, TRAILER MTD
HP D-off
OLIN ENGINEERING, INC.
7410 22C55OE006 $50,223 5.58 0.81 7.65 443.6020.82CONCRETE PUMP, 22 CY/HR,TRAILER MTD (OPEN LOOP HYDRAULIC SYSTEM)
HP D-off
12720 80C55OE009 $94,873 10.54 1.54 13.13 726.8137.87CONCRETE PUMP, 76 CY/HR, TRAILER MTD TANDEM (CLOSED LOOP HYDRAULIC SYSTEM)
HP D-off
18115 95C55OE011 $87,787 9.74 1.42 18.71 706.2942.26CONCRETE PUMP, 100 CY/HR, TRAILER MTD TANDEM (OPEN LOOP HYDRAULIC SYSTEM)
HP D-off
18120 100C55OE012 $111,472 12.41 1.81 18.71 818.0248.13CONCRETE PUMP, 100 CY/HR, TRAILER MTD TANDEM (CLOSED LOOP HYDRAULIC SYSTEM)
HP D-off
4Z 26XC55OE001 $266,534 29.99 4.32 0.00 10019.3265.89CONCRETE PUMP, PUMP & BOOM, 130 CY/HR, REACH: 72' HORIZONTAL / 85' VERTICAL (ADD 50,000 GVW TRUCK)
4Z 36XC55OE002 $342,259 38.50 5.55 0.00 10024.8084.61CONCRETE PUMP, PUMP & BOOM, 182 CY/HR, REACH: 104' HORIZONTAL / 118' VERTICAL (ADD 50,000 GVW TRUCK)
5RZ 47IC55OE003 $521,246 58.64 8.45 0.00 10037.77128.86CONCRETE PUMP, PUMP & BOOM, 182 CY/HR, REACH: 134' HORIZONTAL / 152' VERTICAL (ADD 50,000 GVW TRUCK)
SCHWING AMERICA INC.
80WP750 D-18XC55SC001 $71,976 8.06 1.17 8.27 695.2026.90CONCRETE PUMP, 70 CY/HR, 1,100 PSI, TRAILER MTD
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-76
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
C55 SCHWING AMERICA INC. (continued)177BPA 2000HDD-
20RC55SC002 $176,571 19.73 2.86 18.29 11512.7363.77CONCRETE PUMP, 67 CY/HR, 1,565 PSI,
TRAILER MTD HP D-off
210S 28XC55SC005 $370,832 41.28 6.01 24.92 35926.65119.15CONCRETE PUMP, 117 CY/HR, 75' BOOM, TRUCK MTD
HP D-on
210KVM 32XGC55SC006 $442,590 49.35 7.18 24.92 47031.86136.89CONCRETE PUMP, 117 CY/HR, 92' BOOM, TRUCK MTD
HP D-on
CONCRETE SAWS (Add cost for sawblade wear)C600.00 CONCRETE SAWS (Add cost for sawblade wear)SUBCATEGORY
CUSHION CUT, INC.
66FS 6600 D 18C60CQ011 $22,237 3.34 0.38 8.63 192.0517.06CONCRETE SAW, 6.5" DEPTH, SELF PROPELLED, 14" BLADE (ADD COST FOR SAWBLADE WEAR & WATER)
HP D-off
9FS 9BC60CQ002 $2,912 0.44 0.05 2.15 20.273.35CONCRETE SAW, 5.625" DEPTH, MANUAL, 16" BLADE (ADD COST FOR SAWBLADE WEAR & WATER)
HP G
13FS 13BUCC60CQ003 $3,135 0.47 0.05 3.11 20.294.49CONCRETE SAW, 5.625" DEPTH, MANUAL, 16" BLADE (ADD COST FOR SAWBLADE WEAR & WATER)
HP G
35FS 3500 G 18C60CQ001 $12,880 1.93 0.22 8.36 101.1913.52CONCRETE SAW, 6.5" DEPTH, SELF-PROPELLED, 18" BLADE (ADD COST FOR SAWBLADE WEAR & WATER)
HP G
30FS 3500 E 26C60CQ014 $13,850 2.08 0.23 2.40 91.277.88CONCRETE SAW, 10.625" DEPTH, SELF PROPELLED, 26" BLADE (ADD COST FOR SAWBLADE WEAR & WATER)
HP E
66FS 6600 D 26C60CQ012 $22,292 3.34 0.38 8.63 192.0517.07CONCRETE SAW, 10.625" DEPTH, SELF PROPELLED, 26" BLADE (ADD COST FOR SAWBLADE WEAR & WATER)
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-77
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
C60 CUSHION CUT, INC. (continued)35FS 3500 G 30C60CQ010 $13,331 2.00 0.23 8.36 121.2313.67CONCRETE SAW, 12.125" DEPTH, SELF
PROPELLED, 30" BLADE,W/TRANSAXLE (ADD COST FOR SAWBLADE WEAR & WATER)
HP G
66FS 6600 D 36C60CQ013 $22,470 3.37 0.38 8.63 202.0717.13CONCRETE SAW, 14.875" DEPTH, SELF PROPELLED, 36" BLADE (ADD COST FOR SAWBLADE WEAR & WATER)
HP D-off
84FS 8400/36C60CQ016 $28,392 4.26 0.48 10.98 202.6121.73CONCRETE SAW, 14.875" DEPTH, SELF PROPELLED, 36" BLADE (ADD COST FOR SAWBLADE WEAR & WATER)
HP D-off
FELKER (TARGET)
2S80/14ZC60FE002 $1,503 0.23 0.03 0.48 10.151.04CONCRETE SAW, 5.00" DEPTH, MANUAL, 14" BLADE (ADD COST FOR SAWBLADE WEAR & WATER)
HP G
9ES 1409C60FE006 $3,139 0.47 0.05 2.15 20.293.42CONCRETE SAW, 4.625" DEPTH, WALK BEHIND, 14" BLADE (ADD COST FOR SAWBLADE WEAR & WATER)
HP G
13ES 1413C60FE007 $3,286 0.49 0.06 3.11 20.314.54CONCRETE SAW, 4.625" DEPTH, WALK BEHIND, 14" BLADE (ADD COST FOR SAWBLADE WEAR & WATER)
HP G
20ECII20HC60FE009 $10,495 1.57 0.18 4.78 60.978.75CONCRETE SAW, 7.50" DEPTH, SELF PROPELLED, 20" BLADE (ADD COST FOR SAWBLADE WEAR & WATER)
HP G
BOART LONGYEAR COMPANY
13FS 13BC60LY005 $3,082 0.46 0.05 3.11 20.284.47CONCRETE SAW, 7.00" DEPTH, WALK BEHIND(ADD COST FOR SAWBLADE WEAR & WATER)
HP G
EP 1110-1-8, Vol. 330 Nov 09
2-78
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
C60 BOART LONGYEAR COMPANY (continued)10360-10APC60LY001 $26,872 4.03 0.46 2.39 22.4811.41CONCRETE SAW, RAIL SAW, 15.50"
DEPTH, WALL (ADD COMPRESSOR & COST FOR SAWBLADE WEAR & WATER)
HP G
35360-35HMC60LY002 $39,741 5.96 0.67 8.36 23.6522.24CONCRETE SAW, RAIL SAW, 24.50" DEPTH, WALL(ADD COST FOR SAWBLADE WEAR & WATER)
HP G
32WR-400C60LY011 $76,793 11.52 1.30 4.18 157.0629.71CONCRETE SAW, WIRE SAW SYSTEM, HEAVY DUTY (ADD COST FOR SAW WIRE WEAR & WATER)
HP D-off
CONCRETE VIBRATORSC650.00 CONCRETE VIBRATORSSUBCATEGORY
STOW MANUFACTURING, INC.
1SV-1 115VC65ST007 $910 0.20 0.02 0.06 10.120.87CONCRETE VIBRATOR, 1.375" HEAD, 21' SHAFT (ADD 2KV GENERATOR)
HP E
2SV-2 115VC65ST008 $950 0.21 0.02 0.12 10.130.99CONCRETE VIBRATOR, 2.175" HEAD, 21' SHAFT (ADD 2KV GENERATOR)
HP E
3SV-3 115VC65ST009 $1,124 0.25 0.02 0.17 10.151.21CONCRETE VIBRATOR, 2.625" HEAD, 21' SHAFT (ADD 2KV GENERATOR)
HP E
6G55HC65ST013 $2,075 0.47 0.04 0.96 20.282.88CONCRETE VIBRATOR, 2.325" HEAD, 21' SHAFT, W/GAS MOTOR ON CART
HP G
WACKER CORPORATION
5A 5000C65WC005 $1,894 0.43 0.03 0.87 10.252.62CONCRETE VIBRATOR, 1.75" HEAD, 13' SHAFT, W/GAS MOTOR ON CART
HP G
EP 1110-1-8, Vol. 330 Nov 09
2-79
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
C65 WACKER CORPORATION (continued)3M 3000C65WC004 $991 0.22 0.02 0.17 10.131.24CONCRETE VIBRATOR, 1.75" HEAD, 13'
SHAFT, HI-FREQ INTERNAL (ADD 2KV GENERATOR)
HP E
2IREN 57C65WC003 $1,551 0.35 0.03 0.12 10.211.66CONCRETE VIBRATOR, 2.50" HEAD, 16.5' SHAFT, HI-FREQ INTERNAL (ADD 2KV GENERATOR)
HP E
CRANES, HYDRAULIC, SELF-PROPELLEDC750.00 CRANES, HYDRAULIC, SELF-PROPELLEDSUBCATEGORY
BRODERSON MANUFACTURING CORPORATION
38IC-20-1FC75BD007 $61,942 3.72 0.98 7.62 632.8416.58CRANES, HYDRAULIC, SELF-PROPELLED, YARD, 2.5 TON, 15' BOOM, 4X2
HP G
42IC-35-2CC75BD008 $82,367 4.96 1.30 8.43 783.7820.10CRANES, HYDRAULIC, SELF-PROPELLED, YARD, 4.0 TON, 19.2' BOOM, 4X2
HP G
42IC-35-2CC75BD004 $85,787 5.13 1.36 8.43 793.9320.67CRANES, HYDRAULIC, SELF-PROPELLED, YARD, 4.0 TON, 19' BOOM, 4X2, NON-ROTATING OPERATOR'S CAB
HP G
69IC-80-3GC75BD009 $111,181 6.65 1.76 13.84 1725.0930.05CRANES, HYDRAULIC, SELF-PROPELLED, YARD, 8.5 TON, 30' BOOM, 4X2
HP G
69IC-80-1GC75BD005 $107,641 6.43 1.70 13.84 1634.9229.59CRANES, HYDRAULIC, SELF-PROPELLED, YARD, 9.0 TON, 20' BOOM, 4X2, NON-ROTATING OPERATOR'S CAB
HP G
110IC-200-3FC75BD006 $156,957 9.36 2.48 22.07 3087.1645.34CRANES, HYDRAULIC, SELF-PROPELLED, YARD, 15.0 TON, 50' BOOM, 4X2, NON-ROTATING OPERATOR'S CAB
HP G
85IC-250-3AC75BD010 $185,418 11.09 2.94 9.30 3848.4934.68CRANES, HYDRAULIC, SELF-PROPELLED, YARD, 18.0 TON, 50' BOOM, 4X4
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-80
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
C75 BRODERSON MANUFACTURING CORPORATION (continued)
130RT-300-2BC75BD011 $246,258 14.73 3.90 14.23 47311.2748.83CRANES, HYDRAULIC, SELF-PROPELLED, YARD, 15.0 TON, 60' BOOM, 4X4, 20'0" OFFSET
HP D-off
GROVE CRANES (MANITOWOC)
62YB4410C75GV021 $124,181 7.44 1.97 12.44 1735.6930.20CRANES, HYDRAULIC, SELF-PROPELLED, YARD, 10 TON, 30' BOOM, 4X4, NON-ROTATING OPERATOR'S CAB
HP G
110YB4415XTC75GV022 $153,616 9.16 2.43 12.04 3137.0133.66CRANES, HYDRAULIC, SELF-PROPELLED, YARD, 15 TON, 52' BOOM, 4X4, NON-ROTATING OPERATOR'S CAB
HP D-off
152RT525EC75GV028 $289,003 17.19 4.57 16.63 50013.1757.82CRANES, HYDRAULIC, SELF-PROPELLED, ROUGH TERRAIN, 25 TON, 75' BOOM, 4X4X4
HP D-off
152RT530EC75GV023 $300,694 17.13 4.76 16.63 58013.3365.47CRANES, HYDRAULIC, SELF-PROPELLED, ROUGH TERRAIN, 30 TON, 95' BOOM, 4X4
HP D-off
173RT640EC75GV024 $459,592 26.78 7.28 18.93 65020.6788.43CRANES, HYDRAULIC, SELF-PROPELLED, ROUGH TERRAIN, 40 TON, 105' BOOM 4X4
HP D-off
240RT750EC75GV019 $529,487 30.40 8.38 26.27 87623.58110.20CRANES, HYDRAULIC, SELF-PROPELLED, ROUGH TERRAIN, 50 TON, 110' BOOM, 4X4
HP D-off
240RT760C75GV014 $529,751 30.42 8.39 26.27 90923.60110.24CRANES, HYDRAULIC, SELF-PROPELLED, ROUGH TERRAIN, 60 TON, 110' BOOM, 4X4, W/HOOK BLOCK & BALL
HP D-off
250RT875CC75GV025 $841,667 49.36 13.32 27.36 1,09138.00150.65CRANES, HYDRAULIC, SELF-PROPELLED, ROUGH TERRAIN, 70 TON, 110' BOOM 4X4
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-81
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
C75 GROVE CRANES (MANITOWOC) (continued)250RT875 BXLC75GV020 $846,654 49.86 13.40 27.36 1,11938.33150.67CRANES, HYDRAULIC, SELF-PROPELLED,
ROUGH TERRAIN, 90 TON, 138' BOOM, 4X4
HP D-off
300RT9130EC75GV016 $1,206,329 71.69 19.10 32.83 1,36454.95202.92CRANES, HYDRAULIC, SELF-PROPELLED, ROUGH TERRAIN, 100 TON, 160' BOOM, 4X4, W/HOOK BLOCK & BALL
HP D-off
PETTIBONE MICHIGAN LLC
18540RSC75PB002 $484,629 28.88 7.67 20.25 49622.1186.55CRANES, HYDRAULIC, SELF-PROPELLED, ROUGH TERRAIN, 20 TON, 64.1' BOOM, 4X4X4
HP D-off
TADANO AMERICA CORPORATION
180TR-300XL-4C75TD003 $390,275 23.26 6.18 19.70 53717.8175.22CRANES, HYDRAULIC, SELF-PROPELLED, ROUGH TERRAIN, 30 TON, 112' BOOM, 4X4
HP D-off
247TR-500XL-4C75TD007 $740,823 43.46 11.73 27.03 88233.46130.35CRANES, HYDRAULIC, SELF-PROPELLED, ROUGH TERRAIN, 50 TON, 175' BOOM, 4X4
HP D-off
247TR-650XL-3C75TD008 $686,948 40.19 10.87 27.03 94530.97129.59CRANES, HYDRAULIC, SELF-PROPELLED, ROUGH TERRAIN, 65 TON, 180' BOOM, 4X4
HP D-off
TEREX CORPORATION
130RT230C75TE001 $367,140 22.02 5.81 14.23 56316.8264.62CRANES, HYDRAULIC, SELF-PROPELLED, ROUGH TERRAIN, 30 TON, 94' BOOM, 4X4
HP D-off
152RT335/40C75TE002 $505,056 30.23 7.99 16.63 63423.1186.05CRANES, HYDRAULIC, SELF-PROPELLED, ROUGH TERRAIN, 40 TON, 94' BOOM, 4X4
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-82
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
CRANES, HYDRAULIC, TRUCK MOUNTEDC800.01 UNDER 26 TONSUBCATEGORY
TEREX CORPORATION
130CD225C80TE008 $288,367 17.07 4.56 12.25 52513.1050.32CRANES, HYDRAULIC, TRUCK MTD, ROUGH TERRAIN, 25 TON, 72' BOOM, 4X4
HP D-off
NO SPECIFIC MANUFACTURER
2451700C80XX001 $146,174 8.65 2.31 23.09 3306.6443.76CRANES, HYDRAULIC, TRUCK MTD, BOOM TRUCK, 17 TON, 80' BOOM, 4X2
HP D-off
3002300C80XX002 $193,064 11.38 3.06 28.27 6008.7555.49CRANES, HYDRAULIC, TRUCK MTD, BOOM TRUCK, 23.5 TON, 102' BOOM, 6X2
HP D-off
0.02 26 TON THRU 65 TONSUBCATEGORY
GROVE CRANES (MANITOWOC)
300TMS-500EC80GV025 $464,511 24.47 7.29 28.27 54019.5382.18CRANES, HYDRAULIC, TRUCK MTD, 40 TON, 95' BOOM, 6X4
HP D-off
400TMS-700EC80GV006 $711,893 37.56 11.18 37.70 77129.96119.56CRANES, HYDRAULIC, TRUCK MTD, 50 TON, 110' BOOM, 8X4
HP D-off
400TMS750EC80GV029 $715,300 37.55 11.23 37.70 94730.01120.71CRANES, HYDRAULIC, TRUCK MTD, 50 TON, 110' BOOM, 8X4X4
HP D-off
348GMK 3050C80GV026 $701,909 36.91 11.02 32.80 74529.48113.58CRANES, HYDRAULIC, TRUCK MTD, ALL TERRAIN, 55 TON, 125' BOOM, 8X4
HP D-off
400TMS760EC80GV030 $716,521 37.62 11.25 37.70 94930.06120.84CRANES, HYDRAULIC, TRUCK MTD, 60 TON, 110' BOOM, 8X4X4
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-83
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
LINK-BELT CONSTRUCTION EQUIPMENT COMPANY
350HTC-8640 SLC80LI009 $572,127 30.08 8.98 32.98 57524.0299.52CRANES, HYDRAULIC, TRUCK MTD, 40 TON, 105' BOOM, 6X4X2
HP D-off
315HTC-8650 IIC80LI010 $509,790 26.70 8.00 29.69 78021.3589.40CRANES, HYDRAULIC, TRUCK MTD, 50 TON, 110' BOOM, 8X4X4
HP D-off
365HTC-8660 IIC80LI011 $587,423 30.76 9.22 34.40 83124.60103.22CRANES, HYDRAULIC, TRUCK MTD, 60 TON, 110' BOOM, 8X4X4
HP D-off
TEREX CORPORATION
250T335/40C80TE002 $372,573 19.52 5.85 23.56 49315.6167.38CRANES, HYDRAULIC, TRUCK MTD, ALL TERRAIN, 40 TON, 94' BOOM, 6X4
HP D-off
370T 500C80TE003 $495,690 25.91 7.78 34.87 80620.7493.70CRANES, HYDRAULIC, TRUCK MTD, ALL TERRAIN, 50 TON, 110' BOOM, 8X4
HP D-off
0.03 66 TON THRU 125 TONSUBCATEGORY
GROVE CRANES (MANITOWOC)
400TMS-870C80GV020 $888,969 41.66 13.85 37.70 9,16134.68134.41CRANES, HYDRAULIC, TRUCK MTD, 70 TON, 110' BOOM, 8X4
HP D-off
400TMS875CC80GV031 $810,974 37.90 12.63 37.70 81731.58126.77CRANES, HYDRAULIC, TRUCK MTD, 75 TON, 110' BOOM, 8X4X4
HP D-off
422GMK4090C80GV032 $1,080,751 50.35 16.83 39.77 1,18442.01161.54CRANES, HYDRAULIC, TRUCK MTD, ALL TERRAIN, 80 TON, 142' BOOM, 8X6X8
HP D-off
TADANO AMERICA CORPORATION
121ATF-650XLC80TD001 $753,663 34.91 11.74 17.49 1,09029.20100.15349 HP D-onCRANES, HYDRAULIC, TRUCK MTD, ALL TERRAIN, 65 TON, 132' BOOM, 8X8
HP D-off
158ATF-1000XLC80TD002 $939,736 43.70 14.64 21.43 1,07036.49123.53375 HP D-onCRANES, HYDRAULIC, TRUCK MTD, ALL TERRAIN, 100 TON, 138' BOOM, 8X8
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-84
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
0.04 OVER 125 TONSUBCATEGORY
GROVE CRANES (MANITOWOC)
174GMK 5240C80GV013 $2,117,845 89.24 32.82 26.87 1,18077.44247.38600 HP D-onCRANES, HYDRAULIC, TRUCK MTD, ALL TERRAIN, 125 TON, 197' BOOM, 10X8
HP D-off
174GMK 5240C80GV014 $2,123,701 89.49 32.91 26.87 1,33677.66247.96600 HP D-onCRANES, HYDRAULIC, TRUCK MTD, ALL TERRAIN, 165 TON, 197' BOOM, 10X8
HP D-off
174GMK 5240C80GV015 $2,134,311 89.94 33.08 26.87 2,34878.05249.01600 HP D-onCRANES, HYDRAULIC, TRUCK MTD, ALL TERRAIN, 200 TON, 197' BOOM, 10X8
HP D-off
165GMK 6350C80GV016 $3,002,360 126.68 46.53 24.71 1,425109.87333.98525 HP D-onCRANES, HYDRAULIC, TRUCK MTD, ALL TERRAIN, 200 TON, 197' BOOM, 12X8
HP D-off
TADANO AMERICA CORPORATION
533ATF-1500XLC80TD005 $1,128,052 47.18 17.48 59.01 1,33041.07180.19503 HP D-onCRANES, HYDRAULIC, TRUCK MTD, ALL TERRAIN, 150 TON, 162' BOOM, 10X8
HP D-off
CRANES, MECHANICAL, LATTICE BOOM, CRAWLER MOUNTEDC850.12 DRAGLINE, CLAMSHELL, OVER 1.0 CY THRU 2.5 CYSUBCATEGORY
LINK-BELT CONSTRUCTION EQUIPMENT CO.
263LS-208H IIC85LB019 $826,155 41.31 13.44 20.79 1,39034.10117.92CRANES, MECHANICAL, LATTICE BOOM, CRAWLER, DRAGLINE/CLAMSHELL, 80 TON, 100' BOOM (ADD BUCKET)
HP D-off
TEREX CORPORATION
1505220C85TE001 $670,213 33.51 10.90 11.86 83127.6690.04CRANES, MECHANICAL, LATTICE BOOM, CRAWLER, DRAGLINE/CLAMSHELL, 50 TON, 100' BOOM (ADD BUCKET)
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-85
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
C85 TEREX CORPORATION (continued)2507225C85TE002 $932,503 46.63 15.17 19.76 1,25938.49128.94CRANES, MECHANICAL, LATTICE BOOM,
CRAWLER, DRAGLINE/CLAMSHELL, 85 TON, 100' BOOM (ADD BUCKET)
HP D-off
0.13 DRAGLINE, CLAMSHELL, OVER 2.5 CY THRU 5.0 CYSUBCATEGORY
LINK-BELT CONSTRUCTION EQUIPMENT CO.
284238 HYLAB 5C85LB021 $1,341,795 59.64 21.68 22.45 3,35751.50169.83CRANES, MECHANICAL, LATTICE BOOM, CRAWLER, DRAGLINE/CLAMSHELL, 150 TON, 100' BOOM (ADD BUCKET)
HP D-off
237LS-248H IIC85LB022 $1,550,422 68.91 25.06 18.73 3,24259.52188.45CRANES, MECHANICAL, LATTICE BOOM, CRAWLER, DRAGLINE/CLAMSHELL, 200 TON, 120' BOOM (ADD BUCKET)
HP D-off
MANITOWOC ENGINEERING CO.
350222HDC85MA001 $1,062,564 47.23 17.17 27.66 1,98840.79145.17CRANES, MECHANICAL, LATTICE BOOM, CRAWLER, DRAGLINE/CLAMSHELL, 3.5 CY, 80' BOOM (ADD BUCKET)
HP D-off
340777C85MA002 $1,303,697 57.94 21.07 26.87 3,81550.04170.46CRANES, MECHANICAL, LATTICE BOOM, CRAWLER, DRAGLINE/CLAMSHELL, 5.0 CY, 130' BOOM (ADD BUCKET)
HP D-off
TEREX CORPORATION
3359225C85TE003 $1,176,078 52.27 19.01 26.48 2,48245.15156.20CRANES, MECHANICAL, LATTICE BOOM, CRAWLER, DRAGLINE/CLAMSHELL, 150 TON, 100' BOOM (ADD BUCKET)
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-86
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
0.14 DRAGLINE, CLAMSHELL, OVER 5.0 CYSUBCATEGORY
LINK-BELT CONSTRUCTION EQUIPMENT CO.
440LS-278HC85LB023 $1,826,992 73.08 29.39 34.78 4,06465.93227.35CRANES, MECHANICAL, LATTICE BOOM, CRAWLER, DRAGLINE/CLAMSHELL, 250 TON, 120' BOOM (ADD BUCKET)
HP D-off
MANITOWOC ENGINEERING CO.
375999C85MA003 $1,941,086 77.64 31.22 29.64 5,10070.04233.58CRANES, MECHANICAL, LATTICE BOOM, CRAWLER, DRAGLINE/CLAMSHELL, 7.0 CY, 140' BOOM (ADD BUCKET)
HP D-off
340888C85MA009 $1,704,463 68.18 27.42 26.87 3,39761.51206.04CRANES, MECHANICAL, LATTICE BOOM, CRAWLER, DRAGLINE/CLAMSHELL, 10 CY, 70' BOOM (ADD BUCKET)
HP D-off
0.22 LIFTING, 26 TON THRU 50 TONSUBCATEGORY
KOBELCO AMERICA INC.
178CK550C85KC007 $616,047 27.38 9.96 10.28 1,00123.6571.64CRANES, MECHANICAL, LATTICE BOOM, CRAWLER, 50 TON, 30' BOOM, LIFTING
HP D-off
0.23 LIFTING, 51 TON THRU 150 TONSUBCATEGORY
KOBELCO AMERICA INC.
178CK550C85KC004 $665,746 28.29 10.32 10.28 1,07124.4775.37CRANES, MECHANICAL, LATTICE BOOM, CRAWLER, 55 TON, 160' BOOM, LIFTING
HP D-off
213CK850C85KC005 $768,685 32.67 11.91 12.30 1,72928.2587.50CRANES, MECHANICAL, LATTICE BOOM, CRAWLER, 85 TON, 180' BOOM, LIFTING
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-87
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
C85 KOBELCO AMERICA INC. (continued)265CK1000C85KC003 $1,054,888 44.83 16.35 15.31 1,89938.77118.39CRANES, MECHANICAL, LATTICE BOOM,
CRAWLER, 100 TON, 200' BOOM, LIFTING
HP D-off
LINK-BELT CONSTRUCTION EQUIPMENT CO.
263LS-208H IIC85LB013 $849,775 36.12 13.17 15.19 1,39031.2398.46CRANES, MECHANICAL, LATTICE BOOM, CRAWLER, 80 TON, 190' BOOM, LIFTING
HP D-off
284218 HSLC85LB014 $968,396 41.16 15.01 16.40 1,79035.59111.21CRANES, MECHANICAL, LATTICE BOOM, CRAWLER, 110 TON, 230' BOOM, LIFTING
HP D-off
284238 HYLAB 5C85LB015 $1,341,795 57.03 20.80 16.40 3,35749.32147.27CRANES, MECHANICAL, LATTICE BOOM, CRAWLER, 150 TON, 240' BOOM, LIFTING
HP D-off
LINK-BELT CONSTRUCTION EQUIPMENT COMPANY
207LS-138H SERIES II
C85LI001 $695,601 29.56 10.78 11.96 1,46425.5680.08CRANES, MECHANICAL, LATTICE BOOM, CRAWLER, 80 TON, 40' TUBULAR BOOM, LIFTING
HP D-off
MANITOWOC ENGINEERING CO.
350222HDC85MA004 $1,051,073 44.67 16.29 20.22 2,35438.63123.32CRANES, MECHANICAL, LATTICE BOOM, CRAWLER, 100 TON, 210' BOOM, LIFTING
HP D-off
335555C85MA008 $1,043,625 44.35 16.17 19.35 3,12138.35121.65CRANES, MECHANICAL, LATTICE BOOM, CRAWLER, 100 TON, 260' BOOM, LIFTING
HP D-off
335555C85MA005 $985,497 41.88 15.27 19.35 2,74436.21116.04CRANES, MECHANICAL, LATTICE BOOM, CRAWLER, 150 TON, 250' BOOM, LIFTING
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-88
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
TEREX CORPORATION
184HC 80C85TE008 $704,712 29.95 10.92 10.63 1,43025.9079.52CRANES, MECHANICAL, LATTICE BOOM, CRAWLER, 80 TON, 200' BOOM, LIFTING
HP D-off
230HC 110C85TE009 $868,828 36.93 13.47 13.28 1,91131.9498.23CRANES, MECHANICAL, LATTICE BOOM, CRAWLER, 100 TON, 230' BOOM, LIFTING
HP D-off
240HC 125C85TE010 $1,152,544 48.98 17.86 13.86 2,12842.35126.24CRANES, MECHANICAL, LATTICE BOOM, CRAWLER, 125 TON, 240' BOOM, LIFTING
HP D-off
0.24 LIFTING, OVER 150 TONSUBCATEGORY
KOBELCO AMERICA INC.
316CK2000C85KC008 $1,400,880 54.12 21.60 18.25 3,62248.66150.45CRANES, MECHANICAL, LATTICE BOOM, CRAWLER, 200 TON, 50' BOOM, LIFTING
HP D-off
279CK2500C85KC006 $1,973,602 76.25 30.44 16.12 4,98568.57201.55CRANES, MECHANICAL, LATTICE BOOM, CRAWLER, 250 TON, 280' BOOM, LIFTING
HP D-off
LINK-BELT CONSTRUCTION EQUIPMENT CO.
284248 HYLAB 5C85LB016 $1,693,390 65.43 26.11 16.40 3,24258.83175.72CRANES, MECHANICAL, LATTICE BOOM, CRAWLER, 200 TON, 280' BOOM, LIFTING
HP D-off
440LS-278HC85LB017 $1,912,149 73.88 29.49 25.41 4,06466.43205.92CRANES, MECHANICAL, LATTICE BOOM, CRAWLER, 250 TON, 330' BOOM, LIFTING
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-89
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
MANITOWOC ENGINEERING CO.
340777C85MA006 $1,369,906 52.93 21.13 19.64 3,92947.60149.10CRANES, MECHANICAL, LATTICE BOOM, CRAWLER, 200 TON, 260' BOOM, LIFTING
HP D-off
340888C85MA010 $1,747,132 67.50 26.94 19.64 3,69760.69184.26CRANES, MECHANICAL, LATTICE BOOM, CRAWLER, 230 TON, 300' BOOM, LIFTING
HP D-off
375999C85MA007 $1,931,942 74.64 29.79 21.66 4,94267.11203.68CRANES, MECHANICAL, LATTICE BOOM, CRAWLER, 250 TON, 260' BOOM, LIFTING
HP D-off
TEREX CORPORATION
315HC 210C85TE011 $1,702,084 65.76 26.25 18.19 3,70859.13178.48CRANES, MECHANICAL, LATTICE BOOM, CRAWLER, 210 TON, 280' BOOM, LIFTING
HP D-off
CRANES, MECHANICAL, LATTICE BOOM, TRUCK MOUNTEDC900.04 OVER 125 TONSUBCATEGORY
LINK-BELT CONSTRUCTION EQUIPMENT CO.
197HC-238H IIC90LB001 $1,532,662 60.68 24.65 21.87 1,91354.99180.38430 HP D-onCRANES, MECHANICAL, LATTICE BOOM, TRUCK MTD, 150 TON, 260' BOOM, 8X4
HP D-off
248HC-248HC90LB002 $1,730,470 68.59 27.83 25.59 2,47662.13203.63430 HP D-onCRANES, MECHANICAL, LATTICE BOOM, TRUCK MTD, 200 TON, 280' BOOM, 8X4
HP D-off
430HC-278 H IIC90LB003 $2,779,494 110.24 44.71 38.87 3,38599.83323.80430 HP D-onCRANES, MECHANICAL, LATTICE BOOM, TRUCK MTD, 300 TON, 330' BOOM, 12X6
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-90
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
CRANES, TOWERC950.00 CRANES, TOWERSUBCATEGORY
PECCO AND WOLFF TOWER CRANES (MORROW)
128SK200C95AP004 $539,217 23.97 8.71 7.40 97020.7070.55TOWER CRANE, 3.4 TON @ 181' RADIUS 42.6' HEIGHT (ADD 95KW GENERATOR & T-SECTION)
HP E
S16-35 TOWER SECTION
C95AP005 $17,062 0.76 0.28 0.00 160.661.77TOWER CRANE OPTION, 1.1' T-TRANSITION S35 -S16 (ADD SK 140 - SK 225 TOWER CRANE)
S35 TOWER SECTION
C95AP006 $32,196 1.43 0.52 0.00 891.243.33TOWER CRANE OPTION, 19.33' TOWER SECTION (ADD TO SK 140 - SK 400 TOWER CRANE)
213SK400C95AP007 $852,157 37.87 13.77 12.32 1,78332.71111.08TOWER CRANE, 3.3 TON @ 245' RADIUS, 56.7' HEIGHT (ADD 160 KW GENERATOR & T-SECTION)
HP E
S35 CLIMBING UNIT
C95AP008 $130,522 5.80 2.11 0.00 2485.0114.00TOWER CRANE OPTION, 29.2' CLIMBING UNIT (ADD TO SK 200 - SK 400 TOWER CRANE)
S35-60 TOWER SECTION
C95AP009 $43,408 1.93 0.70 0.00 991.674.49TOWER CRANE OPTION, 19.4' T-TRANSITION S60 S35 (ADD SK 225 - SK 560 TOWER CRANE)
217SK560C95AP010 $1,136,861 50.53 18.37 12.55 1,55743.64140.87TOWER CRANE, 2.8 TON @ 265' RADIUS, 76.5' HEIGHT (ADD 161 KW GENERATOR &T-SECTION)
HP E
S60 TOWER SECTION
C95AP011 $40,565 1.80 0.66 0.00 991.564.20TOWER CRANE OPTION, 19.33' TOWER SECTION (ADD TO SK 225 - SK 560 TOWER CRANE)
EP 1110-1-8, Vol. 330 Nov 09
2-91
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
C95 PECCO AND WOLFF TOWER CRANES (MORROW) (continued)
S60 CLIMB UNITC95AP012 $162,827 7.24 2.63 0.00 2586.2517.34TOWER CRANE OPTION, 32.8' CLIMBING UNIT (ADD TO SK 225 - SK 560 TOWER CRANE)
354SN355C95AP013 $1,087,936 48.35 17.58 20.48 2,74841.76147.34TOWER CRANE, 3.8 TON @ 197' RADIUS, 110' TALL, LUFFING (ADD 300 KW GENERATOR & T-SECTION)
HP E
SN35 TOWER SECTION
C95AP014 $36,914 1.64 0.60 0.00 891.423.82TOWER CRANE OPTION, 14.75' TOWER SECTION (ADD TO SN 141 - SN 355 TOWER CRANE)
SN35 CLIMBING UNIT
C95AP015 $141,982 6.31 2.29 0.00 2485.4515.18TOWER CRANE OPTION, 29.2' CLIMBING UNIT (ADD TO SN 141 - SN 355 TOWER CRANE)
S35N-60TOWER SECTION
C95AP016 $49,616 2.21 0.80 0.00 991.915.14TOWER CRANE OPTION, 19.4' T-TRANSITION S60 S35N (ADD SN 141 - SK 355 TOWER CRANE)
125SK140C95AP017 $460,275 20.46 7.44 7.23 1,30917.6761.15TOWER CRANE, 3.1 TON @ 151' RADIUS, 85.0' HEIGHT (ADD 95KW GENERATOR & T-SECTION)
HP E
S16 TOWER SECTION
C95AP018 $15,411 0.68 0.25 0.00 550.591.59TOWER CRANE OPTION, 14.75' TOWER SECTION (ADD TO SK 140 - SK 200 TOWER CRANE)
S16 CLIMBING UNIT
C95AP019 $88,259 3.92 1.43 0.00 1653.399.63TOWER CRANE OPTION, 29.2' CLIMBING UNIT (ADD TO SK140 - SK 200 TOWER CRANE)
223SN141C95AP020 $507,163 22.54 8.20 12.90 1,08219.4774.24TOWER CRANE, 1.6 TON @ 147' RADIUS, 89' TALL, LUFFING (ADD 200 KW GENERATOR & T-SECTION)
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-92
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
C95 PECCO AND WOLFF TOWER CRANES (MORROW) (continued)
258SN160-16C95AP021 $793,125 35.25 12.82 14.93 1,17930.45107.78TOWER CRANE, 2.8 TON @ 164' RADIUS, 88' TALL, LUFFING (ADD 250 KW GENERATOR & T-SECTION)
HP E
24PH5000-12C95AP022 $119,831 5.33 1.94 1.39 1304.6115.42TOWER CRANE OPTION, 24 PERSON / 2.4 TON MATERIAL ELEVATOR/HOIST (ADD 4.9' MAST SECTION & 18 KW GENERATOR)
HP E
MAST SECTIONC95AP023 $2,829 0.13 0.05 0.00 30.120.30TOWER CRANE OPTION, 4.9' MAST-> PERSON/MATERIAL ELEVATOR/HOIST (ADD WALL TIE & CABLE GUIDE @30')
MORROW EQUIPMENT COMPANY, LLC
3597KC95LH022 $418,698 18.46 6.77 2.02 1,59316.0048.63TOWER CRANE, HORIZONTAL BOOM, JIB CRANE, 13.2 TON MAX, 1.9 TON @ 148' RADIUS, 66' HEIGHT, SELF/ERECTING, W/FIVE - 7' 10" TOWER SECTIONS/ & ROAD TRANSPORT EQUIPMENT (ADD 40KW GENERATOR)
HP E
65140KC95LH023 $584,157 25.79 9.44 3.76 1,83622.3469.34TOWER CRANE, HORIZONTAL BOOM, JIB CRANE, 11.0 TON MAX, 1.7 TON @ 180' RAD 146' HEIGHT, SELF/ERECTING, W/EIGHT - 9' 10" TOWER SECTIONS/ & ROAD TRANSPORT EQUIPMENT (ADD 60KW GENERATOR)
HP E
109132 HCC95LH003 $470,770 20.92 7.61 6.31 1,15618.0760.88TOWER CRANE, HORIZONTAL BOOM, JIB CRANE, 8.8 TON MAX, 2.4 TON @ 168' RADIUS, 147.8' HEIGHT, W/FOURTEEN - 8' 2" TOWER SECTIONS (ADD 85 KW GENERATOR)
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-93
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
C95 MORROW EQUIPMENT COMPANY, LLC (continued)
148200 HCC95LH005 $612,340 27.22 9.90 8.56 1,37423.5179.81TOWER CRANE, HORIZONTAL BOOM, JIB CRANE, 11.0 TON MAX, 2.5 TON @ 201' RADIUS, 162.7' HEIGHT, W/NINE - 13' 7" TOWER SECTIONS (ADD 110 KW GENERATOR)
HP E
223390 HCC95LH011 $1,144,071 50.85 18.49 12.90 2,74443.92142.12TOWER CRANE, HORIZONTAL BOOM, JIB CRANE, 17.6 TON MAX, 3.3 TON @ 246' RADIUS, 199.1' HEIGHT, W/NINE - 19' 0" TOWER SECTIONS (ADD 170 KW GENERATOR)
HP E
223550 HC20C95LH013 $1,461,347 64.95 23.62 12.90 3,76556.10174.94TOWER CRANE, HORIZONTAL BOOM, JIB CRANE, 22.0 TON MAX, 3.8 TON @ 265' RADIUS, 237.5' HEIGHT, W/TWELVE - 19' 0" TOWER SECTIONS (ADD 170 KW GENERATOR)
HP E
317550 HC-LC95LH015 $1,947,691 86.56 31.48 18.34 5,07574.76235.17TOWER CRANE, 26.4 TON MAX, 3/4 TON @ 197' RADIUS, 210' HEIGHT, LUFFING, W/SIX 19' 0" TOWER SECTIONS (ADD 480 KW GENERATOR)
HP E
DRILLS, HYDRAULIC TRACK (Add cost for drill steel and bit wear)D100.10 DRILLS, AIR TRACK (Add cost for drill steel and bit wear)SUBCATEGORY
INGERSOLL RAND ROCK DRILL DIV
750ECM350/VL140D10IR003 $165,060 8.84 2.80 0.00 1297.2224.39DRILL, AIR TRACK, CRAWLER, 2.5-4.0" DIA, 12' FEED (ADD COST FOR DRILL STEEL AND BIT WEAR, ADD 750 CFM COMPRESSOR)
CFM A
EP 1110-1-8, Vol. 330 Nov 09
2-94
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
SULLIVAN-PALATEK, INC.
750RAM EXT, VCR360
D10SU002 $203,320 10.89 3.45 0.00 1528.9029.87DRILL, AIR TRACK, CRAWLER, 2.5-4.0" DIA, 12' FEED (ADD COST FOR DRILL STEEL AND BIT WEAR, ADD 750 CFM COMPRESSOR)
CFM A
900RAM EXT, VCR361
D10SU003 $208,221 11.15 3.53 0.00 2059.1130.56DRILL, AIR TRACK, CRAWLER, 3.0-4.0" DIA, 12' FEED (ADD COST FOR DRILL STEEL AND BIT WEAR, ADD 900 CFM COMPRESSOR)
CFM A
0.20 DRILLS, HYDRAULIC TRACK (Add cost for drill steel and bit wear)SUBCATEGORY
INGERSOLL RAND ROCK DRILL DIV
215ECM590/YH80AD10IR005 $444,215 33.32 7.72 24.84 24524.38113.46DRILL, HYDRAULIC TRACK, CRAWLER, 2.5-4.5" DIA, 14' DRIFTER TRAVEL, SELF-CONTAINED (ADD COST FOR DRILL STEEL AND BIT WEAR)
HP D-off
SULLIVAN-PALATEK, INC.
260SCORPION VCR360
D10SU005 $226,154 16.96 3.93 30.04 26512.4176.93DRILL, HYDRAULIC TRACK, CRAWLER, 5.25" DIA, 12' FEED (ADD COST FOR DRILL STEEL AND BIT WEAR)
HP D-off
260SCORPION VCR361
D10SU006 $228,893 17.17 3.98 30.04 26512.5777.47DRILL, HYDRAULIC TRACK, CRAWLER, 6.5" DIA, 12' FEED (ADD COST FOR DRILL STEEL AND BIT WEAR)
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-95
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
DRILLS, HORIZONTAL BORING & GROUND PIERCING (Add cost for drill steel and bit wear)D150.00 DRILLS, HORIZONTAL BORING & GROUND PIERCING (Add cost for drill steel and bit wear)SUBCATEGORY
BOR-IT MANUFACTURING COMPANY INC.
1212 MIGHT MAXD15BI001 $15,305 1.15 0.27 2.55 180.855.67DRILL, HORIZONTAL BORING, 12" DIA, COMBINED HEAD 28,000 LBS THRUST, W/100' AUGER TRACK (ADD COST FOR DRILL STEEL AND BIT WEAR)
HP G
2020 POWER HOUSE II
D15BI002 $27,458 2.06 0.48 2.31 151.517.60DRILL, HORIZONTAL BORING, 20" DIA, COMBINED HEAD 44,000 LBS THRUST, W/100' AUGER TRACK (ADD COST FOR DRILL STEEL AND BIT WEAR)
HP D-off
3024 BRUTED15BI003 $41,519 3.11 0.72 3.47 382.2811.44DRILL, HORIZONTAL BORING, 24" DIA, COMBINED HEAD 84,000 LBS THRUST, W/100' AUGER TRACK (ADD COST FOR DRILL STEEL AND BIT WEAR)
HP D-off
4530 POWER PLUS
D15BI004 $64,658 4.85 1.12 5.20 703.5517.60DRILL, HORIZONTAL BORING, 30" DIA, COMBINED HEAD 170,000 LBS THRUST, W/100' AUGER TRACK (ADD COST FOR DRILL STEEL AND BIT WEAR)
HP D-off
6236 WORKHORSE
D15BI005 $83,163 6.24 1.45 7.16 904.5723.17DRILL, HORIZONTAL BORING, 36" DIA, COMBINED HEAD 225,000 LBS THRUST, W/100' AUGER TRACK (ADD COST FOR DRILL STEEL AND BIT WEAR)
HP D-off
11948 TERMINATOR
D15BI006 $139,492 10.46 2.42 13.75 1707.6540.77DRILL, HORIZONTAL BORING, 48" DIA, COMBINED HEAD 525,000 LBS THRUST, W/100' AUGER TRACK (ADD COST FOR DRILL STEEL AND BIT WEAR)
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-96
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
D15 BOR-IT MANUFACTURING COMPANY INC. (continued)
18954 TERMINATOR II
D15BI008 $172,257 12.92 2.99 21.83 2509.4555.70DRILL, HORIZONTAL BORING, 54" DIA, COMBINED HEAD 32,700,000 LBS THRUST, W/100' AUGER TRACK (ADD COST FOR DRILL STEEL AND BIT WEAR)
HP D-off
18960D15BI007 $184,807 13.86 3.21 21.83 25010.1458.00DRILL, HORIZONTAL BORING, 60" DIA, COMBINED HEAD 1,100,000 LBS THRUST, W/100' AUGER TRACK (ADD COST FOR DRILL STEEL AND BIT WEAR)
HP D-off
NO SPECIFIC MANUFACTURER
MC-500HD15XX001 $8,418 0.63 0.15 0.00 100.471.55DRILL, HORIZONTAL BORING, 3" - 6" DIA, 15,000 LBS THRUST, HYDRAULIC MOTOR (ADD COST FOR DRILL STEEL AND BIT WEAR)
H-12/RM-12D15XX002 $12,676 0.95 0.22 0.00 120.702.33DRILL, HORIZONTAL BORING, 4" - 12" DIA, 24,000 LBS THRUST, HYDRAULIC MOTOR (ADD COST FOR DRILL STEEL AND BIT WEAR)
DRILLS, CORE, COLUMN MOUNTED (Add cost for drill steel and bit wear)D200.00 DRILLS, CORE, COLUMN MOUNTED (Add cost for drill steel and bit wear)SUBCATEGORY
ACKER DRILL COMPANY INC.
2630-ED20AD005 $5,803 0.54 0.10 0.14 10.371.72DRILL, CORE, COLUMN MOUNTED, 4" DIA MAX CORE HOLE (ADD COST FOR DRILL STEEL AND BIT WEAR)
HP E
2930-ED20AD002 $5,898 0.55 0.10 0.14 20.381.74DRILL, CORE, COLUMN MOUNTED, 10" DIA MAX CORE HOLE (ADD COST FOR DRILL STEEL AND BIT WEAR)
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-97
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
D20 ACKER DRILL COMPANY INC. (continued)41040-ED20AD006 $9,606 0.90 0.17 0.28 10.622.90DRILL, CORE, COLUMN MOUNTED, 10" DIA
MAX CORE HOLE (ADD COST FOR DRILL STEEL AND BIT WEAR)
HP E
81200-GD20AD007 $15,850 1.49 0.28 0.57 31.035.08DRILL, CORE, COLUMN MOUNTED, 12" DIA MAX CORE HOLE (ADD COST FOR DRILL STEEL AND BIT WEAR)
HP E
CUSHION CUT, INC.
16HCD24/12D20CQ001 $14,220 1.33 0.25 3.40 50.928.21DRILL, CORE, COLUMN MOUNTED, 1"-24" BIT DIA (ADD COST FOR DRILL STEEL AND BIT WEAR)
HP G
BOART LONGYEAR COMPANY
3752D20LY001 $8,548 0.80 0.15 0.21 20.552.67DRILL, CORE, COLUMN MOUNTED, 1.5"-6" BIT DIA, W/E4-230/110 MOTOR (110V) (ADD COST FOR DRILL STEEL AND BIT WEAR)
HP E
18542ND20LY002 $8,840 0.83 0.16 0.00 30.582.54DRILL, CORE, COLUMN MOUNTED, 0.5"-36" BIT DIA, W/A4-350 MOTOR (ADD COST FOR DRILL STEEL AND BIT WEAR AND ADD 185 CFM AIR COMPRESSOR)
CFM A
DRILLS, CORE & DOWELLING (Add cost for drill steel and bit wear)D250.00 DRILLS, CORE & DOWELLING (Add cost for drill steel and bit wear)SUBCATEGORY
ACKER DRILL COMPANY INC.
28ACEWD25AD004 $82,588 6.19 1.44 3.23 354.5419.51DRILL, CORE, SKID MTD, 725' MAX DRILL DEPTH (ADD COST FOR DRILL STEEL AND BIT WEAR)
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-98
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
D25 ACKER DRILL COMPANY INC. (continued)69BUSH MASTERD25AD003 $103,524 7.76 1.80 7.97 455.6828.73DRILL, CORE, SKID MTD, 1500' MAX DRILL
DEPTH (ADD COST FOR DRILL STEEL AND BIT WEAR)
HP D-off
E-Z DRILL, INC.
100210 BD25EZ002 $6,857 0.47 0.12 0.00 30.361.84DRILL, CORE, SKID MTD, 0.6''-2.5'' DIA., 18" DEPTH, HORIZONTAL DOWELLING ASSEMBLY (ADD COST FOR DRILL STEEL AND BIT WEAR, ADD 100 CFM COMPRESSOR)
CFM A
100210 B SRAD25EZ003 $7,294 0.52 0.13 0.00 30.391.93DRILL, CORE, SKID MTD, 0.6''-2.5'' DIA., 18" DEPTH, HORIZONTAL DOWELLING ASSEMBLY (ADD COST FOR DRILL STEEL AND BIT WEAR, ADD 100 CFM COMPRESSOR)
CFM A
100210 B SR HORIZONTAL
D25EZ001 $7,818 0.59 0.14 0.00 30.442.02DRILL, CORE, SKID MTD, 0.6''-2.5'' DIA., 18" DEPTH, HORIZONTAL DOWELLING ASSEMBLY (ADD COST FOR DRILL STEEL AND BIT WEAR, ADD 100 CFM COMPRESSOR)
CFM A
100210-3 SRAD25EZ005 $26,905 1.96 0.47 0.00 121.456.49DRILL, CORE, SELF PROPELLED, 0.6''-2.5'' DIA., 18" DEPTH, DOWELLING MACHINE (ADD COST FOR DRILL STEEL AND BIT WEAR, ADD 100 CFM COMPRESSOR)
CFM A
EP 1110-1-8, Vol. 330 Nov 09
2-99
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
DRILLS, EARTH / AUGER (Add cost for drill steel and cutting edge wear)D300.00 DRILLS, EARTH / AUGER (Add cost for drill steel and cutting edge wear)SUBCATEGORY
HYDRAULIC POWER SYSTEMS, INC.
210H-15D30HD001 $78,226 5.87 1.36 24.26 1464.3043.90DRILL, AUGER, HYDRAULIC, W/60' 8" X 21" LEADS, 15,000 FT-LBS TORQUE (ADD COST FOR DRILL STEEL AND CUTTING EDGE WEAR AND CRANE)
HP D-off
270H-35VTD30HD002 $117,318 8.80 2.04 31.19 2006.4460.12DRILL, AUGER, HYDRAULIC, W/60' 8" X 27" LEADS, 33,000 FT-LBS TORQUE (ADD COST FOR DRILL STEEL AND CUTTING EDGE WEAR AND CRANE)
HP D-off
335H-50VTD30HD003 $152,671 11.45 2.65 38.70 2698.3876.23DRILL, AUGER, HYDRAULIC, W/60' 8" X 33" LEADS, 50,000 FT-LBS TORQUE (ADD COST FOR DRILL STEEL AND CUTTING EDGE WEAR AND CRANE)
HP D-off
FOREMOST MOBILE DRILLING COMPANY, INC.
8MINUTEMAND30MR001 $12,757 0.96 0.22 1.70 40.704.37DRILL, EARTH / AUGER, W/AUGER KIT, 3" DIA, 30' DEPTH, 350 FT-LBS TORQUE, PORTABLE (ADD COST FOR DRILL STEEL AND CUTTING EDGE WEAR)
HP G
58B-31D30MR003 $86,449 6.42 1.50 6.70 424.7124.14DRILL, EARTH / AUGER, HYDRAULIC AUGER, 14" DIA, 30' DEPTH, 3,500 FT-LBS TORQUE, TRAILER MOUNTED (ADD COST FOR DRILL STEEL AND CUTTING EDGE WEAR)
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-100
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
D30 FOREMOST MOBILE DRILLING COMPANY, INC. (continued)
100B-53D30MR005 $208,161 15.41 3.62 15.56 12011.3357.59230 HP D-onDRILL, EARTH / AUGER, MULTI-PURPOSE, 6" DIA, 245' DEPTH, 5,955 FT-LBS TORQUE, W/21,000 GVW TRUCK (W/PTO DRIVE)(ADD COST FOR DRILL STEEL AND CUTTING EDGE WEAR)
HP D-off
115B-58D30MR006 $214,414 15.88 3.73 17.82 13011.6761.29260 HP D-onDRILL, EARTH / AUGER, MULTI-PURPOSE, 8" DIA, 250' DEPTH, 7,000 FT-LBS TORQUE W/33,000 GVW TRUCK (ADD COST FOR DRILL STEEL AND CUTTING EDGE WEAR)
HP D-off
115B-61HTD30MR007 $270,832 20.11 4.71 17.82 20514.7772.22260 HP D-onDRILL, EARTH / AUGER, MULTI-PURPOSE, 8" DIA, 375' DEPTH, 20,000 FT-LBS TORQUE W/33,000 GVW TRUCK (ADD COST FOR DRILL STEEL AND CUTTING EDGE WEAR)
HP D-off
DRILLS, ROTARY BLASTHOLE (Add cost for drill steel and bit wear)D350.11 DIESEL, 4.5" THRU 9.875" DIAMETER HOLE (Add cost for drill steel and bit wear)SUBCATEGORY
DRILTECH, INC. (SANDVIK)
450D25KSD35DT001 $605,397 34.59 9.94 51.98 62027.24147.57DRILL, ROTARY BLASTHOLE, 5''-6.75'' DIA., 27,000 LB PULLDOWN, CRAWLER, 88' DEEP(ADD COST FOR DRILL STEEL AND BIT WEAR)
HP D-off
450D245SD35DT002 $622,210 35.55 10.21 51.98 72027.99150.02DRILL, ROTARY BLASTHOLE, 5''-8'' DIA., 40,000 LB PULLDOWN, CRAWLER, 148' DEEP (ADD COST FOR DRILL STEEL AND BIT WEAR)
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-101
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
D35 DRILTECH, INC. (SANDVIK) (continued)450D45KSD35DT003 $703,792 40.22 11.55 51.98 1,05031.66161.93DRILL, ROTARY BLASTHOLE, 6''-9'' DIA.,
45,000 LB PULLDOWN, CRAWLER, 208' DEEP (ADD COST FOR DRILL STEEL AND BIT WEAR)
HP D-off
525D50KSD35DT004 $747,468 42.71 12.27 60.65 1,05033.63178.18DRILL, ROTARY BLASTHOLE, 6''-9.875'' DIA., 50,000 LB PULLDOWN, CRAWLER, 148' DEEP (ADD COST FOR DRILL STEEL AND BIT WEAR)
HP D-off
760D55SPD35DT005 $1,165,832 66.62 19.14 87.80 1,32052.45270.17DRILL, ROTARY BLASTHOLE, 6.75''-10'' DIA., 45,000 LB PULLDOWN, CRAWLER, 55' DEEP (SINGLE PASS) (ADD COST FOR DRILL STEEL AND BIT WEAR)
HP D-off
REEDRILL (TEREX)
400SK5ADD35RD001 $456,819 26.10 7.50 52.32 52520.55126.27350 HP D-onDRILL, ROTARY BLASTHOLE, 4"-7" DIA, 12,000 LBS PULL BACK, TRUCK MTD, 148' DEEP (ADD COST FOR DRILL STEEL AND BIT WEAR)
HP D-off
0.12 DIESEL, OVER 9.875" DIAMETER (Add cost for drill steel and bit wear)SUBCATEGORY
DRILTECH, INC. (SANDVIK)
760D75KSD35DT006 $1,032,021 45.87 16.68 87.80 1,40039.62218.73DRILL, ROTARY BLASTHOLE, 9''-11'' DIA., 75,000 LB PULLDOWN, CRAWLER, 173' DEEP (ADD COST FOR DRILL STEEL AND BIT WEAR)
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-102
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
INGERSOLL RAND ROTARY DRILL DIV
465T3WD35IB004 $642,882 28.34 10.39 60.35 66024.56143.14380 HP D-onDRILL, ROTARY BLASTHOLE, WATER WELL 6"-24" DIA, 30,000 LB PULL BACK, TRUCK MTD (ADD COST FOR DRILL STEEL AND BIT WEAR)
HP D-off
475TH-60D35IB003 $674,522 29.78 10.90 61.50 60025.79148.01380 HP D-onDRILL, ROTARY BLASTHOLE, WATER WELL, 12" DIA, 26,500 LBS PULL BACK, TRUCK MTD (ADD COST FOR DRILL STEEL AND BIT WEAR)
HP D-off
575T3W DEEPHOLED35IB005 $745,323 32.89 12.05 73.05 68828.50169.31380 HP D-onDRILL, ROTARY BLASTHOLE, WATER WELL 6"-18" DIA, 50,000 LB PULL BACK, TRUCK MTD (ADD COST FOR DRILL STEEL AND BIT WEAR)
HP D-off
600T4WD35IB006 $783,681 34.60 12.66 74.63 68829.96175.55305 HP D-onDRILL, ROTARY BLASTHOLE, WATER WELL 6"-20" DIA, 70,000 LB PULL BACK, TRUCK MTD (ADD COST FOR DRILL STEEL AND BIT WEAR)
HP D-off
FORK LIFTSF100.00 FORK LIFTSSUBCATEGORY
JCB INC.
75930-4F10JC001 $72,095 5.62 1.21 7.07 1504.0220.21FORK LIFT, ROUGH TERRAIN, 6,000 LBS @ 28' HIGH STRAIGHT MAST, 4X4
HP D-off
75940-4F10JC002 $78,422 6.12 1.32 7.07 1654.3821.27FORK LIFT, ROUGH TERRAIN, 8,000 LBS @ 30' HIGH STRAIGHT MAST, 4X4
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-103
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
GENERATOR SETSG100.10 PORTABLESUBCATEGORY
WACKER CORPORATION
8GP 3800AG10WC00 $2,214 0.25 0.04 1.39 20.171.96GENERATOR SET, PORTABLE, 3.7 KW, 120/240V, 60 HZ
HP G
11GP 5600AG10WC00 $2,561 0.29 0.04 1.91 20.192.60GENERATOR SET, PORTABLE, 5.6 KW, 120/240V, 60 HZ
HP G
16GS 8.5VG10WC00 $4,780 0.54 0.08 2.78 20.353.99GENERATOR SET, PORTABLE, 8.5 KW, 120/240V, 60 HZ, WITH ELECTRIC START
HP G
18GS 9.7VG10WC00 $3,862 0.43 0.06 3.13 20.284.17GENERATOR SET, PORTABLE, 9.7 KW, 120/240V, 60 HZ, WITH ELECTRIC START
HP G
NO SPECIFIC MANUFACTURER
11000G10XX001 $1,011 0.11 0.02 0.17 10.080.38GENERATOR SET, PORTABLE, 1 KW HP G
9D4500G10XX004 $5,815 0.65 0.09 0.85 30.422.09GENERATOR SET, PORTABLE, 5 KW HP D-off
1910000G10XX002 $4,937 0.56 0.08 3.31 60.364.60GENERATOR SET, PORTABLE, 10 KW
HP G
2310000DG10XX003 $11,244 1.26 0.18 2.17 90.814.63GENERATOR SET, PORTABLE, 10 KW
HP D-off
0.20 SKID MOUNTEDSUBCATEGORY
CATERPILLAR INC. ( MACHINE DIVISION)
1743304 PKG - P 304DE03
G10CA020 $27,692 2.49 0.44 16.40 371.6922.66GENERATOR SET, SKID MTD, 113 EKW, 240/480V, 60 HZ PGS PRIME
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-104
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
G10 CATERPILLAR INC. ( MACHINE DIVISION) (continued)
3143306 PKG - 306DE39
G10CA012 $34,680 3.12 0.55 29.59 502.1138.23GENERATOR SET, SKID MTD, 210 EKW, 240 VOLT, 60 HZ PGS PRIME
HP D-off
4053406 PKG - 306DE30
G10CA013 $44,700 4.02 0.71 38.17 682.7249.31GENERATOR SET, SKID MTD, 275 EKW, 480 VOLT, 60 HZ PGS PRIME
HP D-off
5363406 PKG - 406DE30
G10CA014 $58,711 5.28 0.93 50.51 723.5765.16GENERATOR SET, SKID MTD, 365 EKW, 240/480V, 60 HZ PGS PRIME
HP D-off
6873412 PKG - 412DE3H
G10CA015 $81,353 7.32 1.28 64.74 934.9484.59GENERATOR SET, SKID MTD, 455 EKW, 240/480V, 60 HZ PGS PRIME
HP D-off
8173412 PKG - 412DE30
G10CA016 $99,473 8.95 1.57 76.99 1006.05101.07GENERATOR SET, SKID MTD, 545 EKW, 240/480V, 60 HZ PGS PRIME
HP D-off
1,0893508 PKG - 508DE34
G10CA017 $156,211 14.06 2.46 102.63 1819.49138.85GENERATOR SET, SKID MTD, 725 EKW, 480 VOLT, 60 HZ PGS PRIME
HP D-off
1,4433512 PKG - 512DE1F
G10CA018 $198,376 17.85 3.13 135.99 23612.06182.48GENERATOR SET, SKID MTD, 1000 EKW, 480 VOLT, 60 HZ PGS PRIME
HP D-off
2,3043516 PKG - 516DE35
G10CA019 $332,754 29.95 5.25 217.13 29120.23294.16GENERATOR SET, SKID MTD, 1600 EKW, 480 VOLT, 60 HZ PGS PRIME
HP D-off
NO SPECIFIC MANUFACTURER
3625GG10XX005 $17,755 1.60 0.28 6.27 161.089.92GENERATOR SET, SKID MTD, 25 KW HP G
5035GG10XX006 $15,619 1.41 0.25 8.70 170.9612.19GENERATOR SET, SKID MTD, 35 KW HP G
7050GG10XX007 $23,555 2.12 0.37 12.18 261.4317.35GENERATOR SET, SKID MTD, 50 KW HP G
10775DG10XX008 $28,820 2.59 0.45 10.08 381.7515.98GENERATOR SET, SKID MTD, 75 KW HP D-off
143100DG10XX009 $24,718 2.22 0.39 13.48 421.5018.97GENERATOR SET, SKID MTD, 100 KW
HP D-off
200125DG10XX010 $36,820 3.31 0.58 18.85 442.2426.92GENERATOR SET, SKID MTD, 125 KW
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-105
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
G10 NO SPECIFIC MANUFACTURER (continued)375200DG10XX011 $40,450 3.64 0.64 35.34 602.4645.49GENERATOR SET, SKID MTD, 200
KW HP D-off
428300DG10XX012 $47,903 4.31 0.76 40.33 1052.9252.21GENERATOR SET, SKID MTD, 300 KW
HP D-off
570400DG10XX013 $59,877 5.39 0.94 53.72 1503.6468.85GENERATOR SET, SKID MTD, 400 KW
HP D-off
713500DG10XX014 $86,168 7.76 1.36 67.19 1705.2488.10GENERATOR SET, SKID MTD, 500 KW
HP D-off
1,050750DG10XX015 $142,215 12.80 2.24 98.95 2158.64132.41GENERATOR SET, SKID MTD, 750 KW
HP D-off
1,4251000DG10XX016 $201,164 18.10 3.17 134.29 25012.22181.11GENERATOR SET, SKID MTD, 1,000 KW
HP D-off
GRADERS, MOTORG150.00 GRADERS, MOTORSUBCATEGORY
CATERPILLAR INC. ( MACHINE DIVISION)
125120-HG15CA001 $225,281 11.53 3.82 11.02 2999.5939.56GRADER, MOTOR, ARTICULATED, 6X4, 12' BLADE W/17 TEETH SCARIFIERS
HP D-off
135135-HG15CA007 $238,878 12.23 4.05 11.90 30910.1742.14GRADER, MOTOR, ARTICULATED, 6X4, 12' BLADE W/17 TEETH SCARIFIERS
HP D-off
14012-HG15CA003 $264,467 13.56 4.48 12.34 33611.2645.64GRADER, MOTOR, ARTICULATED, 6X4, 12' BLADE W/17 TEETH SCARIFIERS
HP D-off
165140-HG15CA004 $282,775 14.49 4.79 14.55 34712.0450.36GRADER, MOTOR, ARTICULATED, 6X4, 12' BLADE W/5 RIPPER/SCARIFIERS
HP D-off
185143-HG15CA008 $327,683 16.81 5.55 16.31 36413.9657.74GRADER, MOTOR, ARTICULATED, 6X6, AWD, 12' BLADE W/5 RIPPER/SCARIFIERS
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-106
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
G15 CATERPILLAR INC. ( MACHINE DIVISION) (continued)
185160-HG15CA009 $306,289 15.71 5.19 16.31 37213.0555.10GRADER, MOTOR, ARTICULATED, 6X4, 14' BLADE W/5 RIPPER/SCARIFIERS
HP D-off
200163-HG15CA010 $354,462 18.20 6.01 17.63 38815.1162.37GRADER, MOTOR, ARTICULATED, 6X6, AWD, 14' BLADE W/5 RIPPER/SCARIFIERS
HP D-off
21514-HG15CA005 $388,412 19.62 6.58 18.95 44816.3969.81GRADER, MOTOR, ARTICULATED, 6X4, 14' BLADE W/7 SHANK RIPPER
HP D-off
27516-HG15CA006 $560,318 28.41 9.50 24.24 59423.7197.25GRADER, MOTOR, ARTICULATED, 6X4, 16' BLADE W/7 SHANK RIPPER
HP D-off
DEERE & COMPANY
151670CHG15JD008 $245,582 12.41 4.16 13.31 34310.3745.63GRADER, MOTOR, ARTICULATED, 6X4, AWD, 12' BLADE W/5 RIPPER/SCARIFIERS
HP D-off
156672CH (HFWD)G15JD009 $282,971 14.34 4.80 13.75 35311.9750.83GRADER, MOTOR, ARTICULATED, 6X6, AWD, 12' BLADE W/5 RIPPER/SCARIFIERS
HP D-off
185770CHG15JD010 $283,974 14.39 4.81 16.31 35312.0153.50GRADER, MOTOR, ARTICULATED, 6X4, AWD, 12' BLADE W/5 RIPPER/SCARIFIERS
HP D-off
205772CH (HFWD)G15JD011 $320,859 16.30 5.44 18.07 36313.5960.13GRADER, MOTOR, ARTICULATED, 6X6, AWD, 12' BLADE W/5 RIPPER/SCARIFIERS
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-107
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
HAMMERS, HYDRAULIC (Demolition tool) (Add cost for point wear)H100.00 HAMMERS, HYDRAULIC (Demolition tool) (Add cost for point wear)SUBCATEGORY
NPK CONSTRUCTION EQUIPMENT
E-200H10NP001 $7,476 1.00 0.13 0.00 20.632.81HAMMERS, HYDRAULIC, 150 FT-LBS, IMPACT FREQUENCY 700 BPM (ADD 150-250 HP HYDRAULIC EXCAVATOR H25)(ADD COST FOR POINT WEAR)
E-201H10NP002 $8,304 1.11 0.15 0.00 20.713.07HAMMERS, HYDRAULIC, 200 FT-LBS, IMPACT FREQUENCY 750 BPM (ADD 60-75 HP HYDRAULIC EXCAVATOR H25 OR L50)(ADD COST FOR POINT WEAR)
E-202H10NP003 $12,428 1.66 0.22 0.00 41.054.59HAMMERS, HYDRAULIC, 350 FT-LBS, IMPACT FREQUENCY 800 BPM (ADD 60-75HP HYDRAULIC EXCAVATOR H25 OR L50)(ADD COST FOR POINT WEAR)
E-203H10NP004 $15,988 2.13 0.29 0.00 41.365.70HAMMERS, HYDRAULIC, 500 FT-LBS, IMPACT FREQUENCY 800 BPM (ADD 60-75 HP HYDRAULIC EXCAVATOR H25 OR L50)(ADD COST FOR POINT WEAR)
E-204H10NP005 $21,180 2.82 0.38 0.00 71.797.55HAMMERS, HYDRAULIC, 750 FT-LBS, IMPACT FREQUENCY 700 BPM (ADD 75-100 HP HYDRAULIC EXCAVATOR H25 OR L50)(ADD COST FOR POINT WEAR)
E-205H10NP006 $28,480 3.80 0.51 0.00 112.419.81HAMMERS, HYDRAULIC, 1,300 FT-LBS, IMPACT FREQUENCY 750 BPM (ADD 95-125 HP HYDRAULIC EXCAVATOR H25)(ADD COST FOR POINT WEAR)
EP 1110-1-8, Vol. 330 Nov 09
2-108
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
H10 NPK CONSTRUCTION EQUIPMENT (continued)
E-207H10NP008 $43,213 5.76 0.77 0.00 193.6514.61HAMMERS, HYDRAULIC, 2,000 FT-LBS, IMPACT FREQUENCY 550 BPM (ADD 95-125 HP HYDRAULIC EXCAVATOR H25)(ADD COST FOR POINT WEAR)
E-208H10NP009 $55,148 7.35 0.99 0.00 284.6718.30HAMMERS, HYDRAULIC, 2,500 FT-LBS, IMPACT FREQUENCY 550 BPM (ADD 95-125 HP HYDRAULIC EXCAVATOR H25)(ADD COST FOR POINT WEAR)
E-210AH10NP015 $67,176 8.96 1.20 0.00 345.6822.02HAMMERS, HYDRAULIC, 3,000 FT-LBS, IMPACT FREQUENCY 670 BPM (ADD 20-28 TON HYDRAULIC EXCAVATOR H25)(ADD COST FOR POINT WEAR)
E-216H10NP016 $92,565 12.34 1.66 0.00 567.8329.88HAMMERS, HYDRAULIC, 5,500 FT-LBS, IMPACT FREQUENCY 500 BPM (ADD 28-43 TON HYDRAULIC EXCAVATOR H25)(ADD COST FOR POINT WEAR)
E-220H10NP017 $120,878 16.12 2.16 0.00 6810.2238.63HAMMERS, HYDRAULIC, 8,000 FT-LBS, IMPACT FREQUENCY 430 BPM (ADD 33-50 TON HYDRAULIC EXCAVATOR H25)(ADD COST FOR POINT WEAR)
E-260AH10NP018 $280,563 37.41 5.02 0.00 17023.7388.01HAMMERS, HYDRAULIC, 20,000 FT-LBS, IMPACT FREQUENCY 330 BPM (ADD 80-130 TON HYDRAULIC EXCAVATOR H25)(ADD COST FOR POINT WEAR)
EP 1110-1-8, Vol. 330 Nov 09
2-109
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
HAZARDOUS/TOXIC WASTE EQUIPMENTH130.11 COMPACTORS (Compression force) 0 THRU 50 TONSSUBCATEGORY
CONSOLIDATED BALING MACHINE COMPANY, INC
5DOS RAW WIH13CB001 $24,452 2.08 0.40 0.29 251.445.00HAZARDOUS/TOXIC WASTE EQIPMENT, COMPACTOR, RADIOLOGICAL WASTE, 12.5 TON, LOW LEVEL
HP E
10DOS RAW W2H13CB002 $26,443 2.25 0.43 0.58 251.565.77HAZARDOUS/TOXIC WASTE EQUIPMENT, COMPACTOR, RADIOLOGICAL WASTE, 20 TON, LOW LEVEL
HP E
WASTE CONTROL SYSTEMS, INC.
58041CCH13CO002 $11,101 0.94 0.18 0.29 1670.652.63HAZARDOUS/TOXIC WASTE EQUIPMENT, COMPACTOR, 37 TON HAZARD WASTE IN-DRUM , EXPLOSION PROOF
HP E
ENVIRO-PAK
54000HMH13EP001 $24,106 2.05 0.39 0.29 321.424.94HAZARDOUS/TOXIC WASTE EQUIPMENT, COMPACTOR, 30 TON HAZARDOUS WASTE, HAZ-MAT STORAGE CONTAINER 40"X40"X40"
HP E
TEEMARK CORPORATION
5DPC60-E50H13TH001 $13,686 1.16 0.22 0.29 200.802.84HAZARDOUS/TOXIC WASTE EQUIPMENT, COMPACTOR, 30 TON DRUM CRUSHER
HP E
9DPC60-D90H13TH002 $25,771 2.15 0.42 0.85 321.505.49HAZARDOUS/TOXIC WASTE EQUIPMENT, COMPACTOR, 30 TON DRUM CRUSHER, TRAILER MOUNTED
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-110
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
H13 TEEMARK CORPORATION (continued)9DPC85-D90H13TH003 $29,121 2.44 0.48 0.85 471.706.09HAZARDOUS/TOXIC WASTE EQUIPMENT,
COMPACTOR, 42.5 TON DRUM CRUSHER, TRAILER MOUNTED
HP D-off
ADVANCED ENVIRONMENTAL SOLUTIONS
50CCYCH13YB001 $375,219 31.89 6.12 2.89 32022.0770.66HAZARDOUS/TOXIC WASTE EQUIPMENT, COMPACTOR, 700 PSI OPERATING PRESSURE, FINAL COMPACTED SIZE 39.4" X 39.4" X 39.4"
HP E
50CCYC-HD-EH13YB002 $375,219 31.89 6.12 2.89 32022.0770.66HAZARDOUS/TOXIC WASTE EQUIPMENT, COMPACTOR, 1,000 PSI OPERATING PRESSURE, FINAL COMPACTED SIZE 39.4" X 39.4" X 39.4"
HP E
50CMC-HDH13YB003 $375,219 31.89 6.12 2.89 32022.0770.66HAZARDOUS/TOXIC WASTE EQUIPMENT, COMPACTOR, 1,200 PSI OPERATING PRESSURE, FINAL COMPACTED SIZE 39.4" X 39.4" X 39.4"
HP E
0.12 COMPACTORS (Compression force) OVER 50 TONSSUBCATEGORY
WASTE CONTROL SYSTEMS, INC.
38551H13CO003 $23,867 1.59 0.40 0.17 2701.204.19HAZARDOUS/TOXIC WASTE EQUIPMENT, COMPACTOR, 85 TON HAZARD WASTE IN-DRUM
HP E
38564H13CO004 $35,390 2.36 0.59 0.17 2901.776.22HAZARDOUS/TOXIC WASTE EQIPMENT, COMPACTOR, 85 TON HAZARD WASTE IN-DRUM, W/HEPA FILTER
HP E
38560-EXH13CO006 $51,877 3.46 0.86 0.17 3002.598.61HAZARDOUS/TOXIC WASTE EQUIPMENT, COMPACTOR, 85 TON HAZARD WASTE IN-DRUM, W/HEPA FILTER & SS PLATEN & CHAMBER
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-111
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
H13 WASTE CONTROL SYSTEMS, INC. (continued)
38560-EXLH13CO005 $61,837 4.12 1.03 0.17 3103.0910.30HAZARDOUS/TOXIC WASTE EQUIPMENT, COMPACTOR, 85 TON HAZARD WASTE IN-DRUM, EXPLOSION PROOF, W/LIQUID REMOVAL SYSTEM
HP E
ENVIRO-PAK
89600HMH13EP002 $39,416 2.63 0.65 0.43 1001.977.01HAZARDOUS/TOXIC WASTE EQUIPMENT, COMPACTOR, 250 TON HAZARDOUS WASTE, B-25 METAL STORAGE CONTAINER 4'X4'X6'
HP E
0.21 FILTER PRESSES, STATIONARYSUBCATEGORY
KOMLINE-SANDERSON ENGINEERING CO.
100L/S 1200/25H13AY015 $64,006 5.12 1.08 0.00 1123.6411.66HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, STATIONARY, 25 CF MEMBRANE, 1,200 MM SQ (ADD 100 CFM COMPRESSOR)
CFM A
100K/F 1200/25H13AY016 $41,401 3.31 0.70 0.00 1082.367.54HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, STATIONARY, 25 CF CONVENTIONAL, 1,200 MM SQ (ADD 100 CFM COMPRESSOR)
CFM A
100L/S 1200/50H13AY013 $108,683 8.69 1.83 0.00 1736.1819.79HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, STATIONARY, 50 CF MEMBRANE, 1,200 MM SQ (ADD 100 CFM COMPRESSOR)
CFM A
100K/F 1200/50H13AY014 $58,213 4.66 0.98 0.00 1683.3110.61HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, STATIONARY, 50 CF CONVENTIONAL, 1,200 MM SQ (ADD 100 CFM COMPRESSOR)
CFM A
EP 1110-1-8, Vol. 330 Nov 09
2-112
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
H13 KOMLINE-SANDERSON ENGINEERING CO. (continued)
100L/S 1200/75H13AY011 $135,522 10.84 2.28 0.00 1947.7024.68HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, STATIONARY, 75 CF MEMBRANE, 1,200 MM SQ (ADD 100 CFM COMPRESSOR)
CFM A
100K/F 1200/75H13AY012 $69,122 5.53 1.16 0.00 1883.9312.59HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, STATIONARY, 75 CF CONVENTIONAL, 1,200 MM SQ (ADD 100 CFM COMPRESSOR)
CFM A
100L/S 1200/100H13AY009 $162,120 12.97 2.73 0.00 1999.2229.53HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, STATIONARY, 100 CF MEMBRANE, 1,200 MM SQ (ADD 100 CFM COMPRESSOR)
CFM A
100K/F 1200/100H13AY010 $82,429 6.59 1.39 0.00 1914.6915.01HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, STATIONARY, 100 CF CONVENTIONAL, 1,200 MM SQ (ADD 100 CFM COMPRESSOR)
CFM A
100L/S 1200/125H13AY007 $182,268 14.58 3.07 0.00 21610.3633.20HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, STATIONARY, 125 CF MEMBRANE, 1,200 MM SQ (ADD 100 CFM COMPRESSOR)
CFM A
100K/F 1200/125H13AY008 $89,299 7.14 1.50 0.00 2075.0716.26HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, STATIONARY, 125 CF CONVENTIONAL, 1,200 MM SQ (ADD 100 CFM COMPRESSOR)
CFM A
100L/S 1200/150H13AY017 $202,445 16.20 3.41 0.00 23511.5136.88HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, STATIONARY, 150 CF MEMBRANE, 1,200 MM SQ (ADD 100 CFM COMPRESSOR)
CFM A
EP 1110-1-8, Vol. 330 Nov 09
2-113
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
H13 KOMLINE-SANDERSON ENGINEERING CO. (continued)
100K/F 1200/150H13AY018 $102,815 8.23 1.73 0.00 2245.8518.73HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, STATIONARY, 150 CF CONVENTIONAL, 1,200 MM SQ (ADD 100 CFM COMPRESSOR)
CFM A
1H13AY019 $13,271 1.06 0.22 0.06 50.752.75HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, STATIONARY, FILTER PRESS PLATE SHIFTING UNIT, 1,200 MM SQ, MECHANIZED
HP E
1SLC-500H13AY020 $17,205 1.38 0.29 0.06 20.983.48HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, STATIONARY, PLC CONTROL PANEL - PLATE SHIFTING, COMPUTER AUTOMATED
HP E
USFILTER PERRIN PRODUCTS
3PLC 25-1000H13PR001 $101,362 8.11 1.71 0.17 1255.7718.72HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, STATIONARY, 25 CF STANDARD FILTER PRESS, 1,000 MM SQ
HP E
5PLC 115-1200H13PR003 $178,862 14.31 3.01 0.29 46010.1733.00HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, STATIONARY, 115 CF STANDARD FILTER PRESS, 1,200 MM SQ
HP E
5PLC 180-1500H13PR005 $236,629 18.93 3.99 0.29 68013.4643.52HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, STATIONARY, 180 CF STANDARD FILTER PRESS, 1,500 MM SQ
HP E
10PLC 270-1500H13PR007 $290,922 23.27 4.90 0.58 1,10016.5453.83HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, STATIONARY, 270 CF MAXI FILTER PRESS, 1,500 MM SQ
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-114
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
H13 USFILTER PERRIN PRODUCTS (continued)2BPR 1200-15HH13PR022 $209,780 16.78 3.53 0.12 19111.9238.37HAZARDOUS/TOXIC WASTE EQUIPMENT,
FILTER PRESS, STATIONARY, 47" WIDE FILTER BELT PRESS, 2 HP
HP E
3BPR 1600-15HH13PR023 $239,863 19.19 4.04 0.17 25813.6443.94HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, STATIONARY, 63" WIDE FILTER BELT PRESS, 3 HP
HP E
3BPR 2000-15HH13PR024 $265,809 21.26 4.48 0.17 31915.1148.66HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, STATIONARY, 78.75" WIDE FILTER BELT PRESS, 3 HP
HP E
3BPR 2500-15HH13PR025 $320,993 25.68 5.41 0.17 51518.2558.72HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, STATIONARY, 98.5" WIDE FILTER BELT PRESS, 3 HP
HP E
4BPR 3000-15HH13PR026 $391,315 31.31 6.59 0.23 59422.2571.61HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, STATIONARY, 118" WIDE FILTER BELT PRESS, 4 HP
HP E
0.22 FILTER PRESSES, MOBILESUBCATEGORY
KOMLINE-SANDERSON ENGINEERING CO.
100L/S 1200/25MH13AY031 $79,730 6.60 1.30 0.00 1124.6014.34HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, MOBILE, 25 CF MEMBRANE, 1,200 MM SQ, TRAILER MOUNTED (ADD 100 CFM COMPRESSOR)
CFM A
100K/F 1200/25MH13AY032 $53,161 4.34 0.87 0.00 1093.049.63HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, MOBILE, 25 CF CONVENTIONAL, 1,200 MM SQ, TRAILER MOUNTED (ADD 100 CFM COMPRESSOR)
CFM A
EP 1110-1-8, Vol. 330 Nov 09
2-115
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
H13 KOMLINE-SANDERSON ENGINEERING CO. (continued)
100L/S 1200/50MH13AY029 $120,728 10.08 1.97 0.00 1937.0121.60HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, MOBILE, 50 CF MEMBRANE, 1,200 MM SQ, TRAILER MOUNTED (ADD 100 CFM COMPRESSOR)
CFM A
100K/F 1200/50MH13AY030 $70,257 5.79 1.15 0.00 1884.0512.66HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, MOBILE, 50 CF CONVENTIONAL, 1,200 MM SQ, TRAILER MOUNTED (ADD 100 CFM COMPRESSOR)
CFM A
100L/S 1200/75MH13AY027 $148,858 12.48 2.43 0.00 2148.6726.59HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, MOBILE, 75 CF MEMBRANE, 1,200 MM SQ, TRAILER MOUNTED (ADD 100 CFM COMPRESSOR)
CFM A
100K/F 1200/75MH13AY028 $82,458 6.83 1.35 0.00 2084.7714.83HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, MOBILE, 75 CF CONVENTIONAL, 1,200 MM SQ, TRAILER MOUNTED (ADD 100 CFM COMPRESSOR)
CFM A
100L/S 1200/100MH13AY025 $176,747 14.85 2.88 0.00 21910.3131.52HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, MOBILE, 100 CF MEMBRANE, 1,200 MM SQ, TRAILER MOUNTED (ADD 100 CFM COMPRESSOR)
CFM A
100K/F 1200/100MH13AY026 $97,055 8.07 1.58 0.00 2115.6217.40HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, MOBILE, 100 CF CONVENTIONAL, 1,200 MM SQ, TRAILER MOUNTED (ADD 100 CFM COMPRESSOR)
CFM A
EP 1110-1-8, Vol. 330 Nov 09
2-116
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
H13 KOMLINE-SANDERSON ENGINEERING CO. (continued)
100L/S 1200/125MH13AY023 $198,186 16.67 3.23 0.00 23611.5735.32HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, MOBILE, 125 CF MEMBRANE, 1,200 MM SQ, TRAILER MOUNTED (ADD 100 CFM COMPRESSOR)
CFM A
100K/F 1200/125MH13AY024 $105,218 8.77 1.72 0.00 2276.1118.86HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, MOBILE, 125 CF CONVENTIONAL, 1,200 MM SQ, TRAILER MOUNTED (ADD 100 CFM COMPRESSOR)
CFM A
100L/S 1200/150MH13AY021 $218,019 18.35 3.56 0.00 25512.7438.83HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, MOBILE, 150 CF MEMBRANE, 1,200 MM SQ, TRAILER MOUNTED (ADD 100 CFM COMPRESSOR)
CFM A
100K/F 1200/150MH13AY022 $118,404 9.89 1.93 0.00 2446.8821.19HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, MOBILE, 150 CF CONVENTIONAL, 1200 MM SQ, TRAILER MOUNTED (ADD 100 CFM COMPRESSOR)
CFM A
KOCH-WATER
13BFP-0500H13KP001 $83,888 7.08 1.37 0.72 404.9115.97HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, MOBILE, FILTER BELT PRESS, 20" (0.5M) WIDE, 0.6 - 2.0 TONS/HR, TRAILER MOUNTED (STAND ALONE UNIT, INCLUDES POLYMER FEED PUMP, BOOSTER PUMP, SLUDGE PUMP, AND DISCHARGE CONVEYOR)
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-117
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
H13 KOCH-WATER (continued)16BFP-1000H13KP002 $95,113 8.04 1.55 0.90 485.5718.22HAZARDOUS/TOXIC WASTE EQUIPMENT,
FILTER PRESS, MOBILE, FILTER BELT PRESS, 39" (1.0M) WIDE, 3.0 - 6.5 TONS/HR, TRAILER MOUNTED (STAND ALONE UNIT, INCLUDES POLYMER FEED PUMP, BOOSTER PUMP, SLUDGE PUMP, AND DISCHARGE CONVEYOR)
HP E
22BFP-1500H13KP003 $111,876 9.46 1.83 1.27 556.5621.73HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, MOBILE, FILTER BELT PRESS, 59" (1.5M) WIDE, 6.0 - 14.0 TONS/HR, TRAILER MOUNTED (STAND ALONE UNIT, INCLUDES POLYMER FEED PUMP, BOOSTER PUMP, SLUDGE PUMP, AND DISCHARGE CONVEYOR)
HP E
28BFP-2000H13KP004 $128,684 10.89 2.10 1.62 657.5525.22HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, MOBILE, FILTER BELT PRESS, 79" (2.0M) WIDE, 14.0 - 20.0 TONS/HR, TRAILER MOUNTED (STAND ALONE UNIT, INCLUDES POLYMER FEED PUMP, BOOSTER PUMP, SLUDGE PUMP, AND DISCHARGE CONVEYOR)
HP E
USFILTER PERRIN PRODUCTS
3PLC 25-1000MH13PR002 $285,593 24.10 4.66 0.17 14516.7152.55HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, MOBILE, 25 CF STANDARD FILTER PRESS, 1,000 MM SQ, TRAILER MOUNTED (COMPLETE)
HP E
5180-1500MH13PR006 $251,948 21.24 4.11 0.29 70514.7346.76HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, MOBILE, 180 CF STANDARD FILTER PRESS,1,500 MM SQ, TRAILER MOUNTED
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-118
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
H13 USFILTER PERRIN PRODUCTS (continued)2BPR 1200-15H-MH13PR011 $394,370 33.34 6.43 0.12 23523.1071.73HAZARDOUS/TOXIC WASTE EQUIPMENT,
FILTER PRESS, MOBILE, 47" FILTER BELT PRESS, TRAILER MOUNTED (STAND ALONE UNIT, ADD APPURTENANCES SUCH AS FEED PUMPS, POLYMER SYSTEM, WASH WATER BOOSTER PUMP, CONVEYOR ETC.)
HP E
3BPR 1600-15H-MH13PR012 $423,793 35.84 6.91 0.17 30224.8377.02HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, MOBILE, 63" FILTER BELT PRESS, TRAILER MOUNTED (STAND ALONE UNIT, ADD APPURTENANCES SUCH AS FEED PUMPS, POLYMER SYSTEM, WASH WATER BOOSTER PUMP, CONVEYOR ETC.)
HP E
5BPR 2000-15H-MH13PR013 $449,741 38.05 7.34 0.29 31926.3781.80HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, MOBILE, 78.75" FILTER BELT PRESS, TRAILER MOUNTED (STAND ALONE UNIT, ADD APPURTENANCES SUCH AS FEED PUMPS, POLYMER SYSTEM, WASH WATER BOOSTER PUMP, CONVEYOR ETC.)
HP E
8BPR 2500-15H-MH13PR014 $504,925 42.74 8.24 0.46 51529.6191.82HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, MOBILE, 98.5" FILTER BELT PRESS, TRAILER MOUNTED (STAND ALONE UNIT, ADD APPURTENANCES SUCH AS FEED PUMPS, POLYMER SYSTEM, WASH WATER BOOSTER PUMP, CONVEYOR ETC.)
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-119
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
H13 USFILTER PERRIN PRODUCTS (continued)8BPR 3000-15H-MH13PR015 $575,247 48.72 9.38 0.46 59433.74104.27HAZARDOUS/TOXIC WASTE EQUIPMENT,
FILTER PRESS, MOBILE, 118" FILTER BELT PRESS, TRAILER MOUNTED (STAND ALONE UNIT, ADD APPURTENANCES SUCH AS FEED PUMPS, POLYMER SYSTEM, WASH WATER BOOSTER PUMP, CONVEYOR ETC.)
HP E
SOMAT WASTE REDUCTION TECHNOLOGY
31PB-6DH13S5001 $56,897 4.84 0.93 0.17 143.3510.33HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, MOBILE, PUSHER SCREW PRESS, 6-15 GPM CAPACITY, TRAILER MOUNTED
HP E
51PB-9DH13S5002 $89,123 7.58 1.45 0.29 355.2416.21HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, MOBILE, PUSHER SCREW PRESS, 15-40 GPM CAPACITY, TRAILER MOUNTED
HP E
52PB-9DH13S5003 $105,844 9.00 1.73 0.29 406.2319.17HAZARDOUS/TOXIC WASTE EQUIPMENT, FILTER PRESS, MOBILE, PUSHER SCREW PRESS, 30-80 GPM CAPACITY, TRAILER MOUNTED
HP E
0.30 CENTRIFUGESSUBCATEGORY
BOCK ENGINEERED PRODUCTS, INC.
3GP 35H13BC013 $15,565 3.11 0.30 0.17 91.866.24HAZARDOUS/TOXIC WASTE EQUIPMENT, CENTRIFUGE, FIXED SPEED, TIMER, 35 LB DRY WT.
HP E
3305 TXH13BC010 $16,511 3.30 0.32 0.17 61.976.61HAZARDOUS/TOXIC WASTE EQUIPMENT, CENTRIFUGE, FIXED SPEED, TIMER, 35 LB DRY WT.
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-120
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
H13 BOCK ENGINEERED PRODUCTS, INC. (continued)
3GP 60H13BC012 $17,204 3.44 0.33 0.17 92.056.87HAZARDOUS/TOXIC WASTE EQUIPMENT, CENTRIFUGE, FIXED SPEED, TIMER, 60 LB DRY WT.
HP E
3605 TXH13BC006 $21,571 4.31 0.41 0.17 92.578.55HAZARDOUS/TOXIC WASTE EQUIPMENT, CENTRIFUGE, FIXED SPEED, TIMER, 60 LB DRY WT.
HP E
5GP 100H13BC011 $21,026 4.21 0.40 0.29 122.518.52HAZARDOUS/TOXIC WASTE EQUIPMENT, CENTRIFUGE, FIXED SPEED, TIMER, 100 LB DRY WT.
HP E
5GP 130H13BC003 $23,103 4.62 0.44 0.29 122.759.31HAZARDOUS/TOXIC WASTE EQUIPMENT, CENTRIFUGE, FIXED SPEED, TIMER, 130 LB DRY WT.
HP E
3355H13BC009 $28,064 5.61 0.54 0.17 63.3511.05HAZARDOUS/TOXIC WASTE EQUIPMENT, CENTRIFUGE, FIXED SPEED, MANUAL CONTROL, EXPLOSION PROOF, 35 LB
HP E
3655H13BC007 $33,455 6.69 0.64 0.17 93.9913.13HAZARDOUS/TOXIC WASTE EQUIPMENT, CENTRIFUGE, FIXED SPEED, MANUAL CONTROL, EXPLOSION PROOF, 60 LB
HP E
5755H13BC008 $40,929 8.19 0.79 0.29 124.8916.18HAZARDOUS/TOXIC WASTE EQUIPMENT, CENTRIFUGE, FIXED SPEED, MANUAL CONTROL, EXPLOSION PROOF, 100 LB
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-121
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
0.40 SHREDDERSSUBCATEGORY
GRANUTE-SATURN SYSTEMS(MAC CORPORATION)
15052-32HTH13MN001 $354,223 29.78 5.78 8.68 20020.6781.34HAZARDOUS/TOXIC WASTE EQUIPMENT, SHREDDER, 32" X 52" OPENING, TRAILER MTD, W/DIESEL GENERATOR SET/ BELT-TYPE INFEED & DISCHARGE CONVEYORS
HP E
20062-40HTH13MN002 $414,490 34.80 6.76 11.57 30024.1697.65HAZARDOUS/TOXIC WASTE EQUIPMENT, SHREDDER, 38" X 62" OPENING, TRAILER MTD, W/DIESEL GENERATOR SET, HOOK-TYPE INFEED FOR TIRES, & DISCHARGE CONVEYOR
HP E
20062-40HTH13MN003 $469,751 39.50 7.66 11.57 30027.41108.96HAZARDOUS/TOXIC WASTE EQUIPMENT, SHREDDER, 38" X 62" OPENING, TRAILER MTD, W/DIESEL GENERATOR SET, CRANE GRAPPLE & DISCHARGE CONVEYOR SYSTEM
HP E
30072-46HTH13MN004 $535,865 45.12 8.74 17.36 40031.30130.46HAZARDOUS/TOXIC WASTE EQUIPMENT, SHREDDER, 45" X 72" OPENING , TRAILER MTD, W/DIESEL GENERATOR SET, CRANE GRAPPLE & DISCHARGE CONVEYOR SYSTEM
HP E
SHRED-TECH LIMITED
20ST-25EH13SH001 $55,315 4.70 0.90 1.16 203.2511.96HAZARDOUS/TOXIC WASTE EQUIPMENT, SHREDDER, 29" X 42" OPENING, TRAILER MTD. (ADD COST FOR CONVEYOR SYSTEM, POWER SUPPLY, AND TRAILER)
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-122
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
H13 SHRED-TECH LIMITED (continued)20ST-25ELH13SH002 $51,876 4.41 0.85 1.16 233.0611.33HAZARDOUS/TOXIC WASTE EQUIPMENT,
SHREDDER, 29" X 46" OPENING, TRAILER MTD. (ADD COST FOR CONVEYOR SYSTEM, POWER SUPPLY, AND TRAILER)
HP E
40ST-50H13SH003 $89,284 7.59 1.46 2.31 455.2619.93HAZARDOUS/TOXIC WASTE EQUIPMENT, SHREDDER, 40" X 55" OPENING, TRAILER MTD. (ADD COST FOR CONVEYOR SYSTEM, POWER SUPPLY, AND TRAILER)
HP E
40ST-50LH13SH004 $93,166 7.92 1.52 2.31 505.4820.65HAZARDOUS/TOXIC WASTE EQUIPMENT, SHREDDER, 40" X 65" OPENING, TRAILER MTD. (ADD COST FOR CONVEYOR SYSTEM, POWER SUPPLY, AND TRAILER)
HP E
100ST-100H13SH005 $148,934 12.66 2.43 5.79 2008.7635.96HAZARDOUS/TOXIC WASTE EQUIPMENT, SHREDDER, 63" X 70" OPENING, TRAILER MTD. (ADD COST FOR CONVEYOR SYSTEM, POWER SUPPLY, AND TRAILER)
HP E
300ST-500H13SH006 $478,955 40.71 7.81 17.36 42028.17113.85HAZARDOUS/TOXIC WASTE EQUIPMENT, SHREDDER, 66" X 96" OPENING, TRAILER MTD. (ADD COST FOR CONVEYOR SYSTEM, POWER SUPPLY, AND TRAILER)
HP E
600ST-500LH13SH007 $623,951 53.04 10.18 34.71 44036.70165.39HAZARDOUS/TOXIC WASTE EQUIPMENT, SHREDDER, 66" X 115" OPENING, TRAILER MTD. (ADD COST FOR CONVEYOR SYSTEM, POWER SUPPLY, AND TRAILER)
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-123
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
0.71 WASTE HANDLING EQUIPMENT, DRUM HANDLINGSUBCATEGORY
BASCO
10VELT 55/35H13BB001 $21,090 4.48 0.40 0.58 112.6411.45HAZARDOUS/TOXIC WASTE EQUIPMENT, WASTE HANDLING EQUIPMENT, DRUM HANDLING, DRUM FILLER, 55 GAL TOP FILL
HP E
152BH13BB002 $18,767 3.99 0.35 0.87 192.3511.02HAZARDOUS/TOXIC WASTE EQUIPMENT, WASTE HANDLING EQUIPMENT, DRUM CLEANER, 12 DRUM/HR CAP INTERIOR
HP E
HOISTS & AIR WINCHESH200.00 HOISTS & AIR WINCHESSUBCATEGORY
INGERSOLL RAND MATERIAL HANDLING
700FA2.5H20BE002 $39,368 3.50 0.67 0.00 102.427.69AIR WINCH, MANUAL BRAKE, 24" DRUM, 5,000 LBS CAP, 145 FPM (ADD 700 CFM COMPRESSOR)
CFM A
700FA5H20BE003 $48,765 4.33 0.83 0.00 193.009.57AIR WINCH, MANUAL BRAKE, 24" DRUM, 10,000 LBS CAP, 65 FPM (ADD 700 CFM COMPRESSOR)
CFM A
800FA10H20BE004 $53,604 4.76 0.91 0.00 353.2910.58AIR WINCH, AUTOMATIC BRAKE, 24" DRUM, 22,000 LBS CAP, 30 FPM (ADD 800 CFM COMPRESSOR)
CFM A
EP 1110-1-8, Vol. 330 Nov 09
2-124
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
HYDRAULIC EXCAVATORS, CRAWLER MOUNTEDH250.10 0 LBS THRU 12,500 LBS (COMPACT EXCAVATORS)SUBCATEGORY
CATERPILLAR INC. ( MACHINE DIVISION)
18301.8H25CA034 $38,132 3.57 0.68 1.70 372.479.20HYDRAULIC EXCAVATOR, CRAWLER-RUBBER TRACK, 3,800 LBS, 0.04 CY BUCKET, 7.50' MAX DIGGING DEPTH
HP D-off
30303 CRH25CA035 $44,516 4.17 0.79 2.83 762.8811.68HYDRAULIC EXCAVATOR, CRAWLER-RUBBER TRACK, 7,500 LBS, 0.11 CY BUCKET, 9.08' MAX DIGGING DEPTH
HP D-off
47305 CRH25CA036 $71,566 6.71 1.27 4.43 1154.6318.66HYDRAULIC EXCAVATOR, CRAWLER-RUBBER TRACK, 10,800 LBS, 0.17 CY BUCKET, 11.08' MAX DIGGING DEPTH
HP D-off
Komatsu America International Company
20PC20MR-2H25KM018 $48,620 4.56 0.86 1.88 513.1411.40HYDRAULIC EXCAVATOR, CRAWLER-RUBBER TRACK, 4,800 LBS, 0.05 CY BUCKET, 8'11" MAX DIGGING DEPTH
HP D-off
39PC40MR-2H25KM021 $65,340 6.13 1.16 3.68 1064.2316.63HYDRAULIC EXCAVATOR, CRAWLER-RUBBER TRACK, 10,000 LBS, 0.18 CY BUCKET, 12'9" MAX DIGGING DEPTH
HP D-off
40PC58UU-3H25KM022 $83,560 7.83 1.48 3.77 1155.4020.19HYDRAULIC EXCAVATOR, CRAWLER-RUBBER TRACK, 11,400 LBS, 0.29 CY BUCKET, 13'1" MAX DIGGING DEPTH
HP D-off
54PC78US-6H25KM023 $102,970 9.65 1.83 5.09 1596.6625.39HYDRAULIC EXCAVATOR, CRAWLER, 6,200 LBS, 0.37 CY BUCKET, 12'4" MAX DIGGING DEPTH
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-125
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
MELROE COMPANY/BOBCAT
13323H25ME001 $29,789 2.79 0.53 1.25 371.937.09HYDRAULIC EXCAVATOR, CRAWLER-RUBBER TRACK, 3,600 LBS, 0.04 CY BUCKET, 7'6" MAX DIGGING DEPTH
HP D-off
40331H25ME002 $42,667 4.00 0.76 3.77 722.7612.40HYDRAULIC EXCAVATOR, CRAWLER-RUBBER TRACK, 7,200 LBS, 0.10 CY BUCKET, 10'2" MAX DIGGING DEPTH
HP D-off
48337H25ME003 $59,272 5.56 1.05 4.52 1103.8316.41HYDRAULIC EXCAVATOR, CRAWLER-RUBBER TRACK, 11,000 LBS, 0.18 CY BUCKET, 12' MAX DIGGING DEPTH
HP D-off
0.11 OVER 12,500 LBS THRU 40,000 LBSSUBCATEGORY
CATERPILLAR INC. ( MACHINE DIVISION)
54307DH25CA038 $103,026 9.09 1.82 5.09 1596.3724.35HYDRAULIC EXCAVATOR, CRAWLER, 14,310 LBS, 0.48 CY BUCKET, 15.25' MAX DIGGING DEPTH
HP D-off
79311-CUH25CA020 $131,752 11.63 2.33 7.44 2588.1532.19HYDRAULIC EXCAVATOR, CRAWLER, 24,640 LBS, 0.60 CY BUCKET, 16.50' MAX DIGGING DEPTH
HP D-off
84312-D LH25CA021 $132,450 11.69 2.34 7.92 2888.1932.85HYDRAULIC EXCAVATOR, CRAWLER, 26,900 LBS, 0.68 CY BUCKET, 18.16' MAX DIGGING DEPTH
HP D-off
KOBELCO AMERICA INC.
5470SRH25KC017 $112,990 9.97 2.00 5.09 1686.9926.15HYDRAULIC EXCAVATOR, CRAWLER, 16,400 LBS, 0.33 CY BUCKET, 14.75' MAX DIGGING DEPTH
HP D-off
94135SR LCH25KC016 $160,163 14.13 2.83 8.86 3199.9038.93HYDRAULIC EXCAVATOR, CRAWLER, 30,870 LBS, 0.60 CY BUCKET, 19.58' MAX DIGGING DEPTH
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-126
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
Komatsu America International Company
86PC128UU-2H25KM027 $200,078 17.65 3.53 8.10 29512.3645.27HYDRAULIC EXCAVATOR, CRAWLER, 12,200 LBS, 0.58 CY BUCKET, 16' 0" MAX DIGGING DEPTH
HP D-off
89PC 120-6H25KM001 $141,409 12.48 2.50 8.39 2658.7435.01HYDRAULIC EXCAVATOR, CRAWLER, 26,950 LBS, 0.75 CY BUCKET, 18.08' MAX DIGGING DEPTH
HP D-off
110PC 160LC-7H25KM003 $218,585 19.29 3.86 10.37 39513.5151.18HYDRAULIC EXCAVATOR, CRAWLER, 39,400 LBS, 1.12 CY BUCKET, 19.58' MAX DIGGING DEPTH
HP D-off
LINK-BELT CONSTRUCTION EQUIPMENT COMPANY
89130 LXH25LI003 $146,598 12.94 2.59 8.39 2719.0635.95HYDRAULIC EXCAVATOR, CRAWLER, 27,100 LBS, 0.50 CY BUCKET, 18' 2" MAX DIGGING DEPTH
HP D-off
101160 LXH25LI005 $171,334 15.12 3.03 9.52 36210.5941.69HYDRAULIC EXCAVATOR, CRAWLER, 35,275 LBS, 0.66 CY BUCKET, 20' 1" MAX DIGGING DEPTH
HP D-off
0.12 OVER 40,000 LBS THRU 100,000 LBSSUBCATEGORY
CATERPILLAR INC. ( MACHINE DIVISION)
125319CLH25CA040 $142,278 8.89 2.44 11.78 4056.8933.23HYDRAULIC EXCAVATOR, CRAWLER, 40,600 LBS, 1.00 CY BUCKET, 22.50' MAX DIGGING DEPTH
HP D-off
128320DH25CA022 $213,298 13.33 3.66 12.06 44410.3343.50HYDRAULIC EXCAVATOR, CRAWLER, 43,800 LBS, 1.50 CY BUCKET, 21.75' MAX DIGGING DEPTH
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-127
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
H25 CATERPILLAR INC. ( MACHINE DIVISION) (continued)
128320DLH25CA023 $309,336 19.33 5.31 12.06 53614.9856.96HYDRAULIC EXCAVATOR, CRAWLER, 49,000 LBS, 0.80 CY BUCKET, 39.0' MAX DIGGING DEPTH, LONG REACH BOOM
HP D-off
KOBELCO AMERICA INC.
143SK210 LCH25KC019 $249,493 15.59 4.28 13.48 48012.0850.17HYDRAULIC EXCAVATOR, CRAWLER, 48,000 LBS, 1.13 CY BUCKET, 22.00' MAX DIGGING DEPTH
HP D-off
143SK210 LCH25KC020 $274,576 17.16 4.71 13.48 53413.2953.69HYDRAULIC EXCAVATOR, CRAWLER, 53,400 LBS, 0.63 CY BUCKET, 39' MAX DIGGING DEPTH, LONG REACH BOOM
HP D-off
176SK250 LCH25KC021 $290,466 18.15 4.98 16.59 55114.0659.42HYDRAULIC EXCAVATOR, CRAWLER, 55,100 LBS, 1.875 CY BUCKET, 23.08' MAX DIGGING DEPTH
HP D-off
176SK250 LCH25KC022 $329,048 20.57 5.64 16.59 59115.9364.84HYDRAULIC EXCAVATOR, CRAWLER, 59,100 LBS, 0.50 CY BUCKET, 23' MAX DIGGING DEPTH, LONG REACH BOOM
HP D-off
238SK330 LCH25KC023 $409,900 25.62 7.03 22.43 77819.8482.75HYDRAULIC EXCAVATOR, CRAWLER, 77,800 LBS, 2.05 CY BUCKET, 24.58' MAX DIGGING DEPTH
HP D-off
0.13 OVER 100,000 LBS THRU 160,000 LBSSUBCATEGORY
KOBELCO AMERICA INC.
306SK400 LCH25KC024 $521,464 24.44 8.79 28.84 1,01921.0192.80HYDRAULIC EXCAVATOR, CRAWLER, 101,900 LBS 3.06 CY BUCKET, 25.58' MAX DIGGING DEPTH
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-128
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
H25 KOBELCO AMERICA INC. (continued)315SK480LCH25KC026 $546,336 25.61 9.21 29.69 1,08022.0296.68HYDRAULIC EXCAVATOR, CRAWLER,
108,000 LBS, 2.25 CY BUCKET, 25.58' MAX DIGGING DEPTH
HP D-off
Komatsu America International Company
384PC 600 LC-7H25KM015 $936,945 43.92 15.79 36.19 1,33237.75150.47HYDRAULIC EXCAVATOR, CRAWLER, 133,160 LBS, 4.25 CY BUCKET, 27.83' MAX DIGGING DEPTH
HP D-off
0.14 OVER 160,000 LBSSUBCATEGORY
Komatsu America International Company
454PC 750LC-7H25KM009 $1,122,693 44.32 18.74 42.78 1,75040.90166.69HYDRAULIC EXCAVATOR, CRAWLER, 171,070 LBS, 4.05 CY BUCKET, 27.66' MAX DIGGING DEPTH
HP D-off
908PC1800-6H25KM033 $2,248,783 88.77 37.55 85.57 3,96881.94333.76HYDRAULIC EXCAVATOR, CRAWLER, 396,800 LBS, 15.70 CY BUCKET, 30'5" MAX DIGGING DEPTH
HP D-off
0.21 ATTACHMENTS, MOBILE SHEARSSUBCATEGORY
CATERPILLAR INC. ( MACHINE DIVISION)
S305H25CA055 $19,876 2.82 0.35 0.00 151.766.40HYDRAULIC EXCAVATOR, ATTACHMENT, MOBILE SHEARS, SCRAP, 9.4" JAW OPENING (ADD 10,000 LB HYDRAULIC EXCAVATOR)
S320BH25CA057 $83,313 11.80 1.45 0.00 577.3525.89HYDRAULIC EXCAVATOR, ATTACHMENT, MOBILE SHEARS, SCRAP, 15.4" JAW OPENING (ADD 20,000 LB HYDRAULIC EXCAVATOR)
EP 1110-1-8, Vol. 330 Nov 09
2-129
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
H25 CATERPILLAR INC. ( MACHINE DIVISION) (continued)
S230H25CA052 $104,606 14.82 1.82 0.00 849.2333.01HYDRAULIC EXCAVATOR, ATTACHMENT, MOBILE SHEARS, SCRAP, 22.0" JAW OPENING (ADD 35,000 LB HYDARULIC EXCAVATOR)
S250H25CA053 $141,876 20.10 2.47 0.00 15812.5244.34HYDRAULIC EXCAVATOR, ATTACHMENT, MOBILE SHEARS, SCRAP, 28.0" JAW OPENING (ADD 45,000 LB HYDRAULIC EXCAVATOR)
S280H25CA054 $182,455 25.85 3.18 0.00 19116.1157.97HYDRAULIC EXCAVATOR, ATTACHMENT, MOBILE SHEARS, SCRAP, 32.0" JAW OPENING (ADD 100,000 LB HYDRAULIC EXCAVATOR)
S2130H25CA056 $297,475 42.14 5.18 0.00 30726.2592.61HYDRAULIC EXCAVATOR, ATTACHMENT, MOBILE SHEARS, SCRAP, 43.0" JAW OPENING (ADD 100,000 LB HYDRAULIC EXCAVATOR)
LABOUNTY MANUFACTURING,
MSD 7H25LU001 $26,653 3.78 0.46 0.00 102.358.43HYDRAULIC EXCAVATOR, ATTACHMENT, MOBILE SHEARS, 10" JAW OPENING (ADD 10,000 LB HYDRAULIC EXCAVATOR)
MSD 7RH25LU002 $30,040 4.26 0.52 0.00 112.659.55HYDRAULIC EXCAVATOR, ATTACHMENT, MOBILE SHEARS, 10" JAW OPENING (ADD 14,000 LB HYDRAULIC EXCAVATOR)
MSD 15H25LU003 $46,342 6.57 0.81 0.00 304.1014.77HYDRAULIC EXCAVATOR, ATTACHMENT, MOBILE SHEARS, 18" JAW OPENING (ADD 20,000 LB HYDRAULIC EXCAVATOR)
MSD 15RH25LU004 $53,875 7.63 0.94 0.00 354.7617.13HYDRAULIC EXCAVATOR, ATTACHMENT, MOBILE SHEARS, 18" JAW OPENING (ADD 25,000 LB HYDRAULIC EXCAVATOR)
EP 1110-1-8, Vol. 330 Nov 09
2-130
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
H25 LABOUNTY MANUFACTURING, (continued)MSD 30 - III SVH25LU005 $67,523 9.57 1.18 0.00 505.9721.45HYDRAULIC EXCAVATOR, ATTACHMENT,
MOBILE SHEARS, 22" JAW OPENING (ADD 25,000 LB HYDRAULIC EXCAVATOR)
MSD 30R - III SVH25LU006 $94,626 13.41 1.65 0.00 678.3630.01HYDRAULIC EXCAVATOR, ATTACHMENT, MOBILE SHEARS, 22" JAW OPENING (ADD 35,000 LB HYDRAULIC EXCAVATOR)
MSD 40-III SVH25LU007 $80,673 11.43 1.40 0.00 707.1225.70HYDRAULIC EXCAVATOR, ATTACHMENT, MOBILE SHEARS, 27" JAW OPENING (ADD 40,000 LB HYDRAULIC EXCAVATOR)
MSD 40R-III SVH25LU008 $105,526 14.95 1.84 0.00 909.3233.39HYDRAULIC EXCAVATOR, ATTACHMENT, MOBILE SHEARS, 27" JAW OPENING (ADD 45,000 LB HYDRAULIC EXCAVATOR)
MSD 50-III SVH25LU009 $115,792 16.40 2.02 0.00 10910.2236.58HYDRAULIC EXCAVATOR, ATTACHMENT, MOBILE SHEARS, 32" JAW OPENING (ADD 45,000 LB HYDRAULIC EXCAVATOR)
MSD 50R-III SVH25LU010 $139,088 19.70 2.42 0.00 14012.2743.89HYDRAULIC EXCAVATOR, ATTACHMENT, MOBILE SHEARS, 32" JAW OPENING (ADD 60,000 LB HYDRAULIC EXCAVATOR)
MSD 70-III SVH25LU011 $137,791 19.52 2.40 0.00 13012.1643.51HYDRAULIC EXCAVATOR, ATTACHMENT, MOBILE SHEARS, 35" JAW OPENING (ADD 60,000 LB HYDRAULIC EXCAVATOR)
MSD 70R-III SVH25LU012 $168,704 23.90 2.94 0.00 16414.8953.32HYDRAULIC EXCAVATOR, ATTACHMENT, MOBILE SHEARS, 35" JAW OPENING (ADD 75,000 LB HYDRAULIC EXCAVATOR)
MSD 100-III SVH25LU013 $174,346 24.70 3.04 0.00 15015.3955.13HYDRAULIC EXCAVATOR, ATTACHMENT, MOBILE SHEARS, 38" JAW OPENING (ADD 75,000 LB HYDRAULIC EXCAVATOR)
MSD 100R-III SVH25LU014 $202,905 28.74 3.53 0.00 18017.9064.12HYDRAULIC EXCAVATOR, ATTACHMENT, MOBILE SHEARS, 38" JAW OPENING (ADD 75,000 LB HYDRAULIC EXCAVATOR)
EP 1110-1-8, Vol. 330 Nov 09
2-131
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
0.22 ATTACHMENTS, MATERIAL HANDLINGSUBCATEGORY
BALDERSON, INC.
H25BS001 $5,266 0.70 0.09 0.00 100.441.46HYDRAULIC EXCAVATOR, ATTACHMENT, MATERIAL HANDLING, 0.50 CY BUCKET, W/TIPS (ADD 25,000-50,000 LB HYDRAULIC EXCAVATOR)
H25BS002 $6,069 0.81 0.11 0.00 160.521.69HYDRAULIC EXCAVATOR, ATTACHMENT, MATERIAL HANDLING, 0.75 CY BUCKET, W/TIPS (ADD 25,000-50,000 LB HYDRAULIC EXCAVATOR)
H25BS003 $6,551 0.87 0.12 0.00 300.561.82HYDRAULIC EXCAVATOR, ATTACHMENT, MATERIAL HANDLING, 1.25 CY BUCKET, W/TIPS (ADD 25,000-60,000 LB HYDRAULIC EXCAVATOR)
H25BS004 $8,143 1.09 0.15 0.00 220.702.27HYDRAULIC EXCAVATOR, ATTACHMENT, MATERIAL HANDLING, 1.50 CY BUCKET, W/TIPS (ADD 50,000-60,000 LB HYDRAULIC EXCAVATOR)
H25BS005 $12,586 1.68 0.23 0.00 521.073.50HYDRAULIC EXCAVATOR, ATTACHMENT, MATERIAL HANDLING, 3.25 CY BUCKET, W/TIPS (ADD 50,000-75,000 LB HYDRAULIC EXCAVATOR)
LABOUNTY MANUFACTURING,
TW 100H25LU023 $36,717 4.90 0.66 0.00 163.1110.45HYDRAULIC EXCAVATOR, ATTACHMENT, MATERIAL HANDLING, GRAPPLE, 1.25CY, 4-TINE/ 5-TINE (ADD 25,000 LB HYDRAULIC EXCAVATOR)
EP 1110-1-8, Vol. 330 Nov 09
2-132
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
H25 LABOUNTY MANUFACTURING, (continued)TW 110H25LU024 $18,260 2.43 0.33 0.00 281.555.37HYDRAULIC EXCAVATOR, ATTACHMENT,
MATERIAL HANDLING, GRAPPLE, 3.50CY, 4-TINE/ 5-TINE (ADD 35,000 LB HYDRAULIC EXCAVATOR)
120 TRH25LU025 $22,380 2.98 0.40 0.00 351.896.61HYDRAULIC EXCAVATOR, ATTACHMENT, MATERIAL HANDLING, GRAPPLE, 3.50CY, 4-TINE/ 5-TINE (ADD 45,000 LB HYDRAULIC EXCAVATOR)
140 TWH25LU026 $25,443 3.39 0.46 0.00 482.167.56HYDRAULIC EXCAVATOR, ATTACHMENT, MATERIAL HANDLING, GRAPPLE, 5.50CY, 4-TINE/ 5-TINE (ADD 60,000 LB HYDRAULIC EXCAVATOR)
160 TRH25LU027 $28,461 3.79 0.51 0.00 582.418.50HYDRAULIC EXCAVATOR, ATTACHMENT, MATERIAL HANDLING, GRAPPLE, 6.50CY, 4-TINE/ 5-TINE (ADD 75,000 LB HYDRAULIC EXCAVATOR)
TW 170H25LU028 $47,049 6.27 0.84 0.00 783.9813.75HYDRAULIC EXCAVATOR, ATTACHMENT, MATERIAL HANDLING, GRAPPLE, 9.00CY, 4-TINE/ 5-TINE (ADD 100,000 LB HYDRAULIC EXCAVATOR)
RDG 60H25LU034 $68,824 9.18 1.23 0.00 355.8219.90HYDRAULIC EXCAVATOR, ATTACHMENT, MATERIAL HANDLING, ROTATING GRAPPLE, 1.75 CY (ADD 38,000-70,000 LB HYDRAULIC EXCAVATOR)
RDG 90H25LU035 $82,347 10.98 1.47 0.00 696.9623.75HYDRAULIC EXCAVATOR, ATTACHMENT, MATERIAL HANDLING, ROTATING GRAPPLE, 1.25 CY (ADD 70,000-140,000 LB HYDRAULIC EXCAVATOR)
EP 1110-1-8, Vol. 330 Nov 09
2-133
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
H25 LABOUNTY MANUFACTURING, (continued)RDG 120H25LU036 $94,781 12.64 1.70 0.00 1008.0227.31HYDRAULIC EXCAVATOR, ATTACHMENT,
MATERIAL HANDLING, ROTATING GRAPPLE, 2.00 CY (ADD 120,000-160,000 LB HYDRAULIC EXCAVATOR)
WAIN-ROY, INC.
H25WN001 $7,484 1.00 0.13 0.00 160.632.08HYDRAULIC EXCAVATOR, ATTACHMENT, MATERIAL HANDLING, BUCKET, 36" CONCRETE/PAVEMENT REMOVAL (ADD 75,000 LB HYDRAULIC EXCAVATOR)
0.23 ATTACHMENTS, CONCRETE PULVERIZERSSUBCATEGORY
CATERPILLAR INC. ( MACHINE DIVISION)
CR3H25CA058 $22,177 3.14 0.39 0.00 61.967.53HYDRAULIC EXCAVATOR, ATTACHMENT, CONCRETE PULVERIZER, CRUSHER, 16.0" JAW OPENING (ADD 40,000 LB MIN HYDRAULIC EXCAVATOR)
P16H25CA059 $80,884 11.46 1.41 0.00 537.1426.25HYDRAULIC EXCAVATOR, ATTACHMENT, CONCRETE PULVERIZER, 30.0" JAW OPENING (ADD 40,000 LB MIN HYDRAULIC EXCAVATOR)
P28H25CA060 $119,112 16.87 2.07 0.00 8710.5138.51HYDRAULIC EXCAVATOR, ATTACHMENT, CONCRETE PULVERIZER, 34.0" JAW OPENING (ADD 40,000 LB MIN HYDRAULIC EXCAVATOR)
CR28H25CA061 $103,951 14.73 1.81 0.00 819.1833.71HYDRAULIC EXCAVATOR, ATTACHMENT, CONCRETE PULVERIZER, CRUSHER, 36.0" JAW OPENING (ADD 45,000 LB MIN HYDRAULIC EXCAVATOR)
EP 1110-1-8, Vol. 330 Nov 09
2-134
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
H25 CATERPILLAR INC. ( MACHINE DIVISION) (continued)
P60H25CA062 $190,387 26.97 3.31 0.00 19416.8061.26HYDRAULIC EXCAVATOR, ATTACHMENT, CONCRETE PULVERIZER, 45.0" JAW OPENING (ADD 45,000 LB MIN HYDRAULIC EXCAVATOR)
CR35H25CA063 $136,091 19.28 2.37 0.00 11112.0144.05HYDRAULIC EXCAVATOR, ATTACHMENT, CONCRETE PULVERIZER, CRUSHER, 47.0" JAW OPENING (ADD 50,000 LB MIN HYDRAULIC EXCAVATOR)
CR50H25CA064 $165,534 23.45 2.88 0.00 15514.6153.48HYDRAULIC EXCAVATOR, ATTACHMENT, CONCRETE PULVERIZER, CRUSHER, 63.0" JAW OPENING (ADD 50,000 LB MIN HYDRAULIC EXCAVATOR)
KENT DEMOLITION TOOLS
KF12 TLBH25KN001 $29,291 4.15 0.51 0.00 192.599.79HYDRAULIC EXCAVATOR, ATTACHMENT, CONCRETE BREAKER, 2,000 FT-LB, W/4.25'' DIA. POINT (ADD 16,000-24,000 LB HYDRAULIC EXCAVATOR)
KF19 QTH25KN002 $40,610 5.75 0.71 0.00 313.5913.38HYDRAULIC EXCAVATOR, ATTACHMENT, CONCRETE BREAKER, 3,000 FT-LB, W/4.75'' DIA. POINT (ADD 26,000-36,000 LB HYDRAULIC EXCAVATOR)
KF22 QTH25KN003 $49,499 7.01 0.86 0.00 384.3716.19HYDRAULIC EXCAVATOR, ATTACHMENT, CONCRETE BREAKER, 4,000 FT-LB, W/5.25'' DIA. POINT (ADD 36,000-50,000 LB HYDRAULIC EXCAVATOR)
KF27 QTH25KN004 $56,914 8.06 0.99 0.00 435.0218.54HYDRAULIC EXCAVATOR, ATTACHMENT, CONCRETE BREAKER, 5,000 FT-LB, W/5.51'' DIA. POINT (ADD 50,000-64,000 LB HYDRAULIC EXCAVATOR)
EP 1110-1-8, Vol. 330 Nov 09
2-135
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
H25 KENT DEMOLITION TOOLS (continued)KF70 QTH25KN006 $114,862 16.27 2.00 0.00 10310.1437.42HYDRAULIC EXCAVATOR, ATTACHMENT,
CONCRETE BREAKER, 10,000 FT-LB, W/7.09 '' DIA. POINT (ADD 80,000 LB HYDRAULIC EXCAVATOR)
LABOUNTY MANUFACTURING,
CP 40 CH25LU046 $34,252 4.85 0.60 0.00 293.0311.36HYDRAULIC EXCAVATOR, ATTACHMENT, CONCRETE PULVERIZER, 30" JAW OPENING (ADD 40,000 LB HYDRAULIC EXCAVATOR)
CP 60 SH25LU047 $39,396 5.58 0.69 0.00 303.4813.09HYDRAULIC EXCAVATOR, ATTACHMENT, CONCRETE PULVERIZER, 36" JAW OPENING (ADD 60,000 LB HYDRAULIC EXCAVATOR)
CP 80 SH25LU048 $42,185 5.98 0.73 0.00 453.7214.08HYDRAULIC EXCAVATOR, ATTACHMENT, CONCRETE PULVERIZER, 42" JAW OPENING (ADD 75,000 LB HYDRAULIC EXCAVATOR)
CP 100 SH25LU049 $50,942 7.22 0.89 0.00 624.5016.96HYDRAULIC EXCAVATOR, ATTACHMENT, CONCRETE PULVERIZER, 48" JAW OPENING (ADD 100,000 LB HYDRAULIC EXCAVATOR)
CP 120 SH25LU050 $77,097 10.92 1.34 0.00 996.8025.34HYDRAULIC EXCAVATOR, ATTACHMENT, CONCRETE PULVERIZER, 54" JAW OPENING (ADD 140,000 LB HYDRAULIC EXCAVATOR)
UP 45 SVH25LU040 $143,968 20.40 2.51 0.00 10512.7146.41HYDRAULIC EXCAVATOR, ATTACHMENT, CONCRETE PULVERIZER, CRACKING JAWS, 45" JAW OPENING (ADD 55,000 LB HYDRAULIC EXCAVATOR)
EP 1110-1-8, Vol. 330 Nov 09
2-136
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
H25 LABOUNTY MANUFACTURING, (continued)UP 75 SVH25LU041 $176,595 25.02 3.07 0.00 12715.5856.74HYDRAULIC EXCAVATOR, ATTACHMENT,
CONCRETE PULVERIZER, CRACKING JAWS, 49" JAW OPENING (ADD 80,000 LB HYDRAULIC EXCAVATOR)
UP 90H25LU042 $212,971 30.17 3.71 0.00 17118.8069.03HYDRAULIC EXCAVATOR, ATTACHMENT, CONCRETE PULVERIZER, CRACKING JAWS, 62" JAW OPENING (ADD 75,000 LB HYDRAULIC EXCAVATOR)
UP 45 SVH25LU053 $151,520 21.47 2.64 0.00 10513.3848.80HYDRAULIC EXCAVATOR, ATTACHMENT, CONCRETE PULVERIZER, 36" JAW OPENING (ADD 55,000 LB HYDRAULIC EXCAVATOR)
UP 75 SVH25LU054 $186,555 26.43 3.25 0.00 12616.4759.91HYDRAULIC EXCAVATOR, ATTACHMENT, CONCRETE PULVERIZER, 40" JAW OPENING (ADD 80,000 LB HYDRAULIC EXCAVATOR)
0.24 ATTACHMENTS, COMPACTORSSUBCATEGORY
ALLIED CONSTRUCTION PRODUCTS
4700 W/SWIVELH25AU001 $7,595 1.08 0.13 0.00 40.672.41HYDRAULIC EXCAVATOR, ATTACHMENT, COMPACTOR, 18" X 12" PLATE, 3,000 LBS FORCE (ADD 15,000-20,000 LB HYDRAULIC EXCAVATOR)
8700C W/SWIVEL
H25AU002 $8,733 1.24 0.15 0.00 90.772.77HYDRAULIC EXCAVATOR, ATTACHMENT, COMPACTOR, 34" X 24" PLATE, 6,400 LBS FORCE (ADD 20,000-30,000 LB HYDRAULIC EXCAVATOR)
EP 1110-1-8, Vol. 330 Nov 09
2-137
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
H25 ALLIED CONSTRUCTION PRODUCTS (continued)
9700C W/SWIVEL
H25AU003 $12,168 1.72 0.21 0.00 161.073.85HYDRAULIC EXCAVATOR, ATTACHMENT, COMPACTOR, 40" X 29" PLATE, 13,000 LBS FORCE (ADD 25,000-50,000 LB HYDRAULIC EXCAVATOR)
9800 W/SWIVELH25AU004 $18,976 2.69 0.33 0.00 231.686.02HYDRAULIC EXCAVATOR, ATTACHMENT, COMPACTOR, 46" X 34" PLATE, 20,000 LBS FORCE (ADD 40,000-75,000 LB HYDRAULIC EXCAVATOR)
9801 W/SWIVELH25AU005 $19,023 2.69 0.33 0.00 231.686.03HYDRAULIC EXCAVATOR, ATTACHMENT, COMPACTOR, 46" X 34" PLATE, 22,000 LBS FORCE (ADD 50,000-75,000 LB HYDRAULIC EXCAVATOR)
AMERICAN COMPACTION EQUIPMENT, INC.
DC-24BLH25AX001 $7,660 1.09 0.13 0.00 250.682.43HYDRAULIC EXCAVATOR, ATTACHMENT, COMPACTOR, 23" WIDE, SHEEPS FOOT, 3 RIMS - 38" DIA (ADD 25,000-50,000 LB HYDRAULIC EXCAVATOR)
DC-24EXH25AX003 $9,216 1.31 0.16 0.00 330.822.93HYDRAULIC EXCAVATOR, ATTACHMENT, COMPACTOR, 23" WIDE, SHEEPS FOOT, 3 RIMS - 42" DIA (ADD 50,000-75,000 LB HYDRAULIC EXCAVATOR)
DC-24EXLH25AX005 $10,411 1.47 0.18 0.00 390.923.29HYDRAULIC EXCAVATOR, ATTACHMENT, COMPACTOR, 23" WIDE, SHEEPS FOOT, 3 RIMS - 48" DIA (ADD 75,000-110,000 LB HYDRAULIC EXCAVATOR)
DC-36BLH25AX002 $8,995 1.27 0.16 0.00 330.802.85HYDRAULIC EXCAVATOR, ATTACHMENT, COMPACTOR, 35" WIDE, SHEEPS FOOT, 4 RIMS - 38" DIA (ADD 50,000-75,000 LB HYDRAULIC EXCAVATOR)
EP 1110-1-8, Vol. 330 Nov 09
2-138
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
H25 AMERICAN COMPACTION EQUIPMENT, INC. (continued)
DC-36EXH25AX004 $11,133 1.58 0.19 0.00 430.983.53HYDRAULIC EXCAVATOR, ATTACHMENT, COMPACTOR, 35" WIDE, SHEEPS FOOT, 4 RIMS - 42" DIA (ADD 50,000-75,000 LB HYDRAULIC EXCAVATOR)
DC-36EXLH25AX006 $12,830 1.82 0.22 0.00 531.134.07HYDRAULIC EXCAVATOR, ATTACHMENT, COMPACTOR, 36" WIDE, SHEEPS FOOT, 4 RIMS - 48" DIA (ADD 75,000-110,000 LB HYDRAULIC EXCAVATOR)
KENT DEMOLITION TOOLS
KHP-35 ME-SH25KN007 $5,897 0.84 0.10 0.00 40.522.02HYDRAULIC EXCAVATOR, ATTACHMENT, COMPACTOR, 12" X 26" PLATE, 3000 LB FORCE (ADD 14,000-25,000 LB HYDRAULIC EXCAVATOR)
KHP-135FT - IIH25KN009 $12,234 1.73 0.21 0.00 141.084.02HYDRAULIC EXCAVATOR, ATTACHMENT, COMPACTOR, 28" X 40" PLATE, 13500 LB FORCE (ADD 25,000-50,000 LB HYDRAULIC EXCAVATOR)
KHP-210FT - IIH25KN010 $16,869 2.39 0.29 0.00 231.495.50HYDRAULIC EXCAVATOR, ATTACHMENT, COMPACTOR, 34" X 46" PLATE, 21000 LB FORCE (ADD 40,000-75,000 LB HYDRAULIC EXCAVATOR)
WAIN-ROY, INC.
24-3 (15-22.5 TON)
H25WN002 $7,964 1.13 0.14 0.00 220.712.53HYDRAULIC EXCAVATOR, ATTACHMENT, COMPACTOR, 24'' WIDE, SHEEPSFOOT, 3 RIMS - 33" DIA (ADD 15-22.5 TON HYDRAULIC EXCAVATOR)
EP 1110-1-8, Vol. 330 Nov 09
2-139
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
H25 WAIN-ROY, INC. (continued)36-4 (15-22.5 TON)
H25WN003 $8,736 1.24 0.15 0.00 260.772.77HYDRAULIC EXCAVATOR, ATTACHMENT, COMPACTOR, 36'' WIDE, SHEEPSFOOT, 4 RIMS - 33" DIA (ADD 15-22.5 TON HYDRAULIC EXCAVATOR)
24-3 (22.5-30 TON)
H25WN004 $9,551 1.35 0.17 0.00 310.853.03HYDRAULIC EXCAVATOR, ATTACHMENT, COMPACTOR, 24'' WIDE, SHEEPSFOOT, 3 RIMS - 39" DIA (ADD 22.5-30 TON HYDRAULIC EXCAVATOR)
36-4 (22.5-30 TON)
H25WN005 $10,845 1.54 0.19 0.00 380.963.44HYDRAULIC EXCAVATOR, ATTACHMENT, COMPACTOR, 36'' WIDE, SHEEPSFOOT, 4 RIMS - 39" DIA (ADD 22.5-30 TON HYDRAULIC EXCAVATOR)
HYDRAULIC EXCAVATORS, WHEEL MOUNTEDH300.01 0 THRU 1.0 CYSUBCATEGORY
CATERPILLAR INC. ( MACHINE DIVISION)
151M318DH30CA005 $202,023 18.43 3.59 13.31 39312.8149.81HYDRAULIC EXCAVATORS, WHEEL, 33,700 LBS, 1.00 CY BUCKET, 1-PIECE BOOM, 19' DIGGING DEPTH, 4X4
HP D-off
121M315DH30CA007 $170,898 15.32 3.04 10.67 35210.7041.95HYDRAULIC EXCAVATORS, WHEEL, 35,100 LBS, 0.70 CY BUCKET, 1-PIECE BOOM, 17' 7" DIGGING DEPTH, 4X4X2
HP D-off
GRADALL COMPANY
233XL4100 IIIH30GA006 $294,115 27.04 5.23 20.54 47518.7573.29D-onHYDRAULIC EXCAVATORS, WHEEL, 44,851 LBS, 0.75 CY BUCKET, TELESCOPIC BOOM, 22' 6" DIGGING DEPTH, 6X4
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-140
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
H30 GRADALL COMPANY (continued)138XL 3300 IIIH30GA007 $206,350 19.01 3.67 12.17 39313.1848.84HYDRAULIC EXCAVATORS, WHEEL, 15,270
LBS, 0.68 CY BUCKET, TELESCOPIC BOOM, 4X4X2
HP D-off
0.02 OVER 1.0 CYSUBCATEGORY
GRADALL COMPANY
163XL 5100 IIIH30GA008 $330,687 23.92 5.75 18.38 55017.7173.47230 HP D-onHYDRAULIC EXCAVATORS, WHEEL, 22,800 LBS, 1.25 CY BUCKET, TELESCOPIC BOOM, 25' 4" DIGGING DEPTH, 6X4
HP D-off
Komatsu America International Company
123PW170ES-6H30KM001 $247,999 18.35 4.31 10.84 37613.4949.18HYDRAULIC EXCAVATORS, WHEEL, 37,600 LBS, 1.12 CY BUCKET, 1-PIECE BOOM, 18' 8" DIGGING DEPTH, 4X4
HP D-off
HYDRAULIC SHOVELS, CRAWLER MOUNTEDH350.12 DIESEL, OVER 5.0 CYSUBCATEGORY
HITACHI CONSTRUCTION MACHINERY
641EX1200-5H35HI006 $1,381,434 69.07 22.47 60.41 2,44757.01248.62HYDRAULIC SHOVEL, CRAWLER, 8.5 CY BUCKET, FRONT SHOVEL, 17' 3" DIGGING DEPTH
HP D-off
O & K ORENSTEIN & KOPPEL INC.
607RH 40 EH35OK001 $876,817 43.84 14.26 57.20 2,20436.18177.49HYDRAULIC SHOVEL, CRAWLER, 9.20 CY BUCKET, BACKHOE, 28' 10" DIGGING DEPTH
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-141
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
H35 O & K ORENSTEIN & KOPPEL INC. (continued)
1,018RH 90 CH35OK003 $1,778,851 88.94 28.93 95.94 3,59473.40339.09HYDRAULIC SHOVEL, CRAWLER, 13.10 CY BUCKET, BACKHOE, 31' 1" DIGGING DEPTH
HP D-off
1,280RH 120 CH35OK004 $2,838,130 141.91 46.16 120.63 5,842117.12507.16HYDRAULIC SHOVEL, CRAWLER, 17.00 CY BUCKET, FRONT SHOVEL, 7' 7" DIGGING DEPTH
HP D-off
2,250RH 200H35OK005 $5,350,219 267.51 87.01 212.04 10,582220.77940.01HYDRAULIC SHOVEL, CRAWLER, 34.00 CY BUCKET, BACKHOE, 30' 6" DIGGING DEPTH
HP D-off
LAND CLEARING EQUIPMENTL100.00 LAND CLEARING EQUIPMENTSUBCATEGORY
BALDERSON, INC.
BBL7L10BS004 $10,162 0.81 0.17 0.00 240.582.10LAND CLEARING EQUIPMENT, ROCK & ROOT RAKE, 12.0' WIDE, 9 TEETH (ADD 200 - 250 HP TRACTOR DOZER)
BRK8L10BS005 $26,885 2.15 0.45 0.00 721.535.20LAND CLEARING EQUIPMENT, ROCK & ROOT RAKE 12.5' WIDE, 9 TEETH (ADD 275 - 325 HP TRACTOR DOZER)
BMA8L10BS002 $29,447 2.36 0.50 0.00 681.685.68LAND CLEARING EQUIPMENT, MULTI-APPLICATION RAKE, 12.5' WIDE, 9 TEETH (ADD 275 - 325 HP TRACTOR DOZER)
988 DTCL10BS007 $37,850 3.03 0.64 0.00 902.167.41LAND CLEARING EQUIPMENT, LOGGING FORK, 92" TINES (ADD 400 - 450 HP FE LOADER)
EP 1110-1-8, Vol. 330 Nov 09
2-142
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
BUSH HOG
FH174L10BU009 $5,091 0.41 0.09 0.00 100.301.84LAND CLEARING EQUIPMENT, FLAIL MOWER, 62" WIDE, 0.5 - 5" HEIGHT (ADD FARM 30 - 60 HP TRACTOR)
SM-60L10BU005 $9,615 0.77 0.16 0.00 170.552.85LAND CLEARING EQUIPMENT, ROTARY CUTTER, 5' WIDE-SIDE MTD (ADD FARM 50 HP TRACTOR)
287L10BU010 $4,878 0.39 0.08 0.00 110.281.69LAND CLEARING EQUIPMENT, ROTARY CUTTER, 7' WIDE, 1.5 - 12" HEIGHT (ADD FARM 40 HP TRACTOR)
3210L10BU011 $10,488 0.84 0.18 0.00 250.603.42LAND CLEARING EQUIPMENT, ROTARY CUTTER, 10.5' WIDE, 2 - 14" HEIGHT (ADD FARM 70 HP TRACTOR)
3715L10BU012 $21,515 1.72 0.36 0.00 501.225.92LAND CLEARING EQUIPMENT, ROTARY CUTTER, 15' WIDE, 2 - 14" HEIGHT (ADD FARM 80 HP TRACTOR)
2720L10BU013 $22,296 1.78 0.38 0.00 561.276.57LAND CLEARING EQUIPMENT, ROTARY CUTTER, 20' WIDE, 2 - 14" HEIGHT (ADD FARM 90 HP TRACTOR)
ROME PLOW CO.
RV8NL10RM001 $52,288 4.18 0.88 0.00 1342.979.94LAND CLEARING EQUIPMENT, V-TREE CUTTER (ADD 275 - 325 HP TRACTOR DOZER)
MA-152R-8SL10RM002 $47,089 3.77 0.79 0.00 1502.688.59LAND CLEARING EQUIPMENT, MULTI-APPLICATION RAKE, 12' 8'' WIDE, 9 TEETH (ADD 275 - 325 HP TRACTOR DOZER)
EP 1110-1-8, Vol. 330 Nov 09
2-143
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
VERMEER MANUFACTURING CO.
27SC 252L10VE010 $12,846 1.01 0.22 4.30 110.737.12LAND CLEARING EQUIPMENT, STUMPER, 16" DIA WHEEL, TRAILER MTD
HP G
35SC 352L10VE002 $23,500 1.85 0.40 5.58 221.3310.50LAND CLEARING EQUIPMENT, STUMPER, 18" DIA WHEEL, TRAILER MTD
HP G
78SC 802L10VE009 $36,868 2.92 0.62 6.88 402.0814.27LAND CLEARING EQUIPMENT, STUMPER, 28" DIA WHEEL, TRAILER MTD
HP D-off
13TS-30L10VE005 $12,456 0.97 0.21 2.07 380.704.59LAND CLEARING EQUIPMENT, TREE SPADE, 30" DIA, 26" DEPTH, TRAILER MTD
HP G
20TS-44AL10VE006 $32,644 2.58 0.55 3.19 661.849.51LAND CLEARING EQUIPMENT, TREE SPADE, 44" DIA, 40" DEPTH, TRAILER MTD
HP G
TS-50L10VE007 $28,042 2.24 0.47 0.00 811.596.61LAND CLEARING EQUIPMENT, TREE SPADE, 50" DIA, 48" DEPTH (ADD 13,800 GVW TRUCK)
LANDSCAPING EQUIPMENTL150.00 LANDSCAPING EQUIPMENTSUBCATEGORY
BOWIE INDUSTRIES, INC.
25LANCER 500L15BW001 $16,795 3.50 0.32 5.31 252.0712.42LANDSCAPING EQUIPMENT, 500 GAL, HYDROMULCHER, TRAILER MTD
HP G
35VICTOR 800L15BW002 $30,277 6.29 0.57 7.43 483.7220.05LANDSCAPING EQUIPMENT, 800 GAL, HYDROMULCHER, TRAILER MTD
HP G
50VICTOR 1100L15BW003 $34,760 7.24 0.65 10.62 604.2725.30LANDSCAPING EQUIPMENT, 1,100 GAL, HYDROMULCHER, GOOSENECK TRAILER MTD
HP G
EP 1110-1-8, Vol. 330 Nov 09
2-144
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
L15 BOWIE INDUSTRIES, INC. (continued)90IMPERIAL 3000L15BW004 $49,449 10.51 0.93 10.40 886.1930.95LANDSCAPING EQUIPMENT, 3,000 GAL,
HYDROMULCHER, TRUCK MTD (ADD 55,000 GVW TRUCK)
HP D-off
FINN CORPORATION
115T330L15FG001 $189,790 40.33 3.57 18.93 9623.7495.94310 HP D-offLANDSCAPING EQUIPMENT, 3,000 GAL, HYDROSEEDER, TRUCK MTD (INCLUDES 56,000 GVW TRUCK)
HP D-off
115B260TL15FG002 $43,479 9.13 0.82 13.28 485.3931.67LANDSCAPING EQUIPMENT, MULCHER, STRAW BLOWER, 20 TONS PER HOUR, TRAILER MOUNTED
HP D-off
HOFFCO-COMET
3PH980EL15HZ001 $825 0.18 0.02 0.64 10.111.04POST HOLE DRILL, UP TO 8" DIA, 30" DEEP, ONE MAN OPERATION
HP G
DEERE & COMPANY
20F725L15JD001 $11,212 1.66 0.21 4.25 121.049.61LANDSCAPING EQUIPMENT, LAWNMOWER, 54" DECK, SIDE DISCHARGE RIDING, 4X2
HP G
MX5L15JD005 $2,237 0.48 0.04 0.00 80.280.89LANDSCAPING EQUIPMENT, ROTARY MOWER, 60" WIDE, MEDIUM DUTY, PTO DRIVE (ADD 45 - 100 HP AGRICULTURAL TRACTOR)
609L15JD006 $4,154 0.88 0.08 0.00 120.521.65LANDSCAPING EQUIPMENT, ROTARY MOWER, 60" WIDE, HEAVY DUTY, PTO DRIVE (ADD 45 - 100 HP AGRICULTURAL TRACTOR)
EP 1110-1-8, Vol. 330 Nov 09
2-145
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
TORO
622188 - PRO-LINE 21"
L15TO001 $1,332 0.28 0.03 1.27 10.171.91LANDSCAPING EQUIPMENT, LAWNMOWER, 21" DECK, REAR BAGGER, PUSH MOWER
HP G
1530092 MID-SIZEL15TO002 $4,050 0.77 0.08 3.19 60.475.13LANDSCAPING EQUIPMENT, LAWNMOWER, 32" DECK, SIDE DISCHARGE, WALK BEHIND MOWER
HP G
2174448L15TO003 $7,787 1.56 0.15 4.46 120.937.99LANDSCAPING EQUIPMENT, LAWNMOWER, 48" DECK, SIDE DISCHARGE, RIDING MOWER
HP G
2174449L15TO004 $8,310 1.68 0.16 4.46 131.008.19LANDSCAPING EQUIPMENT, LAWNMOWER, 52" DECK W/Z100 TRACTOR, SIDE DISCHARGE, RIDING MOWER
HP G
2974253L15TO006 $15,369 3.13 0.29 6.16 151.8612.92LANDSCAPING EQUIPMENT, LAWNMOWER, 60" DECK W/Z500 TRACTOR, SIDE DISCHARGE, RIDING MOWER
HP G
2974254L15TO007 $15,856 3.23 0.30 6.16 171.9213.11LANDSCAPING EQUIPMENT, LAWNMOWER, 72" DECK, W/Z500 TRACTOR, SIDE DISCHARGE, RIDING MOWER
HP G
WILLMAR EQUIPMENT COMPANY
S-200L15WI001 $8,273 1.68 0.16 0.00 151.003.32LANDSCAPING EQUIPMENT, SPREADER, 70 CF DRY CHEMICAL (ADD 55 HP FARM TRACTOR)
EP 1110-1-8, Vol. 330 Nov 09
2-146
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
LIGHTING SETS, TRAILER MOUNTEDL200.10 METALLIC VAPORSUBCATEGORY
ALLMAND BROTHERS INC.
13MAXI-LITE 7.5/8L20AB017 $13,724 1.35 0.24 1.67 210.925.88LITE SET, TRAILER MTD., 4/1250W, W/7.5 KW GEN, ELECTRIC MAST WINCH
HP D-off
14MAXI-LITE 7.5/8 CSA
L20AB018 $15,288 1.50 0.26 1.78 211.016.45LITE SET, TRAILER MTD., 4/1,000W, W/8 KW GEN, ELECTRIC MAST WINCH
HP D-off
14MAXI-LITE 7.5/8 CSA
L20AB019 $17,926 1.77 0.31 1.78 211.207.24LITE SET, TRAILER MTD., 6/1,000W, W/8 KW GEN, ELECTRIC MAST WINCH
HP D-off
12NIGHT-LITE PRO
L20AB020 $11,575 1.13 0.20 1.43 200.774.97LITE SET, TRAILER MTD., 4/1,000W, W/6 KW GEN, MANUAL MAST WINCH
HP D-off
14NIGHT-LITE PRO CSA
L20AB021 $12,232 1.20 0.21 1.78 200.815.56LITE SET, TRAILER MTD., 4/1,000W, W/8 KW GEN, MANUAL MAST WINCH
HP D-off
13NIGHT-LITE PR0 V
L20AB022 $13,801 1.35 0.24 1.67 210.925.89LITE SET, TRAILER MTD., 4/1,000W, W/7.5 KW GEN, ELECTRIC MAST WINCH
HP D-off
ECLIPSE 2220/SE ALT
L20AB023 $5,671 0.55 0.10 0.00 120.381.68LITE SET, TRAILER MTD., 15 LED LAMP, FLASHING ARROW, W/TWO 8D BATTERIES AND 50W SOLAR ARRAY
ECLIPSE 2220/SE APF
L20AB024 $6,074 0.59 0.10 0.00 120.401.79LITE SET, TRAILER MTD., 25 LED LAMP, FLASHING ARROW, W/TWO 8D BATTERIES AND 50W SOLAR ARRAY
EP 1110-1-8, Vol. 330 Nov 09
2-147
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
LINE STRIPING EQUIPMENTL250.00 LINE STRIPING EQUIPMENTSUBCATEGORY
JCL EQUIPMENT CO.
134-BL25JE001 $11,800 1.18 0.20 2.95 150.796.27LINE STRIPING EQUIPMENT, STRIPER, INTERMEDIATE, 2 GUNS, SELF PROPELLED, SINGLE COLOR
HP G
230ROAD RUNNERL25JE002 $100,557 9.93 1.74 28.67 1166.7157.36LINE STRIPING EQUIPMENT, STRIPER, INTERMEDIATE, 3 GUNS, TRUCK MOUNTED (11,000 LB GVW), TWO COLORS
HP D-off
M-B COMPANIES, INC.
55-10L25MB002 $6,263 0.50 0.11 1.14 60.363.95LINE STRIPING EQUIPMENT, STRIPER, 1 GUN, WALK-BEHIND, SINGLE COLOR
HP G
105-12AL25MB005 $11,426 1.02 0.20 2.27 60.716.52LINE STRIPING EQUIPMENT, STRIPER, 2 GUNS, WALK BEHIND, SINGLE COLOR
HP G
23220L25MB007 $53,218 5.32 0.92 5.22 303.5820.48LINE STRIPING EQUIPMENT, STRIPER, INTERMEDIATE, 3-4 GUNS, SELF PROPELLED, THREE COLORS
HP G
60245L25MB006 $94,822 9.48 1.64 13.63 486.3840.67LINE STRIPING EQUIPMENT, STRIPER, INTERMEDIATE, 3 GUNS, SELF PROPELLED, TWO COLORS
HP G
190VANMARK 360L25MB004 $155,955 15.47 2.69 43.16 13310.4388.97LINE STRIPING EQUIPMENT, STRIPER, INTERMEDIATE, 3-4 GUNS, W/11,000 LBS GVW TRUCK, TWO COLORS
HP G
EP 1110-1-8, Vol. 330 Nov 09
2-148
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
L25 M-B COMPANIES, INC. (continued)190360L25MB008 $170,594 16.70 2.94 23.68 8011.2971.76LINE STRIPING EQUIPMENT, STRIPER,
INTERMEDIATE, 3-4 GUNS, THERMAL 120 GAL, TRUCK MTD, TWO COLORS
HP D-off
LOADERS, BELT (Conveyor belts) & ACCESSORIESL300.00 LOADERS, BELT (Conveyor belts) & ACCESSORIESSUBCATEGORY
HEWITT-ROBINS
25V-11 6X16FT, TDL30HW015 $144,576 11.31 2.44 1.45 1388.1030.03LOADER, CONVEYOR BELT & ACCESSORIES, SCREENING PLANT, W/6' X 16' VIBRATORY SLOPE TRIPLE DECK SCREENS/36"X 16.5' UNDER SCREEN CONVEYOR/ 7 CY HOPPER/ & FEEDER
HP E
KOLBERG - PIONEER, INC
1511-2450L30KB001 $34,307 2.66 0.58 0.87 571.917.90LOADER, CONVEYOR BELT & ACCESSORIES, COVEYOR 50', MOBILE, CONCRETE & AGGREGATE, 24'' WIDE
HP E
1511-2460L30KB002 $36,132 2.80 0.61 0.87 622.018.24LOADER, CONVEYOR BELT & ACCESSORIES, CONVEYOR, 60', MOBILE, CONCRETE & AGGREGATE, 24'' WIDE
HP E
METSO MINERALS
25CV50DL30RA001 $74,114 5.83 1.25 2.36 1304.1716.90LOADER, CONVEYOR BELT & ACCESSORIES, GRIZZLY SINGLE SCREEN, 40 CY/HR TRAILER MTD
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-149
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
SUPERIOR INDUSTRIES, AN ASTEC COMPANY
1536''X35' FEED CONVEY
L30S4001 $18,825 1.51 0.32 0.87 331.084.84LOADER, CONVEYOR BELT & ACCESSORIES, BELT FEEDER
HP E
RUN-ON HYDRAULIC LEG
L30S4002 $21,523 1.72 0.36 0.00 281.224.12LOADER, CONVEYOR BELT & ACCESSORIES, 4 HYDRAULIC JACK LEGS
SIDE SKIRTING UPPER
L30S4003 $1,569 0.13 0.03 0.00 90.100.31LOADER, CONVEYOR BELT & ACCESSORIES, SIDE GUARD, ONE SIDE, UPPER
SIDE SKIRTING LOWER
L30S4004 $2,666 0.21 0.04 0.00 90.150.50LOADER, CONVEYOR BELT & ACCESSORIES, SIDE GUARD, ONE SIDE, LOWER
TELSMITH INC.
12PTC 24IN X 50FT
L30TS001 $38,770 2.91 0.65 0.69 102.118.63LOADER, CONVEYOR BELT & ACCESSORIES, CONVEYOR, TRUSS FRAME, 24"W X 50'L, WHEEL MTD, 300 TPH
HP E
LOADERS, FRONT END, CRAWLER TYPEL350.00 LOADERS, FRONT END, CRAWLER TYPESUBCATEGORY
CATERPILLAR INC. ( MACHINE DIVISION)
90939-CL35CA013 $125,803 10.06 2.12 9.30 2097.1535.45LOADER, FRONT END, CRAWLER, 1.50 CY BUCKET
HP D-off
148953-DL35CA005 $206,908 16.55 3.49 15.30 33411.7758.31LOADER, FRONT END, CRAWLER, 2.25 CY BUCKET
HP D-off
160963-DL35CA014 $282,492 22.60 4.76 16.54 43316.0674.89LOADER, FRONT END, CRAWLER, 3.20 CY BUCKET
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-150
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
L35 CATERPILLAR INC. ( MACHINE DIVISION) (continued)
242973-CL35CA007 $391,404 31.31 6.59 25.01 58122.25106.02LOADER, FRONT END, CRAWLER, 3.70 CY BUCKET
HP D-off
Komatsu America International Company
200D75S-5L35KM006 $460,388 36.83 7.76 20.67 48526.18115.22LOADER, FRONT END, CRAWLER, 3.30 CY BUCKET
HP D-off
LOADERS, FRONT END, WHEEL TYPEL400.11 ARTICULATED, 0 THRU 225 HPSUBCATEGORY
CATERPILLAR INC. ( MACHINE DIVISION)
52904BL40CA032 $47,327 3.66 0.83 4.90 982.6613.79LOADER, FRONT END, WHEEL, 0.80 CY BUCKET, ARTICULATED, 4X4
HP D-off
68906L40CA033 $62,186 4.87 1.09 6.41 1093.5317.98LOADER, FRONT END, WHEEL, 1.00 CY BUCKET, ARTICULATED, 4X4
HP D-off
76908L40CA034 $72,748 5.45 1.27 7.16 1334.0022.86LOADER, FRONT END, WHEEL, 1.30 CY BUCKET, ARTICULATED, 4X4
HP D-off
95914GL40CA019 $101,975 8.08 1.79 8.95 1755.8328.01LOADER, FRONT END, WHEEL, 1.70 CY BUCKET, ARTICULATED, 4X4
HP D-off
128924HzL40CA022 $141,562 11.28 2.48 12.06 2428.1238.20LOADER, FRONT END, WHEEL, 2.20 CY BUCKET, ARTICULATED, 4X4
HP D-off
149928HzL40CA015 $140,260 11.17 2.46 14.04 2768.0540.14LOADER, FRONT END, WHEEL, 2.60 CY BUCKET, ARTICULATED, 4X4
HP D-off
180938HL40CA023 $172,709 13.48 3.02 16.96 3329.7650.23LOADER, FRONT END, WHEEL, 3.65 CY BUCKET, ARTICULATED, 4X4
HP D-off
197950HL40CA024 $217,746 16.89 3.81 18.57 40412.2660.68LOADER, FRONT END, WHEEL, 3.50 CY BUCKET, ARTICULATED, 4X4
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-151
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
L40 CATERPILLAR INC. ( MACHINE DIVISION) (continued)
211962HL40CA025 $231,185 17.98 4.05 19.88 42713.0464.41LOADER, FRONT END, WHEEL, 4.00 CY BUCKET, ARTICULATED, 4X4
HP D-off
CASE CORPORATION
136621DL40CS009 $158,702 12.49 2.78 12.82 2619.0342.66LOADER, FRONT END, WHEEL, 2.5 CY BUCKET, ARTICULATED, 4X4
HP D-off
181721DL40CS010 $189,181 14.97 3.31 17.06 30610.8052.51LOADER, FRONT END, WHEEL, 3.0 CY BUCKET, ARTICULATED, 4X4
HP D-off
187821CL40CS011 $238,925 18.60 4.18 17.62 37913.4863.24LOADER, FRONT END, WHEEL, 3.5 CY BUCKET, ARTICULATED, 4X4
HP D-off
Komatsu America International Company
75WA95-3L40KM015 $89,168 6.94 1.56 7.07 1285.0323.54LOADER, FRONT END, WHEEL, 1.40 CY BUCKET, ARTICULATED, 4X4
HP D-off
139WA250-5L40KM003 $151,666 12.05 2.66 13.10 2418.6941.24LOADER, FRONT END, WHEEL, 3.00 CY BUCKET, ARTICULATED, 4X4
HP D-off
0.12 ARTICULATED, OVER 225 HPSUBCATEGORY
CATERPILLAR INC. ( MACHINE DIVISION)
300980G IIL40CA007 $479,169 26.82 7.88 28.27 66021.29100.92LOADER, FRONT END, WHEEL, 6.00 CY BUCKET, ARTICULATED, 4X4
HP D-off
618990 SERIES IIL40CA018 $1,201,643 67.02 19.76 58.24 1,62853.27219.75LOADER, FRONT END, WHEEL, 11.00 CY BUCKET, ARTICULATED, 4X4
HP D-off
800992-GL40CA009 $1,661,644 91.51 27.32 75.39 2,02373.08300.39LOADER, FRONT END, WHEEL, 16.00 CY BUCKET, ARTICULATED, 4X4
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-152
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
Komatsu America International Company
335WA500-3L40KM008 $478,861 26.80 7.87 31.57 67121.2799.56LOADER, FRONT END, WHEEL, 6.50 CY BUCKET, ARTICULATED, 4X4
HP D-off
490WA600-3L40KM009 $690,156 38.15 11.35 46.18 1,01930.43140.43LOADER, FRONT END, WHEEL, 8.00 CY BUCKET, ARTICULATED, 4X4
HP D-off
684WA700-3L40KM010 $1,122,178 62.31 18.45 64.46 1,57449.61216.45LOADER, FRONT END, WHEEL, 11.10 CY BUCKET, ARTICULATED, 4X4
HP D-off
853WA800-3L40KM011 $1,441,127 78.44 23.69 80.39 2,23062.91278.15LOADER, FRONT END, WHEEL, 13.10 CY BUCKET, ARTICULATED, 4X4
HP D-off
0.20 SKID STEERSUBCATEGORY
CATERPILLAR INC. ( MACHINE DIVISION)
49216BL40CA028 $31,459 2.98 0.54 5.06 542.0312.90LOADER, FRONT END, WHEEL, SKID-STEER, 13.0 CF, 60" BUCKET, 4X4
HP D-off
54226BL40CA029 $34,863 3.32 0.60 5.58 582.2614.19LOADER, FRONT END, WHEEL, SKID-STEER, 13.0 CF, 60" BUCKET, 4X4
HP D-off
59236BL40CA030 $39,538 3.73 0.68 6.10 712.5516.02LOADER, FRONT END, WHEEL, SKID-STEER, 14.0 CF, 66" BUCKET, 4X4
HP D-off
74246CL40CA031 $38,452 3.62 0.66 7.65 742.4717.49LOADER, FRONT END, WHEEL, SKID-STEER, 15.4 CF, 72" BUCKET, 4X4
HP D-off
MELROE COMPANY/BOBCAT
24S70L40ME016 $16,698 1.61 0.29 2.43 281.106.45LOADER, FRONT END, WHEEL, SKID-STEER, 6.5 CF, 44" BUCKET, 4X4
HP D-off
36S100L40ME017 $20,769 1.98 0.36 3.67 411.358.82LOADER, FRONT END, WHEEL, SKID-STEER, 6.7 CF, 48" BUCKET, 4X4
HP D-off
46S175L40ME012 $27,121 2.64 0.47 4.75 621.7911.27LOADER, FRONT END, WHEEL, SKID-STEER, 14.3 CF, 60" BUCKET
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-153
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
L40 MELROE COMPANY/BOBCAT (continued)49S130L40ME021 $23,753 2.22 0.41 5.06 521.5211.26LOADER, FRONT END, WHEEL, SKID-
STEER, 13.0 CF, 54" BUCKET, 4X4 HP D-off
75S220L40ME022 $34,799 3.32 0.60 7.75 752.2616.55LOADER, FRONT END, WHEEL, SKID-STEER, 16.3 CF, 66" BUCKET, 4X4
HP D-off
81S300L40ME023 $38,639 3.71 0.67 8.37 832.5318.06LOADER, FRONT END, WHEEL, SKID-STEER, 23.3 CF, 78" BUCKET, 4X4
HP D-off
0.31 TOOL CARRIER & TELESCOPIC HANDLERS, 0 THRU 225 HPSUBCATEGORY
CATERPILLAR INC. ( MACHINE DIVISION)
90IT14GL40CA013 $119,399 8.78 2.08 8.48 1806.4730.78LOADER, WHEEL, INTEGRATED TOOL CARRIER, 1.75 CY LOADER; 6,303 LB @ 12.17' HIGH, FORK LIFT, OR 1,841 LB @ 22.42' HIGH, MATERIAL HANDLING ARM
HP D-off
145IT38HL40CA012 $190,393 14.09 3.31 13.66 27910.3648.76LOADER, WHEEL, INTEGRATED TOOL CARRIER, 2.50 CY LOADER; 10,640 LB @ 12.58' HIGH FORK LIFT, OR 3,195 LB @ 23.25' HIGH, MATERIAL HANDLING ARM
HP D-off
200IT62G IIL40CA014 $264,770 19.62 4.60 18.85 45414.4167.59LOADER, WHEEL, INTEGRATED TOOL CARRIER, 4.25 CY LOADER; 13,670 LB @ 12.42' HIGH, FORK LIFT, OR 5,040 LB @ 22.67' HIGH, MATERIAL HANDLING ARM
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-154
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
LOADERS / BACKHOE, WHEEL TYPEL500.00 LOADERS / BACKHOE, WHEEL TYPESUBCATEGORY
CATERPILLAR INC. ( MACHINE DIVISION)
78416EL50CA001 $62,635 4.48 1.09 5.69 1623.3318.83LOADER / BACKHOE, WHEEL, 1.00 CY FRONT END BUCKET, 18" DIP, 4.5 CF, 14.5' DIGGING DEPTH, 4X2
HP D-off
110446DL50CA004 $150,855 10.90 2.62 8.03 1938.0737.22LOADER / BACKHOE, WHEEL, 1.50 CY FRONT END BUCKET, 36" DIP, 19 CF, 17.1' DIGGING DEPTH, 4X2
HP D-off
CASE CORPORATION
90580 SUPER M SERIES 2
L50CS005 $95,348 6.87 1.66 6.57 1435.1025.68LOADER / BACKHOE, WHEEL, 1.00 CY FRONT END BUCKET, 24" DIP, 6.2 CF, 14.25' DIGGING DEPTH, 4X4
HP D-off
98590 SUPER M SERIES 2
L50CS006 $114,639 8.27 1.99 7.15 1536.1329.83LOADER / BACKHOE, WHEEL, 1.30 CY FRONT END BUCKET, 24" DIP, 6.4 CF, 18' DIGGING DEPTH, 4X4, EXTENDAHOE
HP D-off
JCB INC.
67212S (4WS)L50JC001 $72,027 5.28 1.25 4.89 1203.8919.16LOADER / BACKHOE, WHEEL, 0.80 CY FRONT END BUCKET, 24" DIP, 4.3 CF, 12' DIGGING DEPTH, 4X4
HP D-off
92214S (2WD)L50JC002 $82,170 5.88 1.43 6.71 1584.3723.64LOADER / BACKHOE, WHEEL, 1.25 CY FRONT END BUCKET, 24" DIP, 7.1 CF, 14.6' DIGGING DEPTH, 4X2
HP D-off
100214S (4WS)L50JC003 $99,757 7.13 1.73 7.30 1645.3027.66LOADER / BACKHOE, WHEEL, 1.40 CY FRONT END BUCKET, 24" DIP, 7.1 CF, 14.6' DIGGING DEPTH, 4X4
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-155
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
L50 JCB INC. (continued)100215S (4WS)L50JC005 $115,604 8.32 2.01 7.30 1766.1730.33LOADER / BACKHOE, WHEEL, 1.40 CY
FRONT END BUCKET, 24" DIP, 7.1 CF, 20.1' DIGGING DEPTH, 4X4
HP D-off
100217S (4WS)L50JC007 $147,935 10.71 2.57 7.30 1787.9335.88LOADER / BACKHOE, WHEEL, 1.60 CY FRONT END BUCKET, 24" DIP, 7.1 CF, 21.5' DIGGING DEPTH, 4X4
HP D-off
LOADER / BACKHOE, ATTACHMENTSL550.00 LOADER / BACKHOE, ATTACHMENTSSUBCATEGORY
KENT DEMOLITION TOOLS
175KB-555L55KN001 $7,019 0.94 0.13 0.00 60.602.70LOADER / BACKHOE, ATTACHMENT, AIR RAM, 500 FT-LB, W/2.5" DIA. POINT (ADD 175 CFM COMPRESSOR & LDR/BH)
CFM A
250KB-999L55KN002 $14,378 1.92 0.26 0.00 101.225.51LOADER / BACKHOE, ATTACHMENT, AIR RAM, 1000 FT-LB, W/ 3.5" DIA. POINT (ADD 250 CFM COMPRESSOR & LDR/BH)
CFM A
KF6TLBL55KN004 $13,324 1.78 0.24 0.00 71.134.13LOADER / BACKHOE, ATTACHMENT, HYDRA RAM, 1000 FT-LB, W/3'' DIA. POINT (ADD 12,000-14,000 LB LDR/BH)
KF9TLBL55KN005 $19,664 2.62 0.35 0.00 111.666.08LOADER / BACKHOE, ATTACHMENT, HYDRA RAM, 1500 FT-LB, W/3.5'' DIA. POINT (ADD 14,000-20,000 LB LDR/BH)
KF12TLBL55KN006 $29,291 3.91 0.52 0.00 192.489.06LOADER / BACKHOE, ATTACHMENT, HYDRA RAM, 2000 FT-LB, W/4.25'' DIA. POINT (ADD 20,000-30,000 LB LDR/BH)
EP 1110-1-8, Vol. 330 Nov 09
2-156
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
LOG SKIDDERSL600.00 LOG SKIDDERSSUBCATEGORY
CATERPILLAR INC. ( MACHINE DIVISION)
120517 GRAPPLEL60CA014 $291,383 24.77 4.75 11.31 40517.1462.10LOG SKIDDER, 8 SF GRAPPLE, CABLE 41,050 LBS LINE-PULL AND WINCH, CRAWLER
HP D-off
160525 BL60CA013 $233,066 19.05 3.80 15.08 35813.3357.56LOG SKIDDER, 11 SF GRAPPLE, CABLE 43,000 LBS LINE-PULL AND WINCH, WHEEL, 4X2
HP D-off
150527 CABLEL60CA010 $334,541 28.44 5.46 14.14 40719.6872.56LOG SKIDDER, CABLE, 69,200 LBS LINE-PULL AND WINCH, BLADE, CRAWLER
HP D-off
150527 GRAPPLEL60CA011 $400,183 34.02 6.53 14.14 47323.5483.74LOG SKIDDER, 10 SF GRAPPLE, CABLE 69,200 LBS LINE-PULL AND WINCH, CRAWLER
HP D-off
DEERE & COMPANY
119540G II - SKIDDER
L60JD001 $157,059 12.54 2.56 11.21 2198.8341.00LOG SKIDDER, CABLE, 40,525 LBS LINE-PULL WINCH AND BLADE, WHEEL, 4X4
HP D-off
119548G III - GRAPPLE
L60JD003 $153,280 12.22 2.50 11.21 2178.6140.36LOG SKIDDER, 8.0 SF GRAPPLE WITH BLADE, WHEEL, 4X4
HP D-off
160648G III - GRAPPLE
L60JD004 $203,220 16.01 3.32 15.08 26611.3354.20LOG SKIDDER, 10.4 SF GRAPPLE WITH BLADE, WHEEL, 4X4
HP D-off
151640G III - SKIDDER
L60JD002 $186,228 15.02 3.04 14.23 23910.5549.29LOG SKIDDER, CABLE, 48,867 LBS LINE-PULL WINCH AND BLADE, WHEEL, 4X4
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-157
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
L60 DEERE & COMPANY (continued)170643HL60JD006 $245,505 19.79 4.01 16.02 32013.9162.01LOG SKIDDER, LOG FELLER/BUNCHER,
18" DIA TREE SAW CUTTER, WHEEL, 4X4
HP D-off
170653GL60JD008 $352,932 30.00 5.76 16.02 41020.7677.77LOG SKIDDER, LOG FELLER/BUNCHER, 28" DIA TREE SAW CUTTER, CRAWLER
HP D-off
200843GL60JD007 $268,598 21.75 4.38 18.85 32315.2669.05LOG SKIDDER, LOG FELLER/BUNCHER, 20" DIA TREE SAW CUTTER, WHEEL, 4X4
HP D-off
MARINE EQUIPMENT (NON DREDGING)M100.41 WORK FLOATS (NON-DREDGING)SUBCATEGORY
MARINE INLAND FABRICATORS
M10MZ001 $18,473 2.77 0.31 0.00 1431.704.57MARINE EQUIPMENT, WORK BARGE, SECTIONAL, MEDIUM DUTY, 40' X 8' X 4', 23 TON
M10MZ003 $22,725 3.41 0.39 0.00 1732.105.63MARINE EQUIPMENT, WORK BARGE, SECTIONAL, MEDIUM DUTY, 40' X 10' X 4', 30 TON
0.42 WORK BARGES (SECTIONAL, NON-DREDGING)SUBCATEGORY
MARINE INLAND FABRICATORS
RAKEM10MZ005 $26,153 0.78 0.38 0.00 1930.771.67MARINE EQUIPMENT, WORK BARGE, SECTIONAL, MEDIUM DUTY', W/ONE BUCKHEAD AND SPUDS, 40' X 12' X 4', 36 TON
EP 1110-1-8, Vol. 330 Nov 09
2-158
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
M10 MARINE INLAND FABRICATORS (continued)
M10MZ007 $27,187 0.82 0.40 0.00 2170.811.75MARINE EQUIPMENT, WORK BARGE, SECTIONAL, MEDIUM DUTY, 40' X 12' X 5', 51 TON
NO SPECIFIC MANUFACTURER
M10XX001 $6,291 0.19 0.09 0.00 10.190.40MARINE EQUIPMENT, WORK BARGE, SECTIONAL, BOW AND STERN SECTIONS
M10XX002 $19,560 0.59 0.29 0.00 10.591.26MARINE EQUIPMENT, WORK BARGE, SECTIONAL, LOADING RAMPS
M10XX003 $23,623 0.71 0.35 0.00 10.711.52MARINE EQUIPMENT, WORK BARGE, SECTIONAL, MID-SECTION, 20' X 10' X 5'
M10XX004 $38,279 1.15 0.56 0.00 11.142.45MARINE EQUIPMENT, WORK BARGE, SECTIONAL, MID-SECTION, 40' X 10' X 5'
0.45 FLAT-DECK OR CARGO BARGE (NON-DREDGING)SUBCATEGORY
NO SPECIFIC MANUFACTURER
M10XX005 $165,118 1.74 2.24 0.00 13.115.04MARINE EQUIPMENT, FLAT-DECK CARGO BARGE, 120' X 30' X 7.25', 400 TON
M10XX006 $232,417 2.45 3.16 0.00 14.397.11MARINE EQUIPMENT, FLAT-DECK CARGO BARGE, 120' X 45' X 7', 800 TON
M10XX007 $295,636 3.12 4.02 0.00 15.589.05MARINE EQUIPMENT, FLAT-DECK CARGO BARGE, 140' X 45' X 7', 900 TON
M10XX008 $410,293 4.33 5.57 0.00 17.7412.54MARINE EQUIPMENT, FLAT-DECK CARGO BARGE, 150' X 45' X 9', 1,100 TON
EP 1110-1-8, Vol. 330 Nov 09
2-159
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
0.48 ALL OTHER BARGES (NON-DREDGING)SUBCATEGORY
NO SPECIFIC MANUFACTURER
OPEN 195M10XX016 $246,725 7.81 3.45 0.00 17.3616.83MARINE EQUIPMENT, ALL OTHER BARGES, HOPPER, 195' X 35' X 12', 1,400 TON
OPEN 200M10XX017 $260,861 8.26 3.65 0.00 17.7817.80MARINE EQUIPMENT, ALL OTHER BARGES, HOPPER, 200' X 35' X 12', 1,600 TON
CLOSED 195M10XX018 $324,907 10.29 4.55 0.00 19.7022.17MARINE EQUIPMENT, ALL OTHER BARGES, HOPPER, 195' X 35' X 12', 1,400 TON (COVERED)
CLOSED 200M10XX019 $331,993 10.51 4.65 0.00 19.9122.65MARINE EQUIPMENT, ALL OTHER BARGES, HOPPER, 200' X 35' X 12', 1,600 TON (COVERED)
0.51 BOATS & LAUNCHES, 0 THRU 250 HPSUBCATEGORY
MARINE INLAND FABRICATORS
140COLTM10MZ010 $49,211 2.61 0.77 13.19 952.0820.48MARINE EQUIPMENT, BOATS & LAUNCHES, TRUCKABLE WORKBOAT W/PILOT HOUSE & PUSH KNEES, INBOARD, 20.25' X 8' X 3'
HP D-off
210MUSTANGM10MZ011 $70,177 3.73 1.10 19.79 1902.9730.33MARINE EQUIPMENT, BOATS & LAUNCHES, TRUCKABLE WORKBOAT W/PILOT HOUSE & PUSH KNEES, INBOARD, 25.25' X 10' X 3.5'
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-160
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
SEAARK MARINE
11518' - 72 SERIESM10SM005 $27,018 1.44 0.42 20.02 151.1425.35MARINE EQUIPMENT, BOATS & LAUNCHES, 18' RIVER RUNNER, VEE HULL, NO CABIN, CAP 1,350 LBS, OUTBOARD, 18' X 7.9' X 0.5'
HP G
20019' - UTILITY SERIES
M10SM008 $49,087 2.61 0.77 34.81 172.0844.33MARINE EQUIPMENT, BOATS & LAUNCHES, 19' ROUSTABOUT, TRI HULL, NO CABIN, CAP 2,600 LBS, OUTBOARD, 19.4' X 8.5' X 0.8'
HP G
15017' - UTILITY SERIES
M10SM001 $58,577 3.11 0.92 26.11 182.4835.66MARINE EQUIPMENT, BOATS & LAUNCHES, 17' LITTLE GIANT, W/CABIN TRI-HULL, CAP 2,000 LBS, OUTBOARD, 17.5' X 7.25' X 0.7'
HP G
20021' - UTILITY SERIES
M10SM003 $72,685 3.86 1.14 34.81 243.0746.95MARINE EQUIPMENT, BOATS & LAUNCHES, 21' LITTLE GIANT, W/CABIN TRI-HULL, CAP 2,800 LBS, OUTBOARD, 21.4' X 8.5' X 1'
HP G
25023' - UTILITY SERIES
M10SM004 $78,086 4.15 1.23 43.51 283.3157.26MARINE EQUIPMENT, BOATS & LAUNCHES, 23' LITTLE GIANT, W/CABIN TRI-HULL, CAP 3,400 LBS, OUTBOARD, 23.4' X 8.5' X 1.2'
HP G
NO SPECIFIC MANUFACTURER
7512M10XX010 $49,410 2.62 0.78 7.07 12.0913.54MARINE EQUIPMENT, BOATS & LAUNCHES, 12' TENDER, 7' BEAM, INBOARD ENGINE
HP D-off
5013M10XX009 $14,779 0.79 0.23 8.70 130.6311.36MARINE EQUIPMENT, BOATS & LAUNCHES, 13' RUNABOUT, 5' BEAM, OUTBOARD ENGINE
HP G
10014M10XX011 $56,764 3.02 0.89 9.42 132.4017.04MARINE EQUIPMENT, BOATS & LAUNCHES, 14' TENDER, 7' BEAM, INBOARD ENGINE
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-161
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
M10 NO SPECIFIC MANUFACTURER (continued)100100M10XX012 $57,827 3.07 0.91 9.42 132.4517.16MARINE EQUIPMENT, BOATS &
LAUNCHES, 16', SHALLOW DRAFT, INLAND TUG
HP D-off
115115M10XX013 $74,912 3.98 1.18 10.84 233.1720.67MARINE EQUIPMENT, BOATS & LAUNCHES, 22', SHALLOW DRAFT, INLAND TUG
HP D-off
175175M10XX014 $102,994 5.47 1.62 16.49 604.3630.23MARINE EQUIPMENT, BOATS & LAUNCHES, 18', W/STEERING NOZZLE, INLAND TUG
HP D-off
250250M10XX015 $129,190 6.86 2.03 23.56 835.4641.19MARINE EQUIPMENT, BOATS & LAUNCHES, 26', W/STEERING NOZZLE, INLAND TUG
HP D-off
0.53 BOATS & LAUNCHES, 251 THRU 500 HPSUBCATEGORY
NO SPECIFIC MANUFACTURER
380380M10XX021 $342,803 17.14 5.14 35.81 10013.7177.77MARINE EQUIPMENT, BOATS & LAUNCHES, 40', STANDARD RUDDER, INLAND TUG
HP D-off
435435M10XX022 $390,102 19.51 5.85 40.99 10015.6188.78MARINE EQUIPMENT, BOATS & LAUNCHES, 45' LENGTH, 16' BEAM, 5' 0" DRAFT, PUSH BOAT
HP D-off
400400M10XX023 $522,551 26.13 7.83 37.70 10020.9099.33MARINE EQUIPMENT, BOATS & LAUNCHES, 48' LENGTH, 20' BEAM, 6' 6" DRAFT PUSH BOAT
HP D-off
435435M10XX024 $745,145 37.26 11.17 40.99 13029.80127.10MARINE EQUIPMENT, BOATS & LAUNCHES, 58' LENGTH, 21' BEAM, 6' 0" DRAFT, PUSH BOAT
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-162
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
PILE HAMMER ACCESSORIES - EXTRACTORS & BOX LEADSP100.00 PILE HAMMER ACCESSORIES - EXTRACTORS & BOX LEADSSUBCATEGORY
INTERNATIONAL CONSTRUCTION EQUIPMENT,INC
175216P10IC001 $111,264 12.05 2.15 16.49 1308.1846.67PILE HAMMER ACCESSORIES, PILE EXTRACTOR, 30 TON LINE PULL (ADD LEADS & CRANE)
HP D-off
300416LP10IC002 $175,143 18.97 3.38 28.27 20712.8776.05PILE HAMMER ACCESSORIES, PILE EXTRACTOR, 40 TON LINE PULL (ADD LEADS & CRANE)
HP D-off
8001412BP10IC005 $468,042 50.70 9.04 75.39 59334.39203.05PILE HAMMER ACCESSORIES, PILE EXTRACTOR, 150 TON LINE PULL (ADD LEADS & CRANE)
HP D-off
P10IC010 $16,254 1.76 0.31 0.00 1011.194.12PILE HAMMER ACCESSORIES, PILE LEADS, SWING, 26" X 86'
P10IC012 $22,903 2.48 0.44 0.00 1551.685.81PILE HAMMER ACCESSORIES, PILE LEADS, SWING, 32" X 88'
13P10IC011 $32,173 3.49 0.62 1.23 1342.379.54PILE HAMMER ACCESSORIES, PILE LEADS, FIXED, 26" X 86', W/SPOTTER
HP D-off
13P10IC013 $39,855 4.32 0.77 2.26 1932.9312.65PILE HAMMER ACCESSORIES, PILE LEADS, FIXED, 32" X 88', W/SPOTTER
HP G
EP 1110-1-8, Vol. 330 Nov 09
2-163
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
PILE HAMMERS, DOUBLE ACTINGP200.10 DIESELSUBCATEGORY
INTERNATIONAL CONSTRUCTION EQUIPMENT,INC
422P20IC002 $100,997 12.62 1.86 0.00 1228.1733.92PILE HAMMER, DOUBLE ACTING, DIESEL, 22,500 FT-LBS, MAX STROKE 5' 8" (ADD LEADS & CRANE)
520P20IC003 $102,588 12.82 1.89 0.00 1568.3035.03PILE HAMMER, DOUBLE ACTING, DIESEL, 30,000 FT-LBS, MAX STROKE 5' 11" (ADD LEADS & CRANE)
640P20IC004 $109,450 13.68 2.01 0.00 1878.8537.85PILE HAMMER, DOUBLE ACTING, DIESEL, 40,000 FT-LBS, MAX STROKE 6' 8" (ADD LEADS & CRANE)
MKT MANUFACTURING, INC.
DA-15CP20MK001 $61,523 7.69 1.13 0.00 604.9820.75PILE HAMMER, DOUBLE ACTING, DIESEL, 8,200 FT-LBS, MAX STROKE 10' 6" (ADD LEADS & CRANE)
0.20 PNUEMATIC (STEAM/AIR)SUBCATEGORY
MKT MANUFACTURING, INC.
2505P20MK002 $18,364 2.45 0.33 0.00 161.566.47PILE HAMMER, DOUBLE ACTING, PNUEMATIC (STEAM/AIR), 1,000 FT-LBS, MAX STROKE 7" (ADD 250 CFM COMPRESSOR, LEADS & CRANE)
CFM A
4006P20MK003 $23,119 3.08 0.41 0.00 301.958.50PILE HAMMER, DOUBLE ACTING, PNUEMATIC (STEAM/AIR), 2,500 FT-LBS, MAX STROKE 8.75" (ADD 400 CFM COMPRESSOR, LEADS & CRANE)
CFM A
EP 1110-1-8, Vol. 330 Nov 09
2-164
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
P20 MKT MANUFACTURING, INC. (continued)4507P20MK004 $28,604 3.81 0.51 0.00 512.4210.54PILE HAMMER, DOUBLE ACTING,
PNUEMATIC (STEAM/AIR), 4,150 FT-LBS, MAX STROKE 9.5" (ADD 450 CFM COMPRESSOR, LEADS & CRANE)
CFM A
6009B3P20MK005 $48,221 6.43 0.86 0.00 714.0816.91PILE HAMMER, DOUBLE ACTING, PNUEMATIC (STEAM/AIR), 8,750 FT-LBS, MAX STROKE 17" (ADD 600 CFM COMPRESSOR, LEADS & CRANE)
CFM A
75010B3P20MK006 $53,350 7.11 0.95 0.00 1104.5119.83PILE HAMMER, DOUBLE ACTING, PNUEMATIC (STEAM/AIR), 13,100 FT-LBS, MAX STROKE 19" (ADD 750 CFM COMPRESSOR, LEADS & CRANE)
CFM A
90011B3P20MK007 $58,374 7.78 1.04 0.00 1424.9321.46PILE HAMMER, DOUBLE ACTING, PNUEMATIC (STEAM/AIR), 19,150 FT-LBS, MAX STROKE 19" (ADD 900 CFM COMPRESSOR, LEADS & CRANE)
CFM A
PILE HAMMERS, SINGLE ACTINGP250.10 DIESELSUBCATEGORY
PILECO, INC.
D6-32P25DL001 $55,504 7.40 0.99 0.00 404.6918.11PILE HAMMER, SINGLE ACTING, DIESEL, 10,500 FT-LBS (ADD LEADS & CRANE)
D12-42P25DL003 $66,500 8.87 1.19 0.00 635.6321.77PILE HAMMER, SINGLE ACTING, DIESEL, 31,320 FT-LBS (ADD LEADS & CRANE)
D19-42P25DL004 $75,994 10.13 1.36 0.00 886.4325.30PILE HAMMER, SINGLE ACTING, DIESEL, 42,800 FT-LBS (ADD LEADS & CRANE)
EP 1110-1-8, Vol. 330 Nov 09
2-165
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
P25 PILECO, INC. (continued)D25-32P25DL005 $104,575 13.94 1.87 0.00 1308.8434.98PILE HAMMER, SINGLE ACTING, DIESEL,
58,248 FT-LBS (ADD LEADS & CRANE)
D30-32P25DL006 $108,313 14.44 1.94 0.00 1419.1636.79PILE HAMMER, SINGLE ACTING, DIESEL, 69,898 FT-LBS (ADD LEADS & CRANE)
D46-32P25DL008 $133,226 17.76 2.38 0.00 20711.2646.49PILE HAMMER, SINGLE ACTING, DIESEL, 107,177 FT-LBS (ADD LEADS & CRANE)
D62-22P25DL009 $200,758 26.77 3.59 0.00 28316.9868.68PILE HAMMER, SINGLE ACTING, DIESEL, 165,000 FT-LBS (ADD LEADS & CRANE)
D80-23P25DL010 $292,778 39.04 5.24 0.00 38224.7698.79PILE HAMMER, SINGLE ACTING, DIESEL, 225,000 FT-LBS (ADD LEADS & CRANE)
D100-13P25DL011 $312,642 41.69 5.59 0.00 45926.44106.58PILE HAMMER, SINGLE ACTING, DIESEL, 300,000 FT-LBS (ADD LEADS & CRANE)
INTERNATIONAL CONSTRUCTION EQUIPMENT,INC
30SP25IC001 $69,132 9.22 1.24 0.00 735.8523.58PILE HAMMER, SINGLE ACTING, DIESEL, 22,500 FT-LBS (ADD LEADS & CRANE)
42SP25IC002 $76,935 10.26 1.38 0.00 916.5127.25PILE HAMMER, SINGLE ACTING, DIESEL, 42,000 FT-LBS (ADD LEADS & CRANE)
60SP25IC003 $110,697 14.76 1.98 0.00 1599.3638.63PILE HAMMER, SINGLE ACTING, DIESEL, 60,000 FT-LBS (ADD LEADS & CRANE)
EP 1110-1-8, Vol. 330 Nov 09
2-166
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
P25 INTERNATIONAL CONSTRUCTION EQUIPMENT,INC (continued)
80SP25IC004 $122,888 16.39 2.20 0.00 22010.4043.31PILE HAMMER, SINGLE ACTING, DIESEL, 80,000 FT-LBS (ADD LEADS & CRANE)
100SP25IC005 $152,997 20.40 2.74 0.00 22012.9453.56PILE HAMMER, SINGLE ACTING, DIESEL, 100,000 FT-LBS (ADD LEADS & CRANE)
120SP25IC006 $188,997 25.20 3.38 0.00 27415.9865.64PILE HAMMER, SINGLE ACTING, DIESEL, 120,000 FT-LBS (ADD LEADS & CRANE)
MKT MANUFACTURING, INC.
DE-33/30/20CP25MK001 $67,865 9.05 1.21 0.00 815.7423.48PILE HAMMER, SINGLE ACTING, DIESEL, 33,000 FT-LBS (ADD LEADS & CRANE)
DE-70/50CP25MK003 $112,517 15.00 2.01 0.00 1539.5138.94PILE HAMMER, SINGLE ACTING, DIESEL, 70,000 FT-LBS (ADD LEADS & CRANE)
0.20 PNUEMATIC (STEAM/AIR)SUBCATEGORY
VULCAN FOUNDATION EQUIPMENT, INC
750306P25VU002 $72,028 10.20 1.25 0.00 1216.3525.33PILE HAMMER, SINGLE ACTING, PNUEMATIC (STEAM/AIR), 18,000 FT-LBS (ADD 750 CFM COMPRESSOR, LEADS & CRANE)
CFM A
600505P25VU003 $88,562 12.55 1.54 0.00 1277.8230.58PILE HAMMER, SINGLE ACTING, PNUEMATIC (STEAM/AIR), 25,000 FT-LBS (ADD 600 CFM COMPRESSOR, LEADS & CRANE)
CFM A
EP 1110-1-8, Vol. 330 Nov 09
2-167
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
P25 VULCAN FOUNDATION EQUIPMENT, INC (continued)
900506P25VU004 $90,518 12.82 1.58 0.00 1407.9931.20PILE HAMMER, SINGLE ACTING, PNUEMATIC (STEAM/AIR), 32,500 FT-LBS (ADD 900 CFM COMPRESSOR, LEADS & CRANE)
CFM A
900508P25VU005 $121,684 17.24 2.12 0.00 20210.7441.09PILE HAMMER, SINGLE ACTING, PNUEMATIC (STEAM/AIR), 40,000 FT-LBS (ADD 900 CFM COMPRESSOR, LEADS & CRANE)
CFM A
1,050510P25VU010 $125,070 17.72 2.18 0.00 22211.0440.61PILE HAMMER, SINGLE ACTING, PNUEMATIC (STEAM/AIR), 50,000 FT-LBS (ADD 1,050 CFM COMPRESSOR, LEADS & CRANE)
CFM A
1,200512P25VU011 $126,628 17.94 2.20 0.00 24211.1741.32PILE HAMMER, SINGLE ACTING, PNUEMATIC (STEAM/AIR), 60,000 FT-LBS (ADD 1,200 CFM COMPRESSOR, LEADS & CRANE)
CFM A
PILE HAMMERS, DRIVER/ EXTRACTOR, VIBRATORYP300.00 PILE HAMMERS, DRIVER/ EXTRACTOR, VIBRATORYSUBCATEGORY
MKT MANUFACTURING, INC.
185V-5C/HP-185P30MK001 $96,435 12.86 1.73 17.43 1208.1649.29PILE HAMMER, DRIVER/EXTRACTOR, VIBRATORY, 53 TON FORCE DRIVE (ADD LEADS & CRANE)
HP D-off
325V-20B/HP-365P30MK003 $166,420 22.19 2.98 30.63 22014.0885.66PILE HAMMER, DRIVER/EXTRACTOR, VIBRATORY, 98.5 TON FORCE DRIVE (ADD LEADS & CRANE)
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-168
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
P30 MKT MANUFACTURING, INC. (continued)630V-35/HP-630P30MK004 $281,505 37.53 5.04 59.37 32723.81153.34PILE HAMMER, DRIVER/EXTRACTOR,
VIBRATORY, 200 TON FORCE DRIVE (ADD LEADS & CRANE)
HP D-off
PIPELAYERSP350.00 PIPELAYERSSUBCATEGORY
CATERPILLAR INC. ( MACHINE DIVISION)
110561MP35CA001 $225,102 12.86 3.70 5.68 35810.1337.61PIPELAYER, 18' BOOM, 40,000 LBS CAPACITY
HP D-off
230572-RP35CA008 $417,559 23.86 6.85 11.89 66918.7871.30PIPELAYER, 20' BOOM, 90,000 LBS CAPACITY
HP D-off
305583-RP35CA009 $542,359 30.99 8.90 15.76 98424.4092.97PIPELAYER, 20' BOOM, 140,000 LBS CAPACITY
HP D-off
420589P35CA006 $704,199 40.24 11.56 21.71 1,45031.68122.15PIPELAYER, 28' BOOM, 230,000 LBS CAPACITY
HP D-off
PLATFORMS & MAN-LIFTSP400.00 PLATFORMS & MAN-LIFTSSUBCATEGORY
BIL-JAX, INC.
SKYRIDER 15P40BX001 $13,465 1.51 0.22 0.00 180.983.00MAN-LIFT, TELESCOPIC MAST, 14.8' HEIGHT, 500 LBS, 24 VOLT DC, RECHARGABLE BATTERIES, SELF PROPELLED, 2.2' X 4' PLATFORM
EP 1110-1-8, Vol. 330 Nov 09
2-169
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
TEREX CORPORATION
32TA50RTP40TE003 $91,143 9.99 1.48 2.33 1546.4823.53MAN-LIFT, ARTICULATED BOOM, 55' HEIGHT, 500 LBS, 29' REACH, 4X4, SELF PROPELLED, 2.2' X 5' PLATFORM
HP D-off
44TA60RTP40TE004 $104,696 11.56 1.70 3.21 2417.4827.30MAN-LIFT, ARTICULATED BOOM, 66' HEIGHT, 500 LBS, 33' REACH, 4X4, SELF PROPELLED, 3' X 6' PLATFROM
HP D-off
66TB42P40TE005 $80,251 8.76 1.30 4.82 1315.6823.87MAN-LIFT, STRAIGHT BOOM, 43' HEIGHT, 650 LBS, 37' REACH, 4X4, SELF PROPELLED, 3' X 6' PLATFORM
HP D-off
66TB66P40TE006 $107,320 11.83 1.74 4.82 2507.6629.71MAN-LIFT, STRAIGHT BOOM, 66' HEIGHT, 650 LBS, 51' REACH, 4X4, SELF PROPELLED, 3' X 6' PLATFORM
HP D-off
66TB85P40TE007 $179,395 19.94 2.91 4.82 37312.8845.53MAN-LIFT, STRAIGHT BOOM, 86' HEIGHT, 600 LBS, 70' REACH, 4X4, SELF PROPELLED, 3' X 6' PLATFORM
HP D-off
76TB100P40TE008 $199,609 22.22 3.24 5.54 39314.3550.77MAN-LIFT, STRAIGHT BOOM, 92' HEIGHT, 500 LBS, 67' REACH, 4X4, SELF PROPELLED, 3' X 6' PLATFORM
HP D-off
76TB110P40TE009 $222,626 24.81 3.61 5.54 42016.0255.82MAN-LIFT, STRAIGHT BOOM, 110' HEIGHT, 500 LBS, 74' REACH, 4X4, SELF PROPELLED, 3' X 6' PLATFORM
HP D-off
210T-292P40TE010 $76,369 8.43 1.24 15.32 1155.4634.07MAN-LIFT, LINE-TRUCK, W/AERIAL 2' X 2.5' PLATFORM, 300 LBS, 34' HEIGHT, 23' RAD
HP D-off
210T-38PP40TE011 $84,138 9.19 1.36 15.32 1285.9636.08MAN-LIFT, LINE-TRUCK, W/AERIAL 2' X 2.5' PLATFORM, 300 LBS, 43' HEIGHT, 26' RAD
HP D-off
210Digger DerrickC-4045
P40TE012 $125,877 13.89 2.04 15.32 2688.9945.24MAN-LIFT, LINE-TRUCK, W/13.7 TON, 45' HIGH-BOOM TILT POLE CLAWS, & 1.5' DIA AUGER
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-170
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
P40 TEREX CORPORATION (continued)2105FC-52P40TE013 $115,279 12.70 1.87 15.32 2158.2242.92MAN-LIFT, LINE-TRUCK, W/AERIAL 2' X 4'
PLATFORM, 700 LBS, 57' HEIGHT, 35' RAD
HP D-off
2105FC-55P40TE014 $117,449 12.94 1.90 15.32 2488.3743.39MAN-LIFT, LINE-TRUCK, W/AERIAL 2' X 2.5' PLATFORM, 500 LBS, 60' HEIGHT, 38' RAD
HP D-off
2106H-65P40TE015 $133,311 14.72 2.16 15.32 2559.5246.87MAN-LIFT, LINE-TRUCK, W/AERIAL 2' X 4' PLATFORM, 750 LBS, 70' HEIGHT, 39' RAD
HP D-off
PUMPS, GROUTP450.00 PUMPS, GROUTSUBCATEGORY
AIRPLACO EQUIPMENT CO., INC.
HG-5P45AF002 $857 0.09 0.01 0.00 10.060.20PUMP, GROUT, HAND PUMP, 12 CF/HR, 0-100 PSI, W/O HOPPER (ADD HOSES)
HG-9P45AF003 $1,184 0.13 0.02 0.00 10.090.29PUMP, GROUT, HAND PUMP, 15 CF/HR, 0-100 PSI, W/5 GAL HOPPER (ADD HOSES)
5HGA-530P45AF008 $7,823 0.83 0.13 0.00 40.551.99PUMP, GROUT, 50 CF/HR, 0-250 PSI, SKID MTD, W/5 GAL HOPPER AND 30 GAL MIXER (ADD 50 CFM COMPRESSOR & HOSE)
CFM A
11HJ-15 SGP45AF005 $12,056 1.25 0.20 2.79 50.836.05PUMP, GROUT, HIGH PRESSURE SINGLE CYLINDER GROUT PUMP, 110 CF/HR, 400 PSI,GROUT-MUD JACKING-SHOTCRETE, TRAILER MTD, W/30 GAL HOPPER AND 30 GAL MIXER (ADD 200 CFM COMPRESSOR & 2" HOSE)
HP G
EP 1110-1-8, Vol. 330 Nov 09
2-171
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
P45 AIRPLACO EQUIPMENT CO., INC. (continued)
350MP-2J6/GM-70DA
P45AF009 $26,194 2.78 0.44 0.00 51.836.42PUMP, GROUT, 160 CF/HR, 1 - 225 PSI, SKID MTD, W/15 GAL HOPPER/ & TWO 70 GAL MIXERS (ADD 350 CFM COMPRESSOR & HOSE)
CFM A
11HJ-15 DGP45AF006 $15,612 1.62 0.26 2.79 71.076.91PUMP, GROUT, HIGH PRESSURE DUAL CYLINDER GROUT PUMP, 180 CF/HR, 0-300 PSI, GROUT-MUD JACKING-SHOTCRETE, TRAILER MTD, W/30 GAL HOPPER AND 30 GAL MIXER (ADD 200 CFM COMPRESSOR & 2" HOSE)
HP G
18HJ-25P45AF010 $30,797 3.24 0.51 4.57 232.1312.56PUMP, GROUT, HIGH PRESSURE DUAL CYLINDER GROUT PUMP, 180 CF/HR, 0 - 400 PSI, GROUT-MUD JACK-PLASTER, TRAILER MTD, W/100 GAL HOPPER AND 45 GAL MIXER/ 2" HOSE
HP G
35HJ-36 CRGP45AF011 $54,820 5.79 0.92 8.88 493.8223.18PUMP, GROUT, HIGH PRESSURE DUAL CYLINDER GROUT PUMP, 250 CF/HR, 0 - 250 PSI, GROUT-MUD JACK-SHOTCRETE, TRAILER MTD, W/120 GAL HOPPER/ 90 GAL MIXER/ 2" HOSE
HP G
30P-280 HDP45AF007 $33,959 3.58 0.57 4.10 252.3612.74PUMP, GROUT, HIGH VOLUME DUAL CYLINDER GROUT PUMP, 756 CF/HR CONCRETE, 486 CF/HR SHOTCRETE, TRAILER MTD, W/1200 GAL HOPPER (ADD HOSE 2" - 3" DIA)
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-172
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
ALLENTOWN EQUIPMENT
46POWER CRETER MAGNUM
P45AL015 $61,106 6.46 1.02 6.29 354.2521.71PUMP, GROUT, GROUT-MUD JACK-SHOTCRE, HIGH PRESSURE DUAL CYLINDER GROUT PUMP, 135 CF/HR, 0 - 1,770 PSI, TRAILER MTD, W/75 GAL HOPPER/ 82 GAL MIXER/ 3" HOSE
HP D-off
CHEMGROUT, INC.
15CG-050P45CG001 $4,171 0.44 0.07 0.00 10.291.05PUMP, GROUT, MINI, AIR, 40 CF/HR, 225 PSI, PORTABLE, SKID MTD (ADD 15 CFM - 100 PSI COMPRESSOR)
CFM A
85CG-550PP45CG002 $6,755 0.72 0.11 0.00 30.471.73PUMP, GROUT, MIXER, AIR, 40 CF/HR, 225 PSI, SKID MTD (ADD 85 CFM - 100 PSI COMPRESSOR)
CFM A
230CG-500/2C6 VERSATILE
P45CG003 $15,657 1.66 0.26 0.00 121.093.93PUMP, GROUT, MIXER, AIR, 160 CF/HR, 160 PSI, SKID MTD, 15 GAL HOPPER & 2 - 70 GAL MIXING TANKS (ADD 250 CFM - 100 PSI COMPRESSOR)
CFM A
16CG-570 / 3C6 / HP45CG007 $22,906 2.43 0.38 4.06 131.6010.05PUMP, GROUT, THICK MIX/SPRAY, 64 CF/HR, 261 PSI, SKID MTD, 15 GAL HOPPER & 45 GAL MIXING TANK, W/AIR COMPRESSOR, POWER UNIT
HP G
16CG-570 / 3C6P45CG006 $28,597 3.00 0.48 4.06 151.9811.45PUMP, GROUT, THICK MIX/SPRAY, 64 CF/HR, 261 PSI, TRAILER MTD, 15 GAL HOPPER & 45 GAL MIXING TANK, W/AIR COMPRESSOR, POWER UNIT
HP G
OLIN ENGINEERING, INC.
555 40P45OE002 $35,278 3.68 0.59 7.52 422.4316.84PUMP, GROUT PUMP, 1,134 CF/HR, 750 PSI, 37 GAL HOPPER, TRAILER MTD, W/POWER UNIT
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-173
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
P45 OLIN ENGINEERING, INC. (continued)845 65P45OE003 $45,809 4.80 0.77 11.49 483.1723.75PUMP, GROUT PUMP, 1,836 CF/HR, 1100
PSI, 37 GAL HOPPER, TRAILER MTD, W/POWER UNIT
HP D-off
1205 85P45OE004 $54,763 5.75 0.92 16.42 563.8031.36PUMP, GROUT PUMP, 2,295 CF/HR, 1100 PSI, 37 GAL HOPPER, TRAILER MTD, W/POWER UNIT
HP D-off
1815 140CAP45OE005 $73,779 7.70 1.23 24.76 1005.0845.15PUMP, GROUT PUMP, 3,780 CF/HR, 900 PSI, 37 GAL HOPPER, TRAILER MTD TANDEM, W/POWER UNIT
HP D-off
PUMPS, WATER, CENTRIFUGAL, TRASHP500.11 ENGINE DRIVESUBCATEGORY
WACKER CORPORATION
10PT 2AP50WC001 $1,379 0.14 0.02 2.39 10.092.98PUMP, WATER, CENTRIFUGAL, TRASH, ENGINE DRIVE, 2" DIA, 205 GPM @ 100' HEAD (ADD HOSES)
HP G
15PT 3AP50WC002 $1,622 0.16 0.03 1.96 20.112.59PUMP, WATER, CENTRIFUGAL, TRASH, ENGINE DRIVE, 3" DIA, 425 GPM @ 95' HEAD (ADD HOSES)
HP D-off
16PTS 4VP50WC003 $3,776 0.38 0.07 2.09 30.263.23PUMP, WATER, CENTRIFUGAL, TRASH, ENGINE DRIVE, 4" DIA, 705 GPM @ 106' HEAD (ADD HOSES)
HP D-off
33PT 6LTP50WC004 $17,452 1.73 0.30 4.31 251.178.84PUMP, WATER, CENTRIFUGAL, TRASH, ENGINE DRIVE, 6" DIA, 1,300 GPM @ 100' HEAD ,TRAILER MTD (ADD HOSES)
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-174
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
NO SPECIFIC MANUFACTURER
606'' DIESELP50XX001 $24,582 2.46 0.42 7.84 221.6514.43PUMP, WATER, CENTRIFUGAL, TRASH, ENGINE DRIVE, 6" DIA, 1,165 GPM, AIR COOLED (ADD HOSES)
HP D-off
708'' DIESELP50XX002 $45,413 4.54 0.78 9.15 353.0520.58PUMP, WATER, CENTRIFUGAL, TRASH, ENGINE DRIVE, 8" DIA, 2,085 GPM, WATER COOLED (ADD HOSES)
HP D-off
8510'' DIESELP50XX003 $48,696 4.87 0.84 11.11 433.2823.55PUMP, WATER, CENTRIFUGAL, TRASH, ENGINE DRIVE, 10" DIA, 2,665 GPM, WATER COOLED (ADD HOSES)
HP D-off
0.31 HOSES, PUMP, SUCTION & DISCHARGESUBCATEGORY
GORMAN-RUPP COMPANY
P50GR001 $207 0.05 0.00 0.00 10.030.12PUMP, WATER, CENTRIFUGAL, TRASH, HOSE, SUCTION/DISCH, 2" DIA X 20' WITH COUPLING (PER SECTION)
P50GR002 $360 0.08 0.01 0.00 10.050.22PUMP, WATER, CENTRIFUGAL, TRASH, HOSE, SUCTION/DISCH, 3" DIA X 20' WITH COUPLING (PER SECTION)
P50GR003 $508 0.11 0.01 0.00 10.070.30PUMP, WATER, CENTRIFUGAL, TRASH, HOSE, SUCTION/DISCH, 4" DIA X 20' WITH COUPLING (PER SECTION)
P50GR004 $1,143 0.26 0.02 0.00 10.150.69PUMP, WATER, CENTRIFUGAL, TRASH, HOSE, SUCTION/DISCH, 6" DIA X 20' WITH COUPLING (PER SECTION)
P50GR005 $379 0.09 0.01 0.00 10.060.23PUMP, WATER, CENTRIFUGAL, TRASH, HOSE, SUCTION/DISCH, 2" DIA X 50' WITH COUPLING (PER SECTION)
EP 1110-1-8, Vol. 330 Nov 09
2-175
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
P50 GORMAN-RUPP COMPANY (continued)P50GR006 $725 0.16 0.01 0.00 10.090.43PUMP, WATER, CENTRIFUGAL, TRASH,
HOSE, SUCTION/DISCH, 3" DIA X 50' WITH COUPLING (PER SECTION)
P50GR007 $1,196 0.27 0.02 0.00 20.160.72PUMP, WATER, CENTRIFUGAL, TRASH, HOSE, SUCTION/DISCH, 4" DIA X 50' WITH COUPLING (PER SECTION)
P50GR008 $2,543 0.57 0.05 0.00 30.341.52PUMP, WATER, CENTRIFUGAL, TRASH, HOSE, SUCTION/DISCH, 6" DIA X 50' WITH COUPLING (PER SECTION)
PUMPS, WATER, SUBMERSIBLEP550.01 ENGINE DRIVESUBCATEGORY
GRIFFIN DEWATERING CORP.
214MHP55GF001 $21,361 2.14 0.37 2.75 191.448.17PUMP, WATER, SUBMERSIBLE, ENGINE DRIVE, 4" DIA, 400 GPM @ 20' HEAD, SKID MTD (INCLUDES POWER UNIT MODEL 250)(ADD HOSES)
HP D-off
726TP55GF002 $23,714 2.37 0.41 9.41 311.6016.30PUMP, WATER, SUBMERSIBLE, ENGINE DRIVE, 6" DIA, 2,000 GPM @ 20' HEAD, SKID MTD (INCLUDES POWER UNIT MODEL 400)(ADD HOSES)
HP D-off
0.02 ELECTRIC DRIVESUBCATEGORY
GORMAN-RUPP COMPANY
2S2A1P55GR001 $3,925 0.42 0.07 0.16 20.281.00PUMP, WATER, SUBMERSIBLE, ELECTRIC, 2" DIA, 138 GPM @ 20' HEAD (ADD HOSES)
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-176
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
P55 GORMAN-RUPP COMPANY (continued)5S3A1P55GR002 $4,852 0.52 0.08 0.40 30.341.51PUMP, WATER, SUBMERSIBLE, ELECTRIC,
3" DIA, 278 GPM @ 20' HEAD (ADD HOSES)
HP E
25S4A1P55GR003 $15,456 1.64 0.26 2.00 121.085.82PUMP, WATER, SUBMERSIBLE, ELECTRIC, 4" DIA, 860 GPM @ 40' HEAD (ADD HOSES)
HP E
60S6A1P55GR004 $23,241 2.47 0.39 4.81 141.6311.29PUMP, WATER, SUBMERSIBLE, ELECTRIC, 6" DIA, 1,950 GPM @ 40' HEAD (ADD HOSES)
HP E
WACKER CORPORATION
1PS2 500P55WC001 $401 0.04 0.01 0.08 10.030.19PUMP, WATER, SUBMERSIBLE, ELECTRIC, 2" DIA, 66 GPM @ 39' HEAD (ADD HOSES)
HP E
1PS2 750P55WC002 $547 0.06 0.01 0.08 10.040.22PUMP, WATER, SUBMERSIBLE, ELECTRIC, 2" DIA, 100 GPM @ 52' HEAD (ADD HOSES)
HP E
PUMPS, WATER, CENTRIFUGAL, DEWATERINGP600.11 SKID MOUNTED, ENGINE DRIVESUBCATEGORY
RIVERSIDE PUMP MANUFACTURING
4S2BP60HO002 $941 0.09 0.02 0.84 10.071.15PUMP, WATER, CENTRIFUGAL, DEWATERING, SKID MOUNTED, ENGINE DRIVE, 2" DIA, 150 GPM @ 22' HEAD (ADD HOSES)
HP G
8TP3BP60HO003 $1,682 0.17 0.03 1.91 10.122.51PUMP, WATER, CENTRIFUGAL, DEWATERING, SKID MOUNTED, ENGINE DRIVE, 3" DIA, 293 GPM @ 20' HEAD (ADD HOSES)
HP G
EP 1110-1-8, Vol. 330 Nov 09
2-177
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
WACKER CORPORATION
4PG 2AP60WC001 $686 0.07 0.01 0.96 10.051.22PUMP, WATER, CENTRIFUGAL, DEWATERING, SKID MOUNTED, ENGINE DRIVE, 2" DIA, 159 GPM @ 98' HEAD (ADD HOSES)
HP G
6PG 3AP60WC002 $907 0.09 0.02 1.43 10.071.81PUMP, WATER, CENTRIFUGAL, DEWATERING, SKID MOUNTED, ENGINE DRIVE, 3" DIA, 264 GPM @ 98' HEAD (ADD HOSES)
HP G
0.21 WHEEL MOUNTED, ENGINE DRIVESUBCATEGORY
GRIFFIN DEWATERING CORP.
21250/4"MHP60GF003 $24,165 2.38 0.42 2.75 191.618.57PUMP, WATER, CENTRIFUGAL, DEWATERING, WHEEL, 4" DIA, 400 GPM @ 60' HEAD (ADD HOSES)
HP D-off
72400/6"TP60GF008 $26,518 2.62 0.46 9.41 311.7716.68PUMP, WATER, CENTRIFUGAL, DEWATERING, WHEEL, 6" DIA, 1,040 GPM @ 60' HEAD (ADD HOSES)
HP D-off
72400/6"TP60GF004 $26,518 2.62 0.46 9.41 311.7716.68PUMP, WATER, CENTRIFUGAL, DEWATERING, WHEEL, 6" DIA, 2,000 GPM @ 60' HEAD (ADD HOSES)
HP D-off
113600/8"TP60GF005 $30,536 3.02 0.53 14.77 392.0423.69PUMP, WATER, CENTRIFUGAL, DEWATERING, WHEEL, 8" DIA, 3,410 GPM @ 60' HEAD (ADD HOSES)
HP D-off
140825/12"TP60GF006 $47,505 4.71 0.82 18.30 393.1831.50PUMP, WATER, CENTRIFUGAL, DEWATERING, WHEEL, 12" DIA, 4,410 GPM @ 60' HEAD (ADD HOSES)
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-178
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
GORMAN-RUPP COMPANY
4714C2-F3LP60GR001 $25,198 2.49 0.43 6.14 201.6812.65PUMP, WATER, CENTRIFUGAL, DEWATERING, WHEEL, 4" DIA, 600 GPM @ 80' HEAD (ADD HOSES)
HP D-off
10116C2-F4LP60GR002 $29,382 2.91 0.51 24.13 201.9733.55PUMP, WATER, CENTRIFUGAL, DEWATERING, WHEEL, 6" DIA, 1,825 GPM @ 40' HEAD (ADD HOSES)
HP G
PUMPS, WATER, DIAPHRAGMP650.11 SKID MOUNTED, ENGINE DRIVESUBCATEGORY
RIVERSIDE PUMP MANUFACTURING
4DP2BP65HO001 $1,691 0.17 0.03 0.84 10.121.32PUMP, WATER, DIAPHRAGM, SKID MTD, 2" DIA, 33 GPM @ 25' HEAD (ADD HOSES)
HP G
4DP3BP65HO002 $1,963 0.20 0.03 0.84 20.131.38PUMP, WATER, DIAPHRAGM, SKID MTD, 3" DIA, 80 GPM @ 25' HEAD (ADD HOSES)
HP G
0.21 WHEEL MOUNTED, ENGINE DRIVESUBCATEGORY
GORMAN-RUPP COMPANY
53D-13P65GR001 $4,484 0.37 0.08 1.19 20.272.33PUMP, WATER, DIAPHRAGM, WHEEL, 2" DIA SUCTION X 3" DIA DISCHARGE, 56 GPMH @ 25' HEAD (ADD HOSES)
HP G
23D-BP65GR002 $5,278 0.45 0.09 0.36 20.321.57PUMP, WATER, DIAPHRAGM, WHEEL, 3" DIA, 560 GPM @ 25' HEAD (ADD HOSES)
HP G
EP 1110-1-8, Vol. 330 Nov 09
2-179
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
P65 GORMAN-RUPP COMPANY (continued)34D-BP65GR003 $12,662 1.20 0.22 0.72 30.823.53PUMP, WATER, DIAPHRAGM, WHEEL, 4"
DIA, 74 GPM @ 25' HEAD (ADD HOSES)
HP G
WACKER CORPORATION
4PDT 2AP65WC001 $1,780 0.18 0.03 0.96 10.121.45PUMP, WATER, DIAPHRAGM, WHEEL, 2" DIA, 50 GPM @ 25' HEAD (ADD HOSES)
HP G
4PDT 3AP65WC002 $1,922 0.19 0.03 0.96 20.131.47PUMP, WATER, DIAPHRAGM, WHEEL, 3" DIA, 88 GPM @ 25' HEAD (ADD HOSES)
HP G
PUMPS, WATER (For core drills)P700.01 ENGINE DRIVESUBCATEGORY
NO SPECIFIC MANUFACTURER
275-7.6P70XX001 $3,451 0.32 0.06 0.48 10.221.25PUMP, WATER, FOR CORE DRILLS, 7.6 GPM, 75 PSI, MANUAL, SKID (ADD HOSES)
HP G
6225-17.5P70XX002 $9,002 0.84 0.16 1.43 10.583.45PUMP, WATER, FOR CORE DRILLS, 17.5 GPM, 225 PSI, MANUAL, SKID (ADD HOSES)
HP G
EP 1110-1-8, Vol. 330 Nov 09
2-180
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
RIPPERS & HYDRAULIC BANK SLOPERS (Add cost for point wear)R100.00 RIPPERS & HYDRAULIC BANK SLOPERS (Add cost for point wear)SUBCATEGORY
CATERPILLAR INC. ( MACHINE DIVISION)
D-5C111R10CA006 $280 0.03 0.00 0.00 10.020.06RIPPER, SHANK, EACH (ADD D-5 TRACTOR DOZER & RIPPER & COST FOR POINT WEAR)
D6RII-174-9198R10CA022 $1,128 0.11 0.02 0.00 20.080.25RIPPER SHANK, EACH (ADD D6RII TRACTOR DOZER & RIPPER & COST FOR POINT WEAR)
D6R II - 9J-8926R10CA023 $1,138 0.11 0.02 0.00 20.080.25RIPPER, SHANK, EACH (ADD D-6 TRACTOR DOZER & RIPPER & COST FOR POINT WEAR)
D-7RR10CA010 $1,849 0.18 0.03 0.00 20.120.41RIPPER, SHANK, EACH (ADD D-7 TRACTOR DOZER & RIPPER & COST FOR POINT WEAR)
D-8RR10CA013 $4,099 0.41 0.07 0.00 70.280.92RIPPER, SHANK, EACH (ADD D-8 TRACTOR DOZER & RIPPER & COST FOR POINT WEAR)
D-9RR10CA016 $4,114 0.41 0.07 0.00 80.280.92RIPPER, SHANK, EACH (ADD D-9 TRACTOR DOZER & RIPPER & COST FOR POINT WEAR)
D-10RR10CA019 $6,704 0.67 0.12 0.00 120.461.75RIPPER, SHANK, EACH (ADD D-10 TRACTOR DOZER & RIPPER & COST FOR POINT WEAR)
D-3R10CA001 $10,732 1.07 0.19 0.00 130.732.49RIPPER, 3-SHANKS & BEAM, HYDRAULIC (ADD D-3 TRACTOR DOZER & COST FOR POINT WEAR)
EP 1110-1-8, Vol. 330 Nov 09
2-181
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
R10 CATERPILLAR INC. ( MACHINE DIVISION) (continued)
D-4C SERIES IIIR10CA003 $10,732 1.07 0.19 0.00 130.732.49RIPPER, 3-SHANKS & BEAM, HYDRAULIC (ADD D-4 TRACTOR DOZER & COST FOR POINT WEAR)
D-5C SERIES IIIR10CA005 $10,732 1.07 0.19 0.00 130.732.49RIPPER, 3-SHANKS & BEAM, HYDRAULIC (ADD D-5 TRACTOR DOZER & COST FOR POINT WEAR)
D-6R IIR10CA007 $24,624 2.46 0.42 0.00 401.655.59RIPPER, 3-SHANKS & BEAM, HYDRAULIC (ADD D-6 TRACTOR DOZER & COST FOR POINT WEAR)
D-7RR10CA009 $45,846 4.58 0.79 0.00 773.0810.36RIPPER, 3-SHANKS & BEAM, HYDRAULIC (ADD D-7 TRACTOR DOZER & COST FOR POINT WEAR)
D-8RR10CA011 $49,808 4.98 0.86 0.00 913.3511.27RIPPER, 1-SHANK & BEAM, HYDRAULIC (ADD D-8 TRACTOR DOZER & RIPPER & COST FOR POINT WEAR)
D-8RR10CA012 $58,797 5.88 1.01 0.00 1023.9513.28RIPPER, 3-SHANKS & BEAM, HYDRAULIC (ADD D-8 TRACTOR DOZER & COST FOR POINT WEAR)
D-9RR10CA014 $64,104 6.41 1.11 0.00 1024.3214.54RIPPER, 1-SHANK & BEAM, HYDRAULIC (ADD D-9 TRACTOR DOZER & COST FOR POINT WEAR)
D-9RR10CA015 $73,068 7.31 1.26 0.00 914.9216.55RIPPER, 3-SHANKS & BEAM, HYDRAULIC (ADD D-9 TRACTOR DOZER & COST FOR POINT WEAR)
D-10RR10CA017 $97,634 9.76 1.68 0.00 1616.5622.10RIPPER, 1-SHANK & BEAM, HYDRAULIC (ADD D-10 TRACTOR DOZER & COST FOR POINT WEAR)
EP 1110-1-8, Vol. 330 Nov 09
2-182
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
R10 CATERPILLAR INC. ( MACHINE DIVISION) (continued)
D-10RR10CA018 $116,543 11.65 2.01 0.00 1797.8426.35RIPPER, 3-SHANKS & BEAM, HYDRAULIC (ADD D-10 TRACTOR DOZER & COST FOR POINT WEAR)
D-11RR10CA020 $118,378 11.84 2.04 0.00 727.9626.78RIPPER, 1-SHANK & BEAM, HYDRAULIC (ADD D-11 TRACTOR DOZER & COST FOR POINT WEAR)
D-11RR10CA021 $122,129 12.21 2.11 0.00 1038.2227.64RIPPER, 3-SHANKS & BEAM, HYDRAULIC (ADD D-11 TRACTOR DOZER & COST FOR POINT WEAR)
ROLLERS, STATIC, TOWED, PNEUMATICR150.00 ROLLERS, STATIC, TOWED, PNEUMATICSUBCATEGORY
SOUTHWEST CONSTRUCTION EQUIPMENT CO.
C-50R15SO001 $136,252 9.88 2.30 0.00 3097.2422.78ROLLER, STATIC, TOWED, PNEUMATIC, 60 TON, 9.8' WIDE, 4 TIRE (ADD TOWING UNIT)
C-75R15SO002 $150,247 9.76 2.53 0.00 3477.4124.89ROLLER, STATIC, TOWED, PNEUMATIC, 75 TON, 10.5' WIDE, 4 TIRE (ADD TOWING UNIT)
C-100XLR15SO003 $209,798 14.53 3.53 0.00 55110.8034.99ROLLER, STATIC, TOWED, PNEUMATIC, 100 TON, 10.5' WIDE, 4 TIRE (ADD TOWING UNIT)
EP 1110-1-8, Vol. 330 Nov 09
2-183
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
ROLLERS, STATIC, TOWED, STEEL DRUMR200.00 ROLLERS, STATIC, TOWED, STEEL DRUMSUBCATEGORY
REYNOLDS INTERNATIONAL, L.P.
DD-48X60R20RI002 $33,951 2.72 0.57 0.00 1771.936.22ROLLER, STATIC, TOWED, 2 STEEL DRUMS, 10-15 TON, 48" WIDE X 60" DIA, PADFOOT (ADD TOWING UNIT)
SOUTHWEST CONSTRUCTION EQUIPMENT CO.
2DH-RRR20SO001 $75,518 6.04 1.27 0.00 2004.2913.52ROLLER, STATIC, TOWED, 2 STEEL DRUMS, 10-20 TON, 60" WIDE X 60" DIA, SHEEPSFOOT (ADD TOWING UNIT)
ROLLERS, STATIC, SELF-PROPELLED R300.01 PNEUMATICSUBCATEGORY
COMPACTION AMERICA (BOMAG)
85BW11RHR30BO004 $88,619 8.68 1.48 9.82 1005.8229.99ROLLER, STATIC, SELF-PROPELLED, PNEUMATIC, 13.50 TON, 68" WIDE, 9 TIRE, ASPHALT COMPACTOR
HP D-off
110BW24RR30BO003 $145,556 14.77 2.43 12.71 2909.8244.95ROLLER, STATIC, SELF-PROPELLED, PNEUMATIC, 30.00 TON, 78" WIDE, 8 TIRE, ASPHALT COMPACTOR
HP D-off
CATERPILLAR INC. ( MACHINE DIVISION)
70PS-150BR30CA010 $84,162 8.77 1.41 8.09 855.8026.66ROLLER, STATIC, SELF-PROPELLED, PNEUMATIC, 14.25 TON, 68" WIDE, 9 TIRE, ASPHALT COMPACTOR
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-184
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
R30 CATERPILLAR INC. ( MACHINE DIVISION) (continued)
105PS-200BR30CA011 $96,877 10.06 1.62 12.13 876.6533.82ROLLER, STATIC, SELF-PROPELLED, PNEUMATIC, 20.00 TON, 68" WIDE, 9 TIRE, ASPHALT COMPACTOR
HP D-off
105PS-360BR30CA014 $161,870 16.76 2.71 12.13 35211.0948.68ROLLER, STATIC, SELF-PROPELLED, PNEUMATIC, 27.55 TON, 90" WIDE, 7 TIRE, ASPHALT COMPACTOR
HP D-off
ROSCO, A LeeBoy COMPANY
80TRU-PAC 915R30RS003 $65,976 6.75 1.10 9.24 1154.4824.09ROLLER, STATIC, SELF-PROPELLED, PNEUMATIC, 6-15 TON, 68" WIDE, 9 TIRES, ASPHALT/SOIL COMPACTOR
HP D-off
SAKAI AMERICA, INC.
91TS200R30SI002 $110,181 11.17 1.84 10.51 1877.4335.03ROLLER, STATIC, SELF-PROPELLED, PNEUMATIC, 16 TON, 81" WIDE, 9 TIRE, ASPHALT COMPACTOR
HP D-off
95TS600CR30SI003 $136,796 14.00 2.29 10.97 1879.2941.11ROLLER, STATIC, SELF-PROPELLED, PNEUMATIC, 16 TON, 81" WIDE, 9 TIRE, ASPHALT COMPACTOR
HP D-off
108TS650CR30SI004 $181,295 18.79 3.03 12.48 28112.4352.00ROLLER, STATIC, SELF-PROPELLED, PNEUMATIC, 27 TON, 82" WIDE, 7 TIRE, ASPHALT COMPACTOR
HP D-off
0.02 SMOOTH DRUMSUBCATEGORY
COMPACTION AMERICA (BOMAG)
47BW5ASR30BO005 $78,993 6.71 1.29 5.43 1304.6520.13ROLLER, STATIC, SELF-PROPELLED, SMOOTH DRUM, DOUBLE DRUM, 6 TON, 40" WIDE ASPHALT COMPACTOR
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-185
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
R30 COMPACTION AMERICA (BOMAG) (continued)
83BW9ASR30BO006 $93,771 7.97 1.53 9.59 1625.5227.33ROLLER, STATIC, SELF-PROPELLED, SMOOTH DRUM, DOUBLE DRUM, 10 TON, 50" WIDE ASPHALT COMPACTOR
HP D-off
78BW11ASR30BO007 $110,551 9.40 1.80 9.01 2156.5029.72ROLLER, STATIC, SELF-PROPELLED, SMOOTH DRUM, DOUBLE DRUM, 14 TON, 54" WIDE ASPHALT COMPACTOR
HP D-off
ROSCO, A LeeBoy COMPANY
16300 BR30RS001 $14,860 1.26 0.24 3.40 260.876.37ROLLER, STATIC, SELF-PROPELLED, SMOOTH DRUM, DOUBLE DRUM, 1.5 TON, 34" WIDE, ASPHALT COMPACTOR
HP G
40400R30RS002 $29,711 2.53 0.48 4.62 371.7510.37ROLLER, STATIC, SELF-PROPELLED, SMOOTH DRUM, DOUBLE DRUM, 2 TON, 40" WIDE, ASPHALT COMPACTOR
HP D-off
SAKAI AMERICA, INC.
75R2H-2R30SI005 $118,526 10.07 1.93 8.66 2076.9730.77ROLLER, STATIC, SELF-PROPELLED, SMOOTH DRUM, 3 DRUMS, 14 TON, 64" WIDE, ASPHALT COMPACTOR
HP D-off
0.03 TAMPING FOOT, LANDFILL & SOIL COMPACTORSSUBCATEGORY
COMPACTION AMERICA (BOMAG)
442BC672RBR30BO009 $607,127 40.48 10.07 51.06 71030.31145.99ROLLER, STATIC, SELF-PROPELLED, LANDFILL/SOIL COMPACTOR, SHEEPSFOOT, 4X4, 35 TON, 63" DIA, 19.58' WIDTH PER 2-PASS, W/BLADE
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-186
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
R30 COMPACTION AMERICA (BOMAG) (continued)
442BC772RBR30BO008 $645,398 43.03 10.71 51.06 81232.23151.69ROLLER, STATIC, SELF-PROPELLED, LANDFILL/SOIL COMPACTOR, SHEEPSFOOT, 4X4, 40 TON, 63" DIA, 19.58' WIDTH PER 2-PASS, W/BLADE
HP D-off
CATERPILLAR INC. ( MACHINE DIVISION)
240815-FR30CA003 $369,771 24.65 6.14 27.72 44918.4785.24ROLLER, STATIC, SELF-PROPELLED, LANDFILL/SOIL COMPACTOR, SHEEPSFOOT, 4X4, 23 TON, 56" DIA, 14.25' WIDTH PER 2-PASS, W/BLADE
HP D-off
220816-FR30CA012 $377,285 25.15 6.26 25.41 50918.8483.85ROLLER, STATIC, SELF-PROPELLED, LANDFILL/SOIL COMPACTOR, TAMPING FOOT, CHOPPER, 4X4, 25.0 TON, 14.75' WIDTH PER 2-PASS, W/BLADE
HP D-off
315825-G IIR30CA006 $561,263 37.42 9.31 36.39 73428.02123.20ROLLER, STATIC, SELF-PROPELLED, LANDFILL/SOIL COMPACTOR, SHEEPSFOOT, 4X4, 35 TON, 51" DIA, 16.00' WIDTH PER 2-PASS, W/BLADE
HP D-off
315826-G IIR30CA013 $584,094 38.94 9.69 36.39 77129.16126.60ROLLER, STATIC, SELF-PROPELLED, LANDFILL/SOIL COMPACTOR, TAMPING FOOT, CHOPPER, 4X4, 36.5 TON, 15.66' WIDTH PER 2-PASS, W/BLADE
HP D-off
473836 GR30CA009 $776,690 51.78 12.89 54.64 1,16638.78175.15ROLLER, STATIC, SELF-PROPELLED, LANDFILL/SOIL COMPACTOR, TAMPING FOOT, CHOPPER, 4X4, 50.0 TON, 18.58' WIDTH PER 2-PASS, W/BLADE
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-187
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
ROLLERS, VIBRATORY, TOWEDR400.00 ROLLERS, VIBRATORY, TOWEDSUBCATEGORY
COMPACTION AMERICA (BOMAG)
50BW6R40BO001 $81,280 8.13 1.40 6.54 1285.4724.85ROLLER, VIBRATORY, TOWED, SINGLE DRUM, SMOOTH, 13,000 LB OPER. WT., 26,550 LB (13.3 TONS) CENTRIFUGAL FORCE, 67'' WIDE (ADD 180 HP TOWING UNIT)
HP D-off
50BW6SR40BO002 $90,855 9.09 1.57 6.54 1486.1226.92ROLLER, VIBRATORY, TOWED, SINGLE DRUM, SHEEPSFOOT, 15,000 LB OPER. WT., 26,550 LB (13.3 TONS) CENTRIFUGAL FORCE, 67'' WIDE (ADD 180 HP TOWING UNIT)
HP D-off
ROLLERS, VIBRATORY, SELF-PROPELLED, DOUBLE DRUMR450.00 ROLLERS, VIBRATORY, SELF-PROPELLED, DOUBLE DRUMSUBCATEGORY
COMPACTION AMERICA (BOMAG)
33BW120AD-4R45BO004 $55,113 5.51 0.95 4.31 573.7118.74ROLLER, VIBRATORY, SELF-PROPELLED, DOUBLE DRUM, SMOOTH, 2.9 TON, 47.2" WIDE, 2X1, ASPHALT COMPACTOR
HP D-off
46BW138ADR45BO005 $67,368 6.74 1.16 6.01 924.5323.75ROLLER, VIBRATORY, SELF-PROPELLED, DOUBLE DRUM, SMOOTH, 4.6 TON, 54.3" WIDE, 2X1, ASPHALT COMPACTOR
HP D-off
108BW151AD-4R45BO006 $139,851 13.99 2.41 14.12 1589.4151.14ROLLER, VIBRATORY, SELF-PROPELLED, DOUBLE DRUM, SMOOTH, 7.8 TON, 66.1" WIDE, 2X1, ASPHALT COMPACTOR
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-188
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
R45 COMPACTION AMERICA (BOMAG) (continued)
131BW161AD-4 HFR45BO007 $161,561 16.16 2.79 17.12 20910.8759.98ROLLER, VIBRATORY, SELF-PROPELLED, DOUBLE DRUM, SMOOTH, 10.4 TON, 66.1" WIDE, 2X1, ASPHALT COMPACTOR
HP D-off
205BW190AD-4 HFR45BO008 $168,461 16.85 2.91 26.80 25211.3472.54ROLLER, VIBRATORY, SELF-PROPELLED, DOUBLE DRUM, SMOOTH, 12.6 TON, 79.0" WIDE, 2X1, ASPHALT COMPACTOR
HP D-off
CATERPILLAR INC. ( MACHINE DIVISION)
32CB-214DR45CA001 $47,561 4.76 0.82 4.18 813.2016.70ROLLER, VIBRATORY, SELF-PROPELLED, DOUBLE DRUM, SMOOTH, 2.5 TON, 39.4" WIDE, 2X1, ASPHALT COMPACTOR
HP D-off
32CB-224DR45CA002 $54,508 5.45 0.94 4.18 583.6718.45ROLLER, VIBRATORY, SELF-PROPELLED, DOUBLE DRUM, SMOOTH, 2.7 TON, 47.2" WIDE, 2X1, ASPHALT COMPACTOR
HP D-off
70CB-434CR45CA005 $131,873 13.19 2.28 9.15 1378.8843.58ROLLER, VIBRATORY, SELF-PROPELLED, DOUBLE DRUM, SMOOTH, 6.6 TON, 56" WIDE, 2X1, ASPHALT COMPACTOR
HP D-off
105CB-534CR45CA007 $160,800 16.08 2.77 13.73 23310.8155.99ROLLER, VIBRATORY, SELF-PROPELLED, DOUBLE DRUM, SMOOTH, 10.0 TON, 67" WIDE, 2X1, ASPHALT COMPACTOR
HP D-off
145CB-634DR45CA010 $199,967 20.00 3.45 18.95 28313.4571.73ROLLER, VIBRATORY, SELF-PROPELLED, DOUBLE DRUM, SMOOTH, 13.2 TON, 84" WIDE, 2X1, ASPHALT COMPACTOR
HP D-off
ROSCO, A LeeBoy COMPANY
20300BR45RS001 $19,071 1.91 0.33 2.61 261.297.74ROLLER, VIBRATORY, SELF-PROPELLED, DOUBLE DRUM, SMOOTH, 2.0 TON, 36" WIDE, ASPHALT COMPACTOR
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-189
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
SAKAI AMERICA, INC.
35SW320-1R45SI008 $37,005 3.70 0.64 4.58 282.4914.47ROLLER, VIBRATORY, SELF-PROPELLED, DOUBLE DRUM, SMOOTH, 3.0 TON, 47" WIDE, 2X1, ASPHALT COMPACTOR
HP D-off
78SW652R45SI009 $100,639 10.06 1.74 10.20 1576.7736.84ROLLER, VIBRATORY, SELF-PROPELLED, DOUBLE DRUM, SMOOTH, 7.8 TON, 58" WIDE, 2X1, ASPHALT COMPACTOR
HP D-off
127SW850-3R45SI010 $135,046 13.50 2.33 16.60 1249.0852.69ROLLER, VIBRATORY, SELF-PROPELLED, DOUBLE DRUM, SMOOTH, 14.0 TON, 79" WIDE, 2X1, ASPHALT COMPACTOR
HP D-off
ROLLERS, VIBRATORY, SELF-PROPELLED, SINGLE DRUMR500.00 ROLLERS, VIBRATORY, SELF-PROPELLED, SINGLE DRUMSUBCATEGORY
COMPACTION AMERICA (BOMAG)
50BW124DH-3R50BO005 $67,953 5.87 1.21 4.71 604.1521.85ROLLER, VIBRATORY, SELF-PROPELLED, SINGLE DRUM, SMOOTH, 2.9 TON, 47.2" WIDE, 3X2, SOIL COMPACTOR
HP D-off
50BW124PDH-3R50BO010 $70,040 6.43 1.24 4.71 604.4621.86ROLLER, VIBRATORY, SELF-PROPELLED, SINGLE DRUM, PAD FOOT, 2.9 TON, 47.2" WIDE, 3X2, SOIL COMPACTOR
HP D-off
75BW145D-3R50BO006 $91,919 8.57 1.63 7.07 1105.9229.53ROLLER, VIBRATORY, SELF-PROPELLED, SINGLE DRUM, SMOOTH, 5.5 TON, 56.1" WIDE, 3X2, SOIL COMPACTOR
HP D-off
75BW145PDH-3R50BO011 $98,861 9.22 1.76 7.07 1186.3731.17ROLLER, VIBRATORY, SELF-PROPELLED, SINGLE DRUM, PAD FOOT, 5.8 TON, 56.1" WIDE, 3X2, SOIL COMPACTOR
HP D-off
75BW177D-3R50BO007 $126,773 11.73 2.25 7.07 1598.1237.85ROLLER, VIBRATORY, SELF-PROPELLED, SINGLE DRUM, SMOOTH, 7.9 TON, 66.4" WIDE, 3X2, SOIL COMPACTOR
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-190
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
R50 COMPACTION AMERICA (BOMAG) (continued)
101BW177PDH-3R50BO012 $143,059 13.26 2.54 9.52 1669.1744.42ROLLER, VIBRATORY, SELF-PROPELLED, SINGLE DRUM, PAD FOOT, 8.3 TON, 66.4" WIDE, 3X2, SOIL COMPACTOR
HP D-off
155BW213DH-4R50BO008 $167,230 15.17 2.97 14.61 26910.5656.19ROLLER, VIBRATORY, SELF-PROPELLED, SINGLE DRUM, SMOOTH, 11.5 TON, 83.9" WIDE, 3X2, SOIL COMPACTOR
HP D-off
131BW213PDH-3R50BO013 $179,336 16.31 3.19 12.35 28311.3556.52ROLLER, VIBRATORY, SELF-PROPELLED, SINGLE DRUM, PAD FOOT, 14.1 TON, 83.9" WIDE, 3X2, SOIL COMPACTOR
HP D-off
195BW219DH-4R50BO009 $236,552 21.67 4.20 18.38 41215.0476.68ROLLER, VIBRATORY, SELF-PROPELLED, SINGLE DRUM, SMOOTH, 20.6 TON, 83.9" WIDE, 3X2, SOIL COMPACTOR
HP D-off
CATERPILLAR INC. ( MACHINE DIVISION)
70CS-323CR50CA001 $87,387 8.09 1.55 6.60 975.6028.00ROLLER, VIBRATORY, SELF-PROPELLED, SINGLE DRUM, SMOOTH, 4.6 TON, 50" WIDE, 3X2, SOIL COMPACTOR
HP D-off
97CS-431CR50CA003 $117,825 10.88 2.09 9.14 1387.5338.07ROLLER, VIBRATORY, SELF-PROPELLED, SINGLE DRUM, SMOOTH, 6.9 TON, 66" WIDE, 3X2, SOIL COMPACTOR
HP D-off
100CS-433ER50CA005 $127,859 11.82 2.27 9.42 1478.1840.74ROLLER, VIBRATORY, SELF-PROPELLED, SINGLE DRUM, SMOOTH, 7.1 TON, 66" WIDE, 3X2, SOIL COMPACTOR
HP D-off
150CS-563ER50CA009 $161,781 14.69 2.87 14.14 25310.2254.36ROLLER, VIBRATORY, SELF-PROPELLED, SINGLE DRUM, SMOOTH, 12.2 TON, 84" WIDE, 3X2, SOIL COMPACTOR
HP D-off
150CS-583ER50CA011 $198,755 18.16 3.53 14.14 34012.6163.05ROLLER, VIBRATORY, SELF-PROPELLED, SINGLE DRUM, SMOOTH, 16.5 TON, 84" WIDE, 3X2, SOIL COMPACTOR
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-191
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
R50 CATERPILLAR INC. ( MACHINE DIVISION) (continued)
70CP-323C (PADS)R50CA002 $101,813 9.45 1.81 6.60 1056.5431.40ROLLER, VIBRATORY, SELF-PROPELLED, SINGLE DRUM, PAD FOOT, 4.6 TON, 50" WIDE, 3X2, SOIL COMPACTOR
HP D-off
150CP-563E (PADS)R50CA010 $193,707 17.68 3.44 14.14 26212.2861.85ROLLER, VIBRATORY, SELF-PROPELLED, SINGLE DRUM, PAD FOOT, 12.5 TON, 84" WIDE, 3X2 SOIL COMPACTOR
HP D-off
100CP-433E (PADS)R50CA004 $141,014 13.05 2.51 9.42 1509.0443.83ROLLER, VIBRATORY, SELF-PROPELLED, SINGLE DRUM, PAD FOOT, 7.1 TON, 66" WIDE, 3X2, SOIL COMPACTOR
HP D-off
150CP-563E (PADS)R50CA012 $193,884 17.70 3.44 14.14 27512.2961.90ROLLER, VIBRATORY, SELF-PROPELLED, SINGLE DRUM, PAD FOOT, 12.5 TON, 84" WIDE, 3X2, SOIL COMPACTOR
HP D-off
INGERSOLL RAND ROAD MACHINERY DIV
80SD-45DR50IP001 $90,347 8.27 1.61 7.54 1045.7529.89ROLLER, VIBRATORY, SELF-PROPELLED, SINGLE DRUM, SMOOTH, 4.9 TON, 54" WIDE, SOIL COMPACTOR
HP D-off
SAKAI AMERICA, INC.
28TW350 ComboR50SI024 $58,021 5.32 1.03 2.64 253.6916.71ROLLER, VIBRATORY, SELF-PROPELLED, SINGLE DRUM, SMOOTH, 1.5 TON, 39.5" WIDE, 2X1, ASPHALT COMPACTOR
HP D-off
30TW500 ComboR50SI025 $71,608 6.60 1.27 2.83 364.5720.11ROLLER, VIBRATORY, SELF-PROPELLED, SINGLE DRUM, SMOOTH, 3.9 TON, 51" WIDE, 2X1, ASPHALT COMPACTOR
HP D-off
60SV201DR50SI006 $76,391 6.97 1.36 5.65 414.8524.48ROLLER, VIBRATORY, SELF-PROPELLED, SINGLE DRUM, SMOOTH, 4.8 TON, 54" WIDE, 3X2, SOIL COMPACTOR
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-192
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
R50 SAKAI AMERICA, INC. (continued)60SV201T (PADS)R50SI007 $81,811 7.48 1.45 5.65 435.1925.75ROLLER, VIBRATORY, SELF-PROPELLED,
SINGLE DRUM, SMOOTH, 4.9 TON, 54" WIDE, 3X2, SOIL COMPACTOR
HP D-off
100SV400D-2R50SI022 $104,116 9.59 1.85 9.42 1566.6535.18ROLLER, VIBRATORY, SELF-PROPELLED, SINGLE DRUM, SMOOTH, 7.7 TON, 67" WIDE, 3X2, SOIL COMPACTOR
HP D-off
104TW750 ComboR50SI026 $142,416 13.23 2.53 9.80 1009.1544.51ROLLER, VIBRATORY, SELF-PROPELLED, SINGLE DRUM, SMOOTH, 8.7 TON, 66" WIDE, 2X1, ASPHALT COMPACTOR
HP D-off
100SV400TB-2 (PADS)
R50SI023 $116,834 10.78 2.08 9.42 727.4738.17ROLLER, VIBRATORY, SELF-PROPELLED, SINGLE DRUM, SMOOTH, 9.6 TON, 67" WIDE, 3X2, SOIL COMPACTOR
HP D-off
148SV510D-3R50SI013 $125,342 11.25 2.23 13.95 5077.8645.64ROLLER, VIBRATORY, SELF-PROPELLED, SINGLE DRUM, SMOOTH, 11.5 TON, 84" WIDE, 3X2, SOIL COMPACTOR
HP D-off
148SV510T-3 (PADS)
R50SI016 $134,658 12.12 2.39 13.95 1108.4547.82ROLLER, VIBRATORY, SELF-PROPELLED, SINGLE DRUM, SMOOTH, 11.9 TON, 60" WIDE, 3X2, SOIL COMPACTOR
HP D-off
148SV510TF-3 (PADS)
R50SI017 $145,721 13.16 2.59 13.95 1319.1750.42ROLLER, VIBRATORY, SELF-PROPELLED, SINGLE DRUM, SMOOTH, 14.3 TON, 85" WIDE, 3X2, SOIL COMPACTOR
HP D-off
ROOFING EQUIPMENTR550.00 ROOFING EQUIPMENTSUBCATEGORY
AEROIL PRODUCTS COMPANY, INC.
8EZ LOAD 270R55AE001 $7,922 1.07 0.14 1.27 200.686.91ROOFING EQUIPMENT, KETTLE, 270 GAL, W/PUMP, TRAILER MTD
HP G
EP 1110-1-8, Vol. 330 Nov 09
2-193
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
R55 AEROIL PRODUCTS COMPANY, INC. (continued)
8EZ LOAD 410R55AE002 $9,631 1.32 0.17 1.27 250.839.11ROOFING EQUIPMENT, KETTLE, 410 GAL, W/PUMP, TRAILER MTD
HP G
8EZ LOAD 680R55AE003 $13,001 1.75 0.23 1.27 391.1111.64ROOFING EQUIPMENT, KETTLE, 680 GAL, W/PUMP, TRAILER MTD
HP G
8EZ LOAD 1000R55AE004 $17,206 2.26 0.30 1.27 541.4313.19ROOFING EQUIPMENT, KETTLE, 1,000 GAL, W/PUMP, TRAILER MTD
HP G
8RHINO S PEELER
R55AE008 $5,686 0.76 0.10 1.27 60.483.00ROOFING EQUIPMENT, ROOF PEELER, 16" WIDE, WALK BEHIND, POWERED WHEEL 2X2
HP G
9MKI9R55AE009 $2,063 0.29 0.04 1.43 20.192.14ROOFING EQUIPMENT, 1-BLADE CUTTER, 3.75" DEEP, WALK BEHIND (ADD BLADE COST)
HP G
16MK216RR55AE010 $3,788 0.54 0.07 2.55 30.343.86ROOFING EQUIPMENT, 2-BLADE CUTTER, 20'' WIDE, 3.75" DEEP, WALK BEHIND (ADD BLADE COST)
HP G
5BUFFALO 800R55AE011 $3,877 0.46 0.07 0.80 40.301.95ROOFING EQUIPMENT, MATERIAL BUGGY, 36'' WIDE, WALK BEHIND GRAVEL SPREADER, HOPPER 800 LBS, 8 CF, 4X2
HP G
GARLOCK EQUIPMENT CO.
5SUPER MINI SAW
R55GL017 $2,106 0.30 0.04 0.80 20.191.48ROOFING EQUIPMENT, 1-BLADE CUTTER, 18" HEIGHT & 2" WALL CLEARANCE
HP G
9DUST MASTER ULTRA CU
R55GL016 $5,951 0.84 0.10 1.43 30.523.24ROOFING EQUIPMENT, 1-BLADE CUTTER, W/WATER DAMPENING SYSTEM AND H.E.P.A. VACUUM SYSTEM
HP G
16ENFORCER TWIN CUTTER
R55GL011 $6,348 0.90 0.11 2.55 40.564.58ROOFING EQUIPMENT, 2-BLADE CUTTER, 30" WIDE, SELF PROPELLED (ADD BLADE COST)
HP G
EP 1110-1-8, Vol. 330 Nov 09
2-194
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
R55 GARLOCK EQUIPMENT CO. (continued)5NO.12R55GL018 $2,185 0.31 0.04 0.80 10.201.50ROOFING EQUIPMENT, SCRATCHER, 4.5"
WIDE HP G
8NO. 30R55GL019 $4,229 0.60 0.07 1.27 30.372.58ROOFING EQUIPMENT, SCRATCHER, 13" WIDE
HP G
11 ROTARY PLANER
R55GL009 $2,598 0.37 0.05 1.67 20.242.57ROOFING EQUIPMENT, ROTARY PLANER, 12" WIDE
HP G
11ROCK MASTER SWEEPER
R55GL008 $5,510 0.70 0.10 1.75 20.453.45ROOFING EQUIPMENT, POWER SWEEPER, 48" WIDE
HP G
9MODEL 1000R55GL015 $10,686 1.51 0.19 1.43 80.954.60ROOFING EQUIPMENT, HYDRAULIC HOIST, W/175' CABLE, 1,000 LB CAP
HP G
18SUPER MAX HYDR HOIST
R55GL007 $13,044 1.85 0.23 2.87 101.166.85ROOFING EQUIPMENT, HYDRAULIC SWING HOIST, W/275' CABLE, 1,400 LB CAP
HP G
MODEL 30R55GL013 $1,449 0.12 0.03 0.00 30.090.62ROOFING EQUIPMENT, KETTLE, 30 GAL, WHEEL MTD
MODEL 90R55GL014 $3,296 0.47 0.06 0.00 70.301.30ROOFING EQUIPMENT, KETTLE, 90 GAL, SKID MTD
MODEL 115 R55GL001 $3,796 0.51 0.07 0.00 80.331.57ROOFING EQUIPMENT, KETTLE, 115 GAL, TRAILER MTD
5MODEL 175 R55GL002 $7,406 1.00 0.13 0.80 170.633.46ROOFING EQUIPMENT, KETTLE, 175 GAL, W/PUMP, TRAILER MTD
HP G
9MODEL 300R55GL012 $11,707 1.61 0.20 1.43 231.015.61ROOFING EQUIPMENT, KETTLE, 300 GAL, W/PUMP, TRAILER MTD
HP G
9MODEL 412R55GL003 $14,887 2.03 0.26 1.43 301.286.51ROOFING EQUIPMENT, KETTLE, 412 GAL, W/PUMP, TRAILER MTD
HP G
9MODEL 612R55GL004 $17,844 2.49 0.31 1.43 401.567.63ROOFING EQUIPMENT, KETTLE, 612 GAL, W/PUMP, TRAILER MTD
HP G
EP 1110-1-8, Vol. 330 Nov 09
2-195
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
SCRAPERS, ELEVATINGS100.01 0 THRU 200 HPSUBCATEGORY
CATERPILLAR INC. ( MACHINE DIVISION)
175613-C SERIES IIS10CA001 $282,816 22.01 4.77 16.49 33615.7872.06SCRAPER, ELEVATING LOADING, 11 CY, 13 TON, 7.7' CUT WIDTH, 4X2 - SINGLE POWERED
HP D-off
0.02 OVER 200 HPSUBCATEGORY
CATERPILLAR INC. ( MACHINE DIVISION)
265615-C SERIES IIS10CA002 $437,888 23.38 7.47 24.97 52619.16100.84SCRAPER, ELEVATING LOADING, 17 CY, 19 TON, 9.5' CUT WIDTH, 4X2 - SINGLE POWERED
HP D-off
365623-GS10CA003 $653,827 36.18 11.15 34.40 81029.24140.46SCRAPER, ELEVATING LOADING, 23 CY, 25 TON, 11.5' CUT WIDTH, 4X2 - SINGLE POWERED
HP D-off
SCRAPERS, CONVENTIONALS150.00 SCRAPERS, CONVENTIONALSUBCATEGORY
CATERPILLAR INC. ( MACHINE DIVISION)
365621-GS15CA001 $570,485 29.09 9.32 32.18 71423.87113.13SCRAPER, CONVENTIONAL, STANDARD LOADING, 21 CY, 24 TON, 9.1' CUT WIDTH, 4X2 - SINGLE POWERED
HP D-off
450631-GS15CA002 $865,933 44.33 14.15 39.67 1,02036.32160.34SCRAPER, CONVENTIONAL, STANDARD LOADING, 34 CY, 37.5 TON, 11.5' CUT WIDTH, 4X2 - SINGLE POWERED
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-196
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
S15 CATERPILLAR INC. ( MACHINE DIVISION) (continued)
550651-ES15CA003 $1,073,776 55.20 17.54 48.49 1,32345.14196.52SCRAPER, CONVENTIONAL, STANDARD LOADING, 44 CY, 52 TON, 12.6' CUT WIDTH, 4X2 - SINGLE POWERED
HP D-off
ATI-Bell
4224206DTIS28S15JU001 $575,674 30.16 9.41 37.20 94024.49112.50SCRAPER, CONVENTIONAL, STANDARD LOADING, 28 CY, 32 TON, 14' CUT WIDTH, 4X4 - SINGLE POWERED, TRACTOR EQUIPPED WITH ATI RUBBER TRACKS
HP D-off
4224206DTIS33S15JU002 $595,730 31.23 9.73 37.20 95325.35114.89SCRAPER, CONVENTIONAL, STANDARD LOADING, 33 CY, 37 TON, 14' CUT WIDTH, 4X4 - SINGLE POWERED, TRACTOR EQUIPPED WITH ATI RUBBER TRACKS
HP D-off
SCRAPERS, TANDEM POWEREDS200.00 SCRAPERS, TANDEM POWEREDSUBCATEGORY
CATERPILLAR INC. ( MACHINE DIVISION)
330627-GS20CA001 $647,883 33.22 10.59 50.62 79127.20146.76225 HP D-offSCRAPER, TANDEM POWERED, STANDARD LOADING, 21 CY, 24 TON, 9.1' CUT WIDTH, 4X4, D-9 ASSISTED LOADING
HP D-off
330627-G PPS20CA002 $683,939 35.14 11.18 50.62 82428.75151.19225 HP D-offSCRAPER, TANDEM POWERED, STANDARD LOADING, 20 CY, 24 TON, 9.1' CUT WIDTH, 4X4, PUSH-PULL
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-197
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
S20 CATERPILLAR INC. ( MACHINE DIVISION) (continued)
450637-GS20CA003 $1,095,568 56.58 17.90 63.84 1,08446.19220.79250 HP D-offSCRAPER, TANDEM POWERED, STANDARD LOADING, 34 CY, 37.5 TON, 11.5' CUT WIDTH, 4X4, D-10 ASSISTED LOADING
HP D-off
450637-G PPS20CA004 $1,140,524 58.98 18.64 63.84 1,11748.13226.32250 HP D-offSCRAPER, TANDEM POWERED, STANDARD LOADING, 34 CY, 37.5 TON, 11.5' CUT WIDTH, 4X4, PUSH-PULL
HP D-off
550657-ES20CA005 $1,297,461 65.67 21.20 86.64 1,51654.04285.34400 HP D-offSCRAPER, TANDEM POWERED, STANDARD LOADING, 44 CY, 52 TON, 12.6' CUT WIDTH, 4X4, D-11 ASSISTED LOADING
HP D-off
550657-E PPS20CA006 $1,427,216 74.05 23.32 86.64 1,55060.35288.41400 HP D-offSCRAPER, TANDEM POWERED, STANDARD LOADING, 44 CY, 52 TON, 12.6' CUT WIDTH, 4X4, PUSH-PULL
HP D-off
SCRAPERS, TRACTOR DRAWNS250.00 SCRAPERS, TRACTOR DRAWNSUBCATEGORY
DEERE & COMPANY
1510CS25JD001 $53,995 3.29 0.90 0.00 1682.559.78SCRAPER, TOWED, STANDARD LOADING, 11 CY, 17 TON, 10' CUT WIDTH (ADD 225 HP TRACTOR)
1814CS25JD002 $67,603 4.05 1.12 0.00 2133.1512.09SCRAPER, TOWED, STANDARD LOADING, 14 CY, 23 TON, 14' CUT WIDTH (ADD 360HP TRACTOR)
EP 1110-1-8, Vol. 330 Nov 09
2-198
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
REYNOLDS INTERNATIONAL, L.P.
14CS10S25RI001 $44,563 2.87 0.74 0.00 1382.187.92SCRAPER, TOWED, PIVOT DUMP, 10.7-14 CY, 15 TON, 10' CUT WIDTH (ADD 250 - 300 HP TRACTOR)
17C12 (RG)S25RI002 $50,180 3.20 0.83 0.00 1702.438.82SCRAPER, TOWED, PIVOT DUMP, 13-17 CY, 17 TON, 12' CUT WIDTH (ADD 350 - 400 HP TRACTOR)
ROME PLOW CO.
R56HS25RM003 $95,107 5.53 1.58 0.00 2034.3517.59SCRAPER, TOWED, 9-12 CY, 12.5 TON, 8.5' CUT WIDTH (ADD 120-165 HP TRACTOR)
R67H S25RM001 $126,109 7.60 2.09 0.00 2385.8921.87SCRAPER, TOWED, 12-17 CY, 17 TON, 9.9' CUT WIDTH (ADD 165-215 HP TRACTOR)
R89HS25RM002 $186,099 11.03 3.09 0.00 3828.6131.99SCRAPER, TOWED, 18-26 CY, 25 TON, 10.8' CUT WIDTH (ADD 285-370 HP TRACTOR)
SCREENING & CRUSHING PLANTSS300.10 CONVEYORSSUBCATEGORY
KOLBERG - PIONEER, INC
1512-3050S30KB034 $56,222 4.75 0.89 0.87 153.2710.98SCREENING & CRUSHING PLANTS, FEEDER CONVEYOR, 30" WIDE X 50' LONG, 7 CY HOPPER & 6' FEED, PORTABLE, 500 TPH
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-199
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
S30 KOLBERG - PIONEER, INC (continued)2012-3070S30KB035 $64,113 5.41 1.01 1.16 183.7212.76SCREENING & CRUSHING PLANTS,
FEEDER CONVEYOR, 30" WIDE X 70' LONG, 7 CY HOPPER & 6' FEED, PORTABLE, 500 TPH
HP E
2012-3650S30KB036 $60,270 5.09 0.95 1.16 163.5012.08SCREENING & CRUSHING PLANTS, FEEDER CONVEYOR, 36" WIDE X 50' LONG, 7 CY HOPPER & 6' FEED, PORTABLE, 750 TPH
HP E
2012-3670S30KB041 $68,968 5.81 1.09 1.16 194.0013.62SCREENING & CRUSHING PLANTS, FEEDER CONVEYOR, 36" WIDE X 70' LONG, 7 CY HOPPER & 6' FEED, PORTABLE, 750 TPH
HP E
1013-2480S30KB001 $37,031 3.10 0.58 0.58 142.137.22SCREENING & CRUSHING PLANTS, CONVEYOR, STACKING, 24" WIDE X 80' LONG, PORTABLE, 250 TPH
HP E
1513-24100S30KB002 $47,791 4.02 0.75 0.87 182.769.51SCREENING & CRUSHING PLANTS, CONVEYOR, STACKING, 24" WIDE X 100' LONG, PORTABLE, 250 TPH
HP E
2013-3080S30KB003 $39,236 3.38 0.62 1.16 202.318.43SCREENING & CRUSHING PLANTS, CONVEYOR, STACKING, 30" WIDE X 80' LONG, PORTABLE, 500 TPH
HP E
2513-30100S30KB004 $59,873 4.90 0.94 1.45 253.3912.44SCREENING & CRUSHING PLANTS, CONVEYOR, STACKING, 30" WIDE X 100' LONG, PORTABLE, 500 TPH
HP E
2513-3680S30KB005 $45,918 3.81 0.72 1.45 302.6310.00SCREENING & CRUSHING PLANTS, CONVEYOR, STACKING, 36" WIDE X 80' LONG, PORTABLE, 750 TPH
HP E
3013-36100S30KB006 $67,924 5.60 1.07 1.74 383.8714.24SCREENING & CRUSHING PLANTS, CONVEYOR, STACKING, 36" WIDE X 100' LONG, PORTABLE, 750 TPH
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-200
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
S30 KOLBERG - PIONEER, INC (continued)1031-2480S30KB007 $42,570 3.60 0.67 0.58 222.478.18SCREENING & CRUSHING PLANTS,
CONVEYOR, SIDE FOLDING STACKER, 24" WIDE X 80' LONG, WHEEL MTD, 750 TPH
HP E
1531-24100S30KB008 $52,324 4.46 0.83 0.87 273.0610.28SCREENING & CRUSHING PLANTS, CONVEYOR, SIDE FOLDING STACKER, 24" WIDE X 100' LONG, PORTABLE, 250 TPH
HP E
1531-24125S30KB009 $72,487 6.03 1.14 0.87 334.1613.79SCREENING & CRUSHING PLANTS, CONVEYOR, SIDE FOLDING STACKER, 24" WIDE X 125' LONG, PORTABLE, 250 TPH
HP E
2031-3080S30KB010 $44,648 3.72 0.70 1.16 322.569.37SCREENING & CRUSHING PLANTS, CONVEYOR, SIDE FOLDING STACKER, 30" WIDE X 80' LONG, PORTABLE, 500 TPH
HP E
2531-30100S30KB011 $63,771 5.42 1.01 1.45 393.7213.10SCREENING & CRUSHING PLANTS, CONVEYOR, SIDE FOLDING STACKER, 30" WIDE X 100' LONG, PORTABLE, 550 TPH
HP E
2531-30125S30KB012 $77,133 6.42 1.22 1.45 474.4315.44SCREENING & CRUSHING PLANTS, CONVEYOR, SIDE FOLDING STACKER, 30" WIDE X 125' LONG, PORTABLE, 500 TPH
HP E
2531-3680S30KB013 $51,709 4.34 0.82 1.45 422.9911.02SCREENING & CRUSHING PLANTS, CONVEYOR, SIDE FOLDING STACKER, 36" WIDE X 80' LONG, PORTABLE, 750 TPH
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-201
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
S30 KOLBERG - PIONEER, INC (continued)3031-36100S30KB014 $69,072 5.87 1.09 1.74 594.0314.43SCREENING & CRUSHING PLANTS,
CONVEYOR, SIDE FOLDING STACKER, 36" WIDE X 100' LONG, PORTABLE, 750 TPH
HP E
4031-36125S30KB015 $93,540 7.86 1.48 2.31 705.4119.49SCREENING & CRUSHING PLANTS, CONVEYOR, SIDE FOLDING STACKER, 36" WIDE X 125' LONG, PORTABLE, 750 TPH
HP E
2535-24150S30KB018 $106,962 9.29 1.69 1.45 396.3420.52SCREENING & CRUSHING PLANTS, CONVEYOR, FIXED HEIGHT STACKER, 24" WIDE X 150' LONG, PORTABLE, 750 TPH
HP E
4035-30150S30KB021 $123,951 10.78 1.96 2.31 567.3524.68SCREENING & CRUSHING PLANTS, CONVEYOR, FIXED HEIGHT STACKER, 30" WIDE X 150' LONG, PORTABLE, 1,500 TPH
HP E
6035-36150S30KB024 $142,011 12.37 2.24 3.47 848.4329.43SCREENING & CRUSHING PLANTS, CONVEYOR, FIXED HEIGHT STACKER, 36" WIDE X 150' LONG, PORTABLE, 2,000 TPH
HP E
2036-24100S30KB025 $76,148 6.57 1.20 1.16 524.4914.80SCREENING & CRUSHING PLANTS, CONVEYOR, ADJUSTABLE HEIGHT RADIAL STACKER, 24" WIDE X 100' LONG, PORTABLE, 750 TPH
HP E
2036-24125S30KB026 $90,497 7.84 1.43 1.16 575.3517.29SCREENING & CRUSHING PLANTS, CONVEYOR, ADJUSTABLE HEIGHT RADIAL STACKER, 24" WIDE X 120' LONG, PORTABLE, 750 TPH
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-202
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
S30 KOLBERG - PIONEER, INC (continued)2536-24150S30KB027 $114,373 9.96 1.80 1.45 656.7821.79SCREENING & CRUSHING PLANTS,
CONVEYOR, ADJUSTABLE HEIGHT RADIAL STACKER, 24" WIDE X 150' LONG, PORTABLE, 750 TPH
HP E
3036-30100S30KB028 $86,582 7.48 1.37 1.74 645.1117.43SCREENING & CRUSHING PLANTS, CONVEYOR, ADJUSTABLE HEIGHT RADIAL STACKER, 30" WIDE X 100' LONG, PORTABLE, 1,500 TPH
HP E
3036-30125S30KB029 $104,203 9.04 1.64 1.74 716.1620.45SCREENING & CRUSHING PLANTS, CONVEYOR, ADJUSTABLE HEIGHT RADIAL STACKER, 30" WIDE X 120' LONG, PORTABLE, 1,500 TPH
HP E
4036-30150S30KB030 $130,829 11.40 2.06 2.31 827.7625.86SCREENING & CRUSHING PLANTS, CONVEYOR, ADJUSTABLE HEIGHT RADIAL STACKER, 30" WIDE X 150' LONG, PORTABLE, 1,500 TPH
HP E
5036-36100S30KB031 $112,454 9.79 1.77 2.89 826.6723.50SCREENING & CRUSHING PLANTS, CONVEYOR, ADJUSTABLE HEIGHT RADIAL STACKER, 36" WIDE X 100' LONG, PORTABLE, 2,000 TPH
HP E
5036-36125S30KB032 $132,543 11.55 2.09 2.89 937.8726.99SCREENING & CRUSHING PLANTS, CONVEYOR, ADJUSTABLE HEIGHT RADIAL STACKER, 36" WIDE X 120' LONG, PORTABLE, 2,000 TPH
HP E
6036-36150S30KB033 $152,774 13.34 2.41 3.47 1109.0831.28SCREENING & CRUSHING PLANTS, CONVEYOR, ADJUSTABLE HEIGHT RADIAL STACKER, 36" WIDE X 150' LONG, PORTABLE, 2,000 TPH
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-203
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
S30 KOLBERG - PIONEER, INC (continued)301430-60-25S30KB042 $95,304 8.30 1.50 1.74 185.6518.91SCREENING & CRUSHING PLANTS,
SURGE BIN, 25CY, BELT FEEDER, & 30" WIDE X 60' LONG CONVEYOR, PORTABLE, 1,500 TPH
HP E
151936-2S30KB054 $97,549 8.50 1.54 0.87 185.7918.08SCREENING & CRUSHING PLANTS, SURGE BIN, 25CY, BELT FEEDER, & 30" WIDE X 40' LONG CONVEYOR, PORTABLE, 1,500 TPH
HP E
401436-60-25S30KB053 $98,462 8.56 1.55 2.31 205.8320.28SCREENING & CRUSHING PLANTS, SURGE BIN, 25CY, BELT FEEDER, & 36" WIDE X 60' LONG CONVEYOR, PORTABLE, 2,000 TPH
HP E
151936-3S30KB043 $140,890 12.38 2.22 0.87 208.4125.55SCREENING & CRUSHING PLANTS, SURGE BIN, 25CY, BELT FEEDER, & 36" WIDE X 40' LONG CONVEYOR, PORTABLE, 2,000 TPH
HP E
151936-4S30KB044 $173,002 15.27 2.73 0.87 2010.3731.08SCREENING & CRUSHING PLANTS, SURGE BIN, 25CY, BELT FEEDER, & 36" WIDE X 40' LONG CONVEYOR, PORTABLE, 2,000 TPH
HP E
PUTZMEISTER INC.
215TELEBELT TB 50
S30PU001 $253,793 22.58 4.00 20.26 20115.2966.18SCREENING & CRUSHING PLANTS, CONVEYOR, 16" WIDE X 50' LONG, 1 CY HOPPER & TREMIE, 2X4, TRUCK MTD, 80 CY/HR
HP D-off
350TELEBELT TB 80
S30PU002 $494,001 44.02 7.79 32.98 33229.80121.69SCREENING & CRUSHING PLANTS, CONVEYOR, 18" WIDE X 80' LONG, 3 CY HOPPER & TREMIE, 4X6, TRUCK MTD, 360 CY/HR
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-204
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
S30 PUTZMEISTER INC. (continued)350TELEBELT TB
110S30PU003 $639,669 57.08 10.09 32.98 59238.63146.76SCREENING & CRUSHING PLANTS,
CONVEYOR, 18" WIDE X 106' LONG, 3 CY HOPPER & TREMIE, 4X8, TRUCK MTD, 360 CY/HR
HP D-off
TELSMITH INC.
12PTC 24IN X 50FT
S30TS001 $38,770 3.30 0.61 0.69 102.267.69SCREENING & CRUSHING PLANTS, CONVEYOR, TRUSS FRAME, 24" WIDE X 50' LONG, WHEEL MTD, 300 TPH
HP E
17PTC 24IN X 70FT
S30TS002 $52,614 4.50 0.83 0.98 133.0810.48SCREENING & CRUSHING PLANTS, CONVEYOR, TRUSS FRAME, 24" WIDE X 70' LONG, WHEEL MTD, 300 TPH
HP E
17PTC 30IN X 50FT
S30TS003 $40,152 3.40 0.63 0.98 122.338.35SCREENING & CRUSHING PLANTS, CONVEYOR, TRUSS FRAME, 30" WIDE X 50' LONG, WHEEL MTD, 590 TPH
HP E
22PTC 30IN X 70FT
S30TS004 $54,386 4.63 0.86 1.27 173.1811.23SCREENING & CRUSHING PLANTS, CONVEYOR, TRUSS FRAME, 30" WIDE X 70' LONG, WHEEL MTD, 1,000 TPH
HP E
22PTC 36IN X 50FT
S30TS005 $42,262 3.56 0.67 1.27 192.459.12SCREENING & CRUSHING PLANTS, CONVEYOR, TRUSS FRAME, 36" WIDE X 50' LONG, WHEEL MTD, 750 TPH
HP E
27PTC 36IN X 70FT
S30TS006 $57,182 4.84 0.90 1.56 263.3212.13SCREENING & CRUSHING PLANTS, CONVEYOR, TRUSS FRAME, 36" WIDE X 70' LONG, WHEEL MTD, 1,200 TPH
HP E
32PTC 42IN X 50FT
S30TS007 $50,544 4.28 0.80 1.85 252.9411.38SCREENING & CRUSHING PLANTS, CONVEYOR, TRUSS FRAME, 42" WIDE X 50' LONG, WHEEL MTD, 1,000 TPH
HP E
42PTC 42IN X 70FT
S30TS008 $84,996 7.31 1.34 2.43 255.0018.16SCREENING & CRUSHING PLANTS, CONVEYOR, TRUSS FRAME, 42" WIDE X 70' LONG, WHEEL MTD, 1,000 TPH
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-205
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
0.20 CRUSHERS - VERTICAL & HORIZONTAL SHAFT IMPACTORSUBCATEGORY
HEWITT-ROBINS
250MODEL 13654VS30HW001 $336,542 11.85 4.96 14.46 80410.8950.95SCREENING & CRUSHING PLANTS, CRUSHER - SHAFT IMPACTOR, 36"X54", SINGLE ROTOR, 250 TPH, W/3' X 16' FEEDER/ 4' GRIZZLY/ 24" X 8' REJECTION CONVEYOR/ & 36" X 37' DISCHARGE END DELIVERY CONVEYOR, TRAILER MTD (ADD 250 KW GENERATOR)
HP E
350MODEL 14866VS30HW002 $454,262 16.03 6.69 20.25 1,28014.7169.72SCREENING & CRUSHING PLANTS, CRUSHER - SHAFT IMPACTOR, 48"X66" SINGLE ROTOR, 350 TPH, W/4'X16' FEEDER/ 6' GRIZZLY/ 30" X 9.5' REJECTION CONVEYOR/ & 48" X43' DISCHARGE END DELIVERY CONVEYOR, TRAILER MTD (ADD 350 KW GENERATOR)
HP E
450MODEL H4832SS30HW013 $403,156 14.25 5.94 26.03 60013.0773.16SCREENING & CRUSHING PLANTS, CRUSHER - SHAFT IMPACTOR, SECONDARY, 48"X32" HAMMERMILL, 500 TPH, W/3' X 37' FEED CONVEYOR/ 5' X 16' VIBRATORY HORIZONTAL TRIPLE DECK SCREEN/ 36"X30' RETURN CONVEYOR/ & ROTOR LIFT, TRAILER MTD (ADD 450 KW GENERATOR)
HP E
KOLBERG - PIONEER, INC
360CS-4250S30KB045 $576,579 20.55 8.49 33.93 54818.7789.06SCREENING & CRUSHING PLANTS, CRUSHER - SHAFT IMPACTOR, 42" X 52", 500 TPH, W/18' X 42" VIBRATORY FEEDER/ ADJUSTABLE GRIZZLY/ & BYPASS FEED, TRAILER MTD
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-206
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
TELSMITH INC.
3004246S30TS009 $304,424 10.96 4.49 17.36 5959.9754.47SCREENING & CRUSHING PLANTS, CRUSHER - SHAFT IMPACTOR, 46'' X 59'', 600 TPH
HP E
4004856S30TS010 $450,855 16.23 6.64 23.14 94214.7676.60SCREENING & CRUSHING PLANTS, CRUSHER - SHAFT IMPACTOR, 56'' X 85'', 1,100 TPH
HP E
8006071S30TS011 $747,895 26.92 11.02 46.28 1,95024.48139.57SCREENING & CRUSHING PLANTS, CRUSHER - SHAFT IMPACTOR, 71'' X 100'', 2,100 TPH
HP E
0.21 CRUSHERS - CONESUBCATEGORY
KOLBERG - PIONEER, INC
2721200 LSS30KB046 $402,684 14.25 5.93 15.74 81013.0661.56SCREENING & CRUSHING PLANTS, CRUSHERS - CONE, SECONDARY, 120 TPH @ 3/8" -> 250 TPH @ 1", 42" X 50" IMPACT CRUSHER, W/HOPPER/ & 36" X 32' END DELIVERY CONVEYOR, TRAILER MTD (ADD 210KW GENERATOR)
HP E
3151400 LSS30KB047 $501,959 17.89 7.40 18.22 74116.3574.47SCREENING & CRUSHING PLANTS, CRUSHERS - CONE, SECONDARY PLANT, 630 TPH @ 1" ->1,050 TPH @ 2.5", 42" X 50" IMPACT CRUSHER, W/HOPPER/ & 42" X 32' END DELIVERY CONVEYOR, TRAILER MTD (INCLUDES GENERATOR)
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-207
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
0.22 CRUSHERS - JAWSUBCATEGORY
HEWITT-ROBINS
40MODEL J1524PFS30HW005 $181,260 6.36 2.67 2.31 865.8517.41SCREENING & CRUSHING PLANTS, JAW CRUSHER, 15"X24", 21 TPH @ 1" -> 54 TPH @ 3", W/2.5' X 8' FEEDER/ 2' GRIZZLY/ & 24" X 20' END DELIVERY CONVEYOR, TRAILER MTD (ADD 40 KW GENERATOR)
HP E
100MODEL J1536VS30HW006 $301,739 10.69 4.45 5.79 1289.8031.44SCREENING & CRUSHING PLANTS, JAW CRUSHER, 15"X36", 45 TPH @1.5" -> 150 TPH @ 6", W/3' X 14' FEEDER/ 4' GRIZZLY/ & 30" X 31' END DELIVERY CONVEYOR, TRAILER MTD (ADD 40 KW GENERATOR)
HP E
125MODEL J2036VS30HW007 $327,906 11.63 4.83 7.23 12810.6535.43SCREENING & CRUSHING PLANTS, JAW CRUSHER, 20" X 36", 65 TPH @ 2" -> 223 TPH @ 7", W/3' X 14' FEEDER/ 4' GRIZZLY/ & 30" X 31' END DELIVERY CONVEYOR, TRAILER MTD (ADD 40 KW GENERATOR)
HP E
150MODEL J2142VS30HW009 $355,297 12.54 5.23 8.68 15211.5039.80SCREENING & CRUSHING PLANTS, JAW CRUSHER, 21" X 42", 183 TPH @ 4" -> 345 TPH @ 8", W/3.5' X 16' FEEDER/ 4' GRIZZLY/ & 36" X 34' END DELIVERY CONVEYOR, TRAILER MTD (ADD 40 KW GENERATOR)
HP E
200MODEL J2248VS30HW011 $424,492 14.99 6.25 11.57 16813.7549.21SCREENING & CRUSHING PLANTS, JAW CRUSHER, 22" X 48", 115 TPH @ 2.5" -> 240 TPH @ 6", W/4' X 16' FEEDER/ 4' GRIZZLY/ & 48" X 37' END DELIVERY CONVEYOR (ADD 40 KW GENERATOR)
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-208
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
S30 HEWITT-ROBINS (continued)125MODEL J2436VS30HW008 $342,593 12.16 5.05 7.23 12811.1336.55SCREENING & CRUSHING PLANTS, JAW
CRUSHER, 24" X 36", 95 TPH @ 2.5" -> 230 TPH @ 6", W/3' X 14' FEEDER/ 4' GRIZZLY/ & 30" X 31' END DELIVERY CONVEYOR, TRAILER MTD (ADD 40 KW GENERATOR)
HP E
200MODEL J3042VS30HW010 $432,961 15.31 6.38 11.57 15614.0449.82SCREENING & CRUSHING PLANTS, JAW CRUSHER, 30" X 42", 200 TPH @ 4" -> 390 TPH @ 8", W/3.5' X 16' FEEDER/ 6' GRIZZLY/ & 36" X 55' END DELIVERY CONVEYOR, TRAILER MTD (ADD 40 KW GENERATOR)
HP E
200MODEL J3048VS30HW012 $501,720 17.74 7.39 11.57 16816.2655.13SCREENING & CRUSHING PLANTS, JAW CRUSHER, 30" X 48", 340 TPH @ 5" -> 615 TPH @ 10", W/4' X 16' FEEDER/ 4' GRIZZLY/ & 48" X 37' END DELIVERY CONVEYOR, TRAILER MTD (ADD 40 KW GENERATOR)
HP E
KOLBERG - PIONEER, INC
245CS-1536S30KB055 $374,397 13.31 5.52 23.09 54812.1854.20SCREENING & CRUSHING PLANTS, JAW CRUSHER, 15" X 36", 45 TPH @ 1.5" -> 150 TPH @ 6", W/36"' X 14' VIBRATING FEEDER/ ADJUSTABLE GRIZZLY & BYPASS/ HOPPER/ & 36" X 22' END DELIVERY CONVEYOR, TRAILER MTD, INCLUDES GENERATOR
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-209
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
S30 KOLBERG - PIONEER, INC (continued)1301524-2416
DUPLEX PLS30KB058 $400,629 14.27 5.90 7.52 39113.0441.30SCREENING & CRUSHING PLANTS, JAW
CRUSHER, 15" X 36", 200 TPH @ 1/4" -> 250 TPH @ 6", W/36" X 14' VIBRATING FEEDER/ ADJUSTABLE GRIZZLY & BYPASS/ HOPPER/ SCREEN CONVEYOR/ & TRIPLE VIBRATORY SCREENS, TRAILER MTD
HP E
245CS-2036S30KB056 $383,675 13.64 5.65 23.09 59012.4754.89SCREENING & CRUSHING PLANTS, JAW CRUSHER, 20" X 36", 65 TPH @ 2" -> 223 TPH @ 7", W/36"' X 14' VIBRATING FEEDER/ ADJUSTABLE GRIZZLY & BYPASS/ HOPPER/ & 36" X 22' END DELIVERY CONVEYOR, TRAILER MTD, INCLUDES GENERATOR
HP D-off
3002036-3024 DUPLEX PL
S30KB059 $628,681 22.41 9.26 17.36 41520.4772.57SCREENING & CRUSHING PLANTS, JAW CRUSHER, 20" X 36", 270 TPH @ 1/4" -> 320 TPH @ 7", W/36" X 14' RECIPROCATING PLATE FEEDER/ 12' LONG ADJUSTABLE GRIZZLY & BYPASS/ HOPPER/ & 18" X 15' SCREEN CONVEYOR, TRAILER MTD (ADD 300KW GENERATOR)
HP E
245CS-2436S30KB057 $428,164 15.24 6.31 23.09 70113.9358.24SCREENING & CRUSHING PLANTS, JAW CRUSHER, 24" X 36", 95 TPH @ 2.5" -> 230 TPH @ 6", W/36"' X 16' VIBRATING FEEDER/ ADJUSTABLE GRIZZLY & BYPASS/ HOPPER/ & 36" X 22' END DELIVERY CONVEYOR, TRAILER MTD, INCLUDES GENERATOR
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-210
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
0.30 SCREENING PLANTSUBCATEGORY
HEWITT-ROBINS
15V-11 6X16FT, DD
S30HW014 $131,627 11.59 2.08 0.87 1017.8825.15SCREENING & CRUSHING PLANTS, SCREENING PLANT, 6' X 16' VIBRATORY SLOPE DOUBLE DECK SCREENS, W/36" X 16.5' UNDER SCREEN CONVEYOR/ 7 CY HOPPER/ & FEEDER, TRAILER MTD
HP E
20V-11 6X20FT, DD
S30HW016 $136,881 12.06 2.16 1.16 1158.1926.51SCREENING & CRUSHING PLANTS, SCREENING PLANT, 6' X 20' VIBRATORY SLOPE DOUBLE DECK SCREENS, W/36" X 16.5' UNDER SCREEN CONVEYOR/ 7 CY HOPPER/ & FEEDER, TRAILER MTD
HP E
25V-11 6X16FT, TDS30HW015 $144,576 12.76 2.28 1.45 1388.6628.32SCREENING & CRUSHING PLANTS, SCREENING PLANT, 6' X 16' VIBRATORY SLOPE TRIPLE DECK SCREENS W/36" X 16.5' UNDER SCREEN CONVEYOR/ 7 CY HOPPER/ & FEEDER, TRAILER MTD
HP E
25V-11 6X20FT, TDS30HW017 $147,091 12.98 2.32 1.45 1678.8128.77SCREENING & CRUSHING PLANTS, SCREENING PLANT, 6' X 20' VIBRATORY SLOPE TRIPLE DECK SCREENS W/36" X 16.5' UNDER SCREEN CONVEYOR/ 7 CY HOPPER/ & FEEDER, TRAILER MTD,
HP E
40V-11 8X20FT, TDS30HW018 $175,122 15.28 2.76 2.31 24310.4035.11SCREENING & CRUSHING PLANTS, SCREENING PLANT, 8' X 20' VIBRATORY SLOPE TRIPLE DECK SCREENS, W/48" X 15.5' UNDER SCREEN CONVEYOR/ 7 CY HOPPER/ & FEEDER, TRAILER MTD
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-211
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
KOLBERG - PIONEER, INC
85616 E-3S30KB048 $177,315 15.61 2.80 4.92 28010.6139.20SCREENING & CRUSHING PLANTS, SCREENING PLANT, 6' X 16', VIBRATORY SLOPE TRIPLE DECK SCREENS, W/HOPPER/ 36" X 28.5' FEEDER CONVEYOR/ 48" X27' UNDER SCREEN CONVEYOR/ & 24" X 20' SIDE DELIVERY CONVEYOR, TRAILER MTD
HP E
90620 E-3S30KB049 $209,026 17.65 3.30 5.21 35512.1345.57SCREENING & CRUSHING PLANTS, SCREENING PLANT, 6' X 20' VIBRATORY SLOPE TRIPLE DECK SCREENS, W/HOPPER/ 42" X 34' FEEDER CONVEYOR/ 60" X 25' UNDER SCREEN CONVEYOR/ & 30" X 15' SIDE DELIVERY CONVEYOR, TRAILER MTD
HP E
2501822S30KB050 $252,074 22.33 3.98 14.46 41615.1566.18SCREENING & CRUSHING PLANTS, WASHING/SCREENING PLANT, 6' X 16' VIBRATORY SLOPE TRIPLE DECK SCREENS, W/HOPPER / 3 PRODUCT CHUTES/ ONE FINES CHUTE TO 8' X 32' CLASSIFYING TANK/ 36" DIA X 32' SLOPED SCREW & CHUTE, TRAILER MTD (ADD WATER & FEEDER)
HP E
2501830S30KB051 $320,543 28.32 5.06 14.46 42019.2278.63SCREENING & CRUSHING PLANTS, WASHING/SCREENING PLANT, 6' X 20' VIBRATORY SLOPED TRIPLE DECK SCREENS, W/HOPPER/ 3 PRODUCT CHUTES/ ONE FINES CHUTE/ 8' X 32' CLASSIFYING TANK/ & 44" DIA X 32' SLOPED SCREW & CHUTE, TRAILER MTD (ADD WATER & FEEDER)
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-212
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
S30 KOLBERG - PIONEER, INC (continued)2507208-32 S/PS30KB052 $334,605 29.94 5.28 14.46 45020.2581.16SCREENING & CRUSHING PLANTS,
CLASSIFYING PLANT (SAND SORT) 8'W X 32'L TANK & 44" DIA SCREW
HP E
METSO MINERALS
25CV 50DS30RA002 $74,114 6.58 1.17 2.36 1304.4616.07SCREENING & CRUSHING PLANTS, GRIZZLY-SINGLE SCREEN, 120 CY/HR, TRAILER MTD
HP D-off
49CV 90DS30RA003 $117,274 10.36 1.85 4.62 1957.0326.40SCREENING & CRUSHING PLANTS, GRIZZLY-SINGLE SCREEN, 200 CY/HR, TRAILER MTD
HP D-off
SNOW REMOVAL EQUIPMENTS350.00 SNOW REMOVAL EQUIPMENTSUBCATEGORY
AMERICAN ROAD MACHINERY, INC.
112S35AR001 $4,973 0.50 0.09 0.00 150.341.06SNOW REMOVAL EQUIPMENT, SNOW PLOW, REVERSIBLE (ADD DUMP TRUCK)
713S35AR002 $7,067 0.71 0.12 0.00 200.481.50SNOW REMOVAL EQUIPMENT, SNOW PLOW, 1-WAY TRIP (ADD DUMP TRUCK)
EP 1110-1-8, Vol. 330 Nov 09
2-213
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
SOIL & ROAD STABILIZERSS400.00 SOIL & ROAD STABILIZERSSUBCATEGORY
COMPACTION AMERICA (BOMAG)
360MPH-362 R-2 RECYCLER
S40BO002 $407,011 32.03 6.86 37.21 39022.88113.89SOIL & ROAD STABILIZER, 12" DEEP X 79" WIDE, HYDROSTATIC RECLAIMER/ SOIL STABILIZER, 4X2
HP D-off
360MPH-362 S-2S40BO003 $398,573 31.36 6.72 37.21 39022.40112.40SOIL & ROAD STABILIZER, 14" DEEP X 79" WIDE, HYDROSTATIC RECLAIMER/ SOIL STABILIZER, 4X2
HP D-off
360MPH-362 SDM-2S40BO004 $391,128 30.76 6.59 37.21 39021.97111.08SOIL & ROAD STABILIZER, 21" DEEP X 79" WIDE, HYDROSTATIC RECLAIMER/ SOIL STABILIZER, 4X2
HP D-off
CATERPILLAR INC. ( MACHINE DIVISION)
309RR-250BS40CA001 $370,496 29.25 6.24 31.94 37020.87101.72SOIL & ROAD STABILIZER, 12" DEEP X 96" WIDE, HYDROSTATIC RECLAIMER/ SOIL STABILIZER, 4X2
HP D-off
309SS-250BS40CA002 $355,486 27.79 5.99 31.94 30819.8998.69SOIL & ROAD STABILIZER, 18" DEEP X 96" WIDE, HYDROSTATIC RECLAIMER/ SOIL STABILIZER, 4X2
HP D-off
350RM-300S40CA003 $299,581 22.09 5.05 36.18 51816.1099.87SOIL & ROAD STABILIZER, 18" DEEP X 96" WIDE, HYDROSTATIC ROAD RECLAIMER/ SOIL STABILIZER, 4X4
HP D-off
540RM-500S40CA004 $497,870 38.41 8.39 55.81 59927.60154.59SOIL & ROAD STABILIZER, 16" DEEP X 96" WIDE, HYDROSTATIC ROAD RECLAIMER/ SOIL STABILIZER, 4X4
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-214
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
SPLITTERS, ROCK & CONCRETES450.00 SPLITTERS, ROCK & CONCRETESUBCATEGORY
ELCO INTERNATIONAL INC.
8002-2S45DA004 $12,554 1.67 0.22 0.00 11.064.12SPLITTER, ROCK & CONCRETE, 220 TON SFORCE, 1.75" DIA, SIZE 2, 5 GAL, 12" DEEP HOLE REQ'D (ADD 80 CFM COMPRESSOR)
CFM A
8002-9S45DA005 $15,009 2.00 0.27 0.00 11.274.89SPLITTER, ROCK & CONCRETE, 220 TON SFORCE, 1.75" DIA, SIZE 9, 5 GAL, 18" DEEP HOLE REQ'D (ADD 80 CFM COMPRESSOR)
CFM A
8002-12S45DA007 $15,820 2.11 0.28 0.00 11.345.14SPLITTER, ROCK & CONCRETE, 385 TON SFORCE, 1.75" DIA, SIZE 12, 5 GAL, 26" DEEP HOLE REQ'D (ADD 80 CFM COMPRESSOR)
CFM A
TRACTOR BLADES & ATTACHMENTS (including agricultural)T100.00 TRACTOR BLADES & ATTACHMENTS (including agricultural)SUBCATEGORY
CATERPILLAR INC. ( MACHINE DIVISION)
D3-61-9722T10CA001 $13,745 1.10 0.23 0.00 220.782.46TRACTOR ATTACHMENTS, BLADE, POWER ANGLE, HYDRAULIC, FOR D3, 1.65 CY (ADD D3 TRACTOR)
D3-PA 30BT10CA002 $20,640 1.65 0.35 0.00 211.183.65TRACTOR ATTACHMENTS, POWER WINCH, W/250' CABLE, FOR D3 (ADD D3 TRACTOR)
D4-104-5683T10CA004 $15,214 1.22 0.26 0.00 240.872.72TRACTOR ATTACHMENTS, BLADE, POWER ANGLE, HYDRAULIC, FOR D4, 2.17 CY (ADD D4 TRACTOR)
EP 1110-1-8, Vol. 330 Nov 09
2-215
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
T10 CATERPILLAR INC. ( MACHINE DIVISION) (continued)
D4-PA 30BT10CA005 $20,640 1.65 0.35 0.00 211.183.65TRACTOR ATTACHMENTS, POWER WINCH, W/250' CABLE, FOR D4 (ADD D4 TRACTOR)
D5 N - ANGLE BLADE
T10CA007 $23,051 1.84 0.39 0.00 261.314.06TRACTOR ATTACHMENTS, BLADE, POWER ANGLE, HYDRAULIC, FOR D5, 2.53 CY (ADD D5 TRACTOR)
D5-PA 55T10CA008 $30,824 2.47 0.52 0.00 261.765.42TRACTOR ATTACHMENTS, POWER WINCH, FOR D5 (ADD D5 TRACTOR)
D6-108-3970T10CA009 $28,079 2.25 0.47 0.00 571.604.94TRACTOR ATTACHMENTS, BLADE, STRAIGHT, HYDRAULIC, FOR D6, 5.09 CY (ADD D6 TRACTOR)
D6-108-3982T10CA010 $30,693 2.46 0.52 0.00 691.755.40TRACTOR ATTACHMENTS, BLADE, POWER ANGLE, HYDRAULIC, FOR D6, 4.16 CY (ADD D6 TRACTOR)
D6-PA56 WINCHT10CA011 $42,945 3.44 0.72 0.00 272.447.51TRACTOR ATTACHMENTS, POWER WINCH, W/CABLE, FOR D6 (ADD D6 TRACTOR)
D7-ST10CA012 $41,372 3.31 0.70 0.00 772.367.24TRACTOR ATTACHMENTS, BLADE, STRAIGHT, HYDRAULIC, FOR D7, 6.75 CY (ADD D7 TRACTOR)
D7-UT10CA013 $45,428 3.63 0.77 0.00 862.597.94TRACTOR ATTACHMENTS, BLADE, UNIVERSAL, HYDRAULIC, FOR D7, 10.09 CY (ADD D7 TRACTOR)
D7-AT10CA014 $37,781 3.02 0.64 0.00 782.156.62TRACTOR ATTACHMENTS, BLADE, POWER ANGLE, HYDRAULIC, FOR D7, 5.08 CY (ADD D7 TRACTOR)
D7-PA57 WINCHT10CA015 $56,439 4.52 0.95 0.00 453.219.87TRACTOR ATTACHMENTS, POWER WINCH, W/CABLE, FOR D7 (ADD D7 TRACTOR)
EP 1110-1-8, Vol. 330 Nov 09
2-216
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
T10 CATERPILLAR INC. ( MACHINE DIVISION) (continued)
D8-SUT10CA016 $55,096 4.41 0.93 0.00 1073.149.65TRACTOR ATTACHMENTS, BLADE, STRAIGHT, HYDRAULIC, FOR D8, 6.09 CY (ADD D8 TRACTOR)
D8-UT10CA017 $59,779 4.78 1.01 0.00 1243.4010.47TRACTOR ATTACHMENTS, BLADE, UNIVERSAL, HYDRAULIC, FOR D8, 15.30 CY (ADD D8 TRACTOR)
D8-AT10CA018 $52,856 4.23 0.89 0.00 1233.019.27TRACTOR ATTACHMENTS, BLADE, POWER ANGLE, HYDRAULIC, FOR D8, 6.09 CY (ADD D8 TRACTOR)
D8-PPT10CA019 $1,517 0.12 0.03 0.00 50.090.32TRACTOR ATTACHMENTS, BLADE, PUSH PLATE, FOR D8 (ADD D8 TRACTOR)
D8, PA58VS WINCH
T10CA020 $56,238 4.50 0.95 0.00 503.209.88TRACTOR ATTACHMENTS, POWER WINCH, W/CABLE, FOR D8 (ADD D8 TRACTOR)
D9-SUT10CA021 $74,860 5.99 1.26 0.00 1434.2613.14TRACTOR ATTACHMENTS, BLADE, SEMI-U, HYDRAULIC, FOR D9, 17.70 CY (ADD D9 TRACTOR)
D9-UT10CA022 $81,217 6.50 1.37 0.00 1374.6214.24TRACTOR ATTACHMENTS, BLADE, UNIVERSAL, HYDRAULIC, FOR D9, 21.40 CY (ADD D9 TRACTOR)
D9, PA59VS WINCH
T10CA023 $75,580 6.05 1.27 0.00 864.3013.27TRACTOR ATTACHMENTS, POWER WINCH, W/CABLE, FOR D9 (ADD D9 TRACTOR)
D10-SU ABRASION
T10CA024 $111,252 8.90 1.87 0.00 3576.3219.52TRACTOR ATTACHMENTS, BLADE, SEMI-U, HYDRAULIC, FOR D10, 24.20 CY (ADD D10 TRACTOR)
D10-U ABRASION
T10CA025 $118,724 9.50 2.00 0.00 2516.7520.82TRACTOR ATTACHMENTS, BLADE, UNIVERSAL, HYDRAULIC, FOR D10, 28.70 CY (ADD D10 TRACTOR)
EP 1110-1-8, Vol. 330 Nov 09
2-217
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
T10 CATERPILLAR INC. ( MACHINE DIVISION) (continued)
D11-SUT10CA026 $161,839 12.95 2.73 0.00 3679.2128.40TRACTOR ATTACHMENTS, BLADE, STRAIGHT, HYDRAULIC, FOR D11, 35.50 CY (ADD D11 TRACTOR)
D11-UT10CA027 $174,423 13.95 2.94 0.00 4239.9230.58TRACTOR ATTACHMENTS, BLADE, UNIVERSAL, HYDRAULIC, FOR D11, 45.00 CY (ADD D11 TRACTOR)
DEERE & COMPANY
915 V-RIPPERT10JD001 $13,636 1.05 0.23 0.00 170.762.64TRACTOR ATTACHMENTS, DEEP TILLER, 5x7 V SHAPED, 175" WIDE, 7 SHANKS (ADD 200HP TRACTOR W/PTO)
TRACTORS, CRAWLER (DOZER) (includes blade)T150.01 0 THRU 225 HPSUBCATEGORY
CATERPILLAR INC. ( MACHINE DIVISION)
70D-3G LGPT15CA002 $95,659 6.70 1.72 7.24 1755.0726.62TRACTOR, CRAWLER (DOZER), 70 HP, LOW GROUND PRESSURE, W/2.0 CY SEMI-U BLADE (ADD ATTACHMENTS)
HP D-off
80D-4G XLT15CA020 $120,735 8.45 2.17 8.27 1816.4032.61TRACTOR, CRAWLER (DOZER), 80 HP, POWERSHIFT, W/2.18 CY SEMI-U BLADE (ADD ATTACHMENTS)
HP D-off
80D-4G LGPT15CA005 $118,275 8.28 2.12 8.27 1846.2632.13TRACTOR, CRAWLER (DOZER), 80 HP, LOW GROUND PRESSURE, W/2.39 CY SEMI-U BLADE (ADD ATTACHMENTS)
HP D-off
90D-5G XLT15CA021 $124,961 8.75 2.24 9.30 1956.6234.58TRACTOR, CRAWLER (DOZER), 90 HP, POWERSHIFT, W/2.85 CY POWER ANGLE BLADE (ADD ATTACHMENTS)
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-218
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
T15 CATERPILLAR INC. ( MACHINE DIVISION) (continued)
90D-5G LGPT15CA022 $132,316 9.26 2.37 9.30 2037.0035.99TRACTOR, CRAWLER (DOZER), 90 HP, LOW GROUND PRESSURE, W/3.04 CY POWER ANGLE BLADE (ADD ATTACHMENTS)
HP D-off
110D-5M XLT15CA024 $169,018 11.83 3.03 11.37 2778.9545.41TRACTOR, CRAWLER (DOZER), 110 HP, POWERSHIFT, W/3.37 CY SEMI-U BLADE (ADD ATTACHMENTS)
HP D-off
145D-6N PS XL FTCT15CA008 $236,029 16.52 4.24 14.99 32112.5062.41TRACTOR, CRAWLER (DOZER), 145 HP, POWERSHIFT, W/5.60 CY SEMI-U BLADE (ADD ATTACHMENTS)
HP D-off
165D-6RT15CA023 $338,477 23.69 6.07 17.05 51917.9284.45TRACTOR, CRAWLER (DOZER), 165 HP, LOW GROUND PRESSURE, POWERSHIFT, W/5.09 CY SEMI-U BLADE (ADD ATTACHMENTS)
HP D-off
165D-6R WHAT15CA009 $338,477 23.69 6.07 17.05 51917.9284.45TRACTOR, CRAWLER (DOZER), 165 HP, W/14.3 CY BLADE, TRASH/WASTE HANDLING ARRANGEMENT
HP D-off
185D-6R LGPT15CA011 $328,943 23.03 5.90 19.12 46117.4284.98TRACTOR, CRAWLER (DOZER), 165 HP, LOW GROUND PRESSURE, W/5.09 CY SEMI-U BLADE (ADD ATTACHMENTS)
HP D-off
CASE CORPORATION
67550H WTT15CS004 $107,794 7.55 1.93 6.93 1465.7128.60TRACTOR, CRAWLER (DOZER), 67 HP, POWERSHIFT, W/1.90 CY UNIVERSAL BLADE (ADD ATTACHMENTS)
HP D-off
1191150H WTT15CS007 $188,100 13.17 3.38 12.30 2639.9750.15TRACTOR, CRAWLER (DOZER), 119 HP, POWERSHIFT, W/3.90 CY UNIVERSAL BLADE (ADD ATTACHMENTS)
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-219
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
DEERE & COMPANY
70450H LTT15JD005 $86,113 6.03 1.55 7.24 1554.5724.78TRACTOR, CRAWLER (DOZER), 70 HP, POWERSHIFT, W/2.00 CY ANGLE BLADE (ADD ATTACHMENTS)
HP D-off
74450H LGPT15JD006 $102,461 7.17 1.84 7.65 1655.4328.39TRACTOR, CRAWLER (DOZER), 74 HP, LOW GROUND PRESSURE, W/2.15 CY ANGLE BLADE (ADD ATTACHMENTS)
HP D-off
90650HT15JD007 $117,733 8.24 2.11 9.30 1856.2333.18TRACTOR, CRAWLER (DOZER), 90 HP, POWERSHIFT, W/2.60 CY ANGLE BLADE (ADD ATTACHMENTS)
HP D-off
140750C-II LTT15JD008 $207,973 14.56 3.73 14.47 31711.0156.41TRACTOR, CRAWLER (DOZER), 140 HP, POWERSHIFT, W/5.60 CY ANGLE BLADE (ADD ATTACHMENTS)
HP D-off
140750C-II LGPT15JD009 $218,752 15.31 3.93 14.47 36511.5958.49TRACTOR, CRAWLER (DOZER), 140 HP, LOW GROUND PRESSURE, W/4.84 CY ANGLE BLADE (ADD ATTACHMENTS)
HP D-off
185850CT15JD010 $271,231 18.99 4.87 19.12 40414.3773.87TRACTOR, CRAWLER (DOZER), 185 HP, POWERSHIFT, W/7.44 CY SEMI-U BLADE (ADD ATTACHMENTS)
HP D-off
185850C LGPT15JD011 $293,657 20.56 5.27 19.12 42015.5578.19TRACTOR, CRAWLER (DOZER), 185 HP, LOW GROUND PRESSURE, W/7.14 CY SEMI-U BLADE (ADD ATTACHMENTS)
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-220
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
0.02 226 HP THRU 425 HPSUBCATEGORY
CATERPILLAR INC. ( MACHINE DIVISION)
240D-7R SERIES IIT15CA012 $392,589 23.56 6.71 24.81 56318.4993.46TRACTOR, CRAWLER (DOZER), 240 HP, POWERSHIFT, W/8.98 CY SEMI-U BLADE (ADD ATTACHMENTS)
HP D-off
240D-7R II LGPT15CA014 $465,706 27.94 7.97 24.81 53021.94105.77TRACTOR, CRAWLER (DOZER), 240 HP, LOW GROUND PRESSURE, W/7.70 CY STRAIGHT BLADE (ADD ATTACHMENTS)
HP D-off
310D-8R IIT15CA016 $517,539 31.05 8.85 32.04 89824.38122.46TRACTOR, CRAWLER (DOZER), 310 HP, POWERSHIFT, W/15.3 CY SEMI-U BLADE (ADD ATTACHMENTS)
HP D-off
410D-9RT15CA017 $688,055 41.28 11.77 42.38 1,03332.41162.58TRACTOR, CRAWLER (DOZER), 410 HP, POWERSHIFT, W/17.7 CY SEMI-U BLADE (ADD ATTACHMENTS)
HP D-off
Komatsu America International Company
310D155AX-5T15KM008 $591,732 35.50 10.12 32.04 80327.87134.95TRACTOR, CRAWLER (DOZER), 310 HP, POWERSHIFT, W/11.5 CY SEMI-U BLADE
HP D-off
0.03 OVER 425 HPSUBCATEGORY
CATERPILLAR INC. ( MACHINE DIVISION)
580D-10RT15CA018 $977,327 52.12 15.97 51.13 1,42142.03196.46TRACTOR, CRAWLER (DOZER), 580 HP, POWERSHIFT, W/28.7 CY SEMI-U BLADE (ADD ATTACHMENTS)
HP D-off
850D-11RT15CA019 $1,517,204 80.92 24.79 74.94 2,02965.25300.31TRACTOR, CRAWLER (DOZER), 850 HP, POWERSHIFT, W/44.0 CY SEMI-U BLADE (ADD ATTACHMENTS)
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-221
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
TRACTORS, WHEEL TYPE (DOZER)T200.00 TRACTORS, WHEEL TYPE (DOZER)SUBCATEGORY
CATERPILLAR INC. ( MACHINE DIVISION)
240814-FT20CA001 $355,670 21.09 5.63 21.16 47916.1868.62TRACTOR, WHEEL (DOZER), 240 HP, ARTICULATING, 4X4, W/3.77 CY STRAIGHT BLADE
HP D-off
339824-G IIT20CA002 $518,657 29.97 8.21 29.89 63323.20103.65TRACTOR, WHEEL (DOZER), 339 HP, ARTICULATING, 4X4, W/6.70 CY STRAIGHT BLADE
HP D-off
481834-GT20CA003 $781,245 44.00 12.37 42.40 90234.37150.72TRACTOR, WHEEL (DOZER), 481 HP, ARTICULATING, 4X4, W/10.33 CY STRAIGHT BLADE
HP D-off
TRACTORS, AGRICULTURALT250.10 CRAWLERSUBCATEGORY
CATERPILLAR INC. ( MACHINE DIVISION)
267CH 65ET25CA006 $205,706 17.49 3.36 25.16 33112.1165.82TRACTOR, AGRICULTURAL, CRAWLER-RUBBER TRACK, 267 HP, 3 POINT HITCH
HP D-off
292CH 75ET25CA007 $225,762 19.19 3.68 27.52 34113.2872.13TRACTOR, AGRICULTURAL, CRAWLER-RUBBER TRACK, 292 HP, 3 POINT HITCH
HP D-off
353CH 85ET25CA008 $244,607 20.79 3.99 33.27 35014.3981.95TRACTOR, AGRICULTURAL, CRAWLER-RUBBER TRACK, 353 HP, 3 POINT HITCH
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-222
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
0.20 WHEELSUBCATEGORY
DEERE & COMPANY
455103T25JD015 $18,265 1.76 0.31 4.24 391.198.60TRACTOR, AGRICULTURAL, WHEEL, 45 HP, 4X2, PTO, 3 POINT HITCH
HP D-off
565225T25JD016 $26,489 2.63 0.44 5.28 391.7611.46TRACTOR, AGRICULTURAL, WHEEL, 56 HP, 4X2, PTO, 3 POINT HITCH
HP D-off
565225 W/609 MOWER
T25JD017 $30,492 3.06 0.51 5.28 512.0412.30TRACTOR, AGRICULTURAL, WHEEL, 56 HP, 4X2, PTO, 3 POINT HITCH, WITH 60" HEAVY DUTY ROTARY MOWER
HP D-off
675325T25JD018 $37,692 3.82 0.63 6.31 492.5414.95TRACTOR, AGRICULTURAL, WHEEL, 67 HP, 4X2, PTO, 3 POINT HITCH
HP D-off
815425T25JD019 $40,188 4.03 0.67 7.63 542.6916.95TRACTOR, AGRICULTURAL, WHEEL, 81 HP, 4X2, PTO, 3 POINT HITCH
HP D-off
1107230T25JD008 $85,260 8.75 1.43 10.37 1155.8129.46TRACTOR, AGRICULTURAL, WHEEL, 110 HP, 4X4, PTO, 3 POINT HITCH
HP D-off
915525T25JD020 $43,496 3.94 0.73 8.58 592.7019.02TRACTOR, AGRICULTURAL, WHEEL, 91 HP, 4X2, PTO, 3 POINT HITCH
HP D-off
1757630T25JD009 $103,662 10.70 1.73 16.49 1557.0840.04TRACTOR, AGRICULTURAL, WHEEL, 175 HP, 4X4, PTO, 3 POINT HITCH
HP D-off
2258130T25JD010 $118,228 11.87 1.98 21.20 2157.9248.50TRACTOR, AGRICULTURAL, WHEEL, 225 HP, 4X4, PTO, 3 POINT HITCH
HP D-off
3259230T25JD012 $176,110 16.62 2.94 30.63 32911.2571.45TRACTOR, AGRICULTURAL, WHEEL, 325 HP, 4X4, PTO, 3 POINT HITCH
HP D-off
4259430T25JD013 $221,102 21.40 3.70 40.05 34914.4091.26TRACTOR, AGRICULTURAL, WHEEL, 425 HP, 4X4, PTO, 3 POINT HITCH
HP D-off
2758330T25JD014 $158,315 16.13 2.65 25.92 21110.7262.09TRACTOR, AGRICULTURAL, WHEEL, 275 HP, 4X4, PTO, 3 POINT HITCH
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-223
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
TRENCHERS, CHAIN TYPE CUTTERT300.00 TRENCHERS, CHAIN TYPE CUTTERSUBCATEGORY
DITCH WITCH(The Charles Machine Works)I
131230T30DW012 $9,300 0.90 0.16 2.26 80.614.62TRENCHER, CHAIN TYPE CUTTER, 36" DEEP X 6" WIDE, WALK BEHIND
HP G
181820T30DW013 $13,093 1.25 0.23 3.13 130.866.47TRENCHER, CHAIN TYPE CUTTER, 48" DEEP X 16" WIDE, WALK BEHIND
HP G
353610T30DW014 $34,298 3.21 0.59 3.30 392.2011.51TRENCHER, CHAIN TYPE CUTTER, 60" DEEP X 16" WIDE, 4X4 (W/BLADE)
HP D-off
443700T30DW005 $36,416 3.52 0.63 4.15 422.3912.91TRENCHER, CHAIN TYPE CUTTER, 63" DEEP X 12" WIDE, 4X4 (W/DBL PIVOT)
HP D-off
575700T30DW016 $59,163 5.79 1.02 5.37 953.9219.45TRENCHER, CHAIN TYPE CUTTER, 52" DEEP X 12" WIDE, 4X4 (W/BLADE)
HP D-off
70RT 70 MT30DW017 $74,398 7.22 1.28 6.60 694.8924.29TRENCHER, CHAIN TYPE CUTTER, 96" DEEP X 24" WIDE, 4X4 (W/BLADE)
HP D-off
78RT 90 MT30DW018 $83,295 8.11 1.44 7.35 775.5027.16TRENCHER, CHAIN TYPE CUTTER, 96" DEEP X 24" WIDE, 4X4 (W/BLADE)
HP D-off
185HT185 (H1812)T30DW011 $206,726 20.67 3.57 17.43 19513.9166.40TRENCHER, CHAIN TYPE CUTTER, 84" DEEP X 9"-24" WIDE, CRAWLER (W/BLADE)
HP D-off
TESMEC USA, INC.
185TRS 900-AT30TM001 $312,524 31.25 5.39 17.43 37521.0290.54TRENCHER, CHAIN TYPE CUTTER, 3' DEEP X 4"-8" WIDE, CRAWLER (W/CRUMBSHOE)
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-224
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
T30 TESMEC USA, INC. (continued)185TRS 900-A-SLT30TM004 $337,492 33.75 5.82 17.43 40022.7096.24TRENCHER, CHAIN TYPE CUTTER, 3'
DEEP X 4"-8" WIDE, CRAWLER (W/CRUMBSHOE) SELF LEVEL
HP D-off
270TRS 1000-AT30TM009 $439,424 43.94 7.58 25.44 55029.55128.34TRENCHER, CHAIN TYPE CUTTER, 4' DEEP X 5"-12" WIDE, CRAWLER (W/CRUMBSHOE)
HP D-off
220TRS 775T30TM007 $445,870 44.59 7.69 20.73 45029.99124.62TRENCHER, CHAIN TYPE CUTTER, 4' DEEP X 12" WIDE, CRAWLER (W/CRUMBSHOE) SELF LEVEL, OFFSET
HP D-off
220TRS 775T30TM008 $448,781 44.88 7.74 20.73 47030.18125.28TRENCHER, CHAIN TYPE CUTTER, 6' DEEP X 18" WIDE, CRAWLER (W/CRUMBSHOE) SELF LEVEL, OFFSET
HP D-off
385TRS 1100T30TM012 $766,301 76.63 13.22 36.28 85051.54214.90TRENCHER, CHAIN TYPE CUTTER, 8' DEEP X 26" WIDE, CRAWLER (W/CRUMBSHOE)
HP D-off
525TRS 1475 XHPT30TM014 $1,202,437 120.24 20.75 49.48 1,68080.87329.00TRENCHER, CHAIN TYPE CUTTER, 10' DEEP X 26" WIDE, CRAWLER (W/CRUMBSHOE)
HP D-off
525TRS 1475 XHPT30TM013 $1,255,904 125.59 21.67 49.48 1,68084.47341.21TRENCHER, CHAIN TYPE CUTTER, 14' DEEP X 42" WIDE, CRAWLER (W/CRUMBSHOE)
HP D-off
525TRS 1475 XHPT30TM015 $1,282,199 128.22 22.13 49.48 1,68086.24347.21TRENCHER, CHAIN TYPE CUTTER, 16' DEEP X 42" WIDE, CRAWLER (W/CRUMBSHOE)
HP D-off
VERMEER MANUFACTURING CO.
125T 455T30VE007 $174,097 17.41 3.00 11.78 18011.7152.71TRENCHER, CHAIN TYPE CUTTER, 6' DEEP X 8"-24" WIDE, CRAWLER, HYDROSTATIC
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-225
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
T30 VERMEER MANUFACTURING CO. (continued)
185T 555 IIIT30VE008 $221,220 22.12 3.82 17.43 22514.8869.71TRENCHER, CHAIN TYPE CUTTER, 8' DEEP X 8"-24" WIDE, CRAWLER, HYDROSTATIC
HP D-off
250T 655 IIIT30VE009 $358,174 35.82 6.18 23.56 50024.09107.73TRENCHER, CHAIN TYPE CUTTER, 8' DEEP X 10.5"-26" WIDE, CRAWLER, HYDROSTATIC
HP D-off
275T 755 IIIT30VE010 $434,764 43.48 7.50 25.92 66029.24127.81TRENCHER, CHAIN TYPE CUTTER, 10' DEEP X 14"-36" WIDE, CRAWLER, HYDROSTATIC
HP D-off
TRENCHERS, WHEEL TYPE CUTTERT350.00 TRENCHERS, WHEEL TYPE CUTTERSUBCATEGORY
CLEVELAND TRENCHER
1409624T35CT001 $235,064 23.51 4.06 13.19 17015.8268.20TRENCHER, WHEEL TYPE CUTTER, 72" DEEP X 21.5" WIDE, ROUND BUCKET, CRAWLER
HP D-off
1409600-ST35CT002 $289,470 28.95 5.00 13.19 22819.4880.62TRENCHER, WHEEL TYPE CUTTER, 72" DEEP X 24" WIDE, ROUND BUCKET, CRAWLER
HP D-off
185246-FDT35CT003 $325,069 32.51 5.61 17.43 32021.8793.41TRENCHER, WHEEL TYPE CUTTER, 84" DEEP X 24" WIDE, ROUND BUCKET, CRAWLER
HP D-off
1027036T35CT005 $289,649 28.96 5.00 9.61 26319.4876.70TRENCHER, WHEEL TYPE CUTTER, 84" DEEP X 36" WIDE, ROUND BUCKET, CRAWLER
HP D-off
1027036T35CT006 $289,649 28.96 5.00 9.61 26319.4876.70TRENCHER, WHEEL TYPE CUTTER, 84" DEEP X 36" WIDE, ROUND BUCKET, CRAWLER
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-226
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
T35 CLEVELAND TRENCHER (continued)1027036-HDT35CT004 $306,199 30.62 5.28 9.61 28620.5980.48TRENCHER, WHEEL TYPE CUTTER, 84"
DEEP X 36" WIDE, ROUND BUCKET, CRAWLER
HP D-off
1027036-SDT35CT007 $320,453 32.05 5.53 9.61 34021.5683.74TRENCHER, WHEEL TYPE CUTTER, 84" DEEP X 36" WIDE, ROUND BUCKET, CRAWLER
HP D-off
1508700T35CT008 $410,544 41.05 7.08 14.14 42427.61109.28TRENCHER, WHEEL TYPE CUTTER, 84" DEEP X 36" WIDE, ROUND BUCKET, CRAWLER
HP D-off
1507648-SDT35CT009 $477,905 47.79 8.25 14.14 44532.15124.67TRENCHER, WHEEL TYPE CUTTER, 90" DEEP X 48" WIDE, ROUND BUCKET, CRAWLER
HP D-off
1507648T35CT010 $468,135 46.81 8.08 14.14 44531.49122.43TRENCHER, WHEEL TYPE CUTTER, 90" DEEP X 48" WIDE, ROUND BUCKET, CRAWLER
HP D-off
175400W-HDT35CT011 $562,459 56.25 9.71 16.49 70037.84146.56TRENCHER, WHEEL TYPE CUTTER, 108" DEEP X 72" WIDE, ROUND BUCKET, CRAWLER
HP D-off
TRUCK OPTIONST400.10 CRANES / HOISTS, PERSONNEL & MATERIAL HANDLINGSUBCATEGORY
AUTO CRANE CO.
AC8-59T40AH001 $27,048 2.70 0.47 0.00 21.825.98TRUCK OPTIONS, CRANE, HYDRAULIC, 3-ARM ARTICULATING, 3.5 TON, 32' BOOM (ADD 21,000 GVW TRUCK & FLATBED)
EP 1110-1-8, Vol. 330 Nov 09
2-227
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
T40 AUTO CRANE CO. (continued)AC15-101T40AH003 $40,089 4.01 0.69 0.00 32.708.75TRUCK OPTIONS, CRANE, HYDRAULIC, 3-
ARM ARTICULATING, 6.6 TON, 36' BOOM (ADD 32,500 GVW TRUCK & FLATBED)
AC20-142T40AH004 $49,573 4.96 0.86 0.00 83.3410.77TRUCK OPTIONS, CRANE, HYDRAULIC, 3-ARM ARTICULATING, 8.6 TON, 41' BOOM (ADD 46,000 GVW TRUCK & FLATBED)
PALFINGER INC.
PC 2300T40PA001 $8,010 0.80 0.14 0.00 90.541.94TRUCK OPTIONS, CRANE, HYDRAULIC, 2-ARM ARTICULATING, 2.4 TON, 21' BOOM (ADD 25,000 GVW TRUCK & FLATBED)
PK 12502T40PA002 $44,144 4.41 0.76 0.00 352.979.59TRUCK OPTIONS, CRANE, HYDRAULIC, 3-ARM ARTICULATING, 5.3 TON, 61' BOOM (ADD 28,000 GVW TRUCK & FLATBED)
PK 20002T40PA003 $54,804 5.48 0.95 0.00 513.6911.88TRUCK OPTIONS, CRANE, HYDRAULIC, 3-ARM ARTICULATING, 8.3 TON, 70' BOOM (ADD 30,000 GVW TRUCK & FLATBED)
PK 26502T40PA004 $63,994 6.40 1.10 0.00 614.3013.82TRUCK OPTIONS, CRANE, HYDRAULIC, 3-ARM ARTICULATING, 9.0 TON, 69' BOOM (ADD 52,000 GVW TRUCK & FLATBED)
PK 50002T40PA005 $121,274 12.13 2.09 0.00 1,0728.1625.98TRUCK OPTIONS, CRANE, HYDRAULIC, 2-ARM ARTICULATING, 12.5 TON, 82' BOOM (ADD 60,000 GVW TRUCK & FLATBED)
EP 1110-1-8, Vol. 330 Nov 09
2-228
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
T40 PALFINGER INC. (continued)PK 65002T40PA006 $125,478 12.55 2.17 0.00 1268.4526.88TRUCK OPTIONS, CRANE, HYDRAULIC, 2-
ARM ARTICULATING, 14.9 TON, 82' BOOM (ADD 62,000 GVW TRUCK & FLATBED)
0.20 DUMP BODY, REARSUBCATEGORY
GALION DUMP BODIES, INC.
PACKAGE 89-FT40GN001 $15,725 1.77 0.25 0.00 421.143.32TRUCK OPTIONS, DUMP BODY, REAR, 16-23.5 CY (W/HOIST) (ADD 36,000 GVW TRUCK)
MIDLAND MANUFACTURING INC.
KLEENSIDET40MY002 $5,211 0.59 0.08 0.00 210.381.10TRUCK OPTIONS, DUMP BODY, REAR, 7.5 CY, AIR GATE (W/HOIST) (ADD 30,000 GVW TRUCK)
KLEENSIDET40MY003 $6,474 0.73 0.10 0.00 260.471.37TRUCK OPTIONS, DUMP BODY, REAR, 8.9 CY, AIR GATE (W/HOIST) (ADD 27,000 GVW TRUCK)
KLEENSIDET40MY004 $7,494 0.84 0.12 0.00 310.541.58TRUCK OPTIONS, DUMP BODY, REAR, 10.0 CY, AIR GATE (W/HOIST) (ADD 35,000 GVW TRUCK)
KLEENSIDET40MY005 $10,573 1.19 0.17 0.00 330.772.24TRUCK OPTIONS, DUMP BODY, REAR, 13.6 CY, AIR GATE (W/HOIST) (ADD 35,000 GVW TRUCK)
KLEENSIDET40MY006 $12,042 1.35 0.20 0.00 400.882.55TRUCK OPTIONS, DUMP BODY, REAR, 20.0 CY, AIR GATE (W/HOIST) (ADD 50,000 GVW TRUCK)
EP 1110-1-8, Vol. 330 Nov 09
2-229
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
0.30 FLATBEDS, WITH SIDESSUBCATEGORY
KNAPHEIDE MANUFACTURING CO.
8' X 8'T40KF011 $2,713 0.27 0.05 0.00 110.190.51TRUCK OPTIONS, FLATBED, W/SIDE RACKS, 8' X 8'
8' X 10'T40KF013 $4,048 0.40 0.07 0.00 140.270.76TRUCK OPTIONS, FLATBED, W/SIDE RACKS, 8' X 10'
8' X 12'T40KF014 $3,596 0.36 0.06 0.00 160.240.68TRUCK OPTIONS, FLATBED, W/SIDE RACKS, 8' X 12'
8' X 16'T40KF016 $5,203 0.52 0.09 0.00 160.350.98TRUCK OPTIONS, FLATBED, W/SIDE RACKS, 8' X 16'
8' X 20'T40KF018 $6,269 0.63 0.11 0.00 180.431.19TRUCK OPTIONS, FLATBED, W/SIDE RACKS, 8' X 20'
8' X 24'T40KF020 $7,286 0.73 0.13 0.00 200.501.38TRUCK OPTIONS, FLATBED, W/SIDE RACKS, 8' X 24'
0.41 HOIST, ELECTRIC DRIVESUBCATEGORY
KNAPHEIDE MANUFACTURING CO.
KH-1416LT40KF021 $2,984 0.30 0.05 0.00 60.200.70TRUCK OPTIONS, HOIST, ELECTRIC DRIVE, PTO, 10' TO 14', 7-16 TON
KH-1416L-EET40KF023 $4,006 0.40 0.07 0.00 60.270.85TRUCK OPTIONS, HOIST, ELECTRIC DRIVE, 10' TO 14', 7-16 TON
KH-1627L-EET40KF024 $4,709 0.47 0.08 0.00 100.320.99TRUCK OPTIONS, HOIST, ELECTRIC DRIVE, 15' TO 20', 14-37 TON
KH-2538LT40KF022 $5,919 0.59 0.10 0.00 150.401.28TRUCK OPTIONS, HOIST, ELECTRIC DRIVE, PTO, 20' TO 24', 20-45 TON
EP 1110-1-8, Vol. 330 Nov 09
2-230
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
0.50 TRANSIT MIXERSSUBCATEGORY
NO SPECIFIC MANUFACTURER
235RDTM-8T40XX034 $149,022 15.83 2.49 25.42 26610.4159.05TRANSIT MIXER, 8 CY, HYDROSTATIC, 100 GAL, (INCLUDES 60,000 GVW TRUCK)
HP D-on
250RDTM-9T40XX035 $151,403 16.09 2.53 27.05 27010.5861.37TRANSIT MIXER, 9 CY, HYDROSTATIC, 100 GAL, (INCLUDES 66,000 GVW TRUCK)
HP D-on
285RDTM-10T40XX036 $181,701 19.31 3.04 30.83 27412.7071.84TRANSIT MIXER, 10 CY, HYDROSTATIC, 100 GAL, (INCLUDES 66,000 GVW TRUCK)
HP D-on
285RDTM-11T40XX037 $178,328 18.95 2.98 30.83 28512.4671.14TRANSIT MIXER, 11 CY, HYDROSTATIC, 100 GAL, (INCLUDES 70,000 GVW TRUCK)
HP D-on
285RDTM-12T40XX038 $186,640 19.83 3.12 30.83 29513.0472.85TRANSIT MIXER, 12 CY, HYDROSTATIC, 100 GAL, (INCLUDES 75,000 GVW TRUCK)
HP D-on
0.60 WATER TANKSSUBCATEGORY
ROSCO, A LeeBoy COMPANY
DS 2000T40RS001 $29,425 2.76 0.52 0.00 381.905.37TRUCK OPTIONS, WATER TANK, 2,000 GAL (ADD 28,000 GVW TRUCK)
DS 3000T40RS002 $30,379 2.85 0.54 0.00 451.975.55TRUCK OPTIONS, WATER TANK, 3,000 GAL (ADD 40,000 GVW TRUCK)
DS 4000T40RS003 $32,650 3.06 0.58 0.00 552.115.96TRUCK OPTIONS, WATER TANK, 4,000 GAL (ADD 50,000 GVW TRUCK)
EP 1110-1-8, Vol. 330 Nov 09
2-231
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
0.70 ALL OTHER OPTIONSSUBCATEGORY
ARROW-MASTER, INC.
801350T40AG001 $86,610 8.44 1.49 7.54 965.7125.82TRUCK OPTIONS, GUILLOTINE CONCRETE BREAKER, W/8'' DIA BREAKING TOOL AND CAB
HP D-off
TRUCK TRAILERST450.10 BOTTOM DUMPSUBCATEGORY
MIDLAND MANUFACTURING INC.
40' MC 2000T45MY004 $31,322 2.44 0.49 0.00 1521.716.18TRUCK TRAILER, BOTTOM DUMP, 21 CY, 28 TON, 40' - 2 AXLE, CLAMSHELL (ADD TOWING TRUCK)
40' TC 3000T45MY005 $42,409 3.25 0.67 0.00 1382.308.35TRUCK TRAILER, BOTTOM DUMP, 21 CY, 30 TON, 40' - 3 AXLE, CLAMSHELL (ADD TOWING TRUCK)
38' MC 3000T45MY006 $43,547 3.35 0.69 0.00 1452.378.55TRUCK TRAILER, BOTTOM DUMP, 23 CY, 30 TON, 38' - 3 AXLE, CLAMSHELL (ADD TOWING TRUCK)
40' MC 3000T45MY007 $42,204 3.23 0.67 0.00 1522.298.32TRUCK TRAILER, BOTTOM DUMP, 23 CY, 30 TON, 40' - 3 AXLE, CLAMSHELL (ADD TOWING TRUCK)
NO SPECIFIC MANUFACTURER
T45XX001 $38,794 3.19 0.61 0.00 1222.217.48TRUCK TRAILER, BOTTOM DUMP, 27 TON (ADD TOWING TRUCK)
T45XX003 $51,897 4.37 0.82 0.00 1603.019.74TRUCK TRAILER, BOTTOM DUMP, 30 TON (ADD TOWING TRUCK)
EP 1110-1-8, Vol. 330 Nov 09
2-232
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
0.20 END DUMPSUBCATEGORY
MIDLAND MANUFACTURING INC.
28' SK2000T45MY015 $33,575 2.64 0.53 0.00 1151.856.53TRUCK TRAILER, END DUMP, 28 CY, 36 TON, 28' - 2 AXLE (W/HOIST) (ADD TOWING TRUCK)
32' ST 2400T45MY016 $34,196 2.70 0.54 0.00 1301.896.64TRUCK TRAILER, END DUMP, 28 CY, 36 TON, 32' - 2 AXLE (W/HOIST) (ADD TOWING TRUCK)
39' SK 2300T45MY017 $37,879 2.84 0.60 0.00 1702.027.52TRUCK TRAILER, END DUMP, 39 CY, 50 TON, 39' - 3 AXLE (W/HOIST) (ADD TOWING TRUCK)
NO SPECIFIC MANUFACTURER
T45XX008 $32,592 2.63 0.51 0.00 1101.836.27TRUCK TRAILER, END DUMP, 20 CY, 24 TON (ADD TOWING TRUCK)
0.30 PUP TRAILERSUBCATEGORY
MIDLAND MANUFACTURING INC.
14' SK 2100T45MY018 $22,585 2.07 0.37 0.00 801.415.31TRUCK TRAILER, PUP TRAILER, 10 CY, 13 TON, 14' - 2 AXLE (W/HOIST) (ADD TOWING TRUCK)
14' SL 2100T45MY019 $22,403 2.04 0.36 0.00 801.385.25TRUCK TRAILER, PUP TRAILER, 12 CY, 15 TON, 14' - 2 AXLE (W/HOIST) (ADD TOWING TRUCK)
NO SPECIFIC MANUFACTURER
T45XX009 $33,158 3.35 0.54 0.00 862.227.34TRUCK TRAILER, PUP TRAILER, 8 CY, LONG TONGUE (ADD TOWING TRUCK)
EP 1110-1-8, Vol. 330 Nov 09
2-233
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
T45 NO SPECIFIC MANUFACTURER (continued)T45XX010 $33,271 3.36 0.54 0.00 862.227.36TRUCK TRAILER, PUP TRAILER, 10 CY,
LONG TONGUE (ADD TOWING TRUCK)
T45XX032 $41,711 4.41 0.68 0.00 922.899.07TRUCK TRAILER, PUP TRAILER, 13 CY, 14.5 TON, 3 AXLE (ADD TOWING TRUCK)
T45XX033 $49,155 5.15 0.80 0.00 1003.3810.74TRUCK TRAILER, PUP TRAILER, 16 CY, 18.0 TON, 4 AXLE (ADD TOWING TRUCK)
0.41 LOWBOY, RIGID NECK, DROP DECKSUBCATEGORY
EAGER BEAVER
35GSL-BRT45EA006 $43,788 3.41 0.69 0.00 1502.408.00TRUCK TRAILER, LOWBOY, 35 TON, 2 AXLE, DETATCHABLE GOOSENECK (ADD TOWING TRUCK)
50GSL/3T45EA007 $65,144 5.06 1.03 0.00 2053.5611.68TRUCK TRAILER, LOWBOY, 50 TON, 3 AXLE , DETATCHABLE GOOSENECK (ADD TOWING TRUCK)
NO SPECIFIC MANUFACTURER
T45XX011 $32,829 2.68 0.52 0.00 951.865.84TRUCK TRAILER, LOWBOY, 25 TON, 2 AXLE (ADD TOWING TRUCK)
T45XX012 $34,857 2.86 0.55 0.00 1151.986.14TRUCK TRAILER, LOWBOY, 30 TON, 2 AXLE (ADD TOWING TRUCK)
T45XX013 $36,569 2.99 0.58 0.00 1102.086.47TRUCK TRAILER, LOWBOY, 35 TON, 2 AXLE (ADD TOWING TRUCK)
T45XX014 $44,661 3.61 0.70 0.00 1272.517.95TRUCK TRAILER, LOWBOY, 35 TON, 3 AXLE (ADD TOWING TRUCK)
EP 1110-1-8, Vol. 330 Nov 09
2-234
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
T45 NO SPECIFIC MANUFACTURER (continued)T45XX015 $45,717 3.70 0.72 0.00 1362.578.11TRUCK TRAILER, LOWBOY, 40 TON, 3
AXLE (ADD TOWING TRUCK) T45XX016 $51,154 4.15 0.81 0.00 1452.899.04TRUCK TRAILER, LOWBOY, 50 TON, 3
AXLE (ADD TOWING TRUCK) T45XX017 $54,369 4.36 0.86 0.00 1753.049.63TRUCK TRAILER, LOWBOY, 60 TON, 3
AXLE (ADD TOWING TRUCK) T45XX018 $54,822 4.40 0.87 0.00 2133.079.71TRUCK TRAILER, LOWBOY, 70 TON, 3
AXLE (ADD TOWING TRUCK) T45XX019 $62,649 5.10 0.99 0.00 2203.5410.90TRUCK TRAILER, LOWBOY, 75 TON, 3
AXLE (ADD TOWING TRUCK) T45XX020 $60,931 4.87 0.96 0.00 2683.4010.85TRUCK TRAILER, LOWBOY, 80 TON, 4
AXLE (ADD TOWING TRUCK) T45XX021 $66,170 5.34 1.04 0.00 2933.7111.65TRUCK TRAILER, LOWBOY, 90 TON, 4
AXLE (ADD TOWING TRUCK) T45XX022 $74,567 6.00 1.18 0.00 3124.1813.10TRUCK TRAILER, LOWBOY, 100 TON, 4
AXLE (ADD TOWING TRUCK) T45XX023 $89,232 7.16 1.41 0.00 3504.9915.58TRUCK TRAILER, LOWBOY, 120 TON, 4
AXLE (ADD TOWING TRUCK)
0.50 FLATBED TRAILERSUBCATEGORY
NO SPECIFIC MANUFACTURER
T45XX025 $31,097 2.49 0.49 0.00 1101.745.32TRUCK TRAILER, FLATBED, 25 TON, 2 AXLE (ADD TOWING TRUCK)
32T45XX034 $30,557 2.44 0.48 0.00 1031.705.53TRUCK TRAILER, FLATBED, 40 TON, 2 AXLE (ADD TOWING TRUCK)
40T45XX035 $32,477 2.62 0.51 0.00 1101.825.83TRUCK TRAILER, FLATBED, 40 TON, 2 AXLE (ADD TOWING TRUCK)
EP 1110-1-8, Vol. 330 Nov 09
2-235
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
0.60 MISCELLANEOUS / UTILITYSUBCATEGORY
NO SPECIFIC MANUFACTURER
T45XX026 $17,588 1.42 0.28 0.00 620.993.35TRUCK TRAILER, MISCELLANEOUS/UTILITY, TILT BED, 12 TON, 2 AXLE (ADD TOWING TRUCK)
T45XX027 $19,892 1.57 0.31 0.00 651.103.77TRUCK TRAILER, MISCELLANEOUS/UTILITY, TILT BED, 16 TON, 2 AXLE (ADD TOWING TRUCK)
T45XX028 $22,924 1.78 0.36 0.00 671.254.34TRUCK TRAILER, MISCELLANEOUS/UTILITY, TILT BED, 20 TON, 2 AXLE (ADD TOWING TRUCK)
T45XX024 $28,786 2.29 0.45 0.00 621.604.96TRUCK TRAILER, MISCELLANEOUS/UTILITY, ATTACHMENT, HELPER DOLLY, 60 TON TRAILER MAX (ADD TOWING TRUCK)
0.70 WATER TANKER TRAILERSUBCATEGORY
NO SPECIFIC MANUFACTURER
63T45XX029 $81,357 5.95 1.41 5.94 1704.3918.81TRUCK TRAILER, WATER TANKER, 4,000 GAL, W/PUMP (ADD TOWING TRUCK)
HP D-off
63T45XX030 $81,119 5.78 1.41 5.94 2404.3019.00TRUCK TRAILER, WATER TANKER, 5,000 GAL, W/PUMP (ADD TOWING TRUCK)
HP D-off
63T45XX031 $98,491 7.08 1.71 5.94 2505.2521.59TRUCK TRAILER, WATER TANKER, 6,000 GAL, W/PUMP (ADD TOWING TRUCK)
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-236
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
TRUCKS, HIGHWAY (Add attachments as required)T500.01 0 THRU 10,000 GVWSUBCATEGORY
GMC AND CHEVROLET
120S10 T50GM001 $16,430 1.57 0.28 4.96 261.078.85TRUCK, HIGHWAY, 3,500 GVW, 4X2 (COMPACT)
HP G
285R26T50GM004 $36,557 3.58 0.63 11.77 502.4220.39TRUCK, HIGHWAY, 8,600 GVW, 4X2 (SUBURBAN)
HP G
285V26T50GM005 $39,303 3.86 0.68 11.77 522.6120.96TRUCK, HIGHWAY, 8,600 GVW, 4X4 (SUBURBAN)
HP G
NO SPECIFIC MANUFACTURER
1304X2 1/2 130 CONV GAS
T50XX001 $15,932 1.49 0.27 5.37 451.029.24TRUCK, HIGHWAY, CONVENTIONAL, 1/2 TON PICKUP, 4X2
HP G
1304X2 3/4 130 CONV GAS
T50XX002 $19,037 1.82 0.33 5.37 401.249.84TRUCK, HIGHWAY, CONVENTIONAL, 3/4 TON PICKUP, 4X2
HP G
1804X2 1 180 CONV GAS
T50XX003 $21,646 2.09 0.37 7.43 411.4212.64TRUCK, HIGHWAY, CONVENTIONAL, 1 TON PICKUP, 4X2
HP G
1304X4 1/2 130 CONV GAS
T50XX004 $19,130 1.81 0.33 5.37 431.249.91TRUCK, HIGHWAY, CONVENTIONAL, 1/2 TON PICKUP, 4X4
HP G
1304X4 3/4 130 CONV GAS
T50XX005 $22,450 2.16 0.39 5.37 451.4710.54TRUCK, HIGHWAY, CONVENTIONAL, 3/4 TON PICKUP, 4X4
HP G
1804X4 1 180 CONV GAS
T50XX006 $23,195 2.24 0.40 7.43 411.5212.95TRUCK, HIGHWAY, CONVENTIONAL, 1 TON PICKUP, 4X4
HP G
1304X2 1/2 130 CREW GAS
T50XX007 $16,816 1.58 0.29 5.37 451.089.42TRUCK, HIGHWAY, CREW, 1/2 TON PICKUP, 4X2
HP G
1304X2 3/4 130 CREW GAS
T50XX008 $20,216 1.94 0.35 5.37 471.3210.08TRUCK, HIGHWAY, CREW, 3/4 TON PICKUP, 4X2
HP G
EP 1110-1-8, Vol. 330 Nov 09
2-237
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
T50 NO SPECIFIC MANUFACTURER (continued)1804X2 1 180
CREW GAST50XX009 $24,790 2.40 0.43 7.43 451.6313.27TRUCK, HIGHWAY, CREW, 1 TON PICKUP,
4X2 HP G
1304X4 1/2 130 CREW GAS
T50XX010 $22,710 2.17 0.39 5.37 481.4810.63TRUCK, HIGHWAY, CREW, 1/2 TON PICKUP, 4X4
HP G
1804X4 3/4 180 CREW GAS
T50XX011 $24,399 2.36 0.42 7.43 551.6013.20TRUCK, HIGHWAY, CREW, 3/4 TON PICKUP, 4X4
HP G
1804X4 1 180 CREW GAS
T50XX012 $25,509 2.47 0.44 7.43 451.6813.41TRUCK, HIGHWAY, CREW, 1 TON PICKUP, 4X4
HP G
754X2 1/2 75 CONV DSL
T50XX013 $20,600 1.96 0.36 1.83 391.346.26TRUCK, HIGHWAY, CONVENTIONAL, 1/2 TON PICKUP, 4X2
HP D-on
754X2 3/4 75 CONV DSL
T50XX014 $22,828 2.20 0.39 1.83 401.496.67TRUCK, HIGHWAY, CONVENTIONAL, 3/4 TON PICKUP, 4X2
HP D-on
1304X2 1 130 CONV DSL
T50XX015 $26,303 2.55 0.45 3.18 431.738.84TRUCK, HIGHWAY, CONVENTIONAL, 1 TON PICKUP, 4X2
HP D-on
1304X4 1/2 130 CONV DSL
T50XX016 $24,529 2.35 0.42 3.18 431.608.53TRUCK, HIGHWAY, CONVENTIONAL, 1/2 TON PICKUP, 4X4
HP D-on
1304X4 3/4 130 CONV DSL
T50XX017 $24,768 2.40 0.43 3.18 451.638.55TRUCK, HIGHWAY, CONVENTIONAL, 3/4 TON PICKUP, 4X4
HP D-on
130CONV DSL 4X4 1 130
T50XX018 $29,612 2.88 0.51 3.18 491.959.50TRUCK, HIGHWAY, CONVENTIONAL, 1 TON PICKUP, 4X4
HP D-on
1304X2 3/4 130 CREW DSL
T50XX019 $23,693 2.29 0.41 3.18 471.568.32TRUCK, HIGHWAY, CREW, 3/4 TON PICKUP, 4X2
HP D-on
1304X4 3/4 130 CREW DSL
T50XX020 $28,645 2.78 0.49 3.18 551.889.31TRUCK, HIGHWAY, CREW, 3/4 TON PICKUP 4X4
HP D-on
1304X2 1 130 CREW DSL
T50XX021 $25,999 2.52 0.45 3.18 481.718.78TRUCK, HIGHWAY, CREW, 1 TON PICKUP, 4X2
HP D-on
EP 1110-1-8, Vol. 330 Nov 09
2-238
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
0.02 OVER 10,000 THRU 30,000 GVW (Chassis only - Add options)SUBCATEGORY
NO SPECIFIC MANUFACTURER
2104X2 20KGVW GAS
T50XX023 $40,837 3.13 0.69 19.82 702.2628.68TRUCK, HIGHWAY, 20,000 LBS GVW, 2 AXLE, 4X2 (CHASSIS ONLY-ADD OPTIONS)
HP G
2104X2 25KGVW GAS
T50XX024 $35,544 2.71 0.60 19.82 721.9627.85TRUCK, HIGHWAY, 25,000 LBS GVW, 2 AXLE, 4X2 (CHASSIS ONLY-ADD OPTIONS)
HP G
1804X2 25KGVW DSL
T50XX022 $51,822 4.01 0.87 10.68 882.8820.12TRUCK, HIGHWAY, 25,000 LBS GVW, 2 AXLE, 4X2 (CHASSIS ONLY-ADD OPTIONS)
HP D-on
1704X4 30KGVW DSL
T50XX025 $68,236 5.25 1.15 10.09 973.7822.24TRUCK, HIGHWAY, 30,000 LBS GVW, 2 AXLE, 4X4 (CHASSIS ONLY-ADD OPTIONS)
HP D-on
2104X2 30KGVW DSL
T50XX026 $69,376 5.34 1.17 12.46 1053.8424.98TRUCK, HIGHWAY, 30,000 LBS GVW, 2 AXLE, 4X2 (CHASSIS ONLY-ADD OPTIONS)
HP D-on
2104X2 30KGVW DSL
T50XX035 $96,284 7.49 1.62 12.46 1355.3729.25TRUCK, HIGHWAY, 30,000 LBS GVW, 2 AXLE, 4X2, WITH 3-ARM ARTICULATING CRANE, 3.5 TON, 32' BOOM, WITH 8' X 20' FLATBED
HP D-on
0.03 OVER 30,000 GVW (Chassis only - Add options)SUBCATEGORY
NO SPECIFIC MANUFACTURER
2654X2 35KGVW DSL
T50XX027 $110,111 7.17 1.83 22.20 1265.4239.66TRUCK, HIGHWAY, 35,000 LBS GVW, 2 AXLE, 4X2 (CHASSIS ONLY-ADD OPTIONS)
HP D-on
EP 1110-1-8, Vol. 330 Nov 09
2-239
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
T50 NO SPECIFIC MANUFACTURER (continued)2654X2 35KGVW
DSLT50XX032 $119,519 7.79 1.98 22.20 1605.8840.92DUMP TRUCK, HIGHWAY, 35,000 LBS
GVW, 2 AXLE, 4X2 WITH REAR 10 - 13 CY DUMP BODY
HP D-on
2306X4 45KGVW DSL
T50XX028 $110,346 7.09 1.83 19.26 1355.3836.62TRUCK, HIGHWAY, 45,000 LBS GVW, 3 AXLE, 6X4 (CHASSIS ONLY-ADD OPTIONS)
HP D-on
3106X4 55KGVW DSL
T50XX029 $101,762 6.52 1.69 25.97 1444.9542.86TRUCK, HIGHWAY, 50,000 LBS GVW, 3 AXLE, 6X4 (CHASSIS ONLY-ADD OPTIONS)
HP D-on
3506X6 70KGVW DSL
T50XX030 $129,609 8.38 2.15 29.32 1806.3450.31TRUCK, HIGHWAY, 70,000 LBS GVW, 3 AXLE, 6X6 (CHASSIS ONLY-ADD OPTIONS)
HP D-on
4006X4 75KGVW DSL
T50XX031 $119,374 7.72 1.98 33.50 1975.8453.49TRUCK, HIGHWAY, 75,000 LBS GVW, 3 AXLE, 6X4 (CHASSIS ONLY-ADD OPTIONS)
HP D-on
4006X4 75KGVW DSL
T50XX033 $130,121 8.44 2.16 33.50 2406.3854.94DUMP TRUCK, HIGHWAY, 75,000 LBS GVW, 3 AXLE, 6X4 WITH REAR 16 - 20 CY DUMP BODY
HP D-on
TRUCKS, OFF-HIGHWAYT550.10 RIGID FRAMESUBCATEGORY
CATERPILLAR INC. ( MACHINE DIVISION)
487769DT55CA007 $660,913 26.99 10.24 25.17 66823.74103.51TRUCK, OFF-HIGHWAY, RIGID FRAME, 31.7 CY, 41.6 TON, 4X4, REAR DUMP
HP D-off
650773DT55CA002 $888,686 35.88 13.77 33.59 87231.71133.89TRUCK, OFF-HIGHWAY, RIGID FRAME, 46.9 CY, 57.7 TON, 4X4, REAR DUMP
HP D-off
938777DT55CA003 $1,228,251 48.67 19.04 48.48 1,41943.38190.93TRUCK, OFF-HIGHWAY, RIGID FRAME, 78.6 CY, 100 TON, 4X4, REAR DUMP
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-240
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
Komatsu America International Company
488HD325-6T55KM009 $662,756 27.07 10.27 25.22 70723.81103.74TRUCK, OFF-HIGHWAY, RIGID FRAME, 31.4 CY, 44 TON, 4X4, REAR DUMP
HP D-off
1,042HD785-5T55KM012 $973,337 37.84 15.08 53.85 1,54234.00171.48TRUCK, OFF-HIGHWAY, RIGID FRAME, 78.7 CY, 100 TON, 4X4, REAR DUMP
HP D-off
1,486HD1500-5T55KM013 $2,250,475 90.06 34.88 76.80 5,50079.91332.94TRUCK, OFF-HIGHWAY, RIGID FRAME, 102 CY, 165 TON, 4X4, REAR DUMP
HP D-off
2,000730ET55KM014 $2,658,975 101.46 41.21 103.36 7,15091.94426.60TRUCK, OFF-HIGHWAY, RIGID FRAME, 145 CY, 205 TON, 4X4, REAR DUMP
HP D-off
0.20 ARTICULATED FRAMESUBCATEGORY
CATERPILLAR INC. ( MACHINE DIVISION)
260D25DT55CA008 $416,247 25.86 6.63 18.97 42919.5684.43TRUCK, OFF-HIGHWAY, ARTICULATED FRAME, 18 CY, 25 TON, 4X4, REAR DUMP
HP D-off
285D30DT55CA009 $493,157 30.36 7.86 20.79 47323.0499.50TRUCK, OFF-HIGHWAY, ARTICULATED FRAME, 22 CY, 30 TON, 4X4, REAR DUMP
HP D-off
214D250D SERIES IIT55CA010 $414,820 26.42 6.61 15.61 42419.8277.66TRUCK, OFF-HIGHWAY, ARTICULATED FRAME, 18 CY, 25 TON, 6X6, REAR DUMP
HP D-off
260D300E SERIES IIT55CA011 $490,387 31.07 7.81 18.97 48823.3593.13TRUCK, OFF-HIGHWAY, ARTICULATED FRAME, 22 CY, 30 TON, 6X6, REAR DUMP
HP D-off
355D350E SERIES IIT55CA012 $603,940 37.45 9.62 25.90 66628.35121.37TRUCK, OFF-HIGHWAY, ARTICULATED FRAME, 25 CY, 35 TON, 6X6, REAR DUMP
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-241
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
T55 CATERPILLAR INC. ( MACHINE DIVISION) (continued)
405D400E SERIES IIT55CA013 $665,039 40.92 10.59 29.55 69831.05136.43TRUCK, OFF-HIGHWAY, ARTICULATED FRAME, 28 CY, 40 TON, 6X6, REAR DUMP
HP D-off
DEERE & COMPANY
265250DT55JD001 $324,700 20.24 5.17 19.33 35515.2970.53TRUCK, OFF-HIGHWAY, ARTICULATED FRAME, 18 CY, 25 TON, 6X6, REAR DUMP
HP D-off
285300DT55JD002 $374,086 23.47 5.96 20.79 40117.7078.95TRUCK, OFF-HIGHWAY, ARTICULATED FRAME, 22 CY, 29 TON, 6X6, REAR DUMP
HP D-off
380350DT55JD003 $484,246 29.45 7.71 27.72 57122.44107.54TRUCK, OFF-HIGHWAY, ARTICULATED FRAME, 25 CY, 35 TON, 6X6, REAR DUMP
HP D-off
413400DT55JD004 $543,505 32.90 8.66 30.13 63525.11120.42TRUCK, OFF-HIGHWAY, ARTICULATED FRAME, 29 CY, 40 TON, 6X6, REAR DUMP
HP D-off
Komatsu America International Company
389HM350-1T55KM015 $590,686 36.41 9.41 28.38 63027.62123.01TRUCK, OFF-HIGHWAY, ARTICULATED FRAME, 19.1-25.9 CY, 35.7 TON, 6 X 6 X 2, REAR DUMP
HP D-off
430HM400-1T55KM016 $674,882 41.49 10.75 31.37 66831.50139.97TRUCK, OFF-HIGHWAY, ARTICULATED FRAME, 21.6-29.2 CY, 40.3 TON, 6 X 6 X 2, REAR DUMP
HP D-off
VOLVO CONSTRUCTION EQUIPMENT GROUP
299A-25E 4X4T55VO002 $354,458 21.88 5.65 21.82 42916.5978.86TRUCK, OFF-HIGHWAY, ARTICULATED FRAME, 14-18 CY, 25 TON, 4X4, REAR DUMP
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-242
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
T55 VOLVO CONSTRUCTION EQUIPMENT GROUP (continued)
299A-25ET55VO003 $374,295 23.41 5.96 21.82 47517.6780.40TRUCK, OFF-HIGHWAY, ARTICULATED FRAME, 14-18 CY, 25 TON, 6X6, REAR DUMP
HP D-off
336A-30ET55VO005 $436,121 27.81 6.95 24.51 50820.8689.54TRUCK, OFF-HIGHWAY, ARTICULATED FRAME, 17-22 CY, 30 TON, 6X6, REAR DUMP
HP D-off
414A-35ET55VO004 $536,069 33.01 8.54 30.21 62025.05116.57TRUCK, OFF-HIGHWAY, ARTICULATED FRAME, 19-25 CY, 35 TON, 6X6, REAR DUMP
HP D-off
464A-40ET55VO006 $602,873 36.60 9.60 33.85 66627.90133.53TRUCK, OFF-HIGHWAY, ARTICULATED FRAME, 21-29 CY, 40 TON, 6X6, REAR DUMP
HP D-off
TRUCKS,OFF-HIGHWAY/PRIME MOVER TRACTORS & WAGONST560.10 PRIME MOVER TRACTORSSUBCATEGORY
CATERPILLAR INC. ( MACHINE DIVISION)
938776DT56CA006 $1,366,310 54.54 21.18 54.18 1,16448.45213.12TRUCK, OFF-HIGHWAY, RIGID FRAME, PRIME MOVER TRACTOR, 4X4
HP D-off
TRUCKS, VACUUMT570.00 TRUCKS, VACUUMSUBCATEGORY
WASTEQUIP CUSCO INDUSTRIES
76INDUSTRIAL VAC 130
T57CU001 $100,917 8.03 1.70 7.16 765.7225.65TRAILER, VACUUM, 5,500 GAL, 750 CFM, REAR DOOR & HYDRAULIC DUMP SYSTEM
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-243
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
T57 WASTEQUIP CUSCO INDUSTRIES (continued)
76SS INDUST. VAC 130
T57CU002 $139,740 11.13 2.35 7.16 767.9232.35TRAILER, VACUUM, 5,500 GAL, 750 CFM, STAINLESS STEEL, REAR DOOR & HYDRAULIC DUMP SYSTEM
HP D-off
1152127T57CU003 $148,302 11.82 2.50 10.84 1158.4137.89TRUCK, VACUUM, 3,500 GAL, 2,100 CFM, REAR DOOR & HYDRAULIC DUMP SYSTEM
HP D-off
1773827T57CU004 $159,116 12.68 2.68 16.68 1779.0246.18TRUCK, VACUUM, 3,500 GAL, 3,170 CFM, REAR DOOR & HYDRAULIC DUMP SYSTEM
HP D-off
3355327T57CU005 $180,246 14.37 3.04 31.57 33510.2366.26TRUCK, VACUUM, 3,500 GAL, 4,550 CFM, REAR DOOR & HYDRAULIC DUMP SYSTEM
HP D-off
TRUCKS, WATER, OFF-HIGHWAYT600.00 TRUCKS, WATER, OFF-HIGHWAYSUBCATEGORY
KLEIN PRODUCTS, INC.
175KT-50 T60KI001 $269,334 17.34 4.47 16.49 32013.1457.65TRUCK, WATER, OFF-HIGHWAY, 5,000 GAL, W/CAT 613C TRACTOR
HP D-off
330KT-60 T60KI002 $418,178 26.10 6.94 31.10 58019.9999.50TRUCK, WATER, OFF-HIGHWAY, 6,000 GAL, W/CAT 621E TRACTOR
HP D-off
450KT-80 T60KI003 $675,467 43.22 11.21 42.41 75132.82147.69TRUCK, WATER, OFF-HIGHWAY, 8,000 GAL, W/CAT 631E TRACTOR
HP D-off
450KT-100 T60KI004 $145,726 7.91 2.42 42.41 8116.3874.76TRUCK, WATER, OFF-HIGHWAY, 10,000 GAL, W/CAT 631E TRACTOR
HP D-off
550KT-120 T60KI006 $823,557 50.49 13.67 51.83 1,09738.92189.15TRUCK, WATER, OFF-HIGHWAY, 12,000 GAL, W/CAT 651E TRACTOR
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-244
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
SOUTHWEST CONSTRUCTION EQUIPMENT CO.
330STT-60 T60SO001 $484,353 30.52 8.04 31.10 61023.30108.62TRUCK, WATER, OFF-HIGHWAY, 6,000 GAL, W/CAT 621E TRACTOR
HP D-off
450STT-80 T60SO002 $674,000 41.36 11.18 42.41 81231.86154.64TRUCK, WATER, OFF-HIGHWAY, 8,000 GAL, W/CAT 631E TRACTOR
HP D-off
450STT-100 T60SO003 $684,442 42.06 11.36 42.41 89732.39156.09TRUCK, WATER, OFF-HIGHWAY, 10,000 GAL, W/CAT 631E TRACTOR
HP D-off
550STT-120 T60SO004 $850,712 54.13 14.12 51.83 1,14941.19185.47TRUCK, WATER, OFF-HIGHWAY, 12,000 GAL, W/CAT 651E TRACTOR
HP D-off
550STT-140 T60SO005 $865,013 55.08 14.35 51.83 1,18441.89187.42TRUCK, WATER, OFF-HIGHWAY, 14,000 GAL, W/CAT 651E TRACTOR
HP D-off
TUNNEL/MINING EQUIPMENTT650.10 DRIFTING & TUNNELING DRILLSSUBCATEGORY
ATLAS COPCO WAGNER
158L2CT65WG012 $1,556,867 94.11 24.64 14.10 52071.70241.46156 HP D-offTUNNELING DRILL, 2 BOOM, 560-1,120 SF CROSS SECTION, RUBBER TIRED (ADD DRILL BITS AND DRILL STEEL COST)
HP E
158WL2CT65WG013 $2,341,313 141.74 37.06 14.10 728107.93352.66156 HP D-offTUNNELING DRILL, 4 BOOM, 700-1,600 SF CROSS SECTION, RUBBER TIRED (ADD DRILL BITS AND DRILL STEEL COST)
HP E
380WL4CT65WG014 $2,554,719 154.70 40.44 31.15 1,058117.79407.30224 HP D-offTUNNELING DRILL, 4 BOOM, 700-1,650 SF CROSS SECTION, RUBBER TIRED (ADD DRILL BITS AND DRILL STEEL COST)
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-245
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
WATER & CO2 BLASTERSW250.10 LOW PRESSURE, (< 5,000 PSI)SUBCATEGORY
SIOUX STEAM CLEANER CORPORATION
1S1.7 D250W25SD006 $5,628 1.13 0.11 0.08 40.686.82WATER BLASTER, LOW PRESSURE, STEAM CLEANER, 100 GPH, 250 PSI, 1.7 GPM
HP E
1S2 D250W25SD007 $5,997 1.20 0.12 0.08 50.727.99WATER BLASTER, LOW PRESSURE, STEAM CLEANER, 120 GPH, 250 PS, 2.0 GPM
HP E
1S2.7 D250W25SD008 $6,523 1.30 0.13 0.08 60.789.24WATER BLASTER, LOW PRESSURE, STEAM CLEANER, 160 GPH, 250 PSI, 2.7 GPM
HP E
5C-4-E 2000W25SD001 $5,282 1.06 0.10 0.42 40.633.11WATER BLASTER, LOW PRESSURE, COLD WATER, 2,000 PSI, 4 GPM
HP E
12C-4-G 2800W25SD005 $6,183 1.24 0.12 3.04 40.746.28WATER BLASTER, LOW PRESSURE, COLD WATER, 2,800 PSI, 4 GPM
HP G
18C-5-G 3400W25SD003 $8,194 1.64 0.16 4.57 50.988.90WATER BLASTER, LOW PRESSURE, COLD WATER, 3,400 PSI, 5 GPM
HP G
8H3.5*3000W25SD004 $12,004 2.35 0.23 2.03 61.417.91WATER BLASTER, LOW PRESSURE, HOT WATER, 3,000 PSI, 3.5 GPM, TRAILER MTD
HP G
11SF11W25SD009 $14,460 2.89 0.28 0.93 91.7314.21WATER BLASTER, LOW PRESSURE, STEAM GENERATOR, 15 PSI, 355 LB/HR STEAM, 55 GAL BOILER
HP E
3EN-140-H4-1800W25SD002 $13,641 2.73 0.26 0.25 71.636.88WATER BLASTER, LOW PRESSURE, HOT WATER, 1,800 PSI, 2.3 GPM
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-246
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
NO SPECIFIC MANUFACTURER
5COLD 3/1000GW25XX005 $1,971 0.39 0.04 1.27 40.242.32WATER BLASTER, LOW PRESSURE, COLD WATER, 700 PSI, 3 GPM
HP G
5COLD 4/1000GW25XX006 $2,758 0.55 0.05 1.27 40.332.70WATER BLASTER, LOW PRESSURE, COLD WATER, 1,200 PSI, 3 GPM
HP G
8COLD 4/2000GW25XX007 $3,701 0.74 0.07 2.03 20.443.98WATER BLASTER, LOW PRESSURE, COLD WATER, 2,000 PSI, 4 GPM
HP G
11COLD 4/3000GW25XX008 $3,846 0.77 0.07 2.79 60.464.87WATER BLASTER, LOW PRESSURE, COLD WATER, 3,000 PSI, 4 GPM
HP G
8HOT 4/1000GW25XX009 $7,735 1.55 0.15 2.03 60.935.92WATER BLASTER, LOW PRESSURE, HOT WATER/STEAM, 1,000 PSI, 4 GPM
HP G
24HOT 6/3000GW25XX010 $11,845 2.37 0.23 6.09 101.4212.31WATER BLASTER, LOW PRESSURE, HOT WATER/STEAM, 3,000 PSI, 6 GPM
HP G
0.20 HIGH PRESSURE, (>= 5,000 PSI)SUBCATEGORY
NLB CORPORATION
2006200EW25NL001 $72,443 14.49 1.39 16.91 1188.6459.55WATER BLASTER, HIGH PRESSURE, 6,000 PSI, 50 GPM, SKID MTD, W/MODEL 10200 PUMP
HP E
150 201536DW25NL003 $78,278 15.66 1.50 20.52 789.3362.03WATER BLASTER, HIGH PRESSURE, 20,000 PSI, 13.2 GPM, SKID MTD, W/50 LF HOSE & CLEANING LANCE
HP D-off
33520253DW25NL002 $122,112 24.42 2.34 45.83 14014.55111.98WATER BLASTER, HIGH PRESSURE, 20,000 PSI, 22 GPM, SKID MTD (ADD TRUCK, FLATBED TRAILER & WATER TANKER)
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-247
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
W25 NLB CORPORATION (continued)70020600DW25NL005 $299,914 59.98 5.76 95.76 20035.75256.53WATER BLASTER, HIGH PRESSURE,
20,000 PSI, 53 GPM, SKID MTD (ADD TRUCK, FLATBED TRAILER & WATER TANKER)
HP D-off
344400W25NL004 $160,732 31.67 3.09 4.65 8018.9385.54WATER BLASTER, HIGH PRESSURE, HYDRODEMOLITION UNIT, CONCRETE BUSTER, SELF PROPELLED (ADD MODEL 20600D WATER BLASTER)
HP D-off
0.30 STEAM CLEANERSSUBCATEGORY
ALKOTA CLEANING SYSTEMS, INC.
1122W25AO002 $4,224 0.84 0.08 0.08 40.502.88WATER BLASTER, STEAM CLEANER, 400 PSI, 1.7 GPM
HP E
1181W25AO003 $6,148 1.23 0.12 0.08 60.743.81WATER BLASTER, STEAM CLEANER, 250 PSI, 3.0 GPM
HP E
2240W25AO004 $6,049 1.21 0.12 0.17 70.734.14WATER BLASTER, STEAM CLEANER, 350 PSI, 4.0 GPM
HP E
4301W25AO005 $12,242 2.45 0.23 0.34 141.467.83WATER BLASTER, STEAM CLEANER, 400 PSI, 5.0 GPM
HP E
1246W25AO006 $9,467 1.89 0.18 0.08 71.135.40WATER BLASTER, STEAM GENERATOR, 100 PSI, 1.0 GPM
HP E
0.40 CO2 BLASTERSSUBCATEGORY
COLD JET
20P750BW25CJ001 $74,539 9.94 1.33 1.25 346.3024.87CARBON DIOXIDE (CO2) BLASTER/PELLETIZER, 600 LBS/HR, SINGLE HOSE DELIVERY (ADD 65-100 CFM COMPRESSOR)
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-248
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
W25 COLD JET (continued)24P1500BW25CJ002 $115,737 15.43 2.07 1.50 379.7937.97CARBON DIOXIDE (CO2)
BLASTER/PELLETIZER, 1,200 LBS/HR, SINGLE HOSE DELIVERY (ADD 65-150 CFM COMPRESSOR)
HP E
24P3000BW25CJ003 $182,931 24.39 3.27 1.50 6615.4758.74CARBON DIOXIDE (CO2) BLASTER/PELLETIZER, 1,200 LBS/HR, DUAL HOSE DELIVERY (ADD 65-200 CFM COMPRESSOR)
HP E
0.50 WET ABRASIVE BLASTING SYSTEM (TORBO)SUBCATEGORY
KEIZER TECHNOLOGIES AMERICAS, INC
350TORBO M120W25KZ001 $21,007 1.37 0.39 0.00 41.082.56WATER BLASTER, WET ABRASIVE BLASTER, 4.2 CF TANK CAP, 170 PSI, (INCLUDES HOSES & NOZZLE, ADD 350 CFM AIR COMPRESSOR)
CFM A
350TORBO M120W25KZ002 $23,257 1.51 0.43 0.00 41.192.82WATER BLASTER, WET ABRASIVE BLASTER, 4.2 CF TANK CAP, 170 PSI, W/MIX RUST INHIBITOR INJECTOR (INCLUDES HOSES & NOZZLE, ADD 350 CFM AIR COMPRESSOR)
CFM A
350LOC RESTORATION UNIT
W25KZ003 $23,777 1.55 0.44 0.00 41.222.89WATER BLASTER, WET ABRASIVE BLASTER, 4.2 CF TANK CAP, 170 PSI, W/LOC RESTORATION UNIT (INCLUDES HOSES & NOZZLE, ADD 350 CFM AIR COMPRESSOR)
CFM A
385TORBO M320W25KZ004 $33,820 2.20 0.63 0.00 81.734.11WATER BLASTER, WET ABRASIVE BLASTER, 13.0 CF TANK CAP, 170 PSI, (INCLUDES HOSES & NOZZLE, ADD 385 CFM AIR COMPRESSOR)
CFM A
EP 1110-1-8, Vol. 330 Nov 09
2-249
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
W25 KEIZER TECHNOLOGIES AMERICAS, INC (continued)
385TORBO XL320W25KZ005 $39,937 2.60 0.74 0.00 82.044.85WATER BLASTER, WET ABRASIVE BLASTER, 13.0 CF TANK CAP, 170 PSI, (INCLUDES HOSES & NOZZLE, ADD 385 CFM AIR COMPRESSOR)
CFM A
385TORBO XL320W25KZ006 $40,702 2.65 0.75 0.00 92.084.94WATER BLASTER, WET ABRASIVE BLASTER, 19.0 CF TANK CAP, 170 PSI, (INCLUDES HOSES & NOZZLE, ADD 385 CFM AIR COMPRESSOR)
CFM A
385TORBO XL320W25KZ007 $43,414 2.82 0.80 0.00 92.215.27WATER BLASTER, WET ABRASIVE BLASTER, 19.0 CF TANK CAP, 170 PSI, W/MIX RUST INHIBATOR INJECTOR,(INCLUDES HOSES & NOZZLE, ADD 385 CFM AIR COMPRESSOR)
CFM A
WATER TANKSW300.10 PORTABLE WITH WHEELSSUBCATEGORY
SOUTHWEST CONSTRUCTION EQUIPMENT CO.
8EWT-8CW30SO001 $53,963 3.48 0.90 1.39 1302.648.76WATER TANK, PORTABLE, TRAILER MTD, SELF ELEVATING, 8,000 GAL, 10" PIPE
HP G
8EWT-10CW30SO002 $64,364 4.18 1.07 1.39 1703.1610.12WATER TANK, PORTABLE, TRAILER MTD, SELF ELEVATING, 10,000 GAL, 10" PIPE
HP G
8EWT-12CW30SO003 $70,043 4.56 1.16 1.39 1853.4410.85WATER TANK, PORTABLE, TRAILER MTD, SELF ELEVATING, 12,000 GAL, 10" PIPE
HP G
EP 1110-1-8, Vol. 330 Nov 09
2-250
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8(Vol. 3)
7/31/2009
CAT
0.20 SKID MOUNTEDSUBCATEGORY
SOUTHWEST CONSTRUCTION EQUIPMENT CO.
WST-8 W30SO004 $34,487 2.30 0.57 0.00 1071.724.22WATER TANK, PORTABLE, SKID MTD, 8,000 GAL, 10" PIPE
WST-10 W30SO005 $38,507 2.57 0.64 0.00 1221.934.72WATER TANK, PORTABLE, SKID MTD, 10,000 GAL, 10" PIPE
WST-12 W30SO006 $44,418 2.96 0.74 0.00 1422.225.44WATER TANK, PORTABLE, SKID MTD, 12,000 GAL, 10" PIPE
WELDERSW350.10 ENGINE DRIVENSUBCATEGORY
NO SPECIFIC MANUFACTURER
11GAS 150 ACW35XX020 $2,451 0.23 0.04 2.34 20.163.03WELDER, ENGINE DRIVEN, GAS, AC, 150 AMP, 4.5 KW, PORTABLE, SKID MTD
HP G
17GAS 225 AC/DC-CC
W35XX021 $6,474 0.59 0.12 3.61 60.425.23WELDER, ENGINE DRIVEN, GAS, AC/DC-CC, 225 AMP, 5-8 KW, TRAILER MTD
HP G
18GAS 250 AC/DC-CC/CV
W35XX022 $6,672 0.61 0.12 3.82 60.435.49WELDER, ENGINE DRIVEN, GAS, AC/DC-CC/CV, 250 AMP, 9 KW, TRAILER MTD
HP G
45GAS 300 DC-CCW35XX023 $11,526 1.06 0.20 9.56 140.7312.70WELDER, ENGINE DRIVEN, GAS, DC-CC, 300 AMP, 3 KW, TRAILER MTD
HP G
48DIESEL 400 DC-CC/CV
W35XX024 $17,021 1.58 0.30 5.54 211.099.43WELDER, ENGINE DRIVEN, DIESEL, DC-CC/CV, 400 AMP, 2-10 KW, TRAILER MTD
HP D-off
42DIESEL 500 DC-CC/CV
W35XX025 $16,328 1.51 0.29 4.85 181.058.54WELDER, ENGINE DRIVEN, DIESEL, DC-CC/CV, 500 AMP, 4 KW, TRAILER MTD
HP D-off
EP 1110-1-8, Vol. 330 Nov 09
2-251
TOTAL HOURLY RATES ($/HR)
VALUE (TEV)
2006 ($)MODEL EQUIPMENT DESCRIPTION MAIN
ENGINE HORSEPOWER AND FUEL TYPE
AVERAGE STANDBY DEPR FCCM FUEL CWTID.NO. CARRIER
ADJUSTABLE ELEMENTS
Table 2-1. HOURLY EQUIPMENT OWNERSHIP AND OPERATING EXPENSE3REGION
EP 1110-1-8
7/31/2009
CAT
(Vol. 3)
0.20 ELECTRIC DRIVENSUBCATEGORY
LINCOLN ELECTRIC COMPANY
5SP-180TW35LC018 $886 0.12 0.02 0.13 10.080.39WELDER, ELECTRIC DRIVEN, 30-180 AMP, WIRE FEEDER
HP E
15LINCWELD 225/125
W35LC010 $625 0.08 0.01 0.40 10.050.69WELDER, ELECTRIC DRIVEN, 225 AMP, STICK
HP E
27IDEAL ARC R3R-300
W35LC011 $3,124 0.42 0.06 0.72 40.271.71WELDER, ELECTRIC DRIVEN, 300 AMP, STICK
HP E
35IDEAL ARC R3R-400
W35LC012 $4,004 0.53 0.07 0.93 50.342.19WELDER, ELECTRIC DRIVEN, 400 AMP, STICK
HP E
41IDEAL ARC R3R-500
W35LC013 $4,292 0.57 0.08 1.09 50.372.48WELDER, ELECTRIC DRIVEN, 500 AMP, STICK
HP E
26PROCUT 80W35LC020 $3,934 0.52 0.07 0.69 10.331.84WELDER, ELECTRIC DRIVEN, 85 AMP, PLASMA CUTTING TORCH
HP E
EP 1110-1-8, Vol. 330 Nov 09
2-252
2-253
Table 2-2. Hourly Rate Elements
This Table Contains All Hourly Rate Elements as
Described in Chapter 2
For
Average and Severe Operating Conditions.
Refer to Chapter 2, Section II. Operating Condition
EP 1110-1-8, Vol. 330 Nov 09
2-253
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
A10A10AR001 0.41 0.06 0.00 0.00 0.00 0.00 0.29 0.76A10AR002 1.99 0.27 0.00 0.20 0.00 0.00 1.42 3.88A10RS003 10.83 1.91 15.71 1.37 0.47 0.06 9.70 40.05A10RS004 10.90 1.92 15.71 1.37 0.47 0.06 9.76 40.19A10RS005 10.95 1.93 15.71 1.37 0.47 0.06 9.81 40.30A10RS006 10.98 1.93 15.71 1.37 0.47 0.06 9.83 40.35A10RS007 11.11 1.95 15.71 1.37 0.47 0.06 9.95 40.62A10RS008 21.55 3.78 21.19 1.85 0.71 0.09 19.29 68.46A10SE001 1.72 0.23 0.00 0.00 0.00 0.00 1.22 3.17A10SE002 2.01 0.27 0.00 0.00 0.00 0.00 1.44 3.72
A15A15IA001 1.78 0.38 6.13 0.63 0.08 0.01 1.67 10.68A15IA002 3.87 0.82 12.04 1.23 0.08 0.01 3.64 21.69A15IA003 4.61 0.98 19.04 1.95 0.14 0.02 4.34 31.08A15IA004 4.61 0.98 19.04 1.95 0.14 0.02 4.34 31.08A15IA005 4.61 0.98 19.04 1.95 0.14 0.02 4.34 31.08A15IA006 10.20 2.17 32.83 3.35 0.29 0.04 9.60 58.48A15IA007 10.70 2.28 32.83 3.35 0.29 0.04 10.07 59.56A15IA008 8.06 1.72 36.66 3.75 0.29 0.04 7.59 58.11A15IA009 8.07 1.72 33.93 3.47 0.29 0.04 7.60 55.12A15IA010 14.46 3.07 43.78 4.47 0.29 0.04 13.60 79.71A15SR002 15.29 3.25 48.15 4.92 0.43 0.06 14.38 86.48A15SR004 1.28 0.28 8.54 0.87 0.08 0.01 1.21 12.27A15SR005 1.86 0.40 8.76 0.90 0.08 0.01 1.76 13.77A15SR006 1.28 0.28 8.32 0.85 0.08 0.01 1.21 12.03A15SR007 1.29 0.28 8.43 0.86 0.08 0.01 1.21 12.16
2 192
EP 1110-1-8, Vol. 330 Nov 09
2-254
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
A15 cont.A15SR008 3.15 0.67 13.46 1.38 0.14 0.02 2.96 21.78A15SR009 3.15 0.67 13.57 1.39 0.14 0.02 2.96 21.90A15SR010 6.54 1.40 25.17 2.57 0.29 0.04 6.16 42.17A15SR011 7.72 1.65 32.83 3.35 0.29 0.04 7.26 53.14A15SR012 7.60 1.62 32.83 3.35 0.29 0.04 7.15 52.88A15SR013 13.36 2.84 49.25 5.03 0.29 0.04 12.56 83.37A15SR014 14.45 3.09 49.25 5.03 0.56 0.07 13.60 86.05A15SR015 10.76 2.31 57.46 5.87 0.56 0.07 10.14 87.17A15XX019 0.74 0.16 6.02 0.70 0.08 0.01 0.70 8.41A15XX020 1.44 0.31 3.28 0.34 0.08 0.01 1.36 6.82A15XX021 1.00 0.22 10.03 1.17 0.08 0.01 0.94 13.45A15XX022 1.48 0.32 3.83 0.39 0.08 0.01 1.39 7.50A15XX023 1.05 0.23 13.04 1.52 0.08 0.01 0.99 16.92A15XX024 1.67 0.36 5.47 0.56 0.08 0.01 1.57 9.72A15XX025 1.15 0.25 12.04 1.40 0.08 0.01 1.08 16.01A15XX026 1.87 0.40 7.66 0.78 0.08 0.01 1.76 12.56A15XX027 1.20 0.26 18.05 2.10 0.08 0.01 1.13 22.83A15XX028 1.91 0.41 8.76 0.90 0.08 0.01 1.80 13.87A15XX029 1.29 0.28 14.04 1.64 0.08 0.01 1.22 18.56A15XX030 2.54 0.54 9.30 0.95 0.08 0.01 2.39 15.81A15XX031 3.72 0.79 12.04 1.23 0.08 0.01 3.50 21.37A15XX032 3.37 0.72 12.59 1.29 0.14 0.02 3.17 21.30A15XX033 4.46 0.96 18.60 1.90 0.29 0.04 4.21 30.46A15XX034 6.23 1.33 27.36 2.80 0.29 0.04 5.87 43.92A15XX035 6.64 1.42 30.10 3.08 0.29 0.04 6.25 47.82A15XX036 7.16 1.53 30.10 3.08 0.29 0.04 6.74 48.94A15XX037 7.66 1.64 33.93 3.47 0.29 0.04 7.21 54.24
2 193
EP 1110-1-8, Vol. 330 Nov 09
2-255
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
A15 cont.A15XX038 11.68 2.48 39.40 4.03 0.29 0.04 10.99 68.91A15XX039 12.20 2.60 50.34 5.14 0.38 0.05 11.48 82.19A15XX040 13.15 2.80 54.72 5.59 0.38 0.05 12.37 89.06A15XX041 0.17 0.04 0.33 0.14 0.00 0.00 0.13 0.81A15XX042 0.23 0.05 0.47 0.19 0.00 0.00 0.18 1.12A15XX043 0.34 0.08 0.67 0.27 0.00 0.00 0.26 1.62A15XX044 0.40 0.09 1.00 0.41 0.00 0.00 0.31 2.21A15XX045 0.58 0.13 1.67 0.69 0.00 0.00 0.44 3.51A15XX046 0.71 0.16 2.00 0.82 0.00 0.00 0.54 4.23
A20A20CK001 0.24 0.03 0.00 0.00 0.00 0.00 0.39 0.66A20CK002 0.14 0.02 0.00 0.00 0.00 0.00 0.24 0.40A20CK003 0.25 0.03 0.00 0.00 0.00 0.00 0.42 0.70A20CK005 0.31 0.04 0.00 0.00 0.00 0.00 0.52 0.87A20CK006 0.17 0.02 0.00 0.00 0.00 0.00 0.28 0.47A20CK008 0.18 0.02 0.00 0.00 0.00 0.00 0.30 0.50A20CK010 0.19 0.02 0.00 0.00 0.00 0.00 0.31 0.52A20CM010 0.59 0.07 0.00 0.06 0.00 0.00 0.99 1.71A20CM011 0.76 0.09 0.00 0.06 0.00 0.00 1.27 2.18A20CM012 0.86 0.10 0.00 0.13 0.00 0.00 1.43 2.52A20CM013 2.50 0.29 0.00 0.28 0.11 0.01 4.20 7.39A20CM014 2.95 0.37 0.00 0.41 0.39 0.05 4.98 9.15A20CM015 3.50 0.42 0.00 0.50 0.26 0.03 5.88 10.59A20CM016 2.23 0.25 0.00 0.30 0.00 0.00 3.73 6.51A20CM017 0.10 0.01 0.00 0.00 0.00 0.00 0.17 0.28A20CM018 0.11 0.01 0.00 0.00 0.00 0.00 0.19 0.31A20CM019 0.14 0.01 0.00 0.00 0.00 0.00 0.25 0.40
2 194
EP 1110-1-8, Vol. 330 Nov 09
2-256
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
A20 cont.A20CM020 0.11 0.01 0.00 0.00 0.00 0.00 0.20 0.32A20WC002 0.17 0.02 0.12 0.19 0.00 0.00 0.28 0.78A20WC004 0.49 0.06 0.70 0.08 0.00 0.00 0.82 2.15A20XX001 0.36 0.02 0.00 0.00 0.00 0.00 0.57 0.95A20XX002 0.42 0.03 0.00 0.00 0.00 0.00 0.66 1.11A20XX003 0.52 0.04 0.00 0.00 0.00 0.00 0.83 1.39A20XX004 0.68 0.05 0.00 0.00 0.00 0.00 1.08 1.81A20XX005 0.97 0.07 0.00 0.00 0.00 0.00 1.53 2.57A20XX006 1.18 0.08 0.00 0.00 0.00 0.00 1.87 3.13A20XX007 1.46 0.10 0.00 0.00 0.00 0.00 2.31 3.87A20XX008 1.95 0.13 0.00 0.00 0.00 0.00 3.09 5.17A20XX021 0.19 0.02 0.00 0.00 0.00 0.00 0.31 0.52A20XX022 0.22 0.02 0.00 0.00 0.00 0.00 0.36 0.60A20XX023 0.26 0.03 0.00 0.00 0.00 0.00 0.44 0.73A20XX024 0.27 0.03 0.00 0.00 0.00 0.00 0.45 0.75A20XX025 0.38 0.04 0.00 0.00 0.00 0.00 0.63 1.05
A25A25RS006 9.11 1.03 0.00 1.16 0.00 0.00 8.19 19.49A25RS008 10.43 1.18 0.00 1.80 0.00 0.00 9.38 22.79A25XX001 7.69 0.87 0.00 0.64 0.00 0.00 6.91 16.11A25XX002 8.95 1.01 0.00 1.51 0.00 0.00 8.04 19.51A25XX003 9.79 1.11 0.00 2.09 0.00 0.00 8.80 21.79
A30A30BG003 40.40 6.68 16.33 3.17 3.80 0.49 45.59 116.46A30BG004 36.68 5.77 11.58 2.68 0.00 0.00 41.08 97.79A30BG005 42.54 6.70 16.33 3.17 0.00 0.00 47.65 116.39
2 195
EP 1110-1-8, Vol. 330 Nov 09
2-257
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
A30 cont.A30BG007 31.53 5.12 10.13 2.54 2.17 0.28 35.49 87.26A30BG009 34.10 5.56 14.37 1.47 2.56 0.33 38.40 96.79A30BK010 16.20 2.66 4.86 0.50 1.67 0.22 18.26 44.37A30BK011 28.70 4.68 11.06 1.13 2.17 0.28 32.32 80.34A30BK013 30.38 4.93 14.99 1.53 1.95 0.25 34.19 88.22A30BK015 34.83 5.67 19.02 1.94 2.56 0.33 39.22 103.57A30BK017 38.05 5.99 19.02 1.94 0.00 0.00 42.62 107.62A30BK018 39.18 6.17 19.02 1.94 0.00 0.00 43.88 110.19A30BK019 22.77 3.64 10.85 1.11 0.58 0.07 25.56 64.58A30BK020 29.42 4.68 17.88 1.83 0.70 0.09 33.01 87.61A30BK021 38.53 6.06 18.19 1.86 0.00 0.00 43.16 107.80A30BK022 28.37 4.62 14.99 1.53 1.95 0.25 31.93 83.64A30BK023 33.10 5.21 14.99 1.53 0.00 0.00 37.07 91.90A30BK024 27.55 5.93 17.34 1.77 1.41 0.18 26.36 80.54A30CA002 29.68 4.83 11.06 1.13 1.95 0.25 33.41 82.31A30CA007 9.50 2.06 10.08 1.03 0.65 0.08 9.11 32.51A30CA008 34.52 5.61 17.98 1.84 2.45 0.32 38.86 101.58A30CA009 43.84 6.90 17.88 1.83 0.00 0.00 49.10 119.55A30CA013 30.91 4.86 12.51 1.28 0.00 0.00 34.62 84.18A30CA014 31.07 5.08 15.81 1.62 2.56 0.33 35.00 91.47A30CA015 51.85 8.16 17.98 1.84 0.00 0.00 58.08 137.91A30CA016 40.17 6.32 17.88 1.83 0.00 0.00 44.99 111.19A30CH001 27.52 4.49 11.37 1.16 2.17 0.28 31.00 77.99A30CH002 30.15 4.90 15.71 1.61 1.95 0.25 33.93 88.50A30CH003 31.36 4.93 15.71 1.61 0.00 0.00 35.12 88.73A30CH004 31.74 5.16 15.71 1.61 2.07 0.27 35.73 92.29A30CH005 34.66 5.63 17.88 1.83 2.45 0.32 39.00 101.77
2 196
EP 1110-1-8, Vol. 330 Nov 09
2-258
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
A30 cont.A30CH006 41.71 6.56 20.67 2.11 0.00 0.00 46.72 117.77A30GC002 4.03 0.65 2.58 0.26 0.17 0.02 4.53 12.24A30GC004 5.91 0.93 4.24 0.43 0.00 0.00 6.62 18.13A30LD001 10.94 2.41 10.37 1.06 1.23 0.16 10.52 36.69A30MP001 10.75 2.26 7.54 0.77 0.00 0.00 10.24 31.56A30MP002 13.96 2.94 9.42 0.96 0.00 0.00 13.30 40.58A30RT001 40.63 8.56 25.92 2.65 0.08 0.01 38.70 116.55A30RT002 42.60 8.99 25.92 2.65 0.17 0.02 40.59 120.94A30XX001 9.67 2.44 9.70 0.83 0.63 0.08 6.35 29.70A30XX002 12.01 2.99 9.70 0.83 0.00 0.00 7.86 33.39
A35A35AE001 1.30 0.18 0.87 2.05 0.07 0.01 1.25 5.73A35AE002 1.35 0.19 0.87 2.75 0.07 0.01 1.30 6.54A35AE003 1.48 0.20 0.87 3.10 0.05 0.01 1.41 7.12A35AE004 1.62 0.22 0.87 4.00 0.05 0.01 1.55 8.32A35AE005 1.74 0.25 0.87 6.20 0.09 0.01 1.67 10.83
A40A40CA008 65.08 8.73 68.40 6.99 0.00 0.00 77.44 226.64A40CA009 91.56 12.29 85.50 8.74 0.00 0.00 108.96 307.05A40CW001 107.86 14.48 129.96 13.28 0.00 0.00 128.36 393.94A40RT001 42.82 5.95 31.46 3.21 1.81 0.23 51.31 136.79A40RT002 57.90 7.77 34.20 3.49 0.00 0.00 68.90 172.26A40RT003 71.36 9.58 62.93 6.43 0.00 0.00 84.91 235.21A40RT005 97.87 13.13 109.44 11.18 0.00 0.00 116.46 348.08A40RT006 108.39 14.55 109.44 11.18 0.00 0.00 128.98 372.54
2 197
EP 1110-1-8, Vol. 330 Nov 09
2-259
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
A45A45AE001 1.42 0.17 0.00 7.10 0.04 0.01 1.53 10.27A45AE002 2.81 0.33 0.00 14.25 0.04 0.01 3.02 20.46A45AE003 3.32 0.39 0.00 16.85 0.04 0.01 3.57 24.18A45RS001 7.58 0.88 7.54 1.27 0.07 0.01 8.13 25.48A45RS002 24.59 2.83 22.72 2.82 0.00 0.00 26.34 79.30A45SE003 5.95 0.69 2.83 2.29 0.11 0.01 6.39 18.27A45SE004 3.67 0.44 2.26 0.76 0.14 0.02 3.97 11.26
B10B10CC007 4.64 0.82 3.13 3.37 0.13 0.02 5.55 17.66B10CC008 12.66 2.24 28.37 6.81 0.64 0.08 15.14 65.94B10CC009 14.06 2.52 34.81 7.81 1.12 0.14 16.87 77.33B10CC010 15.20 2.72 34.81 8.06 1.12 0.14 18.22 80.27B10CC011 2.20 0.38 1.16 1.48 0.00 0.00 2.61 7.83B10CC012 2.16 0.37 3.13 1.12 0.00 0.00 2.57 9.35B10CC013 2.61 0.45 3.13 1.17 0.00 0.00 3.11 10.47B10CC014 0.68 0.12 0.29 0.62 0.00 0.00 0.81 2.52B10CL005 29.67 5.22 6.94 4.85 0.75 0.10 35.45 82.98B10CL006 30.17 5.30 6.94 4.85 0.75 0.10 36.04 84.15B10CL015 15.57 2.78 1.74 3.21 0.70 0.09 18.65 42.74B10CL021 8.31 1.49 2.02 0.83 0.41 0.05 9.96 23.07B10CL025 27.79 4.83 11.57 4.75 0.22 0.03 33.11 82.30B10CL027 2.13 0.37 0.00 0.00 0.00 0.00 2.54 5.04B10CL032 0.43 0.07 0.58 0.24 0.00 0.00 0.51 1.83B10CL034 0.85 0.15 1.16 0.48 0.00 0.00 1.01 3.65B10CL036 0.36 0.06 0.46 0.19 0.00 0.00 0.42 1.49B10CL040 0.49 0.08 1.16 0.48 0.00 0.00 0.59 2.80
2 198
EP 1110-1-8, Vol. 330 Nov 09
2-260
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
B10 cont.B10CL042 0.33 0.06 0.29 0.12 0.00 0.00 0.39 1.19B10CL045 0.42 0.07 0.58 0.24 0.00 0.00 0.50 1.81B10EM001 42.71 7.53 4.35 3.01 1.24 0.16 51.04 110.04B10EM002 2.75 0.52 0.58 1.24 0.35 0.05 3.34 8.83B10EM003 2.77 0.48 0.00 0.00 0.00 0.00 3.29 6.54B10KB001 13.64 2.93 5.50 2.26 0.45 0.06 16.29 41.13B10KB002 24.47 5.22 12.73 5.22 0.50 0.06 29.19 77.39B10RC006 18.92 3.37 2.63 5.58 0.77 0.10 22.66 54.03B10RC007 14.45 2.55 0.87 2.86 0.47 0.06 17.28 38.54B10RC008 16.04 2.83 1.74 3.21 0.47 0.06 19.18 43.53B10RC016 23.43 4.15 4.34 7.28 0.77 0.10 28.03 68.10B10RC027 14.91 2.57 2.31 2.95 0.00 0.00 17.74 40.48B10RC028 16.75 2.89 3.47 3.67 0.00 0.00 19.93 46.71B10RC029 18.93 3.27 4.63 4.40 0.00 0.00 22.52 53.75B10RC030 20.62 3.56 5.79 6.13 0.00 0.00 24.54 60.64B10RC031 21.77 3.76 6.94 6.85 0.00 0.00 25.90 65.22B10RC032 20.59 3.66 2.89 5.69 0.77 0.10 24.65 58.35B10SN031 6.99 1.32 1.45 1.94 0.85 0.11 8.48 21.14B10SN032 11.03 2.02 1.74 2.46 0.86 0.11 13.28 31.50B10SN033 13.71 2.48 1.74 2.21 0.84 0.11 16.47 37.56B10SN034 14.92 2.69 1.16 1.98 0.86 0.11 17.91 39.63B10SN035 15.70 2.82 1.74 2.36 0.86 0.11 18.85 42.44B10SN036 14.61 2.63 2.60 2.82 0.86 0.11 17.54 41.17
B15B15BM001 5.10 0.74 7.54 0.77 0.00 0.00 4.30 18.45B15EC001 21.05 3.07 8.18 0.83 0.62 0.08 17.75 51.58B15EC002 13.94 2.03 9.42 0.96 0.32 0.04 11.76 38.47
2 199
EP 1110-1-8, Vol. 330 Nov 09
2-261
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
B15 cont.B15EC003 19.97 2.88 21.68 2.22 0.10 0.01 16.82 63.68B15MB001 0.90 0.13 0.00 0.10 0.00 0.00 0.76 1.89B15MB002 1.09 0.16 0.00 0.14 0.00 0.00 0.92 2.31B15MB003 1.54 0.23 0.00 0.24 0.08 0.01 1.30 3.40B15MB004 1.78 0.26 3.13 0.27 0.08 0.01 1.50 7.03B15RS001 4.45 0.65 7.54 0.77 0.11 0.01 3.75 17.28B15RS005 5.77 0.84 7.54 0.77 0.17 0.02 4.87 19.98B15TB001 2.51 0.37 3.49 0.36 0.12 0.02 2.12 8.99B15TB002 2.53 0.37 3.49 0.36 0.12 0.02 2.13 9.02B15WD001 3.98 0.58 7.54 0.77 0.11 0.01 3.36 16.35B15WD002 4.13 0.60 7.54 0.77 0.11 0.01 3.48 16.64
B20B20BN001 1.25 0.18 4.35 0.51 0.03 0.00 1.19 7.51B20BN002 1.99 0.29 12.36 1.44 0.06 0.01 1.89 18.04B20BN003 2.52 0.37 24.37 2.84 0.07 0.01 2.39 32.57B20BN005 2.16 0.32 12.18 1.42 0.07 0.01 2.05 18.21B20BN006 2.40 0.35 20.71 2.42 0.07 0.01 2.28 28.24B20BN007 4.33 0.64 11.78 1.20 0.20 0.03 4.12 22.30B20MQ001 2.48 0.36 8.10 0.83 0.02 0.00 2.35 14.14B20MQ003 3.43 0.50 13.19 1.35 0.07 0.01 3.25 21.80B20MQ004 3.92 0.58 23.56 2.41 0.23 0.03 3.73 34.46B20MQ005 43.38 6.30 61.26 7.76 0.57 0.07 41.15 160.49
B25B25HB001 2.15 0.31 0.00 0.00 0.00 0.00 1.51 3.97 2.64 0.32 0.00 0.00 0.00 0.00 2.13 5.09B25HB003 3.45 0.50 0.00 0.00 0.00 0.00 2.43 6.38 4.24 0.51 0.00 0.00 0.00 0.00 3.42 8.17B25HB005 4.48 0.65 0.00 0.00 0.00 0.00 3.16 8.29 5.51 0.67 0.00 0.00 0.00 0.00 4.44 10.62
2 200
EP 1110-1-8, Vol. 330 Nov 09
2-262
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
B25 cont.B25HB007 5.28 0.76 0.00 0.00 0.00 0.00 3.73 9.77 6.50 0.79 0.00 0.00 0.00 0.00 5.25 12.54B25HB008 6.16 0.89 0.00 0.00 0.00 0.00 4.35 11.40 7.58 0.92 0.00 0.00 0.00 0.00 6.12 14.62B25HB009 6.79 0.98 0.00 0.00 0.00 0.00 4.79 12.56 8.35 1.01 0.00 0.00 0.00 0.00 6.74 16.10B25HB010 7.14 1.03 0.00 0.00 0.00 0.00 5.04 13.21 8.79 1.06 0.00 0.00 0.00 0.00 7.09 16.94B25HB011 7.33 1.06 0.00 0.00 0.00 0.00 5.17 13.56 9.02 1.09 0.00 0.00 0.00 0.00 7.28 17.39B25HB012 7.75 1.12 0.00 0.00 0.00 0.00 5.47 14.34 9.54 1.15 0.00 0.00 0.00 0.00 7.70 18.39B25HB013 8.01 1.15 0.00 0.00 0.00 0.00 5.65 14.81 9.86 1.19 0.00 0.00 0.00 0.00 7.95 19.00B25HB014 8.37 1.21 0.00 0.00 0.00 0.00 5.90 15.48 10.30 1.24 0.00 0.00 0.00 0.00 8.31 19.85B25HB015 8.67 1.25 0.00 0.00 0.00 0.00 6.11 16.03 10.66 1.29 0.00 0.00 0.00 0.00 8.60 20.55B25XX001 0.97 0.14 0.00 0.00 0.00 0.00 0.68 1.79 1.19 0.14 0.00 0.00 0.00 0.00 0.96 2.29B25XX002 1.44 0.21 0.00 0.00 0.00 0.00 1.01 2.66 1.77 0.21 0.00 0.00 0.00 0.00 1.42 3.40B25XX003 1.77 0.25 0.00 0.00 0.00 0.00 1.25 3.27 2.18 0.26 0.00 0.00 0.00 0.00 1.76 4.20B25XX004 1.94 0.28 0.00 0.00 0.00 0.00 1.37 3.59 2.38 0.29 0.00 0.00 0.00 0.00 1.92 4.59B25XX005 2.26 0.33 0.00 0.00 0.00 0.00 1.59 4.18 2.78 0.34 0.00 0.00 0.00 0.00 2.24 5.36B25XX006 2.54 0.37 0.00 0.00 0.00 0.00 1.79 4.70 3.12 0.38 0.00 0.00 0.00 0.00 2.52 6.02B25XX007 2.71 0.39 0.00 0.00 0.00 0.00 1.91 5.01 3.34 0.40 0.00 0.00 0.00 0.00 2.69 6.43B25XX008 3.17 0.46 0.00 0.00 0.00 0.00 2.24 5.87 3.90 0.47 0.00 0.00 0.00 0.00 3.15 7.52B25XX009 3.33 0.48 0.00 0.00 0.00 0.00 2.35 6.16 4.09 0.49 0.00 0.00 0.00 0.00 3.30 7.88B25XX010 3.54 0.51 0.00 0.00 0.00 0.00 2.50 6.55 4.36 0.53 0.00 0.00 0.00 0.00 3.52 8.41B25XX011 3.71 0.53 0.00 0.00 0.00 0.00 2.62 6.86 4.57 0.55 0.00 0.00 0.00 0.00 3.68 8.80B25XX012 4.15 0.60 0.00 0.00 0.00 0.00 2.92 7.67 5.10 0.62 0.00 0.00 0.00 0.00 4.12 9.84B25XX013 5.58 0.80 0.00 0.00 0.00 0.00 3.94 10.32 6.87 0.83 0.00 0.00 0.00 0.00 5.54 13.24B25XX014 5.96 0.86 0.00 0.00 0.00 0.00 4.20 11.02 7.33 0.89 0.00 0.00 0.00 0.00 5.91 14.13B25XX015 7.20 1.04 0.00 0.00 0.00 0.00 5.08 13.32 8.87 1.07 0.00 0.00 0.00 0.00 7.15 17.09B25XX016 7.26 1.05 0.00 0.00 0.00 0.00 5.12 13.43 8.94 1.08 0.00 0.00 0.00 0.00 7.21 17.23B25XX017 7.84 1.13 0.00 0.00 0.00 0.00 5.53 14.50 9.65 1.17 0.00 0.00 0.00 0.00 7.79 18.61B25XX018 7.44 1.07 0.00 0.00 0.00 0.00 5.25 13.76 9.16 1.11 0.00 0.00 0.00 0.00 7.39 17.66
2 201
EP 1110-1-8, Vol. 330 Nov 09
2-263
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
B25 cont.B25XX019 8.33 1.20 0.00 0.00 0.00 0.00 5.87 15.40 10.25 1.24 0.00 0.00 0.00 0.00 8.27 19.76
B30B30CR001 0.58 0.08 0.00 0.00 0.00 0.00 0.44 1.10B30CR002 0.62 0.08 0.00 0.00 0.00 0.00 0.48 1.18B30CR003 0.67 0.09 0.00 0.00 0.00 0.00 0.51 1.27B30CR004 0.69 0.09 0.00 0.00 0.00 0.00 0.53 1.31B30CR005 0.82 0.11 0.00 0.00 0.00 0.00 0.62 1.55B30CR006 0.96 0.13 0.00 0.00 0.00 0.00 0.73 1.82B30CR009 0.86 0.11 0.00 0.00 0.00 0.00 0.66 1.63B30CR010 1.00 0.13 0.00 0.00 0.00 0.00 0.77 1.90B30CR011 1.19 0.16 0.00 0.00 0.00 0.00 0.91 2.26B30CR012 1.37 0.18 0.00 0.00 0.00 0.00 1.05 2.60B30GB001 0.49 0.06 0.00 0.00 0.00 0.00 0.33 0.88B30GB002 0.64 0.08 0.00 0.00 0.00 0.00 0.43 1.15B30GB003 0.78 0.10 0.00 0.00 0.00 0.00 0.52 1.40B30GB004 1.13 0.15 0.00 0.00 0.00 0.00 0.76 2.04B30GB005 1.35 0.18 0.00 0.00 0.00 0.00 0.91 2.44B30GB006 2.50 0.33 0.00 0.00 0.00 0.00 1.79 4.62B30GB007 2.71 0.36 0.00 0.00 0.00 0.00 1.94 5.01B30GB008 3.00 0.40 0.00 0.00 0.00 0.00 2.15 5.55B30GB009 3.42 0.45 0.00 0.00 0.00 0.00 2.45 6.32B30GB010 4.23 0.56 0.00 0.00 0.00 0.00 3.03 7.82B30GB011 1.98 0.26 0.00 0.00 0.00 0.00 1.51 3.75B30GB012 2.05 0.27 0.00 0.00 0.00 0.00 1.57 3.89B30GB013 2.13 0.28 0.00 0.00 0.00 0.00 1.63 4.04B30GB014 2.79 0.37 0.00 0.00 0.00 0.00 2.13 5.29B30GB015 2.89 0.38 0.00 0.00 0.00 0.00 2.21 5.48
2 202
EP 1110-1-8, Vol. 330 Nov 09
2-264
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
B30 cont.B30GB016 4.16 0.55 0.00 0.00 0.00 0.00 3.18 7.89B30GB017 5.00 0.66 0.00 0.00 0.00 0.00 3.82 9.48B30GB018 0.39 0.05 0.00 0.00 0.00 0.00 0.26 0.70
B35B35HE001 0.88 0.13 0.00 0.00 0.00 0.00 0.62 1.63 1.09 0.13 0.00 0.00 0.00 0.00 0.88 2.10B35HE002 1.03 0.15 0.00 0.00 0.00 0.00 0.73 1.91 1.27 0.15 0.00 0.00 0.00 0.00 1.03 2.45B35HE003 1.47 0.21 0.00 0.00 0.00 0.00 1.03 2.71 1.80 0.22 0.00 0.00 0.00 0.00 1.45 3.47B35HE004 1.77 0.25 0.00 0.00 0.00 0.00 1.25 3.27 2.18 0.26 0.00 0.00 0.00 0.00 1.76 4.20B35HE005 2.03 0.29 0.00 0.00 0.00 0.00 1.43 3.75 2.49 0.30 0.00 0.00 0.00 0.00 2.01 4.80B35HE006 2.53 0.36 0.00 0.00 0.00 0.00 1.78 4.67 3.11 0.38 0.00 0.00 0.00 0.00 2.51 6.00B35HE007 2.75 0.40 0.00 0.00 0.00 0.00 1.94 5.09 3.38 0.41 0.00 0.00 0.00 0.00 2.73 6.52B35HE008 3.61 0.52 0.00 0.00 0.00 0.00 2.54 6.67 4.44 0.54 0.00 0.00 0.00 0.00 3.58 8.56B35HE009 3.78 0.55 0.00 0.00 0.00 0.00 2.67 7.00 4.66 0.56 0.00 0.00 0.00 0.00 3.76 8.98B35HE010 4.37 0.63 0.00 0.00 0.00 0.00 3.09 8.09 5.38 0.65 0.00 0.00 0.00 0.00 4.34 10.37B35HE011 4.74 0.68 0.00 0.00 0.00 0.00 3.34 8.76 5.83 0.70 0.00 0.00 0.00 0.00 4.70 11.23B35HE012 5.18 0.75 0.00 0.00 0.00 0.00 3.65 9.58 6.37 0.77 0.00 0.00 0.00 0.00 5.14 12.28B35HE013 5.74 0.83 0.00 0.00 0.00 0.00 4.05 10.62 7.06 0.85 0.00 0.00 0.00 0.00 5.70 13.61B35HE014 6.57 0.95 0.00 0.00 0.00 0.00 4.63 12.15 8.08 0.98 0.00 0.00 0.00 0.00 6.52 15.58B35HE015 7.14 1.03 0.00 0.00 0.00 0.00 5.04 13.21 8.79 1.06 0.00 0.00 0.00 0.00 7.09 16.94B35HE016 8.53 1.23 0.00 0.00 0.00 0.00 6.02 15.78 10.49 1.27 0.00 0.00 0.00 0.00 8.46 20.22B35HE017 9.81 1.41 0.00 0.00 0.00 0.00 6.92 18.14 12.07 1.46 0.00 0.00 0.00 0.00 9.74 23.27B35HE018 0.85 0.14 0.00 0.00 0.00 0.00 0.60 1.59 1.09 0.14 0.00 0.00 0.00 0.00 0.88 2.11B35HE019 0.97 0.16 0.00 0.00 0.00 0.00 0.69 1.82 1.25 0.16 0.00 0.00 0.00 0.00 1.01 2.42B35HE020 1.39 0.22 0.00 0.00 0.00 0.00 0.98 2.59 1.78 0.23 0.00 0.00 0.00 0.00 1.44 3.45B35HE021 1.75 0.28 0.00 0.00 0.00 0.00 1.23 3.26 2.25 0.29 0.00 0.00 0.00 0.00 1.81 4.35B35HE022 2.02 0.32 0.00 0.00 0.00 0.00 1.42 3.76 2.59 0.33 0.00 0.00 0.00 0.00 2.09 5.01B35HE023 2.41 0.39 0.00 0.00 0.00 0.00 1.70 4.50 3.10 0.40 0.00 0.00 0.00 0.00 2.50 6.00
2 203
EP 1110-1-8, Vol. 330 Nov 09
2-265
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
B35 cont.B35HE024 2.66 0.42 0.00 0.00 0.00 0.00 1.88 4.96 3.42 0.44 0.00 0.00 0.00 0.00 2.76 6.62B35HE025 3.44 0.55 0.00 0.00 0.00 0.00 2.43 6.42 4.43 0.57 0.00 0.00 0.00 0.00 3.57 8.57B35HE026 3.52 0.56 0.00 0.00 0.00 0.00 2.48 6.56 4.52 0.58 0.00 0.00 0.00 0.00 3.65 8.75B35HE027 4.26 0.68 0.00 0.00 0.00 0.00 3.01 7.95 5.48 0.70 0.00 0.00 0.00 0.00 4.42 10.60B35HE028 4.41 0.70 0.00 0.00 0.00 0.00 3.11 8.22 5.66 0.73 0.00 0.00 0.00 0.00 4.57 10.96B35HE029 5.08 0.81 0.00 0.00 0.00 0.00 3.58 9.47 6.53 0.84 0.00 0.00 0.00 0.00 5.27 12.64B35HE030 5.60 0.89 0.00 0.00 0.00 0.00 3.95 10.44 7.20 0.92 0.00 0.00 0.00 0.00 5.81 13.93B35HE031 6.81 1.09 0.00 0.00 0.00 0.00 4.81 12.71 8.76 1.13 0.00 0.00 0.00 0.00 7.06 16.95B35HE032 7.26 1.16 0.00 0.00 0.00 0.00 5.12 13.54 9.33 1.20 0.00 0.00 0.00 0.00 7.53 18.06B35HE033 9.25 1.48 0.00 0.00 0.00 0.00 6.52 17.25 11.89 1.53 0.00 0.00 0.00 0.00 9.59 23.01B35HE034 10.30 1.65 0.00 0.00 0.00 0.00 7.27 19.22 13.25 1.70 0.00 0.00 0.00 0.00 10.69 25.64B35HE035 2.85 0.50 0.00 0.00 0.00 0.00 2.01 5.36 3.56 0.51 0.00 0.00 0.00 0.00 2.87 6.94B35HE036 2.97 0.52 0.00 0.00 0.00 0.00 2.10 5.59 3.71 0.54 0.00 0.00 0.00 0.00 3.00 7.25B35HE037 3.34 0.59 0.00 0.00 0.00 0.00 2.36 6.29 4.18 0.60 0.00 0.00 0.00 0.00 3.37 8.15B35HE038 4.54 0.80 0.00 0.00 0.00 0.00 3.20 8.54 5.67 0.82 0.00 0.00 0.00 0.00 4.58 11.07B35HE039 5.08 0.89 0.00 0.00 0.00 0.00 3.58 9.55 6.35 0.91 0.00 0.00 0.00 0.00 5.12 12.38B35HE040 5.24 0.92 0.00 0.00 0.00 0.00 3.70 9.86 6.55 0.94 0.00 0.00 0.00 0.00 5.28 12.77B35HE041 5.61 0.98 0.00 0.00 0.00 0.00 3.96 10.55 7.02 1.01 0.00 0.00 0.00 0.00 5.66 13.69B35HE042 7.22 1.27 0.00 0.00 0.00 0.00 5.10 13.59 9.03 1.30 0.00 0.00 0.00 0.00 7.28 17.61B35HE043 7.43 1.30 0.00 0.00 0.00 0.00 5.24 13.97 9.29 1.34 0.00 0.00 0.00 0.00 7.49 18.12B35HE044 9.66 1.69 0.00 0.00 0.00 0.00 6.81 18.16 12.07 1.74 0.00 0.00 0.00 0.00 9.74 23.55B35HE045 10.00 1.75 0.00 0.00 0.00 0.00 7.06 18.81 12.50 1.80 0.00 0.00 0.00 0.00 10.08 24.38B35HE046 11.89 2.08 0.00 0.00 0.00 0.00 8.39 22.36 14.87 2.14 0.00 0.00 0.00 0.00 11.99 29.00B35HE047 12.66 2.22 0.00 0.00 0.00 0.00 8.93 23.81 15.82 2.28 0.00 0.00 0.00 0.00 12.77 30.87B35SA001 2.22 0.32 0.00 0.00 0.00 0.00 1.56 4.10 2.73 0.33 0.00 0.00 0.00 0.00 2.20 5.26B35SA003 3.32 0.48 0.00 0.00 0.00 0.00 2.35 6.15 4.09 0.49 0.00 0.00 0.00 0.00 3.30 7.88B35SA004 4.56 0.66 0.00 0.00 0.00 0.00 3.22 8.44 5.61 0.68 0.00 0.00 0.00 0.00 4.53 10.82
2 204
EP 1110-1-8, Vol. 330 Nov 09
2-266
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
B35 cont.B35SA005 5.71 0.82 0.00 0.00 0.00 0.00 4.03 10.56 7.03 0.85 0.00 0.00 0.00 0.00 5.67 13.55B35SA006 6.73 0.97 0.00 0.00 0.00 0.00 4.75 12.45 8.29 1.00 0.00 0.00 0.00 0.00 6.68 15.97B35SA007 7.57 1.09 0.00 0.00 0.00 0.00 5.34 14.00 9.32 1.13 0.00 0.00 0.00 0.00 7.52 17.97B35SA008 8.93 1.29 0.00 0.00 0.00 0.00 6.30 16.52 11.00 1.33 0.00 0.00 0.00 0.00 8.87 21.20B35SA009 11.34 1.63 0.00 0.00 0.00 0.00 8.00 20.97 13.95 1.69 0.00 0.00 0.00 0.00 11.26 26.90B35SA010 13.84 1.99 0.00 0.00 0.00 0.00 9.77 25.60 17.03 2.06 0.00 0.00 0.00 0.00 13.74 32.83B35XX001 3.50 0.50 0.00 0.00 0.00 0.00 2.47 6.47 4.30 0.52 0.00 0.00 0.00 0.00 3.47 8.29B35XX002 3.93 0.57 0.00 0.00 0.00 0.00 2.77 7.27 4.84 0.58 0.00 0.00 0.00 0.00 3.90 9.32B35XX003 4.35 0.63 0.00 0.00 0.00 0.00 3.07 8.05 5.35 0.65 0.00 0.00 0.00 0.00 4.32 10.32B35XX004 4.96 0.71 0.00 0.00 0.00 0.00 3.50 9.17 6.10 0.74 0.00 0.00 0.00 0.00 4.92 11.76B35XX005 5.57 0.80 0.00 0.00 0.00 0.00 3.93 10.30 6.85 0.83 0.00 0.00 0.00 0.00 5.53 13.21B35XX006 6.85 0.99 0.00 0.00 0.00 0.00 4.83 12.67 8.43 1.02 0.00 0.00 0.00 0.00 6.80 16.25B35XX007 3.51 0.56 0.00 0.00 0.00 0.00 2.48 6.55 4.52 0.58 0.00 0.00 0.00 0.00 3.64 8.74B35XX008 4.02 0.64 0.00 0.00 0.00 0.00 2.83 7.49 5.16 0.66 0.00 0.00 0.00 0.00 4.17 9.99B35XX009 4.33 0.69 0.00 0.00 0.00 0.00 3.05 8.07 5.56 0.71 0.00 0.00 0.00 0.00 4.49 10.76B35XX010 5.15 0.82 0.00 0.00 0.00 0.00 3.63 9.60 6.62 0.85 0.00 0.00 0.00 0.00 5.34 12.81B35XX011 5.69 0.91 0.00 0.00 0.00 0.00 4.01 10.61 7.32 0.94 0.00 0.00 0.00 0.00 5.90 14.16B35XX012 7.21 1.15 0.00 0.00 0.00 0.00 5.09 13.45 9.27 1.19 0.00 0.00 0.00 0.00 7.48 17.94B35XX013 0.80 0.14 0.00 0.00 0.00 0.00 0.56 1.50 1.00 0.14 0.00 0.00 0.00 0.00 0.80 1.94B35XX014 0.90 0.16 0.00 0.00 0.00 0.00 0.63 1.69 1.12 0.16 0.00 0.00 0.00 0.00 0.90 2.18B35XX015 1.33 0.23 0.00 0.00 0.00 0.00 0.94 2.50 1.67 0.24 0.00 0.00 0.00 0.00 1.34 3.25B35XX016 1.52 0.27 0.00 0.00 0.00 0.00 1.07 2.86 1.90 0.27 0.00 0.00 0.00 0.00 1.53 3.70B35XX017 1.66 0.29 0.00 0.00 0.00 0.00 1.17 3.12 2.08 0.30 0.00 0.00 0.00 0.00 1.68 4.06B35XX018 3.55 0.62 0.00 0.00 0.00 0.00 2.51 6.68 4.44 0.64 0.00 0.00 0.00 0.00 3.58 8.66B35XX019 3.79 0.66 0.00 0.00 0.00 0.00 2.67 7.12 4.74 0.68 0.00 0.00 0.00 0.00 3.82 9.24B35XX020 4.28 0.75 0.00 0.00 0.00 0.00 3.02 8.05 5.35 0.77 0.00 0.00 0.00 0.00 4.31 10.43B35XX021 4.66 0.82 0.00 0.00 0.00 0.00 3.29 8.77 5.82 0.84 0.00 0.00 0.00 0.00 4.69 11.35
2 205
EP 1110-1-8, Vol. 330 Nov 09
2-267
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
B35 cont.B35XX022 5.88 1.03 0.00 0.00 0.00 0.00 4.15 11.06 7.35 1.06 0.00 0.00 0.00 0.00 5.93 14.34B35XX023 6.30 1.10 0.00 0.00 0.00 0.00 4.44 11.84 7.87 1.13 0.00 0.00 0.00 0.00 6.35 15.35
C05C05OL001 0.16 0.01 0.55 0.06 0.00 0.00 0.41 1.19C05OL002 0.25 0.01 1.12 0.13 0.00 0.00 0.65 2.16C05OL003 0.30 0.02 1.24 0.14 0.00 0.00 0.79 2.49C05OL004 0.33 0.02 1.36 0.16 0.00 0.00 0.86 2.73
C10C10BO001 1.11 0.08 0.72 0.06 0.00 0.00 1.33 3.30C10BO003 0.60 0.05 0.96 0.08 0.00 0.00 0.72 2.41C10BO004 0.67 0.05 1.43 0.12 0.00 0.00 0.80 3.07C10BO007 2.74 0.21 0.52 0.05 0.00 0.00 3.28 6.80C10BO008 3.73 0.28 1.18 0.10 0.00 0.00 4.47 9.76C10BO009 1.40 0.12 0.96 0.08 0.00 0.00 1.87 4.43C10BO011 3.74 0.33 1.05 0.09 0.00 0.00 5.01 10.22C10BO013 9.89 0.88 2.48 0.22 0.00 0.00 13.23 26.70C10BO015 3.22 0.28 0.65 0.06 0.00 0.00 4.30 8.51C10BO016 4.70 0.42 1.18 0.10 0.00 0.00 6.28 12.68C10RX001 6.51 0.58 1.05 0.09 0.00 0.00 8.70 16.93C10RX002 8.99 0.80 1.83 0.16 0.00 0.00 12.02 23.80C10RX003 15.03 1.33 4.31 0.38 0.00 0.00 20.11 41.16C10WC003 0.92 0.07 0.52 0.05 0.00 0.00 1.10 2.66C10WC006 1.12 0.08 1.31 0.11 0.00 0.00 1.34 3.96C10WC007 1.71 0.13 2.15 0.19 0.00 0.00 2.05 6.23C10WC008 3.09 0.23 1.18 0.10 0.00 0.00 3.70 8.30C10WC010 2.09 0.18 2.63 0.23 0.00 0.00 2.79 7.92
2 206
EP 1110-1-8, Vol. 330 Nov 09
2-268
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
C10 cont.C10WC015 6.18 0.47 1.83 0.16 0.00 0.00 7.40 16.04C10WC016 6.84 0.61 2.61 0.23 0.00 0.00 9.15 19.44C10WC017 2.76 0.24 1.18 0.10 0.00 0.00 3.69 7.97C10WC019 6.48 0.57 2.61 0.23 0.00 0.00 8.67 18.56
C15C15BL001 2.03 0.19 0.12 0.55 0.00 0.00 2.16 5.05C15BL003 9.73 0.93 0.62 1.78 0.00 0.00 10.37 23.43C15BL004 11.39 1.09 0.93 2.17 0.00 0.00 12.14 27.72C15BL005 16.69 1.60 1.87 2.85 0.00 0.00 17.80 40.81C15BL006 0.35 0.06 47.88 4.89 0.00 0.00 0.37 53.55C15ED001 1.48 0.14 2.04 0.24 0.00 0.00 1.57 5.47C15ED002 0.92 0.09 1.67 0.19 0.00 0.00 0.98 3.85C15XX001 13.35 2.33 26.64 2.72 0.38 0.05 14.27 59.74
C20C20WC002 2.14 0.22 2.42 0.28 0.18 0.02 1.81 7.07C20XX001 1.51 0.16 1.49 0.17 0.13 0.02 1.27 4.75
C25C25AJ001 0.75 0.09 1.12 0.13 0.00 0.00 0.71 2.80C25AJ003 1.06 0.12 1.12 0.13 0.00 0.00 1.01 3.44C25AJ004 1.52 0.17 1.49 0.17 0.00 0.00 1.44 4.79C25AJ005 1.78 0.20 2.04 0.24 0.00 0.00 1.69 5.95C25AJ006 2.12 0.24 2.04 0.24 0.00 0.00 2.00 6.64C25AJ007 2.25 0.26 2.04 0.24 0.00 0.00 2.13 6.92C25AJ008 1.40 0.29 0.96 0.15 0.00 0.00 1.14 3.94C25AJ009 1.49 0.31 0.96 0.15 0.00 0.00 1.21 4.12
2 207
EP 1110-1-8, Vol. 330 Nov 09
2-269
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
C25 cont.C25AJ010 1.59 0.33 0.96 0.15 0.00 0.00 1.29 4.32C25AJ011 1.70 0.36 0.96 0.15 0.00 0.00 1.38 4.55C25AJ012 1.80 0.38 0.96 0.15 0.00 0.00 1.47 4.76C25AJ013 1.91 0.40 0.96 0.15 0.00 0.00 1.55 4.97C25AJ015 2.00 0.23 3.72 0.43 0.00 0.00 1.89 8.27C25AJ016 2.10 0.24 3.72 0.43 0.00 0.00 1.99 8.48C25AJ018 2.43 0.28 4.65 0.54 0.00 0.00 2.30 10.20C25AJ019 3.53 0.41 5.20 0.61 0.00 0.00 3.34 13.09C25ST001 0.41 0.05 1.49 0.17 0.00 0.00 0.39 2.51C25ST002 0.43 0.05 1.67 0.19 0.00 0.00 0.40 2.74C25SV001 26.86 5.66 6.13 0.84 0.41 0.05 21.89 61.84C25SV002 25.29 5.32 6.13 0.84 0.31 0.04 20.60 58.53C25SV003 12.63 2.67 2.83 0.39 0.28 0.04 10.31 29.15C25WC002 0.51 0.06 1.49 0.17 0.00 0.00 0.49 2.72
C35C35AF001 2.88 0.49 0.00 0.30 0.03 0.00 3.29 6.99C35AF002 1.56 0.27 0.00 2.00 0.03 0.00 1.78 5.64C35AF004 4.59 0.78 3.28 2.34 0.05 0.01 5.23 16.28C35AF005 6.82 1.16 5.91 2.60 0.12 0.02 7.78 24.41C35AL002 4.52 0.79 3.28 1.34 0.20 0.03 5.19 15.35C35AL003 1.51 0.28 0.33 0.33 0.20 0.03 1.76 4.44C35AL008 2.73 0.46 0.00 0.30 0.00 0.00 3.10 6.59C35AL013 1.33 0.24 0.00 0.40 0.10 0.01 1.54 3.62C35AL014 7.11 1.20 6.68 1.18 0.05 0.01 8.10 24.33C35AV006 10.16 1.72 1.34 2.55 0.11 0.01 11.57 27.46C35AV008 3.05 0.51 0.47 2.19 0.00 0.00 3.47 9.69C35AV009 3.71 0.62 1.07 2.44 0.00 0.00 4.22 12.06
2 208
EP 1110-1-8, Vol. 330 Nov 09
2-270
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
C35 cont.C35AV010 6.69 1.13 1.74 2.71 0.00 0.00 7.61 19.88C35AV011 5.14 0.87 0.80 2.33 0.00 0.00 5.85 14.99C35AV012 15.34 2.58 1.34 3.05 0.00 0.00 17.45 39.76
C40C40CC001 4.23 0.49 0.62 0.28 0.00 0.00 4.01 9.63C40MU001 0.48 0.06 1.49 0.17 0.03 0.00 0.47 2.70C40MU002 1.02 0.12 2.42 0.28 0.03 0.00 0.97 4.84C40MU003 0.49 0.06 1.49 0.17 0.03 0.00 0.47 2.71C40MU004 0.56 0.07 1.49 0.17 0.03 0.00 0.54 2.86C40ST001 0.32 0.04 0.03 0.21 0.03 0.00 0.31 0.94C40ST002 0.35 0.04 1.02 0.12 0.03 0.00 0.34 1.90C40ST003 0.42 0.05 0.12 0.30 0.03 0.00 0.40 1.32C40ST005 0.56 0.07 0.09 0.34 0.03 0.00 0.53 1.62C40XX001 0.56 0.06 0.12 0.25 0.00 0.00 0.53 1.52C40XX002 0.60 0.07 1.30 0.15 0.00 0.00 0.57 2.69C40XX003 0.86 0.10 0.19 0.29 0.00 0.00 0.81 2.25C40XX004 0.86 0.10 1.49 0.17 0.00 0.00 0.82 3.44C40XX005 1.13 0.13 0.31 0.39 0.00 0.00 1.07 3.03C40XX006 1.57 0.18 0.31 0.39 0.00 0.00 1.49 3.94C40XX007 1.46 0.17 1.67 0.19 0.00 0.00 1.39 4.88
C45C45GO010 20.67 2.77 10.07 1.03 0.00 0.00 24.60 59.14C45GO011 31.84 4.27 20.25 2.07 0.00 0.00 37.89 96.32C45GO012 42.65 5.72 18.50 1.89 0.00 0.00 50.75 119.51C45GO013 17.16 2.30 10.07 1.03 0.00 0.00 20.42 50.98C45GO014 23.65 3.17 10.73 1.10 0.00 0.00 28.14 66.79
2 209
EP 1110-1-8, Vol. 330 Nov 09
2-271
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
C45 cont.C45GO016 46.65 6.26 25.17 2.57 0.00 0.00 55.51 136.16C45GO018 58.17 7.81 36.66 3.75 0.00 0.00 69.22 175.61C45GO020 69.51 9.33 49.25 5.03 0.00 0.00 82.72 215.84C45GO026 7.41 0.99 7.22 0.84 0.00 0.00 8.81 25.27C45GO027 9.41 1.26 5.47 0.56 0.00 0.00 11.20 27.90C45GO028 14.98 2.01 5.47 0.56 0.00 0.00 17.82 40.84C45GO029 9.96 1.34 7.22 0.84 0.00 0.00 11.85 31.21C45GO031 56.51 7.58 42.13 4.30 0.00 0.00 67.24 177.76C45MJ001 1.01 0.13 3.01 0.35 0.00 0.00 1.20 5.70C45MW002 6.15 0.83 2.85 0.29 0.09 0.01 7.33 17.55C45MW003 7.81 1.06 2.85 0.29 0.12 0.02 9.31 21.46
C55C55M3001 2.63 0.38 8.55 1.00 0.05 0.01 2.77 15.39C55M3002 5.98 0.86 6.20 0.63 0.00 0.00 6.29 19.96C55M3003 7.03 1.01 10.96 1.12 0.00 0.00 7.40 27.52C55OE001 29.99 4.32 0.00 0.00 0.00 0.00 31.58 65.89C55OE002 38.50 5.55 0.00 0.00 0.00 0.00 40.56 84.61C55OE003 58.64 8.45 0.00 0.00 0.00 0.00 61.77 128.86C55OE006 5.58 0.81 7.65 0.78 0.10 0.01 5.89 20.82C55OE009 10.54 1.54 13.13 1.34 0.19 0.02 11.11 37.87C55OE011 9.74 1.42 18.71 1.91 0.19 0.02 10.27 42.26C55OE012 12.41 1.81 18.71 1.91 0.19 0.02 13.08 48.13C55SC001 8.06 1.17 8.27 0.84 0.05 0.01 8.50 26.90C55SC002 19.73 2.86 18.29 1.87 0.20 0.03 20.79 63.77C55SC005 41.28 6.01 24.92 2.55 0.76 0.10 43.53 119.15C55SC006 49.35 7.18 24.92 2.55 0.76 0.10 52.03 136.89
2 210
EP 1110-1-8, Vol. 330 Nov 09
2-272
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
C60C60CQ001 1.93 0.22 8.36 0.97 0.00 0.00 2.04 13.52C60CQ002 0.44 0.05 2.15 0.25 0.00 0.00 0.46 3.35C60CQ003 0.47 0.05 3.11 0.36 0.00 0.00 0.50 4.49C60CQ010 2.00 0.23 8.36 0.97 0.00 0.00 2.11 13.67C60CQ011 3.34 0.38 8.63 1.20 0.00 0.00 3.51 17.06C60CQ012 3.34 0.38 8.63 1.20 0.00 0.00 3.52 17.07C60CQ013 3.37 0.38 8.63 1.20 0.00 0.00 3.55 17.13C60CQ014 2.08 0.23 2.40 0.98 0.00 0.00 2.19 7.88C60CQ016 4.26 0.48 10.98 1.52 0.00 0.00 4.49 21.73C60FE002 0.23 0.03 0.48 0.06 0.00 0.00 0.24 1.04C60FE006 0.47 0.05 2.15 0.25 0.00 0.00 0.50 3.42C60FE007 0.49 0.06 3.11 0.36 0.00 0.00 0.52 4.54C60FE009 1.57 0.18 4.78 0.56 0.00 0.00 1.66 8.75C60LY001 4.03 0.46 2.39 0.28 0.00 0.00 4.25 11.41C60LY002 5.96 0.67 8.36 0.97 0.00 0.00 6.28 22.24C60LY005 0.46 0.05 3.11 0.36 0.00 0.00 0.49 4.47C60LY011 11.52 1.30 4.18 0.58 0.00 0.00 12.13 29.71
C65C65ST007 0.20 0.02 0.06 0.02 0.00 0.00 0.57 0.87C65ST008 0.21 0.02 0.12 0.05 0.00 0.00 0.59 0.99C65ST009 0.25 0.02 0.17 0.07 0.00 0.00 0.70 1.21C65ST013 0.47 0.04 0.96 0.11 0.00 0.00 1.30 2.88C65WC003 0.35 0.03 0.12 0.19 0.00 0.00 0.97 1.66C65WC004 0.22 0.02 0.17 0.21 0.00 0.00 0.62 1.24C65WC005 0.43 0.03 0.87 0.10 0.00 0.00 1.19 2.62
2 211
EP 1110-1-8, Vol. 330 Nov 09
2-273
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
C75C75BD004 5.13 1.36 8.43 0.98 0.34 0.04 4.39 20.67C75BD005 6.43 1.70 13.84 1.61 0.44 0.06 5.51 29.59C75BD006 9.36 2.48 22.07 2.57 0.74 0.10 8.02 45.34C75BD007 3.72 0.98 7.62 0.89 0.17 0.02 3.18 16.58C75BD008 4.96 1.30 8.43 0.98 0.17 0.02 4.24 20.10C75BD009 6.65 1.76 13.84 1.61 0.44 0.06 5.69 30.05C75BD010 11.09 2.94 9.30 1.02 0.74 0.10 9.49 34.68C75BD011 14.73 3.90 14.23 1.56 1.59 0.21 12.61 48.83C75GV014 30.42 8.39 26.27 2.87 14.25 1.84 26.20 110.24C75GV016 71.69 19.10 32.83 3.59 12.65 1.63 61.43 202.92C75GV019 30.40 8.38 26.27 2.87 14.25 1.84 26.19 110.20C75GV020 49.86 13.40 27.36 2.99 12.65 1.63 42.78 150.67C75GV021 7.44 1.97 12.44 1.45 0.47 0.06 6.37 30.20C75GV022 9.16 2.43 12.04 1.32 0.77 0.10 7.84 33.66C75GV023 17.13 4.76 16.63 1.82 9.17 1.18 14.78 65.47C75GV024 26.78 7.28 18.93 2.07 9.17 1.18 23.02 88.43C75GV025 49.36 13.32 27.36 2.99 13.50 1.74 42.38 150.65C75GV028 17.19 4.57 16.63 1.82 2.55 0.33 14.73 57.82C75PB002 28.88 7.67 20.25 2.22 2.47 0.32 24.74 86.55C75TD003 23.26 6.18 19.70 2.16 3.54 0.46 19.92 75.22C75TD007 43.46 11.73 27.03 2.96 6.96 0.90 37.31 130.35C75TD008 40.19 10.87 27.03 2.96 12.42 1.60 34.52 129.59C75TE001 22.02 5.81 14.23 1.56 1.90 0.25 18.85 64.62C75TE002 30.23 7.99 16.63 1.82 3.11 0.40 25.87 86.05
C80C80GV006 37.56 11.18 37.70 3.58 1.28 0.17 28.09 119.56 42.93 11.27 49.86 4.73 4.98 0.64 34.38 148.79
2 212
EP 1110-1-8, Vol. 330 Nov 09
2-274
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
C80 cont.C80GV013 89.24 32.82 26.87 2.55 8.87 1.14 85.89 247.38 99.16 32.98 34.25 3.25 35.98 4.64 100.69 310.95C80GV014 89.49 32.91 26.87 2.55 8.87 1.14 86.13 247.96 99.43 33.08 34.25 3.25 35.98 4.64 100.97 311.60C80GV015 89.94 33.08 26.87 2.55 8.87 1.14 86.56 249.01 99.94 33.24 34.25 3.25 35.98 4.64 101.48 312.78C80GV016 126.68 46.53 24.71 2.35 10.46 1.35 121.90 333.98 140.76 46.76 31.56 2.99 41.83 5.40 142.90 412.20C80GV020 41.66 13.85 37.70 3.58 1.76 0.23 35.63 134.41 46.87 13.96 49.86 4.73 6.88 0.89 42.56 165.75C80GV025 24.47 7.29 28.27 2.68 1.03 0.13 18.31 82.18 27.97 7.35 37.39 3.55 4.03 0.52 22.40 103.21C80GV026 36.91 11.02 32.80 3.11 1.88 0.24 27.62 113.58 42.19 11.11 43.37 4.12 7.36 0.95 33.80 142.90C80GV029 37.55 11.23 37.70 3.58 2.25 0.29 28.11 120.71 42.92 11.32 49.86 4.73 8.90 1.15 34.40 153.28C80GV030 37.62 11.25 37.70 3.58 2.25 0.29 28.15 120.84 42.99 11.34 49.86 4.73 8.90 1.15 34.46 153.43C80GV031 37.90 12.63 37.70 3.58 2.25 0.29 32.42 126.77 42.64 12.73 49.86 4.73 8.90 1.15 38.74 158.75C80GV032 50.35 16.83 39.77 3.78 6.83 0.88 43.10 161.54 56.65 16.97 52.60 4.99 26.77 3.45 51.49 212.92C80LI009 30.08 8.98 32.98 3.13 1.64 0.21 22.50 99.52 34.37 9.06 43.62 4.14 6.59 0.85 27.54 126.17C80LI010 26.70 8.00 29.69 2.82 1.95 0.25 19.99 89.40 30.51 8.07 39.26 3.73 7.70 0.99 24.46 114.72C80LI011 30.76 9.22 34.40 3.27 2.25 0.29 23.03 103.22 35.16 9.30 45.49 4.32 8.91 1.15 28.19 132.52C80TD001 34.91 11.74 17.49 1.66 3.94 0.51 29.90 100.15 39.27 11.83 22.39 2.12 15.93 2.05 35.73 129.32C80TD002 43.70 14.64 21.43 2.03 3.83 0.49 37.41 123.53 49.16 14.76 27.54 2.62 14.99 1.93 44.69 155.69C80TD005 47.18 17.48 59.01 5.60 4.84 0.62 45.46 180.19 52.42 17.57 76.96 7.31 19.21 2.48 53.29 229.24C80TE002 19.52 5.85 23.56 2.24 1.42 0.18 14.61 67.38 22.30 5.90 31.16 2.96 5.68 0.73 17.88 86.61C80TE003 25.91 7.78 34.87 3.31 2.15 0.28 19.40 93.70 29.61 7.85 46.12 4.38 8.53 1.10 23.75 121.34C80TE008 17.07 4.56 12.25 1.61 3.42 0.44 10.97 50.32 19.92 4.62 16.20 2.13 13.39 1.73 13.88 71.87C80XX001 8.65 2.31 23.09 3.03 0.99 0.13 5.56 43.76 10.10 2.34 30.54 4.01 3.95 0.51 7.03 58.48C80XX002 11.38 3.06 28.27 3.71 1.56 0.20 7.31 55.49 13.27 3.10 37.39 4.91 6.27 0.81 9.25 75.00
C85C85KC003 44.83 16.35 15.31 1.23 0.00 0.00 40.67 118.39 56.04 16.56 20.14 1.61 0.00 0.00 53.87 148.22C85KC004 28.29 10.32 10.28 0.82 0.00 0.00 25.66 75.37 35.37 10.45 13.53 1.08 0.00 0.00 33.99 94.42C85KC005 32.67 11.91 12.30 0.99 0.00 0.00 29.63 87.50 40.84 12.07 16.19 1.30 0.00 0.00 39.25 109.65C85KC006 76.25 30.44 16.12 1.41 0.00 0.00 77.33 201.55 93.20 30.74 21.20 1.85 0.00 0.00 99.45 246.44
2 213
EP 1110-1-8, Vol. 330 Nov 09
2-275
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
C85 cont.C85KC007 27.38 9.96 10.28 0.75 0.00 0.00 23.27 71.64 32.86 10.07 13.53 0.99 0.00 0.00 29.82 87.27C85KC008 54.12 21.60 18.25 1.59 0.00 0.00 54.89 150.45 66.15 21.82 24.02 2.10 0.00 0.00 70.59 184.68C85LB013 36.12 13.17 15.19 1.22 0.00 0.00 32.76 98.46 45.14 13.34 19.99 1.60 0.00 0.00 43.39 123.46C85LB014 41.16 15.01 16.40 1.31 0.00 0.00 37.33 111.21 51.45 15.21 21.58 1.73 0.00 0.00 49.45 139.42C85LB015 57.03 20.80 16.40 1.31 0.00 0.00 51.73 147.27 71.28 21.07 21.58 1.73 0.00 0.00 68.52 184.18C85LB016 65.43 26.11 16.40 1.43 0.00 0.00 66.35 175.72 79.97 26.37 21.58 1.89 0.00 0.00 85.33 215.14C85LB017 73.88 29.49 25.41 2.22 0.00 0.00 74.92 205.92 90.30 29.78 33.44 2.92 0.00 0.00 96.35 252.79C85LB019 41.31 13.44 20.79 2.57 0.00 0.00 39.81 117.92 50.84 13.63 27.18 3.37 0.00 0.00 54.78 149.80C85LB021 59.64 21.68 22.45 1.80 0.00 0.00 64.26 169.83 71.56 21.92 29.35 2.35 0.00 0.00 85.25 210.43C85LB022 68.91 25.06 18.73 1.50 0.00 0.00 74.25 188.45 82.69 25.33 24.50 1.96 0.00 0.00 98.50 232.98C85LB023 73.08 29.39 34.78 3.04 0.00 0.00 87.06 227.35 91.35 29.71 45.48 3.97 0.00 0.00 119.10 289.61C85LI001 29.56 10.78 11.96 0.96 0.00 0.00 26.82 80.08 36.95 10.92 15.73 1.26 0.00 0.00 35.52 100.38C85MA001 47.23 17.17 27.66 2.22 0.00 0.00 50.89 145.17 56.67 17.36 36.18 2.90 0.00 0.00 67.51 180.62C85MA002 57.94 21.07 26.87 2.15 0.00 0.00 62.43 170.46 69.53 21.30 35.14 2.82 0.00 0.00 82.83 211.62C85MA003 77.64 31.22 29.64 2.59 0.00 0.00 92.49 233.58 97.05 31.57 38.76 3.39 0.00 0.00 126.53 297.30C85MA004 44.67 16.29 20.22 1.62 0.00 0.00 40.52 123.32 55.84 16.50 26.60 2.13 0.00 0.00 53.67 154.74C85MA005 41.88 15.27 19.35 1.55 0.00 0.00 37.99 116.04 52.35 15.47 25.46 2.04 0.00 0.00 50.32 145.64C85MA006 52.93 21.13 19.64 1.72 0.00 0.00 53.68 149.10 64.69 21.34 25.84 2.26 0.00 0.00 69.03 183.16C85MA007 74.64 29.79 21.66 1.89 0.00 0.00 75.70 203.68 91.23 30.09 28.50 2.49 0.00 0.00 97.35 249.66C85MA008 44.35 16.17 19.35 1.55 0.00 0.00 40.23 121.65 55.44 16.39 25.46 2.04 0.00 0.00 53.29 152.62C85MA009 68.18 27.42 26.87 2.35 0.00 0.00 81.22 206.04 85.22 27.72 35.14 3.07 0.00 0.00 111.11 262.26C85MA010 67.50 26.94 19.64 1.72 0.00 0.00 68.46 184.26 82.50 27.21 25.84 2.26 0.00 0.00 88.04 225.85C85TE001 33.51 10.90 11.86 1.47 0.00 0.00 32.30 90.04 41.24 11.05 15.50 1.92 0.00 0.00 44.44 114.15C85TE002 46.63 15.17 19.76 2.45 0.00 0.00 44.93 128.94 57.38 15.38 25.84 3.20 0.00 0.00 61.83 163.63C85TE003 52.27 19.01 26.48 2.12 0.00 0.00 56.32 156.20 62.72 19.22 34.63 2.78 0.00 0.00 74.72 194.07C85TE008 29.95 10.92 10.63 0.85 0.00 0.00 27.17 79.52 37.44 11.07 13.98 1.12 0.00 0.00 35.98 99.59C85TE009 36.93 13.47 13.28 1.06 0.00 0.00 33.49 98.23 46.16 13.64 17.48 1.40 0.00 0.00 44.36 123.04
2 214
EP 1110-1-8, Vol. 330 Nov 09
2-276
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
C85 cont.C85TE010 48.98 17.86 13.86 1.11 0.00 0.00 44.43 126.24 61.23 18.10 18.24 1.46 0.00 0.00 58.85 157.88C85TE011 65.76 26.25 18.19 1.59 0.00 0.00 66.69 178.48 80.38 26.51 23.94 2.09 0.00 0.00 85.77 218.69
C90C90LB001 60.68 24.65 21.87 2.07 7.98 1.03 62.10 180.38 67.42 24.77 27.57 2.61 31.90 4.12 72.80 231.19C90LB002 68.59 27.83 25.59 2.43 7.98 1.03 70.18 203.63 76.21 27.97 32.37 3.07 31.90 4.12 82.27 257.91C90LB003 110.24 44.71 38.87 3.69 11.97 1.54 112.78 323.80 122.49 44.92 49.52 4.70 47.86 6.17 132.21 407.87
C95C95AP004 23.97 8.71 7.40 7.37 0.00 0.00 23.10 70.55C95AP005 0.76 0.28 0.00 0.00 0.00 0.00 0.73 1.77C95AP006 1.43 0.52 0.00 0.00 0.00 0.00 1.38 3.33C95AP007 37.87 13.77 12.32 10.62 0.00 0.00 36.50 111.08C95AP008 5.80 2.11 0.00 0.50 0.00 0.00 5.59 14.00C95AP009 1.93 0.70 0.00 0.00 0.00 0.00 1.86 4.49C95AP010 50.53 18.37 12.55 10.72 0.00 0.00 48.70 140.87C95AP011 1.80 0.66 0.00 0.00 0.00 0.00 1.74 4.20C95AP012 7.24 2.63 0.00 0.50 0.00 0.00 6.97 17.34C95AP013 48.35 17.58 20.48 14.33 0.00 0.00 46.60 147.34C95AP014 1.64 0.60 0.00 0.00 0.00 0.00 1.58 3.82C95AP015 6.31 2.29 0.00 0.50 0.00 0.00 6.08 15.18C95AP016 2.21 0.80 0.00 0.00 0.00 0.00 2.13 5.14C95AP017 20.46 7.44 7.23 6.30 0.00 0.00 19.72 61.15C95AP018 0.68 0.25 0.00 0.00 0.00 0.00 0.66 1.59C95AP019 3.92 1.43 0.00 0.50 0.00 0.00 3.78 9.63C95AP020 22.54 8.20 12.90 8.88 0.00 0.00 21.72 74.24C95AP021 35.25 12.82 14.93 10.81 0.00 0.00 33.97 107.78C95AP022 5.33 1.94 1.39 1.63 0.00 0.00 5.13 15.42
2 215
EP 1110-1-8, Vol. 330 Nov 09
2-277
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
C95 cont.C95AP023 0.13 0.05 0.00 0.00 0.00 0.00 0.12 0.30C95LH003 20.92 7.61 6.31 5.88 0.00 0.00 20.16 60.88C95LH005 27.22 9.90 8.56 7.90 0.00 0.00 26.23 79.81C95LH011 50.85 18.49 12.90 10.88 0.00 0.00 49.00 142.12C95LH013 64.95 23.62 12.90 10.88 0.00 0.00 62.59 174.94C95LH015 86.56 31.48 18.34 15.36 0.00 0.00 83.43 235.17C95LH022 18.46 6.77 2.02 2.92 0.57 0.07 17.82 48.63C95LH023 25.79 9.44 3.76 4.71 0.67 0.09 24.88 69.34
D10D10IR003 8.84 2.80 0.00 0.79 0.00 0.00 11.96 24.39D10IR005 33.32 7.72 24.84 2.54 0.00 0.00 45.04 113.46D10SU002 10.89 3.45 0.00 0.80 0.00 0.00 14.73 29.87D10SU003 11.15 3.53 0.00 0.80 0.00 0.00 15.08 30.56D10SU005 16.96 3.93 30.04 3.07 0.00 0.00 22.93 76.93D10SU006 17.17 3.98 30.04 3.07 0.00 0.00 23.21 77.47
D15D15BI001 1.15 0.27 2.55 0.30 0.00 0.00 1.40 5.67D15BI002 2.06 0.48 2.31 0.24 0.00 0.00 2.51 7.60D15BI003 3.11 0.72 3.47 0.35 0.00 0.00 3.79 11.44D15BI004 4.85 1.12 5.20 0.53 0.00 0.00 5.90 17.60D15BI005 6.24 1.45 7.16 0.73 0.00 0.00 7.59 23.17D15BI006 10.46 2.42 13.75 1.40 0.00 0.00 12.74 40.77D15BI007 13.86 3.21 21.83 2.23 0.00 0.00 16.87 58.00D15BI008 12.92 2.99 21.83 2.23 0.00 0.00 15.73 55.70D15XX001 0.63 0.15 0.00 0.00 0.00 0.00 0.77 1.55D15XX002 0.95 0.22 0.00 0.00 0.00 0.00 1.16 2.33
2 216
EP 1110-1-8, Vol. 330 Nov 09
2-278
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
D20D20AD002 0.55 0.10 0.14 0.31 0.00 0.00 0.64 1.74D20AD005 0.54 0.10 0.14 0.31 0.00 0.00 0.63 1.72D20AD006 0.90 0.17 0.28 0.51 0.00 0.00 1.04 2.90D20AD007 1.49 0.28 0.57 1.03 0.00 0.00 1.71 5.08D20CQ001 1.33 0.25 3.40 1.70 0.00 0.00 1.53 8.21D20LY001 0.80 0.15 0.21 0.59 0.00 0.00 0.92 2.67D20LY002 0.83 0.16 0.00 0.60 0.00 0.00 0.95 2.54
D25D25AD003 7.76 1.80 7.97 0.70 0.00 0.00 10.50 28.73D25AD004 6.19 1.44 3.23 0.28 0.00 0.00 8.37 19.51D25EZ001 0.59 0.14 0.00 0.50 0.00 0.00 0.79 2.02D25EZ002 0.47 0.12 0.00 0.50 0.09 0.01 0.65 1.84D25EZ003 0.52 0.13 0.00 0.50 0.06 0.01 0.71 1.93D25EZ005 1.96 0.47 0.00 1.25 0.12 0.02 2.67 6.49
D30D30HD001 5.87 1.36 24.26 4.48 0.00 0.00 7.93 43.90D30HD002 8.80 2.04 31.19 6.19 0.00 0.00 11.90 60.12D30HD003 11.45 2.65 38.70 7.95 0.00 0.00 15.48 76.23D30MR001 0.96 0.22 1.70 0.20 0.00 0.00 1.29 4.37D30MR003 6.42 1.50 6.70 0.68 0.12 0.02 8.70 24.14D30MR005 15.41 3.62 15.56 1.59 0.45 0.06 20.90 57.59D30MR006 15.88 3.73 17.82 1.82 0.45 0.06 21.53 61.29D30MR007 20.11 4.71 17.82 1.82 0.45 0.06 27.25 72.22
D35D35DT001 34.59 9.94 51.98 7.21 0.00 0.00 43.85 147.57
2 217
EP 1110-1-8, Vol. 330 Nov 09
2-279
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
D35 cont.D35DT002 35.55 10.21 51.98 7.21 0.00 0.00 45.07 150.02D35DT003 40.22 11.55 51.98 7.21 0.00 0.00 50.97 161.93D35DT004 42.71 12.27 60.65 8.41 0.00 0.00 54.14 178.18D35DT005 66.62 19.14 87.80 12.17 0.00 0.00 84.44 270.17D35DT006 45.87 16.68 87.80 10.24 0.00 0.00 58.14 218.73D35IB003 29.78 10.90 61.50 7.17 0.76 0.10 37.80 148.01D35IB004 28.34 10.39 60.35 7.03 0.93 0.12 35.98 143.14D35IB005 32.89 12.05 73.05 8.52 0.93 0.12 41.75 169.31D35IB006 34.60 12.66 74.63 8.70 0.93 0.12 43.91 175.55D35RD001 26.10 7.50 52.32 7.26 0.00 0.00 33.09 126.27
F10F10JC001 5.62 1.21 7.07 0.62 0.59 0.08 5.02 20.21F10JC002 6.12 1.32 7.07 0.62 0.59 0.08 5.47 21.27
G10G10CA012 3.12 0.55 29.59 2.59 0.00 0.00 2.38 38.23 3.90 0.56 39.14 3.42 0.00 0.00 3.41 50.43G10CA013 4.02 0.71 38.17 3.34 0.00 0.00 3.07 49.31 5.03 0.72 50.48 4.41 0.00 0.00 4.39 65.03G10CA014 5.28 0.93 50.51 4.41 0.00 0.00 4.03 65.16 6.60 0.95 66.81 5.84 0.00 0.00 5.77 85.97G10CA015 7.32 1.28 64.74 5.66 0.00 0.00 5.59 84.59 9.15 1.32 85.63 7.48 0.00 0.00 7.99 111.57G10CA016 8.95 1.57 76.99 6.73 0.00 0.00 6.83 101.07 11.19 1.61 101.83 8.90 0.00 0.00 9.77 133.30G10CA017 14.06 2.46 102.63 8.97 0.00 0.00 10.73 138.85 17.57 2.53 135.73 11.86 0.00 0.00 15.35 183.04G10CA018 17.85 3.13 135.99 11.88 0.00 0.00 13.63 182.48 22.32 3.22 179.86 15.72 0.00 0.00 19.49 240.61G10CA019 29.95 5.25 217.13 18.97 0.00 0.00 22.86 294.16 37.43 5.39 287.17 25.09 0.00 0.00 32.69 387.77G10CA020 2.49 0.44 16.40 1.43 0.00 0.00 1.90 22.66 3.12 0.45 21.69 1.90 0.00 0.00 2.72 29.88G10WC001 0.25 0.04 1.39 0.12 0.00 0.00 0.16 1.96 0.28 0.04 1.82 0.16 0.00 0.00 0.22 2.52G10WC002 0.29 0.04 1.91 0.17 0.00 0.00 0.19 2.60 0.33 0.04 2.50 0.22 0.00 0.00 0.25 3.34G10WC003 0.54 0.08 2.78 0.24 0.00 0.00 0.35 3.99 0.61 0.08 3.63 0.32 0.00 0.00 0.47 5.11
2 218
EP 1110-1-8, Vol. 330 Nov 09
2-280
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
G10 cont.G10WC004 0.43 0.06 3.13 0.27 0.00 0.00 0.28 4.17 0.50 0.06 4.09 0.36 0.00 0.00 0.38 5.39G10XX001 0.11 0.02 0.17 0.01 0.00 0.00 0.07 0.38 0.13 0.02 0.23 0.02 0.00 0.00 0.10 0.50G10XX002 0.56 0.08 3.31 0.29 0.00 0.00 0.36 4.60 0.63 0.08 4.32 0.38 0.00 0.00 0.48 5.89G10XX003 1.26 0.18 2.17 0.19 0.00 0.00 0.83 4.63 1.45 0.19 2.87 0.25 0.00 0.00 1.10 5.86G10XX004 0.65 0.09 0.85 0.07 0.00 0.00 0.43 2.09 0.75 0.10 1.12 0.10 0.00 0.00 0.57 2.64G10XX005 1.60 0.28 6.27 0.55 0.00 0.00 1.22 9.92 2.00 0.29 8.18 0.71 0.00 0.00 1.74 12.92G10XX006 1.41 0.25 8.70 0.76 0.00 0.00 1.07 12.19 1.76 0.25 11.36 0.99 0.00 0.00 1.53 15.89G10XX007 2.12 0.37 12.18 1.06 0.00 0.00 1.62 17.35 2.65 0.38 15.90 1.39 0.00 0.00 2.31 22.63G10XX008 2.59 0.45 10.08 0.88 0.00 0.00 1.98 15.98 3.24 0.47 13.34 1.17 0.00 0.00 2.83 21.05G10XX009 2.22 0.39 13.48 1.18 0.00 0.00 1.70 18.97 2.78 0.40 17.82 1.56 0.00 0.00 2.43 24.99G10XX010 3.31 0.58 18.85 1.65 0.00 0.00 2.53 26.92 4.14 0.60 24.93 2.18 0.00 0.00 3.62 35.47G10XX011 3.64 0.64 35.34 3.09 0.00 0.00 2.78 45.49 4.55 0.66 46.74 4.08 0.00 0.00 3.97 60.00G10XX012 4.31 0.76 40.33 3.52 0.00 0.00 3.29 52.21 5.39 0.78 53.35 4.66 0.00 0.00 4.71 68.89G10XX013 5.39 0.94 53.72 4.69 0.00 0.00 4.11 68.85 6.74 0.97 71.04 6.21 0.00 0.00 5.88 90.84G10XX014 7.76 1.36 67.19 5.87 0.00 0.00 5.92 88.10 9.69 1.40 88.87 7.77 0.00 0.00 8.47 116.20G10XX015 12.80 2.24 98.95 8.65 0.00 0.00 9.77 132.41 16.00 2.31 130.87 11.43 0.00 0.00 13.97 174.58G10XX016 18.10 3.17 134.29 11.73 0.00 0.00 13.82 181.11 22.63 3.26 177.61 15.52 0.00 0.00 19.76 238.78
G15G15CA001 11.53 3.82 11.02 1.36 0.87 0.11 10.85 39.56 12.38 3.84 14.06 1.74 2.88 0.37 13.21 48.48G15CA003 13.56 4.48 12.34 1.53 0.87 0.11 12.75 45.64 14.56 4.50 15.75 1.95 2.88 0.37 15.53 55.54G15CA004 14.49 4.79 14.55 1.80 0.97 0.13 13.63 50.36 15.56 4.81 18.56 2.30 3.21 0.41 16.60 61.45G15CA005 19.62 6.58 18.95 2.35 3.35 0.43 18.53 69.81 21.07 6.61 24.18 2.99 11.07 1.43 22.56 89.91G15CA006 28.41 9.50 24.24 3.00 4.69 0.61 26.80 97.25 30.51 9.54 30.93 3.83 15.47 2.00 32.63 124.91G15CA007 12.23 4.05 11.90 1.47 0.87 0.11 11.51 42.14 13.14 4.07 15.18 1.88 2.88 0.37 14.02 51.54G15CA008 16.81 5.55 16.31 2.02 1.10 0.14 15.81 57.74 18.06 5.58 20.81 2.58 3.72 0.48 19.25 70.48G15CA009 15.71 5.19 16.31 2.02 0.97 0.13 14.77 55.10 16.87 5.22 20.81 2.58 3.21 0.41 17.99 67.09G15CA010 18.20 6.01 17.63 2.18 1.10 0.14 17.11 62.37 19.55 6.04 22.50 2.79 3.72 0.48 20.84 75.92
2 219
EP 1110-1-8, Vol. 330 Nov 09
2-281
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
G15 cont.G15JD008 12.41 4.16 13.31 1.65 2.12 0.27 11.71 45.63 13.33 4.18 16.98 2.10 6.99 0.90 14.26 58.74G15JD009 14.34 4.80 13.75 1.70 2.40 0.31 13.53 50.83 15.40 4.82 17.55 2.17 8.09 1.04 16.47 65.54G15JD010 14.39 4.81 16.31 2.02 2.12 0.27 13.58 53.50 15.46 4.84 20.81 2.58 6.99 0.90 16.53 68.11G15JD011 16.30 5.44 18.07 2.24 2.40 0.31 15.37 60.13 17.51 5.46 23.06 2.86 8.09 1.04 18.71 76.73
H10H10NP001 1.00 0.13 0.00 0.50 0.00 0.00 1.18 2.81H10NP002 1.11 0.15 0.00 0.50 0.00 0.00 1.31 3.07H10NP003 1.66 0.22 0.00 0.75 0.00 0.00 1.96 4.59H10NP004 2.13 0.29 0.00 0.75 0.00 0.00 2.53 5.70H10NP005 2.82 0.38 0.00 1.00 0.00 0.00 3.35 7.55H10NP006 3.80 0.51 0.00 1.00 0.00 0.00 4.50 9.81H10NP008 5.76 0.77 0.00 1.25 0.00 0.00 6.83 14.61H10NP009 7.35 0.99 0.00 1.25 0.00 0.00 8.71 18.30H10NP015 8.96 1.20 0.00 1.25 0.00 0.00 10.61 22.02H10NP016 12.34 1.66 0.00 1.25 0.00 0.00 14.63 29.88H10NP017 16.12 2.16 0.00 1.25 0.00 0.00 19.10 38.63H10NP018 37.41 5.02 0.00 1.25 0.00 0.00 44.33 88.01
H13H13AY007 14.58 3.07 0.00 0.00 0.00 0.00 15.55 33.20H13AY008 7.14 1.50 0.00 0.00 0.00 0.00 7.62 16.26H13AY009 12.97 2.73 0.00 0.00 0.00 0.00 13.83 29.53H13AY010 6.59 1.39 0.00 0.00 0.00 0.00 7.03 15.01H13AY011 10.84 2.28 0.00 0.00 0.00 0.00 11.56 24.68H13AY012 5.53 1.16 0.00 0.00 0.00 0.00 5.90 12.59H13AY013 8.69 1.83 0.00 0.00 0.00 0.00 9.27 19.79H13AY014 4.66 0.98 0.00 0.00 0.00 0.00 4.97 10.61
2 220
EP 1110-1-8, Vol. 330 Nov 09
2-282
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
H13 cont.H13AY015 5.12 1.08 0.00 0.00 0.00 0.00 5.46 11.66H13AY016 3.31 0.70 0.00 0.00 0.00 0.00 3.53 7.54H13AY017 16.20 3.41 0.00 0.00 0.00 0.00 17.27 36.88H13AY018 8.23 1.73 0.00 0.00 0.00 0.00 8.77 18.73H13AY019 1.06 0.22 0.06 0.28 0.00 0.00 1.13 2.75H13AY020 1.38 0.29 0.06 0.28 0.00 0.00 1.47 3.48H13AY021 18.35 3.56 0.00 0.00 0.47 0.06 16.39 38.83H13AY022 9.89 1.93 0.00 0.00 0.47 0.06 8.84 21.19H13AY023 16.67 3.23 0.00 0.00 0.47 0.06 14.89 35.32H13AY024 8.77 1.72 0.00 0.00 0.47 0.06 7.84 18.86H13AY025 14.85 2.88 0.00 0.00 0.47 0.06 13.26 31.52H13AY026 8.07 1.58 0.00 0.00 0.47 0.06 7.22 17.40H13AY027 12.48 2.43 0.00 0.00 0.47 0.06 11.15 26.59H13AY028 6.83 1.35 0.00 0.00 0.47 0.06 6.12 14.83H13AY029 10.08 1.97 0.00 0.00 0.47 0.06 9.02 21.60H13AY030 5.79 1.15 0.00 0.00 0.47 0.06 5.19 12.66H13AY031 6.60 1.30 0.00 0.00 0.47 0.06 5.91 14.34H13AY032 4.34 0.87 0.00 0.00 0.47 0.06 3.89 9.63H13BB001 4.48 0.40 0.58 0.99 0.00 0.00 5.00 11.45H13BB002 3.99 0.35 0.87 1.36 0.00 0.00 4.45 11.02H13BC003 4.62 0.44 0.29 0.13 0.00 0.00 3.83 9.31H13BC006 4.31 0.41 0.17 0.08 0.00 0.00 3.58 8.55H13BC007 6.69 0.64 0.17 0.08 0.00 0.00 5.55 13.13H13BC008 8.19 0.79 0.29 0.13 0.00 0.00 6.78 16.18H13BC009 5.61 0.54 0.17 0.08 0.00 0.00 4.65 11.05H13BC010 3.30 0.32 0.17 0.08 0.00 0.00 2.74 6.61H13BC011 4.21 0.40 0.29 0.13 0.00 0.00 3.49 8.52
2 221
EP 1110-1-8, Vol. 330 Nov 09
2-283
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
H13 cont.H13BC012 3.44 0.33 0.17 0.08 0.00 0.00 2.85 6.87H13BC013 3.11 0.30 0.17 0.08 0.00 0.00 2.58 6.24H13CB001 2.08 0.40 0.29 0.38 0.00 0.00 1.85 5.00H13CB002 2.25 0.43 0.58 0.51 0.00 0.00 2.00 5.77H13CO002 0.94 0.18 0.29 0.38 0.00 0.00 0.84 2.63H13CO003 1.59 0.40 0.17 0.33 0.00 0.00 1.70 4.19H13CO004 2.36 0.59 0.17 0.58 0.00 0.00 2.52 6.22H13CO005 4.12 1.03 0.17 0.58 0.00 0.00 4.40 10.30H13CO006 3.46 0.86 0.17 0.43 0.00 0.00 3.69 8.61H13EP001 2.05 0.39 0.29 0.38 0.00 0.00 1.83 4.94H13EP002 2.63 0.65 0.43 0.50 0.00 0.00 2.80 7.01H13KP001 7.08 1.37 0.72 0.33 0.13 0.02 6.32 15.97H13KP002 8.04 1.55 0.90 0.41 0.13 0.02 7.17 18.22H13KP003 9.46 1.83 1.27 0.58 0.13 0.02 8.44 21.73H13KP004 10.89 2.10 1.62 0.74 0.13 0.02 9.72 25.22H13MN001 29.78 5.78 8.68 6.56 0.53 0.07 29.94 81.34H13MN002 34.80 6.76 11.57 8.75 0.69 0.09 34.99 97.65H13MN003 39.50 7.66 11.57 9.75 0.69 0.09 39.70 108.96H13MN004 45.12 8.74 17.36 13.12 0.69 0.09 45.34 130.46H13PR001 8.11 1.71 0.17 0.08 0.00 0.00 8.65 18.72H13PR002 24.10 4.66 0.17 1.58 0.47 0.06 21.51 52.55H13PR003 14.31 3.01 0.29 0.13 0.00 0.00 15.26 33.00H13PR005 18.93 3.99 0.29 0.13 0.00 0.00 20.18 43.52H13PR006 21.24 4.11 0.29 1.63 0.47 0.06 18.96 46.76H13PR007 23.27 4.90 0.58 0.26 0.00 0.00 24.82 53.83H13PR011 33.34 6.43 0.12 1.55 0.47 0.06 29.76 71.73H13PR012 35.84 6.91 0.17 1.58 0.47 0.06 31.99 77.02
2 222
EP 1110-1-8, Vol. 330 Nov 09
2-284
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
H13 cont.H13PR013 38.05 7.34 0.29 1.63 0.47 0.06 33.96 81.80H13PR014 42.74 8.24 0.46 1.71 0.47 0.06 38.14 91.82H13PR015 48.72 9.38 0.46 1.71 0.47 0.06 43.47 104.27H13PR022 16.78 3.53 0.12 0.05 0.00 0.00 17.89 38.37H13PR023 19.19 4.04 0.17 0.08 0.00 0.00 20.46 43.94H13PR024 21.26 4.48 0.17 0.08 0.00 0.00 22.67 48.66H13PR025 25.68 5.41 0.17 0.08 0.00 0.00 27.38 58.72H13PR026 31.31 6.59 0.23 0.10 0.00 0.00 33.38 71.61H13S5001 4.84 0.93 0.17 0.08 0.00 0.00 4.31 10.33H13S5002 7.58 1.45 0.29 0.13 0.00 0.00 6.76 16.21H13S5003 9.00 1.73 0.29 0.13 0.00 0.00 8.02 19.17H13SH001 4.70 0.90 1.16 0.48 0.00 0.00 4.72 11.96H13SH002 4.41 0.85 1.16 0.48 0.00 0.00 4.43 11.33H13SH003 7.59 1.46 2.31 0.95 0.00 0.00 7.62 19.93H13SH004 7.92 1.52 2.31 0.95 0.00 0.00 7.95 20.65H13SH005 12.66 2.43 5.79 2.38 0.00 0.00 12.70 35.96H13SH006 40.71 7.81 17.36 7.12 0.00 0.00 40.85 113.85H13SH007 53.04 10.18 34.71 14.24 0.00 0.00 53.22 165.39H13TH001 1.16 0.22 0.29 0.13 0.00 0.00 1.04 2.84H13TH002 2.15 0.42 0.85 0.07 0.06 0.01 1.93 5.49H13TH003 2.44 0.48 0.85 0.07 0.06 0.01 2.18 6.09H13YB001 31.89 6.12 2.89 1.32 0.00 0.00 28.44 70.66H13YB002 31.89 6.12 2.89 1.32 0.00 0.00 28.44 70.66H13YB003 31.89 6.12 2.89 1.32 0.00 0.00 28.44 70.66
H20H20BE002 3.50 0.67 0.00 0.20 0.00 0.00 3.32 7.69H20BE003 4.33 0.83 0.00 0.30 0.00 0.00 4.11 9.57
2 223
EP 1110-1-8, Vol. 330 Nov 09
2-285
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
H20 cont.H20BE004 4.76 0.91 0.00 0.40 0.00 0.00 4.51 10.58
H25H25AU001 1.08 0.13 0.00 0.00 0.00 0.00 1.20 2.41H25AU002 1.24 0.15 0.00 0.00 0.00 0.00 1.38 2.77H25AU003 1.72 0.21 0.00 0.00 0.00 0.00 1.92 3.85H25AU004 2.69 0.33 0.00 0.00 0.00 0.00 3.00 6.02H25AU005 2.69 0.33 0.00 0.00 0.00 0.00 3.01 6.03H25AX001 1.09 0.13 0.00 0.00 0.00 0.00 1.21 2.43H25AX002 1.27 0.16 0.00 0.00 0.00 0.00 1.42 2.85H25AX003 1.31 0.16 0.00 0.00 0.00 0.00 1.46 2.93H25AX004 1.58 0.19 0.00 0.00 0.00 0.00 1.76 3.53H25AX005 1.47 0.18 0.00 0.00 0.00 0.00 1.64 3.29H25AX006 1.82 0.22 0.00 0.00 0.00 0.00 2.03 4.07H25BS001 0.70 0.09 0.00 0.00 0.00 0.00 0.67 1.46H25BS002 0.81 0.11 0.00 0.00 0.00 0.00 0.77 1.69H25BS003 0.87 0.12 0.00 0.00 0.00 0.00 0.83 1.82H25BS004 1.09 0.15 0.00 0.00 0.00 0.00 1.03 2.27H25BS005 1.68 0.23 0.00 0.00 0.00 0.00 1.59 3.50H25CA020 11.63 2.33 7.44 0.95 0.00 0.00 9.84 32.19 14.12 2.37 9.85 1.26 0.00 0.00 14.51 42.11H25CA021 11.69 2.34 7.92 1.01 0.00 0.00 9.89 32.85 14.19 2.39 10.47 1.34 0.00 0.00 14.59 42.98H25CA022 13.33 3.66 12.06 1.55 0.00 0.00 12.90 43.50 16.00 3.71 15.95 2.04 0.00 0.00 18.39 56.09H25CA023 19.33 5.31 12.06 1.55 0.00 0.00 18.71 56.96 23.20 5.38 15.95 2.04 0.00 0.00 26.66 73.23H25CA034 3.57 0.68 1.70 0.22 0.00 0.00 3.03 9.20 4.09 0.69 2.24 0.29 0.00 0.00 3.95 11.26H25CA035 4.17 0.79 2.83 0.36 0.00 0.00 3.53 11.68 4.77 0.80 3.74 0.48 0.00 0.00 4.62 14.41H25CA036 6.71 1.27 4.43 0.57 0.00 0.00 5.68 18.66 7.67 1.29 5.86 0.75 0.00 0.00 7.42 22.99H25CA038 9.09 1.82 5.09 0.65 0.00 0.00 7.70 24.35 11.04 1.86 6.73 0.86 0.00 0.00 11.35 31.84H25CA040 8.89 2.44 11.78 1.51 0.00 0.00 8.61 33.23 10.67 2.47 15.58 2.00 0.00 0.00 12.26 42.98
2 224
EP 1110-1-8, Vol. 330 Nov 09
2-286
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
H25 cont.H25CA052 14.82 1.82 0.00 1.50 0.00 0.00 14.87 33.01H25CA053 20.10 2.47 0.00 1.60 0.00 0.00 20.17 44.34H25CA054 25.85 3.18 0.00 3.00 0.00 0.00 25.94 57.97H25CA055 2.82 0.35 0.00 0.40 0.00 0.00 2.83 6.40H25CA056 42.14 5.18 0.00 3.00 0.00 0.00 42.29 92.61H25CA057 11.80 1.45 0.00 0.80 0.00 0.00 11.84 25.89H25CA058 3.14 0.39 0.00 0.50 0.00 0.00 3.50 7.53H25CA059 11.46 1.41 0.00 0.60 0.00 0.00 12.78 26.25H25CA060 16.87 2.07 0.00 0.75 0.00 0.00 18.82 38.51H25CA061 14.73 1.81 0.00 0.75 0.00 0.00 16.42 33.71H25CA062 26.97 3.31 0.00 0.90 0.00 0.00 30.08 61.26H25CA063 19.28 2.37 0.00 0.90 0.00 0.00 21.50 44.05H25CA064 23.45 2.88 0.00 1.00 0.00 0.00 26.15 53.48H25KC016 14.13 2.83 8.86 1.14 0.00 0.00 11.97 38.93 17.16 2.89 11.72 1.50 0.00 0.00 17.64 50.91H25KC017 9.97 2.00 5.09 0.65 0.00 0.00 8.44 26.15 12.11 2.04 6.73 0.86 0.00 0.00 12.45 34.19H25KC019 15.59 4.28 13.48 1.73 0.00 0.00 15.09 50.17 18.71 4.34 17.82 2.28 0.00 0.00 21.51 64.66H25KC020 17.16 4.71 13.48 1.73 0.00 0.00 16.61 53.69 20.59 4.77 17.82 2.28 0.00 0.00 23.67 69.13H25KC021 18.15 4.98 16.59 2.13 0.00 0.00 17.57 59.42 21.78 5.05 21.94 2.81 0.00 0.00 25.04 76.62H25KC022 20.57 5.64 16.59 2.13 0.00 0.00 19.91 64.84 24.68 5.72 21.94 2.81 0.00 0.00 28.36 83.51H25KC023 25.62 7.03 22.43 2.87 0.00 0.00 24.80 82.75 30.74 7.13 29.66 3.80 0.00 0.00 35.33 106.66H25KC024 24.44 8.79 28.84 1.17 0.00 0.00 29.56 92.80 28.97 8.88 38.14 1.54 0.00 0.00 38.55 116.08H25KC026 25.61 9.21 29.69 1.20 0.00 0.00 30.97 96.68 30.35 9.30 39.26 1.59 0.00 0.00 40.39 120.89H25KM001 12.48 2.50 8.39 1.08 0.00 0.00 10.56 35.01 15.15 2.55 11.09 1.42 0.00 0.00 15.58 45.79H25KM003 19.29 3.86 10.37 1.33 0.00 0.00 16.33 51.18 23.42 3.94 13.71 1.76 0.00 0.00 24.08 66.91H25KM009 44.32 18.74 42.78 1.88 0.00 0.00 58.97 166.69 56.13 18.97 56.59 2.48 0.00 0.00 84.88 219.05H25KM015 43.92 15.79 36.19 1.46 0.00 0.00 53.11 150.47 52.05 15.95 47.86 1.93 0.00 0.00 69.26 187.05H25KM018 4.56 0.86 1.88 0.24 0.00 0.00 3.86 11.40 5.21 0.88 2.49 0.32 0.00 0.00 5.04 13.94
2 225
EP 1110-1-8, Vol. 330 Nov 09
2-287
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
H25 cont.H25KM021 6.13 1.16 3.68 0.47 0.00 0.00 5.19 16.63 7.00 1.18 4.86 0.62 0.00 0.00 6.78 20.44H25KM022 7.83 1.48 3.77 0.48 0.00 0.00 6.63 20.19 8.95 1.51 4.99 0.64 0.00 0.00 8.67 24.76H25KM023 9.65 1.83 5.09 0.65 0.00 0.00 8.17 25.39 11.03 1.86 6.73 0.86 0.00 0.00 10.68 31.16H25KM027 17.65 3.53 8.10 1.04 0.00 0.00 14.95 45.27 21.44 3.61 10.72 1.37 0.00 0.00 22.04 59.18H25KM033 88.77 37.55 85.57 3.75 0.00 0.00 118.12 333.76 112.44 38.00 113.17 4.96 0.00 0.00 170.01 438.58H25KN001 4.15 0.51 0.00 0.50 0.00 0.00 4.63 9.79H25KN002 5.75 0.71 0.00 0.50 0.00 0.00 6.42 13.38H25KN003 7.01 0.86 0.00 0.50 0.00 0.00 7.82 16.19H25KN004 8.06 0.99 0.00 0.50 0.00 0.00 8.99 18.54H25KN006 16.27 2.00 0.00 1.00 0.00 0.00 18.15 37.42H25KN007 0.84 0.10 0.00 0.15 0.00 0.00 0.93 2.02H25KN009 1.73 0.21 0.00 0.15 0.00 0.00 1.93 4.02H25KN010 2.39 0.29 0.00 0.15 0.00 0.00 2.67 5.50H25LI003 12.94 2.59 8.39 1.08 0.00 0.00 10.95 35.95 15.71 2.64 11.09 1.42 0.00 0.00 16.15 47.01H25LI005 15.12 3.03 9.52 1.22 0.00 0.00 12.80 41.69 18.36 3.09 12.59 1.61 0.00 0.00 18.87 54.52H25LU001 3.78 0.46 0.00 0.40 0.00 0.00 3.79 8.43H25LU002 4.26 0.52 0.00 0.50 0.00 0.00 4.27 9.55H25LU003 6.57 0.81 0.00 0.80 0.00 0.00 6.59 14.77H25LU004 7.63 0.94 0.00 0.90 0.00 0.00 7.66 17.13H25LU005 9.57 1.18 0.00 1.10 0.00 0.00 9.60 21.45H25LU006 13.41 1.65 0.00 1.50 0.00 0.00 13.45 30.01H25LU007 11.43 1.40 0.00 1.40 0.00 0.00 11.47 25.70H25LU008 14.95 1.84 0.00 1.60 0.00 0.00 15.00 33.39H25LU009 16.40 2.02 0.00 1.70 0.00 0.00 16.46 36.58H25LU010 19.70 2.42 0.00 2.00 0.00 0.00 19.77 43.89H25LU011 19.52 2.40 0.00 2.00 0.00 0.00 19.59 43.51H25LU012 23.90 2.94 0.00 2.50 0.00 0.00 23.98 53.32
2 226
EP 1110-1-8, Vol. 330 Nov 09
2-288
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
H25 cont.H25LU013 24.70 3.04 0.00 2.60 0.00 0.00 24.79 55.13H25LU014 28.74 3.53 0.00 3.00 0.00 0.00 28.85 64.12H25LU023 4.90 0.66 0.00 0.25 0.00 0.00 4.64 10.45H25LU024 2.43 0.33 0.00 0.30 0.00 0.00 2.31 5.37H25LU025 2.98 0.40 0.00 0.40 0.00 0.00 2.83 6.61H25LU026 3.39 0.46 0.00 0.50 0.00 0.00 3.21 7.56H25LU027 3.79 0.51 0.00 0.60 0.00 0.00 3.60 8.50H25LU028 6.27 0.84 0.00 0.70 0.00 0.00 5.94 13.75H25LU034 9.18 1.23 0.00 0.80 0.00 0.00 8.69 19.90H25LU035 10.98 1.47 0.00 0.90 0.00 0.00 10.40 23.75H25LU036 12.64 1.70 0.00 1.00 0.00 0.00 11.97 27.31H25LU040 20.40 2.51 0.00 0.75 0.00 0.00 22.75 46.41H25LU041 25.02 3.07 0.00 0.75 0.00 0.00 27.90 56.74H25LU042 30.17 3.71 0.00 1.50 0.00 0.00 33.65 69.03H25LU046 4.85 0.60 0.00 0.50 0.00 0.00 5.41 11.36H25LU047 5.58 0.69 0.00 0.60 0.00 0.00 6.22 13.09H25LU048 5.98 0.73 0.00 0.70 0.00 0.00 6.67 14.08H25LU049 7.22 0.89 0.00 0.80 0.00 0.00 8.05 16.96H25LU050 10.92 1.34 0.00 0.90 0.00 0.00 12.18 25.34H25LU053 21.47 2.64 0.00 0.75 0.00 0.00 23.94 48.80H25LU054 26.43 3.25 0.00 0.75 0.00 0.00 29.48 59.91H25ME001 2.79 0.53 1.25 0.16 0.00 0.00 2.36 7.09 3.19 0.54 1.66 0.21 0.00 0.00 3.09 8.69H25ME002 4.00 0.76 3.77 0.48 0.00 0.00 3.39 12.40 4.57 0.77 4.99 0.64 0.00 0.00 4.43 15.40H25ME003 5.56 1.05 4.52 0.58 0.00 0.00 4.70 16.41 6.35 1.07 5.98 0.77 0.00 0.00 6.15 20.32H25WN001 1.00 0.13 0.00 0.00 0.00 0.00 0.95 2.08H25WN002 1.13 0.14 0.00 0.00 0.00 0.00 1.26 2.53H25WN003 1.24 0.15 0.00 0.00 0.00 0.00 1.38 2.77
2 227
EP 1110-1-8, Vol. 330 Nov 09
2-289
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
H25 cont.H25WN004 1.35 0.17 0.00 0.00 0.00 0.00 1.51 3.03H25WN005 1.54 0.19 0.00 0.00 0.00 0.00 1.71 3.44
H30H30CA005 18.43 3.59 13.31 1.61 1.45 0.19 11.23 49.81 22.69 3.67 16.98 2.06 5.22 0.67 15.20 66.49H30CA007 15.32 3.04 10.67 1.29 1.99 0.26 9.38 41.95 18.86 3.11 13.61 1.65 7.17 0.92 12.69 58.01H30GA006 27.04 5.23 20.54 2.49 1.36 0.18 16.45 73.29 33.28 5.35 26.21 3.18 4.83 0.62 22.25 95.72H30GA007 19.01 3.67 12.17 1.48 0.84 0.11 11.56 48.84 23.40 3.75 15.52 1.88 2.97 0.38 15.64 63.54H30GA008 23.92 5.75 18.38 2.23 5.03 0.65 17.51 73.47 29.90 5.88 23.15 2.80 17.79 2.29 23.74 105.55H30KM001 18.35 4.31 10.84 1.31 0.90 0.12 13.35 49.18 22.94 4.41 13.84 1.68 3.23 0.42 18.10 64.62
H35H35HI006 69.07 22.47 60.41 2.65 0.00 0.00 94.02 248.62 78.94 22.68 79.89 3.50 0.00 0.00 116.34 301.35H35OK001 43.84 14.26 57.20 2.51 0.00 0.00 59.68 177.49 50.10 14.39 75.66 3.32 0.00 0.00 73.84 217.31H35OK003 88.94 28.93 95.94 4.21 0.00 0.00 121.07 339.09 101.65 29.20 126.88 5.57 0.00 0.00 149.80 413.10H35OK004 141.91 46.16 120.63 5.29 0.00 0.00 193.17 507.16 162.18 46.59 159.54 7.00 0.00 0.00 239.01 614.32H35OK005 267.51 87.01 212.04 9.30 0.00 0.00 364.15 940.01 305.73 87.83 280.44 12.30 0.00 0.00 450.56 1,136.86
L10L10BS002 2.36 0.50 0.00 0.30 0.00 0.00 2.52 5.68 3.37 0.52 0.00 0.30 0.00 0.00 4.00 8.19L10BS004 0.81 0.17 0.00 0.25 0.00 0.00 0.87 2.10 1.16 0.18 0.00 0.25 0.00 0.00 1.38 2.97L10BS005 2.15 0.45 0.00 0.30 0.00 0.00 2.30 5.20 3.07 0.47 0.00 0.30 0.00 0.00 3.65 7.49L10BS007 3.03 0.64 0.00 0.50 0.00 0.00 3.24 7.41 4.33 0.66 0.00 0.50 0.00 0.00 5.14 10.63L10BU005 0.77 0.16 0.00 1.10 0.00 0.00 0.82 2.85 1.10 0.17 0.00 1.10 0.00 0.00 1.31 3.68L10BU009 0.41 0.09 0.00 0.90 0.00 0.00 0.44 1.84 0.58 0.09 0.00 0.90 0.00 0.00 0.69 2.26L10BU010 0.39 0.08 0.00 0.80 0.00 0.00 0.42 1.69 0.56 0.09 0.00 0.80 0.00 0.00 0.66 2.11L10BU011 0.84 0.18 0.00 1.50 0.00 0.00 0.90 3.42 1.20 0.18 0.00 1.50 0.00 0.00 1.42 4.30L10BU012 1.72 0.36 0.00 2.00 0.00 0.00 1.84 5.92 2.46 0.38 0.00 2.00 0.00 0.00 2.92 7.76
2 228
EP 1110-1-8, Vol. 330 Nov 09
2-290
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
L10 cont.L10BU013 1.78 0.38 0.00 2.50 0.00 0.00 1.91 6.57 2.55 0.39 0.00 2.50 0.00 0.00 3.03 8.47L10RM001 4.18 0.88 0.00 0.40 0.00 0.00 4.48 9.94 5.98 0.92 0.00 0.40 0.00 0.00 7.10 14.40L10RM002 3.77 0.79 0.00 0.00 0.00 0.00 4.03 8.59 5.38 0.82 0.00 0.00 0.00 0.00 6.40 12.60L10VE002 1.85 0.40 5.58 0.61 0.07 0.01 1.98 10.50 2.64 0.41 7.23 0.79 0.23 0.03 3.15 14.48L10VE005 0.97 0.21 2.07 0.23 0.06 0.01 1.04 4.59 1.38 0.22 2.68 0.29 0.20 0.03 1.65 6.45L10VE006 2.58 0.55 3.19 0.35 0.06 0.01 2.77 9.51 3.69 0.57 4.13 0.45 0.20 0.03 4.40 13.47L10VE007 2.24 0.47 0.00 1.50 0.00 0.00 2.40 6.61 3.20 0.49 0.00 1.50 0.00 0.00 3.81 9.00L10VE009 2.92 0.62 6.88 0.65 0.06 0.01 3.13 14.27 4.17 0.65 8.77 0.83 0.20 0.03 4.97 19.62L10VE010 1.01 0.22 4.30 0.47 0.03 0.00 1.09 7.12 1.45 0.22 5.58 0.61 0.10 0.01 1.73 9.70
L15L15BW001 3.50 0.32 5.31 0.46 0.08 0.01 2.74 12.42L15BW002 6.29 0.57 7.43 0.65 0.17 0.02 4.92 20.05L15BW003 7.24 0.65 10.62 0.93 0.17 0.02 5.67 25.30L15BW004 10.51 0.93 10.40 0.91 0.00 0.00 8.20 30.95L15FG001 40.33 3.57 18.93 1.65 0.00 0.00 31.46 95.94L15FG002 9.13 0.82 13.28 1.16 0.12 0.02 7.14 31.67L15HZ001 0.18 0.02 0.64 0.06 0.00 0.00 0.14 1.04L15JD001 1.66 0.21 4.25 0.37 1.54 0.20 1.38 9.61L15JD005 0.48 0.04 0.00 0.00 0.00 0.00 0.37 0.89L15JD006 0.88 0.08 0.00 0.00 0.00 0.00 0.69 1.65L15TO001 0.28 0.03 1.27 0.11 0.00 0.00 0.22 1.91L15TO002 0.77 0.08 3.19 0.28 0.18 0.02 0.61 5.13L15TO003 1.56 0.15 4.46 0.39 0.18 0.02 1.23 7.99L15TO004 1.68 0.16 4.46 0.39 0.16 0.02 1.32 8.19L15TO006 3.13 0.29 6.16 0.54 0.30 0.04 2.46 12.92L15TO007 3.23 0.30 6.16 0.54 0.30 0.04 2.54 13.11L15WI001 1.68 0.16 0.00 0.05 0.10 0.01 1.32 3.32
2 229
EP 1110-1-8, Vol. 330 Nov 09
2-291
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
L20L20AB017 1.35 0.24 1.67 0.15 0.06 0.01 2.40 5.88L20AB018 1.50 0.26 1.78 0.16 0.06 0.01 2.68 6.45L20AB019 1.77 0.31 1.78 0.16 0.06 0.01 3.15 7.24L20AB020 1.13 0.20 1.43 0.12 0.06 0.01 2.02 4.97L20AB021 1.20 0.21 1.78 0.16 0.06 0.01 2.14 5.56L20AB022 1.35 0.24 1.67 0.15 0.06 0.01 2.41 5.89L20AB023 0.55 0.10 0.00 0.00 0.04 0.01 0.98 1.68L20AB024 0.59 0.10 0.00 0.00 0.04 0.01 1.05 1.79
L25L25JE001 1.18 0.20 2.95 0.26 0.00 0.00 1.68 6.27L25JE002 9.93 1.74 28.67 2.51 0.32 0.04 14.15 57.36L25MB002 0.50 0.11 1.14 1.10 0.31 0.04 0.75 3.95L25MB004 15.47 2.69 43.16 5.27 0.32 0.04 22.02 88.97L25MB005 1.02 0.20 2.27 1.20 0.31 0.04 1.48 6.52L25MB006 9.48 1.64 13.63 2.44 0.00 0.00 13.48 40.67L25MB007 5.32 0.92 5.22 1.46 0.00 0.00 7.56 20.48L25MB008 16.70 2.94 23.68 3.57 0.91 0.12 23.84 71.76
L30L30HW015 11.31 2.44 1.45 0.59 0.69 0.09 13.46 30.03 14.14 2.49 1.89 0.78 2.21 0.29 18.50 40.30L30KB001 2.66 0.58 0.87 0.36 0.23 0.03 3.17 7.90 3.32 0.59 1.13 0.46 0.74 0.10 4.35 10.69L30KB002 2.80 0.61 0.87 0.36 0.23 0.03 3.34 8.24 3.50 0.62 1.13 0.46 0.74 0.10 4.59 11.14L30RA001 5.83 1.25 2.36 0.24 0.25 0.03 6.94 16.90 7.29 1.28 3.12 0.32 0.80 0.10 9.53 22.44L30S4001 1.51 0.32 0.87 0.36 0.00 0.00 1.78 4.84 1.88 0.32 1.13 0.46 0.00 0.00 2.45 6.24L30S4002 1.72 0.36 0.00 0.00 0.00 0.00 2.04 4.12 2.15 0.37 0.00 0.00 0.00 0.00 2.80 5.32L30S4003 0.13 0.03 0.00 0.00 0.00 0.00 0.15 0.31 0.16 0.03 0.00 0.00 0.00 0.00 0.20 0.39
2 230
EP 1110-1-8, Vol. 330 Nov 09
2-292
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
L30 cont.L30S4004 0.21 0.04 0.00 0.00 0.00 0.00 0.25 0.50 0.27 0.05 0.00 0.00 0.00 0.00 0.35 0.67L30TS001 2.91 0.65 0.69 0.28 0.53 0.07 3.50 8.63 3.64 0.67 0.91 0.37 1.67 0.22 4.80 12.28
L35L35CA005 16.55 3.49 15.30 1.33 0.00 0.00 21.64 58.31 20.69 3.57 19.80 1.72 0.00 0.00 30.75 76.53L35CA007 31.31 6.59 25.01 2.17 0.00 0.00 40.94 106.02 39.14 6.75 32.37 2.81 0.00 0.00 58.17 139.24L35CA013 10.06 2.12 9.30 0.81 0.00 0.00 13.16 35.45 12.58 2.17 12.04 1.05 0.00 0.00 18.70 46.54L35CA014 22.60 4.76 16.54 1.44 0.00 0.00 29.55 74.89 28.25 4.87 21.40 1.86 0.00 0.00 41.99 98.37L35KM006 36.83 7.76 20.67 1.80 0.00 0.00 48.16 115.22 46.04 7.94 26.75 2.32 0.00 0.00 68.43 151.48
L40L40CA007 26.82 7.88 28.27 1.95 11.88 1.53 22.59 100.92 30.17 7.95 37.39 2.57 42.75 5.51 27.21 153.55L40CA009 91.51 27.32 75.39 5.19 20.94 2.70 77.34 300.39 102.95 27.57 99.71 6.86 75.39 9.73 93.15 415.36L40CA012 14.09 3.31 13.66 1.30 1.04 0.13 15.23 48.76 15.24 3.33 18.07 1.73 3.75 0.48 17.45 60.05L40CA013 8.78 2.08 8.48 0.81 1.00 0.13 9.50 30.78 9.49 2.09 11.22 1.07 3.58 0.46 10.88 38.79L40CA014 19.62 4.60 18.85 1.80 1.35 0.17 21.20 67.59 21.21 4.64 24.93 2.38 4.85 0.63 24.28 82.92L40CA015 11.17 2.46 14.04 1.34 1.04 0.13 9.96 40.14 11.81 2.47 18.57 1.77 3.75 0.48 12.04 50.89L40CA018 67.02 19.76 58.24 4.01 12.60 1.63 56.49 219.75 75.40 19.94 77.03 5.30 45.35 5.85 68.04 296.91L40CA019 8.08 1.79 8.95 0.85 1.00 0.13 7.21 28.01 8.54 1.80 11.84 1.13 3.58 0.46 8.71 36.06L40CA022 11.28 2.48 12.06 1.15 1.04 0.13 10.06 38.20 11.92 2.49 15.95 1.52 3.75 0.48 12.15 48.26L40CA023 13.48 3.02 16.96 1.62 2.71 0.35 12.09 50.23 14.25 3.04 22.44 2.14 9.76 1.26 14.60 67.49L40CA024 16.89 3.81 18.57 1.77 3.96 0.51 15.17 60.68 17.85 3.84 24.55 2.34 14.26 1.84 18.32 83.00L40CA025 17.98 4.05 19.88 1.90 3.96 0.51 16.13 64.41 19.00 4.07 26.30 2.51 14.26 1.84 19.49 87.47L40CA028 2.98 0.54 5.06 0.48 0.86 0.11 2.87 12.90L40CA029 3.32 0.60 5.58 0.53 0.86 0.11 3.19 14.19L40CA030 3.73 0.68 6.10 0.58 1.19 0.15 3.59 16.02L40CA031 3.62 0.66 7.65 0.73 1.19 0.15 3.49 17.49L40CA032 3.66 0.83 4.90 0.47 0.57 0.07 3.29 13.79 3.87 0.83 6.48 0.62 2.06 0.27 3.98 18.11
2 231
EP 1110-1-8, Vol. 330 Nov 09
2-293
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
L40 cont.L40CA033 4.87 1.09 6.41 0.61 0.57 0.07 4.36 17.98 5.15 1.10 8.48 0.81 2.06 0.27 5.27 23.14L40CA034 5.45 1.27 7.16 0.68 2.98 0.38 4.94 22.86 5.76 1.28 9.47 0.90 10.72 1.38 5.96 35.47L40CS009 12.49 2.78 12.82 1.22 1.92 0.25 11.18 42.66 13.21 2.80 16.95 1.62 6.92 0.89 13.50 55.89L40CS010 14.97 3.31 17.06 1.63 1.92 0.25 13.37 52.51 15.82 3.33 22.56 2.15 6.92 0.89 16.15 67.82L40CS011 18.60 4.18 17.62 1.68 3.96 0.51 16.69 63.24 19.67 4.21 23.31 2.23 14.26 1.84 20.16 85.68L40KM003 12.05 2.66 13.10 1.25 1.26 0.16 10.76 41.24 12.74 2.67 17.32 1.65 4.53 0.58 12.99 52.48L40KM008 26.80 7.87 31.57 2.17 7.60 0.98 22.57 99.56 30.15 7.95 41.75 2.87 27.36 3.53 27.19 140.80L40KM009 38.15 11.35 46.18 3.18 8.28 1.07 32.22 140.43 42.92 11.45 61.07 4.20 29.80 3.84 38.80 192.08L40KM010 62.31 18.45 64.46 4.43 12.60 1.63 52.57 216.45 70.10 18.62 85.25 5.87 45.35 5.85 63.32 294.36L40KM011 78.44 23.69 80.39 5.53 20.94 2.70 66.46 278.15 88.25 23.91 106.32 7.31 75.39 9.73 80.05 390.96L40KM015 6.94 1.56 7.07 0.67 0.95 0.12 6.23 23.54 7.34 1.57 9.35 0.89 3.42 0.44 7.52 30.53L40ME012 2.64 0.47 4.75 0.45 0.38 0.05 2.53 11.27L40ME016 1.61 0.29 2.43 0.23 0.31 0.04 1.54 6.45L40ME017 1.98 0.36 3.67 0.35 0.50 0.06 1.90 8.82L40ME021 2.22 0.41 5.06 0.48 0.84 0.11 2.14 11.26L40ME022 3.32 0.60 7.75 0.74 0.84 0.11 3.19 16.55L40ME023 3.71 0.67 8.37 0.80 0.84 0.11 3.56 18.06
L50L50CA001 4.48 1.09 5.69 2.16 0.72 0.09 4.60 18.83 7.47 1.15 8.06 3.06 2.57 0.33 8.14 30.78L50CA004 10.90 2.62 8.03 3.05 1.29 0.17 11.16 37.22 18.16 2.77 11.37 4.31 4.57 0.59 19.76 61.53L50CS005 6.87 1.66 6.57 2.49 0.93 0.12 7.04 25.68 11.44 1.75 9.30 3.53 3.31 0.43 12.46 42.22L50CS006 8.27 1.99 7.15 2.71 1.10 0.14 8.47 29.83 13.78 2.11 10.13 3.84 3.92 0.51 14.99 49.28L50JC001 5.28 1.25 4.89 1.85 0.45 0.06 5.38 19.16 8.79 1.32 6.93 2.63 1.63 0.21 9.53 31.04L50JC002 5.88 1.43 6.71 2.54 0.92 0.12 6.04 23.64 9.80 1.51 9.51 3.61 3.27 0.42 10.69 38.81L50JC003 7.13 1.73 7.30 2.77 1.24 0.16 7.33 27.66 11.89 1.83 10.34 3.92 4.47 0.58 12.97 46.00L50JC005 8.32 2.01 7.30 2.77 1.24 0.16 8.53 30.33 13.87 2.12 10.34 3.92 4.47 0.58 15.10 50.40L50JC007 10.71 2.57 7.30 2.77 1.39 0.18 10.96 35.88 17.84 2.72 10.34 3.92 4.99 0.64 19.40 59.85
2 232
EP 1110-1-8, Vol. 330 Nov 09
2-294
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
L55L55KN001 0.94 0.13 0.00 0.52 0.00 0.00 1.11 2.70L55KN002 1.92 0.26 0.00 1.06 0.00 0.00 2.27 5.51L55KN004 1.78 0.24 0.00 0.00 0.00 0.00 2.11 4.13L55KN005 2.62 0.35 0.00 0.00 0.00 0.00 3.11 6.08L55KN006 3.91 0.52 0.00 0.00 0.00 0.00 4.63 9.06
L60L60CA010 28.44 5.46 14.14 1.44 0.00 0.00 23.08 72.56 35.54 5.59 18.70 1.91 0.00 0.00 32.99 94.73L60CA011 34.02 6.53 14.14 1.44 0.00 0.00 27.61 83.74 42.52 6.69 18.70 1.91 0.00 0.00 39.47 109.29L60CA013 19.05 3.80 15.08 1.54 2.25 0.29 15.55 57.56 23.81 3.90 19.94 2.04 7.86 1.01 22.23 80.79L60CA014 24.77 4.75 11.31 1.16 0.00 0.00 20.11 62.10 30.96 4.87 14.96 1.53 0.00 0.00 28.74 81.06L60JD001 12.54 2.56 11.21 1.15 2.89 0.37 10.28 41.00 15.68 2.63 14.83 1.52 10.39 1.34 14.69 61.08L60JD002 15.02 3.04 14.23 1.45 2.89 0.37 12.29 49.29 18.78 3.11 18.82 1.92 10.39 1.34 17.57 71.93L60JD003 12.22 2.50 11.21 1.15 2.89 0.37 10.02 40.36 15.28 2.56 14.83 1.52 10.39 1.34 14.32 60.24L60JD004 16.01 3.32 15.08 1.54 4.52 0.58 13.15 54.20 20.01 3.40 19.94 2.04 16.29 2.10 18.79 82.57L60JD006 19.79 4.01 16.02 1.64 3.85 0.50 16.20 62.01 24.74 4.11 21.19 2.16 13.86 1.79 23.15 91.00L60JD007 21.75 4.38 18.85 1.93 3.85 0.50 17.79 69.05 27.19 4.49 24.93 2.55 13.86 1.79 25.43 100.24L60JD008 30.00 5.76 16.02 1.64 0.00 0.00 24.35 77.77 37.50 5.90 21.19 2.16 0.00 0.00 34.81 101.56
M10M10MZ001 2.77 0.31 0.00 0.00 0.00 0.00 1.49 4.57M10MZ003 3.41 0.39 0.00 0.00 0.00 0.00 1.83 5.63M10MZ005 0.78 0.38 0.00 0.00 0.00 0.00 0.51 1.67M10MZ007 0.82 0.40 0.00 0.00 0.00 0.00 0.53 1.75M10MZ010 2.61 0.77 13.19 1.83 0.00 0.00 2.08 20.48 3.22 0.78 17.45 2.42 0.00 0.00 2.74 26.61M10MZ011 3.73 1.10 19.79 2.74 0.00 0.00 2.97 30.33 4.59 1.12 26.17 3.63 0.00 0.00 3.91 39.42M10SM001 3.11 0.92 26.11 3.04 0.00 0.00 2.48 35.66 3.83 0.93 34.07 3.97 0.00 0.00 3.27 46.07
2 233
EP 1110-1-8, Vol. 330 Nov 09
2-295
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
M10 cont.M10SM003 3.86 1.14 34.81 4.06 0.00 0.00 3.08 46.95 4.75 1.16 45.43 5.30 0.00 0.00 4.05 60.69M10SM004 4.15 1.23 43.51 5.07 0.00 0.00 3.30 57.26 5.11 1.24 56.79 6.62 0.00 0.00 4.35 74.11M10SM005 1.44 0.42 20.02 2.33 0.00 0.00 1.14 25.35 1.77 0.43 26.12 3.05 0.00 0.00 1.51 32.88M10SM008 2.61 0.77 34.81 4.06 0.00 0.00 2.08 44.33 3.21 0.78 45.43 5.30 0.00 0.00 2.74 57.46M10XX001 0.19 0.09 0.00 0.00 0.00 0.00 0.12 0.40M10XX002 0.59 0.29 0.00 0.00 0.00 0.00 0.38 1.26M10XX003 0.71 0.35 0.00 0.00 0.00 0.00 0.46 1.52M10XX004 1.15 0.56 0.00 0.00 0.00 0.00 0.74 2.45M10XX005 1.74 2.24 0.00 0.00 0.00 0.00 1.06 5.04M10XX006 2.45 3.16 0.00 0.00 0.00 0.00 1.50 7.11M10XX007 3.12 4.02 0.00 0.00 0.00 0.00 1.91 9.05M10XX008 4.33 5.57 0.00 0.00 0.00 0.00 2.64 12.54M10XX009 0.79 0.23 8.70 1.01 0.00 0.00 0.63 11.36 0.97 0.24 11.36 1.32 0.00 0.00 0.82 14.71M10XX010 2.62 0.78 7.07 0.98 0.00 0.00 2.09 13.54 3.23 0.79 9.35 1.30 0.00 0.00 2.76 17.43M10XX011 3.02 0.89 9.42 1.31 0.00 0.00 2.40 17.04 3.71 0.90 12.46 1.73 0.00 0.00 3.17 21.97M10XX012 3.07 0.91 9.42 1.31 0.00 0.00 2.45 17.16 3.78 0.92 12.46 1.73 0.00 0.00 3.22 22.11M10XX013 3.98 1.18 10.84 1.50 0.00 0.00 3.17 20.67 4.90 1.19 14.33 1.99 0.00 0.00 4.18 26.59M10XX014 5.47 1.62 16.49 2.29 0.00 0.00 4.36 30.23 6.73 1.64 21.81 3.02 0.00 0.00 5.74 38.94M10XX015 6.86 2.03 23.56 3.27 0.00 0.00 5.47 41.19 8.45 2.06 31.16 4.32 0.00 0.00 7.20 53.19M10XX016 7.81 3.45 0.00 0.00 0.00 0.00 5.57 16.83M10XX017 8.26 3.65 0.00 0.00 0.00 0.00 5.89 17.80M10XX018 10.29 4.55 0.00 0.00 0.00 0.00 7.33 22.17M10XX019 10.51 4.65 0.00 0.00 0.00 0.00 7.49 22.65M10XX021 17.14 5.14 35.81 4.96 0.00 0.00 14.72 77.77 20.57 5.21 47.36 6.57 0.00 0.00 18.79 98.50M10XX022 19.51 5.85 40.99 5.68 0.00 0.00 16.75 88.78 23.41 5.93 54.22 7.52 0.00 0.00 21.38 112.46M10XX023 26.13 7.83 37.70 5.23 0.00 0.00 22.44 99.33 31.35 7.94 49.86 6.91 0.00 0.00 28.64 124.70M10XX024 37.26 11.17 40.99 5.68 0.00 0.00 32.00 127.10 44.71 11.32 54.22 7.52 0.00 0.00 40.83 158.60
2 234
EP 1110-1-8, Vol. 330 Nov 09
2-296
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
P10P10IC001 12.05 2.15 16.49 1.92 0.00 0.00 14.06 46.67P10IC002 18.97 3.38 28.27 3.30 0.00 0.00 22.13 76.05P10IC005 50.70 9.04 75.39 8.79 0.00 0.00 59.13 203.05P10IC010 1.76 0.31 0.00 0.00 0.00 0.00 2.05 4.12P10IC011 3.49 0.62 1.23 0.14 0.00 0.00 4.06 9.54P10IC012 2.48 0.44 0.00 0.00 0.00 0.00 2.89 5.81P10IC013 4.32 0.77 2.26 0.26 0.00 0.00 5.04 12.65
P20P20IC002 12.62 1.86 0.00 1.90 0.00 0.00 17.54 33.92P20IC003 12.82 1.89 0.00 2.50 0.00 0.00 17.82 35.03P20IC004 13.68 2.01 0.00 3.15 0.00 0.00 19.01 37.85P20MK001 7.69 1.13 0.00 1.25 0.00 0.00 10.68 20.75P20MK002 2.45 0.33 0.00 0.50 0.00 0.00 3.19 6.47P20MK003 3.08 0.41 0.00 1.00 0.00 0.00 4.01 8.50P20MK004 3.81 0.51 0.00 1.25 0.00 0.00 4.97 10.54P20MK005 6.43 0.86 0.00 1.25 0.00 0.00 8.37 16.91P20MK006 7.11 0.95 0.00 2.50 0.00 0.00 9.27 19.83P20MK007 7.78 1.04 0.00 2.50 0.00 0.00 10.14 21.46
P25P25DL001 7.40 0.99 0.00 0.95 0.00 0.00 8.77 18.11P25DL003 8.87 1.19 0.00 1.20 0.00 0.00 10.51 21.77P25DL004 10.13 1.36 0.00 1.80 0.00 0.00 12.01 25.30P25DL005 13.94 1.87 0.00 2.65 0.00 0.00 16.52 34.98P25DL006 14.44 1.94 0.00 3.30 0.00 0.00 17.11 36.79P25DL008 17.76 2.38 0.00 5.30 0.00 0.00 21.05 46.49
2 235
EP 1110-1-8, Vol. 330 Nov 09
2-297
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
P25 cont.P25DL009 26.77 3.59 0.00 6.60 0.00 0.00 31.72 68.68P25DL010 39.04 5.24 0.00 8.25 0.00 0.00 46.26 98.79P25DL011 41.69 5.59 0.00 9.90 0.00 0.00 49.40 106.58P25IC001 9.22 1.24 0.00 2.20 0.00 0.00 10.92 23.58P25IC002 10.26 1.38 0.00 3.45 0.00 0.00 12.16 27.25P25IC003 14.76 1.98 0.00 4.40 0.00 0.00 17.49 38.63P25IC004 16.39 2.20 0.00 5.30 0.00 0.00 19.42 43.31P25IC005 20.40 2.74 0.00 6.25 0.00 0.00 24.17 53.56P25IC006 25.20 3.38 0.00 7.20 0.00 0.00 29.86 65.64P25MK001 9.05 1.21 0.00 2.50 0.00 0.00 10.72 23.48P25MK003 15.00 2.01 0.00 4.15 0.00 0.00 17.78 38.94P25VU002 10.20 1.25 0.00 2.50 0.00 0.00 11.38 25.33P25VU003 12.55 1.54 0.00 2.50 0.00 0.00 13.99 30.58P25VU004 12.82 1.58 0.00 2.50 0.00 0.00 14.30 31.20P25VU005 17.24 2.12 0.00 2.50 0.00 0.00 19.23 41.09P25VU010 17.72 2.18 0.00 0.95 0.00 0.00 19.76 40.61P25VU011 17.94 2.20 0.00 1.17 0.00 0.00 20.01 41.32
P30P30MK001 12.86 1.73 17.43 2.03 0.00 0.00 15.24 49.29P30MK003 22.19 2.98 30.63 3.57 0.00 0.00 26.29 85.66P30MK004 37.53 5.04 59.37 6.92 0.00 0.00 44.48 153.34
P35P35CA001 12.86 3.70 5.68 0.83 0.00 0.00 14.54 37.61 15.66 3.75 7.36 1.08 0.00 0.00 20.47 48.32P35CA006 40.24 11.56 21.71 3.17 0.00 0.00 45.47 122.15 48.99 11.72 28.09 4.11 0.00 0.00 64.05 156.96P35CA008 23.86 6.85 11.89 1.74 0.00 0.00 26.96 71.30 29.05 6.95 15.38 2.25 0.00 0.00 37.98 91.61P35CA009 30.99 8.90 15.76 2.30 0.00 0.00 35.02 92.97 37.73 9.03 20.40 2.98 0.00 0.00 49.33 119.47
2 236
EP 1110-1-8, Vol. 330 Nov 09
2-298
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
P40P40BX001 1.51 0.22 0.00 0.05 0.00 0.00 1.22 3.00P40TE003 9.99 1.48 2.33 0.24 1.25 0.16 8.08 23.53P40TE004 11.56 1.70 3.21 0.33 1.03 0.13 9.34 27.30P40TE005 8.76 1.30 4.82 0.49 1.25 0.16 7.09 23.87P40TE006 11.83 1.74 4.82 0.49 1.12 0.14 9.57 29.71P40TE007 19.94 2.91 4.82 0.49 1.12 0.14 16.11 45.53P40TE008 22.22 3.24 5.54 0.57 1.12 0.14 17.94 50.77P40TE009 24.81 3.61 5.54 0.57 1.12 0.14 20.03 55.82P40TE010 8.43 1.24 15.32 1.57 0.61 0.08 6.82 34.07P40TE011 9.19 1.36 15.32 1.57 1.06 0.14 7.44 36.08P40TE012 13.89 2.04 15.32 1.57 1.06 0.14 11.22 45.24P40TE013 12.70 1.87 15.32 1.57 1.06 0.14 10.26 42.92P40TE014 12.94 1.90 15.32 1.57 1.06 0.14 10.46 43.39P40TE015 14.72 2.16 15.32 1.57 1.06 0.14 11.90 46.87
P45P45AF002 0.09 0.01 0.00 0.00 0.00 0.00 0.10 0.20P45AF003 0.13 0.02 0.00 0.00 0.00 0.00 0.14 0.29P45AF005 1.25 0.20 2.79 0.33 0.08 0.01 1.39 6.05P45AF006 1.62 0.26 2.79 0.33 0.08 0.01 1.82 6.91P45AF007 3.58 0.57 4.10 0.42 0.06 0.01 4.00 12.74P45AF008 0.83 0.13 0.00 0.10 0.00 0.00 0.93 1.99P45AF009 2.78 0.44 0.00 0.10 0.00 0.00 3.10 6.42P45AF010 3.24 0.51 4.57 0.53 0.08 0.01 3.62 12.56P45AF011 5.79 0.92 8.88 1.04 0.08 0.01 6.46 23.18P45AL015 6.46 1.02 6.29 0.64 0.08 0.01 7.21 21.71P45CG001 0.44 0.07 0.00 0.05 0.00 0.00 0.49 1.05
2 237
EP 1110-1-8, Vol. 330 Nov 09
2-299
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
P45 cont.P45CG002 0.72 0.11 0.00 0.10 0.00 0.00 0.80 1.73P45CG003 1.66 0.26 0.00 0.15 0.00 0.00 1.86 3.93P45CG006 3.00 0.48 4.06 0.47 0.08 0.01 3.35 11.45P45CG007 2.43 0.38 4.06 0.47 0.00 0.00 2.71 10.05P45OE002 3.68 0.59 7.52 0.77 0.14 0.02 4.12 16.84P45OE003 4.80 0.77 11.49 1.17 0.14 0.02 5.36 23.75P45OE004 5.75 0.92 16.42 1.68 0.14 0.02 6.43 31.36P45OE005 7.70 1.23 24.76 2.53 0.28 0.04 8.61 45.15
P50P50GR001 0.05 0.00 0.00 0.00 0.00 0.00 0.07 0.12P50GR002 0.08 0.01 0.00 0.00 0.00 0.00 0.13 0.22P50GR003 0.11 0.01 0.00 0.00 0.00 0.00 0.18 0.30P50GR004 0.26 0.02 0.00 0.00 0.00 0.00 0.41 0.69P50GR005 0.09 0.01 0.00 0.00 0.00 0.00 0.13 0.23P50GR006 0.16 0.01 0.00 0.00 0.00 0.00 0.26 0.43P50GR007 0.27 0.02 0.00 0.00 0.00 0.00 0.43 0.72P50GR008 0.57 0.05 0.00 0.00 0.00 0.00 0.90 1.52P50WC001 0.14 0.02 2.39 0.28 0.00 0.00 0.15 2.98P50WC002 0.16 0.03 1.96 0.27 0.00 0.00 0.17 2.59P50WC003 0.38 0.07 2.09 0.29 0.00 0.00 0.40 3.23P50WC004 1.73 0.30 4.31 0.60 0.04 0.01 1.85 8.84P50XX001 2.46 0.42 7.84 1.09 0.00 0.00 2.62 14.43P50XX002 4.54 0.78 9.15 1.27 0.00 0.00 4.84 20.58P50XX003 4.87 0.84 11.11 1.54 0.00 0.00 5.19 23.55
P55P55GF001 2.14 0.37 2.75 0.38 0.00 0.00 2.53 8.17
2 238
EP 1110-1-8, Vol. 330 Nov 09
2-300
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
P55 cont.P55GF002 2.37 0.41 9.41 1.30 0.00 0.00 2.81 16.30P55GR001 0.42 0.07 0.16 0.07 0.00 0.00 0.28 1.00P55GR002 0.52 0.08 0.40 0.16 0.00 0.00 0.35 1.51P55GR003 1.64 0.26 2.00 0.82 0.00 0.00 1.10 5.82P55GR004 2.47 0.39 4.81 1.97 0.00 0.00 1.65 11.29P55WC001 0.04 0.01 0.08 0.03 0.00 0.00 0.03 0.19P55WC002 0.06 0.01 0.08 0.03 0.00 0.00 0.04 0.22
P60P60GF003 2.38 0.42 2.75 0.38 0.08 0.01 2.55 8.57P60GF004 2.62 0.46 9.41 1.30 0.08 0.01 2.80 16.68P60GF005 3.02 0.53 14.77 2.05 0.08 0.01 3.23 23.69P60GF006 4.71 0.82 18.30 2.54 0.09 0.01 5.03 31.50P60GF008 2.62 0.46 9.41 1.30 0.08 0.01 2.80 16.68P60GR001 2.49 0.43 6.14 0.85 0.07 0.01 2.66 12.65P60GR002 2.91 0.51 24.13 2.81 0.07 0.01 3.11 33.55P60HO002 0.09 0.02 0.84 0.10 0.00 0.00 0.10 1.15P60HO003 0.17 0.03 1.91 0.22 0.00 0.00 0.18 2.51P60WC001 0.07 0.01 0.96 0.11 0.00 0.00 0.07 1.22P60WC002 0.09 0.02 1.43 0.17 0.00 0.00 0.10 1.81
P65P65GR001 0.37 0.08 1.19 0.14 0.17 0.02 0.36 2.33P65GR002 0.45 0.09 0.36 0.04 0.17 0.02 0.44 1.57P65GR003 1.20 0.22 0.72 0.08 0.14 0.02 1.15 3.53P65HO001 0.17 0.03 0.84 0.10 0.00 0.00 0.18 1.32P65HO002 0.20 0.03 0.84 0.10 0.00 0.00 0.21 1.38P65WC001 0.18 0.03 0.96 0.11 0.00 0.00 0.17 1.45
2 239
EP 1110-1-8, Vol. 330 Nov 09
2-301
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
P65 cont.P65WC002 0.19 0.03 0.96 0.11 0.00 0.00 0.18 1.47
P70P70XX001 0.32 0.06 0.48 0.06 0.00 0.00 0.33 1.25P70XX002 0.84 0.16 1.43 0.17 0.00 0.00 0.85 3.45
R10R10CA001 1.07 0.19 0.00 0.08 0.00 0.00 1.15 2.49 1.32 0.19 0.00 0.08 0.00 0.00 1.57 3.16R10CA003 1.07 0.19 0.00 0.08 0.00 0.00 1.15 2.49 1.32 0.19 0.00 0.08 0.00 0.00 1.57 3.16R10CA005 1.07 0.19 0.00 0.08 0.00 0.00 1.15 2.49 1.32 0.19 0.00 0.08 0.00 0.00 1.57 3.16R10CA006 0.03 0.00 0.00 0.00 0.00 0.00 0.03 0.06 0.03 0.00 0.00 0.00 0.00 0.00 0.04 0.07R10CA007 2.46 0.42 0.00 0.08 0.00 0.00 2.63 5.59 3.03 0.44 0.00 0.08 0.00 0.00 3.60 7.15R10CA009 4.58 0.79 0.00 0.08 0.00 0.00 4.91 10.36 5.64 0.81 0.00 0.08 0.00 0.00 6.71 13.24R10CA010 0.18 0.03 0.00 0.00 0.00 0.00 0.20 0.41 0.23 0.03 0.00 0.00 0.00 0.00 0.27 0.53R10CA011 4.98 0.86 0.00 0.10 0.00 0.00 5.33 11.27 6.13 0.88 0.00 0.10 0.00 0.00 7.29 14.40R10CA012 5.88 1.01 0.00 0.10 0.00 0.00 6.29 13.28 7.24 1.04 0.00 0.10 0.00 0.00 8.60 16.98R10CA013 0.41 0.07 0.00 0.00 0.00 0.00 0.44 0.92 0.50 0.07 0.00 0.00 0.00 0.00 0.60 1.17R10CA014 6.41 1.11 0.00 0.16 0.00 0.00 6.86 14.54 7.89 1.13 0.00 0.16 0.00 0.00 9.38 18.56R10CA015 7.31 1.26 0.00 0.16 0.00 0.00 7.82 16.55 8.99 1.29 0.00 0.16 0.00 0.00 10.69 21.13R10CA016 0.41 0.07 0.00 0.00 0.00 0.00 0.44 0.92 0.51 0.07 0.00 0.00 0.00 0.00 0.60 1.18R10CA017 9.76 1.68 0.00 0.21 0.00 0.00 10.45 22.10 12.02 1.73 0.00 0.21 0.00 0.00 14.28 28.24R10CA018 11.65 2.01 0.00 0.22 0.00 0.00 12.47 26.35 14.34 2.06 0.00 0.22 0.00 0.00 17.05 33.67R10CA019 0.67 0.12 0.00 0.24 0.00 0.00 0.72 1.75 0.83 0.12 0.00 0.24 0.00 0.00 0.98 2.17R10CA020 11.84 2.04 0.00 0.23 0.00 0.00 12.67 26.78 14.57 2.09 0.00 0.23 0.00 0.00 17.32 34.21R10CA021 12.21 2.11 0.00 0.25 0.00 0.00 13.07 27.64 15.03 2.16 0.00 0.25 0.00 0.00 17.87 35.31R10CA022 0.11 0.02 0.00 0.00 0.00 0.00 0.12 0.25 0.14 0.02 0.00 0.00 0.00 0.00 0.17 0.33R10CA023 0.11 0.02 0.00 0.00 0.00 0.00 0.12 0.25 0.14 0.02 0.00 0.00 0.00 0.00 0.17 0.33
2 240
EP 1110-1-8, Vol. 330 Nov 09
2-302
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
R15R15SO001 9.88 2.30 0.00 0.40 1.33 0.17 8.70 22.78R15SO002 9.76 2.53 0.00 0.45 2.96 0.38 8.81 24.89R15SO003 14.53 3.53 0.00 0.67 2.96 0.38 12.92 34.99
R20R20RI002 2.72 0.57 0.00 0.25 0.00 0.00 2.68 6.22R20SO001 6.04 1.27 0.00 0.25 0.00 0.00 5.96 13.52
R30R30BO003 14.77 2.43 12.71 1.11 1.65 0.21 12.07 44.95R30BO004 8.68 1.48 9.82 0.86 1.78 0.23 7.14 29.99R30BO005 6.71 1.29 5.43 0.47 0.00 0.00 6.23 20.13R30BO006 7.97 1.53 9.59 0.84 0.00 0.00 7.40 27.33R30BO007 9.40 1.80 9.01 0.79 0.00 0.00 8.72 29.72R30BO008 43.03 10.71 51.06 4.46 0.00 0.00 42.43 151.69R30BO009 40.48 10.07 51.06 4.46 0.00 0.00 39.92 145.99R30CA003 24.65 6.14 27.72 2.42 0.00 0.00 24.31 85.24R30CA006 37.42 9.31 36.39 3.18 0.00 0.00 36.90 123.20R30CA009 51.78 12.89 54.64 4.77 0.00 0.00 51.07 175.15R30CA010 8.77 1.41 8.09 0.71 0.48 0.06 7.14 26.66R30CA011 10.06 1.62 12.13 1.06 0.67 0.09 8.19 33.82R30CA012 25.15 6.26 25.41 2.22 0.00 0.00 24.81 83.85R30CA013 38.94 9.69 36.39 3.18 0.00 0.00 38.40 126.60R30CA014 16.76 2.71 12.13 1.06 2.09 0.27 13.66 48.68R30RS001 1.26 0.24 3.40 0.30 0.00 0.00 1.17 6.37R30RS002 2.53 0.48 4.62 0.40 0.00 0.00 2.34 10.37R30RS003 6.75 1.10 9.24 0.81 0.60 0.08 5.51 24.09
2 241
EP 1110-1-8, Vol. 330 Nov 09
2-303
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
R30 cont.R30SI002 11.17 1.84 10.51 0.92 1.29 0.17 9.13 35.03R30SI003 14.00 2.29 10.97 0.96 1.29 0.17 11.43 41.11R30SI004 18.79 3.03 12.48 1.09 1.15 0.15 15.31 52.00R30SI005 10.07 1.93 8.66 0.76 0.00 0.00 9.35 30.77
R40R40BO001 8.13 1.40 6.54 0.76 0.00 0.00 8.02 24.85R40BO002 9.09 1.57 6.54 0.76 0.00 0.00 8.96 26.92
R45R45BO004 5.51 0.95 4.31 0.50 0.00 0.00 7.47 18.74R45BO005 6.74 1.16 6.01 0.70 0.00 0.00 9.14 23.75R45BO006 13.99 2.41 14.12 1.65 0.00 0.00 18.97 51.14R45BO007 16.16 2.79 17.12 2.00 0.00 0.00 21.91 59.98R45BO008 16.85 2.91 26.80 3.13 0.00 0.00 22.85 72.54R45CA001 4.76 0.82 4.18 0.49 0.00 0.00 6.45 16.70R45CA002 5.45 0.94 4.18 0.49 0.00 0.00 7.39 18.45R45CA005 13.19 2.28 9.15 1.07 0.00 0.00 17.89 43.58R45CA007 16.08 2.77 13.73 1.60 0.00 0.00 21.81 55.99R45CA010 20.00 3.45 18.95 2.21 0.00 0.00 27.12 71.73R45RS001 1.91 0.33 2.61 0.30 0.00 0.00 2.59 7.74R45SI008 3.70 0.64 4.58 0.53 0.00 0.00 5.02 14.47R45SI009 10.06 1.74 10.20 1.19 0.00 0.00 13.65 36.84R45SI010 13.50 2.33 16.60 1.94 0.00 0.00 18.32 52.69
R50R50BO005 5.87 1.21 4.71 0.55 1.44 0.19 7.88 21.85R50BO006 8.57 1.63 7.07 0.82 0.14 0.02 11.28 29.53
2 242
EP 1110-1-8, Vol. 330 Nov 09
2-304
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
R50 cont.R50BO007 11.73 2.25 7.07 0.82 0.45 0.06 15.47 37.85R50BO008 15.17 2.97 14.61 1.70 1.44 0.19 20.11 56.19R50BO009 21.67 4.20 18.38 2.14 1.44 0.19 28.66 76.68R50BO010 6.43 1.24 4.71 0.55 0.38 0.05 8.50 21.86R50BO011 9.22 1.76 7.07 0.82 0.14 0.02 12.14 31.17R50BO012 13.26 2.54 9.52 1.11 0.45 0.06 17.48 44.42R50BO013 16.31 3.19 12.35 1.44 1.44 0.19 21.60 56.52R50CA001 8.09 1.55 6.60 0.77 0.28 0.04 10.67 28.00R50CA002 9.45 1.81 6.60 0.77 0.28 0.04 12.45 31.40R50CA003 10.88 2.09 9.14 1.07 0.48 0.06 14.35 38.07R50CA004 13.05 2.51 9.42 1.10 0.48 0.06 17.21 43.83R50CA005 11.82 2.27 9.42 1.10 0.48 0.06 15.59 40.74R50CA009 14.69 2.87 14.14 1.65 1.36 0.18 19.47 54.36R50CA010 17.68 3.44 14.14 1.65 1.36 0.18 23.40 61.85R50CA011 18.16 3.53 14.14 1.65 1.36 0.18 24.03 63.05R50CA012 17.70 3.44 14.14 1.65 1.36 0.18 23.43 61.90R50IP001 8.27 1.61 7.54 0.88 0.58 0.07 10.94 29.89R50SI006 6.97 1.36 5.65 0.66 0.55 0.07 9.22 24.48R50SI007 7.48 1.45 5.65 0.66 0.55 0.07 9.89 25.75R50SI013 11.25 2.23 13.95 1.63 1.44 0.19 14.95 45.64R50SI016 12.12 2.39 13.95 1.63 1.44 0.19 16.10 47.82R50SI017 13.16 2.59 13.95 1.63 1.44 0.19 17.46 50.42R50SI022 9.59 1.85 9.42 1.10 0.50 0.06 12.66 35.18R50SI023 10.78 2.08 9.42 1.10 0.50 0.06 14.23 38.17R50SI024 5.32 1.03 2.64 0.31 0.33 0.04 7.04 16.71R50SI025 6.60 1.27 2.83 0.33 0.33 0.04 8.71 20.11R50SI026 13.23 2.53 9.80 1.14 0.33 0.04 17.44 44.51
2 243
EP 1110-1-8, Vol. 330 Nov 09
2-305
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
R55R55AE001 1.07 0.14 1.27 3.41 0.05 0.01 0.96 6.91R55AE002 1.32 0.17 1.27 5.11 0.05 0.01 1.18 9.11R55AE003 1.75 0.23 1.27 6.71 0.10 0.01 1.57 11.64R55AE004 2.26 0.30 1.27 7.11 0.19 0.02 2.04 13.19R55AE008 0.76 0.10 1.27 0.11 0.06 0.01 0.69 3.00R55AE009 0.29 0.04 1.43 0.12 0.00 0.00 0.26 2.14R55AE010 0.54 0.07 2.55 0.22 0.00 0.00 0.48 3.86R55AE011 0.46 0.07 0.80 0.07 0.11 0.01 0.43 1.95R55GL001 0.51 0.07 0.00 0.50 0.03 0.00 0.46 1.57R55GL002 1.00 0.13 0.80 0.57 0.05 0.01 0.90 3.46R55GL003 2.03 0.26 1.43 0.87 0.09 0.01 1.82 6.51R55GL004 2.49 0.31 1.43 1.12 0.04 0.01 2.23 7.63R55GL007 1.85 0.23 2.87 0.25 0.00 0.00 1.65 6.85R55GL008 0.70 0.10 1.75 0.15 0.11 0.01 0.63 3.45R55GL009 0.37 0.05 1.67 0.15 0.00 0.00 0.33 2.57R55GL011 0.90 0.11 2.55 0.22 0.00 0.00 0.80 4.58R55GL012 1.61 0.20 1.43 0.87 0.05 0.01 1.44 5.61R55GL013 0.12 0.03 0.00 0.25 0.09 0.01 0.12 0.62R55GL014 0.47 0.06 0.00 0.35 0.00 0.00 0.42 1.30R55GL015 1.51 0.19 1.43 0.12 0.00 0.00 1.35 4.60R55GL016 0.84 0.10 1.43 0.12 0.00 0.00 0.75 3.24R55GL017 0.30 0.04 0.80 0.07 0.00 0.00 0.27 1.48R55GL018 0.31 0.04 0.80 0.07 0.00 0.00 0.28 1.50R55GL019 0.60 0.07 1.27 0.11 0.00 0.00 0.53 2.58
S10S10CA001 22.01 4.77 16.49 2.41 2.66 0.34 23.38 72.06 27.52 4.88 21.81 3.18 10.75 1.39 32.48 102.01
2 244
EP 1110-1-8, Vol. 330 Nov 09
2-306
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
S10 cont.S10CA002 23.38 7.47 24.97 2.91 12.17 1.57 28.37 100.84 26.43 7.53 33.03 3.85 49.16 6.34 33.76 160.10S10CA003 36.18 11.15 34.40 4.01 9.95 1.28 43.49 140.46 40.90 11.25 45.49 5.30 40.22 5.19 51.75 200.10
S15S15CA001 29.09 9.32 32.18 3.75 9.95 1.28 27.56 113.13 34.91 9.44 41.06 4.79 40.22 5.19 35.14 170.75S15CA002 44.33 14.15 39.67 4.63 13.81 1.78 41.97 160.34 53.20 14.33 50.62 5.90 55.82 7.20 53.51 240.58S15CA003 55.20 17.54 48.49 5.65 15.44 1.99 52.21 196.52 66.24 17.76 61.86 7.21 62.37 8.05 66.57 290.06S15JU001 30.16 9.41 37.20 4.34 2.63 0.34 28.42 112.50 36.19 9.52 47.47 5.54 9.77 1.26 36.23 145.98S15JU002 31.23 9.73 37.20 4.34 2.63 0.34 29.42 114.89 37.48 9.86 47.47 5.54 9.77 1.26 37.51 148.89
S20S20CA001 33.22 10.59 50.62 4.81 12.51 1.61 33.40 146.76 36.91 10.65 65.80 6.24 52.91 6.83 39.30 218.64S20CA002 35.14 11.18 50.62 4.81 12.51 1.61 35.32 151.19 39.05 11.24 65.80 6.24 52.91 6.83 41.56 223.63S20CA003 56.58 17.90 63.84 6.06 17.36 2.24 56.81 220.79 62.87 18.01 82.99 7.88 73.44 9.47 66.84 321.50S20CA004 58.98 18.64 63.84 6.06 17.36 2.24 59.20 226.32 65.53 18.75 82.99 7.88 73.44 9.47 69.65 327.71S20CA005 65.67 21.20 86.64 8.22 33.13 4.27 66.21 285.34 72.96 21.33 112.63 10.69 140.16 18.08 77.90 453.75S20CA006 74.05 23.32 86.64 8.22 19.40 2.50 74.28 288.41 82.28 23.47 112.63 10.69 82.06 10.59 87.39 409.11
S25S25JD001 3.29 0.90 0.00 1.50 1.19 0.15 2.75 9.78 3.95 0.91 0.00 1.50 4.44 0.57 3.54 14.91S25JD002 4.05 1.12 0.00 1.50 1.79 0.23 3.40 12.09 4.85 1.14 0.00 1.50 6.66 0.86 4.37 19.38S25RI001 2.87 0.74 0.00 1.50 0.38 0.05 2.38 7.92 3.45 0.75 0.00 1.50 1.42 0.18 3.05 10.35S25RI002 3.20 0.83 0.00 1.50 0.57 0.07 2.65 8.82 3.84 0.85 0.00 1.50 2.13 0.27 3.41 12.00S25RM001 7.60 2.09 0.00 1.50 3.82 0.49 6.37 21.87 9.11 2.12 0.00 1.50 14.05 1.81 8.19 36.78S25RM002 11.03 3.09 0.00 1.50 6.28 0.81 9.28 31.99 13.24 3.14 0.00 1.50 23.26 3.00 11.94 56.08S25RM003 5.53 1.58 0.00 1.50 3.82 0.49 4.67 17.59 6.63 1.60 0.00 1.50 14.05 1.81 6.01 31.60
S30S30HW001 11.85 4.96 14.46 5.93 1.10 0.14 12.51 50.95 19.75 5.11 17.36 8.61 1.24 0.16 26.06 78.29
2 245
EP 1110-1-8, Vol. 330 Nov 09
2-307
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
S30 cont.S30HW002 16.03 6.69 20.25 8.31 1.35 0.17 16.92 69.72 26.72 6.90 24.30 12.06 1.51 0.19 35.25 106.93S30HW005 6.36 2.67 2.31 0.95 0.66 0.09 4.37 17.41 10.61 2.75 2.78 1.38 0.74 0.10 9.52 27.88S30HW006 10.69 4.45 5.79 2.38 0.71 0.09 7.33 31.44 17.82 4.58 6.94 3.44 0.79 0.10 15.98 49.65S30HW007 11.63 4.83 7.23 2.97 0.71 0.09 7.97 35.43 19.39 4.98 8.68 4.31 0.79 0.10 17.39 55.64S30HW008 12.16 5.05 7.23 2.97 0.71 0.09 8.34 36.55 20.27 5.20 8.68 4.31 0.79 0.10 18.18 57.53S30HW009 12.54 5.23 8.68 3.56 1.05 0.14 8.60 39.80 20.89 5.40 10.41 5.17 1.17 0.15 18.75 61.94S30HW010 15.31 6.38 11.57 4.75 1.16 0.15 10.50 49.82 25.51 6.58 13.88 6.89 1.30 0.17 22.89 77.22S30HW011 14.99 6.25 11.57 4.75 1.21 0.16 10.28 49.21 24.98 6.45 13.88 6.89 1.36 0.18 22.42 76.16S30HW012 17.74 7.39 11.57 4.75 1.35 0.17 12.16 55.13 29.57 7.62 13.88 6.89 1.51 0.19 26.53 86.19S30HW013 14.25 5.94 26.03 10.68 1.08 0.14 15.04 73.16 23.75 6.12 31.24 15.50 1.20 0.15 31.33 109.29S30HW014 11.59 2.08 0.87 0.36 0.42 0.05 9.78 25.15 14.49 2.13 1.04 0.52 0.48 0.06 15.30 34.02S30HW015 12.76 2.28 1.45 0.59 0.42 0.05 10.77 28.32 15.95 2.34 1.74 0.86 0.48 0.06 16.83 38.26S30HW016 12.06 2.16 1.16 0.48 0.42 0.05 10.18 26.51 15.08 2.22 1.39 0.69 0.48 0.06 15.92 35.84S30HW017 12.98 2.32 1.45 0.59 0.42 0.05 10.96 28.77 16.23 2.38 1.74 0.86 0.48 0.06 17.13 38.88S30HW018 15.28 2.76 2.31 0.95 0.80 0.10 12.91 35.11 19.10 2.84 2.78 1.38 0.88 0.11 20.19 47.28S30KB001 3.10 0.58 0.58 0.24 0.37 0.05 2.30 7.22 3.88 0.60 0.69 0.34 0.43 0.06 3.50 9.50S30KB002 4.02 0.75 0.87 0.36 0.47 0.06 2.98 9.51 5.02 0.77 1.04 0.52 0.53 0.07 4.53 12.48S30KB003 3.38 0.62 1.16 0.48 0.26 0.03 2.50 8.43 4.22 0.64 1.39 0.69 0.29 0.04 3.80 11.07S30KB004 4.90 0.94 1.45 0.59 0.81 0.10 3.65 12.44 6.13 0.97 1.74 0.86 0.89 0.11 5.54 16.24S30KB005 3.81 0.72 1.45 0.59 0.53 0.07 2.83 10.00 4.77 0.74 1.74 0.86 0.61 0.08 4.31 13.11S30KB006 5.60 1.07 1.74 0.71 0.85 0.11 4.16 14.24 7.00 1.10 2.08 1.03 0.95 0.12 6.33 18.61S30KB007 3.60 0.67 0.58 0.24 0.37 0.05 2.67 8.18 4.50 0.69 0.69 0.34 0.43 0.06 4.06 10.77S30KB008 4.46 0.83 0.87 0.36 0.41 0.05 3.30 10.28 5.57 0.85 1.04 0.52 0.47 0.06 5.02 13.53S30KB009 6.03 1.14 0.87 0.36 0.81 0.10 4.48 13.79 7.54 1.18 1.04 0.52 0.91 0.12 6.81 18.12S30KB010 3.72 0.70 1.16 0.48 0.49 0.06 2.76 9.37 4.65 0.72 1.39 0.69 0.56 0.07 4.20 12.28S30KB011 5.42 1.01 1.45 0.59 0.54 0.07 4.02 13.10 6.77 1.03 1.74 0.86 0.61 0.08 6.10 17.19S30KB012 6.42 1.22 1.45 0.59 0.88 0.11 4.77 15.44 8.02 1.25 1.74 0.86 0.97 0.13 7.24 20.21
2 246
EP 1110-1-8, Vol. 330 Nov 09
2-308
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
S30 cont.S30KB013 4.34 0.82 1.45 0.59 0.53 0.07 3.22 11.02 5.42 0.84 1.74 0.86 0.61 0.08 4.89 14.44S30KB014 5.87 1.09 1.74 0.71 0.59 0.08 4.35 14.43 7.33 1.12 2.08 1.03 0.67 0.09 6.61 18.93S30KB015 7.86 1.48 2.31 0.95 0.94 0.12 5.83 19.49 9.83 1.52 2.78 1.38 1.04 0.13 8.86 25.54S30KB018 9.29 1.69 1.45 0.59 0.56 0.07 6.87 20.52 11.62 1.73 1.74 0.86 0.64 0.08 10.44 27.11S30KB021 10.78 1.96 2.31 0.95 0.63 0.08 7.97 24.68 13.48 2.01 2.78 1.38 0.72 0.09 12.11 32.57S30KB024 12.37 2.24 3.47 1.42 0.70 0.09 9.14 29.43 15.46 2.30 4.17 2.07 0.80 0.10 13.89 38.79S30KB025 6.57 1.20 1.16 0.48 0.47 0.06 4.86 14.80 8.21 1.23 1.39 0.69 0.53 0.07 7.39 19.51S30KB026 7.84 1.43 1.16 0.48 0.51 0.07 5.80 17.29 9.80 1.47 1.39 0.69 0.57 0.07 8.81 22.80S30KB027 9.96 1.80 1.45 0.59 0.56 0.07 7.36 21.79 12.45 1.85 1.74 0.86 0.64 0.08 11.19 28.81S30KB028 7.48 1.37 1.74 0.71 0.52 0.07 5.54 17.43 9.36 1.40 2.08 1.03 0.58 0.07 8.41 22.93S30KB029 9.04 1.64 1.74 0.71 0.56 0.07 6.69 20.45 11.30 1.69 2.08 1.03 0.64 0.08 10.16 26.98S30KB030 11.40 2.06 2.31 0.95 0.63 0.08 8.43 25.86 14.25 2.12 2.78 1.38 0.72 0.09 12.80 34.14S30KB031 9.79 1.77 2.89 1.19 0.56 0.07 7.23 23.50 12.23 1.82 3.47 1.72 0.64 0.08 10.99 30.95S30KB032 11.55 2.09 2.89 1.19 0.65 0.08 8.54 26.99 14.44 2.15 3.47 1.72 0.72 0.09 12.97 35.56S30KB033 13.34 2.41 3.47 1.42 0.70 0.09 9.85 31.28 16.67 2.48 4.17 2.07 0.80 0.10 14.98 41.27S30KB034 4.75 0.89 0.87 0.36 0.52 0.07 3.52 10.98 5.94 0.91 1.04 0.52 0.58 0.07 5.35 14.41S30KB035 5.41 1.01 1.16 0.48 0.61 0.08 4.01 12.76 6.76 1.04 1.39 0.69 0.69 0.09 6.10 16.76S30KB036 5.09 0.95 1.16 0.48 0.56 0.07 3.77 12.08 6.36 0.98 1.39 0.69 0.64 0.08 5.74 15.88S30KB041 5.81 1.09 1.16 0.48 0.68 0.09 4.31 13.62 7.26 1.12 1.39 0.69 0.76 0.10 6.55 17.87S30KB042 8.30 1.50 1.74 0.71 0.47 0.06 6.13 18.91 10.37 1.55 2.08 1.03 0.53 0.07 9.32 24.95S30KB043 12.38 2.22 0.87 0.36 0.51 0.07 9.14 25.55 15.47 2.28 1.04 0.52 0.57 0.07 13.89 33.84S30KB044 15.27 2.73 0.87 0.36 0.51 0.07 11.27 31.08 19.08 2.80 1.04 0.52 0.57 0.07 17.13 41.21S30KB045 20.55 8.49 33.93 3.47 0.85 0.11 21.66 89.06 34.24 8.76 40.49 4.96 0.95 0.12 45.13 134.65S30KB046 14.25 5.93 15.74 6.46 1.02 0.13 18.03 61.56 23.75 6.12 18.88 9.37 1.14 0.15 40.07 99.48S30KB047 17.89 7.40 18.22 7.47 0.77 0.10 22.62 74.47 29.81 7.63 21.87 10.85 0.85 0.11 50.26 121.38S30KB048 15.61 2.80 4.92 2.02 0.59 0.08 13.18 39.20 19.51 2.87 5.90 2.93 0.66 0.09 20.60 52.56S30KB049 17.65 3.30 5.21 2.14 2.05 0.26 14.96 45.57 22.06 3.39 6.25 3.10 2.31 0.30 23.39 60.80
2 247
EP 1110-1-8, Vol. 330 Nov 09
2-309
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
S30 cont.S30KB050 22.33 3.98 14.46 5.93 0.57 0.07 18.84 66.18 27.92 4.09 17.36 8.61 0.63 0.08 29.45 88.14S30KB051 28.32 5.06 14.46 5.93 0.85 0.11 23.90 78.63 35.40 5.20 17.36 8.61 0.95 0.12 37.36 105.00S30KB052 29.94 5.28 14.46 5.93 0.28 0.04 25.23 81.16 37.42 5.42 17.36 8.61 0.32 0.04 39.44 108.61S30KB053 8.56 1.55 2.31 0.95 0.51 0.07 6.33 20.28 10.70 1.60 2.78 1.38 0.57 0.07 9.62 26.72S30KB054 8.50 1.54 0.87 0.36 0.47 0.06 6.28 18.08 10.62 1.58 1.04 0.52 0.53 0.07 9.54 23.90S30KB055 13.31 5.52 23.09 2.36 0.71 0.09 9.12 54.20 22.18 5.69 27.56 3.38 0.79 0.10 19.89 79.59S30KB056 13.64 5.65 23.09 2.36 0.71 0.09 9.35 54.89 22.73 5.83 27.56 3.38 0.79 0.10 20.38 80.77S30KB057 15.24 6.31 23.09 2.36 0.71 0.09 10.44 58.24 25.40 6.50 27.56 3.38 0.79 0.10 22.77 86.50S30KB058 14.27 5.90 7.52 3.08 0.66 0.09 9.78 41.30 23.78 6.09 9.02 4.48 0.74 0.10 21.32 65.53S30KB059 22.41 9.26 17.36 7.12 0.95 0.12 15.35 72.57 37.35 9.55 20.83 10.34 1.05 0.14 33.48 112.74S30PU001 22.58 4.00 20.26 2.07 0.55 0.07 16.65 66.18 28.22 4.11 24.18 2.96 0.65 0.08 25.30 85.50S30PU002 44.02 7.79 32.98 3.37 0.95 0.12 32.46 121.69 55.02 8.01 39.37 4.82 1.12 0.14 49.33 157.81S30PU003 57.08 10.09 32.98 3.37 1.03 0.13 42.08 146.76 71.35 10.37 39.37 4.82 1.21 0.16 63.95 191.23S30RA002 6.58 1.17 2.36 0.24 0.15 0.02 5.55 16.07 8.22 1.20 2.81 0.34 0.17 0.02 8.67 21.43S30RA003 10.36 1.85 4.62 0.47 0.31 0.04 8.75 26.40 12.96 1.90 5.51 0.67 0.34 0.04 13.67 35.09S30TS001 3.30 0.61 0.69 0.28 0.32 0.04 2.45 7.69 4.13 0.63 0.83 0.41 0.36 0.05 3.72 10.13S30TS002 4.50 0.83 0.98 0.40 0.39 0.05 3.33 10.48 5.63 0.85 1.18 0.59 0.45 0.06 5.07 13.83S30TS003 3.40 0.63 0.98 0.40 0.37 0.05 2.52 8.35 4.25 0.65 1.18 0.59 0.41 0.05 3.83 10.96S30TS004 4.63 0.86 1.27 0.52 0.46 0.06 3.43 11.23 5.78 0.88 1.53 0.76 0.52 0.07 5.21 14.75S30TS005 3.56 0.67 1.27 0.52 0.41 0.05 2.64 9.12 4.45 0.69 1.53 0.76 0.47 0.06 4.01 11.97S30TS006 4.84 0.90 1.56 0.64 0.53 0.07 3.59 12.13 6.05 0.93 1.87 0.93 0.59 0.08 5.45 15.90S30TS007 4.28 0.80 1.85 0.76 0.46 0.06 3.17 11.38 5.35 0.82 2.22 1.10 0.52 0.07 4.82 14.90S30TS008 7.31 1.34 2.43 1.00 0.59 0.08 5.41 18.16 9.13 1.38 2.92 1.45 0.67 0.09 8.22 23.86S30TS009 10.96 4.49 17.36 10.12 0.00 0.00 11.54 54.47 18.27 4.62 20.83 13.34 0.00 0.00 24.05 81.11S30TS010 16.23 6.64 23.14 13.49 0.00 0.00 17.10 76.60 27.05 6.85 27.77 17.78 0.00 0.00 35.62 115.07S30TS011 26.92 11.02 46.28 26.99 0.00 0.00 28.36 139.57 44.87 11.36 55.54 35.56 0.00 0.00 59.08 206.41
2 248
EP 1110-1-8, Vol. 330 Nov 09
2-310
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
S35S35AR001 0.50 0.09 0.00 0.00 0.00 0.00 0.47 1.06S35AR002 0.71 0.12 0.00 0.00 0.00 0.00 0.67 1.50
S40S40BO002 32.03 6.86 37.21 3.80 1.71 0.22 32.06 113.89 40.04 7.02 48.15 4.92 7.03 0.91 44.79 152.86S40BO003 31.36 6.72 37.21 3.80 1.71 0.22 31.38 112.40 39.20 6.88 48.15 4.92 7.03 0.91 43.85 150.94S40BO004 30.76 6.59 37.21 3.80 1.71 0.22 30.79 111.08 38.45 6.75 48.15 4.92 7.03 0.91 43.02 149.23S40CA001 29.25 6.24 31.94 3.26 1.58 0.20 29.25 101.72 36.56 6.39 41.33 4.22 6.06 0.78 40.87 136.21S40CA002 27.79 5.99 31.94 3.26 1.65 0.21 27.85 98.69 34.73 6.13 41.33 4.22 6.28 0.81 38.91 132.41S40CA003 22.09 5.05 36.18 3.70 9.25 1.19 22.41 99.87 27.62 5.17 46.82 4.78 36.45 4.70 31.31 156.85S40CA004 38.41 8.39 55.81 5.70 6.80 0.88 38.60 154.59 48.02 8.59 72.23 7.38 26.48 3.42 53.93 220.05
S45S45DA004 1.67 0.22 0.00 0.25 0.00 0.00 1.98 4.12S45DA005 2.00 0.27 0.00 0.25 0.00 0.00 2.37 4.89S45DA007 2.11 0.28 0.00 0.25 0.00 0.00 2.50 5.14
T10T10CA001 1.10 0.23 0.00 0.08 0.00 0.00 1.05 2.46 1.37 0.24 0.00 0.08 0.00 0.00 1.47 3.16T10CA002 1.65 0.35 0.00 0.08 0.00 0.00 1.57 3.65 2.06 0.36 0.00 0.08 0.00 0.00 2.21 4.71T10CA004 1.22 0.26 0.00 0.08 0.00 0.00 1.16 2.72 1.52 0.26 0.00 0.08 0.00 0.00 1.63 3.49T10CA005 1.65 0.35 0.00 0.08 0.00 0.00 1.57 3.65 2.06 0.36 0.00 0.08 0.00 0.00 2.21 4.71T10CA007 1.84 0.39 0.00 0.08 0.00 0.00 1.75 4.06 2.31 0.40 0.00 0.08 0.00 0.00 2.47 5.26T10CA008 2.47 0.52 0.00 0.08 0.00 0.00 2.35 5.42 3.08 0.53 0.00 0.08 0.00 0.00 3.30 6.99T10CA009 2.25 0.47 0.00 0.08 0.00 0.00 2.14 4.94 2.81 0.48 0.00 0.08 0.00 0.00 3.00 6.37T10CA010 2.46 0.52 0.00 0.08 0.00 0.00 2.34 5.40 3.07 0.53 0.00 0.08 0.00 0.00 3.28 6.96T10CA011 3.44 0.72 0.00 0.08 0.00 0.00 3.27 7.51 4.29 0.74 0.00 0.08 0.00 0.00 4.60 9.71T10CA012 3.31 0.70 0.00 0.08 0.00 0.00 3.15 7.24 4.14 0.71 0.00 0.08 0.00 0.00 4.43 9.36
2 249
EP 1110-1-8, Vol. 330 Nov 09
2-311
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
T10 cont.T10CA013 3.63 0.77 0.00 0.08 0.00 0.00 3.46 7.94 4.54 0.78 0.00 0.08 0.00 0.00 4.86 10.26T10CA014 3.02 0.64 0.00 0.08 0.00 0.00 2.88 6.62 3.78 0.65 0.00 0.08 0.00 0.00 4.04 8.55T10CA015 4.52 0.95 0.00 0.10 0.00 0.00 4.30 9.87 5.64 0.97 0.00 0.10 0.00 0.00 6.04 12.75T10CA016 4.41 0.93 0.00 0.12 0.00 0.00 4.19 9.65 5.51 0.95 0.00 0.12 0.00 0.00 5.90 12.48T10CA017 4.78 1.01 0.00 0.13 0.00 0.00 4.55 10.47 5.98 1.03 0.00 0.13 0.00 0.00 6.40 13.54T10CA018 4.23 0.89 0.00 0.13 0.00 0.00 4.02 9.27 5.29 0.91 0.00 0.13 0.00 0.00 5.66 11.99T10CA019 0.12 0.03 0.00 0.05 0.00 0.00 0.12 0.32 0.15 0.03 0.00 0.05 0.00 0.00 0.16 0.39T10CA020 4.50 0.95 0.00 0.15 0.00 0.00 4.28 9.88 5.62 0.97 0.00 0.15 0.00 0.00 6.02 12.76T10CA021 5.99 1.26 0.00 0.19 0.00 0.00 5.70 13.14 7.49 1.29 0.00 0.19 0.00 0.00 8.01 16.98T10CA022 6.50 1.37 0.00 0.19 0.00 0.00 6.18 14.24 8.12 1.40 0.00 0.19 0.00 0.00 8.69 18.40T10CA023 6.05 1.27 0.00 0.20 0.00 0.00 5.75 13.27 7.56 1.30 0.00 0.20 0.00 0.00 8.09 17.15T10CA024 8.90 1.87 0.00 0.28 0.00 0.00 8.47 19.52 11.13 1.92 0.00 0.28 0.00 0.00 11.90 25.23T10CA025 9.50 2.00 0.00 0.29 0.00 0.00 9.03 20.82 11.87 2.05 0.00 0.29 0.00 0.00 12.70 26.91T10CA026 12.95 2.73 0.00 0.40 0.00 0.00 12.32 28.40 16.18 2.79 0.00 0.40 0.00 0.00 17.32 36.69T10CA027 13.95 2.94 0.00 0.42 0.00 0.00 13.27 30.58 17.44 3.01 0.00 0.42 0.00 0.00 18.66 39.53T10JD001 1.05 0.23 0.00 0.25 0.09 0.01 1.01 2.64 1.31 0.24 0.00 0.25 0.10 0.01 1.41 3.32
T15T15CA002 6.70 1.72 7.24 0.95 0.00 0.00 10.01 26.62 8.37 1.75 9.36 1.23 0.00 0.00 14.22 34.93T15CA005 8.28 2.12 8.27 1.09 0.00 0.00 12.37 32.13 10.35 2.16 10.70 1.41 0.00 0.00 17.58 42.20T15CA008 16.52 4.24 14.99 1.97 0.00 0.00 24.69 62.41 20.65 4.31 19.40 2.55 0.00 0.00 35.08 81.99T15CA009 23.69 6.07 17.05 2.24 0.00 0.00 35.40 84.45 29.62 6.19 22.07 2.90 0.00 0.00 50.31 111.09T15CA011 23.03 5.90 19.12 2.52 0.00 0.00 34.41 84.98 28.78 6.01 24.75 3.26 0.00 0.00 48.89 111.69T15CA012 23.56 6.71 24.81 2.54 0.00 0.00 35.84 93.46 28.04 6.80 32.10 3.29 0.00 0.00 44.46 114.69T15CA014 27.94 7.97 24.81 2.54 0.00 0.00 42.51 105.77 33.26 8.07 32.10 3.29 0.00 0.00 52.74 129.46T15CA016 31.05 8.85 32.04 3.28 0.00 0.00 47.24 122.46 36.97 8.97 41.47 4.24 0.00 0.00 58.61 150.26T15CA017 41.28 11.77 42.38 4.34 0.00 0.00 62.81 162.58 49.15 11.93 54.84 5.61 0.00 0.00 77.91 199.44T15CA018 52.12 15.97 51.13 2.90 0.00 0.00 74.34 196.46 62.55 16.17 65.24 3.70 0.00 0.00 100.39 248.05
2 250
EP 1110-1-8, Vol. 330 Nov 09
2-312
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
T15 cont.T15CA019 80.92 24.79 74.94 4.25 0.00 0.00 115.41 300.31 97.10 25.10 95.61 5.43 0.00 0.00 155.85 379.09T15CA020 8.45 2.17 8.27 1.09 0.00 0.00 12.63 32.61 10.56 2.21 10.70 1.41 0.00 0.00 17.94 42.82T15CA021 8.75 2.24 9.30 1.22 0.00 0.00 13.07 34.58 10.93 2.28 12.04 1.58 0.00 0.00 18.57 45.40T15CA022 9.26 2.37 9.30 1.22 0.00 0.00 13.84 35.99 11.58 2.42 12.04 1.58 0.00 0.00 19.67 47.29T15CA023 23.69 6.07 17.05 2.24 0.00 0.00 35.40 84.45 29.62 6.19 22.07 2.90 0.00 0.00 50.31 111.09T15CA024 11.83 3.03 11.37 1.50 0.00 0.00 17.68 45.41 14.79 3.09 14.71 1.94 0.00 0.00 25.12 59.65T15CS004 7.55 1.93 6.93 0.91 0.00 0.00 11.28 28.60 9.43 1.97 8.96 1.18 0.00 0.00 16.02 37.56T15CS007 13.17 3.38 12.30 1.62 0.00 0.00 19.68 50.15 16.46 3.44 15.92 2.09 0.00 0.00 27.96 65.87T15JD005 6.03 1.55 7.24 0.95 0.00 0.00 9.01 24.78 7.53 1.57 9.36 1.23 0.00 0.00 12.80 32.49T15JD006 7.17 1.84 7.65 1.01 0.00 0.00 10.72 28.39 8.97 1.87 9.90 1.30 0.00 0.00 15.23 37.27T15JD007 8.24 2.11 9.30 1.22 0.00 0.00 12.31 33.18 10.30 2.15 12.04 1.58 0.00 0.00 17.50 43.57T15JD008 14.56 3.73 14.47 1.90 0.00 0.00 21.75 56.41 18.20 3.80 18.73 2.46 0.00 0.00 30.91 74.10T15JD009 15.31 3.93 14.47 1.90 0.00 0.00 22.88 58.49 19.14 4.00 18.73 2.46 0.00 0.00 32.51 76.84T15JD010 18.99 4.87 19.12 2.52 0.00 0.00 28.37 73.87 23.73 4.96 24.75 3.26 0.00 0.00 40.31 97.01T15JD011 20.56 5.27 19.12 2.52 0.00 0.00 30.72 78.19 25.69 5.37 24.75 3.26 0.00 0.00 43.64 102.71T15KM008 35.50 10.12 32.04 3.28 0.00 0.00 54.01 134.95 42.27 10.26 41.47 4.24 0.00 0.00 67.01 165.25
T20T20CA001 21.09 5.63 21.16 2.17 3.39 0.44 14.74 68.62 22.71 5.67 27.00 2.76 14.26 1.84 17.19 91.43T20CA002 29.97 8.21 29.89 3.06 10.18 1.31 21.03 103.65 32.27 8.26 38.13 3.90 42.75 5.51 24.52 155.34T20CA003 44.00 12.37 42.40 4.34 14.71 1.90 31.00 150.72 47.38 12.45 54.10 5.54 61.80 7.97 36.15 225.39
T25T25CA006 17.49 3.36 25.16 2.57 0.00 0.00 17.24 65.82T25CA007 19.19 3.68 27.52 2.82 0.00 0.00 18.92 72.13T25CA008 20.79 3.99 33.27 3.40 0.00 0.00 20.50 81.95T25JD008 8.75 1.43 10.37 1.06 0.63 0.08 7.14 29.46T25JD009 10.70 1.73 16.49 1.69 0.63 0.08 8.72 40.04
2 251
EP 1110-1-8, Vol. 330 Nov 09
2-313
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
T25 cont.T25JD010 11.87 1.98 21.20 2.17 1.38 0.18 9.72 48.50T25JD012 16.62 2.94 30.63 3.13 3.89 0.50 13.74 71.45T25JD013 21.40 3.70 40.05 4.10 3.89 0.50 17.62 91.26T25JD014 16.13 2.65 25.92 2.65 1.38 0.18 13.18 62.09T25JD015 1.76 0.31 4.24 0.43 0.36 0.05 1.45 8.60T25JD016 2.63 0.44 5.28 0.54 0.36 0.05 2.16 11.46T25JD017 3.06 0.51 5.28 0.54 0.36 0.05 2.50 12.30T25JD018 3.82 0.63 6.31 0.65 0.36 0.05 3.13 14.95T25JD019 4.03 0.67 7.63 0.78 0.48 0.06 3.30 16.95T25JD020 3.94 0.73 8.58 0.88 1.43 0.18 3.28 19.02
T30T30DW005 3.52 0.63 4.15 0.42 0.23 0.03 3.93 12.91 4.69 0.65 5.48 0.56 0.87 0.11 5.82 18.18T30DW011 20.67 3.57 17.43 1.78 0.00 0.00 22.95 66.40 27.56 3.70 23.06 2.36 0.00 0.00 33.97 90.65T30DW012 0.90 0.16 2.26 0.23 0.06 0.01 1.00 4.62 1.20 0.17 2.95 0.30 0.20 0.03 1.48 6.33T30DW013 1.25 0.23 3.13 0.32 0.12 0.02 1.40 6.47 1.66 0.23 4.09 0.42 0.42 0.05 2.07 8.94T30DW014 3.21 0.59 3.30 0.34 0.41 0.05 3.61 11.51 4.28 0.61 4.36 0.45 1.53 0.20 5.35 16.78T30DW016 5.79 1.02 5.37 0.55 0.23 0.03 6.46 19.45 7.72 1.06 7.10 0.73 0.87 0.11 9.56 27.15T30DW017 7.22 1.28 6.60 0.67 0.41 0.05 8.06 24.29 9.63 1.33 8.72 0.89 1.53 0.20 11.94 34.24T30DW018 8.11 1.44 7.35 0.75 0.41 0.05 9.05 27.16 10.81 1.49 9.72 0.99 1.53 0.20 13.40 38.14T30TM001 31.25 5.39 17.43 1.78 0.00 0.00 34.69 90.54 41.67 5.59 23.06 2.36 0.00 0.00 51.36 124.04T30TM004 33.75 5.82 17.43 1.78 0.00 0.00 37.46 96.24 45.00 6.04 23.06 2.36 0.00 0.00 55.46 131.92T30TM007 44.59 7.69 20.73 2.12 0.00 0.00 49.49 124.62 59.45 7.98 27.42 2.81 0.00 0.00 73.27 170.93T30TM008 44.88 7.74 20.73 2.12 0.00 0.00 49.81 125.28 59.84 8.03 27.42 2.81 0.00 0.00 73.75 171.85T30TM009 43.94 7.58 25.44 2.60 0.00 0.00 48.78 128.34 58.59 7.86 33.65 3.44 0.00 0.00 72.21 175.75T30TM012 76.63 13.22 36.28 3.71 0.00 0.00 85.06 214.90 102.17 13.71 47.99 4.91 0.00 0.00 125.93 294.71T30TM013 125.59 21.67 49.48 5.06 0.00 0.00 139.41 341.21 167.45 22.47 65.44 6.70 0.00 0.00 206.39 468.45T30TM014 120.24 20.75 49.48 5.06 0.00 0.00 133.47 329.00 160.32 21.52 65.44 6.70 0.00 0.00 197.60 451.58
2 252
EP 1110-1-8, Vol. 330 Nov 09
2-314
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
T30 cont.T30TM015 128.22 22.13 49.48 5.06 0.00 0.00 142.32 347.21 170.96 22.94 65.44 6.70 0.00 0.00 210.71 476.75T30VE007 17.41 3.00 11.78 1.20 0.00 0.00 19.32 52.71 23.21 3.12 15.58 1.59 0.00 0.00 28.61 72.11T30VE008 22.12 3.82 17.43 1.78 0.00 0.00 24.56 69.71 29.50 3.96 23.06 2.36 0.00 0.00 36.35 95.23T30VE009 35.82 6.18 23.56 2.41 0.00 0.00 39.76 107.73 47.76 6.41 31.16 3.19 0.00 0.00 58.86 147.38T30VE010 43.48 7.50 25.92 2.65 0.00 0.00 48.26 127.81 57.97 7.78 34.28 3.51 0.00 0.00 71.45 174.99
T35T35CT001 23.51 4.06 13.19 1.35 0.00 0.00 26.09 68.20 31.34 4.21 17.45 1.78 0.00 0.00 38.63 93.41T35CT002 28.95 5.00 13.19 1.35 0.00 0.00 32.13 80.62 38.60 5.18 17.45 1.78 0.00 0.00 47.57 110.58T35CT003 32.51 5.61 17.43 1.78 0.00 0.00 36.08 93.41 43.34 5.82 23.06 2.36 0.00 0.00 53.42 128.00T35CT004 30.62 5.28 9.61 0.98 0.00 0.00 33.99 80.48 40.83 5.48 12.71 1.30 0.00 0.00 50.32 110.64T35CT005 28.96 5.00 9.61 0.98 0.00 0.00 32.15 76.70 38.62 5.18 12.71 1.30 0.00 0.00 47.60 105.41T35CT006 28.96 5.00 9.61 0.98 0.00 0.00 32.15 76.70 38.62 5.18 12.71 1.30 0.00 0.00 47.60 105.41T35CT007 32.05 5.53 9.61 0.98 0.00 0.00 35.57 83.74 42.73 5.73 12.71 1.30 0.00 0.00 52.66 115.13T35CT008 41.05 7.08 14.14 1.44 0.00 0.00 45.57 109.28 54.74 7.35 18.70 1.91 0.00 0.00 67.47 150.17T35CT009 47.79 8.25 14.14 1.44 0.00 0.00 53.05 124.67 63.72 8.55 18.70 1.91 0.00 0.00 78.54 171.42T35CT010 46.81 8.08 14.14 1.44 0.00 0.00 51.96 122.43 62.42 8.38 18.70 1.91 0.00 0.00 76.93 168.34T35CT011 56.25 9.71 16.49 1.68 0.00 0.00 62.43 146.56 74.99 10.06 21.81 2.23 0.00 0.00 92.43 201.52
T40T40AG001 8.44 1.49 7.54 0.88 0.39 0.05 7.03 25.82T40AH001 2.70 0.47 0.00 0.25 0.00 0.00 2.56 5.98T40AH003 4.01 0.69 0.00 0.25 0.00 0.00 3.80 8.75T40AH004 4.96 0.86 0.00 0.25 0.00 0.00 4.70 10.77T40GN001 1.77 0.25 0.00 0.00 0.00 0.00 1.30 3.32 2.18 0.26 0.00 0.00 0.00 0.00 1.83 4.27T40KF011 0.27 0.05 0.00 0.00 0.00 0.00 0.19 0.51T40KF013 0.40 0.07 0.00 0.00 0.00 0.00 0.29 0.76T40KF014 0.36 0.06 0.00 0.00 0.00 0.00 0.26 0.68
2 253
EP 1110-1-8, Vol. 330 Nov 09
2-315
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
T40 cont.T40KF016 0.52 0.09 0.00 0.00 0.00 0.00 0.37 0.98T40KF018 0.63 0.11 0.00 0.00 0.00 0.00 0.45 1.19T40KF020 0.73 0.13 0.00 0.00 0.00 0.00 0.52 1.38T40KF021 0.30 0.05 0.00 0.10 0.00 0.00 0.25 0.70T40KF022 0.59 0.10 0.00 0.10 0.00 0.00 0.49 1.28T40KF023 0.40 0.07 0.00 0.05 0.00 0.00 0.33 0.85T40KF024 0.47 0.08 0.00 0.05 0.00 0.00 0.39 0.99T40MY002 0.59 0.08 0.00 0.00 0.00 0.00 0.43 1.10 0.72 0.09 0.00 0.00 0.00 0.00 0.61 1.42T40MY003 0.73 0.10 0.00 0.00 0.00 0.00 0.54 1.37 0.90 0.11 0.00 0.00 0.00 0.00 0.75 1.76T40MY004 0.84 0.12 0.00 0.00 0.00 0.00 0.62 1.58 1.04 0.13 0.00 0.00 0.00 0.00 0.87 2.04T40MY005 1.19 0.17 0.00 0.00 0.00 0.00 0.88 2.24 1.46 0.18 0.00 0.00 0.00 0.00 1.23 2.87T40MY006 1.35 0.20 0.00 0.00 0.00 0.00 1.00 2.55 1.67 0.20 0.00 0.00 0.00 0.00 1.40 3.27T40PA001 0.80 0.14 0.00 0.24 0.00 0.00 0.76 1.94T40PA002 4.41 0.76 0.00 0.24 0.00 0.00 4.18 9.59T40PA003 5.48 0.95 0.00 0.26 0.00 0.00 5.19 11.88T40PA004 6.40 1.10 0.00 0.26 0.00 0.00 6.06 13.82T40PA005 12.13 2.09 0.00 0.27 0.00 0.00 11.49 25.98T40PA006 12.55 2.17 0.00 0.27 0.00 0.00 11.89 26.88T40RS001 2.76 0.52 0.00 0.00 0.00 0.00 2.09 5.37T40RS002 2.85 0.54 0.00 0.00 0.00 0.00 2.16 5.55T40RS003 3.06 0.58 0.00 0.00 0.00 0.00 2.32 5.96T40XX034 15.83 2.49 25.42 2.96 0.00 0.00 12.35 59.05T40XX035 16.09 2.53 27.05 3.15 0.00 0.00 12.55 61.37T40XX036 19.31 3.04 30.83 3.60 0.00 0.00 15.06 71.84T40XX037 18.95 2.98 30.83 3.60 0.00 0.00 14.78 71.14T40XX038 19.83 3.12 30.83 3.60 0.00 0.00 15.47 72.85
2 254
EP 1110-1-8, Vol. 330 Nov 09
2-316
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
T45T45EA006 3.41 0.69 0.00 0.50 1.40 0.18 1.82 8.00T45EA007 5.06 1.03 0.00 0.50 2.11 0.27 2.71 11.68T45MY004 2.44 0.49 0.00 0.30 1.00 0.13 1.82 6.18 3.05 0.51 0.00 0.30 3.67 0.47 2.61 10.61T45MY005 3.25 0.67 0.00 0.30 1.51 0.19 2.43 8.35 4.06 0.69 0.00 0.30 5.50 0.71 3.48 14.74T45MY006 3.35 0.69 0.00 0.30 1.51 0.19 2.51 8.55 4.19 0.71 0.00 0.30 5.50 0.71 3.59 15.00T45MY007 3.23 0.67 0.00 0.30 1.51 0.19 2.42 8.32 4.03 0.68 0.00 0.30 5.50 0.71 3.46 14.68T45MY015 2.64 0.53 0.00 0.40 1.00 0.13 1.83 6.53 3.30 0.54 0.00 0.40 3.67 0.47 2.65 11.03T45MY016 2.70 0.54 0.00 0.40 1.00 0.13 1.87 6.64 3.37 0.55 0.00 0.40 3.67 0.47 2.70 11.16T45MY017 2.84 0.60 0.00 0.40 1.51 0.19 1.98 7.52 3.55 0.61 0.00 0.40 5.50 0.71 2.86 13.63T45MY018 2.07 0.37 0.00 0.40 1.00 0.13 1.34 5.31T45MY019 2.04 0.36 0.00 0.40 1.00 0.13 1.32 5.25T45XX001 3.19 0.61 0.00 0.40 0.81 0.10 2.37 7.48 3.98 0.63 0.00 0.40 2.94 0.38 3.39 11.72T45XX003 4.37 0.82 0.00 0.40 0.81 0.10 3.24 9.74 5.46 0.84 0.00 0.40 2.94 0.38 4.63 14.65T45XX008 2.63 0.51 0.00 0.40 0.81 0.10 1.82 6.27 3.29 0.53 0.00 0.40 2.94 0.38 2.63 10.17T45XX009 3.35 0.54 0.00 0.40 0.81 0.10 2.14 7.34T45XX010 3.36 0.54 0.00 0.40 0.81 0.10 2.15 7.36T45XX011 2.68 0.52 0.00 0.40 0.72 0.09 1.43 5.84T45XX012 2.86 0.55 0.00 0.40 0.72 0.09 1.52 6.14T45XX013 2.99 0.58 0.00 0.40 0.81 0.10 1.59 6.47T45XX014 3.61 0.70 0.00 0.50 1.08 0.14 1.92 7.95T45XX015 3.70 0.72 0.00 0.50 1.08 0.14 1.97 8.11T45XX016 4.15 0.81 0.00 0.50 1.21 0.16 2.21 9.04T45XX017 4.36 0.86 0.00 0.50 1.41 0.18 2.32 9.63T45XX018 4.40 0.87 0.00 0.50 1.41 0.18 2.35 9.71T45XX019 5.10 0.99 0.00 0.50 1.41 0.18 2.72 10.90T45XX020 4.87 0.96 0.00 0.60 1.61 0.21 2.60 10.85T45XX021 5.34 1.04 0.00 0.60 1.61 0.21 2.85 11.65
2 255
EP 1110-1-8, Vol. 330 Nov 09
2-317
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
T45 cont.T45XX022 6.00 1.18 0.00 0.60 1.88 0.24 3.20 13.10T45XX023 7.16 1.41 0.00 0.60 2.29 0.30 3.82 15.58T45XX024 2.29 0.45 0.00 0.09 0.81 0.10 1.22 4.96T45XX025 2.49 0.49 0.00 0.10 0.81 0.10 1.33 5.32T45XX026 1.42 0.28 0.00 0.40 0.44 0.06 0.75 3.35T45XX027 1.57 0.31 0.00 0.40 0.58 0.07 0.84 3.77T45XX028 1.78 0.36 0.00 0.40 0.75 0.10 0.95 4.34T45XX029 5.95 1.41 5.94 0.52 0.40 0.05 4.54 18.81T45XX030 5.78 1.41 5.94 0.52 0.81 0.10 4.44 19.00T45XX031 7.08 1.71 5.94 0.52 0.81 0.10 5.43 21.59T45XX032 4.41 0.68 0.00 0.50 0.60 0.08 2.80 9.07T45XX033 5.15 0.80 0.00 0.60 0.81 0.10 3.28 10.74T45XX034 2.44 0.48 0.00 0.40 0.81 0.10 1.30 5.53T45XX035 2.62 0.51 0.00 0.40 0.81 0.10 1.39 5.83
T50T50GM001 1.57 0.28 4.96 0.51 0.19 0.02 1.32 8.85 1.93 0.29 6.37 0.65 0.62 0.08 1.74 11.68T50GM004 3.58 0.63 11.77 1.20 0.19 0.02 3.00 20.39 4.41 0.65 15.13 1.55 0.62 0.08 3.95 26.39T50GM005 3.86 0.68 11.77 1.20 0.20 0.03 3.22 20.96 4.75 0.70 15.13 1.55 0.69 0.09 4.25 27.16T50XX001 1.49 0.27 5.37 0.55 0.27 0.03 1.26 9.24 1.83 0.28 6.90 0.71 0.90 0.12 1.66 12.40T50XX002 1.82 0.33 5.37 0.55 0.21 0.03 1.53 9.84 2.24 0.34 6.90 0.71 0.70 0.09 2.02 13.00T50XX003 2.09 0.37 7.43 0.76 0.21 0.03 1.75 12.64 2.57 0.38 9.56 0.98 0.68 0.09 2.31 16.57T50XX004 1.81 0.33 5.37 0.55 0.29 0.04 1.52 9.91 2.23 0.34 6.90 0.71 1.01 0.13 2.01 13.33T50XX005 2.16 0.39 5.37 0.55 0.22 0.03 1.82 10.54 2.66 0.40 6.90 0.71 0.77 0.10 2.40 13.94T50XX006 2.24 0.40 7.43 0.76 0.21 0.03 1.88 12.95 2.76 0.41 9.56 0.98 0.75 0.10 2.48 17.04T50XX007 1.58 0.29 5.37 0.55 0.27 0.03 1.33 9.42 1.94 0.30 6.90 0.71 0.90 0.12 1.76 12.63T50XX008 1.94 0.35 5.37 0.55 0.21 0.03 1.63 10.08 2.39 0.36 6.90 0.71 0.70 0.09 2.15 13.30T50XX009 2.40 0.43 7.43 0.76 0.21 0.03 2.01 13.27 2.96 0.44 9.56 0.98 0.68 0.09 2.65 17.36
2 256
EP 1110-1-8, Vol. 330 Nov 09
2-318
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
T50 cont.T50XX010 2.17 0.39 5.37 0.55 0.29 0.04 1.82 10.63 2.67 0.40 6.90 0.71 1.01 0.13 2.40 14.22T50XX011 2.36 0.42 7.43 0.76 0.22 0.03 1.98 13.20 2.90 0.43 9.56 0.98 0.77 0.10 2.61 17.35T50XX012 2.47 0.44 7.43 0.76 0.21 0.03 2.07 13.41 3.04 0.45 9.56 0.98 0.75 0.10 2.73 17.61T50XX013 1.96 0.36 1.83 0.16 0.27 0.03 1.65 6.26 2.41 0.36 2.62 0.23 0.90 0.12 2.17 8.81T50XX014 2.20 0.39 1.83 0.16 0.21 0.03 1.85 6.67 2.71 0.40 2.62 0.23 0.70 0.09 2.44 9.19T50XX015 2.55 0.45 3.18 0.28 0.21 0.03 2.14 8.84 3.14 0.47 4.54 0.40 0.68 0.09 2.82 12.14T50XX016 2.35 0.42 3.18 0.28 0.29 0.04 1.97 8.53 2.89 0.43 4.54 0.40 1.01 0.13 2.60 12.00T50XX017 2.40 0.43 3.18 0.28 0.22 0.03 2.01 8.55 2.95 0.44 4.54 0.40 0.77 0.10 2.65 11.85T50XX018 2.88 0.51 3.18 0.28 0.21 0.03 2.41 9.50 3.55 0.52 4.54 0.40 0.75 0.10 3.18 13.04T50XX019 2.29 0.41 3.18 0.28 0.21 0.03 1.92 8.32 2.82 0.42 4.54 0.40 0.70 0.09 2.53 11.50T50XX020 2.78 0.49 3.18 0.28 0.22 0.03 2.33 9.31 3.43 0.51 4.54 0.40 0.77 0.10 3.08 12.83T50XX021 2.52 0.45 3.18 0.28 0.21 0.03 2.11 8.78 3.10 0.46 4.54 0.40 0.68 0.09 2.79 12.06T50XX022 4.01 0.87 10.68 1.01 0.38 0.05 3.12 20.12 5.01 0.89 13.82 1.31 1.49 0.19 4.20 26.91T50XX023 3.13 0.69 19.82 2.17 0.38 0.05 2.44 28.68 3.91 0.70 25.40 2.78 1.49 0.19 3.29 37.76T50XX024 2.71 0.60 19.82 2.17 0.38 0.05 2.12 27.85 3.38 0.61 25.40 2.78 1.49 0.19 2.84 36.69T50XX025 5.25 1.15 10.09 0.96 0.62 0.08 4.09 22.24 6.56 1.18 13.05 1.24 2.54 0.33 5.51 30.41T50XX026 5.34 1.17 12.46 1.18 0.59 0.08 4.16 24.98 6.67 1.20 16.12 1.53 2.29 0.30 5.60 33.71T50XX027 7.17 1.83 22.20 2.27 0.55 0.07 5.57 39.66 8.60 1.86 28.67 2.93 2.10 0.27 7.71 52.14T50XX028 7.09 1.83 19.26 1.97 0.83 0.11 5.53 36.62 8.51 1.86 24.88 2.54 3.23 0.42 7.65 49.09T50XX029 6.52 1.69 25.97 2.65 0.83 0.11 5.09 42.86 7.82 1.71 33.54 3.43 3.23 0.42 7.04 57.19T50XX030 8.38 2.15 29.32 3.00 0.83 0.11 6.52 50.31 10.05 2.18 37.87 3.87 3.23 0.42 9.03 66.65T50XX031 7.72 1.98 33.50 3.42 0.76 0.10 6.01 53.49 9.26 2.01 43.28 4.42 2.91 0.38 8.32 70.58T50XX032 7.79 1.98 22.20 2.27 0.55 0.07 6.06 40.92 9.35 2.01 28.67 2.93 2.10 0.27 8.38 53.71T50XX033 8.44 2.16 33.50 3.42 0.76 0.10 6.56 54.94 10.12 2.19 43.28 4.42 2.91 0.38 9.09 72.39T50XX035 7.49 1.62 12.46 1.18 0.59 0.08 5.83 29.25 9.37 1.66 16.12 1.53 2.29 0.30 7.84 39.11
T55T55CA002 35.88 13.77 33.59 4.16 9.52 1.23 35.74 133.89 39.87 13.84 43.47 5.38 37.45 4.83 41.89 186.73
2 257
EP 1110-1-8, Vol. 330 Nov 09
2-319
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
T55 cont.T55CA003 48.67 19.04 48.48 6.00 17.82 2.30 48.62 190.93 54.08 19.13 62.73 7.77 70.09 9.04 56.98 279.82T55CA007 26.99 10.24 25.17 3.12 9.88 1.27 26.84 103.51 29.99 10.29 32.57 4.03 38.89 5.02 31.45 152.24T55CA008 25.86 6.63 18.97 1.31 7.79 1.00 22.87 84.43 27.44 6.66 22.92 1.58 30.12 3.89 25.80 118.41T55CA009 30.36 7.86 20.79 1.43 10.77 1.39 26.90 99.50 32.22 7.89 25.13 1.73 41.64 5.37 30.34 144.32T55CA010 26.42 6.61 15.61 1.07 4.14 0.53 23.28 77.66 28.03 6.64 18.87 1.30 16.29 2.10 26.26 99.49T55CA011 31.07 7.81 18.97 1.31 5.82 0.75 27.40 93.13 32.97 7.85 22.92 1.58 22.90 2.95 30.91 122.08T55CA012 37.45 9.62 25.90 1.78 11.95 1.54 33.13 121.37 39.74 9.67 31.30 2.15 47.02 6.07 37.38 173.33T55CA013 40.92 10.59 29.55 2.03 15.14 1.95 36.25 136.43 43.43 10.65 35.70 2.46 59.94 7.73 40.90 200.81T55JD001 20.24 5.17 19.33 1.33 5.82 0.75 17.89 70.53 21.48 5.20 23.36 1.61 22.90 2.95 20.18 97.68T55JD002 23.47 5.96 20.79 1.43 5.82 0.75 20.73 78.95 24.90 5.99 25.13 1.73 22.90 2.95 23.38 106.98T55JD003 29.45 7.71 27.72 1.91 12.94 1.67 26.14 107.54 31.26 7.75 33.50 2.30 50.88 6.56 29.49 161.74T55JD004 32.90 8.66 30.13 2.07 15.45 1.99 29.22 120.42 34.91 8.70 36.41 2.51 60.80 7.84 32.96 184.13T55KM009 27.07 10.27 25.22 3.12 9.88 1.27 26.91 103.74 30.08 10.32 32.64 4.04 38.89 5.02 31.54 152.53T55KM012 37.84 15.08 53.85 6.67 17.82 2.30 37.92 171.48 42.04 15.16 69.69 8.63 70.09 9.04 44.43 259.08T55KM013 90.06 34.88 76.80 9.51 28.22 3.64 89.83 332.94 100.06 35.05 99.38 12.31 110.97 14.32 105.27 477.36T55KM014 101.46 41.21 103.36 12.80 58.27 7.52 101.98 426.60 112.74 41.41 133.76 16.56 229.20 29.57 119.52 682.76T55KM015 36.41 9.41 28.38 1.95 12.94 1.67 32.25 123.01 38.64 9.46 34.29 2.36 50.88 6.56 36.38 178.57T55KM016 41.49 10.75 31.37 2.16 15.45 1.99 36.76 139.97 44.03 10.80 37.91 2.61 60.80 7.84 41.47 205.46T55VO002 21.88 5.65 21.82 1.50 7.64 0.99 19.38 78.86 23.22 5.67 26.36 1.81 30.24 3.90 21.86 113.06T55VO003 23.41 5.96 21.82 1.50 6.22 0.80 20.69 80.40 24.84 5.99 26.36 1.81 24.47 3.16 23.34 109.97T55VO004 33.01 8.54 30.21 2.08 11.95 1.54 29.24 116.57 35.03 8.58 36.50 2.51 47.02 6.07 32.99 168.70T55VO005 27.81 6.95 24.51 1.69 3.61 0.47 24.50 89.54 29.51 6.98 29.62 2.04 14.20 1.83 27.64 111.82T55VO006 36.60 9.60 33.85 2.33 16.53 2.13 32.49 133.53 38.84 9.65 40.91 2.81 65.00 8.39 36.65 202.25
T56T56CA006 54.54 21.18 54.18 6.71 19.57 2.52 54.42 213.12 60.60 21.28 88.40 10.31 76.39 9.85 63.78 330.61
2 258
EP 1110-1-8, Vol. 330 Nov 09
2-320
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
T57T57CU001 8.03 1.70 7.16 0.73 0.37 0.05 7.61 25.65T57CU002 11.13 2.35 7.16 0.73 0.37 0.05 10.56 32.35T57CU003 11.82 2.50 10.84 1.11 0.37 0.05 11.20 37.89T57CU004 12.68 2.68 16.68 1.70 0.37 0.05 12.02 46.18T57CU005 14.37 3.04 31.57 3.23 0.37 0.05 13.63 66.26
T60T60KI001 17.34 4.47 16.49 1.92 2.81 0.36 14.26 57.65 20.81 4.54 21.81 2.54 10.69 1.38 19.54 81.31T60KI002 26.10 6.94 31.10 3.63 8.97 1.16 21.60 99.50 31.32 7.05 41.13 4.80 34.64 4.47 29.61 153.02T60KI003 43.22 11.21 42.41 4.95 9.14 1.18 35.58 147.69 51.87 11.38 56.09 6.54 35.26 4.55 48.77 214.46T60KI004 7.91 2.42 42.41 4.95 9.14 1.18 6.75 74.76 9.49 2.46 56.09 6.54 35.26 4.55 9.25 123.64T60KI006 50.49 13.67 51.83 6.04 22.31 2.88 41.93 189.15 60.59 13.88 68.55 7.99 86.13 11.11 57.49 305.74T60SO001 30.52 8.04 31.10 3.63 8.97 1.16 25.20 108.62 36.62 8.16 41.13 4.80 34.64 4.47 34.54 164.36T60SO002 41.36 11.18 42.41 4.95 18.07 2.33 34.34 154.64 49.63 11.36 56.09 6.54 69.72 8.99 47.08 249.41T60SO003 42.06 11.36 42.41 4.95 18.07 2.33 34.91 156.09 50.47 11.53 56.09 6.54 69.72 8.99 47.86 251.20T60SO004 54.13 14.12 51.83 6.04 13.06 1.68 44.61 185.47 64.96 14.33 68.55 7.99 50.43 6.51 61.15 273.92T60SO005 55.08 14.35 51.83 6.04 13.06 1.68 45.38 187.42 66.10 14.57 68.55 7.99 50.43 6.51 62.22 276.37
T65T65WG012 94.11 24.64 14.10 5.42 1.80 0.23 101.16 241.46T65WG013 141.74 37.06 14.10 5.42 1.80 0.23 152.31 352.66T65WG014 154.70 40.44 31.15 12.75 1.80 0.23 166.23 407.30
W25W25AO002 0.84 0.08 0.08 0.78 0.00 0.00 1.10 2.88W25AO003 1.23 0.12 0.08 0.78 0.00 0.00 1.60 3.81W25AO004 1.21 0.12 0.17 1.06 0.00 0.00 1.58 4.14W25AO005 2.45 0.23 0.34 1.62 0.00 0.00 3.19 7.83
2 259
EP 1110-1-8, Vol. 330 Nov 09
2-321
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)7/31/2009
3REGION
W25 cont.W25AO006 1.89 0.18 0.08 0.78 0.00 0.00 2.47 5.40W25CJ001 9.94 1.33 1.25 0.57 0.00 0.00 11.78 24.87W25CJ002 15.43 2.07 1.50 0.68 0.00 0.00 18.29 37.97W25CJ003 24.39 3.27 1.50 0.68 0.00 0.00 28.90 58.74W25KZ001 1.37 0.39 0.00 0.00 0.00 0.00 0.80 2.56W25KZ002 1.51 0.43 0.00 0.00 0.00 0.00 0.88 2.82W25KZ003 1.55 0.44 0.00 0.00 0.00 0.00 0.90 2.89W25KZ004 2.20 0.63 0.00 0.00 0.00 0.00 1.28 4.11W25KZ005 2.60 0.74 0.00 0.00 0.00 0.00 1.51 4.85W25KZ006 2.65 0.75 0.00 0.00 0.00 0.00 1.54 4.94W25KZ007 2.82 0.80 0.00 0.00 0.00 0.00 1.65 5.27W25NL001 14.49 1.39 16.91 6.17 0.00 0.00 20.59 59.55W25NL002 24.42 2.34 45.83 4.68 0.00 0.00 34.71 111.98W25NL003 15.66 1.50 20.52 2.10 0.00 0.00 22.25 62.03W25NL004 31.67 3.09 4.65 0.48 0.44 0.06 45.15 85.54W25NL005 59.98 5.76 95.76 9.78 0.00 0.00 85.25 256.53W25SD001 1.06 0.10 0.42 0.15 0.00 0.00 1.38 3.11W25SD002 2.73 0.26 0.25 0.09 0.00 0.00 3.55 6.88W25SD003 1.64 0.16 4.57 0.40 0.00 0.00 2.13 8.90W25SD004 2.35 0.23 2.03 0.18 0.04 0.01 3.07 7.91W25SD005 1.24 0.12 3.04 0.27 0.00 0.00 1.61 6.28W25SD006 1.13 0.11 0.08 4.03 0.00 0.00 1.47 6.82W25SD007 1.20 0.12 0.08 5.03 0.00 0.00 1.56 7.99W25SD008 1.30 0.13 0.08 6.03 0.00 0.00 1.70 9.24W25SD009 2.89 0.28 0.93 6.34 0.00 0.00 3.77 14.21W25XX005 0.39 0.04 1.27 0.11 0.00 0.00 0.51 2.32W25XX006 0.55 0.05 1.27 0.11 0.00 0.00 0.72 2.70
2 260
EP 1110-1-8, Vol. 330 Nov 09
2-322
CAT ID. NO. DEPR FCCM FUEL FOGTIRE WEAR
TIRE REPAIR REPAIR
TOTAL RATE FCCM FUEL FOG
TIRE REPAIR REPAIR
TOTAL RATE DEPR
TIRE WEAR
Table 2-2 . HOURLY RATE ELEMENTS
AVERAGE OPERATING CONDITIONS SEVERE OPERATING CONDITIONS
EP 1110-1-8(Vol. 3)
7/31/2009
3REGION
W25 cont.W25XX007 0.74 0.07 2.03 0.18 0.00 0.00 0.96 3.98W25XX008 0.77 0.07 2.79 0.24 0.00 0.00 1.00 4.87W25XX009 1.55 0.15 2.03 0.18 0.00 0.00 2.01 5.92W25XX010 2.37 0.23 6.09 0.53 0.00 0.00 3.09 12.31
W30W30SO001 3.48 0.90 1.39 0.13 0.36 0.05 2.45 8.76W30SO002 4.18 1.07 1.39 0.13 0.36 0.05 2.94 10.12W30SO003 4.56 1.16 1.39 0.13 0.36 0.05 3.20 10.85W30SO004 2.30 0.57 0.00 0.01 0.00 0.00 1.34 4.22W30SO005 2.57 0.64 0.00 0.01 0.00 0.00 1.50 4.72W30SO006 2.96 0.74 0.00 0.01 0.00 0.00 1.73 5.44
W35W35LC010 0.08 0.01 0.40 0.15 0.00 0.00 0.05 0.69W35LC011 0.42 0.06 0.72 0.26 0.00 0.00 0.25 1.71W35LC012 0.53 0.07 0.93 0.34 0.00 0.00 0.32 2.19W35LC013 0.57 0.08 1.09 0.40 0.00 0.00 0.34 2.48W35LC018 0.12 0.02 0.13 0.05 0.00 0.00 0.07 0.39W35LC020 0.52 0.07 0.69 0.25 0.00 0.00 0.31 1.84W35XX020 0.23 0.04 2.34 0.20 0.00 0.00 0.22 3.03W35XX021 0.59 0.12 3.61 0.32 0.03 0.00 0.56 5.23W35XX022 0.61 0.12 3.82 0.33 0.03 0.00 0.58 5.49W35XX023 1.06 0.20 9.56 0.84 0.03 0.00 1.01 12.70W35XX024 1.58 0.30 5.54 0.48 0.03 0.00 1.50 9.43W35XX025 1.51 0.29 4.85 0.42 0.03 0.00 1.44 8.54
2 261
EP 1110-1-8, Vol. 330 Nov 09
2-323
3-1
CHAPTER 3.0 - ADJUSTMENTS TO HOURLY RATES
SECTION I. GENERAL
3.1 Contents
This chapter explains the procedures for adjusting the hourly rates shown in tables 2-1 and 2-2.
3.2 Basis for Equipment Rates
The rates shown in tables 2-1 and 2-2 are based on the catalog list price of equipment manufactured in 2006 (3 years old). Area factors used to compute regional ownership and operating expenses are listed in appendix B. All equipment hourly rate elements for average and severe conditions are given in table 2-2. Individual cost elements, which comprise the total hourly rate, are shown in table 2-2. These hourly rate elements are listed by equipment ID No., which corresponds to the equipment shown in tables 2-1 and 2-2.
a. Ownership costs consist of two cost elements: depreciation (DEPR) and facilities capital cost of money (FCCM). These elements are located in tables 2-1 and 2-2.
b. Operating costs consist of five cost elements: fuel (FUEL); filters, oil, and grease (FOG); repairs (REPAIR); tire wear (TIRE WEAR); and tire repair (TIRE REPAIR). These elements are located in table 2-2.
3.3 Equipment Rate Adjustment Tables
Table 3-1 is used to adjust the ownership (DEPR + FCCM) portion of the average hourly rate and table 3-2 is used to adjust the standby hourly rate shown in table 2-1.
3.4 Determination for Use of Equipment Rates in Tables 2-1 and 2-2
The predetermined equipment rates in tables 2-1 and 2-2 may be used when the contractor’s actual cost data (cost or pricing data) is insufficient to calculate the rates. If the contractor’s actual equipment is listed in tables 2-1 and 2-2, the equipment must be equivalent. However, if the contractor’s actual equipment is not listed in tables 2-1 and 2-2, an equivalent piece of equipment may be chosen from the tables. To be considered equivalent, the contractor’s equipment must be no more or less than 10 percent of the configuration (size, capacity, and horsepower) and value as compared
EP 1110-1-8, Vol. 330 Nov 09
3-2
to the equipment in tables 2-1 and 2-2. In either case, if the equipment is not equivalent, the equipment rate must be calculated using the methodology in chapter 2.
SECTION II. RATE ADJUSTMENTS
3.5 Rate Adjustments
The ownership and/or the operating portion of the hourly rates and standby hourly rates shall be adjusted whenever one or more of the following rate adjustment conditions exist (rate adjustments are explained in detail in the following paragraphs).
• Changes in operating conditions • Changes in Cost of Money Rate • Actual work hours (hrs) exceed 40 hr per week (wk) • Changes in FUEL cost • Adjustments to FOG cost • Equipment of different age than table 2-1 • Rate adjustment for overage equipment • Rate adjustment for overage equipment standby
There are no rate adjustments for appendix B factors except for fuel cost (electric, gas, diesel off-road, and diesel on-road) and the Cost of Money Rate. Also, there are no rate adjustments for repairs, tire wear, or tire repair.
3.6 Changes in Operating Conditions
If difficult or severe conditions are justified by the Contracting Officer, selection or calculation of the appropriate rate is necessary. See chapter 2, section II, for definition of average, difficult, or severe conditions and determination of condition.
3.7 Change in Cost of Money Rate (CMR)
The Department of the Treasury adjusts the CMR (Prompt Payment Interest Rate) on or about 1 January and 1 July each year; these revisions are printed in the Federal Register. The Internet address for Prompt Payment Interest Rate is http://www.treasurydirect.gov/govt/rates/tcir/tcir_opdprmt2.htm.
EP 1110-1-8, Vol. 330 Nov 09
If the CMR shown in chapter 2, section VII, is not the current rate, the FCCM portion of the total hourly rate shall be adjusted upward or downward to match the CMR for the period of equipment use. See appendix I for a listing of historical CMRs. The total hourly rate adjusted for a differing CMR is computed by the formula:
Costs/hr Operating CMR) (OldCMR)] (NEW x [(FCCM/hr) DEPR/hr RateHourly Total ++=
Example: Assume that table 2-1 includes a crane [category (CAT) C80, subcategory (SUB) 0.02] with hourly costs as shown in the following example. The CMR has increased from 5.00 percent to a current rate of 6.00 percent (increase of 20 percent). The total hourly rate for this piece of equipment is determined as follows:
Assumptions for Total Hourly Rate with CMR of 5.00 percent (per hour):
DEPR $30.00FCCM $10.00Operating Costs (FUEL, FOG, TIRE WEAR, TIRE REPAIR, and REPAIR) $40.00 Total Hourly Rate (Based on a 40 hr/wk) $80.00
Adjustment Calculation of Total Hourly Rate for New CMR of 6.00 percent (per hour): $30.00/hr + [($10.00/hr) x (6.00%)] + $40.00/hr =$82.00/hr (5.00%) 3.8 Actual Work Hours Greater than 40 Hours per Week
If the actual number of work hours per week is greater than 40 hours, an adjustment shall be made to the FCCM element of the ownership cost. The FCCM is to be paid up to a maximum of 40 hours per week (7 calendar days). To calculate a multi-shift rate, prorate the 40-hour FCCM over the actual hours per week, as follows:
Total Hourly Rate = DEPR/hr + [(FCCM/hr) x (40 hr/wk)] + Operating Costs/hr (Actual Work hr/wk) Example: Assume that table 2-1 includes a crane (category C80, subcategory 0.02) with the below hourly costs. This crane worked 10 hours per day, 6 days per week (60 hours per week). The total hourly rate for this piece of equipment is determined as follows:
3-3
EP 1110-1-8, Vol. 330 Nov 09
Assumptions for Total Hourly Rate for 40 Hours/Week:
DEPR $30.00FCCM $10.00Operating Costs (FUEL, FOG, TIRE WEAR, TIRE REPAIR, and REPAIR) $40.00 Total Hourly Rate (Based on a 40 hr/wk) $80.00
Adjustment Calculation of Total Hourly Rate for 60 Hours/Week: $30.00/hr + [($10.00/hr) x (40 hr/wk)] + $40.00/hr =$76.67/hr (60 hr/wk) 3.9 Changes in Fuel Cost
Hourly fuel costs (including electricity) shall be adjusted in the event the average fuel prices at the jobsite vary by more than 10 percent above or below the price in appendix B. The contractor shall be required to furnish copies of all fuel supply contracts and invoices to the government to support fuel cost adjustment. Request for upward adjustment in the rates will be considered only when fuel is supplied by recognized distributors of bulk quantities. Mathematically, this is the ratio of the new fuel cost divided by the fuel cost (appendix B). To calculate the total hourly rate, apply the ratio of fuel cost, as follows:
( )( ) FUEL/hr] x
B Appendix in Cost FuelCost FuelNew [ REPAIR/hr)
REPAIR/hr TIRE WEAR/hrTIRE (FOG/hr FCCM/hr) (DEPR/hr RateHourly Total
+
+++++=
Example: Assume that table 2-1 includes a crane (category C80, subcategory 0.02) with the below hourly costs. Assume the fuel cost (diesel off-road) in appendix B is $2.50/gal and the current fuel cost has increased to $3.00/gal (increase of 20.00 percent). The total hourly rate for this piece of equipment can be determined as follows: Assumptions for Fuel Cost (based on $2.50/gal from appendix B) per hour:
DEPR $30.00FCCM $10.00FOG, TIRE WEAR, TIRE REPAIR, and REPAIR) $30.00FUEL $10.00 Total Hourly Rate $80.00
3-4
EP 1110-1-8, Vol. 330 Nov 09
3-5
Adjustment Calculation for hourly FUEL cost using the new fuel cost of $3.00/gal: ($30.00/hr + $10.00/hr) + $30.00/hr + [($3.00/gal) x $10.00/hr] =$82.00/hr ($2.50/gal) 3.10 Adjustments to Fuel, Oil, and Grease (FOG) Cost
The hourly FOG allowance shall also be adjusted upward or downward by applying the same ratio (new fuel cost divided by fuel cost shown in appendix B) as the fuel costs change using the methodology as shown in paragraph 3-9.
3.11 Equipment of Different Age than Table 2-1
When the age of the equipment is newer or older than the age of the equipment listed in table 2-1, table 3-1 factors may be used to adjust the hourly rate (see paragraph 3-12 for guidance on overage equipment), otherwise the step-by-step calculation method (as shown in figure 2-1) is necessary. To adjust the hourly rate using the tables, the factors given in table 3-1 are multiplied by the hourly ownership costs shown in table 2-1. The result is an ownership rate adjusted for the actual age of the equipment. Note: Age adjustment factors in tables 3-1 and 3-2 vary by region.
a. When the age of a unit of equipment is older than the age of the equipment listed in table 2-1 (purchased new in 2006) and does not exceed the years of economic life, adjust the hourly rate as shown in the next example. The years of economic life is determined by dividing hours of LIFE (from appendix D) by Working Hours Per Year (WHPY) (from appendix B).
Example: Assume that table 2-1 includes a crane (category C80, subcategory 0.02) manufactured in 2006 and has a total hourly rate of $65 per hour and an ownership rate of $30 per hour. If an equivalent crane owned by a contractor was manufactured in 2002, the total hourly rate is determined as follows: Table 2-1 Rate and Adjustment Calculation: Total hourly rate = $65.00/hr Ownership rate 2006 (DEPR + FCCM) = -($30.00)/hr Ownership rate 2002 adjusted for age (Ownership rate = $30) x (0.84 the age adjustment factor from table 3-1, for category C80, subcategory 0.02, and for the year 2002.) = +$25.20/hr Total hourly rate for equipment manufactured in 2002 = $60.20/hr
EP 1110-1-8, Vol. 330 Nov 09
3-6
b. When the unit of equipment is older than the age of equipment listed in table 2-1 (purchased new in 2006) and exceeds the years of economic life, adjust the hourly rate as shown in the example for overage equipment in paragraph 3-12.
c. When the unit of equipment is newer than the equipment listed in table 2-1 (purchased new in 2006), use the adjustment factor in table 3-1 for the year of manufacture. If the equipment is newer than the most recent year shown in table 3-1, use the adjustment factor in the column of the most recent year. Once the adjustment factor is determined from table 3-1, complete the adjustment calculation as shown in the example above. The step-by-step calculation method shown in figure 2-1 may also be used.
3.12 Rate Adjustment for Overage Equipment
If the contractor’s equipment exceeds the economic life in hours (from appendix D), it is considered overage, and the rates shall be adjusted.
a. The total hourly operating rate for overage equipment (no matter how old) shall be computed on the basis that the equipment is as old as possible "without" exceeding the hours of LIFE as shown in appendix D. Tables 3-1 and 3-2 show factors for the economic life for equipment based on the current pamphlet year (e.g., manufactured in 2006). Select a comparable unit of equipment (horsepower, value, capacity, and size) shown in table 2-1, the total hourly rate can be computed as shown in the following example. If there is no comparable unit of equipment in table 2-1, follow the methodology presented in figure 3-1.
b. The ownership portion of the rate shall be adjusted for equipment that is overage. This adjusted rate is not to exceed the rate for the same unit of equipment that is not overage.
Example: Assume that table 2-1 includes a crane (category C80, subcategory 0.02) manufactured in 2006, has a total hourly rate of $65 per hour, and an ownership rate of $30 per hour. If an equivalent crane owned by a contractor was manufactured in 1992 (maximum life 1999), this crane is overage and the total hourly rate is determined as follows:
EP 1110-1-8, Vol. 330 Nov 09
3-7
Table 2-1 Rate and Adjustment Calculation: Total hourly rate = $65.00/hr Ownership rate 2006 (DEPR + FCCM) = -($30.00)/hr Ownership rate 1992 adjusted for age (Ownership rate = $30.00) x (0.78) use the oldest age adjustment factor from table 3-1, for category C80, subcategory 0.02, the last year shown.) = +$23.40/hr Total hourly rate for equipment manufactured in 1992 = $58.40/hr 3.13 Standby Rate Adjustment for Equipment of a Different Age than Table 2-1
If the equipment age is other than listed in table 2-1 (purchased new in 2006), adjustment to the hourly standby rate is required. When the age of the equipment is newer or older than the age of the equipment listed in table 2-1, table 3-2 factors may be used to adjust the hourly rate, otherwise the step-by-step calculation method is necessary. The result is a standby rate adjusted for the actual age of the equipment.
a. Standby rates for overage equipment are based on the actual age of the equipment. The age adjustment factor given in table 3-2 is multiplied by the hourly standby cost shown in table 2-1 for the listed or comparable unit of equipment. This results in a standby rate adjusted for the actual age of the unit of equipment being considered.
Hourly Standby Rate Adjusted for Actual Age = Hourly Standby Rate x Age Adjustment Factor
Example: Assume that table 2-1 includes a crane (category C80, subcategory 0.02) manufactured in 2006 and has a standby rate of $20.00 per hour. If an equivalent crane owned by a contractor was manufactured in 1998, the hourly standby rate is determined as follows: Hourly Standby Rate (table 2-1) =$20.00/hr Age Adjustment Factor (table 3-2) = 0.78
for category C80, subcategory 0.02, and for 1998 (actual year of manufacture)
Adjustment Calculation: Hourly Standby Rate Adjusted for Actual Age =$20.00/hr (Hourly Standby Rate) x 0.78 (Age Adjustment Factor) =$15.60/hr b. When the unit of equipment is newer than the equipment listed in table 2-1 (purchased new in 2006), use the adjustment factor in table 3-2 for the year
EP 1110-1-8, Vol. 330 Nov 09
3-8
of manufacture. Once the adjustment factor is determined from table 3-2, complete the adjustment calculation as shown in the example above. The step-by-step calculation method shown in figure 3-2 may also be used.
c. When the equipment age is older than the last year shown in table 3-2 or newer than the first year shown in table 3-2, the standby rate must be calculated using the step-by-step methodology shown in figure 3-2.
3.14 Equipment Purchased Used
A detailed methodology for computing a total hourly rate for equipment purchased used is not included in this pamphlet.
a. When actual cost data in accordance with chapter 1 is not available, an hourly rate and standby rate for equipment purchased used can be computed on the basis that the equipment was purchased new by the contractor in the year it was manufactured. Consideration for the actual age of used equipment may require an adjustment for overage.
b. The condition of the used equipment at the time of purchase should consider the extent of capital improvements, mechanical condition, and previous hours of operation. These conditions are difficult or impossible to determine and evaluate when computing a total hourly rate based on actual acquisition cost.
3.15 Rate Calculation Examples
Figure 3-1 illustrates how total hourly rates are adjusted for overage equipment. Figure 3-2 gives a sample calculation for computing adjusted standby rates.
EP 1110-1-8, Vol. 330 Nov 09
Table 3-1. Equipment Age Adjustment Factors
for
Ownership Costs
The factors in this table are used when the age of a unit of equipment is other than the age of the equipment listed in table 2-1 (purchased new in 2006).
The factors are multiplied by the hourly ownership costs (shown in table 2-1) and result in an ownership rate adjusted for the actual age of the equipment being considered.
When the actual “life” in hours of the unit of equipment has exceeded the economic life given in appendix D, the age will be determined as discussed in chapter 3.
Refer to chapter 3, as follows:
3-11. Equipment of Different Age than Table 2-1
3-12. Rate Adjustment for Overage Equipment
3-9
EP 1110-1-8, Vol. 330 Nov 09
Table 3-1 Equipment Age Adjustment Factors for Ownership CostYear Purchased NewLife in Years
CATEGORY
SUB TYPE OF EQUIPMENT 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992
REGION 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
EP 1110-1-8
7/31/2009(Vol. 3)
A10 0.00 AGGREGATE / CHIP SPREADERS
A10 0.10 SELF-PROPELLED 1.13 1.08 1.03 1.00 0.95 0.89
A10 0.20 TOWED & TAILGATE 1.13 1.08 1.03 1.00
A15 0.00 AIR COMPRESSORS, PORTABLE
A15 0.10 ROTARY SCREW 1.20 1.12 1.05 1.00 0.96 0.92 0.91
A15 0.20 SHOP TYPE 1.19 1.12 1.04 1.00 0.96 0.92 0.92 0.91
A20 0.00 AIR HOSE, TOOLS & EQUIPMENT
A20 0.10 AIR DRILL HOSE 1.17 1.11 1.04 1.00
A20 0.20 SANDBLAST HOSE 1.17 1.11 1.04 1.00
A20 0.30 SANDBLASTERS, BREAKERS, & MISC. AIR TOOLS 1.18 1.11 1.04 1.00
A25 0.00 ASPHALT PAVING DISTRIBUTORS 1.12 1.07 1.03 1.00
A30 0.00 ASPHALT PAVERS & MISCELLANEOUS ROAD EQUIPMENT
A30 0.10 SELF PROPELLED 1.12 1.07 1.03 1.00 0.95 0.90
A30 0.20 TOWED 1.13 1.08 1.03 1.00 0.95 0.89 0.90
A30 0.30 SLURRY SEAL PAVERS (Cold mix) 1.13 1.08 1.03 1.00 0.95 0.90 0.90 0.90
A30 0.40 MISCELLANEOUS ROAD EQUIPMENT 1.13 1.08 1.03 1.00 0.95 0.89 0.90
A35 0.00 ASPHALT PAVING KETTLES 1.13 1.08 1.03 1.00
A40 0.00 ASPHALT & CONCRETE MILLERS / PROFILERS / PLANERS / ROTARY GRINDERS
1.13 1.08 1.03 1.00
A45 0.00 ASPHALT RECYCLERS & SEALERS 1.13 1.08 1.03 1.00
B10 0.00 BATCH PLANTS, ASPHALT & CONCRETE
B10 0.10 ASPHALT 1.13 1.08 1.03 1.00 0.95 0.89
B10 0.20 CONCRETE 1.13 1.08 1.03 1.00 0.95 0.89
3- 9
EP 1110-1-8, Vol. 330 Nov 09
3-10
Table 3-1 Equipment Age Adjustment Factors for Ownership CostYear Purchased NewLife in Years
CATEGORY
SUB TYPE OF EQUIPMENT 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992
REGION 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
EP 1110-1-8
7/31/2009(Vol. 3)
B10 0.30 PUGMILL 1.13 1.08 1.03 1.00 0.95 0.89 0.90
B15 0.00 BROOMS, STREET SWEEPERS & FLUSHERS 1.11 1.06 1.03 1.00 0.96 0.89
B20 0.00 BRUSH CHIPPERS 1.11 1.06 1.03 1.00 0.96 0.89
B25 0.00 BUCKETS, CLAMSHELL 1.06 1.02 1.01 1.00 0.94 0.89
B30 0.00 BUCKETS, CONCRETE
B30 0.10 GENERAL PURPOSE, MANUAL TRIP 1.06 1.02 1.01 1.00 0.95 0.89
B30 0.20 LAYDOWN 1.06 1.02 1.01 1.00 0.95 0.89
B30 0.30 LOWBOY 1.06 1.02 1.01 1.00 0.95 0.89
B30 0.40 LOW SLUMP 1.06 1.02 1.01 1.00 0.95 0.89
B35 0.00 BUCKETS, DRAGLINE
B35 0.10 LIGHT WEIGHT 1.06 1.02 1.01 1.00 0.94 0.89
B35 0.20 MEDIUM WEIGHT 1.06 1.02 1.01 1.00 0.94 0.89
B35 0.30 HEAVY WEIGHT 1.06 1.02 1.01 1.00 0.94 0.89 0.86
C05 0.00 CHAIN SAWS 1.11 1.06 1.00
C10 0.00 COMPACTORS, WALK-BEHIND OR REMOTE CONTROLLER
C10 0.10 COMPACTORS, RAMMERS / TAMPERS & VIBRATORY PLATES 1.11 1.06 1.02 1.00
C10 0.20 ROLLERS, VIBRATORY 1.12 1.07 1.03 1.00
C15 0.00 CONCRETE CLEANERS / ABRASIVE BLASTERS
C15 0.10 WALK BEHIND 1.13 1.07 1.03 1.00
C15 0.20 TRUCK/TRAILER MOUNTED 1.13 1.07 1.03 1.00 0.95 0.88
C20 0.00 CONCRETE BUGGIES 1.13 1.07 1.03 1.00
C25 0.00 CONCRETE FINISHERS/SCREEDS/SPREADERS
3- 10
EP 1110-1-8, Vol. 330 Nov 09
3-11
Table 3-1 Equipment Age Adjustment Factors for Ownership CostYear Purchased NewLife in Years
CATEGORY
SUB TYPE OF EQUIPMENT 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992
REGION 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
EP 1110-1-8
7/31/2009(Vol. 3)
C25 0.10 FINISHERS/TROWELS 1.13 1.07 1.03 1.00
C25 0.20 VIBRATORY SCREED 1.13 1.07 1.03 1.00
C25 0.25 VIBRATORY LASER SCREED 1.14 1.08 1.03 1.00 0.94 0.87
C25 0.30 MATERIAL/TOPPING SPREADERS 1.14 1.08 1.03 1.00 0.94 0.87
C30 0.00 CONCRETE GRINDERS 1.13 1.07 1.03 1.00
C35 0.00 CONCRETE GUNITERS / SHOTCRETERS 1.13 1.08 1.03 1.00 0.95
C40 0.00 CONCRETE MIXING UNITS 1.13 1.07 1.03 1.00
C45 0.00 CONCRETE PAVING MACHINES 1.13 1.08 1.03 1.00
C55 0.00 CONCRETE PUMPS 1.11 1.06 1.03 1.00 0.96 0.89
C60 0.00 CONCRETE SAWS (Add cost for sawblade wear) 1.11 1.06 1.03 1.00
C65 0.00 CONCRETE VIBRATORS 1.19 1.11 1.04 1.00
C70 0.00 CRANES, GANTRY & STRADDLE
C75 0.00 CRANES, HYDRAULIC, SELF-PROPELLED 1.06 1.02 1.01 1.00 0.94 0.88 0.86 0.83 0.77 0.79
C80 0.00 CRANES, HYDRAULIC, TRUCK MOUNTED
C80 0.01 UNDER 26 TON 1.06 1.02 1.01 1.00 0.94 0.88 0.86 0.83 0.77 0.79
C80 0.02 26 TON THRU 65 TON 1.06 1.02 1.01 1.00 0.94 0.88 0.86 0.84 0.78 0.79 0.78
C80 0.03 66 TON THRU 125 TON 1.06 1.02 1.01 1.00 0.94 0.89 0.86 0.84 0.78 0.79 0.79 0.78
C80 0.04 OVER 125 TON 1.06 1.02 1.01 1.00 0.94 0.89 0.86 0.84 0.78 0.79 0.79 0.78 0.76 0.74
C85 0.00 CRANES, MECHANICAL, LATTICE BOOM, CRAWLER MOUNTED
C85 0.11 DRAGLINE, CLAMSHELL, 0 THRU 1.0 CY 1.07 1.03 1.01 1.00 0.94 0.88 0.85 0.83 0.76 0.78
C85 0.12 DRAGLINE, CLAMSHELL, OVER 1.0 CY THRU 2.5 CY 1.06 1.03 1.01 1.00 0.94 0.88 0.85 0.83 0.77 0.78 0.78
C85 0.13 DRAGLINE, CLAMSHELL, OVER 2.5 CY THRU 5.0 CY 1.06 1.03 1.01 1.00 0.94 0.88 0.86 0.83 0.77 0.78 0.78 0.77
3- 11
EP 1110-1-8, Vol. 330 Nov 09
3-12
Table 3-1 Equipment Age Adjustment Factors for Ownership CostYear Purchased NewLife in Years
CATEGORY
SUB TYPE OF EQUIPMENT 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992
REGION 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
EP 1110-1-8
7/31/2009(Vol. 3)
C85 0.14 DRAGLINE, CLAMSHELL, OVER 5.0 CY 1.06 1.02 1.01 1.00 0.94 0.88 0.86 0.83 0.77 0.78 0.78 0.77 0.75 0.73
C85 0.21 LIFTING, 0 THRU 25 TON 1.06 1.03 1.01 1.00 0.94 0.88 0.85 0.83 0.77 0.78 0.78
C85 0.22 LIFTING, 26 TON THRU 50 TON 1.06 1.03 1.01 1.00 0.94 0.88 0.86 0.83 0.77 0.78 0.78 0.77
C85 0.23 LIFTING, 51 TON THRU 150 TON 1.06 1.02 1.01 1.00 0.94 0.89 0.86 0.84 0.78 0.79 0.79 0.78 0.76 0.74
C85 0.24 LIFTING, OVER 150 TON 1.06 1.02 1.01 1.00 0.94 0.89 0.86 0.84 0.78 0.79 0.79 0.78 0.76 0.74 0.72
C90 0.00 CRANES, MECHANICAL, LATTICE BOOM, TRUCK MOUNTED
C90 0.01 UNDER 26 TON 1.06 1.02 1.01 1.00 0.94 0.88 0.86 0.83 0.77 0.79
C90 0.02 26 TON THRU 65 TON 1.06 1.02 1.01 1.00 0.94 0.88 0.86 0.84 0.78 0.79 0.78
C90 0.03 66 TON THRU 125 TON 1.06 1.03 1.01 1.00 0.94 0.88 0.86 0.83 0.77 0.78 0.78 0.77
C90 0.04 OVER 125 TON 1.06 1.02 1.01 1.00 0.94 0.88 0.86 0.83 0.77 0.78 0.78 0.77 0.75 0.73
C95 0.00 CRANES, TOWER 1.06 1.03 1.01 1.00 0.94 0.88 0.86 0.83 0.77 0.78 0.78 0.77
D10 0.00 DRILLS, AIR/HYDRAULIC,CRWLR MTD,0" THRU 6.5" DIA HOLE (Add cost for drill steel and bit wear)
D10 0.10 DRILLS, AIR TRACK (Add cost for drill steel and bit wear) 1.23 1.17 1.09 1.00 0.91 0.84 0.77 0.75 0.68 0.66
D10 0.20 DRILLS, HYDRAULIC TRACK (Add cost for drill steel and bit wear) 1.23 1.17 1.09 1.00 0.91 0.83 0.77
D15 0.00 DRILLS, HORIZONTAL BORING & GROUND PIERCING (Add cost for drill steel and bit wear)
1.23 1.17 1.09 1.00 0.91 0.83 0.77
D20 0.00 DRILLS, CORE, COLUMN MOUNTED (Add cost for drill steel and bit wear) 1.24 1.18 1.09 1.00 0.91 0.83
D25 0.00 DRILLS, CORE & DOWELLING (Add cost for drill steel and bit wear) 1.23 1.17 1.09 1.00 0.91 0.83 0.77
D30 0.00 DRILLS, EARTH / AUGER (Add cost for drill steel and cutting edge wear) 1.23 1.17 1.09 1.00 0.91 0.83 0.77
D35 0.00 DRILLS, ROTARY BLASTHOLE (Add cost for drill steel and bit wear)
D35 0.11 DIESEL, 4.5" THRU 9.875" DIAMETER HOLE (Add cost for drill steel and bit wear)
1.22 1.16 1.08 1.00 0.92 0.84 0.78 0.77 0.70 0.68
D35 0.12 DIESEL, OVER 9.875" DIAMETER (Add cost for drill steel and bit wear) 1.21 1.16 1.08 1.00 0.92 0.85 0.79 0.77 0.70 0.68 0.67 0.66
D35 0.21 ELECTRIC, 4.5" THRU 9.875" DIAMETER HOLE (Add cost for drill steel and bit wear)
1.22 1.16 1.08 1.00 0.92 0.84 0.78 0.77 0.70 0.68
3- 12
EP 1110-1-8, Vol. 330 Nov 09
3-13
Table 3-1 Equipment Age Adjustment Factors for Ownership CostYear Purchased NewLife in Years
CATEGORY
SUB TYPE OF EQUIPMENT 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992
REGION 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
EP 1110-1-8
7/31/2009(Vol. 3)
D35 0.22 ELECTRIC, OVER 9.875" DIAMETER (Add cost for drill steel and bit wear) 1.21 1.16 1.08 1.00 0.92 0.85 0.79 0.77 0.70 0.68 0.67 0.66
F10 0.00 FORK LIFTS 1.12 1.07 1.03 1.00 0.95 0.88 0.85
G10 0.00 GENERATOR SETS
G10 0.10 PORTABLE 1.16 1.11 1.05 1.00 0.95 0.90
G10 0.20 SKID MOUNTED 1.16 1.11 1.05 1.00 0.95 0.90 0.88
G15 0.00 GRADERS, MOTOR 1.11 1.06 1.02 1.00 0.95 0.91 0.87 0.86 0.85 0.84
H10 0.00 HAMMERS, HYDRAULIC (Demolition tool) (Add cost for point wear) 1.13 1.07 1.03 1.00
H13 0.00 HAZARDOUS/TOXIC WASTE EQUIPMENT
H13 0.11 COMPACTORS (Compression force) 0 THRU 50 TONS 1.12 1.07 1.03 1.00 0.95 0.89 0.85
H13 0.12 COMPACTORS (Compression force) OVER 50 TONS 1.12 1.07 1.03 1.00 0.95 0.88 0.85 0.83
H13 0.21 FILTER PRESSES, STATIONARY 1.12 1.07 1.03 1.00 0.95 0.88 0.85
H13 0.22 FILTER PRESSES, MOBILE 1.12 1.07 1.03 1.00 0.95 0.89 0.85
H13 0.30 CENTRIFUGES 1.13 1.07 1.03 1.00
H13 0.40 SHREDDERS 1.12 1.07 1.03 1.00 0.95 0.89 0.85
H13 0.51 SOIL TREATMENT PLANT, MOBILE 1.12 1.07 1.03 1.00 0.95 0.89 0.85
H13 0.61 SLUDGE PROCESSING EQUIP, SLUDGE DISPENSERS 1.12 1.07 1.03 1.00 0.95 0.89 0.85
H13 0.71 WASTE HANDLING EQUIPMENT, DRUM HANDLING 1.12 1.07 1.03 1.00
H15 0.00 HEATERS, SPACE
H20 0.00 HOISTS & AIR WINCHES 1.12 1.07 1.03 1.00 0.95 0.88
H25 0.00 HYDRAULIC EXCAVATORS, CRAWLER MOUNTED
H25 0.10 0 LBS THRU 12,500 LBS (COMPACT EXCAVATORS) 1.07 1.03 1.02 1.00 0.93 0.87
H25 0.11 OVER 12,500 LBS THRU 40,000 LBS 1.07 1.03 1.02 1.00 0.93 0.87
3- 13
EP 1110-1-8, Vol. 330 Nov 09
3-14
Table 3-1 Equipment Age Adjustment Factors for Ownership CostYear Purchased NewLife in Years
CATEGORY
SUB TYPE OF EQUIPMENT 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992
REGION 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
EP 1110-1-8
7/31/2009(Vol. 3)
H25 0.12 OVER 40,000 LBS THRU 100,000 LBS 1.07 1.03 1.01 1.00 0.93 0.87 0.84 0.82
H25 0.13 OVER 100,000 LBS THRU 160,000 LBS 1.07 1.03 1.01 1.00 0.94 0.87 0.85 0.82 0.76 0.77 0.77
H25 0.14 OVER 160,000 LBS 1.07 1.03 1.01 1.00 0.94 0.88 0.85 0.82 0.76 0.77 0.77 0.76 0.74
H25 0.21 ATTACHMENTS, MOBILE SHEARS 1.12 1.07 1.03 1.00
H25 0.22 ATTACHMENTS, MATERIAL HANDLING 1.13 1.07 1.03 1.00
H25 0.23 ATTACHMENTS, CONCRETE PULVERIZERS 1.12 1.07 1.03 1.00
H25 0.24 ATTACHMENTS, COMPACTORS 1.12 1.07 1.03 1.00
H30 0.00 HYDRAULIC EXCAVATORS, WHEEL MOUNTED
H30 0.01 0 THRU 1.0 CY 1.07 1.03 1.02 1.00 0.93 0.87
H30 0.02 OVER 1.0 CY 1.07 1.03 1.02 1.00 0.93 0.87 0.84
H35 0.00 HYDRAULIC SHOVELS, CRAWLER MOUNTED
H35 0.11 DIESEL, 0 CY THRU 5.0 CY 1.07 1.03 1.01 1.00 0.94 0.88 0.85 0.83 0.76 0.78
H35 0.12 DIESEL, OVER 5.0 CY 1.06 1.03 1.01 1.00 0.94 0.88 0.85 0.83 0.77 0.78 0.78
H35 0.21 ELECTRIC, OVER 2.5 CY 1.06 1.03 1.01 1.00 0.94 0.88 0.86 0.83 0.77 0.78 0.78 0.77
L10 0.00 LAND CLEARING EQUIPMENT 1.13 1.06 1.02 1.00 0.96 0.90 0.87
L15 0.00 LANDSCAPING EQUIPMENT 1.12 1.07 1.03 1.00
L20 0.00 LIGHTING SETS, TRAILER MOUNTED
L20 0.10 METALLIC VAPOR 1.13 1.07 1.03 1.00 0.95 0.88
L25 0.00 LINE STRIPING EQUIPMENT 1.13 1.07 1.03 1.00 0.95 0.88
L30 0.00 LOADERS, BELT (Conveyor belts) & ACCESSORIES 1.12 1.07 1.03 1.00 0.95 0.88 0.85
L35 0.00 LOADERS, FRONT END, CRAWLER TYPE 1.13 1.06 1.02 1.00 0.96 0.90 0.87
L40 0.00 LOADERS, FRONT END, WHEEL TYPE
3- 14
EP 1110-1-8, Vol. 330 Nov 09
3-15
Table 3-1 Equipment Age Adjustment Factors for Ownership CostYear Purchased NewLife in Years
CATEGORY
SUB TYPE OF EQUIPMENT 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992
REGION 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
EP 1110-1-8
7/31/2009(Vol. 3)
L40 0.11 ARTICULATED, 0 THRU 225 HP 1.14 1.07 1.02 1.00 0.95 0.90 0.86
L40 0.12 ARTICULATED, OVER 225 HP 1.13 1.06 1.02 1.00 0.96 0.90 0.87 0.86 0.85
L40 0.20 SKID STEER 1.13 1.06 1.02 1.00 0.95 0.90
L40 0.21 SKID STEER ATTACHMENTS 1.13 1.06 1.02 1.00
L40 0.31 TOOL CARRIER & TELESCOPIC HANDLERS, 0 THRU 225 HP 1.14 1.07 1.02 1.00 0.95 0.90 0.86
L40 0.32 TOOL CARRIER & TELESCOPIC HANDLERS, OVER 225 HP 1.12 1.06 1.02 1.00 0.96 0.91 0.88 0.86
L45 0.00 LOADERS / BACKHOE, CRAWLER TYPE 1.13 1.06 1.02 1.00 0.95 0.90
L50 0.00 LOADERS / BACKHOE, WHEEL TYPE 1.14 1.07 1.02 1.00 0.95 0.90 0.86
L55 0.00 LOADER / BACKHOE, ATTACHMENTS 1.13 1.07 1.03 1.00
L60 0.00 LOG SKIDDERS 1.17 1.11 1.05 1.00 0.95 0.91 0.86
M10 0.00 MARINE EQUIPMENT (NON DREDGING)
M10 0.11 AQUATIC MAINTENANCE 1.14 1.09 1.05 1.00 0.96 0.92 0.87
M10 0.12 AQUATIC MAINTENANCE ATTACHMENTS 1.16 1.10 1.05 1.00
M10 0.21 HYDRAULIC CUTTERHEAD DREDGE, 8" OR LESS,TRANSPORTABLE 1.13 1.09 1.05 1.00 0.96 0.93 0.87 0.83 0.82 0.80 0.79
M10 0.22 HYDRAULIC CUTTERHEAD DREDGE,8" - 12",TRANSPORTABLE 1.13 1.09 1.05 1.00 0.96 0.93 0.87 0.83 0.82 0.80 0.79
M10 0.23 HYDRAULIC AUGERHEAD DREDGE,12" OR LESS,TRANSPORTABLE 1.13 1.09 1.05 1.00 0.96 0.93 0.87 0.83 0.82 0.80 0.79
M10 0.24 HYDRAULIC FLOATING PUMPS,12" OR LESS,TRANSPORTABLE 1.14 1.09 1.05 1.00 0.96 0.92
M10 0.25 HYDRUALIC DREDGE PUMPS,12" OR LESS,TRANSPORTABLE 1.15 1.09 1.05 1.00
M10 0.26 HYDRAULIC DREDGE / PUMP ATTACHMENTS 1.15 1.09 1.05 1.00
M10 0.31 SMALL MECH DREDGES,CLAMSHELL,BARGE-MTD TO 5 CY 1.06 1.02 1.01 1.00 0.94 0.89 0.86 0.84 0.78 0.79 0.79 0.78
M10 0.32 SMALL MECH DREDGES, AMPHIBIOUS EXCAVATORS 1.06 1.02 1.01 1.00 0.94 0.88 0.86
M10 0.33 SMALL MECH DREDGES,HOE-MOUNTED DREDGING ATTACH 1.14 1.09 1.05 1.00 0.96 0.92 0.87 0.83 0.82 0.80 0.78 0.77 0.76 0.73
3- 15
EP 1110-1-8, Vol. 330 Nov 09
3-16
Table 3-1 Equipment Age Adjustment Factors for Ownership CostYear Purchased NewLife in Years
CATEGORY
SUB TYPE OF EQUIPMENT 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992
REGION 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
EP 1110-1-8
7/31/2009(Vol. 3)
M10 0.41 WORK FLOATS (NON-DREDGING) 1.14 1.09 1.05 1.00
M10 0.42 WORK BARGES (SECTIONAL, NON-DREDGING) 1.13 1.08 1.05 1.00 0.96 0.93 0.88 0.84 0.83 0.81 0.79 0.79 0.77 0.75 0.71 0.70 0.69 0.66
M10 0.45 FLAT-DECK OR CARGO BARGE (NON-DREDGING) 1.12 1.08 1.04 1.00 0.96 0.93 0.88 0.85 0.84 0.82 0.81 0.80 0.79 0.76 0.73 0.72 0.71 0.68
M10 0.46 DUMP SCOW (NON-DREDGING) 1.12 1.08 1.04 1.00 0.96 0.93 0.88 0.85 0.84 0.82 0.81 0.80 0.79 0.76 0.73 0.72 0.71 0.68
M10 0.47 DRILL BARGE (NON-DREDGING) 1.13 1.08 1.04 1.00 0.96 0.93 0.88 0.84 0.83 0.81 0.80 0.79 0.78 0.75 0.72 0.71 0.70 0.67
M10 0.48 ALL OTHER BARGES (NON-DREDGING) 1.13 1.08 1.04 1.00 0.96 0.93 0.88 0.84 0.83 0.81 0.80 0.79 0.78 0.75 0.72 0.71 0.70 0.67
M10 0.51 BOATS & LAUNCHES, 0 THRU 250 HP 1.14 1.09 1.05 1.00 0.96 0.92 0.87 0.83 0.81 0.79 0.78
M10 0.53 BOATS & LAUNCHES, 251 THRU 500 HP 1.13 1.09 1.05 1.00 0.96 0.93 0.87 0.83 0.82 0.80 0.79 0.78
M10 0.54 TUGS, 501 THRU 1,000 HP 1.13 1.08 1.04 1.00 0.96 0.93 0.88 0.84 0.83 0.81 0.80 0.79 0.78 0.75 0.72 0.71 0.70 0.66
M10 0.55 TUGS, 1,000 THRU 2,000 HP 1.13 1.08 1.04 1.00 0.96 0.93 0.88 0.84 0.83 0.81 0.80 0.79 0.78 0.75 0.72 0.71 0.70 0.67
P10 0.00 PILE HAMMER ACCESSORIES - EXTRACTORS & BOX LEADS 1.16 1.09 1.04 1.00
P20 0.00 PILE HAMMERS, DOUBLE ACTING
P20 0.10 DIESEL 1.14 1.08 1.03 1.00
P20 0.20 PNUEMATIC (STEAM/AIR) 1.13 1.07 1.03 1.00
P25 0.00 PILE HAMMERS, SINGLE ACTING
P25 0.10 DIESEL 1.13 1.07 1.03 1.00
P25 0.20 PNUEMATIC (STEAM/AIR) 1.12 1.07 1.03 1.00
P30 0.00 PILE HAMMERS, DRIVER/ EXTRACTOR, VIBRATORY 1.13 1.07 1.03 1.00
P35 0.00 PIPELAYERS 1.13 1.06 1.02 1.00 0.96 0.90 0.87 0.86 0.85 0.85
P40 0.00 PLATFORMS & MAN-LIFTS 1.06 1.02 1.01 1.00 0.94 0.89
P45 0.00 PUMPS, GROUT 1.12 1.07 1.03 1.00 0.95 0.89
P50 0.00 PUMPS, WATER, CENTRIFUGAL, TRASH
3- 16
EP 1110-1-8, Vol. 330 Nov 09
3-17
Table 3-1 Equipment Age Adjustment Factors for Ownership CostYear Purchased NewLife in Years
CATEGORY
SUB TYPE OF EQUIPMENT 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992
REGION 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
EP 1110-1-8
7/31/2009(Vol. 3)
P50 0.11 ENGINE DRIVE 1.13 1.07 1.03 1.00 0.95 0.88
P50 0.12 ELECTRIC DRIVE 1.13 1.07 1.03 1.00 0.95 0.88
P50 0.21 WHEEL MOUNTED, ENGINE DRIVE 1.13 1.07 1.03 1.00 0.95 0.88
P50 0.22 WHEEL MOUNTED, ELECTRIC DRIVE 1.13 1.07 1.03 1.00 0.95 0.88
P50 0.31 HOSES, PUMP, SUCTION & DISCHARGE 1.11 1.06 1.03 1.00
P55 0.00 PUMPS, WATER, SUBMERSIBLE
P55 0.01 ENGINE DRIVE 1.13 1.07 1.03 1.00 0.95 0.88
P55 0.02 ELECTRIC DRIVE 1.12 1.07 1.03 1.00 0.95 0.89
P60 0.00 PUMPS, WATER, CENTRIFUGAL, DEWATERING
P60 0.11 SKID MOUNTED, ENGINE DRIVE 1.13 1.07 1.03 1.00 0.95 0.88
P60 0.12 SKID MOUNTED, ELECTRIC DRIVE 1.12 1.07 1.03 1.00 0.95 0.89
P60 0.21 WHEEL MOUNTED, ENGINE DRIVE 1.13 1.07 1.03 1.00 0.95 0.88
P60 0.22 WHEEL MOUNTED, ELECTRIC DRIVE 1.12 1.07 1.03 1.00 0.95 0.89
P65 0.00 PUMPS, WATER, DIAPHRAGM
P65 0.11 SKID MOUNTED, ENGINE DRIVE 1.13 1.07 1.03 1.00 0.95 0.88
P65 0.12 SKID MOUNTED, ELECTRIC DRIVE 1.12 1.07 1.03 1.00 0.95 0.89
P65 0.21 WHEEL MOUNTED, ENGINE DRIVE 1.13 1.07 1.03 1.00 0.95 0.88
P65 0.22 WHEEL MOUNTED, ELECTRIC DRIVE 1.12 1.07 1.03 1.00 0.95 0.89
P70 0.00 PUMPS, WATER (For core drills)
P70 0.01 ENGINE DRIVE 1.13 1.07 1.03 1.00 0.95 0.87
P70 0.02 ELECTRIC DRIVE 1.13 1.07 1.03 1.00 0.95 0.87
R10 0.00 RIPPERS & HYDRAULIC BANK SLOPERS (Add cost for point wear) 1.13 1.06 1.02 1.00 0.95 0.90
3- 17
EP 1110-1-8, Vol. 330 Nov 09
3-18
Table 3-1 Equipment Age Adjustment Factors for Ownership CostYear Purchased NewLife in Years
CATEGORY
SUB TYPE OF EQUIPMENT 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992
REGION 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
EP 1110-1-8
7/31/2009(Vol. 3)
R15 0.00 ROLLERS, STATIC, TOWED, PNEUMATIC 1.18 1.12 1.06 1.00 0.95 0.90 0.85
R20 0.00 ROLLERS, STATIC, TOWED, STEEL DRUM 1.18 1.12 1.06 1.00 0.95 0.90 0.85
R30 0.00 ROLLERS, STATIC, SELF-PROPELLED
R30 0.01 PNEUMATIC 1.17 1.11 1.05 1.00 0.95 0.90
R30 0.02 SMOOTH DRUM 1.17 1.11 1.05 1.00 0.95 0.91 0.86
R30 0.03 TAMPING FOOT, LANDFILL & SOIL COMPACTORS 1.18 1.12 1.06 1.00 0.95 0.90 0.85 0.83
R40 0.00 ROLLERS, VIBRATORY, TOWED 1.18 1.12 1.06 1.00 0.94 0.90
R45 0.00 ROLLERS, VIBRATORY, SELF-PROPELLED, DOUBLE DRUM 1.18 1.12 1.06 1.00 0.94 0.90
R50 0.00 ROLLERS, VIBRATORY, SELF-PROPELLED, SINGLE DRUM 1.19 1.13 1.06 1.00 0.94 0.89
R55 0.00 ROOFING EQUIPMENT 1.12 1.07 1.03 1.00
S10 0.00 SCRAPERS, ELEVATING
S10 0.01 0 THRU 200 HP 1.11 1.06 1.01 1.00 0.96 0.91 0.87
S10 0.02 OVER 200 HP 1.12 1.06 1.02 1.00 0.95 0.91 0.87 0.86 0.84
S15 0.00 SCRAPERS, CONVENTIONAL 1.11 1.06 1.01 1.00 0.96 0.91 0.88 0.87 0.85 0.85
S20 0.00 SCRAPERS, TANDEM POWERED 1.11 1.06 1.01 1.00 0.96 0.91 0.88 0.87 0.85 0.85
S25 0.00 SCRAPERS, TRACTOR DRAWN 1.11 1.06 1.01 1.00 0.96 0.91 0.88 0.86
S30 0.00 SCREENING & CRUSHING PLANTS
S30 0.10 CONVEYORS 1.11 1.06 1.03 1.00 0.96 0.89 0.86
S30 0.20 CRUSHERS - VERTICAL & HORIZONTAL SHAFT IMPACTOR 1.11 1.06 1.03 1.00 0.96 0.90 0.87 0.85 0.84 0.84 0.83 0.82 0.80 0.78 0.77 0.75 0.74
S30 0.21 CRUSHERS - CONE 1.11 1.06 1.03 1.00 0.96 0.90 0.87 0.85 0.84 0.84 0.83 0.82 0.80 0.78 0.77 0.75 0.74
S30 0.22 CRUSHERS - JAW 1.11 1.06 1.03 1.00 0.96 0.90 0.87 0.85 0.84 0.84 0.83 0.82 0.80 0.78 0.77 0.75 0.74
S30 0.30 SCREENING PLANT 1.11 1.06 1.03 1.00 0.96 0.89 0.86
3- 18
EP 1110-1-8, Vol. 330 Nov 09
3-19
Table 3-1 Equipment Age Adjustment Factors for Ownership CostYear Purchased NewLife in Years
CATEGORY
SUB TYPE OF EQUIPMENT 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992
REGION 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
EP 1110-1-8
7/31/2009(Vol. 3)
S35 0.00 SNOW REMOVAL EQUIPMENT 1.13 1.07 1.03 1.00 0.95 0.88
S40 0.00 SOIL & ROAD STABILIZERS 1.11 1.06 1.01 1.00 0.96 0.91 0.87
S45 0.00 SPLITTERS, ROCK & CONCRETE 1.13 1.07 1.03 1.00
T10 0.00 TRACTOR BLADES & ATTACHMENTS (including agricultural) 1.13 1.06 1.02 1.00 0.96 0.90 0.87
T15 0.00 TRACTORS, CRAWLER (DOZER) (includes blade)
T15 0.01 0 THRU 225 HP 1.14 1.07 1.03 1.00 0.95 0.89 0.86
T15 0.02 226 HP THRU 425 HP 1.13 1.06 1.02 1.00 0.95 0.90 0.87 0.85 0.84
T15 0.03 OVER 425 HP 1.13 1.06 1.02 1.00 0.96 0.90 0.87 0.86 0.85 0.85
T20 0.00 TRACTORS, WHEEL TYPE (DOZER) 1.17 1.11 1.05 1.00 0.95 0.91 0.86 0.84 0.83 0.81
T25 0.00 TRACTORS, AGRICULTURAL
T25 0.10 CRAWLER 1.17 1.11 1.05 1.00 0.95 0.91 0.86
T25 0.20 WHEEL 1.17 1.11 1.05 1.00 0.95 0.91
T30 0.00 TRENCHERS, CHAIN TYPE CUTTER 1.18 1.12 1.06 1.00 0.94 0.90
T35 0.00 TRENCHERS, WHEEL TYPE CUTTER 1.18 1.12 1.06 1.00 0.94 0.90
T40 0.00 TRUCK OPTIONS
T40 0.10 CRANES / HOISTS, PERSONNEL & MATERIAL HANDLING 1.13 1.07 1.03 1.00 0.95 0.88
T40 0.20 DUMP BODY, REAR 1.11 1.06 1.03 1.00 0.96 0.89
T40 0.30 FLATBEDS, WITH SIDES 1.13 1.07 1.03 1.00 0.95 0.88
T40 0.41 HOIST, ELECTRIC DRIVE 1.13 1.07 1.03 1.00 0.95 0.88
T40 0.50 TRANSIT MIXERS 1.12 1.07 1.03 1.00 0.95 0.89
T40 0.60 WATER TANKS 1.13 1.07 1.03 1.00 0.95 0.87
T40 0.70 ALL OTHER OPTIONS 1.13 1.07 1.03 1.00 0.95 0.88
3- 19
EP 1110-1-8, Vol. 330 Nov 09
3-20
Table 3-1 Equipment Age Adjustment Factors for Ownership CostYear Purchased NewLife in Years
CATEGORY
SUB TYPE OF EQUIPMENT 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992
REGION 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
EP 1110-1-8
7/31/2009(Vol. 3)
T45 0.00 TRUCK TRAILERS
T45 0.10 BOTTOM DUMP 1.11 1.06 1.03 1.00 0.96 0.89 0.86
T45 0.20 END DUMP 1.11 1.06 1.03 1.00 0.96 0.89 0.86
T45 0.30 PUP TRAILER 1.11 1.06 1.03 1.00 0.96 0.89
T45 0.41 LOWBOY, RIGID NECK, DROP DECK 1.11 1.06 1.03 1.00 0.96 0.89 0.86
T45 0.50 FLATBED TRAILER 1.11 1.06 1.03 1.00 0.96 0.89 0.86
T45 0.60 MISCELLANEOUS / UTILITY 1.11 1.06 1.03 1.00 0.96 0.89 0.86
T45 0.70 WATER TANKER TRAILER 1.13 1.07 1.03 1.00 0.95 0.88 0.84
T45 0.80 DECONTAMINATION FACILITY 1.13 1.07 1.03 1.00 0.95 0.87
T45 0.90 TANK TRAILERS 1.13 1.07 1.03 1.00 0.95 0.88 0.84
T50 0.00 TRUCKS, HIGHWAY (Add attachments as required)
T50 0.01 0 THRU 10,000 GVW 1.13 1.08 1.04 1.00 0.95 0.91
T50 0.02 OVER 10,000 THRU 30,000 GVW (Chassis only - Add options) 1.13 1.08 1.04 1.00 0.95 0.91 0.88
T50 0.03 OVER 30,000 GVW (Chassis only - Add options) 1.13 1.08 1.04 1.00 0.95 0.91 0.88 0.87
T55 0.00 TRUCKS, OFF-HIGHWAY
T55 0.10 RIGID FRAME 1.09 1.06 1.02 1.00 0.95 0.88 0.83 0.81 0.80 0.78 0.77 0.76 0.75 0.72
T55 0.20 ARTICULATED FRAME 1.10 1.07 1.03 1.00 0.95 0.87 0.82 0.81 0.80
T56 0.00 TRUCKS,OFF-HIGHWAY/PRIME MOVER TRACTORS & WAGONS
T56 0.10 PRIME MOVER TRACTORS 1.09 1.06 1.02 1.00 0.95 0.88 0.83 0.81 0.80 0.78 0.77 0.76 0.75 0.72
T56 0.20 WAGONS, BOTTOM DUMP 1.10 1.07 1.03 1.00 0.95 0.87 0.81 0.80 0.79 0.77
T56 0.30 WAGONS, REAR DUMP 1.10 1.07 1.03 1.00 0.94 0.87 0.81 0.80
T57 0.00 TRUCKS, VACUUM 1.12 1.07 1.03 1.00 0.95 0.88 0.85
3- 20
EP 1110-1-8, Vol. 330 Nov 09
3-21
Table 3-1 Equipment Age Adjustment Factors for Ownership CostYear Purchased NewLife in Years
CATEGORY
SUB TYPE OF EQUIPMENT 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992
REGION 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
EP 1110-1-8
7/31/2009(Vol. 3)
T60 0.00 TRUCKS, WATER, OFF-HIGHWAY 1.10 1.07 1.03 1.00 0.94 0.87 0.81 0.80
T65 0.00 TUNNEL/MINING EQUIPMENT
T65 0.10 DRIFTING & TUNNELING DRILLS 1.21 1.15 1.08 1.00 0.92 0.85 0.79 0.78 0.71 0.69
T65 0.20 TUNNEL BORING MACHINES 1.11 1.06 1.03 1.00 0.95 0.89 0.86 0.84 0.83 0.83 0.82 0.81
T65 0.30 PRODUCTION DRILLING RIGS 1.21 1.15 1.08 1.00 0.92 0.85 0.79 0.78
T65 0.40 ROADHEADERS & CONTINUOUS MINERS 1.11 1.06 1.03 1.00 0.95 0.89 0.86 0.84 0.83 0.83 0.82
T65 0.50 ROCK BOLTING EQUIPMENT 1.12 1.07 1.03 1.00 0.95 0.88 0.85
T65 0.61 LOADING & HAULING EQUIPMENT, DIESEL OR GAS 1.12 1.07 1.03 1.00 0.95 0.88 0.85 0.83
T65 0.62 LOADING & HAULING EQUIPMENT, ELECTRIC 1.12 1.07 1.03 1.00 0.95 0.88 0.85 0.83 0.82 0.82
T65 0.63 LOADING & HAULING EQUIPMENT, AIR-POWERED 1.13 1.07 1.03 1.00 0.95 0.88 0.84
T65 0.70 LOCOMOTIVES 1.12 1.07 1.03 1.00 0.95 0.88 0.85 0.83
T65 0.90 OTHER TUNNELING EQUIPMENT 1.12 1.07 1.03 1.00 0.95 0.88 0.85
W10 0.00 WAGONS, BOTTOM DUMP 1.10 1.07 1.03 1.00 0.95 0.87 0.82 0.81
W15 0.00 WAGONS, REAR DUMP 1.10 1.07 1.03 1.00 0.95 0.87 0.82 0.81
W25 0.00 WATER & CO2 BLASTERS
W25 0.10 LOW PRESSURE, (< 5,000 PSI) 1.13 1.07 1.03 1.00
W25 0.20 HIGH PRESSURE, (>= 5,000 PSI) 1.13 1.07 1.03 1.00
W25 0.30 STEAM CLEANERS 1.13 1.07 1.03 1.00
W25 0.40 CO2 BLASTERS 1.13 1.07 1.03 1.00
W25 0.50 WET ABRASIVE BLASTING SYSTEM (TORBO) 1.15 1.08 1.03 1.00 0.94 0.86 0.82
W30 0.00 WATER TANKS
W30 0.10 PORTABLE WITH WHEELS 1.10 1.07 1.03 1.00 0.94 0.87 0.81 0.80
3- 21
EP 1110-1-8, Vol. 330 Nov 09
3-22
Table 3-1 Equipment Age Adjustment Factors for Ownership CostYear Purchased NewLife in Years
CATEGORY
SUB TYPE OF EQUIPMENT 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992
REGION 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
EP 1110-1-8
7/31/2009(Vol. 3)
W30 0.20 SKID MOUNTED 1.10 1.07 1.03 1.00 0.94 0.87 0.81 0.80
W35 0.00 WELDERS
W35 0.10 ENGINE DRIVEN 1.13 1.07 1.03 1.00 0.95 0.87
W35 0.20 ELECTRIC DRIVEN 1.13 1.07 1.03 1.00
3- 22
EP 1110-1-8, Vol. 330 Nov 09
3-23
1. The unit of equipment is not listed in table 2-1.
2. The equipment is contractor owned.
3. Data for the unit in question:
a. Caterpillar front-end wheel loaderb.c. Serial number indicates year of manufacture = 1997d. 1997 = $195,628
e. Horsepower is 170 hp (fuel is Diesel off-road)f.
= x $2,053 /tire = $8,212g.
4. Table 3-1, Age Adjustment Factors for Ownership Costs:
a. The category L40, subcategory 0.11 (wheel loaders < 225 hp)b. = 2003
5.
a. Economic Indexes from appendix E (wheel loaders EK = 45)(1) = 5701(2) = 5303
b.
(5701 / 5303) x = $210,310 (= 2003 purchase price)
6.
TOTAL HOURLY RATE CALCULATION FOR OVERAGE EQUIPMENT
EXAMPLE
The year corresponding to the last age adjustment factor
Drive tire (DT) size = 23.50 x 25, 16 ply, L-3 (appendix F tire code ANNB5)
Actual purchase price in
DT cost (2009)351 cwt
Model 950-F11, 4WD, 3.25 CY capacity
Hourly rate is computed as follows in accordance with figure 2-1, Equipment Rate Computation Worksheet.
Assume the following set of given information for the rate calculation example:
For 2003 (first year of economic life), the economic indexFor 1997 (year of manufacture), the economic index
Adjust the actual purchase price:
$195,628
4 tires
(includes all regional discounts, sales tax and freight)
Purchase price [total equipment value (TEV)] indexed to 2003 (first year of economic life): (Purchase price includes discount, sales tax, and freight for this region).
Weight =
Figure 3-1. Total Hourly Rate Calculation for Overage Equipment
EP 1110-1-8, Vol. 330 Nov 09
3-25
1.
a.(1)(2)(3) 2009(4) 2003(5) 170(6) 0(7)
3 D-off
0 None(8) 351 cwt
(9)
Size/Ply App F Code No. Unit Price Cost(a) Front (FT): 0 $0 $0(b) Drive (DT): 23.5X25/16Ply ANNB5 4 $2,053 $8,212(c) 0 $0 $0
(d) $8,212(10)
$0 $210,310
b. 0.11c.
(1) 45(2) A AVERAGE(3) B 0.075(4) 9,250(5) 0.25(6) 0.031(7) 0.000(8) 0.111(9)
(a) 0.83(b) 0.54(c) 0.92
(10) 0.70
Equipment Specification Data:Equipment Description: Model and Series:
- Equipment: 0-None; 1-electric; 2-gasoline;3-diesel off-road; 4-diesel on-road; 5-marine gas;6-marine diesel
Fuel
Repair Cost Factor (RCF):
Front (FT):
Present Year or Year of Use:Year Manufactured:
Horsepower - Carrier:
Shipping Weight (cwt):
List Price + Accessories: [at Year (yr) of Manufacture]
Hourly Expense Calculation Factors:
Enter number from 0 to 6 ==>
L40Category and Subcategory Number:
Tire size and number of tires: (Cost of tires based on present year - see 1.a.(3) and Appendix F)
Condition (C): A=Average D=Difficult S=Severe
Horsepower - Equipment:
Drive (DT):
Enter number from 0 to 6 ==>
OR actual purchase price:
Total Tire Cost:
USE APPENDIX D TO COMPLETE THE FOLLOWING DATA:
Trailing (TT):
Fuel Factor - Carrier (E G D):
Discount Code (DC): B = 7.5% (0.075) or S = 15.0% (0.15)
Fuel Factor - Equipment [Electric (E) Gas (G) Diesel (D)]:
Life in Hours (LIFE):Salvage Value Percentage (SLV):
USE THIS WORKSHEET TO COMPUTE A HOURLY RATE FOR EQUIPMENT THAT IS NOT IN THIS PAMPHLET OR IS IN THE PAMPHLET BUT NOT EQUIVALENT IN SIZE, CAPACITY, HORSEPOWER OR VALUE. (See Appendix A for a blank
form)Region 03
ID No:
Example: The piece of equipment shown in this example is based on a known piece of equipment for illustration purposes only.
EQUIPMENT INFORMATION AND EXPENSE FACTORS
Loader, Front-end, Wheel, 4WD, 4 CY capacityCaterpillar Model 950-F11
- Carrier: 0-None; 1-electric; 2-gasoline; 3-diesel off-road; 4-diesel on-road; 5-marine gas;6-marine diesel
1997 indexed to
Tire Wear Factor:Filter, Oil, and Grease (FOG) Factor (E G D):
Economic Key (EK):
Trailing (TT):
Figure 3-1. Total Hourly Rate Calculation for Overage Equipment Page 1 of 6
EP 1110-1-8, Vol. 330 Nov 09
3-26
2.
a. = $0
(1) Discount: (List Price + Accessories) x Discount Code
{1.a.(10)} {1.c.(3)}($0 + $0.00) x 0.075 = $0
(2) Subtotal = $0
(3) Sales or Import Tax:
Subtotal x Tax Rate
{2.a.(2)} {Appendix B}
$0 x 9.00% = $0
(4) Subtotal = $0
b. Shipping Weight x Freight Rate
per cwt{1.a.(8)}
0,000 cwt x $0.00 /cwt = $0
c. TOTAL[2.]: = $210,310
3.
a. LIFE / Working Hours Per Year (WHPY) = N
{1.c.(4)} {Appendix B}
9,250 hr / 1,530 hr/yr = 6.05 yrs (N)
4.
a.(1)
Tire Index, Year of Manufacture,
{1.a.(4)} /
Tire Index, Present Year or Year of Use, {1.a.(3)} = TCI
Appendix E, EK=100 Appendix E, EK=100
2487 / 3382 = 0.735
(2) [TEV x (1.0-SLV) - (TCI x Tire Cost)] / LIFE{2.c.} {1.c.(5)} {4.a.(1)} {1.a.(9)(d)} {1.c.(4)}
[$210,310 x (1.0-0.25) - ( 0.735 x $8,212 )] / 9,250 hr = $16.40 /hr
{Appendix B}
Region 03
EQUIPMENT VALUE
List Price + Accessories: [at Year (yr) of Manufacture]
Total Discounted Price: Subtotal: {2.a.(2)} + {2.a.(3)}
DEPRECIATION PERIOD (N)
OWNERSHIP COST
Subtotal {2.a}. - {2.a.(1)}
Tire Cost Index (TCI):
Freight:
TOTAL EQUIPMENT VALUE (TEV):
Depreciation
(See chapter 3 for used and overage equipment rate adjustments.) {2.a.(4)} + {2.b} OR actual purchase price {1a.(10)}
Figure 3-1. Total Hourly Rate Calculation for Overage Equipment Page 2 of 6
EP 1110-1-8, Vol. 330 Nov 09
3-27
4. OWNERSHIP COST (Continued)
b. Facilities Capital Cost of Money (FCCM):
(1) [( N - 1.0 ) x (1.0 + SLV) + 2.0] / (2.0 x N) =Avg Value
Factor{3.a.} {1.c.5.} {3.a.} {AVF}
[(6.05 yr - 1.0) x (1.0 + 0.25) + 2.0] / (2.0 x 6.05 yr) = 0.687
(2) TEV x AVF xAdjusted
Cost-of-Money / WHPY
{2.c.} {4.b.(1)} {Appendix B} {Appendix B}
$210,310 x 0.687 x 3.90% / 1,530 hr/yr = $3.68 /hr
c. TOTAL HOURLY OWNERSHIP COST: TOTAL [4.]: = $20.08 /hr
{4.a.(2)} + {4.b.(2)}
5. OPERATING COST
a. Fuel Costs:
(1) Equipment:
Fuel Factor x Horsepower (hp) xFuel Cost per Gallon (gal)
{1.c.(6)} {1.a.(5)} {Appendix B}
0.031 x 170 hp x $3.04 /gal = $16.02 /hr
(2) Carrier:
Fuel Factor x hp x Fuel Cost per gal{1.c.(7)} {1.a.(6)} {Appendix B}
0.000 x 0 hp x $0.00 /gal = $0.00 /hr
(3) Total Hourly Fuel Cost: Total [5.a.] = $16.02 /hr{(5.a (1)} + {5.a (2)}
b. FOG Cost:
(1) Equipment:
FOG Factor xEquipment Hourly
Fuel Cost xLabor Adjustment
Factor (LAF){1.c.(8)} {5.a.(1)} {Appendix B}0.111 x $16.02 /hr x $ 0.86 /hr = $1.53 /hr
Region 03
Figure 3-1. Total Hourly Rate Calculation for Overage Equipment Page 3 of 6
EP 1110-1-8, Vol. 330 Nov 09
3-28
5.
(2) Carrier:
FOG Factor xCarrier Hourly
Fuel Cost x LAF {1.c.(8)} {5.a.(2)} {Appendix B}
0.111 x $0.00 /hr x 0.86 = $0.00 /hr
(3) = $1.53 /hr{5.b.(1)} + {5.b.(2)}
c. = $0.00 hr
d.
(1)[EK is from 1c. (1)]
Economic Index, Present Year or Year
of Use,1.a.(3)
/ Economic Index, Year of Manufacture, 1.a.(4)
= EAFAppendix E, EK={1.c.(1)} Appendix E, EK={1.c.(1)}
7047 / 5701 = 1.236
(2) Repair Factor (RF):
RCF x EAF x LAF= RF
{1.c.(10)} {5.d.(1)} {Appendix B}
0.70 x 1.236 x 0.86 = 0.744
(3) Repair Cost:
[TEV - (TCI x Tire Cost)] x RF / LIFE {2.c.} {4.a.(1)} {1.a.(9)(d)} {5.d.(2)} {1.c.(4)}
[$210,310 - (0.735 x $8,212)] x 0.744 / 9,250
(4) = $16.43 /hr
(See table 3-1 for last year of economic life.)
Repair Cost:
Economic Adjustment Factor (EAF):
Total Hourly Repair Cost: Total [5.d.]
Alternative Fuel/FOG Cost: Total [5.c.](See chapter 2, paragraph 2.24.d. for guidance on when to use.)
Region 03
Total [5.b.]Total Hourly FOG Cost:
OPERATING COST (Continued)
Figure 3-1. Total Hourly Rate Calculation for Overage Equipment Page 4 of 6
EP 1110-1-8, Vol. 330 Nov 09
3-29
5.
e.
(1) Front Tires (FT):
(1.5 x FT Cost) / (1.8 x FT Wear Factor x Maximum Tire Life Hours){1.a.(9)(a)} {1.c.(9)(a)} {Appendix F}
(1.5 x $0) / (1.8 x 0.83 x 0 hr) = $0.00 /hr
(2) Drive Tires (DT):
(1.5 x DT Cost) / (1.8 x DT Wear Factor x Maximum Tire Life Hours){1.a.(9)(b)} {1.c.(9)(b)} {Appendix F}
(1.5 x $8,212) / (1.8 x 0.54 x 3200 hr) = $3.96 /hr
(3) Trailing Tires (TT):
(1.5 x TT Cost) / (1.8 x TT Wear Factor x Maximum Tire Life Hours){1.a.(9)(c)} {1.c.(9)(c)} {Appendix F}
(1.5 x $0) / (1.8 x 0.92 x 0 hr) = $0.00 /hr
(4) Total Tire Wear Cost: Total [5.e.] = $3.96 /hr
f.
Total Tire Wear Cost per Hour x (0.15 x LAF)
{5.e.(4)} {Appendix B}
$3.96 /hr x (0.15 x 0.86) Total [5.f.] = $0.51 /hr
g. Total [5.] = $38.45 /hrTOTAL HOURLY OPERATING COST:Sum {5.a.} through {5.f.}
Sum {5.e.(1)} through {5.e.(3)}
Region 03
OPERATING COST (Continued)
Tire Wear Cost: (Use current price levels. See Appendix F.)
Tire Repair Cost:
Figure 3-1. Total Hourly Rate Calculation for Overage Equipment Page 5 of 6
EP 1110-1-8, Vol. 330 Nov 09
3-30
6. HOURLY RATES
a. Total Hourly Rate: [based on 40 hours per week (wk)]
Ownership Cost +{4.c.} {5.g.}
$20.08 /hr + $38.45 /hr = $58.53 /hr
b.
(Refer to Chapter 3, Adjustments to Rates, for methodology.)
Depreciation + (FCCM x 40 hr/wk / Work hr/wk) + Operating Cost
{4.a.(2)} {4.b.(2)} {5.g.}
$0.00 /hr + ($0.00 /hr x 40 hr/wk / 60 hr/wk) + $0.00 /hr = $0.00 /hr
c.
(Refer to Chapter 2, paragraph 2.28 for guidance on use.)
(Depreciation x 0.50) + FCCM {4.a.(2)} {4.b.(2)}
($0.00 /hr x 0.50) + $0.00 /hr = $0.00 /hr
(Refer to Chapter 3, paragraph 3.12 for guidance for overage equipment.)
See Figure 3-2 for standby calculations for overage equipment
See Chapter 3 if rate adjustments are necessary.
Standby Hourly Rate:
Region 03
Other Work Shifts Hourly Rate:
example:60 hr/wk
(example:60 hr/wk)
Operating Cost
Figure 3-1. Total Hourly Rate Calculation for Overage Equipment Page 6 of 6
EP 1110-1-8, Vol. 330 Nov 09
3-31
Table 3-2. Equipment Age Adjustment Factors
for
Standby costs
The factors in this table are used when the age of a unit of equipment is other than the age of the equipment listed in table 2-1.
These factors are multiplied by the hourly standby costs shown in table 2-1 and result in a standby rate adjusted for the actual age of the equipment being considered.
When the actual “life” in hours of the unit of equipment has exceeded the economic life given in appendix D, the age will be determined as discussed in chapter 3.
Refer to chapter 3, as follows:
3-13. Rate Adjustments Overage Equipment Standby
3-39
EP 1110-1-8, Vol. 330 Nov 09
3-33
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Table 3-2 Equipment Age Adjustment Factors for Standby CostYear Purchased New
CATEGORY
SUB TYPE OF EQUIPMENT 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992
REGION 3 Life in Years
EP 1110-1-8
7/31/2009(Vol. 3)
A10 0.00 AGGREGATE / CHIP SPREADERS
A10 0.10 SELF-PROPELLED 1.13 1.08 1.03 1.00 0.95 0.90 0.90 0.90 0.90 0.89 0.86 0.85 0.82 0.79 0.77 0.75 0.73 0.71
A10 0.20 TOWED & TAILGATE 1.13 1.08 1.03 1.00 0.95 0.90 0.90 0.90 0.90 0.88 0.86 0.85 0.82 0.79 0.77 0.75 0.73 0.70
A15 0.00 AIR COMPRESSORS, PORTABLE
A15 0.10 ROTARY SCREW 1.19 1.12 1.04 1.00 0.96 0.92 0.92 0.91 0.92 0.90 0.92 0.92 0.91 0.91 0.91 0.88 0.89 0.88
A15 0.20 SHOP TYPE 1.18 1.11 1.04 1.00 0.96 0.93 0.92 0.92 0.92 0.91 0.92 0.92 0.92 0.92 0.91 0.89 0.89 0.89
A20 0.00 AIR HOSE, TOOLS & EQUIPMENT
A20 0.10 AIR DRILL HOSE 1.17 1.11 1.04 1.00 0.96 0.93 0.93 0.92 0.93 0.91 0.93 0.92 0.92 0.92 0.91 0.90 0.90 0.89
A20 0.20 SANDBLAST HOSE 1.17 1.11 1.04 1.00 0.96 0.93 0.93 0.92 0.93 0.91 0.93 0.92 0.92 0.92 0.91 0.90 0.90 0.89
A20 0.30 SANDBLASTERS, BREAKERS, & MISC. AIR TOOLS 1.18 1.11 1.04 1.00 0.96 0.93 0.92 0.92 0.92 0.91 0.92 0.92 0.92 0.92 0.91 0.89 0.90 0.89
A25 0.00 ASPHALT PAVING DISTRIBUTORS 1.12 1.07 1.03 1.00 0.96 0.90 0.91 0.91 0.91 0.89 0.87 0.86 0.83 0.81 0.79 0.77 0.75 0.73
A30 0.00 ASPHALT PAVERS & MISCELLANEOUS ROAD EQUIPMENT
A30 0.10 SELF PROPELLED 1.12 1.07 1.03 1.00 0.95 0.90 0.90 0.90 0.90 0.89 0.87 0.86 0.83 0.80 0.78 0.76 0.75 0.72
A30 0.20 TOWED 1.12 1.07 1.03 1.00 0.95 0.90 0.90 0.90 0.90 0.89 0.87 0.85 0.82 0.80 0.78 0.76 0.74 0.71
A30 0.30 SLURRY SEAL PAVERS (Cold mix) 1.12 1.07 1.03 1.00 0.95 0.90 0.90 0.90 0.90 0.89 0.87 0.85 0.83 0.80 0.78 0.76 0.74 0.72
A30 0.40 MISCELLANEOUS ROAD EQUIPMENT 1.12 1.07 1.03 1.00 0.95 0.90 0.90 0.90 0.90 0.89 0.87 0.85 0.82 0.80 0.78 0.76 0.74 0.71
A35 0.00 ASPHALT PAVING KETTLES 1.13 1.08 1.03 1.00 0.95 0.90 0.90 0.90 0.90 0.88 0.86 0.85 0.82 0.79 0.77 0.75 0.73 0.70
A40 0.00 ASPHALT & CONCRETE MILLERS / PROFILERS / PLANERS / ROTARY GRINDERS
1.13 1.08 1.03 1.00 0.95 0.90 0.90 0.90 0.90 0.88 0.86 0.85 0.82 0.79 0.77 0.75 0.73 0.70
A45 0.00 ASPHALT RECYCLERS & SEALERS 1.13 1.08 1.03 1.00 0.95 0.89 0.90 0.90 0.90 0.88 0.86 0.84 0.81 0.79 0.77 0.74 0.73 0.70
B10 0.00 BATCH PLANTS, ASPHALT & CONCRETE
B10 0.10 ASPHALT 1.13 1.08 1.03 1.00 0.95 0.90 0.90 0.90 0.90 0.89 0.86 0.85 0.82 0.79 0.77 0.75 0.73 0.71
B10 0.20 CONCRETE 1.13 1.08 1.03 1.00 0.95 0.90 0.90 0.90 0.90 0.89 0.86 0.85 0.82 0.79 0.77 0.75 0.73 0.71
3- 28
EP 1110-1-8, Vol. 330 Nov 09
3-34
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Table 3-2 Equipment Age Adjustment Factors for Standby CostYear Purchased New
CATEGORY
SUB TYPE OF EQUIPMENT 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992
REGION 3 Life in Years
EP 1110-1-8
7/31/2009(Vol. 3)
B10 0.30 PUGMILL 1.12 1.07 1.03 1.00 0.95 0.90 0.90 0.90 0.90 0.89 0.87 0.85 0.82 0.80 0.78 0.76 0.74 0.71
B15 0.00 BROOMS, STREET SWEEPERS & FLUSHERS 1.11 1.06 1.03 1.00 0.96 0.90 0.86 0.85 0.84 0.83 0.83 0.81 0.80 0.78 0.76 0.74 0.73 0.71
B20 0.00 BRUSH CHIPPERS 1.11 1.06 1.03 1.00 0.96 0.90 0.86 0.85 0.84 0.83 0.83 0.81 0.80 0.78 0.76 0.74 0.73 0.71
B25 0.00 BUCKETS, CLAMSHELL 1.06 1.02 1.01 1.00 0.94 0.89 0.87 0.84 0.78 0.80 0.81 0.80 0.80 0.78 0.77 0.76 0.77 0.73
B30 0.00 BUCKETS, CONCRETE
B30 0.10 GENERAL PURPOSE, MANUAL TRIP 1.06 1.02 1.01 1.00 0.95 0.89 0.87 0.85 0.79 0.80 0.81 0.81 0.80 0.79 0.78 0.77 0.78 0.74
B30 0.20 LAYDOWN 1.06 1.02 1.01 1.00 0.95 0.89 0.87 0.85 0.79 0.80 0.81 0.81 0.80 0.79 0.78 0.77 0.78 0.74
B30 0.30 LOWBOY 1.06 1.02 1.01 1.00 0.95 0.89 0.87 0.85 0.79 0.80 0.81 0.81 0.80 0.79 0.78 0.77 0.78 0.74
B30 0.40 LOW SLUMP 1.06 1.02 1.01 1.00 0.95 0.89 0.87 0.85 0.79 0.80 0.81 0.81 0.80 0.79 0.78 0.77 0.78 0.74
B35 0.00 BUCKETS, DRAGLINE
B35 0.10 LIGHT WEIGHT 1.06 1.02 1.01 1.00 0.94 0.89 0.87 0.84 0.78 0.80 0.81 0.80 0.80 0.78 0.77 0.76 0.77 0.73
B35 0.20 MEDIUM WEIGHT 1.06 1.02 1.01 1.00 0.94 0.89 0.87 0.84 0.79 0.80 0.81 0.80 0.80 0.78 0.77 0.76 0.77 0.73
B35 0.30 HEAVY WEIGHT 1.06 1.02 1.01 1.00 0.94 0.89 0.87 0.84 0.79 0.80 0.81 0.80 0.80 0.78 0.77 0.77 0.77 0.73
C05 0.00 CHAIN SAWS 1.11 1.06 1.03 1.00 0.95 0.89 0.86 0.84 0.83 0.83 0.82 0.81 0.79 0.77 0.75 0.73 0.72 0.70
C10 0.00 COMPACTORS, WALK-BEHIND OR REMOTE CONTROLLER
C10 0.10 COMPACTORS, RAMMERS / TAMPERS & VIBRATORY PLATES 1.11 1.06 1.02 1.00 0.96 0.90 0.87 0.85 0.84 0.84 0.83 0.82 0.80 0.79 0.77 0.75 0.74 0.72
C10 0.20 ROLLERS, VIBRATORY 1.12 1.07 1.03 1.00 0.95 0.89 0.85 0.84 0.83 0.82 0.81 0.80 0.78 0.76 0.74 0.72 0.71 0.69
C15 0.00 CONCRETE CLEANERS / ABRASIVE BLASTERS
C15 0.10 WALK BEHIND 1.13 1.07 1.03 1.00 0.95 0.88 0.84 0.83 0.82 0.81 0.80 0.79 0.77 0.75 0.73 0.71 0.70 0.67
C15 0.20 TRUCK/TRAILER MOUNTED 1.12 1.07 1.03 1.00 0.95 0.89 0.85 0.84 0.82 0.82 0.81 0.80 0.78 0.76 0.74 0.72 0.71 0.69
C20 0.00 CONCRETE BUGGIES 1.13 1.07 1.03 1.00 0.95 0.88 0.84 0.83 0.82 0.81 0.80 0.79 0.77 0.75 0.73 0.71 0.70 0.67
C25 0.00 CONCRETE FINISHERS/SCREEDS/SPREADERS
3- 29
EP 1110-1-8, Vol. 330 Nov 09
3-35
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Table 3-2 Equipment Age Adjustment Factors for Standby CostYear Purchased New
CATEGORY
SUB TYPE OF EQUIPMENT 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992
REGION 3 Life in Years
EP 1110-1-8
7/31/2009(Vol. 3)
C25 0.10 FINISHERS/TROWELS 1.12 1.07 1.03 1.00 0.95 0.88 0.85 0.83 0.82 0.81 0.80 0.79 0.77 0.75 0.73 0.71 0.70 0.68
C25 0.20 VIBRATORY SCREED 1.12 1.07 1.03 1.00 0.95 0.88 0.85 0.83 0.82 0.81 0.80 0.79 0.77 0.75 0.73 0.71 0.70 0.68
C25 0.25 VIBRATORY LASER SCREED 1.13 1.07 1.03 1.00 0.95 0.87 0.84 0.82 0.81 0.80 0.79 0.78 0.75 0.74 0.71 0.69 0.68 0.65
C25 0.30 MATERIAL/TOPPING SPREADERS 1.13 1.07 1.03 1.00 0.95 0.87 0.84 0.82 0.81 0.80 0.79 0.78 0.75 0.74 0.71 0.69 0.68 0.65
C30 0.00 CONCRETE GRINDERS 1.12 1.07 1.03 1.00 0.95 0.88 0.85 0.83 0.82 0.81 0.80 0.79 0.77 0.75 0.73 0.71 0.70 0.68
C35 0.00 CONCRETE GUNITERS / SHOTCRETERS 1.13 1.07 1.03 1.00 0.95 0.88 0.84 0.83 0.81 0.81 0.80 0.78 0.76 0.75 0.72 0.70 0.69 0.67
C40 0.00 CONCRETE MIXING UNITS 1.12 1.07 1.03 1.00 0.95 0.88 0.85 0.83 0.82 0.81 0.80 0.79 0.77 0.75 0.73 0.71 0.70 0.68
C45 0.00 CONCRETE PAVING MACHINES 1.13 1.08 1.03 1.00 0.95 0.90 0.90 0.90 0.90 0.88 0.86 0.85 0.82 0.79 0.77 0.75 0.73 0.70
C55 0.00 CONCRETE PUMPS 1.11 1.06 1.03 1.00 0.96 0.90 0.86 0.85 0.84 0.83 0.83 0.81 0.80 0.78 0.76 0.74 0.73 0.71
C60 0.00 CONCRETE SAWS (Add cost for sawblade wear) 1.11 1.06 1.03 1.00 0.96 0.89 0.86 0.85 0.84 0.83 0.82 0.81 0.79 0.78 0.76 0.74 0.73 0.71
C65 0.00 CONCRETE VIBRATORS 1.18 1.11 1.04 1.00 0.96 0.93 0.92 0.92 0.92 0.91 0.92 0.92 0.92 0.92 0.91 0.89 0.89 0.89
C70 0.00 CRANES, GANTRY & STRADDLE
C75 0.00 CRANES, HYDRAULIC, SELF-PROPELLED 1.06 1.02 1.01 1.00 0.94 0.89 0.86 0.84 0.78 0.80 0.79 0.78 0.76 0.75 0.72 0.71 0.70 0.67
C80 0.00 CRANES, HYDRAULIC, TRUCK MOUNTED
C80 0.01 UNDER 26 TON 1.06 1.02 1.01 1.00 0.94 0.89 0.86 0.84 0.78 0.80 0.79 0.78 0.76 0.75 0.72 0.71 0.70 0.67
C80 0.02 26 TON THRU 65 TON 1.06 1.02 1.01 1.00 0.94 0.89 0.87 0.84 0.78 0.80 0.79 0.78 0.77 0.75 0.73 0.71 0.70 0.67
C80 0.03 66 TON THRU 125 TON 1.06 1.02 1.01 1.00 0.94 0.89 0.87 0.84 0.79 0.80 0.80 0.78 0.77 0.75 0.73 0.71 0.71 0.67
C80 0.04 OVER 125 TON 1.06 1.02 1.01 1.00 0.94 0.89 0.87 0.84 0.79 0.80 0.80 0.79 0.77 0.75 0.73 0.72 0.71 0.68
C85 0.00 CRANES, MECHANICAL, LATTICE BOOM, CRAWLER MOUNTED
C85 0.11 DRAGLINE, CLAMSHELL, 0 THRU 1.0 CY 1.06 1.02 1.01 1.00 0.94 0.88 0.86 0.84 0.78 0.79 0.79 0.77 0.76 0.74 0.72 0.70 0.69 0.66
C85 0.12 DRAGLINE, CLAMSHELL, OVER 1.0 CY THRU 2.5 CY 1.06 1.02 1.01 1.00 0.94 0.89 0.86 0.84 0.78 0.79 0.79 0.78 0.76 0.74 0.72 0.70 0.69 0.66
C85 0.13 DRAGLINE, CLAMSHELL, OVER 2.5 CY THRU 5.0 CY 1.06 1.02 1.01 1.00 0.94 0.89 0.86 0.84 0.78 0.79 0.79 0.78 0.76 0.74 0.72 0.71 0.70 0.67
3- 30
EP 1110-1-8, Vol. 330 Nov 09
3-36
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Table 3-2 Equipment Age Adjustment Factors for Standby CostYear Purchased New
CATEGORY
SUB TYPE OF EQUIPMENT 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992
REGION 3 Life in Years
EP 1110-1-8
7/31/2009(Vol. 3)
C85 0.14 DRAGLINE, CLAMSHELL, OVER 5.0 CY 1.06 1.02 1.01 1.00 0.94 0.89 0.87 0.84 0.78 0.80 0.79 0.78 0.76 0.75 0.73 0.71 0.70 0.67
C85 0.21 LIFTING, 0 THRU 25 TON 1.06 1.02 1.01 1.00 0.94 0.89 0.86 0.84 0.78 0.79 0.79 0.78 0.76 0.74 0.72 0.70 0.69 0.66
C85 0.22 LIFTING, 26 TON THRU 50 TON 1.06 1.02 1.01 1.00 0.94 0.89 0.86 0.84 0.78 0.79 0.79 0.78 0.76 0.74 0.72 0.71 0.70 0.67
C85 0.23 LIFTING, 51 TON THRU 150 TON 1.06 1.02 1.01 1.00 0.94 0.89 0.87 0.84 0.79 0.80 0.80 0.79 0.77 0.75 0.73 0.72 0.71 0.68
C85 0.24 LIFTING, OVER 150 TON 1.06 1.02 1.01 1.00 0.95 0.89 0.87 0.85 0.79 0.80 0.80 0.79 0.77 0.75 0.73 0.72 0.71 0.68
C90 0.00 CRANES, MECHANICAL, LATTICE BOOM, TRUCK MOUNTED
C90 0.01 UNDER 26 TON 1.06 1.02 1.01 1.00 0.94 0.89 0.86 0.84 0.78 0.80 0.79 0.78 0.76 0.75 0.72 0.71 0.70 0.67
C90 0.02 26 TON THRU 65 TON 1.06 1.02 1.01 1.00 0.94 0.89 0.87 0.84 0.78 0.80 0.79 0.78 0.77 0.75 0.73 0.71 0.70 0.67
C90 0.03 66 TON THRU 125 TON 1.06 1.02 1.01 1.00 0.94 0.89 0.86 0.84 0.78 0.79 0.79 0.78 0.76 0.74 0.72 0.71 0.70 0.67
C90 0.04 OVER 125 TON 1.06 1.02 1.01 1.00 0.94 0.89 0.87 0.84 0.78 0.80 0.79 0.78 0.76 0.75 0.73 0.71 0.70 0.67
C95 0.00 CRANES, TOWER 1.06 1.02 1.01 1.00 0.94 0.89 0.86 0.84 0.78 0.79 0.79 0.78 0.76 0.74 0.72 0.71 0.70 0.67
D10 0.00 DRILLS, AIR/HYDRAULIC,CRWLR MTD,0" THRU 6.5" DIA HOLE (Add cost for drill steel and bit wear)
D10 0.10 DRILLS, AIR TRACK (Add cost for drill steel and bit wear) 1.21 1.16 1.08 1.00 0.92 0.85 0.79 0.77 0.70 0.69 0.67 0.66 0.65 0.64 0.61 0.59 0.58 0.56
D10 0.20 DRILLS, HYDRAULIC TRACK (Add cost for drill steel and bit wear) 1.22 1.16 1.08 1.00 0.92 0.84 0.78 0.76 0.69 0.67 0.66 0.64 0.63 0.62 0.59 0.57 0.56 0.54
D15 0.00 DRILLS, HORIZONTAL BORING & GROUND PIERCING (Add cost for drill steel and bit wear)
1.22 1.16 1.08 1.00 0.92 0.84 0.78 0.76 0.69 0.67 0.66 0.64 0.63 0.62 0.59 0.57 0.56 0.54
D20 0.00 DRILLS, CORE, COLUMN MOUNTED (Add cost for drill steel and bit wear) 1.22 1.17 1.08 1.00 0.92 0.84 0.78 0.76 0.68 0.66 0.65 0.64 0.62 0.61 0.58 0.56 0.55 0.53
D25 0.00 DRILLS, CORE & DOWELLING (Add cost for drill steel and bit wear) 1.22 1.16 1.08 1.00 0.92 0.84 0.78 0.76 0.69 0.67 0.66 0.64 0.63 0.62 0.59 0.57 0.56 0.54
D30 0.00 DRILLS, EARTH / AUGER (Add cost for drill steel and cutting edge wear) 1.22 1.16 1.08 1.00 0.92 0.84 0.78 0.76 0.69 0.67 0.66 0.64 0.63 0.62 0.59 0.57 0.56 0.54
D35 0.00 DRILLS, ROTARY BLASTHOLE (Add cost for drill steel and bit wear)
D35 0.11 DIESEL, 4.5" THRU 9.875" DIAMETER HOLE (Add cost for drill steel and bit wear)
1.20 1.15 1.08 1.00 0.92 0.85 0.80 0.78 0.71 0.70 0.68 0.67 0.66 0.65 0.62 0.60 0.59 0.58
D35 0.12 DIESEL, OVER 9.875" DIAMETER (Add cost for drill steel and bit wear) 1.20 1.15 1.07 1.00 0.93 0.86 0.80 0.79 0.72 0.70 0.69 0.68 0.67 0.66 0.63 0.61 0.60 0.59
D35 0.21 ELECTRIC, 4.5" THRU 9.875" DIAMETER HOLE (Add cost for drill steel and bit wear)
1.20 1.15 1.08 1.00 0.92 0.85 0.80 0.78 0.71 0.70 0.68 0.67 0.66 0.65 0.62 0.60 0.59 0.58
3- 31
EP 1110-1-8, Vol. 330 Nov 09
3-37
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Table 3-2 Equipment Age Adjustment Factors for Standby CostYear Purchased New
CATEGORY
SUB TYPE OF EQUIPMENT 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992
REGION 3 Life in Years
EP 1110-1-8
7/31/2009(Vol. 3)
D35 0.22 ELECTRIC, OVER 9.875" DIAMETER (Add cost for drill steel and bit wear) 1.20 1.15 1.07 1.00 0.93 0.86 0.80 0.79 0.72 0.70 0.69 0.68 0.67 0.66 0.63 0.61 0.60 0.59
F10 0.00 FORK LIFTS 1.12 1.07 1.03 1.00 0.95 0.89 0.85 0.84 0.83 0.82 0.81 0.80 0.78 0.76 0.74 0.72 0.71 0.69
G10 0.00 GENERATOR SETS
G10 0.10 PORTABLE 1.15 1.11 1.05 1.00 0.95 0.90 0.88 0.88 0.88 0.88 0.87 0.87 0.87 0.87 0.86 0.84 0.83 0.81
G10 0.20 SKID MOUNTED 1.15 1.11 1.05 1.00 0.95 0.90 0.88 0.88 0.88 0.88 0.88 0.87 0.87 0.87 0.86 0.84 0.83 0.82
G15 0.00 GRADERS, MOTOR 1.11 1.06 1.01 1.00 0.96 0.91 0.88 0.87 0.86 0.85 0.84 0.81 0.78 0.77 0.72 0.71 0.68 0.63
H10 0.00 HAMMERS, HYDRAULIC (Demolition tool) (Add cost for point wear) 1.12 1.07 1.03 1.00 0.95 0.88 0.85 0.83 0.82 0.82 0.81 0.79 0.77 0.76 0.73 0.71 0.70 0.68
H13 0.00 HAZARDOUS/TOXIC WASTE EQUIPMENT
H13 0.11 COMPACTORS (Compression force) 0 THRU 50 TONS 1.11 1.06 1.03 1.00 0.95 0.89 0.86 0.85 0.83 0.83 0.82 0.81 0.79 0.77 0.75 0.73 0.72 0.70
H13 0.12 COMPACTORS (Compression force) OVER 50 TONS 1.12 1.07 1.03 1.00 0.95 0.89 0.86 0.84 0.83 0.83 0.82 0.80 0.78 0.77 0.75 0.73 0.72 0.70
H13 0.21 FILTER PRESSES, STATIONARY 1.12 1.07 1.03 1.00 0.95 0.89 0.85 0.84 0.83 0.82 0.81 0.80 0.78 0.76 0.74 0.72 0.71 0.69
H13 0.22 FILTER PRESSES, MOBILE 1.11 1.06 1.03 1.00 0.95 0.89 0.86 0.85 0.83 0.83 0.82 0.81 0.79 0.77 0.75 0.73 0.72 0.70
H13 0.30 CENTRIFUGES 1.13 1.07 1.03 1.00 0.95 0.88 0.84 0.83 0.82 0.81 0.80 0.79 0.77 0.75 0.73 0.71 0.70 0.67
H13 0.40 SHREDDERS 1.11 1.06 1.03 1.00 0.95 0.89 0.86 0.85 0.83 0.83 0.82 0.81 0.79 0.77 0.75 0.73 0.72 0.70
H13 0.51 SOIL TREATMENT PLANT, MOBILE 1.11 1.06 1.03 1.00 0.95 0.89 0.86 0.85 0.83 0.83 0.82 0.81 0.79 0.77 0.75 0.73 0.72 0.70
H13 0.61 SLUDGE PROCESSING EQUIP, SLUDGE DISPENSERS 1.11 1.06 1.03 1.00 0.95 0.89 0.86 0.85 0.83 0.83 0.82 0.81 0.79 0.77 0.75 0.73 0.72 0.70
H13 0.71 WASTE HANDLING EQUIPMENT, DRUM HANDLING 1.12 1.07 1.03 1.00 0.95 0.89 0.85 0.84 0.83 0.82 0.81 0.80 0.78 0.76 0.74 0.72 0.71 0.69
H15 0.00 HEATERS, SPACE
H20 0.00 HOISTS & AIR WINCHES 1.12 1.07 1.03 1.00 0.95 0.89 0.85 0.84 0.82 0.82 0.81 0.80 0.78 0.76 0.74 0.72 0.71 0.69
H25 0.00 HYDRAULIC EXCAVATORS, CRAWLER MOUNTED
H25 0.10 0 LBS THRU 12,500 LBS (COMPACT EXCAVATORS) 1.07 1.03 1.01 1.00 0.94 0.87 0.85 0.82 0.76 0.77 0.77 0.75 0.73 0.71 0.69 0.67 0.66 0.63
H25 0.11 OVER 12,500 LBS THRU 40,000 LBS 1.07 1.03 1.01 1.00 0.94 0.87 0.85 0.82 0.76 0.77 0.77 0.75 0.73 0.72 0.69 0.67 0.66 0.63
3- 32
EP 1110-1-8, Vol. 330 Nov 09
3-38
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Table 3-2 Equipment Age Adjustment Factors for Standby CostYear Purchased New
CATEGORY
SUB TYPE OF EQUIPMENT 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992
REGION 3 Life in Years
EP 1110-1-8
7/31/2009(Vol. 3)
H25 0.12 OVER 40,000 LBS THRU 100,000 LBS 1.06 1.03 1.01 1.00 0.94 0.88 0.85 0.83 0.77 0.78 0.77 0.76 0.74 0.73 0.70 0.68 0.68 0.64
H25 0.13 OVER 100,000 LBS THRU 160,000 LBS 1.06 1.02 1.01 1.00 0.94 0.88 0.86 0.83 0.77 0.79 0.78 0.77 0.75 0.73 0.71 0.69 0.69 0.65
H25 0.14 OVER 160,000 LBS 1.06 1.02 1.01 1.00 0.94 0.89 0.86 0.84 0.78 0.79 0.79 0.78 0.76 0.74 0.72 0.70 0.69 0.66
H25 0.21 ATTACHMENTS, MOBILE SHEARS 1.12 1.07 1.03 1.00 0.95 0.89 0.86 0.84 0.83 0.83 0.82 0.80 0.78 0.77 0.75 0.73 0.72 0.69
H25 0.22 ATTACHMENTS, MATERIAL HANDLING 1.12 1.07 1.03 1.00 0.95 0.88 0.85 0.83 0.82 0.82 0.81 0.79 0.77 0.76 0.73 0.71 0.70 0.68
H25 0.23 ATTACHMENTS, CONCRETE PULVERIZERS 1.12 1.07 1.03 1.00 0.95 0.89 0.86 0.84 0.83 0.83 0.82 0.80 0.78 0.77 0.75 0.73 0.72 0.69
H25 0.24 ATTACHMENTS, COMPACTORS 1.12 1.07 1.03 1.00 0.95 0.89 0.86 0.84 0.83 0.83 0.82 0.80 0.78 0.77 0.75 0.73 0.72 0.69
H30 0.00 HYDRAULIC EXCAVATORS, WHEEL MOUNTED
H30 0.01 0 THRU 1.0 CY 1.07 1.03 1.01 1.00 0.94 0.87 0.85 0.82 0.76 0.77 0.77 0.75 0.73 0.71 0.69 0.67 0.66 0.63
H30 0.02 OVER 1.0 CY 1.07 1.03 1.01 1.00 0.94 0.88 0.85 0.82 0.76 0.77 0.77 0.76 0.74 0.72 0.70 0.68 0.67 0.63
H35 0.00 HYDRAULIC SHOVELS, CRAWLER MOUNTED
H35 0.11 DIESEL, 0 CY THRU 5.0 CY 1.06 1.02 1.01 1.00 0.94 0.88 0.86 0.84 0.78 0.79 0.79 0.77 0.76 0.74 0.72 0.70 0.69 0.66
H35 0.12 DIESEL, OVER 5.0 CY 1.06 1.02 1.01 1.00 0.94 0.89 0.86 0.84 0.78 0.79 0.79 0.78 0.76 0.74 0.72 0.70 0.69 0.66
H35 0.21 ELECTRIC, OVER 2.5 CY 1.06 1.02 1.01 1.00 0.94 0.89 0.86 0.84 0.78 0.79 0.79 0.78 0.76 0.74 0.72 0.71 0.70 0.67
L10 0.00 LAND CLEARING EQUIPMENT 1.12 1.06 1.02 1.00 0.96 0.91 0.88 0.86 0.86 0.85 0.84 0.81 0.79 0.78 0.75 0.72 0.69 0.65
L15 0.00 LANDSCAPING EQUIPMENT 1.12 1.07 1.03 1.00 0.95 0.89 0.85 0.84 0.83 0.82 0.81 0.80 0.78 0.76 0.74 0.72 0.71 0.69
L20 0.00 LIGHTING SETS, TRAILER MOUNTED
L20 0.10 METALLIC VAPOR 1.12 1.07 1.03 1.00 0.95 0.89 0.85 0.84 0.82 0.82 0.81 0.80 0.78 0.76 0.74 0.72 0.71 0.69
L25 0.00 LINE STRIPING EQUIPMENT 1.12 1.07 1.03 1.00 0.95 0.89 0.85 0.84 0.82 0.82 0.81 0.80 0.78 0.76 0.74 0.72 0.71 0.69
L30 0.00 LOADERS, BELT (Conveyor belts) & ACCESSORIES 1.12 1.07 1.03 1.00 0.95 0.89 0.85 0.84 0.83 0.82 0.81 0.80 0.78 0.76 0.74 0.72 0.71 0.69
L35 0.00 LOADERS, FRONT END, CRAWLER TYPE 1.12 1.06 1.02 1.00 0.96 0.91 0.88 0.86 0.86 0.85 0.84 0.81 0.79 0.78 0.75 0.72 0.69 0.65
L40 0.00 LOADERS, FRONT END, WHEEL TYPE
3- 33
EP 1110-1-8, Vol. 330 Nov 09
3-39
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Table 3-2 Equipment Age Adjustment Factors for Standby CostYear Purchased New
CATEGORY
SUB TYPE OF EQUIPMENT 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992
REGION 3 Life in Years
EP 1110-1-8
7/31/2009(Vol. 3)
L40 0.11 ARTICULATED, 0 THRU 225 HP 1.13 1.06 1.02 1.00 0.96 0.90 0.87 0.85 0.85 0.85 0.83 0.82 0.80 0.79 0.76 0.73 0.72 0.69
L40 0.12 ARTICULATED, OVER 225 HP 1.12 1.06 1.02 1.00 0.96 0.91 0.88 0.86 0.86 0.86 0.85 0.83 0.81 0.80 0.77 0.75 0.74 0.71
L40 0.20 SKID STEER 1.12 1.06 1.02 1.00 0.96 0.90 0.88 0.86 0.85 0.85 0.84 0.82 0.80 0.79 0.76 0.74 0.73 0.70
L40 0.21 SKID STEER ATTACHMENTS 1.13 1.06 1.02 1.00 0.95 0.90 0.87 0.85 0.85 0.84 0.83 0.81 0.79 0.78 0.75 0.73 0.71 0.69
L40 0.31 TOOL CARRIER & TELESCOPIC HANDLERS, 0 THRU 225 HP 1.13 1.06 1.02 1.00 0.96 0.90 0.87 0.86 0.85 0.85 0.84 0.82 0.80 0.79 0.76 0.74 0.72 0.69
L40 0.32 TOOL CARRIER & TELESCOPIC HANDLERS, OVER 225 HP 1.12 1.06 1.02 1.00 0.96 0.91 0.88 0.87 0.86 0.86 0.85 0.83 0.81 0.81 0.78 0.76 0.74 0.72
L45 0.00 LOADERS / BACKHOE, CRAWLER TYPE 1.12 1.06 1.02 1.00 0.96 0.90 0.88 0.86 0.85 0.85 0.84 0.81 0.79 0.78 0.75 0.72 0.69 0.64
L50 0.00 LOADERS / BACKHOE, WHEEL TYPE 1.13 1.06 1.02 1.00 0.96 0.90 0.87 0.86 0.85 0.85 0.84 0.82 0.80 0.79 0.76 0.74 0.72 0.69
L55 0.00 LOADER / BACKHOE, ATTACHMENTS 1.12 1.07 1.03 1.00 0.95 0.88 0.85 0.83 0.82 0.82 0.81 0.79 0.77 0.76 0.73 0.71 0.70 0.68
L60 0.00 LOG SKIDDERS 1.17 1.11 1.05 1.00 0.95 0.91 0.87 0.84 0.83 0.81 0.80 0.77 0.76 0.75 0.74 0.73 0.71 0.69
M10 0.00 MARINE EQUIPMENT (NON DREDGING)
M10 0.11 AQUATIC MAINTENANCE 1.14 1.09 1.05 1.00 0.96 0.92 0.87 0.83 0.82 0.80 0.78 0.77 0.76 0.73 0.70 0.68 0.67 0.64
M10 0.12 AQUATIC MAINTENANCE ATTACHMENTS 1.15 1.10 1.05 1.00 0.96 0.92 0.86 0.81 0.80 0.78 0.76 0.76 0.74 0.71 0.67 0.66 0.65 0.61
M10 0.21 HYDRAULIC CUTTERHEAD DREDGE, 8" OR LESS,TRANSPORTABLE 1.13 1.08 1.05 1.00 0.96 0.93 0.88 0.84 0.83 0.81 0.79 0.79 0.77 0.75 0.71 0.70 0.69 0.66
M10 0.22 HYDRAULIC CUTTERHEAD DREDGE,8" - 12",TRANSPORTABLE 1.13 1.08 1.05 1.00 0.96 0.93 0.88 0.84 0.83 0.81 0.79 0.79 0.77 0.75 0.71 0.70 0.69 0.66
M10 0.23 HYDRAULIC AUGERHEAD DREDGE,12" OR LESS,TRANSPORTABLE 1.13 1.08 1.05 1.00 0.96 0.93 0.88 0.84 0.83 0.81 0.79 0.79 0.77 0.75 0.71 0.70 0.69 0.66
M10 0.24 HYDRAULIC FLOATING PUMPS,12" OR LESS,TRANSPORTABLE 1.13 1.09 1.05 1.00 0.96 0.93 0.87 0.83 0.82 0.80 0.79 0.78 0.77 0.74 0.71 0.69 0.68 0.65
M10 0.25 HYDRUALIC DREDGE PUMPS,12" OR LESS,TRANSPORTABLE 1.14 1.09 1.05 1.00 0.96 0.92 0.87 0.82 0.81 0.79 0.78 0.77 0.75 0.72 0.69 0.67 0.66 0.63
M10 0.26 HYDRAULIC DREDGE / PUMP ATTACHMENTS 1.14 1.09 1.05 1.00 0.96 0.92 0.87 0.82 0.81 0.79 0.78 0.77 0.75 0.72 0.69 0.67 0.66 0.63
M10 0.31 SMALL MECH DREDGES,CLAMSHELL,BARGE-MTD TO 5 CY 1.06 1.02 1.01 1.00 0.94 0.89 0.87 0.84 0.79 0.80 0.80 0.78 0.77 0.75 0.73 0.71 0.71 0.67
M10 0.32 SMALL MECH DREDGES, AMPHIBIOUS EXCAVATORS 1.06 1.02 1.01 1.00 0.94 0.89 0.86 0.84 0.78 0.79 0.79 0.78 0.76 0.74 0.72 0.70 0.69 0.66
M10 0.33 SMALL MECH DREDGES,HOE-MOUNTED DREDGING ATTACH 1.13 1.09 1.05 1.00 0.96 0.93 0.88 0.84 0.83 0.81 0.79 0.79 0.77 0.74 0.71 0.70 0.69 0.66
3- 34
EP 1110-1-8, Vol. 330 Nov 09
3-40
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Table 3-2 Equipment Age Adjustment Factors for Standby CostYear Purchased New
CATEGORY
SUB TYPE OF EQUIPMENT 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992
REGION 3 Life in Years
EP 1110-1-8
7/31/2009(Vol. 3)
M10 0.41 WORK FLOATS (NON-DREDGING) 1.14 1.09 1.05 1.00 0.96 0.93 0.87 0.83 0.82 0.80 0.79 0.78 0.77 0.74 0.70 0.69 0.68 0.65
M10 0.42 WORK BARGES (SECTIONAL, NON-DREDGING) 1.13 1.08 1.04 1.00 0.96 0.93 0.88 0.84 0.83 0.81 0.80 0.79 0.78 0.76 0.72 0.71 0.70 0.67
M10 0.45 FLAT-DECK OR CARGO BARGE (NON-DREDGING) 1.12 1.08 1.04 1.00 0.97 0.93 0.89 0.85 0.84 0.82 0.81 0.80 0.79 0.76 0.74 0.72 0.71 0.68
M10 0.46 DUMP SCOW (NON-DREDGING) 1.12 1.08 1.04 1.00 0.97 0.93 0.89 0.85 0.84 0.82 0.81 0.80 0.79 0.76 0.74 0.72 0.71 0.68
M10 0.47 DRILL BARGE (NON-DREDGING) 1.13 1.08 1.04 1.00 0.96 0.93 0.88 0.85 0.83 0.82 0.80 0.80 0.78 0.76 0.73 0.71 0.70 0.67
M10 0.48 ALL OTHER BARGES (NON-DREDGING) 1.13 1.08 1.04 1.00 0.96 0.93 0.88 0.85 0.83 0.82 0.80 0.80 0.78 0.76 0.73 0.71 0.70 0.67
M10 0.51 BOATS & LAUNCHES, 0 THRU 250 HP 1.13 1.09 1.05 1.00 0.96 0.93 0.87 0.83 0.82 0.80 0.79 0.78 0.77 0.74 0.71 0.69 0.68 0.65
M10 0.53 BOATS & LAUNCHES, 251 THRU 500 HP 1.13 1.08 1.05 1.00 0.96 0.93 0.88 0.84 0.83 0.81 0.80 0.79 0.78 0.75 0.72 0.70 0.69 0.66
M10 0.54 TUGS, 501 THRU 1,000 HP 1.12 1.08 1.04 1.00 0.96 0.93 0.88 0.85 0.84 0.82 0.80 0.80 0.79 0.76 0.73 0.72 0.71 0.68
M10 0.55 TUGS, 1,000 THRU 2,000 HP 1.12 1.08 1.04 1.00 0.97 0.93 0.89 0.85 0.84 0.82 0.81 0.80 0.79 0.76 0.73 0.72 0.71 0.68
P10 0.00 PILE HAMMER ACCESSORIES - EXTRACTORS & BOX LEADS 1.14 1.08 1.03 1.00 0.94 0.86 0.82 0.80 0.79 0.78 0.77 0.75 0.73 0.71 0.69 0.66 0.65 0.62
P20 0.00 PILE HAMMERS, DOUBLE ACTING
P20 0.10 DIESEL 1.13 1.07 1.03 1.00 0.95 0.88 0.84 0.82 0.81 0.81 0.80 0.78 0.76 0.74 0.72 0.70 0.69 0.66
P20 0.20 PNUEMATIC (STEAM/AIR) 1.12 1.07 1.03 1.00 0.95 0.88 0.85 0.83 0.82 0.82 0.81 0.79 0.77 0.76 0.73 0.71 0.70 0.68
P25 0.00 PILE HAMMERS, SINGLE ACTING
P25 0.10 DIESEL 1.12 1.07 1.03 1.00 0.95 0.88 0.85 0.83 0.82 0.82 0.81 0.79 0.77 0.76 0.73 0.71 0.70 0.68
P25 0.20 PNUEMATIC (STEAM/AIR) 1.12 1.07 1.03 1.00 0.95 0.89 0.86 0.84 0.83 0.83 0.82 0.80 0.78 0.77 0.75 0.73 0.72 0.69
P30 0.00 PILE HAMMERS, DRIVER/ EXTRACTOR, VIBRATORY 1.12 1.07 1.03 1.00 0.95 0.88 0.85 0.83 0.82 0.82 0.81 0.79 0.77 0.76 0.73 0.71 0.70 0.68
P35 0.00 PIPELAYERS 1.12 1.06 1.02 1.00 0.96 0.91 0.88 0.87 0.86 0.86 0.85 0.82 0.80 0.79 0.76 0.73 0.70 0.66
P40 0.00 PLATFORMS & MAN-LIFTS 1.06 1.02 1.01 1.00 0.94 0.89 0.87 0.84 0.78 0.80 0.79 0.78 0.76 0.75 0.73 0.71 0.70 0.67
P45 0.00 PUMPS, GROUT 1.11 1.06 1.03 1.00 0.95 0.89 0.86 0.84 0.83 0.83 0.82 0.81 0.79 0.77 0.75 0.73 0.72 0.70
P50 0.00 PUMPS, WATER, CENTRIFUGAL, TRASH
3- 35
EP 1110-1-8, Vol. 330 Nov 09
3-41
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Table 3-2 Equipment Age Adjustment Factors for Standby CostYear Purchased New
CATEGORY
SUB TYPE OF EQUIPMENT 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992
REGION 3 Life in Years
EP 1110-1-8
7/31/2009(Vol. 3)
P50 0.11 ENGINE DRIVE 1.12 1.07 1.03 1.00 0.95 0.89 0.85 0.84 0.82 0.82 0.81 0.80 0.78 0.76 0.74 0.72 0.71 0.69
P50 0.12 ELECTRIC DRIVE 1.12 1.07 1.03 1.00 0.95 0.89 0.85 0.84 0.82 0.82 0.81 0.80 0.78 0.76 0.74 0.72 0.71 0.69
P50 0.21 WHEEL MOUNTED, ENGINE DRIVE 1.12 1.07 1.03 1.00 0.95 0.89 0.85 0.84 0.82 0.82 0.81 0.80 0.78 0.76 0.74 0.72 0.71 0.69
P50 0.22 WHEEL MOUNTED, ELECTRIC DRIVE 1.12 1.07 1.03 1.00 0.95 0.89 0.85 0.84 0.82 0.82 0.81 0.80 0.78 0.76 0.74 0.72 0.71 0.69
P50 0.31 HOSES, PUMP, SUCTION & DISCHARGE 1.11 1.06 1.03 1.00 0.95 0.89 0.86 0.85 0.83 0.83 0.82 0.81 0.79 0.78 0.76 0.74 0.73 0.71
P55 0.00 PUMPS, WATER, SUBMERSIBLE
P55 0.01 ENGINE DRIVE 1.12 1.07 1.03 1.00 0.95 0.89 0.85 0.84 0.82 0.82 0.81 0.80 0.78 0.76 0.74 0.72 0.71 0.69
P55 0.02 ELECTRIC DRIVE 1.11 1.06 1.03 1.00 0.95 0.89 0.86 0.84 0.83 0.83 0.82 0.81 0.79 0.77 0.75 0.73 0.72 0.70
P60 0.00 PUMPS, WATER, CENTRIFUGAL, DEWATERING
P60 0.11 SKID MOUNTED, ENGINE DRIVE 1.12 1.07 1.03 1.00 0.95 0.89 0.85 0.84 0.82 0.82 0.81 0.80 0.78 0.76 0.74 0.72 0.71 0.69
P60 0.12 SKID MOUNTED, ELECTRIC DRIVE 1.11 1.06 1.03 1.00 0.95 0.89 0.86 0.84 0.83 0.83 0.82 0.81 0.79 0.77 0.75 0.73 0.72 0.70
P60 0.21 WHEEL MOUNTED, ENGINE DRIVE 1.12 1.07 1.03 1.00 0.95 0.89 0.85 0.84 0.82 0.82 0.81 0.80 0.78 0.76 0.74 0.72 0.71 0.69
P60 0.22 WHEEL MOUNTED, ELECTRIC DRIVE 1.11 1.06 1.03 1.00 0.95 0.89 0.86 0.84 0.83 0.83 0.82 0.81 0.79 0.77 0.75 0.73 0.72 0.70
P65 0.00 PUMPS, WATER, DIAPHRAGM
P65 0.11 SKID MOUNTED, ENGINE DRIVE 1.12 1.07 1.03 1.00 0.95 0.89 0.85 0.84 0.82 0.82 0.81 0.80 0.78 0.76 0.74 0.72 0.71 0.69
P65 0.12 SKID MOUNTED, ELECTRIC DRIVE 1.11 1.06 1.03 1.00 0.95 0.89 0.86 0.84 0.83 0.83 0.82 0.81 0.79 0.77 0.75 0.73 0.72 0.70
P65 0.21 WHEEL MOUNTED, ENGINE DRIVE 1.12 1.07 1.03 1.00 0.95 0.89 0.85 0.84 0.82 0.82 0.81 0.80 0.78 0.76 0.74 0.72 0.71 0.69
P65 0.22 WHEEL MOUNTED, ELECTRIC DRIVE 1.11 1.06 1.03 1.00 0.95 0.89 0.86 0.84 0.83 0.83 0.82 0.81 0.79 0.77 0.75 0.73 0.72 0.70
P70 0.00 PUMPS, WATER (For core drills)
P70 0.01 ENGINE DRIVE 1.13 1.07 1.03 1.00 0.95 0.88 0.84 0.83 0.81 0.81 0.80 0.79 0.77 0.75 0.73 0.71 0.69 0.67
P70 0.02 ELECTRIC DRIVE 1.13 1.07 1.03 1.00 0.95 0.88 0.84 0.83 0.81 0.81 0.80 0.79 0.77 0.75 0.73 0.71 0.69 0.67
R10 0.00 RIPPERS & HYDRAULIC BANK SLOPERS (Add cost for point wear) 1.12 1.06 1.02 1.00 0.96 0.90 0.88 0.86 0.85 0.85 0.84 0.81 0.79 0.78 0.75 0.72 0.69 0.64
3- 36
EP 1110-1-8, Vol. 330 Nov 09
3-42
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Table 3-2 Equipment Age Adjustment Factors for Standby CostYear Purchased New
CATEGORY
SUB TYPE OF EQUIPMENT 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992
REGION 3 Life in Years
EP 1110-1-8
7/31/2009(Vol. 3)
R15 0.00 ROLLERS, STATIC, TOWED, PNEUMATIC 1.17 1.11 1.05 1.00 0.95 0.91 0.86 0.84 0.83 0.81 0.82 0.80 0.78 0.77 0.75 0.73 0.68 0.68
R20 0.00 ROLLERS, STATIC, TOWED, STEEL DRUM 1.17 1.11 1.05 1.00 0.95 0.91 0.86 0.84 0.83 0.81 0.82 0.80 0.78 0.77 0.75 0.73 0.68 0.68
R30 0.00 ROLLERS, STATIC, SELF-PROPELLED
R30 0.01 PNEUMATIC 1.17 1.11 1.05 1.00 0.95 0.91 0.86 0.84 0.83 0.81 0.83 0.81 0.79 0.78 0.76 0.74 0.69 0.69
R30 0.02 SMOOTH DRUM 1.17 1.11 1.05 1.00 0.95 0.91 0.87 0.84 0.83 0.81 0.83 0.81 0.79 0.78 0.76 0.74 0.70 0.69
R30 0.03 TAMPING FOOT, LANDFILL & SOIL COMPACTORS 1.17 1.11 1.05 1.00 0.95 0.91 0.86 0.84 0.83 0.81 0.82 0.80 0.79 0.78 0.76 0.73 0.69 0.69
R40 0.00 ROLLERS, VIBRATORY, TOWED 1.18 1.11 1.05 1.00 0.95 0.90 0.86 0.83 0.82 0.80 0.82 0.80 0.78 0.77 0.75 0.72 0.68 0.67
R45 0.00 ROLLERS, VIBRATORY, SELF-PROPELLED, DOUBLE DRUM 1.18 1.11 1.05 1.00 0.95 0.90 0.86 0.83 0.82 0.80 0.82 0.80 0.78 0.77 0.75 0.72 0.68 0.67
R50 0.00 ROLLERS, VIBRATORY, SELF-PROPELLED, SINGLE DRUM 1.18 1.12 1.06 1.00 0.94 0.90 0.85 0.83 0.81 0.79 0.81 0.79 0.77 0.76 0.74 0.71 0.66 0.66
R55 0.00 ROOFING EQUIPMENT 1.12 1.07 1.03 1.00 0.95 0.89 0.86 0.84 0.83 0.83 0.82 0.80 0.78 0.77 0.75 0.73 0.72 0.69
S10 0.00 SCRAPERS, ELEVATING
S10 0.01 0 THRU 200 HP 1.11 1.06 1.01 1.00 0.96 0.91 0.88 0.87 0.86 0.85 0.84 0.81 0.78 0.77 0.72 0.71 0.68 0.63
S10 0.02 OVER 200 HP 1.11 1.06 1.01 1.00 0.96 0.91 0.88 0.87 0.85 0.85 0.83 0.80 0.78 0.77 0.72 0.70 0.68 0.63
S15 0.00 SCRAPERS, CONVENTIONAL 1.10 1.05 1.01 1.00 0.96 0.92 0.88 0.87 0.86 0.86 0.84 0.81 0.79 0.78 0.73 0.72 0.69 0.65
S20 0.00 SCRAPERS, TANDEM POWERED 1.10 1.05 1.01 1.00 0.96 0.92 0.88 0.87 0.86 0.86 0.84 0.81 0.79 0.78 0.73 0.72 0.69 0.65
S25 0.00 SCRAPERS, TRACTOR DRAWN 1.10 1.05 1.01 1.00 0.96 0.92 0.88 0.87 0.86 0.85 0.84 0.81 0.79 0.77 0.73 0.71 0.69 0.64
S30 0.00 SCREENING & CRUSHING PLANTS
S30 0.10 CONVEYORS 1.11 1.06 1.03 1.00 0.96 0.90 0.86 0.85 0.84 0.84 0.83 0.81 0.80 0.78 0.76 0.74 0.73 0.71
S30 0.20 CRUSHERS - VERTICAL & HORIZONTAL SHAFT IMPACTOR 1.10 1.06 1.02 1.00 0.96 0.90 0.87 0.86 0.85 0.84 0.83 0.82 0.81 0.79 0.77 0.76 0.75 0.73
S30 0.21 CRUSHERS - CONE 1.10 1.06 1.02 1.00 0.96 0.90 0.87 0.86 0.85 0.84 0.83 0.82 0.81 0.79 0.77 0.76 0.75 0.73
S30 0.22 CRUSHERS - JAW 1.10 1.06 1.02 1.00 0.96 0.90 0.87 0.86 0.85 0.84 0.83 0.82 0.81 0.79 0.77 0.76 0.75 0.73
S30 0.30 SCREENING PLANT 1.11 1.06 1.03 1.00 0.96 0.90 0.86 0.85 0.84 0.84 0.83 0.81 0.80 0.78 0.76 0.74 0.73 0.71
3- 37
EP 1110-1-8, Vol. 330 Nov 09
3-43
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Table 3-2 Equipment Age Adjustment Factors for Standby CostYear Purchased New
CATEGORY
SUB TYPE OF EQUIPMENT 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992
REGION 3 Life in Years
EP 1110-1-8
7/31/2009(Vol. 3)
S35 0.00 SNOW REMOVAL EQUIPMENT 1.12 1.07 1.03 1.00 0.95 0.89 0.85 0.84 0.82 0.82 0.81 0.80 0.78 0.76 0.74 0.72 0.71 0.69
S40 0.00 SOIL & ROAD STABILIZERS 1.11 1.06 1.01 1.00 0.96 0.91 0.88 0.87 0.86 0.85 0.84 0.81 0.78 0.77 0.72 0.71 0.68 0.63
S45 0.00 SPLITTERS, ROCK & CONCRETE 1.12 1.07 1.03 1.00 0.95 0.88 0.85 0.83 0.82 0.82 0.81 0.79 0.77 0.76 0.73 0.71 0.70 0.68
T10 0.00 TRACTOR BLADES & ATTACHMENTS (including agricultural) 1.12 1.06 1.02 1.00 0.96 0.91 0.88 0.86 0.86 0.85 0.84 0.81 0.79 0.78 0.75 0.72 0.69 0.65
T15 0.00 TRACTORS, CRAWLER (DOZER) (includes blade)
T15 0.01 0 THRU 225 HP 1.13 1.06 1.02 1.00 0.95 0.90 0.87 0.85 0.84 0.84 0.83 0.80 0.78 0.76 0.73 0.70 0.66 0.62
T15 0.02 226 HP THRU 425 HP 1.12 1.06 1.02 1.00 0.96 0.90 0.88 0.86 0.86 0.85 0.84 0.81 0.79 0.78 0.75 0.72 0.69 0.64
T15 0.03 OVER 425 HP 1.12 1.06 1.02 1.00 0.96 0.91 0.88 0.87 0.86 0.86 0.85 0.82 0.80 0.79 0.76 0.73 0.70 0.66
T20 0.00 TRACTORS, WHEEL TYPE (DOZER) 1.16 1.11 1.05 1.00 0.95 0.91 0.87 0.85 0.84 0.82 0.81 0.78 0.77 0.75 0.75 0.74 0.71 0.70
T25 0.00 TRACTORS, AGRICULTURAL
T25 0.10 CRAWLER 1.17 1.11 1.05 1.00 0.95 0.91 0.87 0.84 0.83 0.81 0.80 0.77 0.76 0.75 0.74 0.73 0.71 0.69
T25 0.20 WHEEL 1.17 1.11 1.05 1.00 0.95 0.91 0.86 0.84 0.83 0.81 0.80 0.77 0.76 0.74 0.74 0.73 0.70 0.69
T30 0.00 TRENCHERS, CHAIN TYPE CUTTER 1.18 1.11 1.05 1.00 0.95 0.90 0.82 0.83 0.82 0.80 0.79 0.76 0.73 0.71 0.70 0.67 0.63 0.60
T35 0.00 TRENCHERS, WHEEL TYPE CUTTER 1.18 1.11 1.05 1.00 0.95 0.90 0.82 0.83 0.82 0.80 0.79 0.76 0.73 0.71 0.70 0.67 0.63 0.60
T40 0.00 TRUCK OPTIONS
T40 0.10 CRANES / HOISTS, PERSONNEL & MATERIAL HANDLING 1.12 1.07 1.03 1.00 0.95 0.89 0.85 0.84 0.82 0.82 0.81 0.80 0.78 0.76 0.74 0.72 0.71 0.69
T40 0.20 DUMP BODY, REAR 1.11 1.06 1.03 1.00 0.96 0.90 0.86 0.85 0.84 0.83 0.83 0.81 0.80 0.78 0.76 0.74 0.73 0.71
T40 0.30 FLATBEDS, WITH SIDES 1.12 1.07 1.03 1.00 0.95 0.89 0.85 0.84 0.82 0.82 0.81 0.80 0.78 0.76 0.74 0.72 0.71 0.69
T40 0.41 HOIST, ELECTRIC DRIVE 1.12 1.07 1.03 1.00 0.95 0.89 0.85 0.84 0.82 0.82 0.81 0.80 0.78 0.76 0.74 0.72 0.71 0.69
T40 0.50 TRANSIT MIXERS 1.11 1.06 1.03 1.00 0.95 0.89 0.86 0.84 0.83 0.83 0.82 0.81 0.79 0.77 0.75 0.73 0.72 0.70
T40 0.60 WATER TANKS 1.13 1.07 1.03 1.00 0.95 0.88 0.84 0.83 0.81 0.81 0.80 0.79 0.77 0.75 0.73 0.71 0.69 0.67
T40 0.70 ALL OTHER OPTIONS 1.12 1.07 1.03 1.00 0.95 0.89 0.85 0.84 0.82 0.82 0.81 0.80 0.78 0.76 0.74 0.72 0.71 0.69
3- 38
EP 1110-1-8, Vol. 330 Nov 09
3-44
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Table 3-2 Equipment Age Adjustment Factors for Standby CostYear Purchased New
CATEGORY
SUB TYPE OF EQUIPMENT 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992
REGION 3 Life in Years
EP 1110-1-8
7/31/2009(Vol. 3)
T45 0.00 TRUCK TRAILERS
T45 0.10 BOTTOM DUMP 1.11 1.06 1.03 1.00 0.96 0.90 0.86 0.85 0.84 0.84 0.83 0.81 0.80 0.78 0.76 0.74 0.73 0.71
T45 0.20 END DUMP 1.11 1.06 1.03 1.00 0.96 0.90 0.86 0.85 0.84 0.84 0.83 0.81 0.80 0.78 0.76 0.74 0.73 0.71
T45 0.30 PUP TRAILER 1.11 1.06 1.03 1.00 0.96 0.90 0.86 0.85 0.84 0.83 0.83 0.81 0.80 0.78 0.76 0.74 0.73 0.71
T45 0.41 LOWBOY, RIGID NECK, DROP DECK 1.11 1.06 1.03 1.00 0.96 0.90 0.86 0.85 0.84 0.84 0.83 0.81 0.80 0.78 0.76 0.74 0.73 0.71
T45 0.50 FLATBED TRAILER 1.11 1.06 1.03 1.00 0.96 0.90 0.86 0.85 0.84 0.84 0.83 0.81 0.80 0.78 0.76 0.74 0.73 0.71
T45 0.60 MISCELLANEOUS / UTILITY 1.11 1.06 1.03 1.00 0.96 0.90 0.86 0.85 0.84 0.84 0.83 0.81 0.80 0.78 0.76 0.74 0.73 0.71
T45 0.70 WATER TANKER TRAILER 1.12 1.07 1.03 1.00 0.95 0.88 0.85 0.83 0.82 0.82 0.81 0.79 0.77 0.75 0.73 0.71 0.70 0.68
T45 0.80 DECONTAMINATION FACILITY 1.13 1.07 1.03 1.00 0.95 0.88 0.84 0.83 0.81 0.81 0.80 0.79 0.77 0.75 0.73 0.71 0.69 0.67
T45 0.90 TANK TRAILERS 1.12 1.07 1.03 1.00 0.95 0.88 0.85 0.83 0.82 0.82 0.81 0.79 0.77 0.75 0.73 0.71 0.70 0.68
T50 0.00 TRUCKS, HIGHWAY (Add attachments as required)
T50 0.01 0 THRU 10,000 GVW 1.13 1.07 1.04 1.00 0.96 0.91 0.89 0.87 0.85 0.85 0.87 0.85 0.86 0.88 0.87 0.85 0.81 0.76
T50 0.02 OVER 10,000 THRU 30,000 GVW (Chassis only - Add options) 1.12 1.07 1.03 1.00 0.96 0.91 0.89 0.88 0.85 0.85 0.88 0.85 0.86 0.88 0.87 0.85 0.81 0.76
T50 0.03 OVER 30,000 GVW (Chassis only - Add options) 1.12 1.07 1.03 1.00 0.96 0.91 0.89 0.88 0.86 0.86 0.88 0.86 0.86 0.88 0.88 0.85 0.81 0.77
T55 0.00 TRUCKS, OFF-HIGHWAY
T55 0.10 RIGID FRAME 1.09 1.06 1.02 1.00 0.95 0.88 0.83 0.82 0.81 0.79 0.78 0.77 0.76 0.74 0.71 0.67 0.65 0.64
T55 0.20 ARTICULATED FRAME 1.09 1.06 1.02 1.00 0.95 0.88 0.83 0.82 0.80 0.79 0.77 0.76 0.75 0.73 0.70 0.66 0.64 0.63
T56 0.00 TRUCKS,OFF-HIGHWAY/PRIME MOVER TRACTORS & WAGONS
T56 0.10 PRIME MOVER TRACTORS 1.09 1.06 1.02 1.00 0.95 0.88 0.83 0.82 0.81 0.79 0.78 0.77 0.76 0.74 0.71 0.67 0.65 0.64
T56 0.20 WAGONS, BOTTOM DUMP 1.09 1.06 1.02 1.00 0.95 0.88 0.82 0.81 0.80 0.78 0.77 0.76 0.75 0.72 0.70 0.65 0.63 0.62
T56 0.30 WAGONS, REAR DUMP 1.10 1.07 1.03 1.00 0.95 0.87 0.82 0.81 0.80 0.78 0.76 0.75 0.74 0.72 0.69 0.65 0.62 0.62
T57 0.00 TRUCKS, VACUUM 1.12 1.07 1.03 1.00 0.95 0.89 0.85 0.84 0.83 0.82 0.81 0.80 0.78 0.76 0.74 0.72 0.71 0.69
3- 39
EP 1110-1-8, Vol. 330 Nov 09
3-45
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Table 3-2 Equipment Age Adjustment Factors for Standby CostYear Purchased New
CATEGORY
SUB TYPE OF EQUIPMENT 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992
REGION 3 Life in Years
EP 1110-1-8
7/31/2009(Vol. 3)
T60 0.00 TRUCKS, WATER, OFF-HIGHWAY 1.10 1.07 1.03 1.00 0.95 0.87 0.82 0.81 0.80 0.78 0.76 0.75 0.74 0.72 0.69 0.65 0.62 0.62
T65 0.00 TUNNEL/MINING EQUIPMENT
T65 0.10 DRIFTING & TUNNELING DRILLS 1.20 1.15 1.07 1.00 0.93 0.86 0.80 0.79 0.72 0.71 0.69 0.68 0.67 0.66 0.63 0.62 0.61 0.59
T65 0.20 TUNNEL BORING MACHINES 1.11 1.06 1.03 1.00 0.96 0.90 0.86 0.85 0.84 0.84 0.83 0.82 0.80 0.78 0.76 0.75 0.73 0.72
T65 0.30 PRODUCTION DRILLING RIGS 1.20 1.15 1.07 1.00 0.93 0.86 0.80 0.79 0.72 0.70 0.69 0.68 0.67 0.65 0.63 0.61 0.60 0.58
T65 0.40 ROADHEADERS & CONTINUOUS MINERS 1.11 1.06 1.03 1.00 0.96 0.90 0.86 0.85 0.84 0.84 0.83 0.81 0.80 0.78 0.76 0.74 0.73 0.71
T65 0.50 ROCK BOLTING EQUIPMENT 1.12 1.07 1.03 1.00 0.95 0.89 0.85 0.84 0.83 0.82 0.81 0.80 0.78 0.76 0.74 0.72 0.71 0.69
T65 0.61 LOADING & HAULING EQUIPMENT, DIESEL OR GAS 1.12 1.07 1.03 1.00 0.95 0.89 0.86 0.84 0.83 0.83 0.82 0.80 0.78 0.77 0.75 0.73 0.72 0.70
T65 0.62 LOADING & HAULING EQUIPMENT, ELECTRIC 1.11 1.06 1.03 1.00 0.95 0.89 0.86 0.84 0.83 0.83 0.82 0.81 0.79 0.77 0.75 0.73 0.72 0.70
T65 0.63 LOADING & HAULING EQUIPMENT, AIR-POWERED 1.12 1.07 1.03 1.00 0.95 0.88 0.85 0.83 0.82 0.82 0.81 0.79 0.77 0.75 0.73 0.71 0.70 0.68
T65 0.70 LOCOMOTIVES 1.12 1.07 1.03 1.00 0.95 0.89 0.86 0.84 0.83 0.83 0.82 0.80 0.78 0.77 0.75 0.73 0.72 0.70
T65 0.90 OTHER TUNNELING EQUIPMENT 1.12 1.07 1.03 1.00 0.95 0.89 0.85 0.84 0.83 0.82 0.81 0.80 0.78 0.76 0.74 0.72 0.71 0.69
W10 0.00 WAGONS, BOTTOM DUMP 1.09 1.06 1.02 1.00 0.95 0.88 0.83 0.82 0.80 0.79 0.77 0.76 0.75 0.73 0.70 0.66 0.64 0.63
W15 0.00 WAGONS, REAR DUMP 1.09 1.06 1.02 1.00 0.95 0.88 0.83 0.82 0.80 0.79 0.77 0.76 0.75 0.73 0.70 0.66 0.64 0.63
W25 0.00 WATER & CO2 BLASTERS
W25 0.10 LOW PRESSURE, (< 5,000 PSI) 1.13 1.07 1.03 1.00 0.95 0.88 0.84 0.83 0.82 0.81 0.80 0.79 0.77 0.75 0.73 0.71 0.70 0.67
W25 0.20 HIGH PRESSURE, (>= 5,000 PSI) 1.13 1.07 1.03 1.00 0.95 0.88 0.84 0.83 0.82 0.81 0.80 0.79 0.77 0.75 0.73 0.71 0.70 0.67
W25 0.30 STEAM CLEANERS 1.13 1.07 1.03 1.00 0.95 0.88 0.84 0.83 0.82 0.81 0.80 0.79 0.77 0.75 0.73 0.71 0.70 0.67
W25 0.40 CO2 BLASTERS 1.12 1.07 1.03 1.00 0.95 0.88 0.85 0.83 0.82 0.82 0.81 0.79 0.77 0.76 0.73 0.71 0.70 0.68
W25 0.50 WET ABRASIVE BLASTING SYSTEM (TORBO) 1.13 1.08 1.03 1.00 0.95 0.87 0.83 0.82 0.80 0.80 0.79 0.77 0.75 0.73 0.71 0.69 0.67 0.65
W30 0.00 WATER TANKS
W30 0.10 PORTABLE WITH WHEELS 1.10 1.07 1.03 1.00 0.95 0.87 0.82 0.81 0.80 0.78 0.76 0.75 0.74 0.72 0.69 0.65 0.62 0.62
3- 40
EP 1110-1-8, Vol. 330 Nov 09
3-46
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Table 3-2 Equipment Age Adjustment Factors for Standby CostYear Purchased New
CATEGORY
SUB TYPE OF EQUIPMENT 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992
REGION 3 Life in Years
EP 1110-1-8
7/31/2009(Vol. 3)
W30 0.20 SKID MOUNTED 1.10 1.07 1.03 1.00 0.95 0.87 0.82 0.81 0.80 0.78 0.76 0.75 0.74 0.72 0.69 0.65 0.62 0.62
W35 0.00 WELDERS
W35 0.10 ENGINE DRIVEN 1.13 1.07 1.03 1.00 0.95 0.88 0.84 0.83 0.81 0.81 0.80 0.79 0.77 0.75 0.73 0.71 0.69 0.67
W35 0.20 ELECTRIC DRIVEN 1.12 1.07 1.03 1.00 0.95 0.88 0.85 0.83 0.82 0.82 0.81 0.79 0.77 0.76 0.73 0.71 0.70 0.68
3- 41
EP 1110-1-8, Vol. 330 Nov 09
3-47
1. The unit of equipment is not listed in table 2-1.
2. The equipment is contractor owned.
3.
a.b.c. Serial number indicates year of manufacture = 1997d. 1997 = $195,628
e.f.
= x $2,053/tire = $8,212g.
4.
a. =b. = 1997
5.
Horsepower is 170 hp (fuel is Diesel off-road)
Weight = 35,100 lbs
Use the actual cost data as follows:
Data for the unit in question:
Caterpillar front-end wheel loaderModel 950-F11, 4WD, 3.25 CY capacity
Drive tire (DT) size = 23.50 x 25, 16 ply, L-3 (appendix F tire code ANNB5)DT cost (2009)
Hourly rate is computed as follows:
(includes all regional discounts, sales tax and freight)
STANDBY HOURLY RATE CALCULATION FOR OVERAGE EQUIPMENT
EXAMPLE
Actual purchase price in
Assume the following set of given information for the rate calculation example:
Year of manufacture $195,628
4 tires
Purchase price (TEV)
Figure 3-2. Total Hourly Rate Calculation for Overage Equipment
EP 1110-1-8, Vol. 330 Nov 09
3-49
1.
a.(1)(2)(3) 2009(4) 1997(5) 170(6) 0(7)
3D-off
0 None(8) 351 cwt
(9)
Size/Ply App F Code No. Unit Price Cost(a) 0 $0 $0(b) 23.5X25/16Ply ANNB5 4 $2,053 $8,212(c) 0 $0 $0(d) $8,212
(10)$0 $195,628
b. 0.11c.
(1) 45(2) A AVERAGE(3) B 0.075(4) 9,250(5) 0.25(6) 0.031(7) 0.000(8) 0.111(9)
(a) 0.83(b) 0.54(c) 0.92
0.70
Tire Wear Factor:
ID No:
Drive (DT):
Total Tire Cost:
EQUIPMENT INFORMATION AND EXPENSE FACTORS
Equipment Specification Data:Equipment Description: Model and Series:
Loader, Front-end, Wheel, 4WD, 4 CY capacityCaterpillar Model 950-F11
(10)
USE THIS WORKSHEET TO COMPUTE A HOURLY RATE FOR EQUIPMENT THAT IS NOT IN THIS PAMPHLET OR IS IN THE PAMPHLET BUT NOT EQUIVALENT IN SIZE, CAPACITY, HORSEPOWER OR VALUE. (See Appendix A for a blank form)
Region 03
Example: The piece of equipment shown in this example is based on a known piece of equipment for illustration purposes only.
Repair Cost Factor (RCF):
Front (FT):Drive (DT):Trailing (TT):
Filter, Oil, and Grease (FOG) Factor (E G D):
Economic Key (EK):
Trailing (TT):
Life in Hours (LIFE):Salvage Value Percentage (SLV):
Fuel Factor - Carrier (E G D):
Discount Code (DC): B = 7.5% (0.075) or S = 15.0% (0.15)
Fuel Factor - Equipment [Electric (E) Gas (G) Diesel (D)]:
OR actual purchase price:
Condition (C): A=Average D=Difficult S=Severe
L40Category and Subcategory Number:USE APPENDIX D TO COMPLETE THE FOLLOWING DATA:
Tire size and number of tires: (Cost of tires based on present year - see 1.a.(3) and Appendix F)
List Price + Accessories: [at Year (yr) of Manufacture]
Hourly Expense Calculation Factors:
Horsepower - Carrier:
Shipping Weight (cwt):
- Equipment: 0-None; 1-electric; 2-gasoline;3-diesel off-road; 4-diesel on-road; 5-marine gas;6-marine diesel
- Carrier: 0-None; 1-electric; 2-gasoline; 3-diesel off-road; 4-diesel on-road; 5-marine gas;6-marine diesel
Fuel type:
Enter number from 0 to 6 ==>
Enter number from 0 to 6 ==>
Front (FT):
Horsepower - Equipment:
Present Year or Year of Use:Year Manufactured:
Figure 3-2. Total Hourly Rate Calculation for Overage Equipment Page 1 of 6
EP 1110-1-8, Vol. 330 Nov 09
3-50
2.
a. = $0
(1) Discount: (List Price + Accessories) x Discount Code
{1.a.(10)} {1.c.(3)}($0 + $0.00) x 0.075 = $0
(2) Subtotal {2.a.} - {2.a.(1)} Subtotal = $0
(3) Sales or Import Tax: Subtotal x Tax Rate {2.a.(2)} {Appendix B}
$0 x 9.00% = $0
(4) Subtotal = $0
b. x Freight Rate
per cwt{1.a.(8)} {Appendix B}
0,000 cwt x $0.00 /cwt = $0
c. TOTAL[2.]: = $195,628
3.
a. LIFE / = N {1.c.(4)} {Appendix B}
9,250 hr / = 6.05 yrs
4.
a.(1) Tire Cost Index (TCI):
Tire Index, Year of Manufacture,
{1.a.(4)} / = TCI Appendix E, EK=100
2431 / = 0.719
(2) [TEV x (1.0-SLV) - (TCI x Tire Cost)] / LIFE{2.c.} {1.c.(5)} {4.a.(1)} {1.a.(9)(d)} {1.c.(4)}
[$195,628 x (1.0-0.25) - (0.719 x $8,212 )] / 9,250 /hr = $15.22 /hr
3382
Region 03
EQUIPMENT VALUE
List Price + Accessories: [at Year (yr) of Manufacture]
Total Discounted Price: {Subtotal: 2.a.(2) + 2.a.(3)}
Freight:
(See chapter 3 for used and overage equipment rate adjustments.)
DEPRECIATION PERIOD (N)
OWNERSHIP COST
Depreciation
Tire Index, Present Year or Year of Use
{1.a.(3)}Appendix E, EK=100
Shipping Weight
1,530 hr/yr
TOTAL EQUIPMENT VALUE (TEV):
Working Hours Per Year (WHPY)
{2.a.(4)} + {2.b} OR actual purchase price {1a.(10)}
Figure 3-2. Total Hourly Rate Calculation for Overage Equipment Page 2 of 6
EP 1110-1-8, Vol. 330 Nov 09
3-51
4.
b.
(1) [( N - 1.0) x (1.0 + SLV) + 2.0] / (2.0 x N) =Avg Value
Factor{3.a.} {1.c.5.} {3.a.} (AVF)
[(6.05 yr - 1.0) x (1.0 + 0.25) + 2.0] / (2.0 x 6.05 yr) = 0.687
(2) TEV x AVF xAdjusted
Cost-of-Money / WHPY
{2.c.} {4.b.(1)} {Appendix B} {Appendix B}
$195,628 x 0.687 x 3.90% / 1,530 hr/yr = $3.43 /hr
c. TOTAL [4.]: = $18.65 /hr
{4.a.(2)} + {4.b.(2)}
5.
a.
(1)
Fuel Factor x Horsepower (hp) xFuel Cost per Gallon
(gal) {1.c.(6)} {1.a.(5)} {Appendix B}
0.000 x 0 hp x $0.00 /gal = $0.00 /hr
(2)
Fuel Factor x hp x Fuel Cost per gal{1.c.(7)} {1.a.(6)} {Appendix B}
0.000 x 0 hp x $0.00 /gal = $0.00 /hr
(3) Total [5.a.] = $0.00 /hr{5.a (1)} + {5.a (2)}
b.
(1)
FOG Factor xEquipment Hourly Fuel
Cost xLabor Adjustment
Factor (LAF){1.c.(8)} {5.a.(1)} {Appendix B}
0.000 x $0.00 /hr x 0.00 = $0.00 /hr
Equipment:
Equipment:
Carrier:
Total Hourly Fuel Cost:
FOG Cost:
TOTAL HOURLY OWNERSHIP COST:
OPERATING COST
Fuel Costs:
Region 03
OWNERSHIP COST (Continued)
Facilities Capital Cost of Money (FCCM):
Figure 3-2. Total Hourly Rate Calculation for Overage Equipment Page 3 of 6
EP 1110-1-8, Vol. 330 Nov 09
3-52
5.
(2) Carrier:
FOG Factor xCarrier Hourly
Fuel Cost x LAF {1.c.(8)} {5.a.(2)} {Appendix B}
0.000 x $0.00 /hr x 0.00 = $0.00 /hr
(3) = $0.00 /hr{5.b.(1)} + {5.b.(2)}
c. = $0.00 hr
d.
(1)
Economic Index, Present Year or
Year of Use,{1.a.(3)}
/ Economic Index, Year of Manufacture,
{1.a.(4)}
Appendix E, EK={1.c.(1)}
Appendix E, EK={1.c.(1)}
0000 / 0000 = 0.000
(2)
RCF x EAF x LAF = RF{1.c.(10)} {5.d.(1)} {Appendix B}
0.00 x 0.000 x 0.00 = 0.000
(3) Repair Cost:
[TEV - (TCI x Tire Cost)] x RF / LIFE {2.c.} {4.a.(1)} {1.a.(9)(d)} {5.d.(2)} {1.c.(4)}
[$0 - (0.000 x $0)] x 0.000 / 0
(4) = $0.00 /hr
OPERATING COST (Continued)
Region 03
Total [5.b.]Total Hourly FOG Cost:
(See table 3-1 for last year of economic life.)
Total Hourly Repair Cost: Total [5.d.]
Alternative Fuel/FOG Cost: Total [5.c.]
Economic Adjustment Factor (EAF):EK is from {1.c.(1)}
Repair Factor (RF):
(See chapter 2, paragraph 2.24.d. for guidance on when to use.)
Repair Cost:
Figure 3-2. Total Hourly Rate Calculation for Overage Equipment Page 4 of 6
EP 1110-1-8, Vol. 330 Nov 09
3-53
5. OPERATING COST (Continued)
e. Tire Wear Cost: (Use current price levels. See Appendix F.)
(1) Front Tires (FT):
(1.5 x FT Cost) / (1.8 x FT Wear Factor x Maximum Tire Life Hours){1.a.(9)(a)} {1.c.(9)(a)} {Appendix F}
(1.5 x $0) / (1.8 x 0.00 x 0 hrs) = $0.00/hr
(2)
(1.5 x DT Cost) / (1.8 x DT Wear Factor x Maximum Tire Life Hours){1.a.(9)(b)} {1.c.(9)(b)} {Appendix F}
(1.5 x ($0) / (1.8 x 0.00 x 0 hrs = $0.00/hr
(3)
(1.5 x TT Cost) / (1.8 x TT Wear Factor x Maximum Tire Life Hours){1.a.(9)(c)} {1.c.(9)(c)} {Appendix F}
(1.5 x $0) / (1.8 x 0.00 x 0 hr) = $0.00/hr
(4) Total Tire Wear Cost: Total [5.e.] = $0.00/hrSum {5.e.(1)} through {5.e.(3)}
f.
Total Tire Wear Cost per Hour x (0.15 x LAF)
{5.e.(4)} {Appendix B}
$0.00/hr x (0.15 x 0.00) Total [5.f.] = $0.00/hr
g. Total [5.] = $0.00/hr
TOTAL HOURLY OPERATING COST:Sum {5.a.} through {5.f.}
Region 03
Drive Tires (DT):
Trailing Tires (TT):
Tire Repair Cost:
Figure 3-2. Total Hourly Rate Calculation for Overage Equipment Page 5 of 6
EP 1110-1-8, Vol. 330 Nov 09
3-54
6.
a.
Ownership Cost + Operating Cost{4.c.} {5.g.}
$0.00 /hr + $0.00 /hr = $0.00 /hr
See Figure 3-1 for hourly rate calculations for overage equipment
b.
Depreciation + (FCCM x 40 hr/wk / Work hr/wk) + Operating Cost
{4.a.(2)} {4.b.(2)} {5.g.}
$0.00 /hr + $0.00 /hr x 40 hr/wk / 60 hr/wk + $0.00 /hr = $0.00 /hr
c.
(Depreciation x 0.50) + FCCM {4.a.(2)} {4.b.(2)}
($15.22 /hr x 0.50) + $3.43 /hr = $11.04 /hr
(Refer to Chapter 2, paragraph 2.28 for guidance on use.)
(Refer to Chapter 3, paragraph 3.12 for guidance for overage equipment.)
See Chapter 3 if rate adjustments are necessary.
Standby Hourly Rate:
Other Work Shifts Hourly Rate:
example:60 hr/wk
example:60 hr/wk
Region 03
HOURLY RATES
Total Hourly Rate: [based on 40 hours per week (wk)]
(Refer to Chapter 3, Adjustments to Rates, for methodology.)
Figure 3-2. Total Hourly Rate Calculation for Overage Equipment Page 6 of 6
EP 1110-1-8, Vol. 330 Nov 09
3-55
4-1
CHAPTER 4.0 - METHODOLOGY FOR DREDGING PLANT AND MARINE EQUIPMENT
SECTION I. GENERAL
4.1 Contents
This chapter contains the methodology used to compute ownership and operating rates for dredging plant and permanent floating plant such as floating pile-driving equipment. Dredging plant is marine equipment used for dredging operations for the majority of its life or designed and built for marine/dredging use.
4.2 General
a. The ownership and operating rates provided in table 2-1, category M-10, are based on the methodology in chapter 2 for non-dredging equipment. However, the cost data (Acquisition Cost, Horsepower, and Fuel Type) may be used for calculation of dredging plant and marine equipment rates, provided they are calculated in accordance with the methodology provided in this chapter.
b. Table 4-1 shows ownership and operating cost factors for various types of dredging plant. When a type of plant is not listed, the cost is estimated by using the factors listed in this table for a similar type of plant. c. The methodology for determining operating rates for hopper dredges was omitted from this pamphlet due to the limited number of hopper dredges and the complexity of the methods used to calculate the rates. Further information can be found in Engineer Regulation (ER) 1110-2-1302, Engineering and Design, Civil Works Cost Engineering, on the Internet at http://140.194.76.129/publications/eng-regs/er1110-2-1302/toc.htm, and in Engineer Technical Letter (ETL) 1110-2-573 Engineering and Design: Construction Cost Estimating Guide for Civil Works located at http://140.194.76.129/publications/eng-tech-ltrs/etl1110-2-573/toc.htm. The methodology for calculating ownership cost is in section V of this chapter. d. For mechanical dredges, the cost of the bucket is typically included in the plant value; therefore, no additional allowance should be made for ownership cost. If the bucket cost is not included in the plant value, the bucket may be treated as a separate unit of equipment.
EP 1110-1-8, Vol. 330 Nov 09
4-2
SECTION II. ANNUAL USE
4.3 Time Available to Dredge
a. The number of months available per calendar year (yr) for dredging shall be based on the work time available to dredge, excluding downtime for major repairs, work in dry dock, bad weather, and environmental restrictions. Figure 4-1 depicts months available for dredging, including mobilization and demobilization, based on historic data collected by the U.S. Army Corps of Engineers’ regional dredge estimating teams. The data in figure 4-1 shall be used for computing the ownership costs unless specified otherwise in the contract documents.
AVAILABLE TIME TO DREDGE BY REGION (In Months)
Type of Dredging Operation
Region Pipeline Bucket Hopper
Atlantic Coast and tributaries 9 10 10
Gulf Coast, Lower Mississippi, and Tributaries
10 10 11
Great Lakes, Upper Mississippi, and Tributaries
8 8 8
West Coast and Tributaries 9 9 9
Figure 4-1. Months Available by Region
SECTION III. LIFE
4.4 Life
The life for determining ownership and operating costs is defined as follows:
a. The Useful Life is expressed in years in table 4-1. It is the economic life of the equipment and is used to develop ownership rates for various types of dredging plant.
EP 1110-1-8, Vol. 330 Nov 09
4-3
b. The Physical Life is expressed in hours (hrs) in table 4-1. It is the life of the unit based on effective working time and is used to develop operating rates for various types of dredging plant.
4.5 Annual Hours Available
The annual hours available to dredge can be established for each type of plant based on the months available and the estimated effective monthly hours worked. Dredging time is defined as effective plus non-effective working time. “Effective working time" is defined as time during the dredging operation when actual production is taking place. "Non-effective working time" is defined as time during the dredging operation when the dredge is operational but no production is taking place. For complete definition of terms see ER 1110-2-1302, Engineering and Design, Civil Works Cost Engineering. The total annual hours available can be expressed by formula, as follows: Available Hours per yr = Months Available/yr x Effective Hours/Month Where:
• Months Available/yr is found in figure 4-1. • Effective Hours/Month is the effective working time.
SECTION IV. SALVAGE VALUE
4.6 Salvage Value (SLV)
The salvage value, expressed as a decimal, is shown in table 4-1 for different types of plant.
SECTION V. OWNERSHIP COST
4.7 Ownership Cost
Ownership cost is calculated based on a percent of plant value. Plant value is the acquisition cost plus the cost of any initial capital improvements. The value of initial capital improvements is based on those betterments, which were made within 1 year of purchase. Capital improvements do not include any replacement or repair work. Repairs or replacements are an operating cost and are covered in the repair cost allowance. Capital improvements are considered betterments, where the plant has been improved (e.g., adding radar or upgrade of engines). (Note: Only the cost difference between replacement of existing similar engines and actual cost for upgrading engines should be considered as capital improvement). For capital improvements not made within the first year after the initial acquisition, see section VIII.
EP 1110-1-8, Vol. 330 Nov 09
a. The ownership cost is determined from the plant value and is the total expense rate based on depreciation and CMR. When cost or pricing data is available, the actual acquisition price shall be used. Otherwise, the value of a similar piece of plant is used and, if necessary, adjusted so that capacity, size, and horsepower are properly considered.
b. Ownership rate is determined on a yearly basis and distributed over a monthly basis. The monthly rate is calculated based on the available use months by using the following formula:
MonthsUseAvailablePercent) CMR Yearly Percent DEPR(Yearly x ValuePlant CostOwnershipMonthly +
=
Where:
• Plant Value = Acquisition price plus initial capital improvements. • Yearly DEPR Percent = Ownership percent per year for depreciation. • Yearly CMR Percent = Ownership percent per year for cost of money rate. • Available Use Months is from figure 4-1.
4.8 Depreciation Factor
Depreciation is computed using the straight-line method. The depreciable value is the acquisition cost, plus initial capital improvements, less estimated salvage. The basis for determining the yearly percentage factor for depreciation is expressed by the following formula:
/NSLV) - (1 Percent DEPRYearly =
Where:
• N = Useful Life from table 4-1. • SLV = Salvage Value from table 4-1.
4.9 The Cost of Money Rate (CMR) Factor
The CMR factor is calculated on a yearly basis and is expressed here as an annual percentage factor. The CMR used in the calculation is the rate in effect at the time the work was performed. This formula is expressed as follows:
4-4
EP 1110-1-8, Vol. 330 Nov 09
2N2](discounSLV)1)(1-[(NPercentCMRYearly CMR) ted++
=
Where:
• N = Useful Life from table 4-1. • SLV = Salvage Value from table 4-1. • Discounted CMR = Cost of money rate (appendix I) reduced by
25 percent for overhead and profit allowance. 4.10 Other Ownership Elements
Taxes, storage (lay up), and insurance are considered indirect (overhead) costs as defined in ER 1110-2-1302, appendix D. These costs are not included in ownership rates since they vary by geographic area and with individual contractors. These costs are considered as overhead costs and are, therefore, not included here so they will not be duplicated in the overhead in the estimate or submitted proposal.
SECTION VI. OPERATING FACTORS
4.11 Hourly Operating Cost
Operating cost is based on effective working time. Dredging plant operating factors are shown in table 4-1. These factors, which are described in paragraph 4.12, are not intended to replace historical data but shall be used when historical data is limited or nonexistent.
4.12 Prime and Secondary Power
Prime power refers to the primary operating engine for the dredge or other piece of attendant plant. Secondary power refers to all other secondary engines or power plants. If more than one secondary power engine is present, the horsepower is totaled. Fuel consumption factors are prepared on the same basis as in chapter 2. Hourly fuel costs are calculated separately for the primary and secondary engines. The formula used is expressed as follows:
Hourly Fuel Cost = Horsepower x Fuel Cost/Gallon x Engine Fuel Factor Where:
• Horsepower is the engines rated horsepower. • Fuel Cost/Gallon is based on values shown in appendix B. See
chapter 3 for fuel cost adjustments.
4-5
EP 1110-1-8, Vol. 330 Nov 09
• Fuel Factor - Gas or Diesel Fuel. The fuel factor is listed in table 4-1 for the primary and secondary engines.
4.13 Water, Lube, and Supplies (WLS)
This factor is similar to the filters, oil, and grease (FOG) factor described in chapter 2. This item is computed as either a percentage of the hourly fuel costs or, if the type of plant has no engine, a reasonable hourly cost should be included.
This factor does not include an allowance for the oiler normally assigned to the dredge or other piece of dredging plant. The formula is expressed as follows:
Water, Lube, and Supply Cost = WLS factor x Hourly Fuel Cost
Where:
• WLS Factor is obtained from table 4-1. • Hourly Fuel cost is calculated as shown in paragraph 4-12.
4.14 Repairs (RPR)
This factor includes an allowance for all major and minor repairs and is similar to the maintenance and repair cost factor (RCF) described in chapter 2. The economic adjustment factor (EAF) and the labor adjustment factor (LAF) are required to develop this cost. The formula is expressed as follows:
Repair Cost = (Total Plant Value x RPR x EAF x LAF) Life in hr
Where:
• Total Plant Value = Acquisition price plus Initial capital improvements. • RPR = Repair Factor from table 4-1. • EAF = Economic Index (present year)/ Economic Index (acquisition
year). • LAF = Labor Adjustment Factor from appendix B. • Life in hrs = Physical Life from table 4-1.
It should be noted that the repair allowance does not include the following estimated additive items:
a. Excessive dredge wear for parts (e.g., cutter teeth and main suction pumps) is not included due to the wide variety of materials being dredged. The original cost of the bucket and normal wear are typically included in the plant value covered in the plant rate. Excessive bucket wear for mechanical dredges is estimated as an additive item or treated as a separate unit of equipment from table 2-1. Allowances for wear due to 4-6
EP 1110-1-8, Vol. 330 Nov 09
4-7
abrasive material should only be included as an additive item if it is warranted and is not considered elsewhere in the estimate.
b. Dry docking costs, which represent an allowance for rental of the dry dock facility, are not included because they vary greatly depending on the facilities available. Repairs incurred while in dry dock, which occur periodically, are in the repairs. Dry docking costs will be allocated on an average annual basis over the years between such occurrences in accordance with Cost Accounting Standards and Generally Accepted Accounting Practices.
c. There is no predetermined allowance in the dredging plant methodology for jobsite yard costs, mobilization, or demobilization. All of these cost elements must be separately estimated to match each project’s construction conditions.
SECTION VII. STANDBY
4.15 Standby Rate
The standby rate is computed by allowing the full ownership cost. In addition to the standby ownership rate, it may be necessary on dredges to include operating costs. Examples of allowable operating cost are as follows: a generator fuel allowance to account for operation of a diesel engine generator for power to operate pumps; navigation lights; minimum crew; etc.
a. Standby is a directed delay by the Government and will not be allowed during periods when the plant would have otherwise been in idle status, such as non-effective working time. Since ownership is calculated based on life in years computed monthly, standby should be paid only when additional time has been directed by the Government. Standby is to be paid on a 24-hour basis.
b. Standby for pipeline and accessories shall be based on pumping mud in determining values from table 4-1.
SECTION VIII. NEGOTIATED PROCUREMENT
4.16 Rates
The calculated dredging plant rates based on the methodology presented in this chapter should be used for preparing a reasonable contract estimate. When adequate cost or pricing data is available and submitted by the contractor for negotiated procurement, the rates may be adjusted in accordance with the methodology in this chapter. Cost or pricing data is defined in FAR 15.4, Contract Pricing.
EP 1110-1-8, Vol. 330 Nov 09
4-8
4.17 Allowance for Additional Capital Improvements
Allowance for additional capital improvements shall be calculated in accordance with accepted general accounting principles. When adequate cost or pricing data is not available, factors for a similar unit of equipment may be used for determining the ownership rate for overage equipment and plant.
4.18 Overage Plant
When the plant has exceeded the useful life given in table 4-1, it is considered overage. The ownership rate for overage plant should be determined with the same methodology described in section V.
a. When actual cost or pricing data is available to adjust the operating rate, the data must be accurate, complete, and established in accordance with accepted general accounting principles.
b. When actual cost or pricing data is not available, the total hourly operating rate for overage equipment shall be computed on the basis that the equipment is equal to the useful life as shown in table 4-1.
4.19 Dredging Plant Purchased Used
For plant purchased used, the ownership and operating rate must be calculated on an individual case, due to the varying conditions. When actual cost or pricing data is not available, the methodology from this chapter shall be used and values for life and salvage from table 4-1 can be adjusted. Support for adjustments can be obtained by calling the Chief, Cost Engineering Branch, Engineering and Construction Division, Walla Walla District, U.S. Army Corps of Engineers (CENWW-EC-X), telephone 509-527-7511 or 509-527-7510.
SECTION IX. RATE CALCULATION EXAMPLE
4.20 Rate Calculation Example
The example shown in figure 4-2 illustrates the use of figure 4-1, table 4-1, and the regional data from appendix B to generate a rate. For illustration purposes, assume that a 24-inch hydraulic dredge (pipeline) was purchased new in 1991 for $3,700,000, including tax and delivery, and there were no initial capital improvements. This example uses 500 hours per month and a discounted CMR of 4.20 percent.
EP 1110-1-8, Vol. 330 Nov 09
Table 4-1. Dredging Plant Cost Factors
Type of Plant Useful
Life Physical
Life Salvage Value
Prime Engine Fuel Factor
Secondary Engine Fuel Factor
WLS %
RPR %
YRS HR SLV HPF G D HPF G D G D Hydraulic Dredges - Pipeline (Cutterhead or Dustpan) (Based on Discharge Diameter) (Non-Truckable)
8 inch and under 5 10,000 0.05 80 0.083 0.045 70 0.072 0.039 20 22 70 9 inch through 10 inch 6 12,000 0.05 80 0.083 0.045 70 0.072 0.039 20 22 80 11 inch through 12 inch 8 16,000 0.05 80 0.083 0.045 70 0.072 0.039 20 22 90 13 inch through 15 inch 15 40,000 0.05 80 0.083 0.045 70 0.072 0.039 20 22 100 16 inch through 17 inch 20 80,000 0.05 80 0.083 0.045 70 0.072 0.039 20 22 110 18 inch through 20 inch 20 100,000 0.05 80 0.083 0.045 70 0.072 0.039 20 22 120 21 inch through 22 inch 25 120,000 0.10 80 0.083 0.045 70 0.072 0.039 20 22 130 23 inch through 24 inch 25 130,000 0.10 80 0.083 0.045 70 0.072 0.039 20 22 130 25 inch through 29 inch 30 135,000 0.10 80 0.083 0.045 70 0.072 0.039 20 22 130 30 inch or larger 30 135,000 0.10 80 0.083 0.045 70 0.072 0.039 20 22 130 Barge Mounted Booster Pump (For Pipeline Dredges) 16 inch through 17 inch 20 80,000 0.05 80 0.083 0.045 70 0.072 0.039 22 24 80 18 inch through 20 inch 20 100,000 0.10 80 0.083 0.045 70 0.072 0.039 22 24 90 21 inch through 22 inch 25 120,000 0.10 80 0.083 0.045 70 0.072 0.039 22 24 100 23 inch through 24 inch 25 130,000 0.10 80 0.083 0.045 70 0.072 0.039 22 24 110 25 inch through 29 inch 30 135,000 0.10 80 0.083 0.045 70 0.072 0.039 22 24 120 30 inch or larger 30 135,000 0.10 80 0.083 0.045 70 0.072 0.039 22 24 120
SLV = Salvage Value HPF = Horsepower Factor G = Gas D = Diesel WLS = Water, Lube and Supplies RPR = Repairs
4-9
EP 1110-1-8, Vol. 330 Nov 09
4-10
Table 4-1. Dredging Plant Cost Factors (Continued)
Type of Plant Useful
Life Physical
Life Salvage Value
Prime Engine Fuel Factor
Secondary Engine Fuel Factor
WLS %
RPR %
YRS HR SLV HPF G D HPF G D G D Mechanical Dredges (Large)1
Clamshell - under 5 cy 8 18,000 0.05 70 0.072 0.039 60 0.062 0.033 22 24 90 Clamshell - 6 cy to 10 cy 13 26,000 0.05 70 0.072 0.039 60 0.062 0.033 22 24 100 Clamshell - 11 cy to 15 cy 20 40,000 0.05 70 0.072 0.039 60 0.062 0.033 22 24 110 Clamshell - 16 cy to 20 cy 25 75,000 0.05 70 0.072 0.039 60 0.062 0.033 22 24 120 Clamshell - 20 cy and over 30 90,000 0.05 70 0.072 0.039 60 0.062 0.033 22 24 130 All Other Types
(Bucket or Dipper) 25 90,000 0.10 70 0.072 0.039 60 0.062 0.033 22 24 120
Barge Mounted Crane with Clamshell Bucket Non - Dredging
Clamshell - under 6 cy 9 18,000 0.05 55 0.055 0.031 45 0.045 0.025 22 24 85 Clamshell - 6 cy to 10 cy 14 28,000 0.05 55 0.055 0.031 45 0.045 0.025 22 24 95 Clamshell - 11 cy to 15 cy 21 42,000 0.05 55 0.055 0.031 45 0.045 0.025 22 24 105
Barge Mounted Lifting Crane 25 Ton to 75 Ton, 45’ Boom 9 18,000 0.05 40 0.040 0.022 30 0.030 0.017 22 24 80 75 Ton to 125 Ton, 60’ Boom 14 28,000 0.05 40 0.040 0.022 30 0.030 0.017 22 24 90 Over 125 Ton, over 60’ Boom 21 42,000 0.05 40 0.040 0.022 30 0.030 0.017 22 24 100
Barges (Used with Dredging) Fuel or Water 20 90,000 0.05 20 0.021 0.011 20 0.021 0.011 18 20 60 Equipment or Work 20 90,000 0.05 20 0.021 0.011 20 0.021 0.011 18 20 60 Derrick 20 90,000 0.10 20 0.021 0.011 20 0.021 0.011 18 20 70 Anchor 20 90,000 0.05 20 0.021 0.011 20 0.021 0.011 18 20 60 Mooring Barge 20 90,000 0.05 20 0.021 0.011 20 0.021 0.011 18 20 60 Dump Scow 20 90,000 0.05 20 0.021 0.011 20 0.021 0.011 18 20 70
SLV = Salvage Value HPF = Horsepower Factor G = Gas D = Diesel WLS = Water, Lube and Supplies RPR = Repairs 1 Sized by the largest bucket used (normally a mud bucket)
EP 1110-1-8, Vol. 330 Nov 09
Table 4-1. Dredging Plant Cost Factors (Continued)
Type of Plant Useful
Life Physical
Life Salvage Value
Prime Engine Fuel Factor
Secondary Engine Fuel Factor
WLS %
RPR %
YRS HR SLV HPF G D HPF G D G D Boats – See Category M10 Tugs and Tenders (Used with Dredging) Under 500 hp 8 18,000 0.10 80 0.083 0.045 70 0.072 0.039 32 38 80 501 through 1,000 hp 10 40,000 0.10 80 0.083 0.045 70 0.072 0.039 32 38 90 1,001 through 2,000 hp 15 55,000 0.10 80 0.083 0.045 70 0.072 0.039 32 38 100 2,001 through 3,000 hp 20 100,000 0.10 80 0.083 0.045 70 0.072 0.039 32 38 110 Over 3,000 hp 25 120,000 0.10 80 0.083 0.045 70 0.072 0.039 32 38 120 Pipeline and Accessories (Inland Environment) Metal Pipeline (under 20 inch)
Pumping Mud 2 9,000 0.10 0 0.000 0.000 0 0.000 0.000 0 0 5 Pumping Sand 1 4,500 0.10 0 0.000 0.000 0 0.000 0.000 0 0 5 Pumping Rock (Gravel) 0.3 1,500 0.10 0 0.000 0.000 0 0.000 0.000 0 0 5 Joints 3 12,000 0.10 0 0.000 0.000 0 0.000 0.000 0 0 30 Pontoons/Floats 12 60,000 0.10 0 0.000 0.000 0 0.000 0.000 0 0 5
Metal Pipeline (20 inch and
Larger)
Pumping Mud 3 12,000 0.10 0 0.000 0.000 0 0.000 0.000 0 0 5 Pumping Sand 1.5 6,000 0.10 0 0.000 0.000 0 0.000 0.000 0 0 5 Pumping Rock (Gravel) 0.5 2,000 0.10 0 0.000 0.000 0 0.000 0.000 0 0 5 Joints 3 12,00 0.10 0 0.000 0.000 0 0.000 0.000 0 0 30 Pontoons/Floats 12 60,000 0.10 0 0.000 0.000 0 0.000 0.000 0 0 5 SLV = Salvage Value HPF = Horsepower Factor G = Gas D = Diesel WLS = Water, Lube and Supplies RPR = Repairs
4-11
EP 1110-1-8, Vol. 330 Nov 09
4-12
Table 4-1. Dredging Plant Cost Factors (Continued)
Type of Plant Useful
Life Physical
Life Salvage Value
Prime Engine Fuel Factor
Secondary Engine Fuel Factor
WLS %
RPR %
YRS HR SLV HPF G D HPF G D G D Pipeline and Accessories (Ocean Environment) Metal Pipeline (All sizes)
Pumping Mud 2 9,000 0.40 0 0.000 0.000 0 0.000 0.000 0 0 5 Pumping Sand 1 4,500 0.40 0 0.000 0.000 0 0.000 0.000 0 0 5 Pumping Rock (Gravel) 0.3 1,500 0.40 0 0.000 0.000 0 0.000 0.000 0 0 5 Joints 1 4,500 0.40 0 0.000 0.000 0 0.000 0.000 0 0 5 Pontoons/Floats 2 9,000 0.40 0 0.000 0.000 0 0.000 0.000 0 0 5
Metal Pipeline On-Shore
Pumping Mud 3 12,000 0.10 0 0.000 0.000 0 0.000 0.000 0 0 5 Pumping Sand 1.5 6,000 0.10 0 0.000 0.000 0 0.000 0.000 0 0 5 Pumping Rock (Gravel) 0.5 2,000 0.10 0 0.000 0.000 0 0.000 0.000 0 0 5
Standby Calculation: Standby for pipeline and accessories shall be based on pumping mud.
SLV = Salvage Value HPF = Horsepower Factor G = Gas D = Diesel WLS = Water, Lube and Supplies RPR = Repairs
EP 1110-1-8, Vol. 330 Nov 09
ID No:
1.
a.(1)(2)(3) 2009(4) 1991(5) 3,730 hp(6)
(a) 200 hp(b) 1,325 hp(c) 750 hp(d) 200 hp
2,475 hp(7)
(a) $3,700,000(b) $0
$3,700,000
(8) 500 hrs/mo
(9)(a) Excessive Dredge Wear (Gravel) $8,000 /mo(b) $0 /mo(c) $0 /mo(d) $0 /mo(e) $0 /mo
$8,000 /mob.
(1) Labor Adjustment Factor (LAF) 0.86(2) Marine Diesel
$2.41(3) 4.875%(4) 3.900%
c.(1) Economic Index, Acquisition Year 4438(2) 7762
Input data, methodology and notes used in the following sections of this form are or have reference to EP 1110-1-8, CONSTRUCTION EQUIPMENT OWNERSHIP AND EXPENSE SCHEDULE (see chapter 4).
Hydraulic Water Jet
Plant Value:Acquisition Costs
Total Secondary hp
Appendix B, Area Factors Data
Fuel Cost Per GallonFuel type
Appendix E, Economic Index Data (EK 105)
Cost of Money Rate (undiscounted)
Horsepower (hp) - Secondary Engine (s):Electrical GeneratorsHydraulic SystemCutter Head Drive
Horsepower (hp) - Prime
24" Hydraulic Cutter Suction DredgeEllicott Series 4900 Super Dragon
Present Year or Year of Use:Acquisition Year:
Capital ImprovementsTotal Plant Value
MARINE AND DREDGING PLANT INFORMATION AND EXPENSE FACTORS
Region 03
Cost of Money Rate (discounted)
Economic Index, Present Year or Year of Use
Example: The piece of equipment shown is based on a known piece of equipment for illustration purposes only.
USE THIS WORKSHEET TO COMPUTE A MONTHLY AND HOURLY RATE FOR MARINE AND DREDGING PLANT
Hours Worked per Month (Effective Time)
Total Additive Items
Additive Item(s) (Monthly Costs To be Estimated)
Plant Pertinent Data:Equipment Description: Model and Series:
Figure 4-2. Dredging Plant Ownership and Operating Rate Worksheet Page 1 of 4
EP 1110-1-8, Vol. 330 Nov 09
4-13
1.
d.(1) 9 months/yr
e.(1) 25 yrs(2) 130,000 hrs(3) 0.10(4) 0.045(5) 0.039(6) 22%(7) 1.30
2. ANNUAL OWNERSHIP PERCENTAGE FACTORS
a.
1.0 - SLV / N {1.e.(3)} {1.e.(1)}
1.0 - 0.10 / 25 yrs = 3.60% /yr
b.
(N-1) x (1+SLV)+2 x / 2N{1.e.(1)} {1.e.(3)} {Appendix B} {1.e.(1)}(25-1) x (1+ 0.10) + 2 x 3.900% / 50.00 = 2.22% /yr
c. = 5.82% /yr
3. OWNERSHIP COSTSa. Ownership per Year
Plant Value x {1.a.(7)(a)}
$3,700,000 x = $215,340.00 /yr
b. Monthly Ownership Expense
/ Months Available per Year{3.a.} {1.d.(1)}
$215,340.00 /yr / 9 months/yr rounded = $23,927.00 /mo
Prime Engine Fuel Factor (gal/bhp-hr)
Ownership per Year
Depreciation Percent Per Year (DEPR)
Facilities Capital Cost of Money Percent Per Year (FCCM)
Total Ownership Percent Per Year (DEPR + FCCM)
Discounted Money Rate
Secondary Engine Fuel Factor (gal/bhp-hr)WLS (Water, Lube & Supplies Factor) percentRPR (Repair Cost Factor)
MARINE AND DREDGING PLANT INFORMATION AND EXPENSE FACTORS (Continued)
Region 03
SLV (Salvage Value Factor)
Figure 4-1, Available Time to Dredge By Region Data (See Chapter 4, paragraph 4.3 for guidance)
Table 4-1, Dredging Plant Cost Factors DataUseful Life (in Years) for Ownership (N)Physical Life (in Hours) for Repairs
Months Available Per Year (9 months is used for this example)
(DEPR + FCCM)Total Ownership Percent Per Year
{2.c.}5.82%
Figure 4-2. Dredging Plant Ownership and Operating Rate Worksheet Page 2 of 4
EP 1110-1-8, Vol. 330 Nov 09
4-14
4. OPERATING COSTS
a. Fuel Cost(1) Prime Engine Fuel
Fuel Factor x HP xFuel Cost per Gallon
{1.e.(4)} {1.a.(5)} {1.b.(2)}0.045 gal/bhp-hr x 3,730 x $2.41 = $404.52 /hr
(2) Secondary Engine Fuel
Fuel Factor x HP x{1.e.(5)} {1.a.(6)} {1.b.(2)}
0.039 gal/bhp-hr x 2,475 x $2.41 = $232.63 /hr
(3) Total Fuel (Prime Engine Fuel + Secondary Engine Fuel) = $637.15 /hr
b. Water, Lube, and Supply (WLS) Cost(1) Prime Engine WLS
WLS Factor x Hourly Fuel Cost{1.e.(6)} {4.a.(1)}0.22 x $404.52 /hr = $88.99 /hr
(2) Secondary Engine WLS WLS Factor x Hourly Fuel Cost
{1.e.(6)} {4.a.(2)}0.22 x $232.63 /hr = $51.18 /hr
(3) Total Fuel (Prime Engine WLS + Secondary Engine WLS) = $140.17 /hr
c. Repair Cost
(1) Economic Adjustment Factor (EAF)Economic Index for
Present Year or Year of Use /
Economic Index for Acquisition
Year{1.c.(2)} {1.c.(1)}7762 / 4438 = 1.749
(2) Repair Cost
Total Plant Value x RPR x EAF x LAF / Life in Hrs {1.a.(7)} {1.e.(7)} {4.c.(1)} {1.b.(1)} {1.e.(2)}
$3,700,000 x 1.30 x 1.749 x 0.86 / 130,000 = $55.65 /hr
Fuel Cost per Gallon
Region 03
Figure 4-2. Dredging Plant Ownership and Operating Rate Worksheet Page 3 of 4
EP 1110-1-8, Vol. 330 Nov 09
4-15
4. OPERATING COSTS (Continued)
d. Total Hourly Operating Cost (Fuel + WLS + Repairs) Fuel + WLS + Repairs
{4.a.(3)} {4.b.(3)} {4.c.(2)}$637.15 /hr + $140.17 /hr + $55.65 /hr = $832.97 /hr
e.
Total Hourly
Operating Cost xHrs Worked per
Mo{4.d.} {1.a.(8)}
$832.97 /hr x 500 hrs/mo rounded = $416,485.00 /mo
5. TOTAL MONTHLY RATE
a. Ownership {3.b.} = $23,927.00 /mo
b. Operating {4.e.} = $416,485.00 /mo
c. Total Estimated Additive Items {1.a.(9))} = $8,000.00 /mo
d. = $448,412.00 /mo{5.a.} + {5.b.} + {5.c.}
6. STANDYBY ALLOWANCE
a. Standard Hourly Standby Expense
Monthly Ownership Expense /
Maximum hrs/mo = 30.4 days/mo x 24
hrs/day{3.b.}
$23,927.00 /mo / 730 hrs/mo = $32.78 /hr
b. Generator Fuel Allowance for Dredge (An additional generator fuel allowance may be allowed under certain circumstances. This allowance is applicable to dredges only.)
Generator HP /Total Secondary
HP xSecondary Fuel
Cost{1.a.(6)} {1.a.} {4.a.(2)}200 hp / 2,475 hp x $232.63 = $18.80 /hr
c. TOTAL HOURLY STANDBY ALLOWANCE FOR DREDGE
Standby Expense +Generator Fuel
Allowance{6.a.} {6.b.}
$32.78 /hr + $18.80 /hr = $51.58 /hr
Region 03
Monthly Operating Cost
TOTAL MONTHLY RATE
Figure 4-2. Dredging Plant Ownership and Operating Rate Worksheet Page 4 of 4
EP 1110-1-8, Vol. 330 Nov 09
4-16
APPENDIX A REFERENCES
Section I: Required Publications Section II: Related Publications Section III. EFAR Reference Section IV: Government Bookstores Sample Equipment Rate Computation Worksheet
EP 1110-1-8, Vol. 330 Nov 09
A-1
APPENDIX A
REFERENCES SECTION I: REQUIRED PUBLICATIONS
Public Law 92-41. The Renegotiation Act of 1971 [PL 92-41 (85 Stat. 97)].
Federal Acquisition Regulation 15.400. Contract Pricing, Government Printing Office, Washington, DC.
. 30.101. Cost Accounting Standards, Part 30, Government Printing Office, Washington, DC.
. 31.105. Construction and Architect-Engineer Contracts, Government Printing Office, Washington, DC.
. 31.205-10. Cost of Money, Government Printing Office, Washington, DC.
. 31.205-36. Rental Costs, Government Printing Office, Washington, DC.
. 49.000. Termination of Contracts, Government Printing Office, Washington, DC.
. 52.230-2. Cost Accounting Standards, Government Printing Office, Washington, DC.
Engineer Federal Acquisition Regulation Supplement (EFARS). 31.105 Construction and Architect-Engineer Contracts, Regulation Supplement, Government Printing Office, Washington, DC.
. 31.105-100. Contract Clause, Government Printing Office, Washington, DC.
Engineer Regulation 1110-2-1302. Engineering and Design - Civil Works Cost Engineering, U.S. Army Corps of Engineers.
U.S. Department of Labor, Bureau of Labor Statistics. Producer Price Indexes, Government Printing Office, Washington, DC. http://www.bls.gov/ppi/
EP 1110-1-8, Vol. 330 Nov 09
A-2
SECTION II: RELATED PUBLICATIONS
. 2000. Caterpillar Performance Handbook, 31st ed, Peoria, Illinois.
. 2001. Caterpillar Performance Handbook, 32nd ed, Peoria, Illinois.
. 2004. Caterpillar Performance Handbook, 34th ed, Peoria, Illinois.
. 2005. Caterpillar Performance Handbook, 35th ed, Peoria, Illinois.
. 2006. Caterpillar Performance Handbook, 36th ed, Peoria, Illinois.
. 2008. Caterpillar Performance Handbook, 38th ed, Peoria, Illinois.
. 2009. Caterpillar Performance Handbook, 39th ed, Peoria, Illinois.
Caterpillar Tractor Company, Fundamentals of Earthmoving, Peoria, Illinois, 1975.
Energy Information Administration, Official Energy Statistics from the U.S. Government. Electric Power Monthly, Washington, DC.
. Petroleum Marketing Monthly, Washington, DC.
Equipment Watch. 2006. Green Guide for Off-Highway Trucks and Trailers, San Jose, California.
. 2006. Green Guide Volume I, San Jose, California.
. 2006. Green Guide Volume II, San Jose, California.
. 2006. Contractor’s Equipment Cost Guide.
. 2006. Cost Reference Guide.
Euclid, Inc. 1982. Euclid Hauler Handbook, 15th ed, Cleveland, Ohio.
Fiat-Allis Construction Machinery, Inc. 1983. Owning and Operating Costs, Springfield, Illinois.
International Harvester, Pay Line Division. 1975. Earthmoving Principles, Schaumburg, Illinois.
Koehring Company. 1981. Application Manual for Hydraulic Excavators and Shovels, 1st ed, Milwaukee, Wisconsin.
EP 1110-1-8, Vol. 330 Nov 09
A-3
Goodyear Government Sales Department, Federal Open Market & Net State Price List, G302. March 1, 2009. Akron, Ohio.
Mitchell Industrial Tire Company (MITCO), www.mitco.com.
Goodyear Engineered Products, Veyance Technologies, http://www.goodyearep.com/productsDetail.aspx?id=4156.
Goodyear Tire and Rubber Company, U.S. Bulletin 300C, Base Price List. Setpember 1, 2008.
TITAN Tire Corporation, Tire Catalog, Volume 13 2009.
TITAN Tire Corporaiton, OTR Tires, Off-the-Road Tires made by Titan, General Tire, Volume 2. 2009.
Nichols, H L Jr. 2005. Moving the Earth, 5th ed, McGraw-Hill Professional; 5 edition (March 28, 2005).
R S Means Company, Inc. 2009. Labor Rates for the Construction Industry, 36th ed., Kingston, Massachusetts.
Terex Corporation. 1981. Production and Cost Estimating of Material Movement with Earthmoving Equipment, Hudson, Ohio.
EP 1110-1-8, Vol. 330 Nov 09
A-4
SECTION III: EFAR REFERENCE
EFARS PART 31 CONTRACT COST PRINCIPLE AND PROCEDURES
EAC 95-6
SUBPART 31.1 -- APPLICABILITY 31.105 Construction and Architect-Engineer Contracts. (d)(2)(i)(b) In this case, equipment ownership and operating costs shall be determined using the Construction Equipment Ownership and Operating Expense Schedule published by the U.S. Army Corps of Engineers. 31.105-100 Contract Clause. The contracting officer shall insert the statement at 52.231-5000 in all solicitations and contracts for construction within the United States that are expected to exceed the small purchase threshold. EFARS Clause - 52.231-5000 Equipment Ownership and Operating Expense Schedule. As prescribed in 31.105-100, insert the following clause in all solicitations and contracts for construction that are expected to exceed the small purchase threshold. EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE (MAR 1995) – EFARS. (a) This clause does not apply to terminations. See 52.249-5000, Basis for Settlement of Proposals, and FAR Part 49, Termination of Contracts. (b) Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the contractor’s accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the contractor’s accounting records, costs for that equipment shall be based upon the applicable provisions of EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, Region [Insert roman numeral for the appropriate region of the schedule]. Working conditions shall be considered to
EP 1110-1-8, Vol. 330 Nov 09
A-5
SECTION III: EFAR REFERENCE (Continued) be average for determining equipment rates using the schedule unless specified otherwise by the contracting officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retroactive pricing, the schedule in effect at the time the work was performed shall apply. (c) Equipment rental costs are allowable, subject to the provisions of FAR 31.105, Construction and Architect-Engineer Contract, and FAR 31.205-36, Rental Costs. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment or unaffiliated lessees. (d) When actual equipment costs are proposed and the total amount of the pricing action exceeds the small purchase threshold, the contracting officer shall request the contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.
EP 1110-1-8, Vol. 330 Nov 09
A-6
SECTION IV. GOVERNMENT BOOKSTORES U.S. Government periodicals are sold by the Office of the Superintendent of Documents. Orders may be placed by telephone or fax (Visa/Mastercard is accepted). Telephone: toll free 866-512-1800 (D.C. area: 202-512-1800). Fax: 202-512-2104. Orders may also be placed electronically at Internet address http://bookstore.gpo.gov/. RETURN POLICY: Publications are not accepted for exchange or credit unless an error was made in filling your order. When ordering, please give the following information:
Title of Publication: EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule
Region: Region I through XII Volume No. Volume No. 1 through No. 12 Media: CD-ROM
EP 1110-1-8, Vol. 330 Nov 09
A-7
Use this worksheet to compute rates for equipment that is not in this pamphlet.
1. EQUIPMENT INFORMATION AND EXPENSE FACTORS
ID No.: a. Equipment Specification Data:
(1) Equipment Description: (2) Model and Series: (3) Year of Use: (4) Year Manufactured: (5) Horsepower - Equipment: (6) Horsepower - Carrier: (7) Fuel type: - Equipment: gas/diesel off-road/diesel on-road/electric/air
- Carrier: gas/diesel off-road/diesel on-road/electric/air (8) Shipping Weight (cwt): (9) Tire size and number of tires: (Cost of tires based on year of use – see 1.a.(3) and
appendix F)
No. Size/Ply Unit Price Cost (a) Front (FT): $ $ (b) Drive (DT): $ $ (c) Trailing (TT): $ $ (d) Total Tire Cost: $
USE APPENDIX D TO COMPLETE THE FOLLOWING DATA:
b. Category and Subcategory Number: c. Hourly Expense Calculation Factors:
(1) Economic Key (EK): (2) Condition (C): Average or Severe or Difficult (3) Discount Code (DC): B = 7.5% (0.075) – or – S = 15.0% (0.15) (4) Life in Hours (LIFE): (5) Salvage Value Percentage (SLV): (6) Fuel Factor – Equipment [Electric (E) Gas (G) Diesel (D)]: (7) Fuel Factor – Carrier (E G D): (8) Filters, Oil, and Grease (FOG) Factor (E G D): (9) Tire Wear Factor:
(a) Front (FT): (b) Drive (DT): (c) Trailing (TT):
(10) Repair Cost Factor (RCF):
Equipment Rate Computation Worksheet (copy as needed).
Page 1 of 6
EP 1110-1-8, Vol. 330 Nov 09
A-8
2. EQUIPMENT VALUE a. List Price + Accessories: [at Year of Manufacture] =$
(1) Discount: (List Code) (Discount x es) Accessori Price +
[1.c.(3)] ($ + $ ) x ( ) =-($
(2) Subtotal [2.a.] – [2.a.(1)] Subtotal=$ (3) Sales or Import Tax: Rate)(Tax x (Subtotal)
[2.a.(2)] [Appendix B]
($ ) x ( ) =+$
(4) Total Discounted Price: Subtotal: [2.a.(2)] + [2.a.(3)] Subtotal=$
b. Freight: cwt) per Rate (Freight x Weight)(Shipping[1.a.(8)] [Appendix B]
( cwt) x ($ /cwt) =+$
c. TOTAL EQUIPOMENT VALUE (TEV): TOTAL[2.]:=$ [(2.a.(4)] + [(2.b)]
(See chapter 3 for used and overage equipment rate adjustments.) 3. DEPRECIATION PERIOD (N)
a. N (WHPY)) YearPer Hours (Working / (hr)) hours (LIFE = [1.c.(4)] [Appendix B] ( hr) / ( hr/yr) =
4. OWNERSHIP COST a. Depreciation
(1) Tire Cost Index (TCI):
= 1.a.(3)) on Based Index, (Tire / Mfg) of YrIndex, Tire( Tire Cost Index (TCI) [Appendix E, EK=100] [Appendix E, EK=100]
( ) / ( ) = (TCI)
(2) ) LIFE ( / Cost)]] (Tire x ) TCI ( [ - )]SLV ( - [1.0 x [(TEV)
[2.c.] [1.c.(5)] [4.a.(1)] [1.a.(9)(d)] [1.c.(4)]
[($ ) x [1.0 – ( )] – [( ) x ($ )]] / ( hr)
=$ /hr
Equipment Rate Computation Worksheet (copy as needed).
Page 2 of 6
EP 1110-1-8, Vol. 330 Nov 09
A-9
4. OWNERSHIP COST (Continued) b. Facilities Capital Cost of Money (FCCM):
(1) Factor Value Avg )] N ([2.0x / 2.0] (SLV)] [1.0 x 1.0] - ) N [[( =++ [3.a.] [1.c.5.] [3.a.] (AVF)
[[( yr) – 1.0] x [1.0 + ( )] + 2.0] / [2.0 x ( yr)]
= (AVF)
(2) ) WHPY ( / Money)-of-Cost (Adjusted x ) AVF( x )TEV (
[2.c] [4.b.(1)] [Appendix B] [Appendix B]
($ ) x ( ) x ( ) / ( hr/yr) =$ /hr
c. TOTAL HOURLY OWNERSHIP COST: TOTAL [4.]: =$ /hr
[4.a.(2)] + [4.b.(2)]
5. OPERATING COST
a. Fuel Costs: (1) Equipment:
(Fuel Factor x (Horsepower (hp)) x (Fuel Cost Per Gallon (gal)) [1.c.(6)] [1.a.(5)] [Appendix B] ( ) x ( hp) x ($ / gal) =$ /hr
(2) Carrier:
(Fuel Factor) x (Horsepower) x (Fuel Cost Per Gallon) [1.c.(7)] [1.a.(6)] [Appendix B]
( ) x ( hp) x ($ /gal) =$ /hr
(3) Total Hourly Fuel Cost: Total [5.a.] =$ /hr [(5.a.(1)] + [5.a.(2)]
b. FOG Cost:
(1) Equipment:
(FOG Factor) x (Equipment Fuel Cost) x (Labor Adjustment Factor (LAF)) [1.c.(8)] [5.a.(1)] [Appendix B]
( ) x ($ /hr) x ( ) =$ /hr
Equipment Rate Computation Worksheet (copy as needed).
Page 3 of 6
EP 1110-1-8, Vol. 330 Nov 09
A-10
5. OPERATING COST (Continued)
(2) Carrier:
(FOG Factor) x (Carrier Fuel Cost) x (LAF) [1.c.(8)] [5.a.(2) [Appendix B]
( ) x ($ /hr) x ( ) =$ /hr
(3) Total Hourly FOG Cost: Total [5.b.] =$ /hr
[(5.b.(1)] + [5.b.(2)]
c. Alternative Fuel/FOG Cost: Total [5.c.] =$ /hr (See chapter 2, paragraph 24.d. for guidance on when to use.)
d. Repair Cost:
(1) Economic Adjustment Factor (EAF):
(EK is from [1.c.(1)])
(Economic Index for Year 1.a.(3)) / (Economic Index for Year 1.a.(4)) [Appendix E] [Appendix E]
( ) / ( ) = (EAF)
(See table 3-1 for last year of economic life.)
(2) Repair Factor (RF):
(RCF) x (EAF) x (LAF) = Repair Factor (RF) [1.c.(10)] [5.d.(1)] [Appendix B]
( ) x ( ) x ( ) = (RF)
(3) Repair Cost:
[(TEV) - [(TCI) x (Tire Cost )]] x (RF) / (LIFE) [2.c.] [4.a.(1)] [1.a.(9)(d)] [5.d.(2)] [1.c.(4)] [($ ) – [( ) x ($ )]] x ( ) / ( )
(4) Total Hourly Repair Cost: Total [5.d.] =$ /hr
Equipment Rate Computation Worksheet (copy as needed).
Page 4 of 6
EP 1110-1-8, Vol. 330 Nov 09
A-11
5. OPERATING COST (Continued)
e. Tire Wear Cost: (Use current price levels. See Appendix F)
(1) Front Tires (FT):
[1.5 x (FT Cost)] / [1.8 x (FT Wear Factor) x (Maximum Tire Life Hours)] [1.a.(9)(a)] [1.c.(9)(a)] [Appendix G]
[1.5 x ($ )] / [1.8 x ( ) x ( /hr)]
=$ /hr
(2) Drive Tires (DT):
[1.5 x (DT Cost)] / [1.8 x (DT Wear Factor) x (Maximum Tire Life Hours)] [1.a.(9)(b)] [1.c.(9)(b)] [Appendix G] [1.5 x ($ )] / [1.8 x ( ) x ( /hr)]
=$ /hr
(3) Trailing Tires (TT):
[1.5 x (TT Cost)] / [1.8 x (TT Wear Factor) x (Maximum Tire Life Hours)] [1.a.(9)(c)] [1.c.(9)(c)] [Appendix G]
[1.5 x ($ )] / [1.8 x ( ) x ( /hr)]
=$ /hr
(4) Total Tire Wear Cost: Total [5.e.] =$ /hr [Sum 5.e.(1) through 5.e.(3)]
f. Tire Repair Cost:
(Total Tire Wear Cost) x 0.15 x (LAF) [5.e.(4)] [Appendix B]
($ /hr) x 0.15 x ( ) Total [5.f.] =$ /hr
g. TOTAL HOURLY OPERATING COST: TOTAL [5.] =$ /hr [Sum 5.a. through 5.f.]
Equipment Rate Computation Worksheet (copy as needed).
Page 5 of 6
EP 1110-1-8, Vol. 330 Nov 09
A-12
Equipment Rate Computation Worksheet (copy as needed).
6. HOURLY RATES
a. Total Hourly Rate: [based on 40 hours per week (wk)] (Ownership Cost) + (Operating Cost)
($ /hr) + ($ /hr) =$ /hr
b. Other Work Shifts Hourly Rate: (Refer to Chapter 3, Adjustments to Rates, for methodology.) [(Depreciation) + [(FCCM) x (40 hr/wk) / (Work hr/wk)] + (Operating Cost)] [4.a.(2)] [4.b.(2)] (example: 60 hr/wk) [5.g.] [($ /hr) + [($ /hr) x (40 hr/wk) / ( hr/wk)] + ($ /hr)] =$ /hr
c. Standby Hourly Rate:
[(Depreciation) x 0.50] + (FCCM) [4.a.(2)] [4.b.(2)]
[($ /hr) x 0.50] + ($ /hr) =$ /hr)
See Chapter 3 if rate adjustments are necessary.
Page 6 of 6
EP 1110-1-8, Vol. 330 Nov 09
A-13
APPENDIX B
Region: 3SOUTHEAST
AREA FACTORS
EP 1110-1-8(Vol. 3)
7/31/2009
Total State Sales or Import Tax Rate: 8.50%Working Hours Per Year (WHPY): 1,530
Labor Adjustment Factor (LAF): 0.86
Electricity Cost Per Kilowatt-Hour: $0.089
Gasoline Cost Per Gallon: $2.95Diesel Cost Per Gallon (Off-Road Use): $3.04Diesel Cost Per Gallon (On-Road Use): $3.49Cost-of-Money Rate (Full Rate): 4.875%
Cost-of-Money Rate (Adjusted): 3.900%
over 240cwt thru $14.96
over 300cwt thru $13.61
over 400cwt thru $11.62
over 500cwt thru $9.72
over 700cwt thru $5.42
over 800cwt thru $5.42cwt thru $8.01
240300400500700800
99,999
over 0
Freight Rates
hrs/yr
/kW-Hr
/gal
/gal/gal
B-1
EP 1110-1-8, Vol. 330 Nov 09
B-2
APPENDIX B
Below is a listing of all regional area factors for reference only. The area factor's used for this pamphlet are located on previous page B-1.
EP 1110-1-8
7/31/2009(Vol. *) AREA FACTORS (for all regions)
Freight Cost
Reg SST WHPY LAF Elec Gas D-Off D-On Thru CWT $ Thru CWT $ Thru CWT $ Thru CWT $ Thru CWT $ Thru CWT $ Thru CWT $
1 NORTHEAST 2009 5.80% 1360 1.12 $0.142 $3.01 $3.17 $3.71 240 $17.42 300 $16.01 400 $13.92 500 $11.96 700 $6.15 800 $6.15 99,999 $9.14
2 MIDEAST 2009 5.80% 1450 1.02 $0.094 $2.96 $3.04 $3.59 240 $9.19 300 $8.46 400 $7.61 500 $6.83 700 $4.13 800 $4.13 99,999 $6.14
3 SOUTHEAST 2009 8.50% 1530 0.86 $0.089 $2.95 $3.04 $3.49 240 $14.96 300 $13.61 400 $11.62 500 $9.72 700 $5.42 800 $5.42 99,999 $8.01
4 NORTHCENTRAL 2009 5.85% 1260 1.02 $0.078 $2.88 $3.04 $3.55 240 $16.66 300 $15.38 400 $13.63 500 $12.03 700 $6.41 800 $5.88 99,999 $4.50
5 MIDWEST 2009 7.90% 1400 0.97 $0.075 $2.80 $3.04 $3.53 240 $13.06 300 $12.00 400 $10.42 500 $8.98 700 $5.30 800 $4.91 99,999 $3.75
6 SOUTHWEST 2009 8.10% 1590 0.86 $0.092 $2.83 $3.03 $3.46 240 $16.78 300 $15.67 400 $14.08 500 $12.63 700 $6.60 800 $6.08 99,999 $4.72
7 WEST 2009 8.50% 1630 1.14 $0.097 $3.17 $2.92 $3.44 240 $26.94 300 $25.13 400 $22.50 500 $20.06 700 $9.71 800 $8.53 99,999 $6.26
8 NORTHWEST 2009 6.00% 1540 1.01 $0.067 $3.13 $2.87 $3.41 240 $27.78 300 $26.06 400 $23.69 500 $21.52 700 $11.26 800 $9.51 99,999 $6.48
9 ALASKA 2009 1.50% 1040 1.19 $0.132 $3.65 $4.17 $4.42 240 $44.02 300 $41.59 400 $38.40 500 $35.48 700 $27.35 800 $25.43 99,999 $22.10
10 HAWAII 2009 4.50% 1480 1.24 $0.231 $3.72 $2.86 $3.57 240 $95.58 300 $76.59 400 $56.76 500 $62.17 700 $57.01 800 $44.76 99,999 $30.94
11 PUERTO RICO 2009 7.00% 1560 0.72 $0.139 $2.78 $3.05 $3.52 240 $48.22 300 $39.44 400 $28.83 500 $26.32 700 $19.36 800 $16.06 99,999 $12.91
12 KWAJALEIN 2009 4.50% 1390 1.05 $0.139 $3.01 $2.86 $3.57 240 $29.97 300 $27.88 400 $24.94 500 $22.21 700 $12.23 800 $10.61 99,999 $8.09
B- 2SST = State Sales tax WHPY = Work Hours Per Year LAF = Labor Adjustment Factor Elec = Electricty Cost Per kW-Hr Gas = Gasoline Cost per Gal D-Off = Diesel-Off Road Cost per Gal D-On = Diesel-On Road Cost per Gal CWT = Hundred Pounds
EP 1110-1-8, Vol. 330 Nov 09
B-3
APPENDIX C GUIDE FOR SELECTING OPERATING CONDITIONS
EQUIPMENT TYPE AVERAGE SEVERE B25 and B35: Buckets Clamshell or Dragline Depreciation Period:
Working in gravels, silts, and sands at low impact freshwater environment. 8,000 - 10,000 hours
Working in rock, hard digging, high impact, or saltwater environment. 6,500 - 8,000 hours
C80 and C90: Cranes Hydraulic, Truck Mounted
Mechanical, Truck Mounted
Depreciation Period:
Lift less than rated capacity, intermittent duty. 14,000 - 20,000 hours
Continuous lift near rated capacity, excessive swing, abrasive materials, sloped surfaces, and saltwater environment. 12,000 - 18,000 hours
C85: Cranes Mechanical Dragline,
Lifting, or Clamshell Crawler Mounted Depreciation Period:
Gravels, silts, pull, and lift less than rated capacity. 14,000 - 22,000 hours
Highly abrasive materials, impact breakout, continuous load near rated capacity, and saltwater environment. 12,000 - 18,000 hours
G10: Generators Depreciation Period:
Working below rated capacity, good field conditions. 8,000 - 10,000 hours
Working at or above rated capacity, poor field conditions, such as saltwater. 7,000 - 8,000 hours
EP 1110-1-8, Vol. 330 Nov 09
C-2
APPENDIX C GUIDE FOR SELECTING OPERATING CONDITIONS
EQUIPMENT TYPE AVERAGE SEVERE G15: Graders, Motor Depreciation Period:
Haul road maintenance; road construction, ditching; loose fill spreading; landforming, landleveling; summer road maintenance with medium to heavy winter snow removal; and elevating grader use. 14,500 hours
Maintenance of hard-packed roads with embedded rock; heavy fill spreading; ripping scarifying of asphalt or concrete; continuous high load factor; and high impact. 13,500 hours
H25: Hydraulic Excavators Crawler Mounted Depreciation Period:
Mass excavation or trenching where machine digs all the time in natural bed clay soils; some traveling and steady, full throttle operation; and most log loading operations.
8,500 - 19,000 hours
Continuous trenching or truck loading in rock or shot rock soils; large amount of travel over rough ground; machine continuously working on rock floor with constant high load factor and high impact; and saltwater environment. 7,000 – 15,000 hours
H30: Hydraulic Excavators Wheel Mounted Depreciation Period:
Continuous digging in sandy clay/sandy gravel, site development, and lumber yard applications. 8,000 - 10,000 hours
Continuous digging in rock/natural bed clay, high impact, using hammer, and working in forests or quarries. 6,500 - 8,000 hours
H35: Hydraulic Shovels Crawler Mounted
Continuous loading in well shot rock or fairly tight
Continuous loading in poorly shot rock, virgin, or
EP 1110-1-8, Vol. 330 Nov 09
C-3
APPENDIX C GUIDE FOR SELECTING OPERATING CONDITIONS
EQUIPMENT TYPE AVERAGE SEVERE (nonelectric)
Depreciation Period:
bank. Good underfoot conditions: dry floor, little impact, or sliding on undercarriage.
14,000 - 18,000 hours
lightly blasted tight banks. Adverse underfoot conditions: rough floors, high impact sliding on undercarriage; and saltwater environment. 12,000 - 16,000 hours
L10: Land Clearing Equipment Depreciation Period:
Working in low impact conditions at or below rated capacity. 10,000 hours
High impact conditions working at or above rated capacity. 7,000 hours
L30: Loaders, Belt (conveyors) Depreciation Period:
Working below rated capacity, with intermittent service. 10,000 hours
Working at or above rated capacity with continuous service. 8,000 hours
L35: Loaders, Front End Crawler Type Depreciation Period:
Bank excavation, intermittent ripping, basement digging of natural bed clays, sands, silts, and gravels; some traveling; and steady full throttle operations. 10,000 hours
Loading shot rock, cobbles, glacial till, and caliche; steel millwork; high density materials in standard bucket; continuous work on rock surfaces; large amount of ripping of tight rock materials; high impact conditions; and saltwater environment. 8,000 hours
EP 1110-1-8, Vol. 330 Nov 09
C-4
APPENDIX C GUIDE FOR SELECTING OPERATING CONDITIONS
EQUIPMENT TYPE AVERAGE SEVERE L40: Loaders, Front End Wheel Type (does not include skid steer and tool carriers) Depreciation Period:
Continuous truck loading from stockpile; low to medium density materials in properly sized bucket; hopper charging in low to medium rolling resistance; loading from bank in good digging; and load and carry on poor surfaces and slight adverse grades. 9,250 - 13,500 hours
Loading shot rock (large loaders); handling high density materials with counterweighted machine; steady loading from very tight banks; continuous work on rough or very soft surfaces; load and carry in hard digging; travel longer distances on poor surfaces with adverse grades and saltwater environment. 8,750 - 12,000 hours
L45 and L50: Loaders with Backhoe Crawler Type and Wheel Type Depreciation Period:
Utility applications in medium to heavy soil; occasional use of constant flow implements and dig depths to 3.05 meters (10 feet). 8,000 hours
Production applications or digging in rock; regular use of constant flow implements; and dig depths over 3.05 meters (10 feet). 6,000 hours
L60: Log Skidders Depreciation Period:
Continuous turning, steady skidding for medium distances with moderate decking. Good underfooting: dry floor with few stumps and gradual rolling terrain. 10,000 hours
Continuous turning, steady skidding for long distances with frequent decking; poor underfoot conditions: wet floor, steep slopes, and numerous stumps; and saltwater environment. 8,000 hours
EP 1110-1-8, Vol. 330 Nov 09
C-5
APPENDIX C GUIDE FOR SELECTING OPERATING CONDITIONS
EQUIPMENT TYPE AVERAGE SEVERE M10 - .31 and .32: Clamshell dredges < 5 cy Amphibious Excavator Depreciation Period:
Gravel, silts, breakout force at less than capacity, freshwater conditions. 10,000 - 20,000 hours
Rock, abrasive materials, load at rated capacity, saltwater conditions. 9,000 - 18,000 hours
M10 - .51 and .53: Boats, Skiffs, Crew Boats, Work Boats, Survey Boats, and Launches Depreciation Period:
Freshwater applications, light waves, and steady to light use. 16,000 - 18,000 hours
Saltwater use, medium to high waves, heavy use. 13,000 - 15,000 hours
P35: Pipelayers Depreciation Period:
Typical pipelayer use in operating conditions ranging from very good to severe. 14,000 hours
Continuous use in deep mud or water or on rock surfaces. 11,500 hours
R10: Rippers and Bank Slopers Depreciation Period:
Light rock, medium breakout force required. 8,000 hours
Hard rock, excessive wear due to high breakout force. 6,500 hours
S10, S15, S20, and S25: Scrapers Self-Propelled Tractor Drawn Soil Stabilizers Depreciation Period:
Varying loading and haul road conditions; long and short hauls; adverse and favorable grades; some impact; and typical road-building use on a variety of jobs. 10,000 - 15,000 hours
High impact conditions, such as loading ripped rock; overloading, continuous high total resistance conditions; and rough haul roads. 8,000 - 13,500 hours
EP 1110-1-8, Vol. 330 Nov 09
C-6
APPENDIX C GUIDE FOR SELECTING OPERATING CONDITIONS
EQUIPMENT TYPE AVERAGE SEVERE T15: Tractors Crawler (Dozer) Depreciation Period:
Production dozing in clays, sands, gravels, and talus rock. Push-loading scrapers, borrow pit ripping, most land clearing and skidding applications. Medium impact conditions. Production landfill work. 10,000 - 15,000 hours
Heavy rock ripping; tandem ripping; pushloading and dozing in hard rock; work on rock surfaces; continuous high impact conditions; and saltwater environment. 8,000 - 12,500 hours
T20: Tractors Wheel Type (Dozer) Depreciation Period:
Production dozing, push loading in clays, sands, silts, loose gravels; and shovel cleanup. 14,000 hours
Production dozing in rock; push loading in rocky, boulder strewn borrow pits; high impact conditions; and landfill compactor work. 13,000 hours
T30: Trenchers Chain and Wheel Type Depreciation Period:
Working in sands and silts below rated capacity of the machine. 8,000 hours
Working in gravels and abrasive materials at or above the rated capacity of the machine. 6,000 hours
T45 and T50: Truck Trailers Trucks, Highway Depreciation Period:
Varying loading and road conditions; and typical construction use on a variety of jobs. 8,000 - 12,000 hours
Consistently poor road conditions; and oversized loading equipment. 6,500 - 10,000 hours
EP 1110-1-8, Vol. 330 Nov 09
C-7
APPENDIX C GUIDE FOR SELECTING OPERATING CONDITIONS
EQUIPMENT TYPE AVERAGE SEVERE T55 and T60: Truck, Off-Highway Trucks, Water, Off-Highway (Articulated and Rigid) Depreciation Period:
Varying load and haul road conditions; high rolling resistance and poor traction during part of the job; some adverse grades; some impact loads; and typical use in road building, dam construction, open-pit mining, etc. 12,000 - 20,000 hours
Continuous use on very poorly maintained haul roads, high rolling resistance, and poor traction; frequent adverse grades and high impact loads; and poorly matched loading equipment with continuous overloading. 10,000 - 18,000 hours
W10 and W15: Wagons Bottom Dump Rear Dump Chapter 1 Depreciation Period:
Varying load and haul road conditions; long and short hauls; high rolling resistance and poor traction during part of the job; some adverse grades; some impact; typical road building use in a variety of jobs; and dam construction, open-pit mining, etc. 12,000 hours
Continuous use on very poorly maintained haul roads, high rolling resistance, and poor traction; high impact conditions, such as loading ripped rock; frequent adverse grades and high impact loads; and poorly matched loading equipment with continuous overloading. 10,000 hours
EP 1110-1-8, Vol. 330 Nov 09
C-8
CATEGORY
SUB DESCRIPTION EK C DC LIFE SLV D TT RCFDTFTGEHPF DGEHPF DGEFUEL FACTORS
EQUIPMENT
FUEL FACTORS
CARRIER FOG TIRE WEAR
FACTORS
EQUIPMENT HOURLY CALCULATION FACTORS
EP 1110-1-8
7/31/2009#Error
FACTORS
APPENDIX D
A10 0.00 1AGGREGATE / CHIP SPREADERSA10 0.10 10 A B 8,000 0.20 70 .700 .063 .034 0 .000 .000 .000 .000 .102 .102 0.83 0.72 0.92 0.75 SELF-PROPELLEDA10 0.20 10 A B 6,000 0.20 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.73 0.00 0.82 0.60 TOWED & TAILGATEA15 0.00 1AIR COMPRESSORS, PORTABLEA15 0.10 5 A B 10,000 0.20 75 .750 .068 .036 0 .000 .000 .000 .477 .136 .119 0.66 0.00 0.73 0.75 ROTARY SCREWA15 0.20 5 A B 12,000 0.15 75 .750 .068 .036 0 .000 .000 .000 .477 .136 .119 0.00 0.00 0.00 0.65 SHOP TYPEA20 0.00 1AIR HOSE, TOOLS & EQUIPMENTA20 0.10 5 A B 3,500 0.05 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.00 0.00 0.00 1.50 AIR DRILL HOSEA20 0.20 5 A B 3,500 0.05 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.00 0.00 0.00 1.65 SANDBLAST HOSEA20 0.30 5 A B 6,000 0.10 65 .650 .059 .031 0 .000 .000 .000 .477 .136 .119 0.96 0.84 1.07 1.50 SANDBLASTERS, BREAKERS, & MISC. AIR TOOLSA25 0.00 10 A B 6,000 0.10 65 .650 .059 .031 0 .000 .000 .000 .000 .136 .119 0.96 0.63 1.07 0.85ASPHALT PAVING DISTRIBUTORSA30 0.00 1ASPHALT PAVERS & MISCELLANEOUS ROAD
EQUIPMENTA30 0.10 10 A B 8,000 0.15 70 .700 .063 .034 0 .000 .000 .000 .000 .136 .119 1.08 0.72 1.20 1.00 SELF PROPELLEDA30 0.20 10 A B 10,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .000 .136 .119 1.08 0.00 1.20 0.80 TOWEDA30 0.30 10 A B 12,000 0.20 60 .600 .054 .029 13 .130 .012 .006 .000 .100 .100 1.08 0.71 1.20 0.55 SLURRY SEAL PAVERS (Cold mix)A30 0.40 10 A B 10,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .000 .136 .119 1.08 0.71 1.20 0.80 MISCELLANEOUS ROAD EQUIPMENTA35 0.00 10 A B 6,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .000 .136 .119 1.08 0.71 1.20 0.80ASPHALT PAVING KETTLESA40 0.00 10 A B 6,000 0.20 95 .950 .086 .045 0 .000 .000 .000 .000 .136 .119 1.08 0.71 1.20 1.00ASPHALT & CONCRETE MILLERS / PROFILERS /
PLANERS / ROTARY GRINDERSA45 0.00 10 A B 5,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .000 .136 .119 1.08 0.71 1.20 0.90ASPHALT RECYCLERS & SEALERSB10 0.00 1BATCH PLANTS, ASPHALT & CONCRETEB10 0.10 10 A B 8,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .477 .136 .119 1.08 0.72 1.20 1.00 ASPHALT
D- 1EK=Economic Key (Appendix E) LIFE=Economic Life E=Electric Powered FT=Front Tire C=Operating Conditions (A=average, S=severe) SLV=Salvage Value G=Gas Powered DT=Drive Tire DC=Discount Code (B=basic 7.5%, S=special 15%) HPF=Horsepower Factor D=Diesel Powered TT=Trailing Tire RCF=Repair Cost Factor
EP 1110-1-8, Vol. 330 Nov 09
D-2
CATEGORY
SUB DESCRIPTION EK C DC LIFE SLV D TT RCFDTFTGEHPF DGEHPF DGEFUEL FACTORS
EQUIPMENT
FUEL FACTORS
CARRIER FOG TIRE WEAR
FACTORS
EQUIPMENT HOURLY CALCULATION FACTORS
EP 1110-1-8
7/31/2009#Error
FACTORS
APPENDIX D
B10 0.20 10 A B 8,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .477 .136 .119 1.08 0.71 1.20 1.00 CONCRETEB10 0.30 10 A B 10,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .477 .136 .119 1.08 0.71 1.20 1.00 PUGMILLB15 0.00 95 A B 8,000 0.10 65 .650 .059 .031 13 .130 .012 .006 .000 .102 .119 0.96 0.63 1.07 0.80BROOMS, STREET SWEEPERS & FLUSHERSB20 0.00 95 A B 8,000 0.10 65 .650 .059 .031 0 .000 .000 .000 .000 .136 .119 0.00 0.00 0.92 0.90BRUSH CHIPPERSB25 0.00 15 A B 8,000 0.10 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.00 0.00 0.00 0.70BUCKETS, CLAMSHELLB25 0.00 15 S B 6,500 0.10 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.00 0.00 0.00 0.80BUCKETS, CLAMSHELLB30 0.00 1BUCKETS, CONCRETEB30 0.10 15 A B 8,000 0.05 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.00 0.00 0.00 0.70 GENERAL PURPOSE, MANUAL TRIPB30 0.20 15 A B 8,000 0.05 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.00 0.00 0.00 0.75 LAYDOWNB30 0.30 15 A B 8,000 0.05 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.00 0.00 0.00 0.80 LOWBOYB30 0.40 15 A B 8,000 0.05 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.00 0.00 0.00 0.80 LOW SLUMPB35 0.00 1BUCKETS, DRAGLINEB35 0.10 15 A B 8,000 0.10 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.00 0.00 0.00 0.70 LIGHT WEIGHTB35 0.10 15 S B 6,500 0.10 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.00 0.00 0.00 0.80 LIGHT WEIGHTB35 0.20 15 A B 9,000 0.10 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.00 0.00 0.00 0.70 MEDIUM WEIGHTB35 0.20 15 S B 7,000 0.10 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.00 0.00 0.00 0.80 MEDIUM WEIGHTB35 0.30 15 A B 10,000 0.10 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.00 0.00 0.00 0.70 HEAVY WEIGHTB35 0.30 15 S B 8,000 0.10 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.00 0.00 0.00 0.80 HEAVY WEIGHTC05 0.00 95 A B 2,000 0.10 90 .900 .081 .043 0 .000 .000 .000 .477 .136 .161 0.00 0.00 0.00 2.50CHAIN SAWSC10 0.00 1COMPACTORS, WALK-BEHIND OR REMOTE
CONTROLLERC10 0.10 95 A B 4,000 0.05 90 .900 .081 .043 0 .000 .000 .000 .477 .102 .102 0.00 0.00 0.00 1.20 COMPACTORS, RAMMERS / TAMPERS &
VIBRATORY PLATES
D- 2EK=Economic Key (Appendix E) LIFE=Economic Life E=Electric Powered FT=Front Tire C=Operating Conditions (A=average, S=severe) SLV=Salvage Value G=Gas Powered DT=Drive Tire DC=Discount Code (B=basic 7.5%, S=special 15%) HPF=Horsepower Factor D=Diesel Powered TT=Trailing Tire RCF=Repair Cost Factor
EP 1110-1-8, Vol. 330 Nov 09
D-3
CATEGORY
SUB DESCRIPTION EK C DC LIFE SLV D TT RCFDTFTGEHPF DGEHPF DGEFUEL FACTORS
EQUIPMENT
FUEL FACTORS
CARRIER FOG TIRE WEAR
FACTORS
EQUIPMENT HOURLY CALCULATION FACTORS
EP 1110-1-8
7/31/2009#Error
FACTORS
APPENDIX D
C10 0.20 95 A B 4,000 0.15 90 .900 .081 .043 0 .000 .000 .000 .477 .102 .102 0.00 0.00 0.00 1.20 ROLLERS, VIBRATORYC15 0.00 1 ACONCRETE CLEANERS / ABRASIVE BLASTERSC15 0.10 95 A B 4,000 0.20 70 .700 .063 .034 0 .000 .000 .000 .530 .136 .119 0.00 0.00 0.00 0.90 WALK BEHINDC15 0.20 95 A B 8,000 0.20 95 .950 .086 .045 50 .500 .045 .024 .000 .136 .119 0.72 0.66 0.79 0.90 TRUCK/TRAILER MOUNTEDC20 0.00 95 A B 4,000 0.20 70 .700 .063 .034 0 .000 .000 .000 .530 .136 .119 0.96 0.63 1.07 0.70CONCRETE BUGGIESC25 0.00 1CONCRETE FINISHERS/SCREEDS/SPREADERSC25 0.10 95 A B 5,000 0.20 70 .700 .063 .034 0 .000 .000 .000 .530 .136 .119 0.00 0.00 0.00 0.80 FINISHERS/TROWELSC25 0.20 95 A B 5,000 0.20 70 .700 .063 .034 0 .000 .000 .000 .530 .136 .119 0.96 0.84 1.07 0.80 VIBRATORY SCREEDC25 0.25 95 A B 8,000 0.30 65 .650 .059 .031 0 .000 .000 .000 .000 .180 .160 0.96 0.84 1.07 0.60 VIBRATORY LASER SCREEDC25 0.30 95 A B 8,000 0.30 65 .650 .059 .031 0 .000 .000 .000 .000 .180 .160 0.96 0.84 1.07 0.60 MATERIAL/TOPPING SPREADERSC30 0.00 95 A B 5,000 0.20 70 .700 .063 .034 0 .000 .000 .000 .530 .136 .119 0.00 0.00 0.00 0.90CONCRETE GRINDERSC35 0.00 95 A B 7,000 0.25 75 .750 .068 .036 0 .000 .000 .000 .477 .136 .119 0.96 0.86 1.07 0.90CONCRETE GUNITERS / SHOTCRETERSC40 0.00 95 A B 5,000 0.20 70 .700 .063 .034 0 .000 .000 .000 .530 .136 .119 0.00 0.00 0.92 0.80CONCRETE MIXING UNITSC45 0.00 10 A B 6,000 0.20 75 .750 .068 .036 0 .000 .000 .000 .000 .136 .119 1.08 0.72 1.20 1.00CONCRETE PAVING MACHINESC55 0.00 95 A B 8,000 0.10 70 .700 .063 .034 10 .100 .009 .005 .477 .136 .119 0.96 0.86 1.07 1.00CONCRETE PUMPSC60 0.00 95 A B 6,000 0.10 90 .900 .081 .043 0 .000 .000 .000 .477 .136 .161 0.00 0.00 0.00 1.00CONCRETE SAWS (Add cost for sawblade wear)C65 0.00 5 A B 4,000 0.10 65 .650 .059 .031 0 .000 .000 .000 .477 .136 .161 0.00 0.00 0.00 2.50CONCRETE VIBRATORSC70 0.00 1CRANES, GANTRY & STRADDLEC75 0.00 20 A B 14,000 0.15 75 .750 .068 .036 0 .000 .000 .000 .000 .136 .127 0.66 0.59 0.73 0.80CRANES, HYDRAULIC, SELF-PROPELLEDC80 0.00 1CRANES, HYDRAULIC, TRUCK MOUNTEDC80 0.01 20 A B 14,000 0.15 65 .650 .059 .031 10 .100 .009 .005 .000 .161 .153 0.66 0.58 0.73 0.60 UNDER 26 TONC80 0.01 20 S B 12,000 0.15 85 .850 .077 .041 13 .130 .012 .006 .000 .161 .153 0.18 0.14 0.20 0.65 UNDER 26 TONC80 0.02 20 A B 16,000 0.15 65 .650 .059 .031 10 .100 .009 .005 .000 .127 .110 0.66 0.58 0.73 0.70 26 TON THRU 65 TON
D- 3EK=Economic Key (Appendix E) LIFE=Economic Life E=Electric Powered FT=Front Tire C=Operating Conditions (A=average, S=severe) SLV=Salvage Value G=Gas Powered DT=Drive Tire DC=Discount Code (B=basic 7.5%, S=special 15%) HPF=Horsepower Factor D=Diesel Powered TT=Trailing Tire RCF=Repair Cost Factor
EP 1110-1-8, Vol. 330 Nov 09
D-4
CATEGORY
SUB DESCRIPTION EK C DC LIFE SLV D TT RCFDTFTGEHPF DGEHPF DGEFUEL FACTORS
EQUIPMENT
FUEL FACTORS
CARRIER FOG TIRE WEAR
FACTORS
EQUIPMENT HOURLY CALCULATION FACTORS
EP 1110-1-8
7/31/2009#Error
FACTORS
APPENDIX D
C80 0.02 20 S B 14,000 0.15 85 .850 .077 .041 13 .130 .012 .006 .000 .127 .110 0.18 0.14 0.20 0.75 26 TON THRU 65 TONC80 0.03 20 A B 18,000 0.15 65 .650 .059 .031 10 .100 .009 .005 .000 .127 .110 0.66 0.58 0.73 0.80 66 TON THRU 125 TONC80 0.03 20 S B 16,000 0.15 85 .850 .077 .041 13 .130 .012 .006 .000 .127 .110 0.18 0.14 0.20 0.85 66 TON THRU 125 TONC80 0.04 20 A B 20,000 0.15 65 .650 .059 .031 10 .100 .009 .005 .000 .127 .110 0.66 0.58 0.73 0.90 OVER 125 TONC80 0.04 20 S B 18,000 0.15 85 .850 .077 .041 13 .130 .012 .006 .000 .127 .110 0.18 0.14 0.20 0.95 OVER 125 TONC85 0.00 1CRANES, MECHANICAL, LATTICE BOOM, CRAWLER
MOUNTEDC85 0.11 20 A B 14,000 0.20 55 .550 .050 .026 0 .000 .000 .000 .000 .136 .136 0.00 0.00 0.00 0.80 DRAGLINE, CLAMSHELL, 0 THRU 1.0 CYC85 0.11 20 S B 12,000 0.20 72 .720 .065 .034 0 .000 .000 .000 .000 .136 .136 0.00 0.00 0.00 0.90 DRAGLINE, CLAMSHELL, 0 THRU 1.0 CYC85 0.12 20 A B 16,000 0.20 55 .550 .050 .026 0 .000 .000 .000 .000 .144 .144 0.00 0.00 0.00 0.85 DRAGLINE, CLAMSHELL, OVER 1.0 CY THRU 2.5
CYC85 0.12 20 S B 13,000 0.20 72 .720 .065 .034 0 .000 .000 .000 .000 .144 .144 0.00 0.00 0.00 0.95 DRAGLINE, CLAMSHELL, OVER 1.0 CY THRU 2.5
CYC85 0.13 20 A B 18,000 0.20 55 .550 .050 .026 0 .000 .000 .000 .000 .093 .093 0.00 0.00 0.00 0.95 DRAGLINE, CLAMSHELL, OVER 2.5 CY THRU 5.0
CYC85 0.13 20 S B 15,000 0.20 72 .720 .065 .034 0 .000 .000 .000 .000 .093 .093 0.00 0.00 0.00 1.05 DRAGLINE, CLAMSHELL, OVER 2.5 CY THRU 5.0
CYC85 0.14 20 A B 20,000 0.20 55 .550 .050 .026 0 .000 .000 .000 .000 .102 .102 0.00 0.00 0.00 1.05 DRAGLINE, CLAMSHELL, OVER 5.0 CYC85 0.14 20 S B 16,000 0.20 72 .720 .065 .034 0 .000 .000 .000 .000 .102 .102 0.00 0.00 0.00 1.15 DRAGLINE, CLAMSHELL, OVER 5.0 CYC85 0.21 20 A B 16,000 0.20 40 .400 .036 .019 0 .000 .000 .000 .000 .136 .136 0.00 0.00 0.00 0.65 LIFTING, 0 THRU 25 TONC85 0.21 20 S B 13,000 0.20 52 .520 .047 .025 0 .000 .000 .000 .000 .136 .136 0.00 0.00 0.00 0.70 LIFTING, 0 THRU 25 TONC85 0.22 20 A B 18,000 0.20 40 .400 .036 .019 0 .000 .000 .000 .000 .085 .085 0.00 0.00 0.00 0.75 LIFTING, 26 TON THRU 50 TONC85 0.22 20 S B 15,000 0.20 52 .520 .047 .025 0 .000 .000 .000 .000 .085 .085 0.00 0.00 0.00 0.80 LIFTING, 26 TON THRU 50 TONC85 0.23 20 A B 20,000 0.15 40 .400 .036 .019 0 .000 .000 .000 .000 .093 .093 0.00 0.00 0.00 0.85 LIFTING, 51 TON THRU 150 TON
D- 4EK=Economic Key (Appendix E) LIFE=Economic Life E=Electric Powered FT=Front Tire C=Operating Conditions (A=average, S=severe) SLV=Salvage Value G=Gas Powered DT=Drive Tire DC=Discount Code (B=basic 7.5%, S=special 15%) HPF=Horsepower Factor D=Diesel Powered TT=Trailing Tire RCF=Repair Cost Factor
EP 1110-1-8, Vol. 330 Nov 09
D-5
CATEGORY
SUB DESCRIPTION EK C DC LIFE SLV D TT RCFDTFTGEHPF DGEHPF DGEFUEL FACTORS
EQUIPMENT
FUEL FACTORS
CARRIER FOG TIRE WEAR
FACTORS
EQUIPMENT HOURLY CALCULATION FACTORS
EP 1110-1-8
7/31/2009#Error
FACTORS
APPENDIX D
C85 0.23 20 S B 16,000 0.15 52 .520 .047 .025 0 .000 .000 .000 .000 .093 .093 0.00 0.00 0.00 0.90 LIFTING, 51 TON THRU 150 TONC85 0.24 20 A B 22,000 0.15 40 .400 .036 .019 0 .000 .000 .000 .000 .102 .102 0.00 0.00 0.00 0.95 LIFTING, OVER 150 TONC85 0.24 20 S B 18,000 0.15 52 .520 .047 .025 0 .000 .000 .000 .000 .102 .102 0.00 0.00 0.00 1.00 LIFTING, OVER 150 TONC90 0.00 1CRANES, MECHANICAL, LATTICE BOOM, TRUCK
MOUNTEDC90 0.01 20 A B 14,000 0.15 50 .500 .045 .024 10 .100 .009 .005 .000 .161 .153 0.66 0.58 0.73 0.60 UNDER 26 TONC90 0.01 20 S B 12,000 0.15 65 .650 .059 .031 13 .130 .012 .006 .000 .161 .153 0.18 0.14 0.20 0.65 UNDER 26 TONC90 0.02 20 A B 16,000 0.15 50 .500 .045 .024 10 .100 .009 .005 .000 .127 .110 0.66 0.58 0.73 0.70 26 TON THRU 65 TONC90 0.02 20 S B 14,000 0.15 65 .650 .059 .031 13 .130 .012 .006 .000 .127 .110 0.18 0.14 0.20 0.75 26 TON THRU 65 TONC90 0.03 20 A B 18,000 0.20 50 .500 .045 .024 10 .100 .009 .005 .000 .127 .110 0.66 0.58 0.73 0.80 66 TON THRU 125 TONC90 0.03 20 S B 16,000 0.20 65 .650 .059 .031 13 .130 .012 .006 .000 .127 .110 0.18 0.14 0.20 0.85 66 TON THRU 125 TONC90 0.04 20 A B 20,000 0.20 50 .500 .045 .024 10 .100 .009 .005 .000 .127 .110 0.66 0.58 0.73 0.90 OVER 125 TONC90 0.04 20 S B 18,000 0.20 65 .650 .059 .031 13 .130 .012 .006 .000 .127 .110 0.18 0.14 0.20 0.95 OVER 125 TONC95 0.00 20 A B 18,000 0.20 65 .650 .059 .031 10 .100 .009 .005 .530 .127 .110 0.00 0.00 0.92 0.85CRANES, TOWERD10 0.00 1DRILLS, AIR/HYDRAULIC,CRWLR MTD,0" THRU 6.5"
DIA HOLE (Add cost for drill steel and bit wear)D10 0.10 25 A B 14,000 0.25 80 .800 .072 .038 0 .000 .000 .000 .477 .136 .119 0.00 0.00 0.00 1.00 DRILLS, AIR TRACK (Add cost for drill steel and bit
wear)D10 0.20 25 A B 10,000 0.25 80 .800 .072 .038 0 .000 .000 .000 .477 .136 .119 0.00 0.00 0.00 1.00 DRILLS, HYDRAULIC TRACK (Add cost for drill steel
and bit wear)D15 0.00 25 A B 10,000 0.25 80 .800 .072 .038 0 .000 .000 .000 .477 .136 .119 0.00 0.00 0.00 0.90DRILLS, HORIZONTAL BORING & GROUND
PIERCING (Add cost for drill steel and bit wear)D20 0.00 25 A B 8,000 0.25 80 .800 .072 .038 0 .000 .000 .000 .477 .068 .102 0.00 0.00 0.00 0.85DRILLS, CORE, COLUMN MOUNTED (Add cost for
drill steel and bit wear)
D- 5EK=Economic Key (Appendix E) LIFE=Economic Life E=Electric Powered FT=Front Tire C=Operating Conditions (A=average, S=severe) SLV=Salvage Value G=Gas Powered DT=Drive Tire DC=Discount Code (B=basic 7.5%, S=special 15%) HPF=Horsepower Factor D=Diesel Powered TT=Trailing Tire RCF=Repair Cost Factor
EP 1110-1-8, Vol. 330 Nov 09
D-6
CATEGORY
SUB DESCRIPTION EK C DC LIFE SLV D TT RCFDTFTGEHPF DGEHPF DGEFUEL FACTORS
EQUIPMENT
FUEL FACTORS
CARRIER FOG TIRE WEAR
FACTORS
EQUIPMENT HOURLY CALCULATION FACTORS
EP 1110-1-8
7/31/2009#Error
FACTORS
APPENDIX D
D25 0.00 25 A B 10,000 0.25 80 .800 .072 .038 0 .000 .000 .000 .477 .068 .102 0.00 0.00 0.92 1.00DRILLS, CORE & DOWELLING (Add cost for drill steel and bit wear)
D30 0.00 25 A B 10,000 0.25 80 .800 .072 .038 10 .100 .009 .005 .477 .136 .119 0.96 0.86 1.07 1.00DRILLS, EARTH / AUGER (Add cost for drill steel and cutting edge wear)
D35 0.00 1DRILLS, ROTARY BLASTHOLE (Add cost for drill steel and bit wear)
D35 0.11 25 A B 14,000 0.20 80 .800 .072 .038 10 .100 .009 .005 .005 .161 .161 0.00 0.00 0.00 1.00 DIESEL, 4.5" THRU 9.875" DIAMETER HOLE (Add cost for drill steel and bit wear)
D35 0.12 25 A B 18,000 0.20 80 .800 .072 .038 10 .100 .009 .005 .011 .136 .136 0.96 0.86 1.07 1.00 DIESEL, OVER 9.875" DIAMETER (Add cost for drill steel and bit wear)
D35 0.21 25 A B 14,000 0.20 70 .700 .063 .034 10 .100 .009 .005 .530 .000 .000 0.00 0.00 0.00 0.55 ELECTRIC, 4.5" THRU 9.875" DIAMETER HOLE (Add cost for drill steel and bit wear)
D35 0.22 25 A B 18,000 0.20 70 .700 .063 .034 10 .100 .009 .005 .530 .000 .000 0.00 0.00 0.00 0.55 ELECTRIC, OVER 9.875" DIAMETER (Add cost for drill steel and bit wear)
F10 0.00 95 A B 10,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .477 .102 .102 0.83 0.46 0.92 0.75FORK LIFTSG10 0.00 1GENERATOR SETSG10 0.10 30 A B 8,000 0.10 65 .650 .059 .031 0 .000 .000 .000 .000 .102 .102 0.00 0.00 0.73 0.60 PORTABLEG10 0.10 30 S B 7,000 0.10 85 .850 .077 .041 0 .000 .000 .000 .000 .102 .102 0.00 0.00 0.20 0.70 PORTABLEG10 0.20 30 A B 10,000 0.10 65 .650 .059 .031 0 .000 .000 .000 .000 .102 .102 0.00 0.00 0.00 0.70 SKID MOUNTEDG10 0.20 30 S B 8,000 0.10 85 .850 .077 .041 0 .000 .000 .000 .000 .102 .102 0.00 0.00 0.00 0.80 SKID MOUNTEDG15 0.00 35 A B 14,500 0.25 60 .600 .054 .029 0 .000 .000 .000 .000 .085 .144 0.83 0.54 0.92 0.75GRADERS, MOTORG15 0.00 35 S B 13,500 0.25 78 .780 .070 .037 0 .000 .000 .000 .000 .085 .144 0.27 0.16 0.30 0.85GRADERS, MOTORH10 0.00 95 A B 6,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .000 .136 .136 0.00 0.00 0.00 1.00HAMMERS, HYDRAULIC (Demolition tool) (Add cost
for point wear)H13 0.00 1HAZARDOUS/TOXIC WASTE EQUIPMENT
D- 6EK=Economic Key (Appendix E) LIFE=Economic Life E=Electric Powered FT=Front Tire C=Operating Conditions (A=average, S=severe) SLV=Salvage Value G=Gas Powered DT=Drive Tire DC=Discount Code (B=basic 7.5%, S=special 15%) HPF=Horsepower Factor D=Diesel Powered TT=Trailing Tire RCF=Repair Cost Factor
EP 1110-1-8, Vol. 330 Nov 09
D-7
CATEGORY
SUB DESCRIPTION EK C DC LIFE SLV D TT RCFDTFTGEHPF DGEHPF DGEFUEL FACTORS
EQUIPMENT
FUEL FACTORS
CARRIER FOG TIRE WEAR
FACTORS
EQUIPMENT HOURLY CALCULATION FACTORS
EP 1110-1-8
7/31/2009#Error
FACTORS
APPENDIX D
H13 0.11 95 A B 10,000 0.15 65 .650 .059 .031 0 .000 .000 .000 .530 .102 .102 1.08 0.86 1.20 0.80 COMPACTORS (Compression force) 0 THRU 50 TONS
H13 0.12 95 A B 12,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .530 .102 .102 1.08 0.86 1.20 0.90 COMPACTORS (Compression force) OVER 50 TONSH13 0.21 95 A B 10,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .530 .102 .102 0.00 0.00 0.00 0.90 FILTER PRESSES, STATIONARYH13 0.22 95 A B 10,000 0.15 65 .650 .059 .031 0 .000 .000 .000 .530 .102 .102 0.66 0.59 0.73 0.80 FILTER PRESSES, MOBILEH13 0.30 95 A B 4,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .530 .000 .000 0.00 0.00 0.00 0.70 CENTRIFUGESH13 0.40 95 A B 10,000 0.15 65 .650 .059 .031 0 .000 .000 .000 .477 .136 .119 1.08 0.86 1.20 0.90 SHREDDERSH13 0.51 95 A B 10,000 0.15 65 .650 .059 .031 0 .000 .000 .000 .477 .136 .119 0.77 0.69 0.86 1.00 SOIL TREATMENT PLANT, MOBILEH13 0.61 95 A B 10,000 0.15 65 .650 .059 .031 0 .000 .000 .000 .477 .136 .119 0.00 0.00 0.00 1.00 SLUDGE PROCESSING EQUIP, SLUDGE
DISPENSERSH13 0.71 95 A B 4,000 0.15 65 .650 .059 .031 0 .000 .000 .000 .477 .136 .119 0.00 0.00 0.00 1.00 WASTE HANDLING EQUIPMENT, DRUM HANDLINGH15 0.00 1HEATERS, SPACEH20 0.00 95 A B 9,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .000 .102 .102 0.00 0.00 0.00 0.80HOISTS & AIR WINCHESH25 0.00 1HYDRAULIC EXCAVATORS, CRAWLER MOUNTEDH25 0.10 65 A B 8,000 0.25 65 .650 .059 .031 0 .000 .000 .000 .000 .149 .149 0.00 0.00 0.00 0.70 0 LBS THRU 12,500 LBS (COMPACT EXCAVATORS)H25 0.10 65 S B 7,000 0.25 85 .850 .077 .041 0 .000 .000 .000 .000 .149 .149 0.00 0.00 0.00 0.80 0 LBS THRU 12,500 LBS (COMPACT EXCAVATORS)H25 0.11 65 A B 8,500 0.25 65 .650 .059 .031 0 .000 .000 .000 .000 .149 .149 0.00 0.00 0.00 0.70 OVER 12,500 LBS THRU 40,000 LBSH25 0.11 65 S B 7,000 0.25 85 .850 .077 .041 0 .000 .000 .000 .000 .149 .149 0.00 0.00 0.00 0.85 OVER 12,500 LBS THRU 40,000 LBSH25 0.12 65 A B 12,000 0.25 65 .600 .059 .031 0 .000 .000 .000 .000 .149 .149 0.00 0.00 0.00 0.80 OVER 40,000 LBS THRU 100,000 LBSH25 0.12 65 S B 10,000 0.25 85 .800 .077 .041 0 .000 .000 .000 .000 .149 .149 0.00 0.00 0.00 0.95 OVER 40,000 LBS THRU 100,000 LBSH25 0.13 65 A B 16,000 0.25 65 .650 .059 .031 0 .000 .000 .000 .000 .047 .047 0.00 0.00 0.00 1.00 OVER 100,000 LBS THRU 160,000 LBSH25 0.13 65 S B 13,500 0.25 85 .850 .077 .041 0 .000 .000 .000 .000 .047 .047 0.00 0.00 0.00 1.10 OVER 100,000 LBS THRU 160,000 LBSH25 0.14 65 A B 19,000 0.25 65 .650 .059 .031 0 .000 .000 .000 .000 .051 .051 0.00 0.00 0.00 1.10 OVER 160,000 LBS
D- 7EK=Economic Key (Appendix E) LIFE=Economic Life E=Electric Powered FT=Front Tire C=Operating Conditions (A=average, S=severe) SLV=Salvage Value G=Gas Powered DT=Drive Tire DC=Discount Code (B=basic 7.5%, S=special 15%) HPF=Horsepower Factor D=Diesel Powered TT=Trailing Tire RCF=Repair Cost Factor
EP 1110-1-8, Vol. 330 Nov 09
D-8
CATEGORY
SUB DESCRIPTION EK C DC LIFE SLV D TT RCFDTFTGEHPF DGEHPF DGEFUEL FACTORS
EQUIPMENT
FUEL FACTORS
CARRIER FOG TIRE WEAR
FACTORS
EQUIPMENT HOURLY CALCULATION FACTORS
EP 1110-1-8
7/31/2009#Error
FACTORS
APPENDIX D
H25 0.14 65 S B 15,000 0.25 85 .850 .077 .041 0 .000 .000 .000 .000 .051 .051 0.00 0.00 0.00 1.25 OVER 160,000 LBSH25 0.21 95 A B 6,000 0.15 65 .650 .059 .031 0 .000 .000 .000 .000 .136 .136 0.00 0.00 0.00 0.90 ATTACHMENTS, MOBILE SHEARSH25 0.22 95 A B 6,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .000 .136 .136 0.00 0.00 0.00 0.80 ATTACHMENTS, MATERIAL HANDLINGH25 0.23 95 A B 6,000 0.15 65 .650 .059 .031 0 .000 .000 .000 .000 .136 .136 0.00 0.00 0.00 1.00 ATTACHMENTS, CONCRETE PULVERIZERSH25 0.24 95 A B 6,000 0.15 65 .650 .059 .031 0 .000 .000 .000 .000 .136 .136 0.00 0.00 0.00 1.00 ATTACHMENTS, COMPACTORSH30 0.00 1HYDRAULIC EXCAVATORS, WHEEL MOUNTEDH30 0.01 65 A B 8,000 0.25 60 .600 .054 .029 10 .100 .009 .005 .000 .149 .141 0.83 0.54 0.92 0.50 0 THRU 1.0 CYH30 0.01 65 S B 6,500 0.25 78 .780 .070 .037 13 .130 .012 .006 .000 .149 .141 0.25 0.15 0.28 0.55 0 THRU 1.0 CYH30 0.02 65 A B 10,000 0.25 60 .600 .054 .029 10 .100 .009 .005 .000 .149 .141 0.83 0.54 0.92 0.60 OVER 1.0 CYH30 0.02 65 S B 8,000 0.25 78 .780 .070 .037 13 .130 .012 .006 .000 .149 .141 0.25 0.15 0.28 0.65 OVER 1.0 CYH35 0.00 1HYDRAULIC SHOVELS, CRAWLER MOUNTEDH35 0.11 65 A B 14,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .000 .047 .047 0.00 0.00 0.00 1.00 DIESEL, 0 CY THRU 5.0 CYH35 0.11 65 S B 12,000 0.20 85 .850 .077 .041 0 .000 .000 .000 .000 .047 .047 0.00 0.00 0.00 1.10 DIESEL, 0 CY THRU 5.0 CYH35 0.12 65 A B 16,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .000 .051 .051 0.00 0.00 0.00 1.20 DIESEL, OVER 5.0 CYH35 0.12 65 S B 14,000 0.20 85 .850 .077 .041 0 .000 .000 .000 .000 .051 .051 0.00 0.00 0.00 1.30 DIESEL, OVER 5.0 CYH35 0.21 65 A B 18,000 0.20 50 .500 .045 .024 0 .000 .000 .000 .265 .000 .000 0.00 0.00 0.00 0.80 ELECTRIC, OVER 2.5 CYH35 0.21 65 S B 16,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .265 .000 .000 0.00 0.00 0.00 0.90 ELECTRIC, OVER 2.5 CYL10 0.00 70 A B 10,000 0.20 60 .600 .054 .029 10 .100 .009 .005 .000 .127 .110 0.83 0.54 0.92 0.90LAND CLEARING EQUIPMENTL10 0.00 70 S B 7,000 0.20 78 .780 .070 .037 13 .130 .012 .006 .000 .127 .110 0.25 0.15 0.28 1.00LAND CLEARING EQUIPMENTL15 0.00 95 A B 4,000 0.15 80 .800 .072 .038 13 .130 .012 .006 .477 .102 .102 0.59 0.30 0.66 0.70LANDSCAPING EQUIPMENTL20 0.00 1LIGHTING SETS, TRAILER MOUNTEDL20 0.10 95 A B 8,000 0.20 85 .850 .077 .041 0 .000 .000 .000 .000 .102 .102 0.66 0.58 0.73 1.50 METALLIC VAPORL25 0.00 95 A B 8,000 0.20 85 .850 .077 .041 13 .130 .012 .006 .000 .102 .102 0.66 0.58 0.73 1.20LINE STRIPING EQUIPMENT
D- 8EK=Economic Key (Appendix E) LIFE=Economic Life E=Electric Powered FT=Front Tire C=Operating Conditions (A=average, S=severe) SLV=Salvage Value G=Gas Powered DT=Drive Tire DC=Discount Code (B=basic 7.5%, S=special 15%) HPF=Horsepower Factor D=Diesel Powered TT=Trailing Tire RCF=Repair Cost Factor
EP 1110-1-8, Vol. 330 Nov 09
D-9
CATEGORY
SUB DESCRIPTION EK C DC LIFE SLV D TT RCFDTFTGEHPF DGEHPF DGEFUEL FACTORS
EQUIPMENT
FUEL FACTORS
CARRIER FOG TIRE WEAR
FACTORS
EQUIPMENT HOURLY CALCULATION FACTORS
EP 1110-1-8
7/31/2009#Error
FACTORS
APPENDIX D
L30 0.00 95 A B 10,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .477 .119 .119 0.66 0.58 0.73 1.00LOADERS, BELT (Conveyor belts) & ACCESSORIESL30 0.00 95 S B 8,000 0.20 85 .850 .077 .041 0 .000 .000 .000 .477 .119 .119 0.21 0.16 0.23 1.10LOADERS, BELT (Conveyor belts) & ACCESSORIESL35 0.00 40 A B 10,000 0.20 70 .700 .063 .034 0 .000 .000 .000 .000 .170 .101 0.00 0.00 0.00 1.10LOADERS, FRONT END, CRAWLER TYPEL35 0.00 40 S B 8,000 0.20 91 .910 .082 .044 0 .000 .000 .000 .000 .170 .101 0.00 0.00 0.00 1.25LOADERS, FRONT END, CRAWLER TYPEL40 0.00 1LOADERS, FRONT END, WHEEL TYPEL40 0.11 45 A B 9,250 0.25 65 .650 .059 .031 0 .000 .000 .000 .000 .170 .111 0.83 0.54 0.92 0.70 ARTICULATED, 0 THRU 225 HPL40 0.11 45 S B 8,750 0.25 85 .850 .077 .041 0 .000 .000 .000 .000 .170 .111 0.25 0.15 0.28 0.80 ARTICULATED, 0 THRU 225 HPL40 0.12 45 A B 13,500 0.20 65 .650 .059 .031 0 .000 .000 .000 .000 .170 .080 0.83 0.54 0.92 0.70 ARTICULATED, OVER 225 HPL40 0.12 45 S B 12,000 0.20 85 .850 .077 .041 0 .000 .000 .000 .000 .170 .080 0.25 0.15 0.28 0.75 ARTICULATED, OVER 225 HPL40 0.20 45 A B 8,000 0.20 70 .700 .063 .034 0 .000 .000 .000 .000 .170 .111 0.57 0.29 0.63 0.80 SKID STEERL40 0.21 45 A B 4,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .000 .170 .170 0.00 0.00 0.00 1.00 SKID STEER ATTACHMENTSL40 0.31 45 A B 10,000 0.25 65 .650 .059 .031 0 .000 .000 .000 .000 .170 .111 0.83 0.54 0.92 0.85 TOOL CARRIER & TELESCOPIC HANDLERS, 0
THRU 225 HPL40 0.31 45 S B 9,250 0.25 85 .850 .077 .041 0 .000 .000 .000 .000 .170 .111 0.25 0.15 0.28 0.90 TOOL CARRIER & TELESCOPIC HANDLERS, 0
THRU 225 HPL40 0.32 45 A B 12,000 0.15 65 .650 .059 .031 0 .000 .000 .000 .000 .170 .080 0.83 0.54 0.92 0.85 TOOL CARRIER & TELESCOPIC HANDLERS, OVER
225 HPL40 0.32 45 S B 10,000 0.15 85 .850 .077 .041 0 .000 .000 .000 .000 .170 .080 0.25 0.15 0.28 0.90 TOOL CARRIER & TELESCOPIC HANDLERS, OVER
225 HPL45 0.00 40 A B 8,000 0.20 70 .700 .063 .034 0 .000 .000 .000 .000 .441 .524 0.00 0.00 0.00 1.35LOADERS / BACKHOE, CRAWLER TYPEL45 0.00 40 S B 6,000 0.20 91 .910 .082 .044 0 .000 .000 .000 .000 .441 .524 0.00 0.00 0.00 1.40LOADERS / BACKHOE, CRAWLER TYPEL50 0.00 45 A B 10,000 0.25 50 .500 .045 .024 0 .000 .000 .000 .000 .441 .441 0.83 0.54 0.92 0.80LOADERS / BACKHOE, WHEEL TYPEL50 0.00 45 S B 6,000 0.25 70 .700 .063 .034 0 .000 .000 .000 .000 .441 .441 0.25 0.15 0.28 0.85LOADERS / BACKHOE, WHEEL TYPEL55 0.00 95 A B 6,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .000 .441 .441 0.00 0.00 0.00 1.00LOADER / BACKHOE, ATTACHMENTS
D- 9EK=Economic Key (Appendix E) LIFE=Economic Life E=Electric Powered FT=Front Tire C=Operating Conditions (A=average, S=severe) SLV=Salvage Value G=Gas Powered DT=Drive Tire DC=Discount Code (B=basic 7.5%, S=special 15%) HPF=Horsepower Factor D=Diesel Powered TT=Trailing Tire RCF=Repair Cost Factor
EP 1110-1-8, Vol. 330 Nov 09
D-10
CATEGORY
SUB DESCRIPTION EK C DC LIFE SLV D TT RCFDTFTGEHPF DGEHPF DGEFUEL FACTORS
EQUIPMENT
FUEL FACTORS
CARRIER FOG TIRE WEAR
FACTORS
EQUIPMENT HOURLY CALCULATION FACTORS
EP 1110-1-8
7/31/2009#Error
FACTORS
APPENDIX D
L60 0.00 75 A B 10,000 0.15 65 .650 .059 .031 0 .000 .000 .000 .000 .102 .119 0.83 0.54 0.92 0.70LOG SKIDDERSL60 0.00 75 S B 8,000 0.15 85 .850 .077 .041 0 .000 .000 .000 .000 .102 .119 0.25 0.15 0.28 0.80LOG SKIDDERSM10 0.00 1MARINE EQUIPMENT (NON DREDGING)M10 0.11 105 A B 10,000 0.15 65 .650 .059 .031 0 .000 .000 .000 .477 .136 .119 0.00 0.00 0.00 0.70 AQUATIC MAINTENANCEM10 0.12 105 A B 6,000 0.20 80 .800 .072 .038 0 .000 .000 .000 .000 .000 .000 0.00 0.00 0.00 0.60 AQUATIC MAINTENANCE ATTACHMENTSM10 0.21 105 A B 16,000 0.10 80 .800 .072 .038 0 .000 .000 .000 .477 .136 .119 0.00 0.00 0.00 0.70 HYDRAULIC CUTTERHEAD DREDGE, 8" OR
LESS,TRANSPORTABLEM10 0.22 105 A B 16,000 0.10 80 .800 .072 .038 0 .000 .000 .000 .477 .136 .119 0.00 0.00 0.00 0.80 HYDRAULIC CUTTERHEAD DREDGE,8" -
12",TRANSPORTABLEM10 0.23 105 A B 16,000 0.10 80 .800 .072 .038 0 .000 .000 .000 .477 .136 .119 0.00 0.00 0.00 0.80 HYDRAULIC AUGERHEAD DREDGE,12" OR
LESS,TRANSPORTABLEM10 0.24 105 A B 8,000 0.10 80 .800 .072 .038 0 .000 .000 .000 .477 .136 .119 0.00 0.00 0.00 0.70 HYDRAULIC FLOATING PUMPS,12" OR
LESS,TRANSPORTABLEM10 0.25 105 A B 6,000 0.15 80 .800 .072 .038 0 .000 .000 .000 .477 .136 .119 0.00 0.00 0.00 0.70 HYDRUALIC DREDGE PUMPS,12" OR
LESS,TRANSPORTABLEM10 0.26 105 A B 6,000 0.15 80 .800 .072 .038 0 .000 .000 .000 .477 .136 .119 0.00 0.00 0.00 0.60 HYDRAULIC DREDGE / PUMP ATTACHMENTSM10 0.31 20 A B 18,000 0.15 65 .650 .059 .031 0 .000 .000 .000 .477 .102 .102 0.00 0.00 0.00 1.00 SMALL MECH DREDGES,CLAMSHELL,BARGE-MTD
TO 5 CYM10 0.31 20 S B 16,000 0.15 85 .850 .077 .041 0 .000 .000 .000 .477 .102 .102 0.00 0.00 0.00 1.05 SMALL MECH DREDGES,CLAMSHELL,BARGE-MTD
TO 5 CYM10 0.32 65 A B 10,000 0.15 65 .650 .059 .031 0 .000 .000 .000 .477 .161 .161 0.00 0.00 0.00 1.00 SMALL MECH DREDGES, AMPHIBIOUS
EXCAVATORSM10 0.32 65 S B 9,000 0.15 85 .850 .077 .041 0 .000 .000 .000 .477 .161 .161 0.00 0.00 0.00 1.10 SMALL MECH DREDGES, AMPHIBIOUS
EXCAVATORSM10 0.33 105 A B 20,000 0.15 80 .800 .072 .038 0 .000 .000 .000 .477 .136 .119 0.00 0.00 0.00 0.90 SMALL MECH DREDGES,HOE-MOUNTED
DREDGING ATTACH
D- 10EK=Economic Key (Appendix E) LIFE=Economic Life E=Electric Powered FT=Front Tire C=Operating Conditions (A=average, S=severe) SLV=Salvage Value G=Gas Powered DT=Drive Tire DC=Discount Code (B=basic 7.5%, S=special 15%) HPF=Horsepower Factor D=Diesel Powered TT=Trailing Tire RCF=Repair Cost Factor
EP 1110-1-8, Vol. 330 Nov 09
D-11
CATEGORY
SUB DESCRIPTION EK C DC LIFE SLV D TT RCFDTFTGEHPF DGEHPF DGEFUEL FACTORS
EQUIPMENT
FUEL FACTORS
CARRIER FOG TIRE WEAR
FACTORS
EQUIPMENT HOURLY CALCULATION FACTORS
EP 1110-1-8
7/31/2009#Error
FACTORS
APPENDIX D
M10 0.41 105 A B 6,000 0.10 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.00 0.00 0.00 0.50 WORK FLOATS (NON-DREDGING)M10 0.42 105 A B 30,000 0.10 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.00 0.00 0.00 0.60 WORK BARGES (SECTIONAL, NON-DREDGING)M10 0.45 105 A B 90,000 0.05 20 .200 .018 .010 0 .000 .000 .000 .000 .000 .136 0.00 0.00 0.00 0.60 FLAT-DECK OR CARGO BARGE (NON-DREDGING)M10 0.46 105 A B 90,000 0.05 20 .200 .018 .010 0 .000 .000 .000 .000 .000 .136 0.00 0.00 0.00 0.70 DUMP SCOW (NON-DREDGING)M10 0.47 105 A B 30,000 0.05 20 .200 .018 .010 0 .000 .000 .000 .000 .000 .136 0.00 0.00 0.00 0.70 DRILL BARGE (NON-DREDGING)M10 0.48 105 A B 30,000 0.05 20 .200 .018 .010 0 .000 .000 .000 .000 .000 .136 0.00 0.00 0.00 0.70 ALL OTHER BARGES (NON-DREDGING)M10 0.51 105 A B 16,000 0.15 65 .650 .059 .031 0 .000 .000 .000 .477 .136 .161 0.00 0.00 0.00 0.70 BOATS & LAUNCHES, 0 THRU 250 HPM10 0.51 105 S B 13,000 0.15 85 .850 .077 .041 0 .000 .000 .000 .477 .136 .161 0.00 0.00 0.00 0.75 BOATS & LAUNCHES, 0 THRU 250 HPM10 0.53 105 A B 18,000 0.10 65 .650 .059 .031 0 .000 .000 .000 .477 .136 .161 0.00 0.00 0.00 0.80 BOATS & LAUNCHES, 251 THRU 500 HPM10 0.53 105 S B 15,000 0.10 85 .850 .077 .041 0 .000 .000 .000 .477 .136 .161 0.00 0.00 0.00 0.85 BOATS & LAUNCHES, 251 THRU 500 HPM10 0.54 105 A B 40,000 0.10 60 .600 .054 .029 50 .500 .045 .024 .477 .136 .161 0.00 0.00 0.00 0.90 TUGS, 501 THRU 1,000 HPM10 0.55 105 A B 55,000 0.10 60 .600 .054 .029 50 .500 .045 .024 .477 .136 .161 0.00 0.00 0.00 1.00 TUGS, 1,000 THRU 2,000 HPP10 0.00 50 A B 6,000 0.35 65 .650 .059 .031 0 .000 .000 .000 .477 .136 .136 0.00 0.00 0.00 0.80PILE HAMMER ACCESSORIES - EXTRACTORS &
BOX LEADSP20 0.00 1PILE HAMMERS, DOUBLE ACTINGP20 0.10 50 A B 6,000 0.25 65 .650 .059 .031 0 .000 .000 .000 .000 .136 .136 0.00 0.00 0.00 1.10 DIESELP20 0.20 50 A B 6,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .000 .136 .136 0.00 0.00 0.00 1.10 PNUEMATIC (STEAM/AIR)P25 0.00 1PILE HAMMERS, SINGLE ACTINGP25 0.10 50 A B 6,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .000 .136 .136 0.00 0.00 0.00 1.00 DIESELP25 0.20 50 A B 6,000 0.15 65 .650 .059 .031 0 .000 .000 .000 .000 .136 .136 0.00 0.00 0.00 1.00 PNUEMATIC (STEAM/AIR)P30 0.00 50 A B 6,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .477 .136 .136 0.00 0.00 0.00 1.00PILE HAMMERS, DRIVER/ EXTRACTOR, VIBRATORYP35 0.00 70 A B 14,000 0.20 35 .350 .032 .017 0 .000 .000 .000 .000 .000 .170 0.00 0.00 0.00 0.95PIPELAYERSP35 0.00 70 S B 11,500 0.20 46 .460 .041 .022 0 .000 .000 .000 .000 .000 .170 0.00 0.00 0.00 1.10PIPELAYERS
D- 11EK=Economic Key (Appendix E) LIFE=Economic Life E=Electric Powered FT=Front Tire C=Operating Conditions (A=average, S=severe) SLV=Salvage Value G=Gas Powered DT=Drive Tire DC=Discount Code (B=basic 7.5%, S=special 15%) HPF=Horsepower Factor D=Diesel Powered TT=Trailing Tire RCF=Repair Cost Factor
EP 1110-1-8, Vol. 330 Nov 09
D-12
CATEGORY
SUB DESCRIPTION EK C DC LIFE SLV D TT RCFDTFTGEHPF DGEHPF DGEFUEL FACTORS
EQUIPMENT
FUEL FACTORS
CARRIER FOG TIRE WEAR
FACTORS
EQUIPMENT HOURLY CALCULATION FACTORS
EP 1110-1-8
7/31/2009#Error
FACTORS
APPENDIX D
P40 0.00 20 A B 8,000 0.10 50 .500 .045 .024 50 .500 .045 .024 .477 .136 .119 0.66 0.33 0.73 0.80PLATFORMS & MAN-LIFTSP45 0.00 95 A B 8,000 0.15 95 .950 .086 .045 0 .000 .000 .000 .477 .136 .119 0.66 0.59 0.73 1.00PUMPS, GROUTP50 0.00 1PUMPS, WATER, CENTRIFUGAL, TRASHP50 0.11 95 A B 8,000 0.20 90 .900 .081 .043 0 .000 .000 .000 .000 .136 .161 0.66 0.00 0.73 0.90 ENGINE DRIVEP50 0.12 95 A B 8,000 0.20 90 .900 .081 .043 0 .000 .000 .000 .477 .000 .000 0.66 0.00 0.73 0.50 ELECTRIC DRIVEP50 0.21 95 A B 8,000 0.20 90 .900 .081 .043 0 .000 .000 .000 .000 .136 .161 0.66 0.00 0.73 0.90 WHEEL MOUNTED, ENGINE DRIVEP50 0.22 95 A B 8,000 0.20 90 .900 .081 .043 0 .000 .000 .000 .477 .000 .000 0.66 0.00 0.73 0.50 WHEEL MOUNTED, ELECTRIC DRIVEP50 0.31 95 A B 4,000 0.10 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.00 0.00 0.00 1.50 HOSES, PUMP, SUCTION & DISCHARGEP55 0.00 1PUMPS, WATER, SUBMERSIBLEP55 0.01 95 A B 8,000 0.20 90 .900 .081 .043 0 .000 .000 .000 .000 .136 .161 0.00 0.00 0.00 1.00 ENGINE DRIVEP55 0.02 95 A B 8,000 0.15 90 .900 .081 .043 0 .000 .000 .000 .477 .000 .000 0.00 0.00 0.00 0.60 ELECTRIC DRIVEP60 0.00 1PUMPS, WATER, CENTRIFUGAL, DEWATERINGP60 0.11 95 A B 8,000 0.20 90 .900 .081 .043 0 .000 .000 .000 .000 .136 .161 0.00 0.00 0.00 0.90 SKID MOUNTED, ENGINE DRIVEP60 0.12 95 A B 8,000 0.15 90 .900 .081 .043 0 .000 .000 .000 .477 .000 .000 0.00 0.00 0.00 0.50 SKID MOUNTED, ELECTRIC DRIVEP60 0.21 95 A B 8,000 0.20 90 .900 .081 .043 0 .000 .000 .000 .000 .136 .161 0.00 0.00 0.73 0.90 WHEEL MOUNTED, ENGINE DRIVEP60 0.22 95 A B 8,000 0.15 90 .900 .081 .043 0 .000 .000 .000 .477 .000 .000 0.00 0.00 0.73 0.50 WHEEL MOUNTED, ELECTRIC DRIVEP65 0.00 1PUMPS, WATER, DIAPHRAGMP65 0.11 95 A B 8,000 0.20 90 .900 .081 .043 0 .000 .000 .000 .000 .136 .161 0.00 0.00 0.00 0.90 SKID MOUNTED, ENGINE DRIVEP65 0.12 95 A B 8,000 0.15 90 .900 .081 .043 0 .000 .000 .000 .477 .000 .000 0.00 0.00 0.00 0.50 SKID MOUNTED, ELECTRIC DRIVEP65 0.21 95 A B 8,000 0.20 90 .900 .081 .043 0 .000 .000 .000 .000 .136 .161 0.00 0.00 0.73 0.80 WHEEL MOUNTED, ENGINE DRIVEP65 0.22 95 A B 8,000 0.15 90 .900 .081 .043 0 .000 .000 .000 .477 .000 .000 0.00 0.00 0.73 0.40 WHEEL MOUNTED, ELECTRIC DRIVEP70 0.00 1PUMPS, WATER (For core drills)P70 0.01 95 A B 8,000 0.25 90 .900 .081 .043 0 .000 .000 .000 .000 .136 .161 0.00 0.00 0.00 0.80 ENGINE DRIVE
D- 12EK=Economic Key (Appendix E) LIFE=Economic Life E=Electric Powered FT=Front Tire C=Operating Conditions (A=average, S=severe) SLV=Salvage Value G=Gas Powered DT=Drive Tire DC=Discount Code (B=basic 7.5%, S=special 15%) HPF=Horsepower Factor D=Diesel Powered TT=Trailing Tire RCF=Repair Cost Factor
EP 1110-1-8, Vol. 330 Nov 09
D-13
CATEGORY
SUB DESCRIPTION EK C DC LIFE SLV D TT RCFDTFTGEHPF DGEHPF DGEFUEL FACTORS
EQUIPMENT
FUEL FACTORS
CARRIER FOG TIRE WEAR
FACTORS
EQUIPMENT HOURLY CALCULATION FACTORS
EP 1110-1-8
7/31/2009#Error
FACTORS
APPENDIX D
P70 0.02 95 A B 8,000 0.25 90 .900 .081 .043 0 .000 .000 .000 .477 .000 .000 0.00 0.00 0.00 0.40 ELECTRIC DRIVER10 0.00 70 A B 8,000 0.20 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.00 0.00 0.00 0.90RIPPERS & HYDRAULIC BANK SLOPERS (Add cost
for point wear)R10 0.00 70 S B 6,500 0.20 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.00 0.00 0.00 1.00RIPPERS & HYDRAULIC BANK SLOPERS (Add cost
for point wear)R15 0.00 55 A B 10,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .000 .102 .102 0.00 0.00 0.92 0.70ROLLERS, STATIC, TOWED, PNEUMATICR20 0.00 55 A B 10,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .000 .102 .102 0.00 0.00 0.92 0.80ROLLERS, STATIC, TOWED, STEEL DRUMR30 0.00 1ROLLERS, STATIC, SELF-PROPELLED R30 0.01 55 A B 8,000 0.15 80 .800 .072 .038 0 .000 .000 .000 .000 .102 .102 0.83 0.54 0.92 0.70 PNEUMATICR30 0.02 55 A B 10,000 0.15 80 .800 .072 .038 0 .000 .000 .000 .000 .102 .102 0.00 0.00 0.00 0.80 SMOOTH DRUMR30 0.03 55 A B 12,000 0.20 80 .800 .072 .038 0 .000 .000 .000 .000 .102 .102 0.00 0.00 0.00 0.80 TAMPING FOOT, LANDFILL & SOIL COMPACTORSR40 0.00 55 A B 8,000 0.20 90 .900 .081 .043 0 .000 .000 .000 .000 .136 .136 0.00 0.00 0.00 0.80ROLLERS, VIBRATORY, TOWEDR45 0.00 55 A B 8,000 0.20 90 .900 .081 .043 0 .000 .000 .000 .000 .136 .136 0.00 0.00 0.00 1.10ROLLERS, VIBRATORY, SELF-PROPELLED,
DOUBLE DRUMR50 0.00 55 A B 8,000 0.25 65 .650 .059 .031 0 .000 .000 .000 .000 .136 .136 0.83 0.54 0.92 1.00ROLLERS, VIBRATORY, SELF-PROPELLED, SINGLE
DRUMR55 0.00 95 A B 6,000 0.15 60 .600 .054 .029 0 .000 .000 .000 .477 .102 .102 0.97 0.87 1.08 0.80ROOFING EQUIPMENTS10 0.00 1SCRAPERS, ELEVATINGS10 0.01 60 A B 10,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .000 .000 .170 0.84 0.55 0.93 0.90 0 THRU 200 HPS10 0.01 60 S B 8,000 0.20 85 .850 .077 .041 0 .000 .000 .000 .000 .000 .170 0.23 0.13 0.25 1.00 0 THRU 200 HPS10 0.02 60 A B 13,000 0.25 65 .650 .059 .031 0 .000 .000 .000 .000 .000 .136 0.84 0.55 0.93 0.95 OVER 200 HPS10 0.02 60 S B 11,500 0.25 85 .850 .077 .041 0 .000 .000 .000 .000 .000 .136 0.23 0.13 0.25 1.00 OVER 200 HPS15 0.00 60 A B 15,000 0.20 60 .600 .054 .029 0 .000 .000 .000 .000 .000 .136 0.84 0.55 0.93 0.80SCRAPERS, CONVENTIONALS15 0.00 60 S B 12,500 0.20 78 .780 .070 .037 0 .000 .000 .000 .000 .000 .136 0.23 0.13 0.25 0.85SCRAPERS, CONVENTIONAL
D- 13EK=Economic Key (Appendix E) LIFE=Economic Life E=Electric Powered FT=Front Tire C=Operating Conditions (A=average, S=severe) SLV=Salvage Value G=Gas Powered DT=Drive Tire DC=Discount Code (B=basic 7.5%, S=special 15%) HPF=Horsepower Factor D=Diesel Powered TT=Trailing Tire RCF=Repair Cost Factor
EP 1110-1-8, Vol. 330 Nov 09
D-14
CATEGORY
SUB DESCRIPTION EK C DC LIFE SLV D TT RCFDTFTGEHPF DGEHPF DGEFUEL FACTORS
EQUIPMENT
FUEL FACTORS
CARRIER FOG TIRE WEAR
FACTORS
EQUIPMENT HOURLY CALCULATION FACTORS
EP 1110-1-8
7/31/2009#Error
FACTORS
APPENDIX D
S20 0.00 60 A B 15,000 0.20 62 .620 .056 .030 62 .620 .056 .030 .000 .000 .110 0.84 0.55 0.93 0.85SCRAPERS, TANDEM POWEREDS20 0.00 60 S B 13,500 0.20 81 .810 .073 .039 81 .810 .073 .039 .000 .000 .110 0.23 0.13 0.25 0.90SCRAPERS, TANDEM POWEREDS25 0.00 60 A B 12,000 0.20 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.84 0.55 0.93 0.70SCRAPERS, TRACTOR DRAWNS25 0.00 60 S B 10,000 0.20 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.23 0.13 0.25 0.75SCRAPERS, TRACTOR DRAWNS30 0.00 1SCREENING & CRUSHING PLANTSS30 0.10 95 A B 10,000 0.10 65 .650 .059 .031 0 .000 .000 .000 .477 .136 .119 1.08 0.86 1.20 0.70 CONVEYORSS30 0.10 95 S B 8,000 0.10 78 .780 .070 .037 0 .000 .000 .000 .577 .163 .142 0.96 0.72 1.07 0.85 CONVEYORSS30 0.20 95 A B 25,000 0.10 65 .650 .059 .031 0 .000 .000 .000 .477 .136 .119 1.08 0.86 1.20 1.00 CRUSHERS - VERTICAL & HORIZONTAL SHAFT
IMPACTORS30 0.20 95 S B 15,000 0.10 78 .780 .070 .037 0 .000 .000 .000 .577 .163 .142 0.96 0.72 1.07 1.25 CRUSHERS - VERTICAL & HORIZONTAL SHAFT
IMPACTORS30 0.21 95 A B 25,000 0.10 65 .650 .059 .031 0 .000 .000 .000 .477 .136 .119 1.08 0.86 1.20 1.20 CRUSHERS - CONES30 0.21 95 S B 15,000 0.10 78 .780 .070 .037 0 .000 .000 .000 .577 .163 .142 0.96 0.72 1.07 1.60 CRUSHERS - CONES30 0.22 95 A B 25,000 0.10 65 .650 .059 .031 0 .000 .000 .000 .477 .136 .119 1.08 0.86 1.20 0.65 CRUSHERS - JAWS30 0.22 95 S B 15,000 0.10 78 .780 .070 .037 0 .000 .000 .000 .577 .163 .142 0.96 0.72 1.07 0.85 CRUSHERS - JAWS30 0.30 95 A B 10,000 0.10 65 .650 .059 .031 0 .000 .000 .000 .477 .136 .119 1.08 0.86 1.20 0.80 SCREENING PLANTS30 0.30 95 S B 8,000 0.10 78 .780 .070 .037 0 .000 .000 .000 .577 .163 .142 0.96 0.72 1.07 1.00 SCREENING PLANTS35 0.00 95 A B 8,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .000 .000 .119 0.00 0.00 0.00 0.80SNOW REMOVAL EQUIPMENTS40 0.00 60 A B 10,000 0.20 70 .700 .063 .034 0 .000 .000 .000 .000 .000 .119 0.84 0.55 0.96 0.85SOIL & ROAD STABILIZERSS40 0.00 60 S B 8,000 0.20 91 .910 .082 .044 0 .000 .000 .000 .000 .000 .119 0.23 0.13 0.25 0.95SOIL & ROAD STABILIZERSS45 0.00 95 A B 6,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .000 .136 .136 0.00 0.00 0.00 1.00SPLITTERS, ROCK & CONCRETET10 0.00 70 A B 10,000 0.20 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.00 0.00 0.96 0.80TRACTOR BLADES & ATTACHMENTS (including
agricultural)
D- 14EK=Economic Key (Appendix E) LIFE=Economic Life E=Electric Powered FT=Front Tire C=Operating Conditions (A=average, S=severe) SLV=Salvage Value G=Gas Powered DT=Drive Tire DC=Discount Code (B=basic 7.5%, S=special 15%) HPF=Horsepower Factor D=Diesel Powered TT=Trailing Tire RCF=Repair Cost Factor
EP 1110-1-8, Vol. 330 Nov 09
D-15
CATEGORY
SUB DESCRIPTION EK C DC LIFE SLV D TT RCFDTFTGEHPF DGEHPF DGEFUEL FACTORS
EQUIPMENT
FUEL FACTORS
CARRIER FOG TIRE WEAR
FACTORS
EQUIPMENT HOURLY CALCULATION FACTORS
EP 1110-1-8
7/31/2009#Error
FACTORS
APPENDIX D
T10 0.00 70 S B 8,000 0.20 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.00 0.00 0.86 0.90TRACTOR BLADES & ATTACHMENTS (including agricultural)
T15 0.00 1TRACTORS, CRAWLER (DOZER) (includes blade)T15 0.01 70 A B 10,000 0.30 70 .700 .063 .034 0 .000 .000 .000 .000 .000 .153 0.00 0.00 0.00 1.10 0 THRU 225 HPT15 0.01 70 S B 8,000 0.30 91 .910 .082 .044 0 .000 .000 .000 .000 .000 .153 0.00 0.00 0.00 1.25 0 THRU 225 HPT15 0.02 70 A B 12,500 0.25 70 .700 .063 .034 0 .000 .000 .000 .000 .000 .119 0.00 0.00 0.00 1.20 226 HP THRU 425 HPT15 0.02 70 S B 10,500 0.25 91 .910 .082 .044 0 .000 .000 .000 .000 .000 .119 0.00 0.00 0.00 1.25 226 HP THRU 425 HPT15 0.03 70 A B 15,000 0.20 60 .600 .054 .029 0 .000 .000 .000 .000 .000 .066 0.00 0.00 0.00 1.20 OVER 425 HPT15 0.03 70 S B 12,500 0.20 78 .780 .070 .037 0 .000 .000 .000 .000 .000 .066 0.00 0.00 0.00 1.35 OVER 425 HPT20 0.00 75 A B 14,000 0.15 60 .600 .054 .029 0 .000 .000 .000 .000 .102 .119 0.96 0.63 0.00 0.60TRACTORS, WHEEL TYPE (DOZER)T20 0.00 75 S B 13,000 0.15 78 .780 .070 .037 0 .000 .000 .000 .000 .102 .119 0.25 0.15 0.00 0.65TRACTORS, WHEEL TYPE (DOZER)T25 0.00 1TRACTORS, AGRICULTURALT25 0.10 75 A B 10,000 0.15 65 .650 .059 .031 0 .000 .000 .000 .000 .102 .119 0.00 0.00 0.00 0.85 CRAWLERT25 0.20 75 A B 8,000 0.15 65 .650 .059 .031 0 .000 .000 .000 .000 .102 .119 0.96 0.73 0.00 0.70 WHEELT30 0.00 80 A B 8,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .000 .119 .119 1.08 0.82 0.00 0.90TRENCHERS, CHAIN TYPE CUTTERT30 0.00 80 S B 6,000 0.20 85 .850 .077 .041 0 .000 .000 .000 .000 .119 .119 0.32 0.22 0.00 1.00TRENCHERS, CHAIN TYPE CUTTERT35 0.00 80 A B 8,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .000 .119 .119 1.08 0.82 0.00 0.90TRENCHERS, WHEEL TYPE CUTTERT35 0.00 80 S B 6,000 0.20 85 .850 .077 .041 0 .000 .000 .000 .000 .119 .119 0.32 0.22 0.00 1.00TRENCHERS, WHEEL TYPE CUTTERT40 0.00 1TRUCK OPTIONST40 0.10 95 A B 8,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .477 .136 .136 0.00 0.00 0.00 0.80 CRANES / HOISTS, PERSONNEL & MATERIAL
HANDLINGT40 0.20 95 A B 8,000 0.10 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.00 0.00 0.00 0.70 DUMP BODY, REART40 0.20 95 S B 6,500 0.10 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.00 0.00 0.00 0.80 DUMP BODY, REAR
D- 15EK=Economic Key (Appendix E) LIFE=Economic Life E=Electric Powered FT=Front Tire C=Operating Conditions (A=average, S=severe) SLV=Salvage Value G=Gas Powered DT=Drive Tire DC=Discount Code (B=basic 7.5%, S=special 15%) HPF=Horsepower Factor D=Diesel Powered TT=Trailing Tire RCF=Repair Cost Factor
EP 1110-1-8, Vol. 330 Nov 09
D-16
CATEGORY
SUB DESCRIPTION EK C DC LIFE SLV D TT RCFDTFTGEHPF DGEHPF DGEFUEL FACTORS
EQUIPMENT
FUEL FACTORS
CARRIER FOG TIRE WEAR
FACTORS
EQUIPMENT HOURLY CALCULATION FACTORS
EP 1110-1-8
7/31/2009#Error
FACTORS
APPENDIX D
T40 0.30 95 A B 8,000 0.20 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.00 0.00 0.00 0.60 FLATBEDS, WITH SIDEST40 0.41 95 A B 8,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .477 .136 .136 0.00 0.00 0.00 0.70 HOIST, ELECTRIC DRIVET40 0.50 95 A B 8,000 0.15 65 .650 .059 .031 35 .350 .032 .017 .477 .136 .136 0.77 0.69 0.86 0.70 TRANSIT MIXERST40 0.60 95 A B 8,000 0.25 65 .650 .059 .031 0 .000 .000 .000 .477 .136 .136 0.00 0.00 0.00 0.60 WATER TANKST40 0.70 95 A B 8,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .477 .136 .136 1.08 0.86 1.20 0.70 ALL OTHER OPTIONST45 0.00 1TRUCK TRAILERST45 0.10 95 A B 10,000 0.10 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.66 0.00 0.73 0.70 BOTTOM DUMPT45 0.10 95 S B 8,000 0.10 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.18 0.00 0.20 0.80 BOTTOM DUMPT45 0.20 95 A B 10,000 0.10 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.66 0.00 0.73 0.65 END DUMPT45 0.20 95 S B 8,000 0.10 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.18 0.00 0.20 0.75 END DUMPT45 0.30 95 A B 8,000 0.10 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.66 0.00 0.73 0.60 PUP TRAILERT45 0.41 95 A B 10,000 0.10 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.66 0.00 0.73 0.50 LOWBOY, RIGID NECK, DROP DECKT45 0.50 95 A B 10,000 0.10 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.66 0.00 0.73 0.50 FLATBED TRAILERT45 0.60 95 A B 10,000 0.10 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.66 0.00 0.73 0.50 MISCELLANEOUS / UTILITYT45 0.70 95 A B 10,000 0.25 65 .650 .059 .031 0 .000 .000 .000 .000 .119 .102 0.66 0.92 0.73 0.60 WATER TANKER TRAILERT45 0.80 95 A B 8,000 0.25 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.66 0.00 0.73 0.70 DECONTAMINATION FACILITYT45 0.90 95 A B 10,000 0.25 65 .650 .059 .031 0 .000 .000 .000 .000 .119 .102 0.66 0.00 0.73 0.70 TANK TRAILERST50 0.00 1TRUCKS, HIGHWAY (Add attachments as required)T50 0.01 85 A S 8,000 0.20 15 .150 .014 .007 0 .000 .000 .000 .000 .119 .102 0.61 0.56 0.67 0.70 0 THRU 10,000 GVWT50 0.01 85 S S 6,500 0.20 20 .200 .018 .010 0 .000 .000 .000 .000 .119 .102 0.20 0.16 0.22 0.75 0 THRU 10,000 GVWT50 0.02 85 A S 10,000 0.20 35 .350 .032 .017 0 .000 .000 .000 .000 .127 .110 0.72 0.66 0.79 0.65 OVER 10,000 THRU 30,000 GVW (Chassis only - Add
options)
D- 16EK=Economic Key (Appendix E) LIFE=Economic Life E=Electric Powered FT=Front Tire C=Operating Conditions (A=average, S=severe) SLV=Salvage Value G=Gas Powered DT=Drive Tire DC=Discount Code (B=basic 7.5%, S=special 15%) HPF=Horsepower Factor D=Diesel Powered TT=Trailing Tire RCF=Repair Cost Factor
EP 1110-1-8, Vol. 330 Nov 09
D-17
CATEGORY
SUB DESCRIPTION EK C DC LIFE SLV D TT RCFDTFTGEHPF DGEHPF DGEFUEL FACTORS
EQUIPMENT
FUEL FACTORS
CARRIER FOG TIRE WEAR
FACTORS
EQUIPMENT HOURLY CALCULATION FACTORS
EP 1110-1-8
7/31/2009#Error
FACTORS
APPENDIX D
T50 0.02 85 S S 8,000 0.20 46 .460 .041 .022 0 .000 .000 .000 .000 .127 .110 0.20 0.16 0.22 0.70 OVER 10,000 THRU 30,000 GVW (Chassis only - Add options)
T50 0.03 85 A S 12,000 0.20 50 .500 .045 .024 0 .000 .000 .000 .000 .136 .119 0.77 0.71 0.86 0.65 OVER 30,000 GVW (Chassis only - Add options)T50 0.03 85 S S 10,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .000 .136 .119 0.21 0.18 0.24 0.75 OVER 30,000 GVW (Chassis only - Add options)T55 0.00 1TRUCKS, OFF-HIGHWAYT55 0.10 90 A B 20,000 0.15 35 .350 .032 .017 0 .000 .000 .000 .000 .000 .144 0.84 0.73 0.93 0.90 RIGID FRAMET55 0.10 90 S B 18,000 0.15 45 .450 .041 .022 0 .000 .000 .000 .000 .000 .144 0.23 0.18 0.25 0.95 RIGID FRAMET55 0.20 90 A B 13,000 0.15 50 .500 .045 .024 0 .000 .000 .000 .000 .000 .080 0.84 0.73 0.93 0.80 ARTICULATED FRAMET55 0.20 90 S B 12,250 0.15 60 .600 .054 .029 0 .000 .000 .000 .000 .000 .080 0.23 0.18 0.25 0.85 ARTICULATED FRAMET56 0.00 1TRUCKS,OFF-HIGHWAY/PRIME MOVER TRACTORS
& WAGONST56 0.10 90 A B 20,000 0.15 40 .400 .036 .019 0 .000 .000 .000 .000 .102 .144 0.84 0.64 0.93 0.90 PRIME MOVER TRACTORST56 0.10 90 S B 18,000 0.15 65 .650 .059 .031 0 .000 .000 .000 .000 .102 .136 0.23 0.16 0.25 0.95 PRIME MOVER TRACTORST56 0.20 90 A B 15,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .000 .102 .136 0.84 0.64 0.93 0.65 WAGONS, BOTTOM DUMPT56 0.20 90 S B 10,000 0.20 85 .850 .077 .041 0 .000 .000 .000 .000 .102 .136 0.23 0.16 0.25 0.75 WAGONS, BOTTOM DUMPT56 0.30 90 A B 12,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .000 .102 .136 0.84 0.65 0.93 0.60 WAGONS, REAR DUMPT57 0.00 95 A B 10,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .000 .102 .119 0.23 0.17 0.25 0.80TRUCKS, VACUUMT60 0.00 90 A B 12,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .000 .102 .136 0.90 0.69 1.00 0.70TRUCKS, WATER, OFF-HIGHWAYT60 0.00 90 S B 10,000 0.20 85 .850 .077 .041 0 .000 .000 .000 .000 .102 .136 0.25 0.17 0.28 0.80TRUCKS, WATER, OFF-HIGHWAYT65 0.00 1TUNNEL/MINING EQUIPMENTT65 0.10 25 A B 14,000 0.15 80 .800 .072 .038 13 .130 .012 .006 .530 .136 .119 0.67 0.57 0.00 0.90 DRIFTING & TUNNELING DRILLST65 0.20 95 A B 18,000 0.15 70 .700 .063 .034 0 .000 .000 .000 .530 .000 .000 0.00 0.00 0.00 0.70 TUNNEL BORING MACHINEST65 0.20 95 S B 16,000 0.15 91 .910 .082 .044 0 .000 .000 .000 .530 .000 .000 0.00 0.00 0.00 0.80 TUNNEL BORING MACHINES
D- 17EK=Economic Key (Appendix E) LIFE=Economic Life E=Electric Powered FT=Front Tire C=Operating Conditions (A=average, S=severe) SLV=Salvage Value G=Gas Powered DT=Drive Tire DC=Discount Code (B=basic 7.5%, S=special 15%) HPF=Horsepower Factor D=Diesel Powered TT=Trailing Tire RCF=Repair Cost Factor
EP 1110-1-8, Vol. 330 Nov 09
D-18
CATEGORY
SUB DESCRIPTION EK C DC LIFE SLV D TT RCFDTFTGEHPF DGEHPF DGEFUEL FACTORS
EQUIPMENT
FUEL FACTORS
CARRIER FOG TIRE WEAR
FACTORS
EQUIPMENT HOURLY CALCULATION FACTORS
EP 1110-1-8
7/31/2009#Error
FACTORS
APPENDIX D
T65 0.30 25 A B 12,000 0.15 80 .800 .072 .038 0 .000 .000 .000 .530 .136 .119 0.00 0.00 0.00 0.90 PRODUCTION DRILLING RIGST65 0.40 95 A B 16,000 0.15 70 .700 .063 .034 0 .000 .000 .000 .530 .000 .000 0.00 0.00 0.00 0.90 ROADHEADERS & CONTINUOUS MINERST65 0.40 95 S B 14,000 0.15 91 .910 .082 .044 0 .000 .000 .000 .530 .000 .000 0.00 0.00 0.00 1.00 ROADHEADERS & CONTINUOUS MINERST65 0.50 95 A B 10,000 0.20 80 .800 .072 .038 10 .100 .009 .005 .530 .136 .119 0.00 0.00 0.00 0.80 ROCK BOLTING EQUIPMENTT65 0.61 95 A B 12,000 0.20 70 .700 .063 .034 0 .000 .000 .000 .000 .136 .127 0.00 0.00 0.00 0.75 LOADING & HAULING EQUIPMENT, DIESEL OR
GAST65 0.62 95 A B 14,000 0.20 70 .700 .063 .034 0 .000 .000 .000 .477 .102 .102 0.00 0.00 0.00 0.70 LOADING & HAULING EQUIPMENT, ELECTRICT65 0.63 95 A B 10,000 0.25 70 .700 .063 .034 0 .000 .000 .000 .477 .136 .119 0.00 0.00 0.00 0.65 LOADING & HAULING EQUIPMENT, AIR-POWEREDT65 0.70 95 A B 12,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .477 .136 .119 0.00 0.00 0.00 0.75 LOCOMOTIVEST65 0.90 95 A B 10,000 0.20 70 .700 .063 .034 13 .130 .012 .006 .477 .136 .127 0.00 0.00 0.00 0.80 OTHER TUNNELING EQUIPMENTW10 0.00 90 A B 12,000 0.15 65 .650 .059 .031 0 .000 .000 .000 .000 .102 .136 0.88 0.67 0.98 0.65WAGONS, BOTTOM DUMPW10 0.00 90 S B 10,000 0.15 85 .850 .077 .041 0 .000 .000 .000 .000 .102 .136 0.25 0.17 0.28 0.75WAGONS, BOTTOM DUMPW15 0.00 90 A B 12,000 0.15 65 .650 .059 .031 0 .000 .000 .000 .000 .102 .136 0.88 0.77 0.98 0.60WAGONS, REAR DUMPW15 0.00 90 S B 10,000 0.15 85 .850 .077 .041 0 .000 .000 .000 .000 .102 .136 0.25 0.19 0.28 0.70WAGONS, REAR DUMPW25 0.00 1WATER & CO2 BLASTERSW25 0.10 95 A B 4,000 0.20 95 .950 .086 .045 0 .000 .000 .000 .424 .102 .119 0.96 0.73 1.07 1.10 LOW PRESSURE, (< 5,000 PSI)W25 0.20 95 A B 4,000 0.20 95 .950 .086 .045 0 .000 .000 .000 .424 .102 .119 0.96 0.73 1.07 1.20 HIGH PRESSURE, (>= 5,000 PSI)W25 0.30 95 A B 4,000 0.20 95 .950 .086 .045 0 .000 .000 .000 .424 .102 .119 0.00 0.00 0.73 1.10 STEAM CLEANERSW25 0.40 95 A B 6,000 0.20 70 .700 .063 .034 0 .000 .000 .000 .530 .127 .148 0.00 0.00 0.73 1.00 CO2 BLASTERSW25 0.50 95 A B 10,000 0.35 0 .000 .000 .000 0 .000 .000 .000 .000 .000 .000 0.00 0.00 0.73 0.40 WET ABRASIVE BLASTING SYSTEM (TORBO)W30 0.00 1WATER TANKSW30 0.10 90 A B 12,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .000 .102 .119 0.00 0.00 0.73 0.60 PORTABLE WITH WHEELSW30 0.20 90 A B 12,000 0.20 65 .650 .059 .031 0 .000 .000 .000 .000 .102 .119 0.00 0.00 0.00 0.50 SKID MOUNTED
D- 18EK=Economic Key (Appendix E) LIFE=Economic Life E=Electric Powered FT=Front Tire C=Operating Conditions (A=average, S=severe) SLV=Salvage Value G=Gas Powered DT=Drive Tire DC=Discount Code (B=basic 7.5%, S=special 15%) HPF=Horsepower Factor D=Diesel Powered TT=Trailing Tire RCF=Repair Cost Factor
EP 1110-1-8, Vol. 330 Nov 09
D-19
CATEGORY
SUB DESCRIPTION EK C DC LIFE SLV D TT RCFDTFTGEHPF DGEHPF DGEFUEL FACTORS
EQUIPMENT
FUEL FACTORS
CARRIER FOG TIRE WEAR
FACTORS
EQUIPMENT HOURLY CALCULATION FACTORS
EP 1110-1-8
7/31/2009#Error
FACTORS
APPENDIX D
W35 0.00 1WELDERSW35 0.10 95 A B 8,000 0.25 80 .800 .072 .038 0 .000 .000 .000 .000 .102 .102 0.00 0.00 1.07 0.75 ENGINE DRIVENW35 0.20 95 A B 6,000 0.20 30 .300 .027 .014 0 .000 .000 .000 .424 .000 .000 0.00 0.00 0.00 0.50 ELECTRIC DRIVEN
D- 19EK=Economic Key (Appendix E) LIFE=Economic Life E=Electric Powered FT=Front Tire C=Operating Conditions (A=average, S=severe) SLV=Salvage Value G=Gas Powered DT=Drive Tire DC=Discount Code (B=basic 7.5%, S=special 15%) HPF=Horsepower Factor D=Diesel Powered TT=Trailing Tire RCF=Repair Cost Factor
EP 1110-1-8, Vol. 330 Nov 09
D-20
1995 1994 19932010 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996
KEY
EQUIPMENT DIVISIONS
ECONOMIC INDEXES FOR CONSTRUCTION EQUIPMENT
(EK)
Note: Table 2-1 Equipment Rates are based on equipment purchased new in the year 2006
2011
{--Projected---------}
EP 1110-1-8
7/31/2009
APPENDIX E
(Vol. 12)
2655 245726025 Air Equipment 2319 2234 2157 2085 2075 2069 2079 2047 2078 2074 2070 2063 2053 2012 20222714
4653 4381455710 Asphalt & Concrete Paving Equipment 4228 4116 3950 3758 3763 3769 3766 3717 3638 3589 3490 3390 3323 3248 31894756
9158 8687897215 Buckets 8604 8502 8057 7626 7443 7254 6804 6900 6982 6930 6888 6774 6672 6638 66639362
7048 6685690520 Cranes, Draglines & Clamshells - Crawler & Truck Mtd 6621 6543 6201 5869 5728 5582 5236 5310 5289 5225 5116 5013 4880 4783 47367205
6137 5783601725 Drills 5448 5104 4762 4444 4192 4116 3819 3736 3683 3626 3574 3518 3394 3320 32686273
5966 5623583930 Generators 5357 5112 4888 4641 4566 4548 4548 4529 4520 4517 4484 4511 4457 4343 42946099
7613 7152745135 Graders, Motor 6909 6825 6578 6318 6117 6049 5979 5952 5853 5682 5544 5466 5186 5088 49467782
7810 7259763640 Loaders, Track 7037 6907 6653 6347 6177 6081 6058 6032 5960 5792 5686 5606 5434 5257 50687984
7208 6699704745 Loaders, Wheel 6494 6374 6140 5857 5701 5612 5591 5567 5511 5409 5303 5251 5101 4988 48947368
6789 6377664750 Pile Driving Equipment 6176 6033 5787 5450 5270 5195 5127 5112 5062 4993 4892 4809 4700 4598 45396939
7191 6736705055 Rollers 6424 6145 5872 5646 5406 5285 5225 5130 5204 5092 5001 4950 4851 4719 44847351
7613 7152745160 Scrapers & Soil Stabilizers 6909 6825 6578 6318 6117 6049 5979 5952 5853 5682 5544 5466 5186 5088 49467782
7048 6685690565 Shovels, Backhoes & Hydraulic Excavators 6621 6543 6201 5869 5728 5582 5236 5310 5289 5225 5116 5013 4880 4783 47367205
7810 7259763670 Tractors, Crawlers & Attachments 7037 6907 6653 6347 6177 6081 6058 6032 5960 5792 5686 5606 5434 5257 50687984
6877 6442674275 Tractor, Wheel 6144 5876 5616 5400 5170 5055 4997 4906 4833 4695 4624 4540 4527 4484 43427030
8877 8314870280 Trenchers 7930 7584 7248 6970 6466 6524 6450 6332 6223 6042 5833 5749 5670 5509 52079074
5449 5122533485 Trucks, Highway 4965 4820 4638 4450 4356 4306 4216 4212 4307 4216 4241 4318 4293 4190 40255570
7999 7650784490 Trucks & Wagons - Off-Highway 7392 7231 6896 6424 6095 6026 5931 5828 5715 5651 5581 5440 5265 4979 48378177
6789 6377664795 All Other Equipment 6176 6033 5787 5450 5270 5195 5127 5112 5062 4993 4892 4809 4700 4598 45396939
3440 32673382100 All Tires & Tubes 3025 2926 2759 2614 2487 2430 2401 2373 2371 2400 2431 2475 2559 2517 25253516
7926 74607762105 Marine Equipment 7202 6905 6661 6436 6101 5846 5771 5645 5556 5513 5429 5245 5036 4951 48818102
EK = Economic Key E-1
EP 1110-1-8, Vol. 330 Nov 09
E-2
1977 1976 19751992 1991 1990 1989 1988 1987 1986 1985 1984 1983 1982 1981 1980 1979 1978
KEY
EQUIPMENT DIVISIONS
ECONOMIC INDEXES FOR CONSTRUCTION EQUIPMENT
(EK)
Note: Table 2-1 Equipment Rates are based on equipment purchased new in the year 2006
EP 1110-1-8
7/31/2009(Vol. 12)
APPENDIX E
2008 195619635 Air Equipment 1888 1801 1730 1720 1733 1683 1695 1668 1563 1630 1521 1354 1295 1186 1165
3092 2967310610 Asphalt & Concrete Paving Equipment 2867 2793 2730 2687 2687 2611 2583 2620 2461 2296 2111 1941 1815 1686 1610
6380 5640590115 Buckets 5314 4872 4767 4713 4640 4527 4471 4541 4313 3879 3280 2963 2738 2520 2175
4540 4152429820 Cranes, Draglines & Clamshells - Crawler & Truck Mtd 3967 3688 3595 3485 3395 3339 3282 3213 3009 2782 2512 2301 2138 2010 1843
3196 3069316325 Drills 2969 2807 2792 2786 2832 2803 2836 2810 2602 2265 1993 1858 1699 1638 1559
4234 4116418130 Generators 3998 3773 3575 3514 3510 3400 3314 3236 3160 2817 2390 2301 2128 2053 1839
4655 4359450935 Graders, Motor 4219 4010 3914 3759 3738 3645 3643 3561 3276 2992 2687 2492 2259 2109 1956
4816 4555467740 Loaders, Track 4404 4163 3918 3770 3767 3791 3792 3655 3349 3061 2750 2482 2247 2053 1916
4758 4532464045 Loaders, Wheel 4409 4235 4099 3991 3973 3944 3873 3788 3441 2938 2606 2375 2156 2002 1907
4427 4182430550 Pile Driving Equipment 4029 3845 3745 3668 3626 3570 3519 3439 3208 2894 2562 2329 2135 1989 1852
4460 4630466855 Rollers 4507 4412 4217 4151 4090 3926 3744 3431 3199 2913 2653 2396 2139 1983 1872
4655 4359450960 Scrapers & Soil Stabilizers 4219 4010 3914 3759 3738 3645 3643 3561 3276 2992 2687 2492 2259 2109 1956
4540 4152429865 Shovels, Backhoes & Hydraulic Excavators 3967 3688 3595 3485 3395 3339 3282 3213 3009 2782 2512 2301 2138 2010 1843
4816 4555467770 Tractors, Crawlers & Attachments 4404 4163 3918 3770 3767 3791 3792 3655 3349 3061 2750 2482 2247 2053 1916
4270 4123418675 Tractor, Wheel 4018 3936 3862 3820 3818 3656 3557 3530 3256 2927 2578 2319 2125 1956 1843
5015 4886494880 Trenchers 4753 4679 4600 4586 4488 4431 4360 4097 3618 3153 2772 2580 2300 1894 1633
3838 3546366985 Trucks, Highway 3495 3363 3299 3282 3139 3055 2934 2824 2638 2324 2108 1934 1775 1646 1524
4797 4617473990 Trucks & Wagons - Off-Highway 4405 4094 3915 3840 3822 3786 3744 3662 3363 2964 2588 2364 2196 2081 1965
4427 4182430595 All Other Equipment 4029 3845 3745 3668 3626 3570 3519 3439 3208 2894 2562 2329 2135 1989 1852
2524 24702506100 All Tires & Tubes 2480 2399 2322 2340 2374 2421 2453 2552 2506 2369 2055 1792 1699 1615 1485
4679 42714438105 Marine Equipment 4091 3920 3886 3863 3749 3633 3497 3391 3239 2922 2587 2352 2156 2008 1870
EK = Economic Key E-2
EP 1110-1-8, Vol. 330 Nov 09
E-3
EP CODE SIZE DESCRIPTION SIZE PER EACHCOSTTUBE
PLY (1)
TIRE DESCRIPTION AND TIRE COST
EP 1110-1-8(Vol. 8)
7/31/2009
INDUSTRY CODE
APPENDIX F
LT TRUCK/RECREATIONAL VEHICLE, RADIAL
(Life =WORKHORSE EXTRA GRIP RADIAL 5000 hrs )
ABAA3 LT265/75R16 10.40 16.00 TL $203x 10
(Life =WRANGLER RADIAL AT 5000 hrs )
ABAC1 LT235/75R15 9.25 15.00 TL $147x 6ABAC2 31-1050R15 10.50 15.00 TL $141x 6
(Life =SERVICE TRAILER - MARATHON RADIAL 5000 hrs )
ABBF1 ST175/80R13 7.00 13.00 TL $81x 4ABBF3 ST185/80R13 7.20 13.00 TL $93x 6ABBF5 ST205/75R14 8.00 14.00 TL $106x 6ABBF8 ST205/75R15 8.00 15.00 TL $125x 6ABBF6 ST215/75R14 8.50 14.00 TL $112x 6ABBF9 ST225/75R15 8.80 15.00 TL $126x 6ABBF10 ST225/75R15 8.80 15.00 TL $139x 8
LT TRUCK/RECREATIONAL VEHICLE, BIAS
(Life =WORKHORSE RIB 5000 hrs )
ACBA2 700-15LT 8.30 15.00 TL $165x 8ACBA7 875-16.5LT 8.80 16.50 TL $193x 10ACBA4 750-16LT 8.90 16.00 TL $190x 10ACBA9 950-16.5LT 9.60 16.50 TL $212x 10
(Life =TRACTION HI-MILER 5000 hrs )
ACBC1 6.70-15LT 7.50 15.00 TL $162x 6ACBC3 8-14.5LT 8.00 14.50 TL $278x 12ACBC4 9-14.5LT 9.50 14.50 TL $312x 12
(Life =CUSTOM HI-MILER 5000 hrs )
ACBD1 12-16.5LT 12.10 16.50 TL $621x 12
OVER-THE-ROAD TRUCK, COMMERCIAL, RADIAL
(Life =COMMERICAL RADIAL LT TRUCK 5000 hrs )
ADCA2 LT225/75R16 7.50 16.00 TL $242x 10ADCA17 8R19.5 8.00 19.50 TL $422x 10ADCA18 8R195 8.00 19.50 TL $248x 12
F-1(1) TT = includes tube, TL = no tube, NO = no tube
EP 1110-1-8, Vol. 330 Nov 09
F-2
EP CODE SIZE DESCRIPTION SIZE PER EACHCOSTTUBE
PLY (1)
TIRE DESCRIPTION AND TIRE COST
EP 1110-1-8(Vol. 8)7/31/2009
INDUSTRY CODE
APPENDIX F
ADCA4 LT215/85R16 8.50 16.00 TL $180x 10ADCA3 LT215/85R16 8.50 16.00 TL $197x 8ADCA1 750R16LT 8.70 16.00 TL $174x 8ADCA6 LT225/75R16 8.80 16.00 TL $175x 10ADCA19 225/70R195 8.85 19.50 TL $282x 12ADCA8 LT235/85R16 9.25 16.00 TL $169x 10ADCA21 245/70R195 9.65 19.50 TL $373x 14ADCA11 LT245/75R16 9.80 16.00 TL $185x 10
(Life =COMMERCIAL RADIAL TRUCK TL 5000 hrs )
ADCB2 9R175 9.00 17.50 TL $299x 16ADCB5 9R22.5 9.00 22.50 TL $296x 12ADCB3 10R175 10.00 17.50 TL $301x 16ADCB7 10R22.5 10.00 22.50 TL $400x 14ADCB4 11R17.5 11.00 17.50 TL $389x 16ADCB8 11R22.5 11.00 22.50 TL $509x 16ADCB13 11R24.5 11.00 24.50 TL $550x 16ADCB10 12R22.5 12.00 22.50 TL $597x 16ADCB14 12R24.5 12.00 24.50 TL $614x 16
(Life =LOW PROFILE RADIAL TRUCK TL 5000 hrs )
ADCC1 215/75R175 8.40 17.50 TL $269x 16ADCC5 245/75R22.5 9.60 22.50 TL $306x 14ADCC3 255/70R22.5 10.00 22.50 TL $353x 16ADCC2 265/70R19.5 10.40 19.50 TL $327x 14ADCC6 265/75R22.5 10.40 22.50 TL $372x 14ADCC4 275/70R22.5 10.80 22.50 TL $412x 16ADCC12 285/75R24.5 11.20 24.50 TL $543x 14ADCC8 295/75R22.5 11.60 22.50 TL $551x 16ADCC10 315/80R22.5 12.40 22.50 TL $596x 18
(Life =SUPER SINGLE COMMERCIAL RADIAL TRUCK 5000 hrs )
ADCD1 385/65R22.5 15.10 22.50 TL $684x 18ADCD2 425/65R22.5 16.70 22.50 TL $769x 20ADCD3 445/65R22.5 17.50 22.50 TL $869x 20
(Life =COMMERCIAL RADIAL TRUCK TT 5000 hrs )
ADCE1 825R15 8.25 15.00 TT $315x 14ADCE5 9.00R20 8.25 20.00 TT $372x 12
F-2(1) TT = includes tube, TL = no tube, NO = no tube
EP 1110-1-8, Vol. 330 Nov 09
F-3
EP CODE SIZE DESCRIPTION SIZE PER EACHCOSTTUBE
PLY (1)
TIRE DESCRIPTION AND TIRE COST
EP 1110-1-8(Vol. 8)
7/31/2009
INDUSTRY CODE
APPENDIX F
ADCE6 9.00R20 9.00 20.00 TT $396x 12ADCE3 1000R15 10.00 15.00 TT $412x 14ADCE7 1000R20 10.00 20.00 TT $441x 14ADCE13 10R22.5 10.00 22.50 TL $440x 12ADCE12 365/80R20 10.40 20.00 TT $660x 18ADCE9 1100R20 11.00 20.00 TT $514x 16ADCE10 1100R20 11.00 20.00 TT $587x 16ADCE14 1100R22 11.00 22.00 TT $609x 16ADCE15 1100R24 11.00 24.00 TT $610x 16ADCE11 1200R20 12.00 20.00 TT $627x 18ADCE17 1200R24 12.00 24.00 TT $683x 18
FARM, FRONT
(Life =DYNA RIB F-2-M 5000 hrs )
AFED2 1000-16 10.00 16.00 TL $316x 8F-2MAFED1 11L-15 11.00 15.00 TL $296x 6F-2MAFED4 1100-16 11.00 16.00 TL $418x 8F-2MAFED8 1100-24 11.00 24.00 TL $827x 12F-2MAFED6 14L-161 14.00 16.10 TL $690x 10F-2MAFED7 165L-161 16.50 16.10 TL $800x 8F-2M
(Life =SINGLE RIB FRONT TRACTOR F-1 5000 hrs )
AFEE1 600-16 6.00 16.00 TT $180x 4F-1
(Life =FARM HIGHWAY SERVICE 5000 hrs )
AFEF2 95L-15FI 9.50 15.00 TL $240x DI-1AFEF5 11L-15FI 11.00 15.00 TL $314x FI-1AFEF7 125L-15FI 12.50 15.00 TL $434x FI-1
(Life =FARM UTILITY 5000 hrs )
AFEG7 750-14 7.50 14.00 TL $167x 4I-1AFEG14 760-15 7.60 15.00 TL $187x 8I-1AFEG8 85L-14 8.50 14.00 TL $173x 6I-1AFEG1 95L-14 9.50 14.00 TT $163x 8I-1AFEG17 95L-15 9.50 15.00 TL $247x 12I-1AFEG18 1000-15 10.00 15.00 TL $255x 8I-1AFEG11 11L-14 11.00 14.00 TL $194x 8I-1AFEG22 11L-15 11.00 15.00 TL $271x 10I-1
F-3(1) TT = includes tube, TL = no tube, NO = no tube
EP 1110-1-8, Vol. 330 Nov 09
F-4
EP CODE SIZE DESCRIPTION SIZE PER EACHCOSTTUBE
PLY (1)
TIRE DESCRIPTION AND TIRE COST
EP 1110-1-8(Vol. 8)7/31/2009
INDUSTRY CODE
APPENDIX F
AFEG20 11L-15 11.00 15.00 TL $190x 8I-1AFEG34 11L-16 11.00 16.00 TL $248x 10I-1AFEG25 125L-15 12.50 15.00 TL $305x 12I-1AFEG30 125L-16 12.50 16.00 TL $349x 12I-1AFEG29 125L-16 12.50 16.00 TL $309x 8I-1AFEG28 14L-161 14.00 16.10 TL $514x 12I-1AFEG31 165L-161 16.50 16.10 TL $619x 10I-1AFEG32 19L-161 19.00 16.10 TL $671x 10I-1AFEG27 215L-161 21.50 16.10 TL $1,063x 14I-1
(Life =FOUR RIB FRONT TRACTOR F-2-M 5000 hrs )
AFEH1 750-16 7.50 16.00 TT $196x 6F-2MAFEH3 1000-16 10.00 16.00 TT $280x 8F-2MAFEH4 1100-16 11.00 16.00 TT $326x 8F-2M
(Life =IMPLEMENT RIB 5000 hrs )
AFEK11 400-18 4.00 18.00 TT $137x 4I-1AFEK4 500-15 5.00 15.00 TL $138x 4I-1AFEK16 590-15 5.90 15.00 TL $142x 4I-1AFEK6 600-16 6.00 16.00 TT $149x 6I-1AFEK7 650-16 6.50 16.00 TT $143x 6I-1AFEK5 670-15 6.70 15.00 TL $153x 6I-1AFEK9 750-16 7.50 16.00 TT $200x 10I-1AFEK10 900-16 9.00 16.00 TL $288x 10I-1AFEK13 900-24 9.00 24.00 TL $457x 8I-1AFEK14 1125-28 11.25 28.00 TT $1,207x 12I-1
(Life =LABORER F-3 5000 hrs )
AFEL6 145/75-161 5.70 16.10 TL $858x 10F-3AFEL2 11L-15 11.00 15.00 TL $273x 10F-3AFEL4 11L-16 11.00 16.00 TL $257x 10F-3AFEL5 11L-16 11.00 16.00 TL $296x 12F-3
(Life =MULTI-RIB F-3 5000 hrs )
AFEM1 900-10 9.00 10.00 TT $264x 10F-3TFEM2 1100-16 11.00 16.00 TL $407x 12F-3
(Life =SMOOTH 5000 hrs )
AFEN1 169-30 16.90 30.00 TL $1,742x 6I-1
F-4(1) TT = includes tube, TL = no tube, NO = no tube
EP 1110-1-8, Vol. 330 Nov 09
F-5
EP CODE SIZE DESCRIPTION SIZE PER EACHCOSTTUBE
PLY (1)
TIRE DESCRIPTION AND TIRE COST
EP 1110-1-8
(Vol. 8)
7/31/2009
INDUSTRY CODE
APPENDIX F
(Life =SMOOTH IMP 5000 hrs )
AFEO1 400-8 4.00 8.00 TL $91x 4AFEO3 600-16 6.00 16.00 TL $283x 10AFEO2 11L-15 11.00 15.00 TL $271x 10
(Life =SOFTRAC II 5000 hrs )
AFEP1 165L-161 16.50 16.10 TL $742x 6I-2AFEP3 215L-161 21.50 16.10 TL $1,464x 10I-2
(Life =SUPER RIB F-2 5000 hrs )
TFER1 400-12 4.00 12.00 TT $86x 4F-2
(Life =COMPACT UTILITY R-1 5000 hrs )
TFES2 5-12 5.00 12.00 TL $91x 4 AFES1 7-16 7.00 16.00 TL $179x 6
(Life =SURE GRIP IMPLEMENT 5000 hrs )
AFET1 105/80-18 10.50 18.00 TL $725x 10I-3AFET2 125/80-18 12.50 18.00 TL $781x 10I-3
(Life =SURE GRIP LUG 5000 hrs )
AFEU2 105/80-18 10.50 18.00 TL $732x 10I-3AFEU1 124-16 12.40 16.00 TL $631x 4I-3AFEU3 125/80-18 12.50 18.00 TL $696x 10I-3
(Life =SURE GRIP TRACTION 5000 hrs )
AFEV1 670-15 6.70 15.00 TT $160x 4I-3AFEV5 750-16 7.50 16.00 TL $249x 4I-3AFEV2 750-18 7.50 18.00 TT $245x 4I-3AFEV3 750-20 7.50 20.00 TT $291x 4I-3AFEV4 760-15 7.60 15.00 TL $213x 6I-3
(Life =TRACTION IMPLEMENT 5000 hrs )
AFEW1 500-15 5.00 15.00 TL $155x 4I-3AFEW2 590-15 5.90 15.00 TL $166x 4I-3
(Life =TRIPLE RIB HD 5000 hrs )
AFEX8 550-16 5.50 16.00 TT $169x 6F-2AFEX10 600-16 6.00 16.00 TT $194x 6F-2AFEX11 650-16 6.50 16.00 TT $170x 6F-2
F-5(1) TT = includes tube, TL = no tube, NO = no tube
EP 1110-1-8, Vol. 330 Nov 09
F-6
EP CODE SIZE DESCRIPTION SIZE PER EACHCOSTTUBE
PLY (1)
TIRE DESCRIPTION AND TIRE COST
EP 1110-1-8(Vol. 8)7/31/2009
INDUSTRY CODE
APPENDIX F
AFEX4 75L-15 7.50 15.00 TT $176x 6F-2AFEX18 750-16 7.50 16.00 TL $220x 6F-2AFEX13 750-16 7.50 16.00 TT $216x 8F-2AFEX14 750-18 7.50 18.00 TT $236x 6F-2AFEX5 95L-15 9.50 15.00 TT $254x 8F-2AFEX16 1000-16 10.00 16.00 TL $299x 8F-2AFEX6 11L-15 11.00 15.00 TT $290x 8F-2AFEX17 1100-16 11.00 16.00 TL $384x 8F-2
(Life =TRIPLE RIB R/S F-2 5000 hrs )
AFEY2 400-15 4.00 15.00 TT $118x 4F-2AFEY1 500-15 5.00 15.00 TT $121x 4F-2
(Life =DURATORQUE R-1 5000 hrs )
AFFU3 8-16 8.00 16.00 TL $250x 6R-1
FARM, REAR
(Life =ALL TRACTION R-3 5000 hrs )
AGFA1 750-16 7.50 16.00 TT $231x 4R-3
(Life =ALL WEATHER R-3 5000 hrs )
AGFB2 95-24 9.50 24.00 TT $609x 4R-3AGFB7 136-161 13.60 16.10 TL $1,030x 8R-3AGFB5 136-28 13.60 28.00 TT $780x 6R-3AGFB3 149-24 14.90 24.00 TL $783x 6R-3AGFB4 169-24 16.90 24.00 TL $904x 6R-3AGFB8 184-161 18.40 16.10 TL $1,102x 8R-3AGFB10 184-26 18.40 26.00 TL $1,481x 12R-3AGFB11 231-26 23.10 26.00 TL $2,209x 10R-3AGFB12 231-26 23.10 26.00 TL $2,337x 12R-3AGFB14 245-32 24.50 32.00 TL $3,285x 12R-3AGFB13 28L-26 28.00 26.00 TL $3,118x 16R-3AGFB15 305L-32 30.50 32.00 TL $3,581x 12R-3AGFB16 305L-32 VA 30.50 32.00 TL $5,771x 24R-3
(Life =DT 800 RADIAL R-1W 5000 hrs )
AGFE1 320/90R42 12.60 42.00 TL $1,748x 139A8R-1WAGFE3 320/90R50 12.60 50.00 TL $2,207x 148A8R-1W
F-6(1) TT = includes tube, TL = no tube, NO = no tube
EP 1110-1-8, Vol. 330 Nov 09
F-7
EP CODE SIZE DESCRIPTION SIZE PER EACHCOSTTUBE
PLY (1)
TIRE DESCRIPTION AND TIRE COST
EP 1110-1-8(Vol. 8)
7/31/2009
INDUSTRY CODE
APPENDIX F
AGFE2 380/90R46 14.90 46.00 TL $2,482x 149A8R-1W
(Life =DT 812 RADIAL R-1W 5000 hrs )
AGFF1 380/70R24 14.90 24.00 TL $1,863x UKR-1WAGFF2 420/70R28 16.50 28.00 TL $1,171x UKR-1WAGFF3 480/70R30 18.90 30.00 TL $2,115x UKR-1W
(Life =DT 820 RADIAL R-1W 5000 hrs )
AGFG2 600/65R28 23.60 28.00 TL $2,923x UKR-1WAGFG1 620/75R26 24.40 26.00 TL $4,648x UKR-1WAGFG5 620/70R42 24.40 42.00 TL $3,727x UKR-1WAGFG3 650/75R34 25.60 34.00 TL $4,625x UKR-1WAGFG4 710/70R38 27.90 38.00 TL $3,984x UKR-1W
(Life =DYNA TORQUE RADIAL R-1 5000 hrs )
TGFH5 320/85R34 12.60 34.00 TL $1,556x 132DR-1AGFH7 149R30 14.90 30.00 TL $1,321x X3R-1AGFH9 149R34 14.90 34.00 TL $1,431x X3R-1AGFH15 149R46 14.90 46.00 TL $1,490x X3R-1TGFH6 385/85R34 15.20 34.00 TL $1,736x 141GR-1AGFH16 420/80R46 16.50 46.00 TL $2,971x UKR-1AGFH8 169R30 16.90 30.00 TL $1,762x X3R-1TGFH2 184R26 18.40 26.00 TL $1,842x X2R-1AGFH10 184R38 18.40 38.00 TL $1,320x X1R-1AGFH13 184R42 18.40 42.00 TL $1,644x X2R-1AGFH17 184R46 18.40 46.00 TL $1,981x X3R-1AGFH12 208R38 20.80 38.00 TL $1,819x X1R-1AGFH14 208R42 20.80 42.00 TL $1,925x X2R-1
(Life =DYNA TORQUE II R-1 5000 hrs )
AGFJ29 112-16 11.20 16.00 TL $375x 4R-1AGFJ6 136-24 13.60 24.00 TT $843x 8R-1AGFJ11 136-28 13.60 28.00 TL $937x 10R-1AGFJ41 136-28 13.60 28.00 TL $937x 10R-1AGFJ7 149-24 14.90 24.00 TL $721x 6R-1AGFJ31 149-24 14.90 24.00 TL $737x 8R-1AGFJ42 149-28 14.90 28.00 TL $1,160x 10R-1AGFJ8 169-24 16.90 24.00 TT $806x 6R-1AGFJ39 169-26 16.90 26.00 TL $1,479x 10R-1
F-7(1) TT = includes tube, TL = no tube, NO = no tube
EP 1110-1-8, Vol. 330 Nov 09
F-8
EP CODE SIZE DESCRIPTION SIZE PER EACHCOSTTUBE
PLY (1)
TIRE DESCRIPTION AND TIRE COST
EP 1110-1-8
(Vol. 8)
7/31/2009
INDUSTRY CODE
APPENDIX F
AGFJ43 169-28 16.90 28.00 TL $1,495x 10R-1AGFJ37 169-34 16.90 34.00 TT $1,016x 6R-1AGFJ23 169-38 16.90 38.00 TL $1,951x 14R-1AGFJ40 184-26 18.40 26.00 TL $1,419x 12R-1AGFJ18 184-34 18.40 34.00 TT $1,166x 8R-1AGFJ24 184-38 18.40 38.00 TT $1,249x 8R-1AGFJ19 208-34 20.80 34.00 TT $1,816x 8R-1AGFJ25 208-38 20.80 38.00 TT $1,643x 8R-1AGFJ27 208-42 20.80 42.00 TL $2,422x 10R-1AGFJ45 231-26 23.10 26.00 TL $2,337x 12R-1AGFJ20 231-34 23.10 34.00 TT $2,203x 8R-1AGFJ35 245-32 24.50 32.00 TL $2,536x 12R-1AGFJ34 28L-26 28.00 26.00 TL $3,055x 12R-1AGFJ36 305L-32 30.50 32.00 TL $3,665x 14R-1
(Life =INDUSTRIAL SURE GRIP R-4 5000 hrs )
AGFK1 169-30 16.90 30.00 TT $2,058x 10R-4AGFK3 184-28 18.40 28.00 TL $1,295x 12R-4
(Life =IT510 RADIAL R4 5000 hrs )
AGFL3 195LR24 19.50 24.00 TL $1,854x UKR-4
(Life =IT525 RADIAL R4 5000 hrs )
AGFM1 149-24 14.90 24.00 TL $871x 8R-4AGFM4 169-24 16.90 24.00 TL $1,005x 10R-4AGFM12 169-28 16.90 28.00 TL $1,122x 10R-4AGFM6 175L-24 17.50 24.00 TL $882x 10R-4AGFM5 184-24 18.40 24.00 TL $1,390x 12R-4AGFM7 195L-24 19.50 24.00 TL $1,252x 10R-4AGFM8 195L-24 19.50 24.00 TL $1,278x 12R-4AGFM9 21L-24 21.00 24.00 TL $1,542x 12R-4AGFM11 21L-24 21.00 24.00 TL $1,774x 16R-4AGFM14 21L-28 21.00 28.00 TL $1,821x 14R-4
(Life =POWER TORQUE R-1 5000 hrs )
AGFN1 6-12 6.00 12.00 TL $135x 4R-1
(Life =SPECIAL SURE GRIP R-2-0 5000 hrs )
AGFO2 149-24 14.90 24.00 TL $1,463x 6R-2
F-8(1) TT = includes tube, TL = no tube, NO = no tube
EP 1110-1-8, Vol. 330 Nov 09
F-9
EP CODE SIZE DESCRIPTION SIZE PER EACHCOSTTUBE
PLY (1)
TIRE DESCRIPTION AND TIRE COST
EP 1110-1-8(Vol. 8)
7/31/2009
INDUSTRY CODE
APPENDIX F
AGFO11 184-26 18.40 26.00 TL $1,470x 10R-2AGFO8 184-38 18.40 38.00 TL $2,057x 8R-2AGFO12 VA500/95D32 19.70 32.00 TL $4,124x 20R-2AGFO10 208-38 20.80 38.00 TL $1,840x 8R-2AGFO3 231-26 23.10 26.00 TL $2,356x 10R-2AGFO4 28L-26 28.00 26.00 TL $3,279x 12R-2AGFO6 305L-32 30.50 32.00 TL $4,670x 14R-2
(Life =SPECIAL SURE GRIP RADIAL R-2-0 5000 hrs )
AGFP8 320/90R46 12.60 46.00 TL $2,101x R-2AGFP9 340/85R46 13.40 46.00 TL $2,271x UKR-2AGFP1 169R28 16.90 28.00 TL $2,168x X2R-2AGFP2 169R30 16.90 30.00 TL $2,373x X3R-2AGFP3 184R38 18.40 38.00 TL $2,376x X1R-2AGFP5 184R42 18.40 42.00 TL $2,814x X2R-2AGFP7 184R46 18.40 46.00 TL $3,126x X3R-2AGFP4 208R38 20.80 38.00 TL $2,930x X2R-2AGFP6 208R42 20.80 42.00 TL $2,720x X2R-2
(Life =SUPER TRACTION RADIAL R-1W 5000 hrs )
AGFQ3 260/80R20 10.20 20.00 TL $551x 8R-1WAGFQ2 112R20 11.20 20.00 TL $899x UKR-1WAGFQ6 136R28 13.60 28.00 TL $1,733x UKR-1WAGFQ15 136R38 13.60 38.00 TL $2,074x UKR-1WAGFQ20 149R24 14.90 24.00 TL $1,861x X2R-1WAGFQ7 149R28 14.90 28.00 TL $1,909x UKR-1WAGFQ9 149R30 14.90 30.00 TL $1,545x UKR-1WAGFQ4 169R24 16.90 24.00 TL $2,553x UKR-1WAGFQ5 169R26 16.90 26.00 TL $2,604x UKR-1WAGFQ8 169R28 16.90 28.00 TL $1,873x UKR-1WAGFQ10 169R30 16.90 30.00 TL $1,991x UKR-1WAGFQ21 169R34 16.90 34.00 TL $2,557x X2R-1WAGFQ22 169R38 16.90 38.00 TT $2,683x X2R-1WAGFQ11 184R26 18.40 26.00 TL $1,951x UKR-1WAGFQ12 184R30 18.40 30.00 TL $2,853x UKR-1WAGFQ14 184R34 18.40 34.00 TL $3,053x UKR-1WAGFQ16 184R38 18.40 38.00 TL $2,030x UKR-1WAGFQ18 184R42 18.40 42.00 TL $2,678x UKR-1W
F-9(1) TT = includes tube, TL = no tube, NO = no tube
EP 1110-1-8, Vol. 330 Nov 09
F-10
EP CODE SIZE DESCRIPTION SIZE PER EACHCOSTTUBE
PLY (1)
TIRE DESCRIPTION AND TIRE COST
EP 1110-1-8(Vol. 8)7/31/2009
INDUSTRY CODE
APPENDIX F
AGFQ17 208R38 20.80 38.00 TL $2,833x UKR-1WAGFQ19 208R42 20.80 42.00 TL $2,368x UKR-1WAGFQ13 800/65R32 31.50 32.00 TL $4,532x UKR-1W
(Life =DURATORQUE R-1 5000 hrs )
AGFU1 149-28 14.90 28.00 TT $643x 6R-1AGFU2 169-30 16.90 30.00 TT $902x 6R-1AGFU3 184-30 18.40 30.00 TT $1,076x 8R-1AGFU5 184-38 18.40 38.00 TT $1,192x 8R-1
FARM, TERRA - 20" UP
(Life =SFT105 5000 hrs )
AHGA2 54-3100-26 31.00 26.00 TL $2,442x 10HF-1
(Life =SOF TRAC 5000 hrs )
AHGB3 38-1400-20 14.00 20.00 TL $626x 4HF-1AHGB2 41-1400-20 14.00 20.00 TL $675x 4HF-1AHGB1 44-1800-20 18.00 20.00 TL $941x 4HF-1
(Life =SUPER TERRA GRIP 5000 hrs )
AHGC1 38-1400-20 14.00 20.00 TL $768x 8HF-2AHGC2 42-2500-20 25.00 20.00 TL $2,259x 8HF-2AHGC7 54-3100-26 31.00 26.00 TL $6,785x 10HF-2AHGC12 67-3400-25 34.00 25.00 TL $5,629x 10HF-2AHGC11 66-4300-25 43.00 25.00 TL $9,219x 20HF-2
(Life =SUPER TERRA GRIP XT 5000 hrs )
AHGD1 42-2500-20 25.00 20.00 TL $3,430x 12HF-3AHGD5 48-3100-20 31.00 20.00 TL $4,352x 12HF-3AHGD6 66-4300-25 43.00 25.00 TL $6,269x 10HF-3AHGD7 73-4400-32 44.00 32.00 TL $9,815x 16HF-3
(Life =TUNDRA GRIP 5000 hrs )
AHGF2 66-4400-25 44.00 25.00 TL $7,285x 16HF-1AHGF1 66-4400-25 44.00 25.00 TL $8,106x 20HF-1
FARM, SPECIALTY
F-10(1) TT = includes tube, TL = no tube, NO = no tube
EP 1110-1-8, Vol. 330 Nov 09
F-11
EP CODE SIZE DESCRIPTION SIZE PER EACHCOSTTUBE
PLY (1)
TIRE DESCRIPTION AND TIRE COST
EP 1110-1-8(Vol. 8)
7/31/2009
INDUSTRY CODE
APPENDIX F
(Life =SOFTRAC 5000 hrs )
IJHB2 18-650-8 6.50 8.00 TL $102x 4TJHB3 18-850-10 8.50 10.00 TL $109x 4AJHB1 25-850-14 8.50 14.00 TL $214x 6HF-1AJHB5 27-850-15 8.50 15.00 TL $217x 4HF-1AJHB4 25-1050-15 10.50 15.00 TL $244x 4HF-1AJHB6 27-1050-15 10.50 15.00 TL $271x 4HF-1AJHB7 29-1250-15 12.50 15.00 TL $309x 4HF-1AJHB10 31-1250-15 12.50 15.00 TL $311x 4HF-1AJHB11 33-1250-15 12.50 15.00 TL $532x 4HF-1AJHB8 31-1350-15 13.50 15.00 TL $359x 4HF-1AJHB9 31-1550-15 15.50 15.00 TL $395x 4HF-1
(Life =SUPER TERRA GRIP 5000 hrs )
AJHC3 29-1250-15 12.50 15.00 TL $287x 6HF-2AJHC6 31-1550-15 15.50 15.00 TL $505x 8HF-2AJHC7 38-2000-16.1 20.00 16.00 TL $1,035x 8HF-2
(Life =SURE GRIP LUG 5000 hrs )
AJHD9 27-850-15 8.50 15.00 TL $244x 6HF-2AJHD1 10-165 10.00 16.50 TL $298x 6AJHD10 27-1050-15 10.50 15.00 TL $358x 6HF-2AJHD4 12-165 12.00 16.50 TL $443x 10 AJHD3 12-165 12.00 16.50 TL $394x 8AJHD5 14-175 14.00 17.50 TL $366x 10I-3AJHD7 15-195 15.00 19.50 TL $553x 12I-3AJHD6 15-195 15.00 19.50 TL $718x 12
(Life =IT 323 5000 hrs )
AJHE1 10-165 10.00 16.50 TL $374x 8AJHE3 12-165 12.00 16.50 TL $519x 10AJHE4 31-1550-15 15.50 15.00 TL $930x 8
(Life =POWER RIB 5000 hrs )
TJHJ1 18-850-8 8.50 8.00 TL $88x 4IJHJ2 20-1000-10 10.00 10.00 TL $186x 4
(Life =RALLY 5000 hrs )
TJHK1 480-8 4.80 8.00 TL $43x 4
F-11(1) TT = includes tube, TL = no tube, NO = no tube
EP 1110-1-8, Vol. 330 Nov 09
F-12
EP CODE SIZE DESCRIPTION SIZE PER EACHCOSTTUBE
PLY (1)
TIRE DESCRIPTION AND TIRE COST
EP 1110-1-8(Vol. 8)7/31/2009
INDUSTRY CODE
APPENDIX F
IJHK2 18-950-8 9.50 8.00 TL $201x 4
(Life =TERRA RIB 5000 hrs )
AJHM2 25-750-15 7.50 15.00 TL $221x 6HF-1AJHM4 27-950-15 9.50 15.00 TL $358x 10HF-1AJHM6 31-1350-15 13.50 15.00 TL $465x 8HF-1
(Life =ATV 5000 hrs )
TJHN1 AT21-7-10 7.00 10.00 TL $69x X3IJHN3 AT23-8-11 8.00 11.00 TL $146x 6TJHN5 AT24-9-11 9.00 11.00 TL $145x 6
(Life =TRACKER ATT 5000 hrs )
IJHT1 AT24-8-11 8.00 11.00 TL $161x X2IJHT2 AT24-10-11 10.00 11.00 TL $157x X2
INDUSTRIAL, MINE SERVICE
(Life =HARD ROCK LUG MINE & INDUSTRIAL 5000 hrs )
TKJC1 10.00-20 10.00 20.00 TT $807x 18
(Life =XTRA TRACTION LUG 5000 hrs )
AKJD2 8.25-15 8.25 15.00 TT $757x 16AKJD3 36-11x15(10.00L15) 10.00 15.00 TT $931x 16AKJD7 24x12x12 12.00 12.00 TL $752x 24AKJD6 35-15x15(14.50L-15) 14.50 15.00 TL $1,535x 32
(Life =XTRA TRACTION GRIP 5000 hrs )
AKJE1 32x15-15 12.00 15.00 TL $1,202x 20
OFF-THE-ROAD, MED & HEAVY COMMERCIAL, RADIAL
(Life =G-2 GRADER SERVICE - RL2F, SG2B 3200 hrs )
AMLA1 14.00R24 14.00 24.00 TL $828x X1G2
(Life =E-2 HAULAGE SERVICE - RL2F/GP2B RL2+ 2800 hrs )
AMLB1 17.5R25 17.50 25.00 TL $1,253x X1E/L/G3AMLB8 18.00R25 18.00 25.00 TL $4,403x X2L5AMLB2 20.5R25 20.50 25.00 TL $1,771x X1E/L/G3AMLB9 20.5R25 20.50 25.00 TL $1,771x X2E/L/G3AMLB5 20.5R25 20.50 25.00 TL $3,143x X2E/K 3T
F-12(1) TT = includes tube, TL = no tube, NO = no tube
EP 1110-1-8, Vol. 330 Nov 09
F-13
EP CODE SIZE DESCRIPTION SIZE PER EACHCOSTTUBE
PLY (1)
TIRE DESCRIPTION AND TIRE COST
EP 1110-1-8(Vol. 8)
7/31/2009
INDUSTRY CODE
APPENDIX F
AMLB15 21.00R35 21.00 35.00 TL $7,384x X2E4AMLB3 23.5R25 23.50 25.00 TL $2,488x X1E/L/G3AMLB10 23.5R25 23.50 25.00 TL $2,659x X2E/L/G3AMLB21 26.5R25 26.50 25.00 TL $5,530x X2E/L/G 3+TAMLB22 29.5R25 29.50 25.00 TL $6,607x X2E/L 3AMLB17 33.25R35 33.25 35.00 TL $10,195x X2E3AMLB23 40.5/75R39 40.50 39.00 TL $15,305x X2E3+
(Life =E-3 HAULAGE SERVICE - ROCK DESIGN RL3, RL3J, R 2800 hrs )
AMLC3 18.00R33 18.00 33.00 TL $4,226x X2E3+AMLC5 24.00R35 24.00 35.00 TL $8,329x X2E3+AMLC6 29.5R29 29.50 29.00 TL $7,546x X2E3AMLC7 33.25R35 33.25 25.00 TL $10,195x X2E3AMLC8 37.25R35 37.35 35.00 TL $12,390x X2E3AMLC9 37.5R39 37.50 39.00 TL $13,690x X2E3
(Life =E-4 RL4J/RL4 & RL4H/RL4 E4 5000 hrs )
AMLD1 12.00R24 12.00 24.00 TT $1,516x X3E4AMLD2 14.00R24 14.00 24.00 TL $1,661x X3E4AMLD3 14.00R25 14.00 25.00 TL $1,750x X3E4AMLD4 18.00R25 18.00 25.00 TL $3,722x X2E4AMLD5 18.00R33 18.00 33.00 TL $5,093x X2E4AMLD14 21.00R35 21.00 35.00 TL $7,384x X2E4AMLD15 24.00R35 24.00 25.00 TL $9,698x X2E4AMLD7 27.00R49 27.00 49.00 TL $13,602x X2E4AMLD8 30.00R51 30.00 51.00 TL $17,439x X2E4AMLD9 33.00R51 33.00 51.00 TL $21,535x X2E4AMLD10 36.00R51 36.00 51.00 TL $24,665x X2E4AMLD11 37.00R57 37.00 57.00 TL $44,480x X2E4AMLD12 40.00R57 40.00 57.00 TL $45,057x X2E4
(Life =MOBILE CRANE 5000 hrs )
AMLF1 445/80R25 (17.5R25) 17.50 25.00 TL $2,112x UKE/L/G3AMLF3 525/80R25 (20.5R25) 20.60 25.00 TL $1,771x UKE/L/G3
(Life =L-5 DOZER & LOADER SERVICE RL5K 8000 hrs )
AMLG1 20.5R25 20.50 25.00 TL $3,907x X1L5AMLG2 23.5R25 23.50 25.00 TL $4,819x X1L5
F-13(1) TT = includes tube, TL = no tube, NO = no tube
EP 1110-1-8, Vol. 330 Nov 09
F-14
EP CODE SIZE DESCRIPTION SIZE PER EACHCOSTTUBE
PLY (1)
TIRE DESCRIPTION AND TIRE COST
EP 1110-1-8(Vol. 8)7/31/2009
INDUSTRY CODE
APPENDIX F
(Life =SPECIAL SERVICE - AT2A 5000 hrs )
AMLH1 14.00R20 14.00 20.00 TL $1,173x 18E/L/G 3AMLH3 16.00R20 16.00 20.00 TL $1,764x 22E/L/G 3AMLH4 16.00R21 16.00 21.00 TL $196x 22E/L/G 3AMLH2 17.5R25 17.50 25.00 TL $1,253x X1E/L/G3AMLH6 22/65R25 22.00 25.00 TL $2,466x X1E/L/G3
OFF-THE-ROAD, MED & HEAVY COMMERCIAL, BIAS
(Life =INDUSTRIAL SURE GRIP MPT 5000 hrs )
ANMA1 10.5-20 10.50 20.00 TL $363x 10ANMA2 12.5-20 12.50 20.00 TL $464x 10
(Life =E-1 HRR 1A 2500 hrs )
ANMB1 14.00-25 14.00 25.00 TL $1,206x 20E3ANMB2 16.00-25 16.00 25.00 TL $2,154x 32E1
(Life =E-2 TRACTION EARTHMOVER SURE GRIP 2800 hrs )
ANMC3 18.00-25 18.00 25.00 TL $1,604x 16E7
(Life =E-3 ROCK SERVICE HARD ROCK LUG/HRL WC 2800 hrs )
ANME1 12.00-20 12.00 20.00 TT $883x 20E3ANME2 12.00-24 12.00 24.00 TT $844x 16E3ANME3 14.00-24 14.00 24.00 TT $1,583x 28E3ANME4 14.00-25 14.00 25.00 TL $1,206x 20E3ANME6 16.00-25 16.00 25.00 TL $1,752x 24E3
(Life =E-3 ROCK SERVICE SUPER HARD ROCK LUG 2800 hrs )
ANMF1 26.5-25 26.50 25.00 TL $5,110x 24L5ANMF4 29.5-25 29.50 25.00 TL $7,064x 28L5ANMF5 29.5-29 29.50 29.00 TL $6,156x 28L4ANMF6 29.5-29 29.50 29.00 TL $5,778x 34E3
(Life =E-3 ROCK SERVICE SHRL8 2800 hrs )
ANMG4 29.5-35 29.50 35.00 TL $6,077x 34E3ANMG1 33.25-29 33.25 29.00 TL $6,344x 26E3TNMG6 33.25-35 33.25 35.00 TL $9,551x 38E3ANMG7 37.25-35 37.25 35.00 TL $8,020x 36E3ANMG9 37.5-39 37.50 39.00 TL $8,961x 44E3
F-14(1) TT = includes tube, TL = no tube, NO = no tube
EP 1110-1-8, Vol. 330 Nov 09
F-15
EP CODE SIZE DESCRIPTION SIZE PER EACHCOSTTUBE
PLY (1)
TIRE DESCRIPTION AND TIRE COST
EP 1110-1-8(Vol. 8)
7/31/2009
INDUSTRY CODE
APPENDIX F
(Life =E-3 ROCK SERVICE ELV3A, ELV4B, ELV4/5A 2800 hrs )
ANMH4 18.00-25 18.00 25.00 TL $4,768x 40IND 5SANMH9 21.00-25 21.00 25.00 TL $4,544x 32IND 3
(Life =E-3 ROCK SERVICE HRL 3F 2800 hrs )
ANMJ2 33.25-35 33.25 35.00 TL $6,267x 32E3ANMJ5 37.25-35 37.25 35.00 TL $8,016x 36E3ANMJ6 37.5-39 37.50 39.00 TL $8,961x 44E3
(Life =E-3 ROCK SERVICE WRL 3A 2800 hrs )
ANML1 14.00-20 14.00 20.00 TT $1,253x 24E3ANML2 14.00-24 14.00 24.00 TT $1,330x 24E3
(Life =E-4 ROCK SERVICE HRL 4B 5000 hrs )
ANMN1 16.00-25 16.00 25.00 TL $2,182x 28E4ANMN3 18.00-33 18.00 33.00 TL $3,863x 32E4ANMN4 21.00-35 21.00 35.00 TL $5,616x 36E4ANMN5 24.00-35 24.00 35.00 TL $7,269x 36E4ANMN9 36.00-51 36.00 51.00 TL $23,181x 58E4
(Life =E-7 FLOTATION TYPE SAND RIB SRB 7A 3000 hrs )
TNMQ1 14.00-20 14.00 20.00 TL $581x 10E7TNMQ2 16.00-24 16.00 24.00 TL $1,510x 12E7TNMQ3 18.00-25 18.00 25.00 TL $2,057x 16E7
(Life =E-7 FLOTATION TYPE PAVER TIRE 3000 hrs )
ANMR1 1600-24 16.00 24.00 TL $1,235x 12E7
(Life =G-2 SGG2A 3200 hrs )
ANMT1 13.00-24 13.00 24.00 TL $408x 10G2ANMT10 13.00-24 13.00 24.00 TL $341x 12G2ANMT6 14.00-24 14.00 24.00 TL $381x 12G2ANMT8 16.00-24 16.00 24.00 TL $1,311x 12G2
(Life =G-2 SGLDL 2A L2 3200 hrs )
ANMV2 15.5-25 15.50 25.00 TL $516x 12L2/G2ANMV3 17.5-25 17.50 25.00 TL $540x 12L2/G2ANMV4 17.5-25 17.50 25.00 TL $698x 16L2/G2ANMV5 17.5-25 17.50 25.00 TL $900x 20L2/G2
F-15(1) TT = includes tube, TL = no tube, NO = no tube
EP 1110-1-8, Vol. 330 Nov 09
F-16
EP CODE SIZE DESCRIPTION SIZE PER EACHCOSTTUBE
PLY (1)
TIRE DESCRIPTION AND TIRE COST
EP 1110-1-8
(Vol. 8)
7/31/2009
INDUSTRY CODE
APPENDIX F
(Life =G-2 SGLEL 2A ES/L2/G2 3200 hrs )
ANMW1 20.5-25 20.50 25.00 TL $997x 12E/L/G2ANMW2 20.5-25 20.50 25.00 TL $1,077x 16E/L/G2ANMW4 23.5-25 23.50 25.00 TL $1,549x 12E/L/G2ANMW5 23.5-25 23.50 25.00 TL $1,764x 16E/L/G2
(Life =G-3 RKG 3A 3200 hrs )
TNMX1 14.00-24 14.00 24.00 TL $826x 14G2
(Life =L-2 DOZER/LOADER SERVICE TRACTION SG LUG DL 3200 hrs )
ANNA2 26.5-25 26.50 25.00 TL $3,273x 20L3
(Life =L-3 DOZER/LOADER SERVICE ROCK SERVICE E3/L3 3200 hrs )
ANNB1 20.5-25 20.50 25.00 TL $1,405x 12E/L 3ANNB2 20.5-25 20.50 25.00 TL $1,445x 16E/L 3ANNB5 23.5-25 23.50 25.00 TL $2,053x 16E/L 3ANNB6 23.5-25 23.50 25.00 TL $2,345x 20E/L 3
(Life =L-3 DOZER/LOADER SERVICE ROCK SHRL DL 3200 hrs )
ANNC1 26.5-25 26.50 25.00 TL $3,273x 20L3ANNC3 29.5-25 29.50 25.00 TL $6,156x 28L4
(Life =L-3 DOZER/LOADER SERVICE ROCK HRL DL 3A & 3F 3200 hrs )
ANND2 17.5-25 17.50 25.00 TL $652x 12L/G3ANND4 17.5-25 17.50 25.00 TL $1,066x 20L/G3
(Life =L-4 DOZER/LOADER SERVICE ROCK DEEP TREAD S 5000 hrs )
ANNE2 26.5-25 26.50 25.00 TL $3,273x 20L3ANNE4 29.5-25 29.50 25.00 TL $6,156x 28L4ANNE5 29.5-29 29.50 29.00 TL $5,778x 34E3
(Life =L-4 DOZER/LOADER SERVICE ROCK DEEP TREAD N 5000 hrs )
TNNG1 35/65-33 35.00 33.00 TL $13,905x 42L5
(Life =L-5 DOZER/LOADER SERVICE ROCK SUPER XTRA T 8000 hrs )
ANNL2 35/65-33 35.00 33.00 TL $10,727x 30L5ANNL4 41.25/70-39 41.25 39.00 TL $16,327x 42L5ANNL7 45/65-45 45.00 45.00 TL $27,141x 58L5
F-16(1) TT = includes tube, TL = no tube, NO = no tube
EP 1110-1-8, Vol. 330 Nov 09
F-17
EP CODE SIZE DESCRIPTION SIZE PER EACHCOSTTUBE
PLY (1)
TIRE DESCRIPTION AND TIRE COST
EP 1110-1-8(Vol. 8)
7/31/2009
INDUSTRY CODE
APPENDIX F
(Life =L-5 DOZER/LOADER SERVICE SMOOTH SMO SL5B 8000 hrs )
ANNN3 18.00-25 18.00 25.00 TL $2,939x 32IND 3
(Life =L-5 DOZER/LOADER SERVICE SMOOTH SUPER XTRA 8000 hrs )
ANNO1 21.00-25 21.00 25.00 TL $6,527x 32L5SANNO3 26.5-25 26.50 25.00 TL $6,332x 32L5SANNO4 29.5-25 29.50 25.00 TL $8,199x 28L5S
(Life =L-5 DOZER/LOADER SERVICE SMOOTH NSM DL5B 8000 hrs )
ANNP1 35/65-33 35.00 33.00 TL $9,813x 24L5
INDUSTRIAL, SOLID
(Life =SOLID, HIGH PERFORMANCE, OIL RESISTANT/STATI 5000 hrs )
IPPO5 10-3-61/4 Grip 3.00 10.00 NO $380xIPPO4 10-31/2-6 3.50 10.00 NO $294xIPPO18 12-31/2-8 3.50 12.00 NO $300xIPPO23 13-31/2-8 3.50 13.00 NO $340xIPPO32 15-31/2-111/4 3.50 15.00 NO $322xIPPO1 81/2-4-4 4.00 8.50 NO $371xIPPO10 10-4-61/2 4.00 10.00 NO $256xIPPO6 10-4-61/4 4.00 10.00 NO $299xIPPO19 12-4-8 4.00 12.00 NO $328xIPPO47 161/4-4-111/4 Lug 4.00 16.25 NO $405xIPPO30 14-41/2-8 4.50 14.00 NO $445xIPPO40 16-41/2-101/2 Lug 4.50 16.00 NO $483xIPPO2 9-5- 5 Grip 5.00 9.00 NO $388xIPPO12 10-5-61/2 5.00 10.00 NO $267xIPPO7 10-5-61/4 5.00 10.00 NO $299xIPPO13 101/2-5-5 5.00 10.50 NO $435xIPPO31 14-5-10 5.00 14.00 NO $408xIPPO33 15-5-111/4 5.00 15.00 NO $393xIPPO38 151/2-5-10 5.00 15.50 NO $457xIPPO41 16-5-101/2 5.00 16.00 NO $505xIPPO48 161/4-5-111/4 5.00 16.25 NO $436xIPPO53 17-5-121/8 5.00 17.00 NO $497xIPPO63 18-5-14 5.00 18.00 NO $444xIPPO58 18-5-121/8 5.00 18.00 NO $528x
F-17(1) TT = includes tube, TL = no tube, NO = no tube
EP 1110-1-8, Vol. 330 Nov 09
F-18
EP CODE SIZE DESCRIPTION SIZE PER EACHCOSTTUBE
PLY (1)
TIRE DESCRIPTION AND TIRE COST
EP 1110-1-8(Vol. 8)7/31/2009
INDUSTRY CODE
APPENDIX F
IPPO68 20-5-16 5.00 20.00 NO $591xIPPO73 21-5-15 5.00 21.00 NO $615xIPPO79 22-5-16 5.00 22.00 NO $657xIPPO8 10-6-61/4 6.00 10.00 NO $360xIPPO14 101/2-6-5 Lug 6.00 10.50 NO $453xIPPO34 15-6-111/4 Grip 6.00 15.00 NO $585xIPPO42 16-6-101/2 6.00 16.00 NO $566xIPPO49 161/4-6-111/4 6.00 16.25 NO $515xIPPO59 18-6-121/8 6.00 18.00 NO $594xIPPO69 20-6-16 6.00 20.00 NO $629xIPPO74 21-6-15 6.00 21.00 NO $769xIPPO80 22-6-16 6.00 22.00 NO $775xIPPO22 12-61/2-8 6.50 12.00 NO $454xIPPO9 10-7-61/4 7.00 10.00 NO $420xIPPO35 15-7-111/4 7.00 15.00 NO $520xIPPO43 16-7-101/2 7.00 16.00 NO $649xIPPO50 161/4-7-111/4 7.00 16.25 NO $641xIPPO60 18-7-121/8 7.00 18.00 NO $619xIPPO70 20-7-16 7.00 20.00 NO $761xIPPO75 21-7-15 7.00 21.00 NO $789xIPPO81 22-7-16 7.00 22.00 NO $931xIPPO94 26-7-20 7.00 26.00 NO $1,164xIPPO36 15-8-111/4 8.00 15.00 NO $622xIPPO61 18-8-121/8 8.00 18.00 NO $727xIPPO66 18-8-14 8.00 18.00 NO $758xIPPO71 20-8-16 8.00 20.00 NO $812xIPPO76 21-8-15 8.00 21.00 NO $962xIPPO82 22-8-16 8.00 22.00 NO $1,004xIPPO37 15-9-111/4 9.00 15.00 NO $828xIPPO67 18-9-14 9.00 18.00 NO $800xIPPO62 18-9-121/8 9.00 18.00 NO $860xIPPO72 20-9-16 9.00 20.00 NO $1,102xIPPO77 21-9-15 9.00 21.00 NO $1,150xIPPO116 22-9-16 9.00 22.00 NO $1,141xIPPO83 22-9-16 9.00 22.00 NO $1,141xIPPO92 22-10-173/4 10.00 22.00 NO $1,380xIPPO84 22-10-16 10.00 22.00 NO $1,543x
F-18(1) TT = includes tube, TL = no tube, NO = no tube
EP 1110-1-8, Vol. 330 Nov 09
F-19
EP CODE SIZE DESCRIPTION SIZE PER EACHCOSTTUBE
PLY (1)
TIRE DESCRIPTION AND TIRE COST
EP 1110-1-8(Vol. 8)
7/31/2009
INDUSTRY CODE
APPENDIX F
IPPO95 28-10-22 10.00 28.00 NO $1,854xIPPO99 36-10-30 10.00 36.00 NO $1,570xIPPO78 21-12-15 12.00 21.00 NO $1,849xIPPO86 22-12-16 12.00 22.00 NO $1,622xIPPO96 28-12-22 12.00 28.00 NO $2,411xIPPO87 22-14-16 14.00 22.00 NO $1,813xIPPO93 22-14-173/4 14.00 22.00 NO $2,096xIPPO88 22-16-16 16.00 22.00 NO $1,998xIPPO98 28-16-22 16.00 28.00 NO $3,423x
CONVEYOR/LOADER BELTING
(Life =CONVEYOR BELTING (GOODYEAR EP) 5000 hrs )
AZZA1 Conveyor Belting 24.00 50.00 NO $610x 2AZZA2 Conveyor Belting 24.00 60.00 NO $731x 2AZZA3 Conveyor Belting 24.00 70.00 NO $854x 2AZZA4 Conveyor Belting 24.00 80.00 NO $975x 2AZZA5 Conveyor Belting 24.00 90.00 NO $1,098x 2AZZA6 Conveyor Belting 24.00 100.00 NO $1,219x 2AZZA7 Conveyor Belting 24.00 110.00 NO $1,341x 2AZZA8 Conveyor Belting 24.00 120.00 NO $1,463x 2AZZA9 Conveyor Belting 24.00 130.00 NO $1,585x 2AZZA10 Conveyor Belting 24.00 140.00 NO $1,707x 2AZZA11 Conveyor Belting 24.00 150.00 NO $1,829x 2AZZA12 Conveyor Belting 30.00 50.00 NO $762x 2AZZA13 Conveyor Belting 30.00 60.00 NO $914x 2AZZA14 Conveyor Belting 30.00 70.00 NO $1,067x 2AZZA15 Conveyor Belting 30.00 80.00 NO $1,219x 2AZZA16 Conveyor Belting 30.00 90.00 NO $1,372x 2AZZA17 Conveyor Belting 30.00 100.00 NO $1,524x 2AZZA18 Conveyor Belting 30.00 110.00 NO $1,677x 2AZZA19 Conveyor Belting 30.00 120.00 NO $1,829x 2AZZA20 Conveyor Belting 30.00 130.00 NO $1,981x 2AZZA21 Conveyor Belting 30.00 140.00 NO $2,134x 2AZZA22 Conveyor Belting 30.00 150.00 NO $2,286x 2AZZA23 Conveyor Belting 36.00 50.00 NO $914x 2AZZA24 Conveyor Belting 36.00 60.00 NO $1,098x 2AZZA25 Conveyor Belting 36.00 70.00 NO $1,280x 2
F-19(1) TT = includes tube, TL = no tube, NO = no tube
EP 1110-1-8, Vol. 330 Nov 09
F-20
EP CODE SIZE DESCRIPTION SIZE PER EACHCOSTTUBE
PLY (1)
TIRE DESCRIPTION AND TIRE COST
EP 1110-1-8(Vol. 8)7/31/2009
INDUSTRY CODE
APPENDIX F
AZZA26 Conveyor Belting 36.00 80.00 NO $1,463x 2AZZA27 Conveyor Belting 36.00 90.00 NO $1,646x 2AZZA28 Conveyor Belting 36.00 100.00 NO $1,829x 2AZZA29 Conveyor Belting 36.00 110.00 NO $2,012x 2AZZA30 Conveyor Belting 36.00 120.00 NO $2,195x 2AZZA31 Conveyor Belting 36.00 130.00 NO $2,378x 2AZZA32 Conveyor Belting 36.00 140.00 NO $2,560x 2AZZA33 Conveyor Belting 36.00 150.00 NO $2,743x 2AZZA34 Conveyor Belting 42.00 50.00 NO $1,067x 2AZZA35 Conveyor Belting 42.00 60.00 NO $1,280x 2AZZA36 Conveyor Belting 42.00 70.00 NO $1,493x 2AZZA37 Conveyor Belting 42.00 80.00 NO $1,707x 2AZZA38 Conveyor Belting 42.00 90.00 NO $1,921x 2AZZA39 Conveyor Belting 42.00 100.00 NO $2,134x 2AZZA40 Conveyor Belting 42.00 110.00 NO $2,347x 2AZZA41 Conveyor Belting 42.00 120.00 NO $2,560x 2AZZA42 Conveyor Belting 42.00 130.00 NO $2,774x 2AZZA43 Conveyor Belting 42.00 140.00 NO $2,988x 2AZZA44 Conveyor Belting 42.00 150.00 NO $3,201x 2AZZA45 Conveyor Belting 48.00 50.00 NO $1,458x 3AZZA46 Conveyor Belting 48.00 60.00 NO $1,750x 3AZZA47 Conveyor Belting 48.00 70.00 NO $2,042x 3AZZA48 Conveyor Belting 48.00 80.00 NO $2,333x 3AZZA49 Conveyor Belting 48.00 90.00 NO $2,625x 3AZZA50 Conveyor Belting 48.00 100.00 NO $2,917x 3AZZA51 Conveyor Belting 48.00 110.00 NO $3,209x 3AZZA52 Conveyor Belting 48.00 120.00 NO $3,501x 3AZZA53 Conveyor Belting 48.00 130.00 NO $3,791x 3AZZA54 Conveyor Belting 48.00 140.00 NO $4,083x 3AZZA55 Conveyor Belting 48.00 150.00 NO $4,375x 3AZZA56 Conveyor Belting 60.00 50.00 NO $2,862x 4AZZA57 Conveyor Belting 60.00 60.00 NO $3,434x 4AZZA58 Conveyor Belting 60.00 70.00 NO $4,007x 4AZZA59 Conveyor Belting 60.00 80.00 NO $4,580x 4AZZA60 Conveyor Belting 60.00 90.00 NO $5,153x 4AZZA61 Conveyor Belting 60.00 100.00 NO $5,725x 4AZZA62 Conveyor Belting 60.00 110.00 NO $6,297x 4
F-20(1) TT = includes tube, TL = no tube, NO = no tube
EP 1110-1-8, Vol. 330 Nov 09
F-21
EP CODE SIZE DESCRIPTION SIZE PER EACHCOSTTUBE
PLY (1)
TIRE DESCRIPTION AND TIRE COST
EP 1110-1-8(Vol. 8)
7/31/2009
INDUSTRY CODE
APPENDIX F
AZZA63 Conveyor Belting 60.00 120.00 NO $6,869x 4AZZA64 Conveyor Belting 60.00 130.00 NO $7,442x 4AZZA65 Conveyor Belting 60.00 140.00 NO $8,015x 4AZZA66 Conveyor Belting 60.00 150.00 NO $8,587x 4
F-21(1) TT = includes tube, TL = no tube, NO = no tube
EP 1110-1-8, Vol. 330 Nov 09
F-22
APPENDIX G TIRE LIFE AND TIRE WEAR FACTORS
SECTION I. TIRE WEAR FACTORS The tire wear factors used in this pamphlet are listed in appendix D. The “useful life” of a new tire is the product of Condition Factors (CF) from I through V, the Wheel Position Factor (WPF), the Grade Factor (GF) (for Drive Tires only) and the Miscellaneous Condition (MC). These factors provide a percentage reduction to the maximum tire life. See chapter 2 for tire cost methodology. Condition Factors, Wheel Position Factors, Grade Factor, and Miscellaneous Condition are derived from the Caterpillar Performance Handbook. The factors shown below are examples specifically for a rear dump wagon.
Condition Factors (CF): Average Severe I. Maintenance 0.981 0.763 II. Speed 0.872 0.763 III. Curves 0.981 0.872 IV. Surface Condition 0.981 0.763 V. Loads 1.090 0.709 CF Product of the factors 0.897 0.275 (I x II x III x IV x V)
VI. Wheel Position Factors (WPF): WPF-FT Front Tire (FT) 0.981 0.981 WPF-DTR Drive Tire (DT) - Rear Dump 0.818 0.709 WPF-TT Trailing Tire (TT) 1.090 1.090 VII. Grade Factor (GF) (Drive Tires Only) 0.981 0.763 VIII. Miscellaneous Condition (MC) 1.090 0.981
EP 1110-1-8, Vol. 330 Nov 09
G-2
APPENDIX G TIRE LIFE AND TIRE WEAR FACTORS (Continued)
SECTION I. TIRE WEAR FACTORS (Continued)
Example: Final Tire Wear Factors for Wagon, Rear Dump (See Appendix D, Category W15)
Average Severe Front Tire - Average = (CF = 0.897)(WPF-FT = 0.981)(MC = 1.090) 0.96 Front Tire - Severe = (CF = 0.275)(WPF-FT = 0.981)(MC = 0.927) 0.60 Drive Tire - Average = (CF = 0.897)(WPF-DTR = 0.763)(GF = 0.981)(MC = 1.090) 0.78 Drive Tire - Severe = (CF = 0.275)(WPF-DTR = 0.732)(GF = 0.763)(MC = 0.927) 0.15 Trailing Tire - Average = (CF = 0.897)(WPF-TT = 1.090)(MC = 1.090) 1.07 Trailing Tire - Severe = (CF = 0.275)(WPF-TT = 1.090)(MC = 0.927) 0.29 SECTION II. MAXIMUM TIRE LIFE Maximum tire life is used in the formula to determine tire wear cost and is located in Appendix F by type of tire.
EP 1110-1-8, Vol. 330 Nov 09
G-3
APPENDIX HMANUFACTURER LIST
EP 1110-1-8(Vol. 8)
7/31/2009
CODE MANUFACTURER
A1 ALLIED-GATOR, INC.-
A2 ASV INC.-
A3 AMERICAN PILEDRIVING EQUIPMENT, INC.-
A4 ATLAS COPCO WAGNER INC.-
AA AMERICAN AUGERS, INC.-
AB ALLMAND BROTHERS INC.-
AC ACE ENTERPRISES-
AD ACKER DRILL COMPANY INC.-
AE AEROIL PRODUCTS COMPANY, INC.-
AF AIRPLACO EQUIPMENT CO., INC.-
AG ARROW-MASTER, INC.-
AH AUTO CRANE CO.-
AI AMIDA INDUSTRIES, INC.-
AJ ALLEN ENGINEERING CORP.-
AK TYLER EQUIPMENT CO.-
AL ALLENTOWN EQUIPMENT-
AM AMERICAN CRANE CORPORATION (TEREX)-
AN ATLANTIC-
AO ALKOTA CLEANING SYSTEMS, INC.-
AP PECCO AND WOLFF TOWER CRANES (MORROW)-
AQ AQUATICS UNLIMITED-
AR AMERICAN ROAD MACHINERY, INC.-
AS ATLAS COPCO CONSTRUCTION TOOLS INC.-
AT ANDERSON MAVOR INC.-
AU ALLIED CONSTRUCTION PRODUCTS-
AV ALIVA LTD.-
AW AIRMAN (HOKUETSU INDUSTRIES CO. LTD.)-
AX AMERICAN COMPACTION EQUIPMENT, INC.-
H-1
EP 1110-1-8, Vol. 330 Nov 09
H-2
APPENDIX HMANUFACTURER LIST
EP 1110-1-8(Vol. 8)7/31/2009
CODE MANUFACTURER
AY KOMLINE-SANDERSON ENGINEERING CO.-
AZ ALLIS-CHALMERS CORP.-
BA BADGER EQUIPMENT CO.-
BB BASCO-
BC BOCK ENGINEERED PRODUCTS, INC.-
BD BRODERSON MANUFACTURING CORPORATION-
BE INGERSOLL RAND MATERIAL HANDLING-
BF BENFORD-
BG BARBER-GREENE COMPANY-
BI BOR-IT MANUFACTURING COMPANY INC.-
BJ BURKEEN MANUFACTURING CO.-
BK BLAW KNOX CONSTRUCTION EQUIPMENT CORP.-
BL US FILTER/BLASTRAC-
BM BROCE MANUFACTURING COMPANY-
BN BANDIT INDUSTRIES, INC.-
BO COMPACTION AMERICA (BOMAG)-
BQ BELL EQUIPMENT NORTH AMERICA INC .-
BR BROOKVILLE MINING EQUIPMENT CORP.-
BS BALDERSON, INC.-
BT BREAKER TECHNOLOGY INC.-
BU BUSH HOG-
BW BOWIE INDUSTRIES, INC.-
BX BIL-JAX, INC.-
C1 COYOTE LOADER SALES, INC.-
C2 CARELIFT EQUIPMENT-
C3 TIME CONDOR CORPORATION-
C4 CATERPILLAR LIFT TRUCKS,-
C5 Construction Equipment Company-
H-2
EP 1110-1-8, Vol. 330 Nov 09
H-3
APPENDIX HMANUFACTURER LIST
EP 1110-1-8(Vol. 8)
7/31/2009
CODE MANUFACTURER
CA CATERPILLAR INC. ( MACHINE DIVISION)-
CB CONSOLIDATED BALING MACHINE COMPANY, INC-
CC CEMEN TECH-
CD CDS GROUP-
CE ATHEY PRODUCTS CORPORATION-
CF CGR COMPACTING-
CG CHEMGROUT, INC.-
CH CHAMPION ROAD MACHINERY-PRO PAV (WIRTGEN-
CI CHIPMORE MANUFACTURING CO., INC.-
CJ COLD JET-
CK CHICAGO PNEUMATIC TOOL CO.-
CL CON-E-CO-
CM CLEMCO INDUSTRIES CORPORATION-
CN CEMEN TECH, INC.-
CO WASTE CONTROL SYSTEMS, INC.-
CP CRISAFULLI PUMP-
CQ CUSHION CUT, INC.-
CR CAMLEVER-
CS CASE CORPORATION-
CT CLEVELAND TRENCHER-
CU WASTEQUIP CUSCO INDUSTRIES-
CV CONMACO, INC.-
CW TEREX - CMI (TEREX ROADBUILDING)-
CX CMC (CONSTRUCTION MACHINERY COMPANY)-
CY CENTRIC-
CZ CLYDE IRON WORKS-
DA ELCO INTERNATIONAL INC.-
DD DELTA DREDGE & PUMP CORP.-
H-3
EP 1110-1-8, Vol. 330 Nov 09
H-4
APPENDIX HMANUFACTURER LIST
EP 1110-1-8(Vol. 8)7/31/2009
CODE MANUFACTURER
DE DEMOLITION TECHNOLOGIES-
DF DURA FLOAT-
DG DAINONG HEAVY INDUSTRIES, INC.-
DH DAEWOO HEAVY INDUSTRIES LTD.-
DI DICKSON INDUSTRIES INC.-
DJ CATERPILLAR/DJB-
DL PILECO, INC.-
DO DOSCO CORPORATION-
DR DRESSER MINING EQUIPMENT-
DS DREDGING SUPPLY COMPANY (DSC)-
DT DRILTECH, INC. (SANDVIK)-
DW DITCH WITCH(The Charles Machine Works)I-
DY DYNAPAC DIVISION - SVEDALA INDUSTRIES-
EA EAGER BEAVER-
EC ELGIN SWEEPER COMPANY-
ED EQUIPMENT DEVELOPMENT CO., INC. (EDCO)-
EI EIMCO JARVIS CLARK-
EJ CEDARAPIDS INC., A TEREX COMPANY-
EL ELLICOTT MACHINE CORPORATION-
EM EXCEL MACHINERY LTD.-
EP ENVIRO-PAK-
ES ESCO CORPORATION-
ET E. D. ETNYRE & CO.-
EU EUCLID INDUSTRIES, INC.-
EX EXCEL INDUSTRIES, INC.-
EZ E-Z DRILL, INC.-
FC FERMEC NORTH AMERICA LTD., A TEREX CO.-
FE FELKER (TARGET)-
H-4
EP 1110-1-8, Vol. 330 Nov 09
H-5
APPENDIX HMANUFACTURER LIST
EP 1110-1-8(Vol. 8)
7/31/2009
CODE MANUFACTURER
FG FINN CORPORATION-
FH FRUEHAUF TRAILER CORPORATION-
FI FIATALLIS-
FK FRANKLIN TREEFARMER-
FL FLETCHER MINING EQUIPMENT-
FN NEW HOLLAND NORTH AMERICA, INC.-
FO FORD MOTOR COMPANY-
FR FERGUSON MANUFACTURING & EQUIPMENT-
FS FIVE STAR MANUFACTURING CO/ELGIN SWEEPER-
FU FURUKAWA CO.,LTD.-
GA GRADALL COMPANY-
GB GAR-BRO MANUFACTURING COMPANY-
GC GEHL COMPANY-
GD GARDNER-DENVER INDUSTRIAL MACHINES-
GE GENSCO AMERICA CO. LTD.-
GF GRIFFIN DEWATERING CORP.-
GH GEITH INC.-
GI GALION DIVISION-
GJ GENIE INDUSTRIES-
GL GARLOCK EQUIPMENT CO.-
GM GMC AND CHEVROLET-
GN GALION DUMP BODIES, INC.-
GO GOMACO CORPORATION-
GR GORMAN-RUPP COMPANY-
GT GILCREST EQUIPMENT COMPANY-
GV GROVE CRANES (MANITOWOC)-
GW GROVE MANLIFT (JLG)-
HA HAZCO SERVICES, INC.-
H-5
EP 1110-1-8, Vol. 330 Nov 09
H-6
APPENDIX HMANUFACTURER LIST
EP 1110-1-8(Vol. 8)7/31/2009
CODE MANUFACTURER
HB HAWCO MANUFACTURING COMPANY, LLC-
HC HAMM COMPACTORS, INC.-
HD HYDRAULIC POWER SYSTEMS, INC.-
HE HENDRIX MANUFACTURING COMPANY, INC.-
HF HYDRA-MAC INTERNATIONAL, INC.-
HH ESG MANUFACTURING H&H PUMP & DREDGE-
HI HITACHI CONSTRUCTION MACHINERY-
HM H&M VIBRO, INC.-
HN HINO DIESEL TRUCKS (U.S.A.) INC.-
HO RIVERSIDE PUMP MANUFACTURING-
HP COMPACTION AMERICA-
HQ HYPAC COMPACTION EQUIPMENT-
HR HYDROCAL INC.-
HU HYUNDAI CONSTRUCTION EQUIPMENT-
HW HEWITT-ROBINS-
HY HYSTER CO.-
HZ HOFFCO-COMET-
IA INGERSOLL RAND ROTARY-REC COMPRESSOR DIV-
IB INGERSOLL RAND ROTARY DRILL DIV-
IC INTERNATIONAL CONSTRUCTION EQUIPMENT,INC-
ID KOMATSU DRESSER-
IE IDEAL MANUFACTURING, INC.-
IF INGERSOLL RAND PORTABLE COMPRESSOR DIV-
IG INGRAM COMPACTING, LLC-
IH NAVISTAR INTERNATIONAL TRANSPORTATION-
IM INNOVATIVE MATERIAL SYSTEMS, INC. (IMS)-
IN INGERSOLL RAND CO.-
IP INGERSOLL RAND ROAD MACHINERY DIV-
H-6
EP 1110-1-8, Vol. 330 Nov 09
H-7
APPENDIX HMANUFACTURER LIST
EP 1110-1-8(Vol. 8)
7/31/2009
CODE MANUFACTURER
IR INGERSOLL RAND ROCK DRILL DIV-
IS INSLEY DIVISION-
IT NAVISTAR INTERNATIONAL CORPORATION-
JC JCB INC.-
JD DEERE & COMPANY-
JE JCL EQUIPMENT CO.-
JL JLG INDUSTRIES, INC.-
JM JEFFREY MINING MACHINERY DIVISION-
JO C. S. JOHNSON COMPANY-
JR JRB COMPANY INC.-
JS JOHNSTON SWEEPER COMPANY-
JU ATI-Bell-
KA KAWASAKI LOADERS, INC.-
KB KOLBERG - PIONEER, INC-
KC KOBELCO AMERICA INC.-
KD K-D MANITOU, INC.-
KE KENWORTH TRUCK COMPANY-
KF KNAPHEIDE MANUFACTURING CO.-
KH KOHLER COMPANY-
KI KLEIN PRODUCTS, INC.-
KK KEENE ENGINEERING INC.-
KL KOLMAN / ATHEY DIV.-
KM Komatsu America International Company-
KN KENT DEMOLITION TOOLS-
KO KOEHRING CRANES, INC.-
KP KOCH-WATER-
KR KORI CORPORATION-
KU KUBOTA TRACTOR CORPORATION-
H-7
EP 1110-1-8, Vol. 330 Nov 09
H-8
APPENDIX HMANUFACTURER LIST
EP 1110-1-8(Vol. 8)7/31/2009
CODE MANUFACTURER
KW KERSHAW MFG., CO.-
KZ KEIZER TECHNOLOGIES AMERICAS, INC-
LA LAYTON MANUFACTURING COMPANY-
LB LINK-BELT CONSTRUCTION EQUIPMENT CO.-
LC LINCOLN ELECTRIC COMPANY-
LD LEE-BOY-
LE LELY PACIFIC, INC.-
LF LOFTNESS / US ATTACHMENTS-
LG LITTLE GIANT CRANE & SHOVEL INC.-
LH MORROW EQUIPMENT COMPANY, LLC-
LI LINK-BELT CONSTRUCTION EQUIPMENT COMPANY-
LK LIFTKING INDUSTRIES, INC.-
LL OMNIQUIP, LULL-
LN LONDON MACHINERY INC.-
LO LORAIN CRANES DIVISION-
LS LAKE SHORE MINING EQUIPMENT INC.-
LU LABOUNTY MANUFACTURING,-
LY BOART LONGYEAR COMPANY-
LZ LIEBHERR CONSTRUCTION EQUIPMENT CO.-
M1 MANITEX - MANITOWOC BOOM TRUCKS GROUP-
M2 MAULDIN - CALDER BROTHERS CORP.-
M3 MAYCO PUMP - MULTIQUIP INC.-
M4 MITCHELL INDUSTRIAL TIRE COMPANY (MITCO)-
MA MANITOWOC ENGINEERING CO.-
MB M-B COMPANIES, INC.-
MC VME NORTH AMERICA-
MD MDI/YUTANI-
ME MELROE COMPANY/BOBCAT-
H-8
EP 1110-1-8, Vol. 330 Nov 09
H-9
APPENDIX HMANUFACTURER LIST
EP 1110-1-8(Vol. 8)
7/31/2009
CODE MANUFACTURER
MF MF INDUSTRIAL-
MG McMASTER-CARR-
MH MITSUBISHI FUSO TRUCK OF AMERICA-
MI MITSUBISHI CONSTRUCTION EQUIP.-
MJ MILLER SPREADER CO.-
MK MKT MANUFACTURING, INC.-
ML ITT MARLOW PUMPS-
MM MACO-MUEDON-
MN GRANUTE-SATURN SYSTEMS(MAC CORPORATION)-
MO MORGEN MANUFACTURING CO.-
MP MIDLAND MACHINERY CO-
MQ MORBARK, INC.-
MR FOREMOST MOBILE DRILLING COMPANY, INC.-
MS MUSTANG UNITS COMPANY-
MT MACK TRUCKS, INC.-
MU MULTIQUIP, INC.-
MV MAYVILLE ENGINEERING CO., INC.-
MW M-B-W, INC.-
MX MAXON INDUSTRIES-
MY MIDLAND MANUFACTURING INC.-
MZ MARINE INLAND FABRICATORS-
NA NAGANO - LELY CORP.-
NB NASCO EQUIPMENT CO. INC.-
NC NATIONAL CRANE CORPORATION-
NE NEAL MANUFACTURING COMPANY, INC-
NI NIFTYLIFT INC. - USA-
NL NLB CORPORATION-
NO NORTHWEST ENGINEERING COMPANY-
H-9
EP 1110-1-8, Vol. 330 Nov 09
H-10
APPENDIX HMANUFACTURER LIST
EP 1110-1-8(Vol. 8)7/31/2009
CODE MANUFACTURER
NP NPK CONSTRUCTION EQUIPMENT-
OE OLIN ENGINEERING, INC.-
OK O & K ORENSTEIN & KOPPEL INC.-
OL OLYMPYK CHAIN SAWS-
ON ONAN CORPORATION-
PA PALFINGER INC.-
PB PETTIBONE MICHIGAN LLC-
PC GETMAN BROTHERS MFG. COMPANY-
PE PETERBILT MOTORS COMPANY-
PH P & H-
PI PIQUA ENGINEERING-
PL PRO-LINE / ANVIL ATTACHMENTS-
PN PEMBERTON, INC.-
PO PROGRESSIVE DEVELOPMENT INC.-
PP PACIFIC RUBBER-
PR USFILTER PERRIN PRODUCTS-
PS POWER CURBERS, INC.-
PT PATENT CONSTRUCTION SYSTEMS-
PU PUTZMEISTER INC.-
PW POWERSCREEN INTERNATIONAL DISTRIBUTION LTD-
RA METSO MINERALS-
RC JOHNSON-ROSS (TEREX ROADBUILDING)-
RD REEDRILL (TEREX)-
RE NORSTAR PRODUCTS INTERNATIONAL, INC.-
RI REYNOLDS INTERNATIONAL, L.P.-
RK RAPID MIX-
RM ROME PLOW CO.-
RN ALLIED SYSTEMS COMPANY (RANGER)-
H-10
EP 1110-1-8, Vol. 330 Nov 09
H-11
APPENDIX HMANUFACTURER LIST
EP 1110-1-8(Vol. 8)
7/31/2009
CODE MANUFACTURER
RO ROBBINS COMPANY-
RQ REED MANUFACTURING-
RR RAMMER - GR COSTRUTTORI - SANDVIK-
RS ROSCO, A LeeBoy COMPANY-
RT ROADTEC ( ASTEC INDUSTRIES COMPANY)-
RX RAMMAX MACHINERY CO.-
S1 STANLEY HYDRAULIC TOOLS-
S2 SCHRAMM, INC-
S3 CHAMPION ROAD MACHINERY - SUPERPAC CO.-
S4 SUPERIOR INDUSTRIES, AN ASTEC COMPANY-
S5 SOMAT WASTE REDUCTION TECHNOLOGY-
S6 SUPERIOR TIRE & RUBBER CORP.-
SA SAUERMAN (NATIONAL OILWELL VARCO)-
SB SCAT TRAK - OMNIQUIP - TEXTRON INC.-
SC SCHWING AMERICA INC.-
SD SIOUX STEAM CLEANER CORPORATION-
SE SEALMASTER, INC.-
SF SECO CORPORATION-
SG STONE CONSTRUCTION EQUIPMENT, INC.-
SH SHRED-TECH LIMITED-
SI SAKAI AMERICA, INC.-
SJ SKYJACK, INC.-
SK LTV ENERGY PRODUCTS (SKAGIT)-
SL SHUTTLELIFT, INC.-
SM SEAARK MARINE-
SN STEPHENS MANUFACTURING CO., INC.-
SO SOUTHWEST CONSTRUCTION EQUIPMENT CO.-
SP SPRAGUE AND HENWOOD-
H-11
EP 1110-1-8, Vol. 330 Nov 09
H-12
APPENDIX HMANUFACTURER LIST
EP 1110-1-8(Vol. 8)7/31/2009
CODE MANUFACTURER
SQ SCHAEFF INC.-
SR SULLAIR CORPORATION-
SS SAMSUNG CONSTRUCTION EQUIPMENT AMERICA-
ST STOW MANUFACTURING, INC.-
SU SULLIVAN-PALATEK, INC.-
SV SOMERO ENTERPRISES, INC.-
SW SNORKEL-
SX SELLICK EQUIPMENT LIMITED-
SY SKY TRAK - OMNIQUIP - TEXTRON INC.-
SZ STRATO-LIFT INTERNATIONAL CORP.-
TA TAMPO MANUFACTURING CO., INC.-
TB TERRAMITE CONSTRUCTION EQUIPMENT-
TC TCM-
TD TADANO AMERICA CORPORATION-
TE TEREX CORPORATION-
TF THOMAS EQUIPMENT LTD.-
TG TIMBCO HYDRAULICS, INC.-
TH TEEMARK CORPORATION-
TI TIMBERJACK, A JOHN DEERE COMPANY-
TJ TRAMAC-
TK TAKEUCHI MFG. (U.S.), LTD-
TL BREAKER TECHNOLOGY, INC. (AN ASTEC CO.)-
TM TESMEC USA, INC.-
TO TORO-
TR TEREX MINING-
TS TELSMITH INC.-
TT TRAIL KING INDUSTRIES, INC.-
TU TITAN INTERNATIONAL, INC.-
H-12
EP 1110-1-8, Vol. 330 Nov 09
H-13
APPENDIX HMANUFACTURER LIST
EP 1110-1-8(Vol. 8)
7/31/2009
CODE MANUFACTURER
TV TRAVERSE LIFT CO.-
UE UNDERGROUND EQUIPMENT & SUPPLY-
UL UNIVERSAL ENGINEERING - SVEDALA - METSO-
UN UNIT RIG-
UP UPRIGHT INC.-
VA VOEST-ALPINE-
VB VIBROMAX AMERICA INC.-
VE VERMEER MANUFACTURING CO.-
VI VINCE HAGAN COMPANY-
VO VOLVO CONSTRUCTION EQUIPMENT GROUP-
VP VOGELE AMERICA - PRO-PAV DIV.-
VS VALLEY SLURRY SEAL / MACROPAVER DIVISION-
VT VALMET - PARTEK FOREST LLC-
VU VULCAN FOUNDATION EQUIPMENT, INC-
WA HAULPAK DIVISION-
WB WEBER MASCHINENTECHNIK GMBH-
WC WACKER CORPORATION-
WD WALDON, INC.-
WE WEATHERFORD U.S. INC.-
WF WATSON INC.-
WG ATLAS COPCO WAGNER-
WH WIGGINS LIFT CO., INC.-
WI WILLMAR EQUIPMENT COMPANY-
WL WALKER MANUFACTURING CO., INC.-
WN WAIN-ROY, INC.-
WO WACO SCAFFOLDING & EQUIPMENT-
WR WARNER FRUEHAUF TRAILER CO., INC.-
WS WHITEMAN CONSPRAY, INC.-
H-13
EP 1110-1-8, Vol. 330 Nov 09
H-14
APPENDIX HMANUFACTURER LIST
EP 1110-1-8(Vol. 8)7/31/2009
CODE MANUFACTURER
WT WIRTGEN AMERICAN, INC.-
XX NO SPECIFIC MANUFACTURER-
YA YANMAR DIESEL AMERICA CORP.-
YB ADVANCED ENVIRONMENTAL SOLUTIONS-
ZZ GENERIC EQUIPMENT-
H-14
EP 1110-1-8, Vol. 330 Nov 09
H-15
(Renegotiation or Prompt Payment Rate)
APPENDIX IFEDERAL COST-OF-MONEY RATE
EP 1110-1-8(Vol. 12)
7/31/2009
EFFECTIVE DATE RATEEFFECTIVE MONTHS
JULY - DECEMBER 7.000%7/1/1994
JANUARY - JUNE 8.125%1/1/1995
JULY - DECEMBER 6.375%7/1/1995
JANUARY - JUNE 5.875%1/1/1996
JULY - DECEMBER 7.000%7/1/1996
JANUARY - JUNE 6.375%1/1/1997
JULY - DECEMBER 6.750%7/1/1997
JANUARY - JUNE 6.250%1/1/1998
JULY - DECEMBER 6.000%7/1/1998
JANUARY - JUNE 5.000%1/1/1999
JULY - DECEMBER 6.500%7/1/1999
JANUARY - JUNE 6.750%1/1/2000
JULY - DECEMBER 7.250%7/1/2000
JANUARY - JUNE 6.375%1/1/2001
JULY - DECEMBER 5.875%7/1/2001
JANUARY - JUNE 5.500%1/1/2002
JULY - DECEMBER 5.250%7/1/2002
JANUARY - JUNE 4.250%1/1/2003
JULY - DECEMBER 3.125%7/1/2003
JANUARY - JUNE 4.000%1/1/2004
JULY - DECEMBER 4.500%7/1/2004
JANUARY - JUNE 4.250%1/1/2005
JULY - DECEMBER 4.500%7/1/2005
JANUARY - JUNE 5.125%1/1/2006
JULY - DECEMBER 5.750%7/1/2006
JANUARY - JUNE 5.250%1/1/2007
JULY - DECEMBER 5.750%7/1/2007
JANUARY - JUNE 4.750%1/1/2008
JULY - DECEMBER 5.125%7/1/2008
JANUARY - JUNE 5.625%1/1/2009
JULY - DECEMBER 4.875%7/1/2009
I-1
EP 1110-1-8, Vol. 330 Nov 09
I-2
APPENDIX J EQUIPMENT ACCESSORIES
The following accessories are listed by category (CAT), subcategory (SUB), and description (including features required for safety). The accessories have been included with the major equipment listed in this pamphlet when they are not included with the basic cost and are offered by the manufacturer.
CAT SUB DESCRIPTION C85.10 CRANES, DRAGLINE AND CLAMSHELL, CRAWLER MOUNTED Power load lowering Independent swing and travel Third drum Torque converter [machines 1 1/2 cubic yard (cy) or larger] Approximately one-half maximum boom length Counterweight (standard) Fire extinguisher 5-B:C Swing and reverse signal (backup) alarm Boom angle indicator and a load-indicating device Drum rotation indicators Anti-two block (upper limit) devices Manufacturers’ mandatory accessories C85.20 CRANES, LIFTING, CRAWLER MOUNTED Power load lowering Independent swing and travel Third drum Torque converter (machines 25 tons or larger) One-half maximum boom length (machines less than 60 tons) Maximum boom length at 360 degree rating (machines larger than
60 tons) Counterweight (standard) Fire extinguisher 5-B:C Swing and reverse signal (backup) alarm Boom angle indicator and a load-indicating device Drum rotation indicators Anti-two block (upper limit) devices Manufacturers’ mandatory accessories Hook block on machines larger than 100 tons C90.01 TRUCK CRANES - LESS THAN 25 TONS Power load lowering Third drum
EP 1110-1-8, Vol. 330 Nov 09
J-2
CAT SUB DESCRIPTION Mechanical outriggers with screw jacks Maximum boom length at 360 degrees rating C90.01 TRUCK CRANES - LESS THAN 25 TONS (Continued) Counterweight (standard) Fire extinguisher 5-B:C Swing and reverse signal (backup) alarm Boom angle indicator and a load-indicating device Drum rotation indicators Anti-two block (upper limit) devices Manufacturers mandatory accessories C90.02 TRUCK CRANE - 25 TONS AND LARGER C90.03 Power load lowering C90.04 Third drum Hydraulic outriggers with screw jacks Torque converter when available (upper only) Maximum boom length at 360 degrees rating Counterweight (standard) Fire extinguisher 5-B:C Reverse signal (backup) alarm Boom angle indicator and a load-indicating device Drum rotation indicators Anti-two block (upper limit) devices Hook block on machines larger than 100 tons G15 GRADER Rollover protective structures (ROPS) with enclosed cab Ripper/scarifier, rear mounted Front wheel lean Power circle Hydraulic shift and tilt moldboard End bits Standard work lights Fire extinguisher 5-B:C Reverse signal (backup) alarm H25 EXCAVATORS, HYDRAULIC H30 Backhoe bucket (standard) Backhoe stick (medium length) Backhoe boom (one piece) Backhoe bucket linkage (with cylinder) Guards
EP 1110-1-8, Vol. 330 Nov 09
J-3
CAT SUB DESCRIPTION Counterweight Standard work lights Reverse signal (backup) alarm ROPS Fire extinguisher 5-B:C H35 HYDRAULIC SHOVELS - CRAWLER MOUNTED Torque converter (machines 1 1/2 cy or larger) Counterweight Reverse signal (backup) alarm ROPS Fire extinguisher 5-B:C L30 LOADERS, BELT (CONVEYOR BELTS) Power unit Head pulley clutch and backstop Belt cleaner and belt installing equipment King pin attachments L35 LOADERS, 1 1/2 cy AND LARGER L40 Blower fan Guard, power train Automatic bucket positioner Standard counterweight Machines less than 7 cy: General purpose or excavating bucket
with bolt on cutting edge and no teeth Machines 7 cy or larger: Rock bucket with bolt on cutting edge and
teeth Standard work lights Reverse signal (backup) alarm ROPS Fire extinguisher 5-B:C S10 SCRAPERS S15 Control single lever S20 Blower fan Standard work light Guards, power train Reverse signal (backup) alarm ROPS Fire extinguisher 5-B:C Supplemental steering
EP 1110-1-8, Vol. 330 Nov 09
J-4
CAT SUB DESCRIPTION T15 TRACTOR, CRAWLER Hydraulic controls for ripper and blade Guards Blower fan Standard work lights Hook, front pull Track grousers (severe service for units over 200 hp) Counterweights where required Reverse signal (backup) alarm ROPS Universal blade T20 TRACTOR, WHEEL Hydraulic controls for ripper and blade Guards Blower fan Standard work lights Blade Fire extinguisher 5-B:C Counterweights when required T25 TRACTOR, AGRICULTURAL Independent power take off (PTO) Standard work lights Fire extinguisher 5-B:C Counterweights when required 3-point hitch ROPS Hydraulic system with controls T55 TRUCKS, OFF-HIGHWAY No spin differential Tachograph Engine and transmission guards Body liners
EP 1110-1-8, Vol. 330 Nov 09
J-5
APPENDIX K GROUND ENGAGING COMPONENT COSTS INCLUDED IN REPAIRS (RCF)
EP 1110-1-8, Vol. 330 Nov 09
K-1
CATEGORY
SUB DESCRIPTION EK C DC LIFE SLV RCF
Blade cutting edges, wear plates,
hard facing, and end plates
Ground Engaging Component Costs Included in Repairs (RCF)
EP 1110-1-8
7/31/2009(Vol. 8)
APPENDIX K
Bucket teeth, cutting edges,
side cutters, and wear plates
Ripper tips and shank protection
Equipment Specific Wear
Items
B15 0.00 95 A B 8,000 0.10 0.80BROOMS, STREET SWEEPERS & FLUSHERS
B25 0.00 15 A B 8,000 0.10 0.70BUCKETS, CLAMSHELL
B25 0.00 15 S B 6,500 0.10 0.80BUCKETS, CLAMSHELL
B35 0.00 1BUCKETS, DRAGLINE
B35 0.10 15 A B 8,000 0.10 0.70 LIGHT WEIGHT
B35 0.10 15 S B 6,500 0.10 0.80 LIGHT WEIGHT
B35 0.20 15 A B 9,000 0.10 0.70 MEDIUM WEIGHT
B35 0.20 15 S B 7,000 0.10 0.80 MEDIUM WEIGHT
B35 0.30 15 A B 10,000 0.10 0.70 HEAVY WEIGHT
B35 0.30 15 S B 8,000 0.10 0.80 HEAVY WEIGHT
G15 0.00 35 A B 14,500 0.25 0.75GRADERS, MOTOR
G15 0.00 35 S B 13,500 0.25 0.85GRADERS, MOTOR
H25 0.00 1HYDRAULIC EXCAVATORS, CRAWLER MOUNTED
H25 0.10 65 A B 8,000 0.25 0.70 0 LBS THRU 12,500 LBS (COMPACT EXCAVATORS)
H25 0.10 65 S B 7,000 0.25 0.80 0 LBS THRU 12,500 LBS (COMPACT EXCAVATORS)
H25 0.11 65 A B 8,500 0.25 0.70 OVER 12,500 LBS THRU 40,000 LBS
H25 0.11 65 S B 7,000 0.25 0.85 OVER 12,500 LBS THRU 40,000 LBS
H25 0.12 65 A B 12,000 0.25 0.80 OVER 40,000 LBS THRU 100,000 LBS
H25 0.12 65 S B 10,000 0.25 0.95 OVER 40,000 LBS THRU 100,000 LBS
H25 0.13 65 A B 16,000 0.25 1.00 OVER 100,000 LBS THRU 160,000 LBS
L- 1
EK=Economic Key (Appendix E) C=Operating Conditions (A=average, S=severe) DC=Discount Code (B=basic 7.5%, S=special 15%) LIFE=Economic Life SLV=Salvage Value RCF=Repair Cost FactorGround Engaging Component (GEC) is defined as those wear items on the machine that come in direct contact with in situ ground to perform the machines primary function. For machines with blades, GEC can include: cutting edges, wear plates, hard facing, and end plates. For machines with buckets, GEC can include: bucket teeth, cutting edges, side cutters, and wear plates. For machines with rippers, GEC can include: tips and shank protectors. Equipment Specific Wear items include those items of wear that are specific to that equipment. Not included in the Repairs and must be added as needed are: drill/bits, drill/steel, roadheader/rock breaking bits, air tools/breaker points/jackhammer points, concrete coring drill bits, and other wear items that are not shown here.
EP 1110-1-8, Vol. 330 Nov 09
K-2
CATEGORY
SUB DESCRIPTION EK C DC LIFE SLV RCF
Blade cutting edges, wear plates,
hard facing, and end plates
Ground Engaging Component Costs Included in Repairs (RCF)
EP 1110-1-8
7/31/2009(Vol. 8)
APPENDIX K
Bucket teeth, cutting edges,
side cutters, and wear plates
Ripper tips and shank protection
Equipment Specific Wear
Items
H25 0.13 65 S B 13,500 0.25 1.10 OVER 100,000 LBS THRU 160,000 LBS
H25 0.14 65 A B 19,000 0.25 1.10 OVER 160,000 LBS
H25 0.14 65 S B 15,000 0.25 1.25 OVER 160,000 LBS
H30 0.00 1HYDRAULIC EXCAVATORS, WHEEL MOUNTED
H30 0.01 65 A B 8,000 0.25 0.50 0 THRU 1.0 CY
H30 0.01 65 S B 6,500 0.25 0.55 0 THRU 1.0 CY
H30 0.02 65 A B 10,000 0.25 0.60 OVER 1.0 CY
H30 0.02 65 S B 8,000 0.25 0.65 OVER 1.0 CY
H35 0.00 1HYDRAULIC SHOVELS, CRAWLER MOUNTED
H35 0.11 65 A B 14,000 0.20 1.00 DIESEL, 0 CY THRU 5.0 CY
H35 0.11 65 S B 12,000 0.20 1.10 DIESEL, 0 CY THRU 5.0 CY
H35 0.12 65 A B 16,000 0.20 1.20 DIESEL, OVER 5.0 CY
H35 0.12 65 S B 14,000 0.20 1.30 DIESEL, OVER 5.0 CY
H35 0.21 65 A B 18,000 0.20 0.80 ELECTRIC, OVER 2.5 CY
H35 0.21 65 S B 16,000 0.20 0.90 ELECTRIC, OVER 2.5 CY
L35 0.00 40 A B 10,000 0.20 1.10LOADERS, FRONT END, CRAWLER TYPE
L35 0.00 40 S B 8,000 0.20 1.25LOADERS, FRONT END, CRAWLER TYPE
L40 0.00 1LOADERS, FRONT END, WHEEL TYPE
L40 0.11 45 A B 9,250 0.25 0.70 ARTICULATED, 0 THRU 225 HP
L40 0.11 45 S B 8,750 0.25 0.80 ARTICULATED, 0 THRU 225 HP
L- 2
EK=Economic Key (Appendix E) C=Operating Conditions (A=average, S=severe) DC=Discount Code (B=basic 7.5%, S=special 15%) LIFE=Economic Life SLV=Salvage Value RCF=Repair Cost FactorGround Engaging Component (GEC) is defined as those wear items on the machine that come in direct contact with in situ ground to perform the machines primary function. For machines with blades, GEC can include: cutting edges, wear plates, hard facing, and end plates. For machines with buckets, GEC can include: bucket teeth, cutting edges, side cutters, and wear plates. For machines with rippers, GEC can include: tips and shank protectors. Equipment Specific Wear items include those items of wear that are specific to that equipment. Not included in the Repairs and must be added as needed are: drill/bits, drill/steel, roadheader/rock breaking bits, air tools/breaker points/jackhammer points, concrete coring drill bits, and other wear items that are not shown here.
EP 1110-1-8, Vol. 330 Nov 09
K-3
CATEGORY
SUB DESCRIPTION EK C DC LIFE SLV RCF
Blade cutting edges, wear plates,
hard facing, and end plates
Ground Engaging Component Costs Included in Repairs (RCF)
EP 1110-1-8
7/31/2009(Vol. 8)
APPENDIX K
Bucket teeth, cutting edges,
side cutters, and wear plates
Ripper tips and shank protection
Equipment Specific Wear
Items
L40 0.12 45 A B 13,500 0.20 0.70 ARTICULATED, OVER 225 HP
L40 0.12 45 S B 12,000 0.20 0.75 ARTICULATED, OVER 225 HP
L40 0.20 45 A B 8,000 0.20 0.80 SKID STEER
L40 0.31 45 A B 10,000 0.25 0.85 TOOL CARRIER & TELESCOPIC HANDLERS, 0 THRU 225 HP
L40 0.31 45 S B 9,250 0.25 0.90 TOOL CARRIER & TELESCOPIC HANDLERS, 0 THRU 225 HP
L40 0.32 45 A B 12,000 0.15 0.85 TOOL CARRIER & TELESCOPIC HANDLERS, OVER 225 HP
L40 0.32 45 S B 10,000 0.15 0.90 TOOL CARRIER & TELESCOPIC HANDLERS, OVER 225 HP
L45 0.00 40 A B 8,000 0.20 1.35LOADERS / BACKHOE, CRAWLER TYPE
L45 0.00 40 S B 6,000 0.20 1.40LOADERS / BACKHOE, CRAWLER TYPE
L50 0.00 45 A B 10,000 0.25 0.80LOADERS / BACKHOE, WHEEL TYPE
L50 0.00 45 S B 6,000 0.25 0.85LOADERS / BACKHOE, WHEEL TYPE
L60 0.00 75 A B 10,000 0.15 0.70LOG SKIDDERS
L60 0.00 75 S B 8,000 0.15 0.80LOG SKIDDERS
P35 0.00 70 A B 14,000 0.20 0.95PIPELAYERS
P35 0.00 70 S B 11,500 0.20 1.10PIPELAYERS
R30 0.00 1ROLLERS, STATIC, SELF-PROPELLED
R30 0.03 55 A B 12,000 0.20 0.80 TAMPING FOOT, LANDFILL & SOIL COMPACTORS
S10 0.00 1SCRAPERS, ELEVATING
S10 0.01 60 A B 10,000 0.20 0.90 0 THRU 200 HP
S10 0.01 60 S B 8,000 0.20 1.00 0 THRU 200 HP
L- 3
EK=Economic Key (Appendix E) C=Operating Conditions (A=average, S=severe) DC=Discount Code (B=basic 7.5%, S=special 15%) LIFE=Economic Life SLV=Salvage Value RCF=Repair Cost FactorGround Engaging Component (GEC) is defined as those wear items on the machine that come in direct contact with in situ ground to perform the machines primary function. For machines with blades, GEC can include: cutting edges, wear plates, hard facing, and end plates. For machines with buckets, GEC can include: bucket teeth, cutting edges, side cutters, and wear plates. For machines with rippers, GEC can include: tips and shank protectors. Equipment Specific Wear items include those items of wear that are specific to that equipment. Not included in the Repairs and must be added as needed are: drill/bits, drill/steel, roadheader/rock breaking bits, air tools/breaker points/jackhammer points, concrete coring drill bits, and other wear items that are not shown here.
EP 1110-1-8, Vol. 330 Nov 09
K-4
CATEGORY
SUB DESCRIPTION EK C DC LIFE SLV RCF
Blade cutting edges, wear plates,
hard facing, and end plates
Ground Engaging Component Costs Included in Repairs (RCF)
EP 1110-1-8
7/31/2009(Vol. 8)
APPENDIX K
Bucket teeth, cutting edges,
side cutters, and wear plates
Ripper tips and shank protection
Equipment Specific Wear
Items
S10 0.02 60 A B 13,000 0.25 0.95 OVER 200 HP
S10 0.02 60 S B 11,500 0.25 1.00 OVER 200 HP
S15 0.00 60 A B 15,000 0.20 0.80SCRAPERS, CONVENTIONAL
S15 0.00 60 S B 12,500 0.20 0.85SCRAPERS, CONVENTIONAL
S20 0.00 60 A B 15,000 0.20 0.85SCRAPERS, TANDEM POWERED
S20 0.00 60 S B 13,500 0.20 0.90SCRAPERS, TANDEM POWERED
S25 0.00 60 A B 12,000 0.20 0.70SCRAPERS, TRACTOR DRAWN
S25 0.00 60 S B 10,000 0.20 0.75SCRAPERS, TRACTOR DRAWN
T15 0.00 1TRACTORS, CRAWLER (DOZER) (includes blade)
T15 0.01 70 A B 10,000 0.30 1.10 0 THRU 225 HP
T15 0.01 70 S B 8,000 0.30 1.25 0 THRU 225 HP
T15 0.02 70 A B 12,500 0.25 1.20 226 HP THRU 425 HP
T15 0.02 70 S B 10,500 0.25 1.25 226 HP THRU 425 HP
T15 0.03 70 A B 15,000 0.20 1.20 OVER 425 HP
T15 0.03 70 S B 12,500 0.20 1.35 OVER 425 HP
T20 0.00 75 A B 14,000 0.15 0.60TRACTORS, WHEEL TYPE (DOZER)
T20 0.00 75 S B 13,000 0.15 0.65TRACTORS, WHEEL TYPE (DOZER)
L- 4
EK=Economic Key (Appendix E) C=Operating Conditions (A=average, S=severe) DC=Discount Code (B=basic 7.5%, S=special 15%) LIFE=Economic Life SLV=Salvage Value RCF=Repair Cost FactorGround Engaging Component (GEC) is defined as those wear items on the machine that come in direct contact with in situ ground to perform the machines primary function. For machines with blades, GEC can include: cutting edges, wear plates, hard facing, and end plates. For machines with buckets, GEC can include: bucket teeth, cutting edges, side cutters, and wear plates. For machines with rippers, GEC can include: tips and shank protectors. Equipment Specific Wear items include those items of wear that are specific to that equipment. Not included in the Repairs and must be added as needed are: drill/bits, drill/steel, roadheader/rock breaking bits, air tools/breaker points/jackhammer points, concrete coring drill bits, and other wear items that are not shown here.
EP 1110-1-8, Vol. 330 Nov 09
K-5
Guide for Estimating Drill Steel and Drill Bit Costs
Prepared for the US Army Corps of Engineers, Walla Walla District By Western Mine Engineering, Inc in cooperation
with Aventurine Engineering, Inc. 2006
August 2006
EP Octpb
L-2
EP 1110-1-8, Vol. 330 Nov 09
Cost Assumptions for Drill Steel and Drill Bit
General: The approach to defining the scope of this cost guide was to confine the work to the basic drilling process and attendant drill bit and steel lives and costs. This not only simplified the study parameters but also ensured that future users of the study results could readily modify the data to suit their individual needs.
1. The steel costs reflect the cost of drilling steel only. All ancillary equipment such as
couplings, striking bars, and hammer maintenance items were not included.
2. The bit life is indicative of the total life of each bit to include up to 10 sharpenings/grindings per bit. The bit costs, however, are list prices for each bit and do not reflect the costs associated with this process.
3. Costs for both bits and steel are list pricing based on manufacturers’ catalogs or
quotes. No additional materials, equipment costs, or other associated costs are included. No discounts were applied to the catalog list prices. Estimators will have to determine an appropriate discount for their individual cases. All prices are based on current, 2006 costs.
4. The bit and steel lives and penetration rates are based on time the bit is engaged in
the hole. Adjustment for setup, tear down, and moving time between holes has not been considered.
5. Appropriate bits were identified primarily by drill type and then list prices were
determined from manufacturers’ catalogs. All bits were button type; with threaded button bits used for the top hammer percussion drills, down the hole (DTH) button bits for “DTH” drills, and tungsten carbide button, roller bits selected for rotary drills.
6. Large rotary drills often use 20' or longer drilling steel. It was our belief that most
situations Corps of Engineers estimators face will fall in the range of percussion or smaller “DTH” drills. In these instances the 12' rod is appropriate. Cursory review of the costs of longer steel rods suggest that costs for a specific drill steel diameter do not vary dramatically on a per foot basis for longer rods. Therefore, the assumption is made that a direct conversion to cost per rod for longer lengths can be made in proportion to the cost for a 12' length rod. For further information, see the note at the lower right corner of each of the spreadsheets for a detailed procedure to make the conversion for rod length and hole depth.
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-3
Example of Estimating Drill Steel and Drill Bit Costs
General: The approach is to define the scope of the work and determine an estimated cost for drill steel and bits from the answers to the questions below. Follow the simplified steps to arrive at the estimated costs. Determine parameters:
1. Determine the type of drilling method – percussion, down the hole (DTH), or rotary.
2. Determine the manufacturer and model of drilling equipment or determine
equivalency of equipment used in this guide.
3. Determine the material that will be drilled through.
4. Determine the hole diameter of drill.
5. Determine the length of drill rod required to drill hole to the required depth. Determine costs: (This is an example on how to determine costs)
1. Determine the type of drilling method – down the hole (DTH).
2. Determine the manufacturer/model of drilling equipment – Atlas Copco DM25SP.
3. Determine the material that will be drilled - Basalt .
4. Determine the hole diameter of drill – 5”.
5. Determine the length of drill rod required – 90 feet.
6. Calculate drill steel costs from cost tables:
a. Cost of drill steel $/foot per rod ranges $0.034 to $0.025 will use $0.034.
b. Based on 90’ of drilling at 12’ lengths of drill rod – (90’/12’) = 7.5 rods are required. Round up to next whole number = 8 rods.
c. From drill steel cost adjustment factor chart: for 8 rods the factor is 4.5. d. From instructions: $0.034 X 4.5 = $0.1530/lf of hole drilled.
7. Determine drill bit costs from cost tables – costs range from $0.55 to $0.40/lf.
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-4
DRILL MODEL - Atlas Copco ROC D5 - percussion
Bit Life (feet/bit) Bit Cost ($/foot)
1.75 2.00 2.50 1.75 2.00 2.50Granite 1,506 - 2,037 1,449 - 1,960 1,359 - 1,838 Granite $0.04 - $0.03 $0.05 - $0.04 $0.07 - $0.05Basalt 674 - 912 649 - 878 608 - 823 Basalt $0.09 - $0.07 $0.11 - $0.08 $0.16 - $0.12Gabbro 1,002 - 1,356 964 - 1,305 904 - 1,223 Gabbro $0.06 - $0.05 $0.07 - $0.05 $0.11 - $0.08Shale 1,427 - 1,931 1,373 - 1,858 1,287 - 1,742 Shale $0.04 - $0.03 $0.05 - $0.04 $0.08 - $0.06Sandstone 524 - 709 504 - 682 473 - 639 Sandstone $0.12 - $0.09 $0.14 - $0.10 $0.21 - $0.15Siltstone 3,779 - 5,112 3,636 - 4,919 3,409 - 4,612 Siltstone $0.02 - $0.01 $0.02 - $0.01 $0.03 - $0.02Conglomer 292 - 395 281 - 380 263 - 356 Conglomer $0.21 - $0.16 $0.25 - $0.18 $0.37 - $0.28Breccia 2,181 - 2,951 2,099 - 2,839 1,968 - 2,662 Breccia $0.03 - $0.02 $0.03 - $0.02 $0.05 - $0.04Limestone 1,835 - 2,483 1,766 - 2,389 1,656 - 2,240 Limestone $0.03 - $0.02 $0.04 - $0.03 $0.06 - $0.04Schist 3,414 - 4,619 3,285 - 4,444 3,080 - 4,167 Schist $0.02 - $0.01 $0.02 - $0.02 $0.03 - $0.02Slate 1,710 - 2,313 1,645 - 2,226 1,542 - 2,087 Slate $0.04 - $0.03 $0.04 - $0.03 $0.06 - $0.05Gneiss 735 - 995 707 - 957 663 - 897 Gneiss $0.08 - $0.06 $0.10 - $0.07 $0.15 - $0.11
Drill Steel Life (feet/rod) Drill Steel Cost ($/foot per rod)
1.75 2.00 2.50 1.75 2.00 2.50Granite 2,720 - 3,680 2,617 - 3,541 2,454 - 3,320 Granite $0.103 - $0.076 $0.107 - $0.079 $0.132 - $0.098Basalt 1,417 - 1,918 1,364 - 1,845 1,279 - 1,730 Basalt $0.198 - $0.146 $0.205 - $0.152 $0.253 - $0.187Gabbro 1,600 - 2,164 1,539 - 2,083 1,443 - 1,953 Gabbro $0.175 - $0.129 $0.182 - $0.134 $0.224 - $0.166Shale 2,855 - 3,863 2,747 - 3,717 2,576 - 3,485 Shale $0.098 - $0.072 $0.102 - $0.075 $0.126 - $0.093Sandstone 2,978 - 4,029 2,865 - 3,877 2,687 - 3,635 Sandstone $0.094 - $0.069 $0.098 - $0.072 $0.121 - $0.089Siltstone 2,964 - 4,011 2,852 - 3,859 2,674 - 3,618 Siltstone $0.094 - $0.070 $0.098 - $0.073 $0.121 - $0.090Conglomer 3,425 - 4,633 3,295 - 4,458 3,090 - 4,180 Conglomer $0.082 - $0.060 $0.085 - $0.063 $0.105 - $0.078Breccia 4,739 - 6,412 4,560 - 6,170 4,276 - 5,785 Breccia $0.059 - $0.044 $0.061 - $0.045 $0.076 - $0.056Limestone 3,931 - 5,318 3,782 - 5,117 3,546 - 4,798 Limestone $0.071 - $0.053 $0.074 - $0.055 $0.091 - $0.068Schist 4,828 - 6,532 4,646 - 6,285 4,356 - 5,893 Schist $0.058 - $0.043 $0.060 - $0.045 $0.074 - $0.055Slate 3,133 - 4,239 3,015 - 4,079 2,827 - 3,824 Slate $0.089 - $0.066 $0.093 - $0.069 $0.115 - $0.085Gneiss 2,849 - 3,855 2,742 - 3,709 2,571 - 3,478 Gneiss $0.098 - $0.073 $0.102 - $0.075 $0.126 - $0.093
(Based on 12 foot drilling rod length.)
Penetration Rate (feet/hour) Drill Steel Cost Adjustment FactorAs this study is based on 12 foot drilling rod length,
1.75 2.00 2.50 Number of rods Factor the total steel cost per foot of hole drilled dependsGranite 98 - 132 83 - 113 64 - 86 upon the total number of 12 foot sections in the hole.Basalt 57 - 77 48 - 65 37 - 50 1 1.0 Divide the total hole length by 12 and round this resultGabbro 63 - 85 53 - 72 41 - 55 2 1.5 up to the next whole number to determine number of Shale 102 - 138 87 - 117 66 - 90 3 2.0 rods required to drill the hole. Adjust this number to theSandstone 105 - 142 90 - 121 69 - 93 4 2.5 average number of rods during drilling by consultingSiltstone 105 - 142 89 - 121 68 - 92 5 3.0 the Drill Steel Cost Adjustment Factor table to the left.Conglomer 118 - 160 101 - 136 77 - 104 6 3.5 Multiply this adjustment factor times the cost per footBreccia 155 - 210 132 - 179 101 - 137 7 4.0 per rod from the table above. The result is the totalLimestone 133 - 180 113 - 153 86 - 117 8 4.5 drill steel cost per foot of hole drilled. Other drillSchist 158 - 213 134 - 181 103 - 139 9 5.0 steel lengths may be adjusted for by determining theSlate 110 - 149 94 - 127 72 - 97 10 5.5 total length of rods required and then converting that Gneiss 102 - 137 86 - 117 66 - 89 n (n+1)/2 to the number of equivalent 12 foot sections. Once
this is determined follow the procedure outlined above.
Prepared by Western Mine Division, InfoMine USA, Inc. in cooperation with Aventurine Engineering, Inc. 2006
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-5
DRILL MODEL - Atlas Copco ROC D7 - percussion
Bit Life (feet/bit) Bit Cost ($/foot)
2.50 3.00 4.00 2.50 3.00 4.00Granite 1,203 - 1,628 1,115 - 1,509 1,050 - 1,421 Granite $0.08 - $0.06 $0.12 - $0.09 $0.21 - $0.16Basalt 539 - 729 499 - 676 470 - 636 Basalt $0.18 - $0.13 $0.26 - $0.19 $0.47 - $0.35Gabbro 801 - 1,083 742 - 1,004 699 - 946 Gabbro $0.12 - $0.09 $0.18 - $0.13 $0.32 - $0.24Shale 1,140 - 1,542 1,057 - 1,430 995 - 1,347 Shale $0.09 - $0.06 $0.12 - $0.09 $0.22 - $0.17Sandstone 418 - 566 388 - 525 365 - 494 Sandstone $0.23 - $0.17 $0.34 - $0.25 $0.61 - $0.45Siltstone 3,019 - 4,084 2,798 - 3,786 2,636 - 3,566 Siltstone $0.03 - $0.02 $0.05 - $0.03 $0.08 - $0.06Conglomer 233 - 315 216 - 292 204 - 275 Conglomer $0.42 - $0.31 $0.61 - $0.45 $1.10 - $0.81Breccia 1,742 - 2,357 1,615 - 2,186 1,521 - 2,058 Breccia $0.06 - $0.04 $0.08 - $0.06 $0.15 - $0.11Limestone 1,466 - 1,983 1,359 - 1,839 1,280 - 1,732 Limestone $0.07 - $0.05 $0.10 - $0.07 $0.17 - $0.13Schist 2,727 - 3,690 2,528 - 3,421 2,381 - 3,222 Schist $0.04 - $0.03 $0.05 - $0.04 $0.09 - $0.07Slate 1,366 - 1,848 1,266 - 1,713 1,193 - 1,613 Slate $0.07 - $0.05 $0.10 - $0.08 $0.19 - $0.14Gneiss 587 - 795 544 - 737 513 - 694 Gneiss $0.17 - $0.12 $0.24 - $0.18 $0.43 - $0.32
Drill Steel Life (feet/rod) Drill Steel Cost ($/foot per rod)
2.50 3.00 4.00 2.50 3.00 4.00Granite 2,173 - 2,940 2,014 - 2,725 1,897 - 2,567 Granite $0.129 - $0.095 $0.161 - $0.119 $0.215 - $0.159Basalt 1,132 - 1,532 1,050 - 1,420 989 - 1,338 Basalt $0.247 - $0.183 $0.309 - $0.228 $0.412 - $0.304Gabbro 1,278 - 1,729 1,185 - 1,603 1,116 - 1,510 Gabbro $0.219 - $0.162 $0.273 - $0.202 $0.365 - $0.270Shale 2,281 - 3,086 2,115 - 2,861 1,992 - 2,695 Shale $0.123 - $0.091 $0.153 - $0.113 $0.204 - $0.151Sandstone 2,379 - 3,218 2,205 - 2,984 2,077 - 2,810 Sandstone $0.118 - $0.087 $0.147 - $0.109 $0.196 - $0.145Siltstone 2,368 - 3,204 2,195 - 2,970 2,068 - 2,798 Siltstone $0.118 - $0.087 $0.148 - $0.109 $0.197 - $0.145Conglomer 2,736 - 3,701 2,536 - 3,431 2,389 - 3,232 Conglomer $0.102 - $0.076 $0.128 - $0.094 $0.170 - $0.126Breccia 3,786 - 5,122 3,510 - 4,749 3,306 - 4,473 Breccia $0.074 - $0.055 $0.092 - $0.068 $0.123 - $0.091Limestone 3,140 - 4,249 2,911 - 3,939 2,742 - 3,710 Limestone $0.089 - $0.066 $0.111 - $0.082 $0.148 - $0.110Schist 3,857 - 5,218 3,576 - 4,838 3,368 - 4,556 Schist $0.073 - $0.054 $0.091 - $0.067 $0.121 - $0.089Slate 2,503 - 3,386 2,320 - 3,139 2,185 - 2,957 Slate $0.112 - $0.083 $0.140 - $0.103 $0.186 - $0.138Gneiss 2,276 - 3,080 2,110 - 2,855 1,987 - 2,689 Gneiss $0.123 - $0.091 $0.154 - $0.113 $0.205 - $0.151
(Based on12 foot drilling rod length.)
Penetration Rate (feet/hour) Drill Steel Cost Adjustment FactorAs this study is based on 12 foot drilling rod length,
2.50 3.00 4.00 Number of rods Factor the total steel cost per foot of hole drilled dependsGranite 87 - 117 63 - 85 49 - 67 upon the total number of 12 foot sections in the hole.Basalt 50 - 68 37 - 50 29 - 39 1 1.0 Divide the total hole length by 12 and round this resultGabbro 56 - 75 41 - 55 32 - 43 2 1.5 up to the next whole number to determine number of Shale 90 - 122 66 - 89 51 - 69 3 2.0 rods required to drill the hole. Adjust this number to theSandstone 93 - 126 68 - 92 53 - 72 4 2.5 average number of rods during drilling by consultingSiltstone 93 - 126 68 - 92 53 - 71 5 3.0 the Drill Steel Cost Adjustment Factor table to the left.Conglomer 105 - 142 76 - 103 60 - 81 6 3.5 Multiply this adjustment factor times the cost per footBreccia 137 - 186 100 - 136 78 - 106 7 4.0 per rod from the table above. The result is the totalLimestone 118 - 159 86 - 116 67 - 90 8 4.5 drill steel cost per foot of hole drilled. Other drillSchist 140 - 189 102 - 138 79 - 107 9 5.0 steel lengths may be adjusted for by determining theSlate 97 - 132 71 - 96 55 - 75 10 5.5 total length of rods required and then converting that Gneiss 90 - 122 66 - 89 51 - 69 n (n+1)/2 to the number of equivalent 12 foot sections. Once
this is determined follow the procedure outlined above.
Prepared by Western Mine Division, InfoMine USA, Inc. in cooperation with Aventurine Engineering, Inc. 2006
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-6
DRILL MODEL - Atlas Copco ECM590 - percussion
Bit Life (feet/bit) Bit Cost ($/foot)
2.50 3.50 4.50 2.50 3.50 4.50Granite 1,168 - 1,580 1,060 - 1,434 986 - 1,334 Granite $0.08 - $0.06 $0.15 - $0.11 $0.27 - $0.20Basalt 523 - 708 475 - 642 441 - 597 Basalt $0.19 - $0.14 $0.34 - $0.25 $0.61 - $0.45Gabbro 778 - 1,052 706 - 955 656 - 888 Gabbro $0.13 - $0.09 $0.23 - $0.17 $0.41 - $0.30Shale 1,107 - 1,498 1,005 - 1,359 934 - 1,264 Shale $0.09 - $0.07 $0.16 - $0.12 $0.29 - $0.21Sandstone 406 - 550 369 - 499 343 - 464 Sandstone $0.24 - $0.18 $0.43 - $0.32 $0.78 - $0.58Siltstone 2,931 - 3,966 2,660 - 3,599 2,474 - 3,347 Siltstone $0.03 - $0.02 $0.06 - $0.04 $0.11 - $0.08Conglomer 226 - 306 205 - 278 191 - 259 Conglomer $0.43 - $0.32 $0.77 - $0.57 $1.40 - $1.04Breccia 1,692 - 2,289 1,535 - 2,077 1,428 - 1,932 Breccia $0.06 - $0.04 $0.10 - $0.08 $0.19 - $0.14Limestone 1,424 - 1,926 1,292 - 1,748 1,201 - 1,626 Limestone $0.07 - $0.05 $0.12 - $0.09 $0.22 - $0.16Schist 2,648 - 3,583 2,403 - 3,251 2,235 - 3,024 Schist $0.04 - $0.03 $0.07 - $0.05 $0.12 - $0.09Slate 1,326 - 1,794 1,203 - 1,628 1,119 - 1,514 Slate $0.07 - $0.05 $0.13 - $0.10 $0.24 - $0.18Gneiss 570 - 771 517 - 700 481 - 651 Gneiss $0.17 - $0.13 $0.31 - $0.23 $0.56 - $0.41
Drill Steel Life (feet/rod) Drill Steel Cost ($/foot per rod)
2.50 3.50 4.50 2.50 3.50 4.50Granite 2,110 - 2,855 1,915 - 2,590 1,781 - 2,409 Granite $0.154 - $0.114 $0.213 - $0.157 $0.229 - $0.169Basalt 1,100 - 1,488 998 - 1,350 928 - 1,255 Basalt $0.295 - $0.218 $0.408 - $0.302 $0.439 - $0.324Gabbro 1,241 - 1,679 1,126 - 1,524 1,047 - 1,417 Gabbro $0.261 - $0.193 $0.361 - $0.267 $0.389 - $0.287Shale 2,215 - 2,997 2,010 - 2,719 1,869 - 2,529 Shale $0.146 - $0.108 $0.202 - $0.150 $0.218 - $0.161Sandstone 2,310 - 3,125 2,096 - 2,836 1,950 - 2,638 Sandstone $0.140 - $0.104 $0.194 - $0.144 $0.209 - $0.154Siltstone 2,300 - 3,111 2,087 - 2,823 1,941 - 2,626 Siltstone $0.141 - $0.104 $0.195 - $0.144 $0.210 - $0.155Conglomer 2,657 - 3,594 2,411 - 3,262 2,242 - 3,033 Conglomer $0.122 - $0.090 $0.169 - $0.125 $0.182 - $0.134Breccia 3,676 - 4,974 3,336 - 4,514 3,103 - 4,198 Breccia $0.088 - $0.065 $0.122 - $0.090 $0.131 - $0.097Limestone 3,049 - 4,125 2,767 - 3,744 2,573 - 3,482 Limestone $0.106 - $0.079 $0.147 - $0.109 $0.158 - $0.117Schist 3,745 - 5,067 3,399 - 4,598 3,161 - 4,277 Schist $0.087 - $0.064 $0.120 - $0.089 $0.129 - $0.095Slate 2,430 - 3,288 2,205 - 2,984 2,051 - 2,775 Slate $0.133 - $0.099 $0.185 - $0.136 $0.198 - $0.147Gneiss 2,210 - 2,990 2,006 - 2,714 1,865 - 2,524 Gneiss $0.147 - $0.108 $0.203 - $0.150 $0.218 - $0.161
(Based pm 12 foot drilling rod length.)
Penetration Rate (feet/hour) Drill Steel Cost Adjustment FactorAs this study is based on 12 foot drilling rod length,
2.50 3.50 4.50 Number of rods Factor the total steel cost per foot of hole drilled dependsGranite 99 - 134 66 - 89 49 - 66 upon the total number of 12 foot sections in the hole.Basalt 57 - 78 38 - 52 28 - 38 1 1.0 Divide the total hole length by 12 and round this resultGabbro 63 - 86 42 - 57 31 - 42 2 1.5 up to the next whole number to determine number of Shale 103 - 139 69 - 93 51 - 69 3 2.0 rods required to drill the hole. Adjust this number to theSandstone 107 - 144 71 - 96 52 - 71 4 2.5 average number of rods during drilling by consultingSiltstone 106 - 144 71 - 96 52 - 71 5 3.0 the Drill Steel Cost Adjustment Factor table to the left.Conglomer 120 - 162 80 - 108 59 - 80 6 3.5 Multiply this adjustment factor times the cost per footBreccia 157 - 212 105 - 142 77 - 105 7 4.0 per rod from the table above. The result is the totalLimestone 134 - 182 90 - 121 66 - 90 8 4.5 drill steel cost per foot of hole drilled. Other drillSchist 159 - 216 106 - 144 79 - 106 9 5.0 steel lengths may be adjusted for by determining theSlate 111 - 150 74 - 100 55 - 74 10 5.5 total length of rods required and then converting that Gneiss 103 - 139 68 - 93 51 - 68 n (n+1)/2 to the number of equivalent 12 foot sections. Once
this is determined follow the procedure outlined above.
Prepared by Western Mine Division, InfoMine USA, Inc. in cooperation with Aventurine Engineering, Inc. 2006
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-7
DRILL MODEL - Atlas Copco ECM720 - percussion
Bit Life (feet/bit) Bit Cost ($/foot)
4.00 4.50 5.00 4.00 4.50 5.00Granite 2,305 - 3,118 2,228 - 3,014 2,161 - 2,924 Granite $0.10 - $0.07 $0.12 - $0.09 $0.15 - $0.11Basalt 1,032 - 1,396 997 - 1,349 967 - 1,309 Basalt $0.22 - $0.16 $0.27 - $0.20 $0.33 - $0.25Gabbro 1,534 - 2,075 1,483 - 2,006 1,438 - 1,946 Gabbro $0.15 - $0.11 $0.18 - $0.13 $0.22 - $0.16Shale 2,184 - 2,955 2,111 - 2,856 2,048 - 2,771 Shale $0.10 - $0.08 $0.13 - $0.09 $0.16 - $0.12Sandstone 802 - 1,085 775 - 1,048 752 - 1,017 Sandstone $0.28 - $0.21 $0.35 - $0.26 $0.43 - $0.32Siltstone 5,783 - 7,824 5,589 - 7,562 5,422 - 7,336 Siltstone $0.04 - $0.03 $0.05 - $0.04 $0.06 - $0.04Conglomer 447 - 604 432 - 584 419 - 567 Conglomer $0.50 - $0.37 $0.62 - $0.46 $0.77 - $0.57Breccia 3,338 - 4,516 3,227 - 4,365 3,130 - 4,235 Breccia $0.07 - $0.05 $0.08 - $0.06 $0.10 - $0.08Limestone 2,809 - 3,800 2,715 - 3,673 2,633 - 3,563 Limestone $0.08 - $0.06 $0.10 - $0.07 $0.12 - $0.09Schist 5,225 - 7,069 5,050 - 6,833 4,899 - 6,628 Schist $0.04 - $0.03 $0.05 - $0.04 $0.07 - $0.05Slate 2,617 - 3,540 2,529 - 3,422 2,453 - 3,319 Slate $0.09 - $0.06 $0.11 - $0.08 $0.13 - $0.10Gneiss 1,125 - 1,522 1,087 - 1,471 1,055 - 1,427 Gneiss $0.20 - $0.15 $0.25 - $0.18 $0.30 - $0.22
Drill Steel Life (feet/rod) Drill Steel Cost ($/foot per rod)
4.00 4.50 5.00 4.00 4.50 5.00Granite 4,163 - 5,632 4,024 - 5,444 3,903 - 5,281 Granite $0.098 - $0.072 $0.141 - $0.104 $0.146 - $0.108Basalt 2,169 - 2,935 2,097 - 2,837 2,034 - 2,752 Basalt $0.188 - $0.139 $0.271 - $0.200 $0.279 - $0.206Gabbro 2,448 - 3,313 2,367 - 3,202 2,296 - 3,106 Gabbro $0.166 - $0.123 $0.240 - $0.177 $0.247 - $0.183Shale 4,370 - 5,912 4,224 - 5,715 4,097 - 5,544 Shale $0.093 - $0.069 $0.134 - $0.099 $0.139 - $0.102Sandstone 4,557 - 6,166 4,405 - 5,960 4,273 - 5,781 Sandstone $0.089 - $0.066 $0.129 - $0.095 $0.133 - $0.098Siltstone 4,537 - 6,138 4,385 - 5,933 4,254 - 5,755 Siltstone $0.090 - $0.066 $0.130 - $0.096 $0.134 - $0.099Conglomer 5,241 - 7,091 5,066 - 6,854 4,914 - 6,649 Conglomer $0.078 - $0.057 $0.112 - $0.083 $0.116 - $0.085Breccia 7,253 - 9,813 7,011 - 9,485 6,801 - 9,201 Breccia $0.056 - $0.041 $0.081 - $0.060 $0.084 - $0.062Limestone 6,016 - 8,139 5,815 - 7,867 5,641 - 7,631 Limestone $0.068 - $0.050 $0.098 - $0.072 $0.101 - $0.074Schist 7,389 - 9,997 7,142 - 9,663 6,928 - 9,374 Schist $0.055 - $0.041 $0.080 - $0.059 $0.082 - $0.061Slate 4,795 - 6,487 4,635 - 6,270 4,496 - 6,083 Slate $0.085 - $0.063 $0.123 - $0.091 $0.126 - $0.093Gneiss 4,361 - 5,900 4,215 - 5,702 4,089 - 5,532 Gneiss $0.093 - $0.069 $0.135 - $0.100 $0.139 - $0.103
(Based on 12 foot drilling rod length.)
Penetration Rate (feet/hour) Drill Steel Cost Adjustment FactorAs this study is based on 12 foot drilling rod length,
4.00 4.50 5.00 Number of rods Factor the total steel cost per foot of hole drilled dependsGranite 100 - 135 87 - 117 76 - 103 upon the total number of 12 foot sections in the hole.Basalt 58 - 78 50 - 68 44 - 60 1 1.0 Divide the total hole length by 12 and round this resultGabbro 64 - 87 56 - 75 49 - 66 2 1.5 up to the next whole number to determine number of Shale 104 - 141 90 - 122 79 - 107 3 2.0 rods required to drill the hole. Adjust this number to theSandstone 108 - 146 93 - 126 82 - 111 4 2.5 average number of rods during drilling by consultingSiltstone 107 - 145 93 - 126 82 - 111 5 3.0 the Drill Steel Cost Adjustment Factor table to the left.Conglomer 121 - 163 105 - 142 92 - 125 6 3.5 Multiply this adjustment factor times the cost per footBreccia 158 - 214 137 - 186 121 - 164 7 4.0 per rod from the table above. The result is the totalLimestone 136 - 183 118 - 159 104 - 140 8 4.5 drill steel cost per foot of hole drilled. Other drillSchist 161 - 218 140 - 189 123 - 166 9 5.0 steel lengths may be adjusted for by determining theSlate 112 - 152 97 - 132 86 - 116 10 5.5 total length of rods required and then converting that Gneiss 104 - 140 90 - 122 79 - 107 n (n+1)/2 to the number of equivalent 12 foot sections. Once
this is determined follow the procedure outlined above.
Prepared by Western Mine Division, InfoMine USA, Inc. in cooperation with Aventurine Engineering, Inc. 2006
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-8
DRILL MODEL - Atlas Copco DM25SP - DTH
Bit Life (feet/bit) Bit Cost ($/foot)
3.50 5.00 6.50 3.50 5.00 6.50Granite 2,498 - 3,380 2,254 - 3,049 2,089 - 2,827 Granite $0.16 - $0.12 $0.24 - $0.18 $0.31 - $0.23Basalt 1,118 - 1,513 1,009 - 1,365 935 - 1,266 Basalt $0.37 - $0.27 $0.55 - $0.40 $0.68 - $0.51Gabbro 1,663 - 2,250 1,500 - 2,030 1,391 - 1,882 Gabbro $0.25 - $0.18 $0.37 - $0.27 $0.46 - $0.34Shale 2,367 - 3,203 2,136 - 2,890 1,980 - 2,679 Shale $0.17 - $0.13 $0.26 - $0.19 $0.32 - $0.24Sandstone 869 - 1,176 784 - 1,061 727 - 983 Sandstone $0.47 - $0.35 $0.70 - $0.52 $0.88 - $0.65Siltstone 6,268 - 8,481 5,655 - 7,651 5,243 - 7,093 Siltstone $0.07 - $0.05 $0.10 - $0.07 $0.12 - $0.09Conglomer 484 - 655 437 - 591 405 - 548 Conglomer $0.85 - $0.63 $1.26 - $0.93 $1.58 - $1.17Breccia 3,618 - 4,896 3,265 - 4,417 3,026 - 4,095 Breccia $0.11 - $0.08 $0.17 - $0.12 $0.21 - $0.16Limestone 3,044 - 4,119 2,747 - 3,716 2,546 - 3,445 Limestone $0.13 - $0.10 $0.20 - $0.15 $0.25 - $0.19Schist 5,664 - 7,663 5,110 - 6,913 4,737 - 6,409 Schist $0.07 - $0.05 $0.11 - $0.08 $0.14 - $0.10Slate 2,836 - 3,837 2,559 - 3,462 2,372 - 3,209 Slate $0.14 - $0.11 $0.21 - $0.16 $0.27 - $0.20Gneiss 1,219 - 1,650 1,100 - 1,489 1,020 - 1,380 Gneiss $0.34 - $0.25 $0.50 - $0.37 $0.63 - $0.46
Drill Steel Life (feet/rod) Drill Steel Cost ($/foot per rod)
3.50 5.00 6.50 3.50 5.00 6.50Granite 28,996 - 39,229 26,159 - 35,392 24,252 - 32,811 Granite $0.016 - $0.012 $0.020 - $0.015 $0.025 - $0.018Basalt 16,978 - 22,970 15,317 - 20,723 14,200 - 19,212 Basalt $0.028 - $0.020 $0.034 - $0.025 $0.042 - $0.031Gabbro 18,752 - 25,371 16,918 - 22,889 15,684 - 21,220 Gabbro $0.025 - $0.018 $0.031 - $0.023 $0.038 - $0.028Shale 30,177 - 40,827 27,225 - 36,834 25,240 - 34,148 Shale $0.016 - $0.011 $0.019 - $0.014 $0.024 - $0.018Sandstone 31,235 - 42,259 28,180 - 38,125 26,125 - 35,345 Sandstone $0.015 - $0.011 $0.019 - $0.014 $0.023 - $0.017Siltstone 31,120 - 42,103 28,076 - 37,985 26,028 - 35,215 Siltstone $0.015 - $0.011 $0.019 - $0.014 $0.023 - $0.017Conglomer 35,035 - 47,400 31,608 - 42,764 29,303 - 39,645 Conglomer $0.013 - $0.010 $0.017 - $0.012 $0.020 - $0.015Breccia 45,750 - 61,896 41,275 - 55,842 38,265 - 51,770 Breccia $0.010 - $0.008 $0.013 - $0.009 $0.016 - $0.012Limestone 39,235 - 53,082 35,397 - 47,890 32,816 - 44,398 Limestone $0.012 - $0.009 $0.015 - $0.011 $0.018 - $0.013Schist 46,452 - 62,847 41,908 - 56,699 38,852 - 52,565 Schist $0.010 - $0.007 $0.013 - $0.009 $0.015 - $0.011Slate 32,566 - 44,060 29,381 - 39,750 27,238 - 36,852 Slate $0.014 - $0.011 $0.018 - $0.013 $0.022 - $0.016Gneiss 30,123 - 40,755 27,177 - 36,768 25,195 - 34,087 Gneiss $0.016 - $0.011 $0.019 - $0.014 $0.024 - $0.018
(Based on 12 foot drilling rod length.)
Penetration Rate (feet/hour) Drill Steel Cost Adjustment FactorAs this study is based on 12 foot drilling rod length,
3.50 5.00 6.50 Number of rods Factor the total steel cost per foot of hole drilled dependsGranite 129 - 175 84 - 114 61 - 83 upon the total number of 12 foot sections in the hole.Basalt 75 - 102 49 - 66 36 - 48 1 1.0 Divide the total hole length by 12 and round this resultGabbro 83 - 113 54 - 73 39 - 53 2 1.5 up to the next whole number to determine number of Shale 135 - 182 88 - 119 64 - 87 3 2.0 rods required to drill the hole. Adjust this number to theSandstone 140 - 189 91 - 123 66 - 90 4 2.5 average number of rods during drilling by consultingSiltstone 139 - 188 90 - 122 66 - 89 5 3.0 the Drill Steel Cost Adjustment Factor table to the left.Conglomer 157 - 212 102 - 138 74 - 101 6 3.5 Multiply this adjustment factor times the cost per footBreccia 205 - 278 134 - 181 98 - 132 7 4.0 per rod from the table above. The result is the totalLimestone 176 - 238 114 - 155 83 - 113 8 4.5 drill steel cost per foot of hole drilled. Other drillSchist 209 - 282 136 - 184 99 - 134 9 5.0 steel lengths may be adjusted for by determining theSlate 146 - 197 95 - 128 69 - 93 10 5.5 total length of rods required and then converting that Gneiss 134 - 182 88 - 118 64 - 86 n (n+1)/2 to the number of equivalent 12 foot sections. Once
this is determined follow the procedure outlined above.
Prepared by Western Mine Division, InfoMine USA, Inc. in cooperation with Aventurine Engineering, Inc. 2006
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-9
DRILL MODEL - Atlas Copco DM30 -DTH
Bit Life (feet/bit) Bit Cost ($/foot)
5.50 6.00 6.50 5.50 6.00 6.50Granite 1,946 - 2,633 1,898 - 2,568 1,855 - 2,509 Granite $0.30 - $0.22 $0.33 - $0.25 $0.35 - $0.26Basalt 871 - 1,179 850 - 1,150 830 - 1,124 Basalt $0.66 - $0.49 $0.74 - $0.55 $0.77 - $0.57Gabbro 1,296 - 1,753 1,263 - 1,709 1,235 - 1,670 Gabbro $0.44 - $0.33 $0.50 - $0.37 $0.52 - $0.38Shale 1,845 - 2,496 1,799 - 2,434 1,758 - 2,378 Shale $0.31 - $0.23 $0.35 - $0.26 $0.36 - $0.27Sandstone 677 - 916 660 - 893 645 - 873 Sandstone $0.85 - $0.63 $0.95 - $0.71 $0.99 - $0.73Siltstone 4,884 - 6,608 4,763 - 6,444 4,654 - 6,297 Siltstone $0.12 - $0.09 $0.13 - $0.10 $0.14 - $0.10Conglomer 377 - 510 368 - 498 360 - 486 Conglomer $1.52 - $1.13 $1.71 - $1.27 $1.78 - $1.32Breccia 2,819 - 3,814 2,749 - 3,720 2,687 - 3,635 Breccia $0.20 - $0.15 $0.23 - $0.17 $0.24 - $0.18Limestone 2,372 - 3,209 2,313 - 3,130 2,260 - 3,058 Limestone $0.24 - $0.18 $0.27 - $0.20 $0.28 - $0.21Schist 4,413 - 5,970 4,303 - 5,822 4,205 - 5,689 Schist $0.13 - $0.10 $0.15 - $0.11 $0.15 - $0.11Slate 2,210 - 2,990 2,155 - 2,916 2,106 - 2,849 Slate $0.26 - $0.19 $0.29 - $0.22 $0.30 - $0.22Gneiss 950 - 1,285 927 - 1,254 905 - 1,225 Gneiss $0.61 - $0.45 $0.68 - $0.50 $0.71 - $0.52
Drill Steel Life (feet/rod) Drill Steel Cost ($/foot per rod)
5.50 6.00 6.50 5.50 6.00 6.50Granite 26,110 - 35,326 25,463 - 34,450 24,881 - 33,663 Granite $0.020 - $0.015 $0.024 - $0.017 $0.029 - $0.021Basalt 15,288 - 20,684 14,909 - 20,171 14,569 - 19,711 Basalt $0.034 - $0.025 $0.040 - $0.030 $0.050 - $0.037Gabbro 16,886 - 22,846 16,468 - 22,280 16,092 - 21,771 Gabbro $0.031 - $0.023 $0.036 - $0.027 $0.045 - $0.033Shale 27,174 - 36,765 26,500 - 35,853 25,895 - 35,034 Shale $0.019 - $0.014 $0.023 - $0.017 $0.028 - $0.021Sandstone 28,127 - 38,054 27,429 - 37,110 26,803 - 36,263 Sandstone $0.019 - $0.014 $0.022 - $0.016 $0.027 - $0.020Siltstone 28,023 - 37,914 27,328 - 36,974 26,704 - 36,129 Siltstone $0.019 - $0.014 $0.022 - $0.016 $0.027 - $0.020Conglomer 31,549 - 42,684 30,766 - 41,625 30,064 - 40,675 Conglomer $0.017 - $0.012 $0.019 - $0.014 $0.024 - $0.018Breccia 41,197 - 55,738 40,176 - 54,355 39,258 - 53,114 Breccia $0.013 - $0.009 $0.015 - $0.011 $0.018 - $0.014Limestone 35,331 - 47,800 34,455 - 46,615 33,668 - 45,551 Limestone $0.015 - $0.011 $0.017 - $0.013 $0.021 - $0.016Schist 41,830 - 56,593 40,792 - 55,190 39,861 - 53,929 Schist $0.013 - $0.009 $0.015 - $0.011 $0.018 - $0.013Slate 29,326 - 39,676 28,599 - 38,692 27,945 - 37,809 Slate $0.018 - $0.013 $0.021 - $0.015 $0.026 - $0.019Gneiss 27,126 - 36,700 26,453 - 35,790 25,849 - 34,972 Gneiss $0.019 - $0.014 $0.023 - $0.017 $0.028 - $0.021
(Based on 12 foot drilling rod length.)
Penetration Rate (feet/hour) Drill Steel Cost Adjustment FactorAs this study is based on 12 foot drilling rod length,
5.50 6.00 6.50 Number of rods Factor the total steel cost per foot of hole drilled dependsGranite 81 - 110 73 - 99 67 - 90 upon the total number of 12 foot sections in the hole.Basalt 47 - 64 43 - 58 39 - 52 1 1.0 Divide the total hole length by 12 and round this resultGabbro 52 - 71 47 - 64 43 - 58 2 1.5 up to the next whole number to determine number of Shale 85 - 115 76 - 103 69 - 94 3 2.0 rods required to drill the hole. Adjust this number to theSandstone 88 - 119 79 - 107 72 - 97 4 2.5 average number of rods during drilling by consultingSiltstone 87 - 118 79 - 107 72 - 97 5 3.0 the Drill Steel Cost Adjustment Factor table to the left.Conglomer 99 - 133 89 - 120 81 - 109 6 3.5 Multiply this adjustment factor times the cost per footBreccia 129 - 175 116 - 158 106 - 143 7 4.0 per rod from the table above. The result is the totalLimestone 111 - 150 100 - 135 91 - 122 8 4.5 drill steel cost per foot of hole drilled. Other drillSchist 131 - 178 118 - 160 107 - 145 9 5.0 steel lengths may be adjusted for by determining theSlate 92 - 124 83 - 112 75 - 101 10 5.5 total length of rods required and then converting that Gneiss 85 - 115 76 - 103 69 - 94 n (n+1)/2 to the number of equivalent 12 foot sections. Once
this is determined follow the procedure outlined above.
Prepared by Western Mine Division, InfoMine USA, Inc. in cooperation with Aventurine Engineering, Inc. 2006
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-10
DRILL MODEL - Atlas Copco DM45 -DTH
Bit Life (feet/bit) Bit Cost ($/foot)
5.00 6.50 8.00 5.00 6.50 8.00Granite 2,580 - 3,490 2,392 - 3,236 2,253 - 3,048 Granite $0.21 - $0.16 $0.27 - $0.20 $0.55 - $0.40Basalt 1,155 - 1,563 1,071 - 1,449 1,009 - 1,364 Basalt $0.48 - $0.35 $0.60 - $0.44 $1.22 - $0.90Gabbro 1,717 - 2,323 1,592 - 2,154 1,499 - 2,029 Gabbro $0.32 - $0.24 $0.40 - $0.30 $0.82 - $0.61Shale 2,445 - 3,308 2,267 - 3,067 2,135 - 2,888 Shale $0.22 - $0.17 $0.28 - $0.21 $0.58 - $0.43Sandstone 897 - 1,214 832 - 1,126 784 - 1,060 Sandstone $0.61 - $0.45 $0.77 - $0.57 $1.57 - $1.16Siltstone 6,473 - 8,758 6,001 - 8,120 5,652 - 7,647 Siltstone $0.08 - $0.06 $0.11 - $0.08 $0.22 - $0.16Conglomer 500 - 677 464 - 627 437 - 591 Conglomer $1.10 - $0.81 $1.38 - $1.02 $2.82 - $2.08Breccia 3,737 - 5,056 3,464 - 4,687 3,263 - 4,414 Breccia $0.15 - $0.11 $0.18 - $0.14 $0.38 - $0.28Limestone 3,144 - 4,254 2,915 - 3,944 2,745 - 3,714 Limestone $0.17 - $0.13 $0.22 - $0.16 $0.45 - $0.33Schist 5,849 - 7,913 5,422 - 7,336 5,107 - 6,910 Schist $0.09 - $0.07 $0.12 - $0.09 $0.24 - $0.18Slate 2,929 - 3,963 2,715 - 3,674 2,557 - 3,460 Slate $0.19 - $0.14 $0.24 - $0.17 $0.48 - $0.36Gneiss 1,259 - 1,704 1,168 - 1,580 1,100 - 1,488 Gneiss $0.44 - $0.32 $0.55 - $0.41 $1.12 - $0.83
Drill Steel Life (feet/rod) Drill Steel Cost ($/foot per rod)
5.00 6.50 8.00 5.00 6.50 8.00Granite 28,482 - 38,534 26,405 - 35,724 24,869 - 33,646 Granite $0.021 - $0.016 $0.027 - $0.020 $0.029 - $0.021Basalt 16,677 - 22,563 15,461 - 20,917 14,561 - 19,701 Basalt $0.036 - $0.027 $0.047 - $0.035 $0.050 - $0.037Gabbro 18,420 - 24,921 17,077 - 23,104 16,083 - 21,760 Gabbro $0.033 - $0.024 $0.042 - $0.031 $0.045 - $0.033Shale 29,642 - 40,104 27,480 - 37,179 25,882 - 35,017 Shale $0.020 - $0.015 $0.026 - $0.019 $0.028 - $0.021Sandstone 30,681 - 41,510 28,444 - 38,483 26,789 - 36,245 Sandstone $0.020 - $0.014 $0.025 - $0.019 $0.027 - $0.020Siltstone 30,568 - 41,357 28,339 - 38,341 26,691 - 36,111 Siltstone $0.020 - $0.014 $0.025 - $0.019 $0.027 - $0.020Conglomer 34,414 - 46,560 31,904 - 43,165 30,049 - 40,654 Conglomer $0.017 - $0.013 $0.023 - $0.017 $0.024 - $0.018Breccia 44,939 - 60,799 41,662 - 56,366 39,238 - 53,087 Breccia $0.013 - $0.010 $0.017 - $0.013 $0.018 - $0.014Limestone 38,539 - 52,141 35,729 - 48,339 33,651 - 45,527 Limestone $0.016 - $0.011 $0.020 - $0.015 $0.021 - $0.016Schist 45,628 - 61,733 42,301 - 57,231 39,841 - 53,902 Schist $0.013 - $0.010 $0.017 - $0.013 $0.018 - $0.013Slate 31,989 - 43,279 29,656 - 40,123 27,931 - 37,789 Slate $0.019 - $0.014 $0.024 - $0.018 $0.026 - $0.019Gneiss 29,589 - 40,032 27,432 - 37,113 25,836 - 34,955 Gneiss $0.020 - $0.015 $0.026 - $0.019 $0.028 - $0.021
(Based on 12 foot drilling rod length.)
Penetration Rate (feet/hour) Drill Steel Cost Adjustment FactorAs this study is based on 12 foot drilling rod length,
5.00 6.50 8.00 Number of rods Factor the total steel cost per foot of hole drilled dependsGranite 109 - 148 80 - 108 62 - 84 upon the total number of 12 foot sections in the hole.Basalt 64 - 86 46 - 63 36 - 49 1 1.0 Divide the total hole length by 12 and round this resultGabbro 70 - 95 51 - 69 40 - 54 2 1.5 up to the next whole number to determine number of Shale 114 - 154 83 - 112 65 - 88 3 2.0 rods required to drill the hole. Adjust this number to theSandstone 118 - 160 86 - 116 67 - 91 4 2.5 average number of rods during drilling by consultingSiltstone 118 - 159 86 - 116 67 - 90 5 3.0 the Drill Steel Cost Adjustment Factor table to the left.Conglomer 133 - 179 97 - 131 75 - 102 6 3.5 Multiply this adjustment factor times the cost per footBreccia 174 - 235 127 - 171 99 - 134 7 4.0 per rod from the table above. The result is the totalLimestone 149 - 201 108 - 147 84 - 114 8 4.5 drill steel cost per foot of hole drilled. Other drillSchist 177 - 239 129 - 174 100 - 136 9 5.0 steel lengths may be adjusted for by determining theSlate 123 - 167 90 - 121 70 - 95 10 5.5 total length of rods required and then converting that Gneiss 114 - 154 83 - 112 65 - 87 n (n+1)/2 to the number of equivalent 12 foot sections. Once
this is determined follow the procedure outlined above.
Prepared by Western Mine Division, InfoMine USA, Inc. in cooperation with Aventurine Engineering, Inc. 2006
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-11
DRILL MODEL - Atlas Copco DM M2 -DTH
Bit Life (feet/bit) Bit Cost ($/foot)
8.88 10.00 11.875 8.88 10.00 11.875Granite 1,779 - 2,407 1,719 - 2,325 1,636 - 2,213 Granite $0.78 - $0.58 $1.11 - $0.82 $2.75 - $2.03Basalt 796 - 1,078 770 - 1,041 732 - 991 Basalt $1.74 - $1.29 $2.47 - $1.82 $6.15 - $4.54Gabbro 1,184 - 1,602 1,144 - 1,548 1,089 - 1,473 Gabbro $1.17 - $0.86 $1.66 - $1.23 $4.13 - $3.06Shale 1,686 - 2,281 1,629 - 2,204 1,550 - 2,097 Shale $0.82 - $0.61 $1.17 - $0.86 $2.90 - $2.15Sandstone 619 - 837 598 - 809 569 - 770 Sandstone $2.24 - $1.65 $3.18 - $2.35 $7.91 - $5.85Siltstone 4,464 - 6,039 4,313 - 5,835 4,104 - 5,553 Siltstone $0.31 - $0.23 $0.44 - $0.33 $1.10 - $0.81Conglomer 345 - 467 333 - 451 317 - 429 Conglomer $4.02 - $2.97 $5.70 - $4.22 $14.19 - $10.49Breccia 2,577 - 3,486 2,490 - 3,368 2,369 - 3,205 Breccia $0.54 - $0.40 $0.76 - $0.56 $1.90 - $1.40Limestone 2,168 - 2,933 2,095 - 2,834 1,993 - 2,697 Limestone $0.64 - $0.47 $0.91 - $0.67 $2.26 - $1.67Schist 4,033 - 5,457 3,897 - 5,272 3,708 - 5,017 Schist $0.34 - $0.25 $0.49 - $0.36 $1.21 - $0.90Slate 2,020 - 2,733 1,951 - 2,640 1,857 - 2,512 Slate $0.69 - $0.51 $0.97 - $0.72 $2.42 - $1.79Gneiss 868 - 1,175 839 - 1,135 798 - 1,080 Gneiss $1.59 - $1.18 $2.26 - $1.67 $5.64 - $4.17
Drill Steel Life (feet/rod) Drill Steel Cost ($/foot per rod)
8.88 10.00 11.875 8.88 10.00 11.875Granite 25,947 - 35,105 25,069 - 33,917 23,856 - 32,276 Granite $0.038 - $0.028 $0.040 - $0.029 $0.042 - $0.031Basalt 15,193 - 20,555 14,679 - 19,859 13,968 - 18,898 Basalt $0.065 - $0.048 $0.068 - $0.050 $0.071 - $0.053Gabbro 16,781 - 22,704 16,213 - 21,935 15,428 - 20,874 Gabbro $0.059 - $0.044 $0.061 - $0.045 $0.064 - $0.048Shale 27,004 - 36,535 26,090 - 35,298 24,828 - 33,590 Shale $0.037 - $0.027 $0.038 - $0.028 $0.040 - $0.030Sandstone 27,951 - 37,817 27,005 - 36,536 25,698 - 34,768 Sandstone $0.036 - $0.026 $0.037 - $0.027 $0.039 - $0.029Siltstone 27,848 - 37,677 26,905 - 36,401 25,604 - 34,640 Siltstone $0.036 - $0.026 $0.037 - $0.027 $0.039 - $0.029Conglomer 31,352 - 42,417 30,290 - 40,981 28,825 - 38,998 Conglomer $0.032 - $0.023 $0.033 - $0.024 $0.035 - $0.026Breccia 40,940 - 55,390 39,554 - 53,514 37,640 - 50,925 Breccia $0.024 - $0.018 $0.025 - $0.019 $0.026 - $0.020Limestone 35,110 - 47,502 33,921 - 45,894 32,280 - 43,673 Limestone $0.028 - $0.021 $0.029 - $0.022 $0.031 - $0.023Schist 41,569 - 56,240 40,161 - 54,336 38,218 - 51,707 Schist $0.024 - $0.018 $0.025 - $0.018 $0.026 - $0.019Slate 29,143 - 39,428 28,156 - 38,093 26,794 - 36,250 Slate $0.034 - $0.025 $0.035 - $0.026 $0.037 - $0.027Gneiss 26,957 - 36,471 26,044 - 35,236 24,784 - 33,531 Gneiss $0.037 - $0.027 $0.038 - $0.028 $0.040 - $0.030
(Based on 12 foot drilling rod length.)
Penetration Rate (feet/hour) Drill Steel Cost Adjustment FactorAs this study is based on 12 foot drilling rod length,
8.88 10.00 11.875 Number of rods Factor the total steel cost per foot of hole drilled dependsGranite 69 - 93 60 - 81 48 - 66 upon the total number of 12 foot sections in the hole.Basalt 40 - 54 35 - 47 28 - 38 1 1.0 Divide the total hole length by 12 and round this resultGabbro 44 - 60 38 - 52 31 - 42 2 1.5 up to the next whole number to determine number of Shale 72 - 97 62 - 84 50 - 68 3 2.0 rods required to drill the hole. Adjust this number to theSandstone 74 - 100 64 - 87 52 - 71 4 2.5 average number of rods during drilling by consultingSiltstone 74 - 100 64 - 87 52 - 70 5 3.0 the Drill Steel Cost Adjustment Factor table to the left.Conglomer 83 - 113 72 - 98 59 - 79 6 3.5 Multiply this adjustment factor times the cost per footBreccia 109 - 148 95 - 128 77 - 104 7 4.0 per rod from the table above. The result is the totalLimestone 94 - 127 81 - 110 66 - 89 8 4.5 drill steel cost per foot of hole drilled. Other drillSchist 111 - 150 96 - 130 78 - 106 9 5.0 steel lengths may be adjusted for by determining theSlate 77 - 105 67 - 91 55 - 74 10 5.5 total length of rods required and then converting that Gneiss 72 - 97 62 - 84 50 - 68 n (n+1)/2 to the number of equivalent 12 foot sections. Once
this is determined follow the procedure outlined above.
Prepared by Western Mine Division, InfoMine USA, Inc. in cooperation with Aventurine Engineering, Inc. 2006
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-12
DRILL MODEL - Atlas Copco DM25SP - Rotary
Bit Life (feet/bit) Bit Cost ($/foot)
3.88 5.00 6.25 3.88 5.00 6.25Granite 3,585 - 4,851 3,364 - 4,552 3,182 - 4,305 Granite $0.32 - $0.24 $0.48 - $0.36 $0.69 - $0.51Basalt 1,878 - 2,541 1,762 - 2,384 1,667 - 2,255 Basalt $0.61 - $0.45 $0.92 - $0.68 $1.32 - $0.98Gabbro 2,118 - 2,865 1,987 - 2,689 1,880 - 2,543 Gabbro $0.54 - $0.40 $0.82 - $0.61 $1.17 - $0.87Shale 3,762 - 5,090 3,531 - 4,777 3,339 - 4,518 Shale $0.31 - $0.23 $0.46 - $0.34 $0.66 - $0.49Sandstone 3,922 - 5,307 3,681 - 4,980 3,481 - 4,710 Sandstone $0.29 - $0.22 $0.44 - $0.33 $0.63 - $0.47Siltstone 3,905 - 5,283 3,664 - 4,957 3,466 - 4,689 Siltstone $0.29 - $0.22 $0.44 - $0.33 $0.64 - $0.47Conglomer 4,506 - 6,096 4,228 - 5,720 3,999 - 5,411 Conglomer $0.26 - $0.19 $0.39 - $0.28 $0.55 - $0.41Breccia 6,220 - 8,415 5,836 - 7,896 5,520 - 7,468 Breccia $0.18 - $0.14 $0.28 - $0.21 $0.40 - $0.30Limestone 5,166 - 6,990 4,848 - 6,559 4,585 - 6,203 Limestone $0.22 - $0.16 $0.34 - $0.25 $0.48 - $0.36Schist 6,335 - 8,571 5,945 - 8,043 5,623 - 7,607 Schist $0.18 - $0.13 $0.27 - $0.20 $0.39 - $0.29Slate 4,125 - 5,581 3,871 - 5,237 3,661 - 4,953 Slate $0.28 - $0.21 $0.42 - $0.31 $0.60 - $0.45Gneiss 3,754 - 5,079 3,523 - 4,766 3,332 - 4,508 Gneiss $0.31 - $0.23 $0.46 - $0.34 $0.66 - $0.49
Drill Steel Life (feet/rod) Drill Steel Cost ($/foot per rod)
3.88 5.00 6.25 3.88 5.00 6.25Granite 44,519 - 60,232 41,775 - 56,519 39,512 - 53,457 Granite $0.012 - $0.009 $0.038 - $0.028 $0.047 - $0.035Basalt 26,067 - 35,267 24,460 - 33,093 23,135 - 31,301 Basalt $0.020 - $0.015 $0.065 - $0.048 $0.081 - $0.060Gabbro 28,792 - 38,954 27,017 - 36,552 25,553 - 34,572 Gabbro $0.018 - $0.014 $0.059 - $0.043 $0.073 - $0.054Shale 46,333 - 62,685 43,477 - 58,821 41,121 - 55,635 Shale $0.011 - $0.008 $0.036 - $0.027 $0.046 - $0.034Sandstone 47,957 - 64,883 45,001 - 60,884 42,563 - 57,586 Sandstone $0.011 - $0.008 $0.035 - $0.026 $0.044 - $0.033Siltstone 47,780 - 64,644 44,835 - 60,659 42,406 - 57,373 Siltstone $0.011 - $0.008 $0.035 - $0.026 $0.044 - $0.033Conglomer 53,792 - 72,777 50,476 - 68,291 47,741 - 64,591 Conglomer $0.010 - $0.007 $0.031 - $0.023 $0.039 - $0.029Breccia 70,243 - 95,034 65,913 - 89,176 62,342 - 84,345 Breccia $0.007 - $0.006 $0.024 - $0.018 $0.030 - $0.022Limestone 60,240 - 81,501 56,527 - 76,478 53,465 - 72,334 Limestone $0.009 - $0.006 $0.028 - $0.021 $0.035 - $0.026Schist 71,321 - 96,493 66,925 - 90,545 63,299 - 85,640 Schist $0.007 - $0.005 $0.024 - $0.017 $0.030 - $0.022Slate 50,001 - 67,649 46,919 - 63,479 44,377 - 60,040 Slate $0.011 - $0.008 $0.034 - $0.025 $0.042 - $0.031Gneiss 46,250 - 62,574 43,400 - 58,717 41,048 - 55,536 Gneiss $0.011 - $0.008 $0.036 - $0.027 $0.046 - $0.034
(Based on 12 foot drilling rod length.)
Penetration Rate (feet/hour) Drill Steel Cost Adjustment FactorAs this study is based on 12 foot drilling rod length,
3.88 5.00 6.25 Number of rods Factor the total steel cost per foot of hole drilled dependsGranite 57 - 77 34 - 46 22 - 29 upon the total number of 12 foot sections in the hole.Basalt 33 - 45 20 - 27 13 - 17 1 1.0 Divide the total hole length by 12 and round this resultGabbro 37 - 50 22 - 30 14 - 19 2 1.5 up to the next whole number to determine number of Shale 60 - 81 36 - 48 23 - 31 3 2.0 rods required to drill the hole. Adjust this number to theSandstone 62 - 83 37 - 50 23 - 32 4 2.5 average number of rods during drilling by consultingSiltstone 61 - 83 37 - 50 23 - 32 5 3.0 the Drill Steel Cost Adjustment Factor table to the left.Conglomer 69 - 94 41 - 56 26 - 36 6 3.5 Multiply this adjustment factor times the cost per footBreccia 91 - 123 54 - 73 34 - 47 7 4.0 per rod from the table above. The result is the totalLimestone 78 - 105 46 - 63 29 - 40 8 4.5 drill steel cost per foot of hole drilled. Other drillSchist 92 - 125 55 - 74 35 - 47 9 5.0 steel lengths may be adjusted for by determining theSlate 64 - 87 38 - 52 24 - 33 10 5.5 total length of rods required and then converting that Gneiss 59 - 80 35 - 48 23 - 31 n (n+1)/2 to the number of equivalent 12 foot sections. Once
this is determined follow the procedure outlined above.
Prepared by Western Mine Division, InfoMine USA, Inc. in cooperation with Aventurine Engineering, Inc. 2006
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-13
DRILL MODEL - Atlas Copco DM30 -Rotary
Bit Life (feet/bit) Bit Cost ($/foot)
5.50 6.00 6.75 5.50 6.00 6.75Granite 3,347 - 4,528 3,275 - 4,431 3,180 - 4,302 Granite $0.59 - $0.44 $0.65 - $0.48 $0.77 - $0.57Basalt 1,753 - 2,372 1,716 - 2,321 1,666 - 2,254 Basalt $1.12 - $0.83 $1.24 - $0.92 $1.48 - $1.09Gabbro 1,977 - 2,675 1,934 - 2,617 1,878 - 2,541 Gabbro $1.00 - $0.74 $1.10 - $0.81 $1.31 - $0.97Shale 3,512 - 4,752 3,437 - 4,649 3,337 - 4,515 Shale $0.56 - $0.42 $0.62 - $0.46 $0.74 - $0.55Sandstone 3,661 - 4,954 3,583 - 4,847 3,479 - 4,707 Sandstone $0.54 - $0.40 $0.59 - $0.44 $0.71 - $0.52Siltstone 3,645 - 4,931 3,567 - 4,826 3,463 - 4,686 Siltstone $0.54 - $0.40 $0.60 - $0.44 $0.71 - $0.53Conglomer 4,206 - 5,690 4,116 - 5,568 3,996 - 5,407 Conglomer $0.47 - $0.35 $0.52 - $0.38 $0.62 - $0.46Breccia 5,806 - 7,855 5,681 - 7,686 5,516 - 7,463 Breccia $0.34 - $0.25 $0.38 - $0.28 $0.45 - $0.33Limestone 4,822 - 6,524 4,719 - 6,384 4,582 - 6,199 Limestone $0.41 - $0.30 $0.45 - $0.33 $0.54 - $0.40Schist 5,913 - 8,000 5,786 - 7,829 5,619 - 7,602 Schist $0.33 - $0.25 $0.37 - $0.27 $0.44 - $0.32Slate 3,851 - 5,210 3,768 - 5,098 3,659 - 4,950 Slate $0.51 - $0.38 $0.57 - $0.42 $0.67 - $0.50Gneiss 3,504 - 4,741 3,429 - 4,639 3,330 - 4,505 Gneiss $0.56 - $0.42 $0.62 - $0.46 $0.74 - $0.55
Drill Steel Life (feet/rod) Drill Steel Cost ($/foot per rod)
5.50 6.00 6.75 5.50 6.00 6.75Granite 41,556 - 56,222 40,663 - 55,014 39,485 - 53,421 Granite $0.045 - $0.033 $0.046 - $0.034 $0.047 - $0.035Basalt 24,332 - 32,920 23,809 - 32,212 23,119 - 31,279 Basalt $0.077 - $0.057 $0.079 - $0.058 $0.081 - $0.060Gabbro 26,875 - 36,360 26,298 - 35,579 25,536 - 34,549 Gabbro $0.070 - $0.051 $0.071 - $0.053 $0.073 - $0.054Shale 43,248 - 58,513 42,319 - 57,255 41,093 - 55,597 Shale $0.043 - $0.032 $0.044 - $0.033 $0.046 - $0.034Sandstone 44,765 - 60,564 43,803 - 59,263 42,534 - 57,546 Sandstone $0.042 - $0.031 $0.043 - $0.032 $0.044 - $0.033Siltstone 44,600 - 60,341 43,642 - 59,045 42,377 - 57,334 Siltstone $0.042 - $0.031 $0.043 - $0.032 $0.044 - $0.033Conglomer 50,211 - 67,932 49,132 - 66,473 47,709 - 64,547 Conglomer $0.037 - $0.028 $0.038 - $0.028 $0.039 - $0.029Breccia 65,567 - 88,708 64,158 - 86,802 62,299 - 84,288 Breccia $0.029 - $0.021 $0.029 - $0.022 $0.030 - $0.022Limestone 56,230 - 76,076 55,022 - 74,441 53,428 - 72,285 Limestone $0.033 - $0.025 $0.034 - $0.025 $0.035 - $0.026Schist 66,573 - 90,070 65,143 - 88,135 63,256 - 85,582 Schist $0.028 - $0.021 $0.029 - $0.021 $0.030 - $0.022Slate 46,673 - 63,146 45,670 - 61,789 44,347 - 59,999 Slate $0.040 - $0.030 $0.041 - $0.030 $0.042 - $0.031Gneiss 43,172 - 58,409 42,244 - 57,154 41,020 - 55,498 Gneiss $0.043 - $0.032 $0.044 - $0.033 $0.046 - $0.034
(Based on 12 foot drilling rod length.)
Penetration Rate (feet/hour) Drill Steel Cost Adjustment FactorAs this study is based on 12 foot drilling rod length,
5.50 6.00 6.75 Number of rods Factor the total steel cost per foot of hole drilled dependsGranite 32 - 43 27 - 36 21 - 28 upon the total number of 12 foot sections in the hole.Basalt 18 - 25 15 - 21 12 - 16 1 1.0 Divide the total hole length by 12 and round this resultGabbro 20 - 28 17 - 23 13 - 18 2 1.5 up to the next whole number to determine number of Shale 33 - 45 28 - 37 22 - 29 3 2.0 rods required to drill the hole. Adjust this number to theSandstone 34 - 46 29 - 39 23 - 31 4 2.5 average number of rods during drilling by consultingSiltstone 34 - 46 29 - 39 22 - 30 5 3.0 the Drill Steel Cost Adjustment Factor table to the left.Conglomer 38 - 52 32 - 44 25 - 34 6 3.5 Multiply this adjustment factor times the cost per footBreccia 50 - 68 42 - 57 33 - 45 7 4.0 per rod from the table above. The result is the totalLimestone 43 - 58 36 - 49 28 - 38 8 4.5 drill steel cost per foot of hole drilled. Other drillSchist 51 - 69 43 - 58 34 - 46 9 5.0 steel lengths may be adjusted for by determining theSlate 36 - 48 30 - 40 24 - 32 10 5.5 total length of rods required and then converting that Gneiss 33 - 45 28 - 37 22 - 29 n (n+1)/2 to the number of equivalent 12 foot sections. Once
this is determined follow the procedure outlined above.
Prepared by Western Mine Division, InfoMine USA, Inc. in cooperation with Aventurine Engineering, Inc. 2006
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-14
DRILL MODEL - Atlas Copco DM45 -Rotary
Bit Life (feet/bit) Bit Cost ($/foot)
5.00 6.75 7.875 5.00 6.75 7.875Granite 3,619 - 4,897 3,358 - 4,543 3,231 - 4,372 Granite $0.45 - $0.33 $0.73 - $0.54 $0.94 - $0.69Basalt 1,896 - 2,565 1,759 - 2,380 1,693 - 2,290 Basalt $0.86 - $0.64 $1.40 - $1.03 $1.79 - $1.32Gabbro 2,138 - 2,893 1,984 - 2,684 1,909 - 2,582 Gabbro $0.76 - $0.56 $1.24 - $0.92 $1.58 - $1.17Shale 3,798 - 5,139 3,524 - 4,768 3,391 - 4,588 Shale $0.43 - $0.32 $0.70 - $0.52 $0.89 - $0.66Sandstone 3,960 - 5,357 3,674 - 4,971 3,535 - 4,783 Sandstone $0.41 - $0.30 $0.67 - $0.50 $0.86 - $0.63Siltstone 3,942 - 5,333 3,658 - 4,948 3,519 - 4,762 Siltstone $0.41 - $0.31 $0.67 - $0.50 $0.86 - $0.63Conglomer 4,549 - 6,154 4,220 - 5,710 4,061 - 5,494 Conglomer $0.36 - $0.26 $0.58 - $0.43 $0.74 - $0.55Breccia 6,279 - 8,495 5,825 - 7,881 5,606 - 7,584 Breccia $0.26 - $0.19 $0.42 - $0.31 $0.54 - $0.40Limestone 5,215 - 7,056 4,839 - 6,547 4,656 - 6,300 Limestone $0.31 - $0.23 $0.51 - $0.38 $0.65 - $0.48Schist 6,395 - 8,652 5,934 - 8,028 5,710 - 7,725 Schist $0.25 - $0.19 $0.42 - $0.31 $0.53 - $0.39Slate 4,164 - 5,634 3,864 - 5,228 3,718 - 5,030 Slate $0.39 - $0.29 $0.64 - $0.47 $0.81 - $0.60Gneiss 3,790 - 5,128 3,517 - 4,758 3,384 - 4,578 Gneiss $0.43 - $0.32 $0.70 - $0.52 $0.89 - $0.66
Drill Steel Life (feet/rod) Drill Steel Cost ($/foot per rod)
5.00 6.75 7.875 5.00 6.75 7.875Granite 44,942 - 60,803 41,698 - 56,415 40,124 - 54,286 Granite $0.035 - $0.026 $0.045 - $0.033 $0.069 - $0.051Basalt 26,314 - 35,602 24,415 - 33,033 23,494 - 31,786 Basalt $0.060 - $0.044 $0.077 - $0.057 $0.117 - $0.087Gabbro 29,065 - 39,323 26,967 - 36,485 25,950 - 35,108 Gabbro $0.054 - $0.040 $0.069 - $0.051 $0.106 - $0.079Shale 46,772 - 63,280 43,397 - 58,713 41,759 - 56,497 Shale $0.034 - $0.025 $0.043 - $0.032 $0.066 - $0.049Sandstone 48,412 - 65,499 44,919 - 60,772 43,223 - 58,478 Sandstone $0.033 - $0.024 $0.042 - $0.031 $0.064 - $0.047Siltstone 48,234 - 65,258 44,753 - 60,548 43,064 - 58,263 Siltstone $0.033 - $0.024 $0.042 - $0.031 $0.064 - $0.047Conglomer 54,302 - 73,468 50,383 - 68,166 48,482 - 65,593 Conglomer $0.029 - $0.022 $0.037 - $0.027 $0.057 - $0.042Breccia 70,909 - 95,936 65,792 - 89,013 63,309 - 85,653 Breccia $0.022 - $0.017 $0.028 - $0.021 $0.044 - $0.032Limestone 60,812 - 82,275 56,423 - 76,337 54,293 - 73,456 Limestone $0.026 - $0.019 $0.033 - $0.025 $0.051 - $0.038Schist 71,998 - 97,409 66,802 - 90,379 64,280 - 86,968 Schist $0.022 - $0.016 $0.028 - $0.021 $0.043 - $0.032Slate 50,476 - 68,291 46,833 - 63,362 45,065 - 60,971 Slate $0.031 - $0.023 $0.040 - $0.030 $0.061 - $0.045Gneiss 46,689 - 63,168 43,320 - 58,609 41,685 - 56,397 Gneiss $0.034 - $0.025 $0.043 - $0.032 $0.066 - $0.049
(Based on 12 foot drilling rod length.)
Penetration Rate (feet/hour) Drill Steel Cost Adjustment FactorAs this study is based on 12 foot drilling rod length,
5.00 6.75 7.875 Number of rods Factor the total steel cost per foot of hole drilled dependsGranite 50 - 68 27 - 37 20 - 27 upon the total number of 12 foot sections in the hole.Basalt 29 - 39 16 - 21 12 - 16 1 1.0 Divide the total hole length by 12 and round this resultGabbro 32 - 44 17 - 24 13 - 17 2 1.5 up to the next whole number to determine number of Shale 52 - 71 28 - 38 21 - 28 3 2.0 rods required to drill the hole. Adjust this number to theSandstone 54 - 73 29 - 40 21 - 29 4 2.5 average number of rods during drilling by consultingSiltstone 54 - 73 29 - 40 21 - 29 5 3.0 the Drill Steel Cost Adjustment Factor table to the left.Conglomer 61 - 82 33 - 45 24 - 33 6 3.5 Multiply this adjustment factor times the cost per footBreccia 80 - 108 43 - 59 32 - 43 7 4.0 per rod from the table above. The result is the totalLimestone 68 - 92 37 - 50 27 - 37 8 4.5 drill steel cost per foot of hole drilled. Other drillSchist 81 - 109 44 - 59 32 - 44 9 5.0 steel lengths may be adjusted for by determining theSlate 56 - 76 31 - 41 22 - 30 10 5.5 total length of rods required and then converting that Gneiss 52 - 70 28 - 38 21 - 28 n (n+1)/2 to the number of equivalent 12 foot sections. Once
this is determined follow the procedure outlined above.
Prepared by Western Mine Division, InfoMine USA, Inc. in cooperation with Aventurine Engineering, Inc. 2006
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-15
DRILL MODEL - Atlas Copco DM M2 -Rotary
Bit Life (feet/bit) Bit Cost ($/foot)
9.00 9.875 11.00 9.00 9.875 11.00Granite 3,312 - 4,481 3,236 - 4,378 3,150 - 4,262 Granite $1.08 - $0.80 $1.48 - $1.09 $1.79 - $1.32Basalt 1,735 - 2,347 1,695 - 2,294 1,650 - 2,233 Basalt $2.07 - $1.53 $2.82 - $2.09 $3.42 - $2.53Gabbro 1,956 - 2,647 1,912 - 2,586 1,861 - 2,518 Gabbro $1.83 - $1.36 $2.50 - $1.85 $3.03 - $2.24Shale 3,476 - 4,702 3,396 - 4,595 3,306 - 4,473 Shale $1.03 - $0.76 $1.41 - $1.04 $1.71 - $1.26Sandstone 3,623 - 4,902 3,540 - 4,790 3,446 - 4,663 Sandstone $0.99 - $0.73 $1.35 - $1.00 $1.64 - $1.21Siltstone 3,607 - 4,880 3,525 - 4,769 3,431 - 4,642 Siltstone $0.99 - $0.74 $1.36 - $1.00 $1.64 - $1.22Conglomer 4,162 - 5,631 4,067 - 5,502 3,959 - 5,356 Conglomer $0.86 - $0.64 $1.18 - $0.87 $1.42 - $1.05Breccia 5,745 - 7,773 5,614 - 7,595 5,465 - 7,393 Breccia $0.62 - $0.46 $0.85 - $0.63 $1.03 - $0.76Limestone 4,772 - 6,457 4,663 - 6,309 4,539 - 6,141 Limestone $0.75 - $0.56 $1.03 - $0.76 $1.24 - $0.92Schist 5,852 - 7,917 5,718 - 7,736 5,566 - 7,531 Schist $0.61 - $0.45 $0.84 - $0.62 $1.01 - $0.75Slate 3,811 - 5,156 3,723 - 5,038 3,624 - 4,904 Slate $0.94 - $0.70 $1.29 - $0.95 $1.56 - $1.15Gneiss 3,468 - 4,692 3,389 - 4,585 3,299 - 4,463 Gneiss $1.03 - $0.76 $1.41 - $1.04 $1.71 - $1.26
Drill Steel Life (feet/rod) Drill Steel Cost ($/foot per rod)
9.00 9.875 11.00 9.00 9.875 11.00Granite 41,124 - 55,639 40,183 - 54,365 39,115 - 52,921 Granite $0.067 - $0.050 $0.069 - $0.051 $0.070 - $0.051Basalt 24,079 - 32,578 23,528 - 31,832 22,903 - 30,986 Basalt $0.115 - $0.085 $0.117 - $0.087 $0.119 - $0.088Gabbro 26,596 - 35,983 25,987 - 35,159 25,297 - 34,225 Gabbro $0.104 - $0.077 $0.106 - $0.078 $0.108 - $0.079Shale 42,800 - 57,905 41,820 - 56,580 40,709 - 55,077 Shale $0.064 - $0.048 $0.066 - $0.049 $0.067 - $0.049Sandstone 44,300 - 59,936 43,286 - 58,564 42,136 - 57,008 Sandstone $0.062 - $0.046 $0.064 - $0.047 $0.065 - $0.048Siltstone 44,137 - 59,715 43,127 - 58,348 41,981 - 56,798 Siltstone $0.063 - $0.046 $0.064 - $0.047 $0.065 - $0.048Conglomer 49,690 - 67,228 48,552 - 65,689 47,262 - 63,943 Conglomer $0.056 - $0.041 $0.057 - $0.042 $0.058 - $0.043Breccia 64,887 - 87,788 63,401 - 85,778 61,717 - 83,499 Breccia $0.043 - $0.031 $0.044 - $0.032 $0.044 - $0.033Limestone 55,647 - 75,287 54,373 - 73,563 52,928 - 71,609 Limestone $0.050 - $0.037 $0.051 - $0.038 $0.051 - $0.038Schist 65,883 - 89,135 64,374 - 87,095 62,664 - 84,781 Schist $0.042 - $0.031 $0.043 - $0.032 $0.043 - $0.032Slate 46,189 - 62,490 45,131 - 61,060 43,932 - 59,438 Slate $0.060 - $0.044 $0.061 - $0.045 $0.062 - $0.046Gneiss 42,724 - 57,803 41,746 - 56,479 40,637 - 54,979 Gneiss $0.065 - $0.048 $0.066 - $0.049 $0.067 - $0.049
(Based on 12 foot drilling rod length.)
Penetration Rate (feet/hour) Drill Steel Cost Adjustment FactorAs this study is based on 12 foot drilling rod length,
9.00 9.875 11.00 Number of rods Factor the total steel cost per foot of hole drilled dependsGranite 21 - 29 18 - 24 14 - 19 upon the total number of 12 foot sections in the hole.Basalt 12 - 17 10 - 14 8 - 11 1 1.0 Divide the total hole length by 12 and round this resultGabbro 14 - 18 11 - 15 9 - 12 2 1.5 up to the next whole number to determine number of Shale 22 - 30 18 - 25 15 - 20 3 2.0 rods required to drill the hole. Adjust this number to theSandstone 23 - 31 19 - 26 15 - 21 4 2.5 average number of rods during drilling by consultingSiltstone 23 - 31 19 - 26 15 - 21 5 3.0 the Drill Steel Cost Adjustment Factor table to the left.Conglomer 26 - 35 21 - 29 17 - 23 6 3.5 Multiply this adjustment factor times the cost per footBreccia 34 - 46 28 - 38 22 - 30 7 4.0 per rod from the table above. The result is the totalLimestone 29 - 39 24 - 32 19 - 26 8 4.5 drill steel cost per foot of hole drilled. Other drillSchist 34 - 46 28 - 38 23 - 31 9 5.0 steel lengths may be adjusted for by determining theSlate 24 - 32 20 - 27 16 - 22 10 5.5 total length of rods required and then converting that Gneiss 22 - 30 18 - 25 15 - 20 n (n+1)/2 to the number of equivalent 12 foot sections. Once
this is determined follow the procedure outlined above.
Prepared by Western Mine Division, InfoMine USA, Inc. in cooperation with Aventurine Engineering, Inc. 2006
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-16
DRILL MODEL - Bucyrus International 59R -Rotary
Bit Life (feet/bit) Bit Cost ($/foot)
12.25 15.00 16.00 12.25 15.00 16.00Granite 3379.984 - 4572.919 3213.372 - 4347.504 3162.023 - 4278.031 Granite $1.95 - $1.44 $3.23 - $2.38 $3.48 - $2.58Basalt 1770.653 - 2395.589 1683.371 - 2277.502 1656.471 - 2241.108 Basalt $3.73 - $2.76 $6.16 - $4.55 $6.65 - $4.92Gabbro 1996.573 - 2701.246 1898.155 - 2568.092 1867.823 - 2527.054 Gabbro $3.31 - $2.44 $5.46 - $4.04 $5.90 - $4.36Shale 3546.993 - 4798.873 3372.149 - 4562.319 3318.263 - 4489.414 Shale $1.86 - $1.38 $3.07 - $2.27 $3.32 - $2.45Sandstone 3697.769 - 5002.863 3515.492 - 4756.254 3459.315 - 4680.25 Sandstone $1.79 - $1.32 $2.95 - $2.18 $3.18 - $2.35Siltstone 3681.304 - 4980.588 3499.839 - 4735.076 3443.912 - 4659.411 Siltstone $1.79 - $1.33 $2.96 - $2.19 $3.20 - $2.36Conglomer 4247.818 - 5747.048 4038.427 - 5463.755 3973.894 - 5376.445 Conglomer $1.55 - $1.15 $2.57 - $1.90 $2.77 - $2.05Breccia 5863.339 - 7932.753 5574.314 - 7541.719 5485.238 - 7421.204 Breccia $1.13 - $0.83 $1.86 - $1.37 $2.01 - $1.48Limestone 4870.335 - 6589.277 4630.259 - 6264.468 4556.268 - 6164.363 Limestone $1.36 - $1.00 $2.24 - $1.65 $2.42 - $1.79Schist 5972.24 - 8080.09 5677.846 - 7681.792 5587.116 - 7559.039 Schist $1.11 - $0.82 $1.83 - $1.35 $1.97 - $1.46Slate 3888.976 - 5261.555 3697.274 - 5002.194 3638.192 - 4922.26 Slate $1.70 - $1.25 $2.80 - $2.07 $3.03 - $2.24Gneiss 3539.394 - 4788.591 3364.924 - 4552.544 3311.153 - 4479.796 Gneiss $1.87 - $1.38 $3.08 - $2.28 $3.33 - $2.46
Drill Steel Life (feet/rod) Drill Steel Cost ($/foot per rod)
12.25 15.00 16.00 12.25 15.00 16.00Granite 41969.55 - 56782.33 39900.72 - 53983.32 39263.11 - 53120.68 Granite $0.078 - $0.058 $0.082 - $0.061 $0.083 - $0.062Basalt 24574.25 - 33247.51 23362.89 - 31608.62 22989.56 - 31103.52 Basalt $0.133 - $0.098 $0.140 - $0.104 $0.142 - $0.105Gabbro 27142.87 - 36722.71 25804.9 - 34912.52 25392.55 - 34354.62 Gabbro $0.121 - $0.089 $0.127 - $0.094 $0.129 - $0.095Shale 43679.22 - 59095.42 41526.11 - 56182.39 40862.54 - 55284.61 Shale $0.075 - $0.055 $0.079 - $0.058 $0.080 - $0.059Sandstone 45210.83 - 61167.6 42982.23 - 58152.42 42295.38 - 57223.16 Sandstone $0.072 - $0.054 $0.076 - $0.056 $0.077 - $0.057Siltstone 45044.11 - 60942.03 42823.72 - 57937.98 42139.41 - 57012.14 Siltstone $0.073 - $0.054 $0.076 - $0.056 $0.078 - $0.057Conglomer 50711.07 - 68609.09 48211.33 - 65227.1 47440.93 - 64184.78 Conglomer $0.065 - $0.048 $0.068 - $0.050 $0.069 - $0.051Breccia 66219.99 - 89591.75 62955.76 - 85175.45 61949.75 - 83814.36 Breccia $0.049 - $0.037 $0.052 - $0.038 $0.053 - $0.039Limestone 56790.17 - 76833.76 53990.78 - 73046.35 53128.02 - 71879.08 Limestone $0.058 - $0.043 $0.061 - $0.045 $0.062 - $0.046Schist 67236.6 - 90967.16 63922.26 - 86483.06 62900.8 - 85101.08 Schist $0.049 - $0.036 $0.051 - $0.038 $0.052 - $0.038Slate 47137.81 - 63774.69 44814.22 - 60631 44098.1 - 59662.13 Slate $0.069 - $0.051 $0.073 - $0.054 $0.074 - $0.055Gneiss 43601.73 - 58990.58 41452.44 - 56082.72 40790.04 - 55186.53 Gneiss $0.075 - $0.055 $0.079 - $0.058 $0.080 - $0.059
(Based on 12 foot drilling rod length.)
Penetration Rate (feet/hour) Drill Steel Cost Adjustment FactorAs this study is based on 12 foot drilling rod length,
12.25 15.00 16.00 Number of rods Factor the total steel cost per foot of hole drilled dependsGranite 19.00236 - 25.70907 12.60139 - 17.04894 11.05531 - 14.95719 upon the total number of 12 foot sections in the hole.Basalt 11.03265 - 14.92652 7.316286 - 9.898504 6.418644 - 8.684048 1 1.0 Divide the total hole length by 12 and round this resultGabbro 12.205 - 16.51264 8.093728 - 10.95034 7.100701 - 9.606831 2 1.5 up to the next whole number to determine number of Shale 19.78892 - 26.77325 13.123 - 17.75464 11.51293 - 15.57631 3 2.0 rods required to drill the hole. Adjust this number to theSandstone 20.49398 - 27.72715 13.59055 - 18.38722 11.92312 - 16.13128 4 2.5 average number of rods during drilling by consultingSiltstone 20.41721 - 27.62329 13.53965 - 18.31835 11.87846 - 16.07085 5 3.0 the Drill Steel Cost Adjustment Factor table to the left.Conglomer 23.02897 - 31.15684 15.27163 - 20.66162 13.39794 - 18.12663 6 3.5 Multiply this adjustment factor times the cost per footBreccia 30.19898 - 40.85745 20.02642 - 27.09456 17.56936 - 23.77031 7 4.0 per rod from the table above. The result is the totalLimestone 25.83581 - 34.95433 17.13298 - 23.17992 15.03092 - 20.33595 8 4.5 drill steel cost per foot of hole drilled. Other drillSchist 30.66998 - 41.49468 20.33876 - 27.51714 17.84338 - 24.14104 9 5.0 steel lengths may be adjusted for by determining theSlate 21.38157 - 28.92801 14.17916 - 19.18357 12.43951 - 16.82992 10 5.5 total length of rods required and then converting that Gneiss 19.75326 - 26.725 13.09935 - 17.72265 11.49218 - 15.54824 n (n+1)/2 to the number of equivalent 12 foot sections. Once
this is determined follow the procedure outlined above.
Prepared by Western Mine Division, InfoMine USA, Inc. in cooperation with Aventurine Engineering, Inc. 2006
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-17
DRILL MODEL - Atlas Copco TBH4 - Rotary
Bit Life (feet/bit) Bit Cost ($/foot)
5.00 6.750 7.875 5.00 6.750 7.875Granite 3,526 - 4,770 3,271 - 4,426 3,148 - 4,259 Granite $0.46 - $0.34 $0.75 - $0.56 $0.96 - $0.71Basalt 1,847 - 2,499 1,714 - 2,319 1,649 - 2,231 Basalt $0.88 - $0.65 $1.44 - $1.06 $1.83 - $1.35Gabbro 2,083 - 2,818 1,932 - 2,614 1,859 - 2,516 Gabbro $0.78 - $0.58 $1.27 - $0.94 $1.63 - $1.20Shale 3,700 - 5,006 3,433 - 4,645 3,303 - 4,469 Shale $0.44 - $0.33 $0.72 - $0.53 $0.92 - $0.68Sandstone 3,857 - 5,219 3,579 - 4,842 3,444 - 4,659 Sandstone $0.42 - $0.31 $0.69 - $0.51 $0.88 - $0.65Siltstone 3,840 - 5,195 3,563 - 4,820 3,428 - 4,638 Siltstone $0.42 - $0.31 $0.69 - $0.51 $0.88 - $0.65Conglomer 4,431 - 5,995 4,111 - 5,562 3,956 - 5,352 Conglomer $0.37 - $0.27 $0.60 - $0.44 $0.76 - $0.56Breccia 6,116 - 8,275 5,675 - 7,678 5,461 - 7,388 Breccia $0.27 - $0.20 $0.43 - $0.32 $0.55 - $0.41Limestone 5,080 - 6,873 4,714 - 6,377 4,536 - 6,137 Limestone $0.32 - $0.24 $0.52 - $0.39 $0.67 - $0.49Schist 6,230 - 8,429 5,780 - 7,820 5,562 - 7,525 Schist $0.26 - $0.19 $0.43 - $0.31 $0.54 - $0.40Slate 4,057 - 5,488 3,764 - 5,092 3,622 - 4,900 Slate $0.40 - $0.30 $0.65 - $0.48 $0.83 - $0.62Gneiss 3,692 - 4,995 3,426 - 4,635 3,296 - 4,460 Gneiss $0.44 - $0.33 $0.72 - $0.53 $0.92 - $0.68
Drill Steel Life (feet/rod) Drill Steel Cost ($/foot per rod)
5.00 6.750 7.875 5.00 6.750 7.875Granite 43,780 - 59,231 40,620 - 54,957 39,087 - 52,882 Granite $0.036 - $0.027 $0.046 - $0.034 $0.071 - $0.052Basalt 25,634 - 34,681 23,784 - 32,178 22,886 - 30,964 Basalt $0.062 - $0.046 $0.079 - $0.058 $0.121 - $0.089Gabbro 28,313 - 38,306 26,270 - 35,542 25,279 - 34,200 Gabbro $0.056 - $0.041 $0.071 - $0.053 $0.109 - $0.081Shale 45,563 - 61,644 42,275 - 57,195 40,679 - 55,036 Shale $0.035 - $0.026 $0.044 - $0.033 $0.068 - $0.050Sandstone 47,161 - 63,806 43,757 - 59,201 42,106 - 56,966 Sandstone $0.034 - $0.025 $0.043 - $0.032 $0.066 - $0.048Siltstone 46,987 - 63,570 43,596 - 58,983 41,950 - 56,756 Siltstone $0.034 - $0.025 $0.043 - $0.032 $0.066 - $0.049Conglomer 52,898 - 71,568 49,081 - 66,403 47,228 - 63,897 Conglomer $0.030 - $0.022 $0.038 - $0.028 $0.058 - $0.043Breccia 69,076 - 93,456 64,091 - 86,711 61,672 - 83,438 Breccia $0.023 - $0.017 $0.029 - $0.022 $0.045 - $0.033Limestone 59,239 - 80,147 54,964 - 74,363 52,890 - 71,556 Limestone $0.027 - $0.020 $0.034 - $0.025 $0.052 - $0.039Schist 70,136 - 94,890 65,075 - 88,042 62,618 - 84,719 Schist $0.023 - $0.017 $0.029 - $0.021 $0.044 - $0.033Slate 49,171 - 66,525 45,622 - 61,724 43,900 - 59,394 Slate $0.032 - $0.024 $0.041 - $0.030 $0.063 - $0.046Gneiss 45,482 - 61,535 42,200 - 57,094 40,607 - 54,939 Gneiss $0.035 - $0.026 $0.044 - $0.033 $0.068 - $0.050
(Based on 12 foot drilling rod length.)
Penetration Rate (feet/hour) Drill Steel Cost Adjustment FactorAs this study is based on 12 foot drilling rod length,
5.00 6.750 7.875 Number of rods Factor the total steel cost per foot of hole drilled dependsGranite 45 - 60 24 - 33 18 - 24 upon the total number of 12 foot sections in the hole.Basalt 26 - 35 14 - 19 10 - 14 1 1.0 Divide the total hole length by 12 and round this resultGabbro 29 - 39 16 - 21 11 - 15 2 1.5 up to the next whole number to determine number of Shale 46 - 63 25 - 34 18 - 25 3 2.0 rods required to drill the hole. Adjust this number to theSandstone 48 - 65 26 - 35 19 - 26 4 2.5 average number of rods during drilling by consultingSiltstone 48 - 65 26 - 35 19 - 26 5 3.0 the Drill Steel Cost Adjustment Factor table to the left.Conglomer 54 - 73 29 - 40 22 - 29 6 3.5 Multiply this adjustment factor times the cost per footBreccia 71 - 96 39 - 52 28 - 38 7 4.0 per rod from the table above. The result is the totalLimestone 61 - 82 33 - 45 24 - 33 8 4.5 drill steel cost per foot of hole drilled. Other drillSchist 72 - 97 39 - 53 29 - 39 9 5.0 steel lengths may be adjusted for by determining theSlate 50 - 68 27 - 37 20 - 27 10 5.5 total length of rods required and then converting that Gneiss 46 - 63 25 - 34 18 - 25 n (n+1)/2 to the number of equivalent 12 foot sections. Once
this is determined follow the procedure outlined above.
Prepared by Western Mine Division, InfoMine USA, Inc. in cooperation with Aventurine Engineering, Inc. 2006
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
Hole Diameter (inches)
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-18
Drill Bits Drill Rod
Bit Type Bit Size Bit Price Rod Type Rod Size Rod Price Button - drop center Percussion rod - 12 ft
1-3/4" $62 R32 $2802" $69 T38 $3242-1.2" $98 T45 $4073" $131 T51 $5683-1.2" $1594" $223 DTH rod - 9'10"4-1.2" $268 3.0 76mm $3845" $321 3.5 89mm $431
4.0 102mm $491 DTH - concave face 4.5 114mm $592
3-1/2" $410 5.5 140mm $8155" $5505-1/2" $575 Rotary rod - 25' to 30'6" $630 4" x 25' $3,3006-1/2" $640 5" x 25' $3,9008" $1,230 7" x 30' $6,9008-7/8" $1,385 8-5/8" x 30' $6,80010" $1,900 10-3/4" x 27.5 $7,50011-/7/8 $4,500
TRICONE - carbide insert3-7/8" $1,1505" $1,6295-1/2" $1,972 All unit prices are manufacturer6" $2,131 list prices. Discounts or 6-1/4" $2,207 premiums may apply depending6-3/4" $2,463 upon market conditions.7-7/8" $3,0239" $3,5899-7/8" $4,78711" $5,64012-1/4" $6,60315" $10,36716" $11,016
BIT AND DRILL STEEL PRICE DATABASE Effective date - 8/2006
Prepared by Western Mine Division, InfoMine USA, Inc. in cooperation with Aventurine Engineering, Inc. 2006
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-19
ROTARY BLASTHOLE DRILLS
Bucyrus manufactures electric rotary blasthole drills with the most innovative features on the market, including programmed drill control, rack and pinion pull-down, hydrostatic propel drives and more. Contact us today for more information about any of our performance-packed drills!
59R Max. hole size: 444 mm (17-1/2 in) Max. bit loading: 74,830 kg (165,000 lbs) Working weight: 183,673 kg (405,000 lbs)
49RIII Max. hole size: 406 mm (16 in) Max. bit loading: 63,975 kg (141,000 lbs) Working weight: 154,224 kg (340,000 lbs)
39HR Max. hole size: 349 mm (13-3/4 in) Max. bit loading: 55,000 kg (122,000 lbs) Working weight: 122,500 kg (270,000 lbs)
35HR Series Max. hole size: 270 mm (10-5/8 in) Max. bit loading: 34,000 kg (75,000 lbs) Working weight: 54,432 kg (120,000 lbs)
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-20
Drilling Solutions
Ingersoll-Rand has been in the drilling business since Simon Ingersoll invented his first rock drill in 1871. This innovative piece of machinery revolutionized the drilling industry and set the pace for the company's future.
Ingersoll-Rand drills are designed and manufactured to a stringent set of quality standards, assuring you of the most efficient and reliable drills available anywhere.
Now in our second century, we are proud of the comprehensive line of Ingersoll-Rand drilling equipment for the mining, exploration, oil and gas, quarry and water well industries around the world.
Drilling Solutions Blasthole Drills Rotary Large Mid-range Hydraulic Crawle Pneumatic Crawl DHD Drill Selector Waterwell Drills Exploration Drills Gas & Oil / Coal BedDrills
Drilling Accessories Down Hole Drills Threaded Access Hollow Anchor Syst Literature Split Set Products Aftermarket Upgrades Kits Product Upgrad Maintenance Up Promotions Maintenance Sche Service New Product Events Calendar Authorized Distribut Used Equipment Federal Governmen Contact Us Training Schedule
Copyright © 1996-2001 Ingersoll-Rand Company. All rights reserved. Ingersoll-Rand Worldwide Headquarters 200 Chestnut Ridge Road Woodcliff Lake, NJ 07675 USA
HOME BACK
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-21
Select Model:
T4BHDM25/SP
DM30DM45/LPDM50/LPDM-L/LPDM45/SPDM-LSPDM-M2DM-M3DM-H2
351
Rotary - DM45/LP
The DM45/LP is a hydraulic rotary head drive, multi-pass, crawler-mounted drill rig with a 45,000 lb. (20,400 kg) bit load capacity. The standard two-motor spur gear rotary head is rated from 9,000 ft-lb. (12,204 N-m) at 0-100 RPM and 5,400 ft-lb. (732 N-m) at 0-160 RPM. The DM45/LP can drill from 5-1/8 to 7-7/8 in. (130 to 200 mm) diameter blastholes to depths of 180 ft. (55 m) with a 30 ft. (9.1 m) drill pipe change. Two low-pressure Ingersoll-Rand compressor options are available with your choice of Caterpillar or Cummins engines.
[ SPECS ] [ FEATURES ] [ LITERATURE ]
Nominal Hole DiameterDiameter 6-8 in.
Power PackEngine #1 Cummins QSX15 (425 HP @ 1800 rpm)
Compressor #1 900 @ 110 CFM @ PSI / 25.5 @ 758 m3/min@kPA
Engine #2 CAT C15 (425 HP @ 1800 RPM)
Compressor #2 900 @ 110 CFM @ PSI / 25.5 @ 758 m3/min@kPA
Engine #3 Cummins QSX15 (475 HP @ 1800 RPM)
Compressor #3 1050 @ 110 CFM @ PSI / 29.7 @ 758 m3/min@kPA
Engine #4 Cat C15 (475 HP @ 1800 RPM)
Compressor #4 1050 @ 110 CFM @ PSI / 29.7 @ 758 m3/min@kPA
Rotation
Type 2-motor variable displacement, high torque/high speed
Head Torque High torque: 9,000 ft-lb @ 100 rpm Speed High speed: 5,400 ft-lb @ 160 rpm rpm
Feed System
Type Hydraulic cyls. w/cable pulldown & chain pullback
Bit Load 45,000 lb / 20,411 kg Tower
Pipe Length 30 ft. / 9.1 m.
Fabrication 4-member open front w/rectangular hollow steel tubing/double cut lacing
UndercarriageModel Caterpillar 325L or equivalent
Drilling Solutions Blasthole Drills Rotary Large Mid-range Hydraulic Crawle Pneumatic Crawl DHD Drill Selector Waterwell Drills Exploration Drills Gas & Oil / Coal BedDrills
Drilling Accessories Down Hole Drills Threaded Access Hollow Anchor Syst Literature Split Set Products Aftermarket Upgrades Kits Product Upgrad Maintenance Up Promotions Maintenance Sche Service New Product Events Calendar Authorized Distribut Used Equipment Federal Governmen Contact Us Training Schedule
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-23
Length 15.3 ft. / 4.66 m Carousel
Capacity Capable of 180 ft. Options
Option #1 Contact your local IR distributor for a complete list of options.
Weight & DimensionsHeight (Tower Up) 43 ft. / 13.11 m
Approx. Working Weight 77,000 - 85,000 lbs. / 34,900 - 38,600 kg. Material To Be Drilled
Soft Yes Drill Application
Mining Yes Quarry Yes
Drilling MethodRotary Yes
Copyright © 1996-2001 Ingersoll-Rand Company. All rights reserved. Ingersoll-Rand Worldwide Headquarters 200 Chestnut Ridge Road Woodcliff Lake, NJ 07675 USA
HOME BACK
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-24
Select Model:
T4BHDM25/SP
DM30DM45/LPDM50/LPDM-L/LPDM45/SPDM-LSPDM-M2DM-M3DM-H2
351
Rotary - DM30
The DM30 is a hydraulic tophead drive, multi-pass, crawler-mounted drill rig designed for blastholes ranging from 5-1/8 to 6-3/4 in. (130 to 171 mm) in diameter. On-board depth capability is up to 150 ft. (45.7 m). For rotary drilling, the DM30 can assert a bit load force up to 30,000 lb. (13,608 kg) and rotation speeds of 0-130 RPM. This rig can also be used with downhole drills when equipped with a high-pressure air compressor option.
[ SPECS ] [ FEATURES ] [ LITERATURE ]
Nominal Hole DiameterDiameter 5-6 in.
Power PackEngine #1 Cummins QSX15 (525 HP @ 1800 RPM)
Compressor #1 IR HR2 900/350 CFM @ PSI / 25.5/2,413 m3/min@kPA
Engine #2 CAT C15 (525 HP @ 1800 RPM)
Compressor #2 IR HR2 900/350 CFM @ PSI / 25.5/2,413 m3/min@kPA
Engine #3 Cummins QSX15 (425 HP @ 1800 RPM)
Compressor #3 IR WW226 900/110 CFM @ PSI / 25.5/758 m3/min@kPA
Engine #4 CAT C15 (425 HP @ 1800 RPM)
Compressor #4 IR WW226 900/110 CFM @ PSI / 25.5/758 m3/min@kPA
Floating Sub Base Isolates components from drilling and propel shock loads/maintains alignment
RotationType Rotary Tophead
Head Torque 5,400 ft-lb. / 7,322 N-m Speed 0-100 rpm
Feed SystemType Single cylinder, cable feed
Bit Load 30,000 lb / (13,608) kg Tower
Pipe Length 30 ft. / 9.1 m.
Construction 4 member open front with hollow steel tubing.
Drilling Solutions Blasthole Drills Rotary Large Mid-range Hydraulic Crawle Pneumatic Crawl DHD Drill Selector Waterwell Drills Exploration Drills Gas & Oil / Coal BedDrills
Drilling Accessories Down Hole Drills Threaded Access Hollow Anchor Syst Literature Split Set Products Aftermarket Upgrades Kits Product Upgrad Maintenance Up Promotions Maintenance Sche Service New Product Events Calendar Authorized Distribut Used Equipment Federal Governmen Contact Us Training Schedule
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-25
UndercarriageManufacturer Caterpillar
Options
Option #1 Contact your local IR distributor for a complete list of options.
Weight & DimensionsHeight (Tower Up) 44.3 ft. / 13.4 m
Approx. Working Weight 68,000 lbs. / 30,844 kg. Material To Be Drilled
Hard Yes Medium Yes
Soft Yes Drill Application
Mining Yes Quarry Yes
Drilling MethodRotary Yes DHD Yes
Copyright © 1996-2001 Ingersoll-Rand Company. All rights reserved. Ingersoll-Rand Worldwide Headquarters 200 Chestnut Ridge Road Woodcliff Lake, NJ 07675 USA
HOME BACK
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-26
Select Model:
T4BHDM25/SP
DM30DM45/LPDM50/LPDM-L/LPDM45/SPDM-LSPDM-M2DM-M3DM-H2
351
Rotary - DM25/SP
The DM25SP is a crawler-mounted rotary table drill rig designed for single-pass blasthole drilling to depths of up to 50 ft. (15.2 m) and diameters of 3-1/2 to 6-3/4 in. (89 to 171 mm). This drill is capable of rotary drilling with 25,000 lb. (11,340 kg) of bit load at 0-200 rpm. The DM25SP can also be used with downhole drills when equipped with a high-pressure air compressor option.
[ SPECS ] [ FEATURES ] [ LITERATURE ]
Nominal Hole DiameterDiameter 5-6 in.
Power PackEngine #1 Cummins QSX15 (525 HP @ 1800 RPM)
Compressor #1 900/350 CFM @ PSI / 25.5/2,413 m3/min@kPA
Engine #2 CAT C15 (525 HP @ 1800 RPM)
Compressor #2 900/350 CFM @ PSI / 25.5/2,413 m3/min@kPA
Engine #3 Cummins QSX15 (425 HP @ 1800 RPM)
Compressor #3 900/110 CFM @ PSI / 25.5/758 m3/min@kPA
Engine #4 CAT C15 (425 HP @ 1800 RPM)
Compressor #4 900/110 CFM @ PSI / 25.5/758 m3/min@kPA
RotationType Rotary Table Drive
Speed 0-170 rpm Torque 3,500 / (4,746 N-m)
Feed SystemType Heavy-duty chains through cluster sprocket
Pulldown 25,000 lbs. / 11,340 kg. Tower
Construction 4 main member, open front, rectangular steel tubing
#1 Single pass depth 40 ft. / 12.2 m. #2 Single pass depth 50 ft. / 15.2 m.
Undercarriage
Drilling Solutions Blasthole Drills Rotary Large Mid-range Hydraulic Crawle Pneumatic Crawl DHD Drill Selector Waterwell Drills Exploration Drills Gas & Oil / Coal BedDrills
Drilling Accessories Down Hole Drills Threaded Access Hollow Anchor Syst Literature Split Set Products Aftermarket Upgrades Kits Product Upgrad Maintenance Up Promotions Maintenance Sche Service New Product Events Calendar Authorized Distribut Used Equipment Federal Governmen Contact Us Training Schedule
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-27
Type Excavator Options
Option #1 Contact your local IR distributor for a complete list of options.
Weight & Dimensions
Weight Varies according to drill pipe: 60,000 - 62,000 lb / 27,216-28,123 kg
Material To Be DrilledHard Yes
Medium Yes Soft Yes
Drill ApplicationQuarry Yes
Drilling MethodRotary Yes DHD Yes
Copyright © 1996-2001 Ingersoll-Rand Company. All rights reserved. Ingersoll-Rand Worldwide Headquarters 200 Chestnut Ridge Road Woodcliff Lake, NJ 07675 USA
HOME BACK
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-28
Select Model:
T4BHDM25/SP
DM30DM45/LPDM50/LPDM-L/LPDM45/SPDM-LSPDM-M2DM-M3DM-H2
351
Rotary - DM-M2
Designed for rotary or downhole drilling of up to 10-5/8 in. (270 mm) diameter blastholes, the DM-M2 provides 75,000 lb. (34,000 kg) of bit load and a 35 ft. (10 m) drill pipe change. Advanced frame and tower design and a unique, patented carriage feed system allow on-board drill depths to 175 ft. (53 m). Compressor/engine packages in both low-pressure, [1900 CFM @ 110 PSI (51 m3/min. @ 758 kPa)] for rotary drilling and high pressure [1250 CFM @ 350 PSI (35.4 m3/min. @ 2,413 kPa)], for downhole drilling, are available.
[ SPECS ] [ FEATURES ] [ LITERATURE ]
Nominal Hole DiameterDiameter 9-11 in.
Power PackEngine #1 Caterpillar 3412E / EPA certified
Compressor #1 1900 @ 100 CFM @ PSI / 53.8 @ 690 m3/min@kPA
Engine #2 Cummins QSK19 / EPA certified
Compressor #2 1900 @ 100 CFM @ PSI / 53.8 @ 690 m3/min@kPA
Engine #3 Caterpillar 3412E / EPA certified
Compressor #3 1250 @ 350 CFM @ PSI / 35.4 @ 2413 m3/min@kPA
RotationType Two-motor, variable displacement
Speed Range 0-150 rpm, variable Head Torque 0-8,640 ft-lbs (0-11,714 Nm) (forward)
Feed SystemType Patented carriage feed
Weight on Bit 0 to 75,000 lb. / 0 to 34,019 kg Tower
Pipe Length 35 ft. / 10.7 m.
Construction 4 member open front with hollow steel tubing.
UndercarriageModel Caterpillar 330EL or equivalent
Carousel
Size Holds 2 to 4 drill pipe depending on pipe diameter
Drilling Solutions Blasthole Drills Rotary Large Mid-range Hydraulic Crawle Pneumatic Crawl DHD Drill Selector Waterwell Drills Exploration Drills Gas & Oil / Coal BedDrills
Drilling Accessories Down Hole Drills Threaded Access Hollow Anchor Syst Literature Split Set Products Aftermarket Upgrades Kits Product Upgrad Maintenance Up Promotions Maintenance Sche Service New Product Events Calendar Authorized Distribut Used Equipment Federal Governmen Contact Us Training Schedule
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-29
Options
Option #1 Contact your local IR distributor for a complete list of options.
Weight & DimensionsHeight (Tower Up) 56.2 ft. / 17.1 m
Approx. Working Weight 120,000 - 133,500 lbs. / 54,400 - 60,555 kg. Material To Be Drilled
Medium Yes Soft Yes
Drill ApplicationMining Yes
Drilling MethodRotary Yes DHD Yes
Copyright © 1996-2001 Ingersoll-Rand Company. All rights reserved. Ingersoll-Rand Worldwide Headquarters 200 Chestnut Ridge Road Woodcliff Lake, NJ 07675 USA
HOME BACK
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-30
Select Model:
T4BHDM25/SP
DM30DM45/LPDM50/LPDM-L/LPDM45/SPDM-LSPDM-M2DM-M3DM-H2
351
Rotary - T4BH
The T4BH is a truck-mounted, hydraulic tophead drive multipass rotary drill specificaly designed for production blasthole drilling to depths of 150 ft. (45.7 m) with a 25 ft. (7.6 m) drill pipe change. Nominal hole size is 5-1/8 to 7-7/8 in. (130 to 200 mm) for rotary or DHD drilling methods. Feed pressure generates a bit load force of up to 30,000 lb. (12,610 kg). An angle drilling option is available. All drill functions are controlled from the newly designed operator cab.
[ SPECS ] [ FEATURES ] [ LITERATURE ]
Nominal Hole DiameterDiameter 6-9 in.
CarrierChassis (Standard) Crane Carrier, Custom, 3 axle, 6X4
Engine CAT C10 (305 HP) Power Pack
Engine #1 Cummins QSX19 (525 HP @ 1800 RPM)
Compressor #1 IR HR2-900/350 CFM @ PSI / 25.5/2413 m3/min@kPA
Engine #2 Cummins QSX19 (600 HP @ 1800 RPM)
Compressor #2 1050 @ 350 CFM @ PSI / 129.7 @ 2413 m3/min@kPA
Engine #3 Cummins QSK-19C (700 HP @ 2100 RPM)
Compressor #3 IR HR2.5 - 1250/350 CFM @ PSI / (35.39 @ 2413) m3/min@kPA
Floating Sub Base Isolates components from drilling and propel shock loads/maintains alignment
RotationType Rotary Tophead
Speed Range 0-160 RPM (std.) Head Torque 6,500 ft-lb. / (8,814 N-m)
Option 7,165 ft-lb @ 0-130 RPM / 9,716 N-m @ 0-130 RPM
Feed SystemType Hydraulic cylinders w/cable and chain
Pulldown 0-37,700 lbs. / 17,108 kg.
Drilling Solutions Blasthole Drills Rotary Large Mid-range Hydraulic Crawle Pneumatic Crawl DHD Drill Selector Waterwell Drills Exploration Drills Gas & Oil / Coal BedDrills
Drilling Accessories Down Hole Drills Threaded Access Hollow Anchor Syst Literature Split Set Products Aftermarket Upgrades Kits Product Upgrad Maintenance Up Promotions Maintenance Sche Service New Product Events Calendar Authorized Distribut Used Equipment Federal Governmen Contact Us Training Schedule
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-31
TowerPipe Length 25 ft. / 7.6 m.
Construction 4 member open front with ASTM A500 GRB steel tubing.
Cab & Controls
Operator Cab New cab designed to optimize operator comfort and safety
Controls All operational functions controlled from driller console in cab
Options
Option #1 Contact your local distributor for a complete list of options.
Weight & DimensionsHeight (Tower Up) 28-3/4 ft. / 8.7 m
Approx. Working Weight 58,000 lbs. / 26,309 kg. Material To Be Drilled
Hard Yes Medium Yes
Soft Yes Drill Application
Mining Yes Quarry Yes
Drilling MethodRotary Yes
Copyright © 1996-2001 Ingersoll-Rand Company. All rights reserved. Ingersoll-Rand Worldwide Headquarters 200 Chestnut Ridge Road Woodcliff Lake, NJ 07675 USA
HOME BACK
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-32
Select Model:
CM695DDM25/SP
DM30DM45/HPDM45/SPDM-L/HPDM-M2
DHD - DM-M2
Designed for rotary or downhole drilling of up to 10-5/8 in. (270 mm) diameter blastholes, the DM-M2 provides 75,000 lb. (34,000 kg) of bit load and a 35 ft. (10 m) drill pipe change. Advanced frame and tower design and a unique, patented carriage feed system allow on-board drill depths to 175 ft. (53 m). Compressor/engine packages in both low-pressure, [1900 CFM @ 110 PSI (51 m3/min. @ 758 kPa)] for rotary drilling and high pressure [1250 CFM @ 350 PSI (35.4 m3/min. @ 2,413 kPa)], for downhole drilling, are available.
[ SPECS ] [ FEATURES ] [ LITERATURE ]
Nominal Hole DiameterDiameter 9-11 in.
Power PackEngine #1 Caterpillar 3412E / EPA certified
Compressor #1 1900 @ 100 CFM @ PSI / 53.8 @ 690 m3/min@kPA
Engine #2 Cummins QSK19 / EPA certified
Compressor #2 1900 @ 100 CFM @ PSI / 53.8 @ 690 m3/min@kPA
Engine #3 Caterpillar 3412E / EPA certified
Compressor #3 1250 @ 350 CFM @ PSI / 35.4 @ 2413 m3/min@kPA
RotationType Two-motor, variable displacement
Speed Range 0-150 rpm, variable Head Torque 0-8,640 ft-lbs (0-11,714 Nm) (forward)
Feed SystemType Patented carriage feed
Weight on Bit 0 to 75,000 lb. / 0 to 34,019 kg Tower
Pipe Length 35 ft. / 10.7 m.
Construction 4 member open front with hollow steel tubing.
UndercarriageModel Caterpillar 330EL or equivalent
Carousel
Size Holds 2 to 4 drill pipe depending on pipe diameter
Drilling Solutions Blasthole Drills Rotary Large Mid-range Hydraulic Crawle Pneumatic Crawl DHD Drill Selector Waterwell Drills Exploration Drills Gas & Oil / Coal BedDrills
Drilling Accessories Down Hole Drills Threaded Access Hollow Anchor Syst Literature Split Set Products Aftermarket Upgrades Kits Product Upgrad Maintenance Up Promotions Maintenance Sche Service New Product Events Calendar Authorized Distribut Used Equipment Federal Governmen Contact Us Training Schedule
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-33
Options
Option #1 Contact your local IR distributor for a complete list of options.
Weight & DimensionsHeight (Tower Up) 56.2 ft. / 17.1 m
Approx. Working Weight 120,000 - 133,500 lbs. / 54,400 - 60,555 kg. Material To Be Drilled
Medium Yes Soft Yes
Drill ApplicationMining Yes
Drilling MethodRotary Yes DHD Yes
Copyright © 1996-2001 Ingersoll-Rand Company. All rights reserved. Ingersoll-Rand Worldwide Headquarters 200 Chestnut Ridge Road Woodcliff Lake, NJ 07675 USA
HOME BACK
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-34
Select Model:
CM695DDM25/SP
DM30DM45/HPDM45/SPDM-L/HPDM-M2
DHD - DM30
The DM30 is a hydraulic tophead drive, multi-pass, crawler-mounted drill rig designed for blastholes ranging from 5-1/8 to 6-3/4 in. (130 to 171 mm) in diameter. On-board depth capability is up to 150 ft. (45.7 m). For rotary drilling, the DM30 can assert a bit load force up to 30,000 lb. (13,608 kg) and rotation speeds of 0-130 RPM. This rig can also be used with downhole drills when equipped with a high-pressure air compressor option.
[ SPECS ] [ FEATURES ] [ LITERATURE ]
Nominal Hole DiameterDiameter 5-6 in.
Power PackEngine #1 Cummins QSX15 (525 HP @ 1800 RPM)
Compressor #1 IR HR2 900/350 CFM @ PSI / 25.5/2,413 m3/min@kPA
Engine #2 CAT C15 (525 HP @ 1800 RPM)
Compressor #2 IR HR2 900/350 CFM @ PSI / 25.5/2,413 m3/min@kPA
Engine #3 Cummins QSX15 (425 HP @ 1800 RPM)
Compressor #3 IR WW226 900/110 CFM @ PSI / 25.5/758 m3/min@kPA
Engine #4 CAT C15 (425 HP @ 1800 RPM)
Compressor #4 IR WW226 900/110 CFM @ PSI / 25.5/758 m3/min@kPA
Floating Sub Base Isolates components from drilling and propel shock loads/maintains alignment
RotationType Rotary Tophead
Head Torque 5,400 ft-lb. / 7,322 N-m Speed 0-100 rpm
Feed SystemType Single cylinder, cable feed
Bit Load 30,000 lb / (13,608) kg Tower
Pipe Length 30 ft. / 9.1 m.
Construction 4 member open front with hollow steel tubing.
Drilling Solutions Blasthole Drills Rotary Large Mid-range Hydraulic Crawle Pneumatic Crawl DHD Drill Selector Waterwell Drills Exploration Drills Gas & Oil / Coal BedDrills
Drilling Accessories Down Hole Drills Threaded Access Hollow Anchor Syst Literature Split Set Products Aftermarket Upgrades Kits Product Upgrad Maintenance Up Promotions Maintenance Sche Service New Product Events Calendar Authorized Distribut Used Equipment Federal Governmen Contact Us Training Schedule
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-35
UndercarriageManufacturer Caterpillar
Options
Option #1 Contact your local IR distributor for a complete list of options.
Weight & DimensionsHeight (Tower Up) 44.3 ft. / 13.4 m
Approx. Working Weight 68,000 lbs. / 30,844 kg. Material To Be Drilled
Hard Yes Medium Yes
Soft Yes Drill Application
Mining Yes Quarry Yes
Drilling MethodRotary Yes DHD Yes
Copyright © 1996-2001 Ingersoll-Rand Company. All rights reserved. Ingersoll-Rand Worldwide Headquarters 200 Chestnut Ridge Road Woodcliff Lake, NJ 07675 USA
HOME BACK
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-36
Select Model:
CM695DDM25/SP
DM30DM45/HPDM45/SPDM-L/HPDM-M2
DHD - DM25/SP
The DM25SP is a crawler-mounted rotary table drill rig designed for single-pass blasthole drilling to depths of up to 50 ft. (15.2 m) and diameters of 3-1/2 to 6-3/4 in. (89 to 171 mm). This drill is capable of rotary drilling with 25,000 lb. (11,340 kg) of bit load at 0-200 rpm. The DM25SP can also be used with downhole drills when equipped with a high-pressure air compressor option.
[ SPECS ] [ FEATURES ] [ LITERATURE ]
Nominal Hole DiameterDiameter 5-6 in.
Power PackEngine #1 Cummins QSX15 (525 HP @ 1800 RPM)
Compressor #1 900/350 CFM @ PSI / 25.5/2,413 m3/min@kPA
Engine #2 CAT C15 (525 HP @ 1800 RPM)
Compressor #2 900/350 CFM @ PSI / 25.5/2,413 m3/min@kPA
Engine #3 Cummins QSX15 (425 HP @ 1800 RPM)
Compressor #3 900/110 CFM @ PSI / 25.5/758 m3/min@kPA
Engine #4 CAT C15 (425 HP @ 1800 RPM)
Compressor #4 900/110 CFM @ PSI / 25.5/758 m3/min@kPA
RotationType Rotary Table Drive
Speed 0-170 rpm Torque 3,500 / (4,746 N-m)
Feed SystemType Heavy-duty chains through cluster sprocket
Pulldown 25,000 lbs. / 11,340 kg. Tower
Construction 4 main member, open front, rectangular steel tubing
#1 Single pass depth 40 ft. / 12.2 m. #2 Single pass depth 50 ft. / 15.2 m.
Undercarriage
Drilling Solutions Blasthole Drills Rotary Large Mid-range Hydraulic Crawle Pneumatic Crawl DHD Drill Selector Waterwell Drills Exploration Drills Gas & Oil / Coal BedDrills
Drilling Accessories Down Hole Drills Threaded Access Hollow Anchor Syst Literature Split Set Products Aftermarket Upgrades Kits Product Upgrad Maintenance Up Promotions Maintenance Sche Service New Product Events Calendar Authorized Distribut Used Equipment Federal Governmen Contact Us Training Schedule
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-37
Type Excavator Options
Option #1 Contact your local IR distributor for a complete list of options.
Weight & Dimensions
Weight Varies according to drill pipe: 60,000 - 62,000 lb / 27,216-28,123 kg
Material To Be DrilledHard Yes
Medium Yes Soft Yes
Drill ApplicationQuarry Yes
Drilling MethodRotary Yes DHD Yes
Copyright © 1996-2001 Ingersoll-Rand Company. All rights reserved. Ingersoll-Rand Worldwide Headquarters 200 Chestnut Ridge Road Woodcliff Lake, NJ 07675 USA
HOME BACK
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-38
Select Model:
CM695DDM25/SP
DM30DM45/HPDM45/SPDM-L/HPDM-M2
DHD - DM45/SP
The DM45/SP is a crawler-mounted hydraulic rotary table drive, drill rig designed to produce 50 ft. (15.2 m) of clean hole in a single pass. Hole diameter capability is 5-1/2 to 6-3/4 in. (139.7 to 171.5 mm) to a depth of up to 50 ft. (15.2 m) with a downhole hammer (high-pressure air package). Feed pressure generates a bit load force of up to 25,000 lb. (11,340 kg). An optional angle drilling system is available.
[ SPECS ] [ FEATURES ] [ LITERATURE ]
Nominal Hole DiameterDiameter 5-7 in.
Power PackEngine #1 Cummins QSX15 (525 HP @ 1800 RPM)
Compressor #1 900/350 CFM @ PSI / 25.5/2413 m3/min@kPA
Engine #2 CAT C15 (525 HP @ 1800 RPM)
Compressor #2 900/350 CFM @ PSI / 25.5/2413 m3/min@kPA
Engine #3 Cummins QSX15 (600 HP @ 1800 RPM)
Compressor #3 1070/350 CFM @ PSI / 30.30/2,413 m3/min@kPA
Engine #4 CAT C16 (600 HP @ 1800 RPM)
Compressor #4 1070/350 CFM @ PSI / 30.30/2413 m3/min@kPA
RotationType Rotary table w/kelly drive
Speed 0-200 rpm Torque 4,000 ft-lb / (5,424 N-m)
Feed SystemType Chain and cable
Pulldown 25,000 lbs. / 11,340 kg. Tower
Type Single Pass Pipe Length 50 ft. / 15.2 m.
4 member open front with rectangular steel
Drilling Solutions Blasthole Drills Rotary Large Mid-range Hydraulic Crawle Pneumatic Crawl DHD Drill Selector Waterwell Drills Exploration Drills Gas & Oil / Coal BedDrills
Drilling Accessories Down Hole Drills Threaded Access Hollow Anchor Syst Literature Split Set Products Aftermarket Upgrades Kits Product Upgrad Maintenance Up Promotions Maintenance Sche Service New Product Events Calendar Authorized Distribut Used Equipment Federal Governmen Contact Us Training Schedule
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-39
Construction tubing Undercarriage
Type Excavator-type Options
Option #1 Contact your local IR distributor for a complete list of options.
Weight & DimensionsHeight (Tower Up) 76-1/2 ft. / 23.3 m
Approx. Working Weight 75,000 - 78,000 lbs. / 34,020 - 35,400 kg. Material To Be Drilled
Hard Yes Medium Yes
Drill ApplicationMining Yes Quarry Yes
Drilling MethodDHD Yes
Copyright © 1996-2001 Ingersoll-Rand Company. All rights reserved. Ingersoll-Rand Worldwide Headquarters 200 Chestnut Ridge Road Woodcliff Lake, NJ 07675 USA
HOME BACK
EP OctpbEP 1110-1-8, Vol. 330 Nov 09
L-40
Select Model:
LM100ACM348
ECM350
Pneumatic Crawler - ECM350
This agile, powerfull drill climbs steep grades over roughest ground, and takes the punishment. You have seen thousands of them on construction jobs of all kinds around the world. The basic ECM350 design has seen many improvements in its years of service ? but every drill produced has set the world standard for reliability and perfomance in its time. The ECM350 is also a fine quarry drill when teamed with an Ingersoll-Rand air compressor. This high-performance team gets more work done faster, more efficiently, and keeps doing it longer than anything else in its class.
[ SPECS ] [ FEATURES ] [ LITERATURE ]
Nominal Hole DiameterDiameter 2-1/2 - 5-1/2 in.
DrifterDrifter #1 VL140
Hole Diameter #1 2.5-4 " / 64-102 mm Rotation Speed #1 0 - 72 rpm
Frequency #1 2100 BPM
Air Consumption #1 750 SCFM @ 100 PSI / 21.2 m3/min @ 7 kg/cm2
Stroke #1 5-1/2 in. / 140 mm. Bore #1 5-1/2 in. / 140 mm.
Weight #1 421 lb. / 191 kg. Guide
Guide Dump #1 180 °Guide Swing (L/R) 50 deg / 35 deg
BoomBoom Swing (L/R) #1 40 ° / 35 °
Boom Lift (Up/Down) #1 45 ° / 15 ° Air Rotary Head
Weight 554 lb. / 252 kg.
Torque Max. 1492 Nm @ 8.4 kg/cm? / (1100 lb-ft @ 120 PSI)
Rotation 0 - 72
Air Consumption 120 CFM @ 50 RPM & 90 PSI / 3.4 m3/min @ 50 RPM & 6.3 kg/cm2
Gear Ratio 33:1
Horse Power 2.23 kw @ 6.3 kg/cm? (3.0 hp @ 90 psig) / 3.13 kw @ 8.4 kg/cm? (4.2 hp @ 120 psig)
GeneralFeed/Pullback Force 3,000 lb / 1,361 kg
Drilling Solutions Blasthole Drills Rotary Large Mid-range Hydraulic Crawle Pneumatic Crawl DHD Drill Selector Waterwell Drills Exploration Drills Gas & Oil / Coal BedDrills
Drilling Accessories Down Hole Drills Threaded Access Hollow Anchor Syst Literature Split Set Products Aftermarket Upgrades Kits Product Upgrad Maintenance Up Promotions Maintenance Sche Service New Product Events Calendar Authorized Distribut Used Equipment Federal Governmen Contact Us Training Schedule
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-41
Downhole DrillsO.D. #1 3.62 in. / 92 mm.
Length (bit ext.) #1 45.7 in. / 1161 mm. Air Consumption @ 10.5 kg/cm? (150
PSIG) #1 5.1 m?/min / (180 SCFM)
Air Consumption @ 17.6 kg/cm? (250 PSIG) #1 9.9 m?/min / (350 SCFM)
Drill #2 DHD350R Hole Diameter #2 5-1/8 - 5-1/2 in. / 130-140 mm.
Weight (less bit) #2 151 lb. / 68.5 kg. O.D. #2 4.5 in. / 114 mm.
Length (bit ext.) #2 54.6 in. / 1388 mm. Air Consumption @ 10.5 kg/cm? (150
PSIG) #2 7.9 m?/min / (280 SCFM)
Air Consumption @ 17.6 kg/cm? (250 PSIG) #2 14.7 m?/min / (520 SCFM)
Crawlair Drill SpecificationsNet weight 12,900 lb. / 5851 kg.
Overall shipping length 12 ft. 0 in. / 3645 mm. Width 8 ft 0 in. / 2438 mm.
Height (vertical guide) 18 ft. 10 in. / 5753 mm. Steel change 12 ft. / 3645 mm.
Drill travel 14 ft. 3 in. / 4356 mm. Max. horizontal boom swing 40? left, 35? right
Max. vertical boom movement 45? above, 15? below Max. guide swing 50? left, 35? right Max guide dump 180?
Ground clearance 12 in. / 292 mm. Grouser width 10 in. / 254 mm.
Weight & DimensionsGround Clearance 12 " / 292 mm
Shipping Width 96 " / 2438 mm Shipping Length 144 " / 3645 mm
Approx. Working Weight 12,900 lbs. / 5851 kg. Material To Be Drilled
Hard Yes Medium Yes
Soft Yes Drill Application
Mining Yes Construction Yes
Quarry Yes Drilling Method
Drifter Yes
Copyright © 1996-2001 Ingersoll-Rand Company. All rights reserved. Ingersoll-Rand Worldwide Headquarters 200 Chestnut Ridge Road Woodcliff Lake, NJ 07675 USA
HOME BACK
EP OctpbEP 1110-1-8, Vol. 330 Nov 09
L-42
Select Model:
ECM470ECM580ECM590
ECM660IIECM-720
Hydraulic Crawler - ECM-720
They said it couldn't be done...they were wrong. The new ECM-720 crawler drill delivers a perfect balance of productivity and cost efficiency. Hole straightness, faster penetration rates, long accessory life, and increased profitability are just a few of the results you can expect with the ECM-720.
[ SPECS ] [ FEATURES ] [ LITERATURE ]
Nominal Hole DiameterDiameter 4-1/2 - 5-1/2 in.
DrifterType Montabert HC-200A
Boom & GuideBoom Swing 45 deg right / 20 deg left maximum
Vertical Boom Movement 50 deg up / 20 deg down maximum Guide Swing 20 deg right / 90 deg left maximum Guide Dump 135 deg maximum
Boom Extension 36 in. / 914 mm Guide Extension 5 ft / 1,524 mm
Overall Guide Length 27 ft 6 in / 8.4 m Drifter Travel 16 ft. 11 in. / 5.15 m
EngineType CAT 3176 C-10
Rated Power 365 HP / 272 kW Operating Speed 1,800 rpm
CompressorType Ingersoll-Rand Rotary Screw
Volume 480 CFM / 13.6 m3/min Pressure 150 PSI / 10.3 BAR
Cab & ControlsOperator Cab ROPS/FOPS
Noise level 80 dBA General
Gradeability 35 deg (70 percent) °Tramming Speed 2.0 mph / 3.3 km/hr Ground clearance 17 in. / 432 mm.
Grouser Width 13-3/4 in. / 349 mm mm. Rod Changer Capacity (6) 12 ft (3.66 m) / (6) 14 ft (4.27 m) opt.
Shipping InformationWeight 45,900 lb / 20,820 kg
Drilling Solutions Blasthole Drills Rotary Large Mid-range Hydraulic Crawle Pneumatic Crawl DHD Drill Selector Waterwell Drills Exploration Drills Gas & Oil / Coal BedDrills
Drilling Accessories Down Hole Drills Threaded Access Hollow Anchor Syst Literature Split Set Products Aftermarket Upgrades Kits Product Upgrad Maintenance Up Promotions Maintenance Sche Service New Product Events Calendar Authorized Distribut Used Equipment Federal Governmen Contact Us Training Schedule
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-43
Width 8 ft 3 in / 2.5 m Length 35 ft 8 in / 10.9 m Height 10 ft 8 in / 3.3 m
Material To Be DrilledHard Yes
Medium Yes Soft Yes
Drill ApplicationMining Yes
Construction Yes Quarry Yes
Drilling MethodDrifter Yes
Copyright © 1996-2001 Ingersoll-Rand Company. All rights reserved. Ingersoll-Rand Worldwide Headquarters 200 Chestnut Ridge Road Woodcliff Lake, NJ 07675 USA
HOME BACK
EP OctpbEP 1110-1-8, Vol. 330 Nov 09
L-44
Select Model:
ECM470ECM580ECM590
ECM660IIECM-720
Hydraulic Crawler - ECM590
The ECM-590 is a self-contained, cabless hydraulic crawler drill capable of drilling up to 4 in. (102 mm) holes. It is available in either a YH70 drifter and rod rack configuration for smaller hole work, or with a YH80 and rod changer for higher production requirements. An extended guide option for 20 ft. (6.1 m) starter steel is available.
[ SPECS ] [ FEATURES ] [ LITERATURE ]
Nominal Hole DiameterDiameter 2-1/2 - 4-1/2 in.
DrifterDrifter #1 YH70
Hole Diameter #1 2.5-4 " / 64-102 mm Rotation Speed #1 0-200 rpm
Frequency #1 2800 BPM Weight #1 419 lb. / 190 kg.
Steel Size #1 T45/T38 Drifter #2 YH80A
Hole Diameter #2 2.5-4.5 in. / 64-114 mm. Rotation Speed #2 0-200 rpm
Frequency #2 2600 BPM Weight #2 462 lb. / 210 kg.
Steel Size #2 T51/T45 Hydraulic Pressure 2130 psi / 150 kg/cm?
Boom & GuideHorizontal Boom Swing 30 deg R / 34.6 deg L
Vertical Boom Movement 51 deg up / 15 deg down Guide Swing 48 deg R / 40 deg L Guide Dump 180 deg
Boom Extension - YH70 (YH80A) 48 in (30 in) / 1,219 mm (762 mm) Drifter Travel - YH70 (YH80A) 15 ft 4 in (14 ft) / 3,099 mm (4,267 mm)
Guide Extension 4 ft / 1,219 mm Overall Guide Length 23 ft 8 in / 7,214 mm
EngineType Cummins 6CT8.3
Rated Power 215 HP / 159 kW Operating Speed 2350 rpm
Drilling Solutions Blasthole Drills Rotary Large Mid-range Hydraulic Crawle Pneumatic Crawl DHD Drill Selector Waterwell Drills Exploration Drills Gas & Oil / Coal BedDrills
Drilling Accessories Down Hole Drills Threaded Access Hollow Anchor Syst Literature Split Set Products Aftermarket Upgrades Kits Product Upgrad Maintenance Up Promotions Maintenance Sche Service New Product Events Calendar Authorized Distribut Used Equipment Federal Governmen Contact Us Training Schedule
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-45
IR Rotary Screw CompressorCompressor pressure(max) 140 psig / 9.8 kg/cm2
Compressor volume 250 cfm / 7 m?/min General
Gradeability 35 °Tramming Speed 2 mph / 3.3 km/hr
Grouser Width 12 in. / 305 mm. Steel length starter rod 14 ft. / 4.27 m.
Weight & DimensionsLength 232.9 " / 5918 mm
Weight #2 24,500 lb. / 11,150 kg. Ground Clearance 18 " / 457 mm
Shipping Width 95.98 " / 2438 mm Shipping Height 112 " / 2845 mm
Material To Be DrilledHard Yes
Medium Yes Soft Yes
Drill ApplicationConstruction Yes
Drilling MethodDrifter Yes
Copyright © 1996-2001 Ingersoll-Rand Company. All rights reserved. Ingersoll-Rand Worldwide Headquarters 200 Chestnut Ridge Road Woodcliff Lake, NJ 07675 USA
HOME BACK
EP OctpbEP 1110-1-8, Vol. 330 Nov 09
L-46
Select Model:
LM100ACM348
ECM350
Pneumatic Crawler - LM100A
The LM100A is a small class pneumatic Crawlair?, capable of drilling 1-3/4" to 4- 1/2" (44 - 114 mm) diameter holes. It can be equipped with either of two drifters or a BRH rotary head for downhole drilling. The LM100A is ideal for applications in confined areas where hand-held tools are not enough, and is light enough to transport by helicopter. Like all Ingersoll-Rand crawler drills, the LM100A is "Abuse Resistant". It keeps coming back for more!
[ SPECS ] [ FEATURES ] [ LITERATURE ]
Nominal Hole DiameterDiameter 1-3/4 - 2-1/2 in.
CarrierOverall Track Length 72 " / 1845 mm
Ground Clearance 9 " / 230 mm Oscillation 20 °Air Motors 4.5 HP
Gradeability 30 °Tramming Speed 0-2 mph / 0-3.2 km/hr
DrifterType Ingersoll-Rand YD90
Hole Diameter #1 1.75-2.5 " / 44-64 mm Frequency #1 1600 BPM
Air Consumption #1 375 scfm @ 100 psi & 50 rpm / 10.6 m3/min @ 7 kg/cm2 & 50 rpm
Stroke #1 3.4 in. / 85 mm. Bore #1 3.5 in. / 90 mm.
Steel Size #1 10 ft / 3048 mm Drifter #2 VL120
Hole Diameter #2 2 - 3.5 in. / 51 - 89 mm. Frequency #2 1900 BPM
Air Consumption #2 600 SCFM @ 50 RPM & 100 psi / 17.0 m3/min @ 50 RPM & 7 kg/cm2
Stroke #2 3.62 in. / 92 mm. Bore #2 4.75 in. / 120 mm.
Steel Size #2 10 ft / 3048 mm Guide
Guide Dump #1 75 °Guide Swing (L/R) 45 deg/45 deg
Drilling Solutions Blasthole Drills Rotary Large Mid-range Hydraulic Crawle Pneumatic Crawl DHD Drill Selector Waterwell Drills Exploration Drills Gas & Oil / Coal BedDrills
Drilling Accessories Down Hole Drills Threaded Access Hollow Anchor Syst Literature Split Set Products Aftermarket Upgrades Kits Product Upgrad Maintenance Up Promotions Maintenance Sche Service New Product Events Calendar Authorized Distribut Used Equipment Federal Governmen Contact Us Training Schedule
EP Octpb
EP 1110-1-8, Vol. 330 Nov 09
L-47
Guide Extension #1 29 " / 750 mm Drill Rod Length 10 ft. / 3 m Feed Motor Pull 3000 lbs. / 1360 kg.
BoomBoom Swing (L/R) #1 30/35 °
Boom Lift (Up/Down) #1 45/30 ° Coverage Length 107 " / 2720 mm
Max. Drill Height (Horizontal) 99 " / 2510 mm BRH Rotary Head
Weight 304 lbs. / 138 kg. Torque Maximum 700 lb.-ft. / 96.7 kg.-m Rotation Range 0 - 50 RPM
Air Consumption 120 SCFM @ 50 RPM & 100 psi / 3.39 m3/min @ 50 RPM & 7 kg/cm2
Gear Ratio 20:1 Horse Power @ 100 psi (7 kg/cm) 4.5 HP / 3.35 kW
Weight & DimensionsWidth 75 " / 1905 mm
Length (Boom @45°) 195 " / 4950 mm Minimum Height 44 " / 1120 mm
Height (Boom @45°) 188 " / 4775 mm Hole Size 1.75-4.5 " / 44-114 mm
Weight Less Drifter 5400 lbs. / 2450 kg. Material To Be Drilled
Hard Yes Medium Yes
Soft Yes Drill Application
Mining Yes Construction Yes
Quarry Yes Drilling Method
Drifter Yes
Copyright © 1996-2001 Ingersoll-Rand Company. All rights reserved. Ingersoll-Rand Worldwide Headquarters 200 Chestnut Ridge Road Woodcliff Lake, NJ 07675 USA
HOME BACK
EP OctpbEP 1110-1-8, Vol. 330 Nov 09
L-48
Glossary-2
AVF average value factor bhp brake horsepower CAT category CENWW U.S. Army Corps of Engineers, Walla Walla District CMR cost of money rate cwt hundredweight D diesel DC discount code DEPR depreciation DT drive tire E electricity EAF economic adjustment factor EK economic key EP Engineer Pamphlet ER Engineer Regulation FAR Federal Acquisition Regulation EFAR Engineer Federal Acquisition Regulation FCCM facilities capital cost of money FOG filters, oil, and grease FT front tire G gas G&A general and administrative gal gallon GCW gross combined weight GVW gross vehicle weight hp horsepower HPF horsepower factor hr hour ID No. identification number IGE Independent Government Estimate kW kilowatt LAF labor adjustment factor lbs pounds LIFE Chapter 1 economic life (probably should take this out) N number of years PDF portable document format PTO power take off RCF repair cost factor RF repair factor ROPS Rollover protective structures RPR repairs SLV salvage value
EP 1110-1-8, Vol. 330 Nov 09
Glossary-3
SUB subcategory TCI tire cost index TEV total equipment value TT trailing tire WHPY working hours per year wk week WLS water, lube, and supplies yr year
EP 1110-1-8, Vol. 330 Nov 09
Index-1
EQUIPMENT INDEX CAT DESCRIPTION PAGE A10 AGGREGATE / CHIP SPREADERS................................................................... 2-22
A15 AIR COMPRESSORS, PORTABLE.................................................................... 2-23
A20 AIR HOSE, TOOLS & EQUIPMENT .................................................................. 2-27
A25 ASPHALT PAVING DISTRIBUTORS ................................................................. 2-30
A30 ASPHALT PAVERS & MISCELLANEOUS ROAD EQUIPMENT........................ 2-31
A35 ASPHALT PAVING KETTLES ......... .................................................................. 2-36
A40 ASPHALT & CONCRETE MILLERS / PROFILERS / PLANERS /
ROTARY GRINDERS ....................................................................................... 2-37
A45 ASPHALT RECYCLERS & SEALERS ............................................................... 2-38
B10 BATCH PLANTS, ASPHALT & CONCRETE ..................................................... 2-39
B15 BROOMS, STREET SWEEPERS & FLUSHERS .............................................. 2-47
B20 BRUSH CHIPPERS ............................................................................................ 2-49
B25 BUCKETS, CLAMSHELL.................................................................................... 2-50
B30 BUCKETS, CONCRETE .................. .................................................................. 2-52
B35 BUCKETS, DRAGLINE ...................................................................................... 2-55
C05 CHAIN SAWS .................................. .................................................................. 2-61
C10 COMPACTORS, WALK-BEHIND OR REMOTE CONTROLLER ....................... 2-62
C15 CONCRETE CLEANERS / ABRASIVE BLASTERS........................................... 2-65
C20 CONCRETE BUGGIES ...................................................................................... 2-66
C25 CONCRETE FINISHERS/SCREEDS/SPREADERS .......................................... 2-66
C35 CONCRETE GUNITERS / SHOTCRETERS ..................................................... 2-69
C40 CONCRETE MIXING UNITS .............................................................................. 2-71
C45 CONCRETE PAVING MACHINES.. ................................................................... 2-73
C55 CONCRETE PUMPS.......................................................................................... 2-75
C60 CONCRETE SAWS (Add cost for sawblade wear)............................................. 2-77
C65 CONCRETE VIBRATORS.................................................................................. 2-79
EP 1110-1-8, Vol. 330 Nov 09
Index-2
C75 CRANES, HYDRAULIC, SELF-PROPELLED..................................................... 2-80
C80 CRANES, HYDRAULIC, TRUCK MOUNTED..................................................... 2-83
C85 CRANES, MECHANICAL, LATTICE BOOM, CRAWLER MOUNTED................ 2-85
C90 CRANES, MECHANICAL, LATTICE BOOM, TRUCK MOUNTED ..................... 2-90
C95 CRANES, TOWER ............................................................................................. 2-91
D10 DRILLS, HYDRAULIC TRACK (Add cost for drill steel and bit wear) ................. 2-94
D15 DRILLS, HORIZONTAL BORING & GROUND PIERCING (Add cost for
drill steel and bit wear) ...................................................................................... 2-96
D20 DRILLS, CORE, COLUMN MOUNTED (Add cost for drill steel and bit
wear)................................................................................................................. 2-97
D25 DRILLS, CORE & DOWELLING (Add cost for drill steel and bit wear) ............... 2-98
D30 DRILLS, EARTH / AUGER (Add cost for drill steel and cutting edge wear)...... 2-100
D35 DRILLS, ROTARY BLASTHOLE (Add cost for drill steel and bit wear) ............ 2-101
F10 FORK LIFTS ..................................................................................................... 2-103
G10 GENERATOR SETS ........................................................................................ 2-104
G15 GRADERS, MOTOR ........................................................................................ 2-106
H10 HAMMERS, HYDRAULIC (Demolition tool) (Add cost for point wear).............. 2-108
H13 HAZARDOUS/TOXIC WASTE EQUIPMENT ................................................... 2-110
H20 HOISTS & AIR WINCHES ................................................................................ 2-124
H25 HYDRAULIC EXCAVATORS, CRAWLER MOUNTED..................................... 2-125
H30 HYDRAULIC EXCAVATORS, WHEEL MOUNTED.......................................... 2-140
H35 HYDRAULIC SHOVELS, CRAWLER MOUNTED ............................................ 2-141
L10 LAND CLEARING EQUIPMENT ....................................................................... 2-142
L15 LANDSCAPING EQUIPMENT .......................................................................... 2-144
L20 LIGHTING SETS, TRAILER MOUNTED........................................................... 2-147
L25 LINE STRIPING EQUIPMENT .......................................................................... 2-148
L30 LOADERS, BELT (Conveyor belts) & ACCESSORIES..................................... 2-149
L35 LOADERS, FRONT END, CRAWLER TYPE .................................................... 2-150
L40 LOADERS, FRONT END, WHEEL TYPE ......................................................... 2-151
EP 1110-1-8, Vol. 330 Nov 09
Index-3
L50 LOADERS / BACKHOE, WHEEL TYPE............................................................ 2-155
L55 LOADER / BACKHOE, ATTACHMENTS .......................................................... 2-156
L60 LOG SKIDDERS ............................................................................................... 2-157
M10 MARINE EQUIPMENT (NON DREDGING) ..................................................... 2-158
P10 PILE HAMMER ACCESSORIES - EXTRACTORS & BOX LEADS .................. 2-163
P20 PILE HAMMERS, DOUBLE ACTING................................................................ 2-164
P25 PILE HAMMERS, SINGLE ACTING ................................................................. 2-165
P30 PILE HAMMERS, DRIVER/ EXTRACTOR, VIBRATORY................................. 2-168
P35 PIPELAYERS.................................................................................................... 2-169
P40 PLATFORMS & MAN-LIFTS............................................................................. 2-169
P45 PUMPS, GROUT .............................................................................................. 2-171
P50 PUMPS, WATER, CENTRIFUGAL, TRASH..................................................... 2-174
P55 PUMPS, WATER, SUBMERSIBLE................................................................... 2-176
P60 PUMPS, WATER, CENTRIFUGAL, DEWATERING......................................... 2-177
P65 PUMPS, WATER, DIAPHRAGM....................................................................... 2-179
P70 PUMPS, WATER (For core drills) ..................................................................... 2-180
R10 RIPPERS & HYDRAULIC BANK SLOPERS (Add cost for point wear) ............ 2-181
R15 ROLLERS, STATIC, TOWED, PNEUMATIC.................................................... 2-183
R20 ROLLERS, STATIC, TOWED, STEEL DRUM.................................................. 2-184
R30 ROLLERS, STATIC, SELF-PROPELLED......................................................... 2-184
R40 ROLLERS, VIBRATORY, TOWED................................................................... 2-188
R45 ROLLERS, VIBRATORY, SELF-PROPELLED, DOUBLE DRUM .................... 2-188
R50 ROLLERS, VIBRATORY, SELF-PROPELLED, SINGLE DRUM...................... 2-190
R55 ROOFING EQUIPMENT................................................................................... 2-193
S10 SCRAPERS, ELEVATING ................................................................................ 2-196
S15 SCRAPERS, CONVENTIONAL........................................................................ 2-196
S20 SCRAPERS, TANDEM POWERED.................................................................. 2-197
S25 SCRAPERS, TRACTOR DRAWN .................................................................... 2-198
S30 SCREENING & CRUSHING PLANTS .............................................................. 2-199
EP 1110-1-8, Vol. 330 Nov 09
Index-4
S35 SNOW REMOVAL EQUIPMENT ...................................................................... 2-213
S40 SOIL & ROAD STABILIZERS ........................................................................... 2-214
S45 SPLITTERS, ROCK & CONCRETE.................................................................. 2-215
T10 TRACTOR BLADES & ATTACHMENTS (including agricultural)....................... 2-215
T15 TRACTORS, CRAWLER (DOZER) (includes blade) ........................................ 2-218
T20 TRACTORS, WHEEL TYPE (DOZER) ............................................................. 2-222
T25 TRACTORS, AGRICULTURAL......................................................................... 2-222
T30 TRENCHERS, CHAIN TYPE CUTTER............................................................. 2-224
T35 TRENCHERS, WHEEL TYPE CUTTER ........................................................... 2-226
T40 TRUCK OPTIONS............................................................................................. 2-227
T45 TRUCK TRAILERS ........................................................................................... 2-232
T50 TRUCKS, HIGHWAY (Add attachments as required) ....................................... 2-237
T55 TRUCKS, OFF-HIGHWAY................................................................................ 2-240
T56 TRUCKS,OFF-HIGHWAY/PRIME MOVER TRACTORS & WAGONS ............. 2-243
T57 TRUCKS, VACUUM.......................................................................................... 2-243
T60 TRUCKS, WATER, OFF-HIGHWAY................................................................. 2-244
T65 TUNNEL/MINING EQUIPMENT........................................................................ 2-245
W25 WATER & CO2 BLASTERS............................................................................. 2-246
W30 WATER TANKS............................................................................................... 2-250